S02-621-15-101 - Correct Admin Bldg 20 .pdf

PDF 698 KB Posted

Attached to
Z2DZ-36C249-21-AP-3182 - 621-15-101 - Correct Admin Bldg. -20 Environment & Condition Deficiencies
Solicitation number
36C24921B0014
Issued by

About this file

This document provides a presolicitation notice for a federal contract opportunity to reconstruct space for police staff at the James H. Quillen VA Medical Center in Mountain Home, Tennessee. The project involves renovating approximately 5,454 square feet over two floors and a basement to incorporate current VA standards. Work includes demolishing interior elements and renovating walls, finishes, mechanical, electrical and security systems. The estimated value ranges from $1,000,000 to $5,000,000. The solicitation is expected to post on October 20, 2021 and close on November 20, 2021. This opportunity is a 100% set-aside for service-disabled veteran-owned small businesses. Offerors must be listed in the VIP database and have active SAM registration. The awarded contractor must enroll in VETS4212 and be deemed responsible in accordance with FAR Part 9. Questions must be submitted in writing to the specified contracting staff.

View the file

Other files

File Type Posted
36C24921B0014 0007.pdf PDF
S04- SITE VISIT ATTENDEES - Bldg 20 - 621-15-101.pdf PDF
VHA Supplemental Contract Requirements for Combatting COVID-19 Updated 12-16-2021.pdf PDF
36C24921B0014 0006.pdf PDF
S05 - VA Comprehensive Asbestos Containing Materials Inspection Report January 2010 - 2.pdf PDF
S06 - AMENDMENT 5 - 36C24921B0014 0005.pdf PDF
S05-Mountain Home TN - VA Asbestos O AND M Plan January 2010 -1.pdf PDF
S05-RFI RESPONSE QUESTIONS - B20 Correct FCA Deficiencies 12-23-2021.pdf PDF
S02-LBP DOC-Building 20 - 36C24921B0014.pdf PDF
S02-Building 20 ACM Report - 36C24921B0014.pdf PDF
S02- Solicitation - 36C24921B0014 - 621-15-101 - Amendment - 0004.pdf PDF
36C24921B0014 0003.pdf PDF
S06- AMENDMENT2 - CO AND PROJECT CONFIRMATION DATES - 36C24921B0014 0002.pdf PDF
S02-AMENDMENT1 - 621-15-101 CORRECT ADMIN BLDG 20 ENVIRONMENT COND DEF - BID SPECIFICATIONS.pdf PDF
S02- AMENDMENT 1 - 03 1200392 VA Bldg 20 ARCH 05 13 2021 Part 1.pdf PDF
S02- AMENDMENT 1 - 06 1200392 VA Bldg 20 PLMB 05 13 2021 Part 1.pdf PDF
S06-AMENDMENT 01 - 621-15-101 - 36C24921B0014 0001 - WB.pdf PDF
621 15 101 CORRECT ADMIN BLDG 20 ENVIR COND DEF BID DOCUMENTS SPECIFICATIONS VOL 1D.pdf PDF
621 15 101 CORRECT ADMIN BLDG 20 ENVIR COND DEF BID DOCUMENTS SPECIFICATIONS VOL 1A.pdf PDF
05 1200392 VA Bldg 20 FIRE 05 13 2021.pdf PDF
06 1200392 VA Bldg 20 PLMB 05 13 2021 Part 2.pdf PDF
621 15 101 CORRECT ADMIN BLDG 20 ENVIR COND DEF BID DOCUMENTS SPECIFICATIONS VOL 2D.pdf PDF
08 1200392 VA Bldg 20 ELEC 05 13 2021.pdf PDF
07 1200392 VA Bldg 20 MECH 05 13 2021.pdf PDF
09 1200392 VA Bldg 20 COMM 05 13 2021.pdf PDF
621 15 101 CORRECT ADMIN BLDG 20 ENVIR COND DEF BID DOCUMENTS SPECIFICATIONS VOL 2C.pdf PDF
S02-Contractor EMR Certification Form - 36C24921B0014.docx DOCX document
04 1200392 VA Bldg 20 INT 05 13 2021.pdf PDF
S02-TECHNICAL SPECS - Project 621-15-101.pdf PDF
02 1200392 VA Bldg 20 CIVIL 05 13 2021.pdf PDF
01 1200392 VA Bldg 20 GEN 05 13 2021.pdf PDF
621 15 101 CORRECT ADMIN BLDG 20 ENVIR COND DEF BID DOCUMENTS SPECIFICATIONS VOL 1B.pdf PDF
S02-WD - WASHINGTON TN - TN20210111 - JAN 2021.pdf PDF
03 1200392 VA Bldg 20 ARCH 05 13 2021 Part 2.pdf PDF
621 15 101 CORRECT ADMIN BLDG 20 ENVIR COND DEF BID DOCUMENTS SPECIFICATIONS VOL 1C.pdf PDF
36C24921B0014.docx DOCX document
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. SOLICITATION NUMBER 2. TYPE OF SOLICITATION 3. DATE ISSUED PAGE OF PAGES

