This document package includes construction drawings and specifications for plumbing work on a federal building project. The project involves correcting environment and condition deficiencies at the Administration Building 20 on the campus of the James H. Quillen VA Medical Center in Mountain Home, Tennessee. Work includes office, conference room, locker room, storage, mechanical and electrical room modifications along with finish material replacements. The estimated construction cost range is between $1 million and $5 million. The solicitation will be released on or around October 20, 2021 and bids will be due on or around November 20, 2021. This requirement is a 100% set-aside for Service-Disabled Veteran Owned Small Businesses. The awarded contractor must be verified in the CVE database and registered in SAM at time of proposal submission and award.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P-502
P-418
P-202
P-103P-103
P-103
P-418
P-601
P-528
1 1/2"ø V DN
2"ø UP TO FD-1 2"ø W DN
& 1 1/2" V UP
2" W A/C
OFFICE
OFFICE
WOMEN
RESTROOM
STAFF
LOUNGE
MEN
RESTROOM
CORRIDOR
CORRIDOR
OFFICER
WORK
ROOM
INTERVIEW
ROOM
EVIDENCE
PROCESSING
EVIDENCE
ROOM
OFFICE
HOUSE
KEEPING
WAITING
ROOM
RECEPTION
ELECT.
OFFICE
OFFICE
3" W UP TO P-502
ON SECOND FLOOR
P-TRAP
3" W DN
AND 2" V UP 2" W A/C
2" W UP TO FD-1 W/TP
4" W DN & 3" W UP
1 1/2"ø V A/C
2" W UP TO P-702
2"ø W A/C
2" W UP TO P-702
4"ø W
4" W IN CHASE
1 1/2" V IN CHASE
4" W UP
3" V UP
WCO
4"ø W
4"ø W
3" V UP
2"ø W
4" W IN CHASE
1 1/2" V IN
CHASE
4" W DN & 3" V UP
4"ø W
2"ø W 2"ø W
1 1/4" ARM OVER
TO P-601
WCO
WCO
WCO
OFF SET VENT LINE
AROUND DUCTWORK
AS NEEDED
2" W UP
4" W UP
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Designed
Drawing Title
Approved: Chief Engineering
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ARCHITECT/ENGINEER OF RECORD STAMP
Raymond-Pond SDVOSB JV, LLC 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592
POND & Company 3500 Parkway Lane, Suite 500 Peachtree Corners, GA 30092 678-336-7740
Raymond Engineering 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
VAMC MOUNTAIN HOME, TN
CORRECT ADMIN BLDG 20
ENVIRONMENT AND
CONDITION DEFICIENCIES
MARCH 15, 2021
BID DOCUMENTS 621-15-101
P-101
FIRST FLOOR PLUMBING SANITARY &
VENT NEW WORK PLAN
ANCH
SCALE: 3/8" = 1'-0"F1
FIRST FLOOR PLUMBING SANITARY AND VENT NEW WORK PLAN
SCALE: = 1'-0"3/8"
0 2 4 62
1. FOR PIPING UP, SEE P-102 FOR CONTINUATION.
2. FOR PIPING DN, SEE P-100 FOR CONTINUATION.
GENERAL NOTES:
REVISIONS DATE
veerendra Image
P-502
P-418
P-103
P-702
P-418
P-103
2"ø V A/C
FD-1
1 1/2"ø V UP
CONFERENCE
ROOM
CHIEF
OFFICE
ELECT.
LOBBY
MECHANICAL
ROOM
HOUSE
KEEPING
OFFICE
OFFICE
OFFICE
OFFICE
209MEN
RESTROOM
MEN
SHOWER &
LOCKER
ROOM
WOMEN
SHOWER &
LOCKER
ROOM
206A
WOMEN
RESTROOM
OIT
DEPUTY
CHIEF
OFFICE
CORRIDOR
FD-1
3"ø V A/C
3" V DN & UP
3" W DN & 3" V UP
1 1/2" ARM OVER
3" V A/C
3" V DN
4" W DN
2" V
3" V UP
& DN
3" W DN
2" V A/C
2" W DN
1 1/2"ø V
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Designed
Drawing Title
Approved: Chief Engineering
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ARCHITECT/ENGINEER OF RECORD STAMP
Raymond-Pond SDVOSB JV, LLC 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592
POND & Company 3500 Parkway Lane, Suite 500 Peachtree Corners, GA 30092 678-336-7740
Raymond Engineering 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
VAMC MOUNTAIN HOME, TN
CORRECT ADMIN BLDG 20
ENVIRONMENT AND
CONDITION DEFICIENCIES
MARCH 15, 2021
BID DOCUMENTS 621-15-101
P-102
SECOND FLOOR PLUMBING SANITARY
& VENT NEW WORK PLAN
ANCH
SCALE: 3/8" = 1'-0"F1
SECOND FLOOR PLUMBING SANITARY AND VENT NEW WORK PLAN
SCALE: = 1'-0"3/8"
0 2 4 62
1. FOR PIPING DN, SEE P-101 FOR CONTINUATION.
2. FOR PIPING UP, SEE P-103 FOR CONTINUATION.
GENERAL NOTES:
REVISIONS DATE
3" VTR
1 1/2"ø V DN
3" V DN3" VTR
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Designed
Drawing Title
Approved: Chief Engineering
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ARCHITECT/ENGINEER OF RECORD STAMP
Raymond-Pond SDVOSB JV, LLC 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592
POND & Company 3500 Parkway Lane, Suite 500 Peachtree Corners, GA 30092 678-336-7740
Raymond Engineering 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
VAMC MOUNTAIN HOME, TN
CORRECT ADMIN BLDG 20
ENVIRONMENT AND
CONDITION DEFICIENCIES
MARCH 15, 2021
BID DOCUMENTS 621-15-101
P-103
ATTIC PLUMBING SANITARY AND VENT
NEW WORK PLAN
ANCH
SCALE: = 1'-0"3/8"
0 2 4 62
SCALE: 3/8" = 1'-0"F1
ATTIC PLUMBING SANITARY AND VENT NEW WORK PLAN
1. FOR PIPING DN, SEE P-102 FOR CONTINUATION.
GENERAL NOTES:
REVISIONS DATE
2"ø DCW
3/4"ø DHW
P-528
3/4"ø DHW UP
3/4"ø DCW UP
1/2"ø DCW
1/2"ø DHW
1"ø DCW
1"ø DCW
3/4"ø DHW
EWH-1
HB-1
1/2"ø DCW
1/2"ø DCW
BFP
WITH ISO VALVE
WITH ISO VALVE
2"ø DCW
MECHANICAL
ROOM
B01
STORAGE
B02
ARMORY /
WEAPONS
B04
CORRIDOR
B03
TP
1/2" DCW TO TRAP
PRIMER W/ ISOLATION
VALVE. EXTEND 1/2"
DRAIN LINE TO FD-1.
CRAWL SPACE
CRAWL SPACE
CRAWL SPACE
CRAWL SPACE
SLAB ON GRADE
2"ø DCW UP
3/4"ø DHW UP
2"ø DCW 3/4"ø DHW
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Designed
Drawing Title
Approved: Chief Engineering
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ARCHITECT/ENGINEER OF RECORD STAMP
Raymond-Pond SDVOSB JV, LLC 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592
POND & Company 3500 Parkway Lane, Suite 500 Peachtree Corners, GA 30092 678-336-7740
Raymond Engineering 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
VAMC MOUNTAIN HOME, TN
CORRECT ADMIN BLDG 20
ENVIRONMENT AND
CONDITION DEFICIENCIES
MARCH 15, 2021
BID DOCUMENTS 621-15-101
P-200
BASEMENT PLUMBING WATER NEW
WORK PLAN
ANCH
SCALE: 3/8" = 1'-0"F1
BASEMENT PLUMBING WATER NEW WORK PLAN
SCALE: = 1'-0"3/8"
0 2 4 62
1. CONNECT NEW 3/4" DCW & DHW TO EWH-1.
2. NEW BACKFLOW PREVENTER ASSEMBLY. INSTALL ABOVE THE BACKFLOW
PREVENTER FOR FIRE PROTECTION
3. CONNECT EXISTING COLD WATER SERVICE TO NEW BACKFLOW PREVENTER.
4. EXISTING COLD WATER SERVICE TO THE BUILDING.
5. ROUTE PIPES BELOW THE CELIING.
KEYNOTES:#
1. FOR PIPING UP, SEE P-201 FOR CONTINUATION.
GENERAL NOTES:
REVISIONS DATE
P-103
P-103
P-202
P-418P-418
P-502
P-528
3/4"ø DHW DN & 1/2"ø
DHW UP
3/4"ø DCW DN & 1/2"ø
DCW UP
P-601
OFFICE
OFFICE
107 WOMEN
RESTROOM
STAFF
LOUNGE
MEN
RESTROOM
CORRIDOR
CORRIDOR
OFFICER
WORK
ROOM
INTERVIEW
ROOM
EVIDENCE
PROCESSING
EVIDENCE
ROOM
OFFICE
HOUSE
KEEPING
WAITING
ROOM
RECEPTION
ELECT.
OFFICE
OFFICE
1"ø DCW
1/2"ø DCW
1"ø DCW
1/2"ø DCW
1"ø DCW
1/2"ø DCW
1/2"ø DHW
1/2"ø DHW
1/2"ø DHW
1 1/2"ø DCW A/C
2"ø DCW DN
3/4"ø DHW DN
"ø
D C
W A
/C
1"ø DCW UP
1 1/4"ø DCW A/C 2"ø DCW A/C
3/4"ø DHW A/C
3/4"ø DCW UP 3/4"ø DHW UP
1 1/2"ø DCW A/C 1"ø DCW
1"ø DCW UP
3/4"ø DCW
3/4"ø DCW
1/2"ø DCW
1/2"ø DHW
/4
"ø D
H W
A /C
/4
"ø D
C W
A /C
/4
"ø D
H W
A /C
/4
"ø D
C W
A /C
3/4"ø DHW UP
3/4"ø DCW UP
1/2"ø DHW UP
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Designed
Drawing Title
Approved: Chief Engineering
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ARCHITECT/ENGINEER OF RECORD STAMP
Raymond-Pond SDVOSB JV, LLC 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592
POND & Company 3500 Parkway Lane, Suite 500 Peachtree Corners, GA 30092 678-336-7740
Raymond Engineering 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
VAMC MOUNTAIN HOME, TN
CORRECT ADMIN BLDG 20
ENVIRONMENT AND
CONDITION DEFICIENCIES
MARCH 15, 2021
BID DOCUMENTS 621-15-101
P-201
FIRST FLOOR PLUMBING WATER NEW
WORK PLAN
ANCH
SCALE: 3/8" = 1'-0"F1
FIRST FLOOR PLUMBING WATER NEW WORK PLAN
SCALE: = 1'-0"3/8"
0 2 4 62
1. FOR PIPING UP, SEE P-202 FOR CONTINUATION.
2. FOR PIPING DN, SEE P-200 FOR CONTINUATION.
GENERAL NOTES:
REVISIONS DATE
P-418 P-418
P-702
P-103
P-502
P-702
1/2"ø DHW 1/2"ø DCW
1/2"ø DCW
1/2"ø DCW
1/2"ø DHW
1/2"ø DHW
1/2"ø DHW
1/2"ø DCW
3/4"ø DCW DN
CONFERENCE
ROOM
CHIEF
OFFICE
ELECT.
LOBBY
MECHANICAL
ROOM
HOUSE
KEEPING
OFFICE
OFFICE
CORRIDOR
OFFICE
OFFICE
209MEN
RESTROOM
MEN
SHOWER &
LOCKER
ROOM
WOMEN
SHOWER &
LOCKER
ROOM
206A
WOMEN
RESTROOM
OIT
DEPUTY
CHIEF
OFFICE
CORRIDOR
CORRIDOR
TP
1/2" DCW TO TRAP
PRIMER W/
ISOLATION VALVE.
EXTEND 1/2" DRAIN
LINE TO FD-1.
1/2"ø DCW A/C
TP
1/2" DCW TO TRAP
PRIMER W/
ISOLATION VALVE.
EXTEND 1/2" DRAIN
LINE TO FD-1.
3/4"ø DHW DN
3/4"ø DCW DN
3/4"ø DHW DN
1/2"ø DHW DN
1/2"ø DCW DN
1"ø DCW DN
1"ø DCW
1"ø DCW DN
N
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Designed
Drawing Title
Approved: Chief Engineering
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ARCHITECT/ENGINEER OF RECORD STAMP
Raymond-Pond SDVOSB JV, LLC 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592
POND & Company 3500 Parkway Lane, Suite 500 Peachtree Corners, GA 30092 678-336-7740
Raymond Engineering 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
VAMC MOUNTAIN HOME, TN
CORRECT ADMIN BLDG 20
ENVIRONMENT AND
CONDITION DEFICIENCIES
MARCH 15, 2021
BID DOCUMENTS 621-15-101
P-202
SECOND FLOOR PLUMBING WATER
NEW WORK PLAN
ANCH
SCALE: 3/8" = 1'-0"F1
SECOND FLOOR PLUMBING WATER NEW WORK PLAN
SCALE: = 1'-0"3/8"
0 2 4 62
1. FOR PIPING DN, SEE P-201 FOR CONTINUATION.
GENERAL NOTES:
REVISIONS DATE
COMBINATION
CHECK-STOP
VALVES
SHOWER
CONTROL
VALVE TYPE
T/P
FINISHED
FLOOR
EDGE OF
SHOWER
INSTITUTIONAL
SHOWER HEAD
BALL TYPE
SHUTOFF
VALVE IN BOX
8"x8"x3"
ACCESS BOX
W/S.S. LOCKING
DOOR ON OPP.
WALL. SEE
DETAIL AT LEFT
TILE WALL
ALT HANDLE
POSITION
(CLOSED)
SHUTOFF
VALVE
SUPPLY
PIPE
ELEVATION
AA
S.S. DOOR W/VANDAL-PROOF
LOCK (KEYED)
SECTION A
ACCESS BOX W/VALVE
/2
15"
2'-0"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Designed
Drawing Title
Approved: Chief Engineering
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ARCHITECT/ENGINEER OF RECORD STAMP
Raymond-Pond SDVOSB JV, LLC 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592
POND & Company 3500 Parkway Lane, Suite 500 Peachtree Corners, GA 30092 678-336-7740
Raymond Engineering 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
VAMC MOUNTAIN HOME, TN
CORRECT ADMIN BLDG 20
ENVIRONMENT AND
CONDITION DEFICIENCIES
MARCH 15, 2021
BID DOCUMENTS 621-15-101
P-601
PLUMBING DETAILS
ANCH
SCALE: NTSF7
FLOOR CLEANOUT DETAIL
SCALE: NTSD6
VENT THROUGH ROOF DETAIL
SCALE: NTSF1
WALL CLEANOUT WITH ACCESS COVER
SCALE: NTSF4
BACKFLOW PREVENTER
SCALE: 1" = 1'-0"D1
SHOWER DETAIL
DETAIL F7 KEYNOTE LEGEND
DETAIL D6 KEYNOTE LEGEND
DETAIL F1 KEYNOTE LEGEND
DETAIL F4 KEYNOTE LEGEND
REVISIONS DATE
2" ARM OVER
SINK
3/4" INSULATED
PIPE IN WALL
TRANSITION
TO 1 1/2" PIPE
COORDINATE INLET ELEVATION WITH
DIV. 23 AND DH-1 CONDENSATE DRAIN
FURR OUT WALL
HOT WATER SUPPLY
ISOLATION GATE
VALVE (TYP)
HEATER
DRAIN
FIN. FLOOR
THERMOMETER POSITIONED TO BE
COLD WATER SUPPLY
PIPE UNION (TYP)
FULL SIZE OF VALVE
OUTLET TO 15 CM OFF FLOOR
OR TO FLOOR DRAIN WHEN AVAILABLE
ROUTE TEMPT. AND PRESS. VALVE
READ FROM FLOOR (RANGE 0-200°F)
P&T RELIEF VALVE
(SETTING BY MFR. OF HEATER)
OUTLETELECTRIC WATER
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Designed
Drawing Title
Approved: Chief Engineering
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ARCHITECT/ENGINEER OF RECORD STAMP
Raymond-Pond SDVOSB JV, LLC 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592
POND & Company 3500 Parkway Lane, Suite 500 Peachtree Corners, GA 30092 678-336-7740
Raymond Engineering 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
VAMC MOUNTAIN HOME, TN
CORRECT ADMIN BLDG 20
ENVIRONMENT AND
CONDITION DEFICIENCIES
MARCH 15, 2021
BID DOCUMENTS 621-15-101
P-602
PLUMBING DETAILS
ANCH
SCALE: N.T.S.D6
CONDENSATE DRAIN CONNECTION FOR DEHUMIDIFIER DH-1
SCALE: N.T.S.D1
WATER HEATER DETAIL
REVISIONS DATE
FIRST FLOOR
BASEMENT
SECOND FLOOR
BFP
WATER HEATER
P-418
P-528
P-103 P-103
P-502
P-528
ROOF
P-502
P-702
P-418
P-103
1/2" DCW (2 FU)
1/2" DHW (2 FU)
1/2" DCW (2 FU)
1/2" DHW (2 FU)
1/2" DCW (2 FU)
1/2" DHW (2 FU)
1/2 " DCW (2 FU)
1/2 " DHW (2 FU)
3/4" DCW (4 FU)
3/4" DHW (4 FU)
1 " DCW (6 FU)
1" DCW (6 FU)
1 1/2" DCW
(12 FU)
1/2" DCW (3 FU)
1/2" DHW (3 FU)
1/2" DCW (3 FU)
1/2" DHW (3 FU)
3/4" DCW (6 FU)
3/4" DHW (6 FU)
1/2" DHW (2 FU)
1/2" DCW (2 FU)
2" DCW 3/4" DHW
HB-1
1/2" DCW (2 FU)
1 " DCW (6 FU)
P-601
1/2" DCW (1 FU)
P-103
1 " DCW (6 FU)
P-418
P-202
3/4" DCW (4 FU)
1/2" DCW (2 FU)
1/2" DHW (2 FU)
P-418
P-702
1/2" DCW (2 FU)
1/2" DHW (2 FU)
1/2" DCW (2 FU)
1/2" DHW (2 FU)
3/4" DCW (4 FU)
3/4" DHW (4 FU)
3/4" DHW
3/4" DHW
2" DCW
1" DCW
1 1/2 " DCW
1/2 " DHW
1 1/4 " DCW
3/4 " DHW
3/4" DHW
2" DCW
1/2" DHW
1 1/2" DCW
3/4 " DCW
3/4 " DHW
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Designed
Drawing Title
Approved: Chief Engineering
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ARCHITECT/ENGINEER OF RECORD STAMP
Raymond-Pond SDVOSB JV, LLC 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592
POND & Company 3500 Parkway Lane, Suite 500 Peachtree Corners, GA 30092 678-336-7740
Raymond Engineering 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
VAMC MOUNTAIN HOME, TN
CORRECT ADMIN BLDG 20
ENVIRONMENT AND
CONDITION DEFICIENCIES
MARCH 15, 2021
BID DOCUMENTS 621-15-101
P-603
COLD AND HOT WATER RISER
SCHEMATIC
ANCH
SCALE: N.T.S.F2
COLD AND HOT WATER RISER SCHEMATIC
REVISIONS DATE
P-103 P-418
P-702
P-103 P-528 P-103 P-418 P-601
BASEMENT
ROOF
P-502
P-502
P-528
V T
R
V T
R
V
V
V
V
/2
V
/2
V
3" W
3" W
2" W
2" W
2" W
4" W
4" W 2" W 4" W 2" W
FD-1
FD-1
/2
V 2"
W
2" W
4" W UNDERFLOOR
FIRST FLOOR
SECOND FLOOR
ATTIC
FD-1
4" W
3" W
V
3" W
V
P-103 P-418
P-702
P-103 P-418 P-601
V
V
/2
V 2" W
2" W
2" W4" W 2" W
4" W
3" W
V
P-202
2" W
3" W
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Designed
Drawing Title
Approved: Chief Engineering
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
Phase
ARCHITECT/ENGINEER OF RECORD STAMP
Raymond-Pond SDVOSB JV, LLC 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592
POND & Company 3500 Parkway Lane, Suite 500 Peachtree Corners, GA 30092 678-336-7740
Raymond Engineering 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
VAMC MOUNTAIN HOME, TN
CORRECT ADMIN BLDG 20
ENVIRONMENT AND
CONDITION DEFICIENCIES
MARCH 15, 2021
BID DOCUMENTS 621-15-101
P-604
WASTE AND VENT RISER SCHEMATIC
ANCH
SCALE: N.T.S.E2
WASTE AND VENT RISER SCHEMATIC
REVISIONS DATE
| Sheets |
| P-101 - FIRST FLOOR PLUMBING SANITARY & VENT NEW WORK PLAN |
| P-102 - SECOND FLOOR PLUMBING SANITARY & VENT NEW WORK PLAN |
| P-103 - ATTIC PLUMBING SANITARY AND VENT NEW WORK PLAN |
| P-200 - BASEMENT PLUMBING WATER NEW WORK PLAN |
| P-201 - FIRST FLOOR PLUMBING WATER NEW WORK PLAN |
| P-202 - SECOND FLOOR PLUMBING WATER NEW WORK PLAN |
| P-601 - PLUMBING DETAILS |
| P-602 - PLUMBING DETAILS |
| P-603 - COLD AND HOT WATER RISER SCHEMATIC |
| P-604 - WASTE AND VENT RISER SCHEMATIC |