4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER

7. ISSUED BY CODE 8. ADDRESS OFFER TO

a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)

12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

STANDARD FORM 1442 (REV. 8/2014) STANDARD FORM 1442

Prescribed by GSA-FAR (48 CFR) 52.236-1(d)

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

SOLICITATION SOLICITATION

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SEALED BID (IFB)

NEGOTIATED (RFP)

11. The Contractor shall begin performance within ____________ calendar days and complete it within ____________ calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).

YES NO

a. Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________

(hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.

b. An offer guarantee is, is not required.

c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d. Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

1 57

36C24921B0014

X

11-23-2021

621-21-1-5103-0001

621-15-101

Department of Veterans Affairs

Network Contracting Office 9 (90C)

NCO 9

1639 Medical Center Parkway, Suite 400

Murfreesboro TN 37129

Department of Veterans Affairs

Network Contracting Office 9 (90C)

NCO 9

1639 Medical Center Parkway, Suite 400

Murfreesboro TN 37129

Will Blassingame 615-225-6964

Project 621-15-101 - Correct Admin. Building 20 Environment& Condition Deficiencies. Contractor is to furnish all labor materials, supervision, equipment, and all other necessary items to completely prepare site for building operations as required per drawings, and specifications to reconstruct space for the police staff to incorporate VA standards at the James H. Quillen VA Medical Center in Mountain Home, Tennessee 37684.

NAICS Code 236220 is applicable to this requirement. The small business size standard is 39.5M. PSC Code is Z2DZ.

The project magnitude of construction is between $1,000,000.00 and $5,000,000.00

There will only be one (1) site visit on this project.

December 04, 2021 @ 8AM CT/ 9AM ET. Please make sure you have a mask to wear during the site visit.

To obtain clarifications and/or additional information concerning the contract requirement, specifications and/or drawings, submit a written Request for Information (RFI) via email to Will Blassingame, Contract Specialist at william.blassingame@va.gov, and Dewayne Knowles, Contracting Officer at Dewayne.Knowles@va.gov.

Contractor submission of RFI's will begin December 03, 2021, and the final day for Contractor RFI questions is

December 10, 2021 at 12PM CT. Questions received after the aforementioned date will not be answered unless it is determined to be in the best interest of the government as deemed by the CO. Telephone requests will not be accepted.

In accordance with Public Law 109-461, this acquisition is 100% set-aside for Service-Disabled Veteran Owned Small

Business (SDVOSB) concerns. In order to be eligible to receive an award under this solicitation, the SDVOSB contractor must be listed and viewable in the VetBiz Registry located at www.vipvetbiz.va.gov at the time of offers due and at time of award. Offerors are advised that the fast track reverification program ended September 30, 2012. Consequently, FAR 52. 204-7 System for Award Management (SAM), all prospective offerors must have an active SAM's registration at the time of offer and at the time of award.

Submit one (1) electronic copy of proposals before the proposal due date/time in block 13 to william.blassingame@va.gov, and dewayne.knowles@va.gov. Submit original hard copy of bid bonds before the proposal due date/time in block 13.

Bid bonds must be sent to: william.blassingame@va.gov.

Proposals are due to CS, William Blassingame via email (William.blassingame@va.gov) on December 23, 2021 @ 12pm Central

The Bid Opening will begin at 12pm CT via Microsoft Teams conference call.

Dial into the Bid Opening : 1-872-701-0185 and enter code 907397371.

10 365 x 52.211-10

X

1 12PM CST

12-23-2021

X

14. NAME AND ADDRESS OF OFFEROR 15. TELEPHONE NUMBER

16. REMITTANCE ADDRESS

CODE FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c)( ) 41 U.S.C. 3304(a) ( )

26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY

PHONE: FAX:

28. NEGOTIATED AGREEMENT 29. AWARD Your

Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.

shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER

TO SIGN

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE

BY

OFFER

AWARD

STANDARD FORM 1442 (REV. 8/2014) BACK

(Include ZIP Code) (Include area code)

(Include only if different than Item 14.)

(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)

(Type or print)

BOX 24

(Type or print) (Type or print)

(Contractor is required to sign this document and return _______ copies to issuing office.)

(Contractor is not required to sign this document.)

(Must be fully completed by offeror)

(To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

Bid Item 1 ____________________________________

The Bidder must provide a response to Bid Item 1.

Failure to do so will result in a rejection of the

Bid.

621-3620162-5103-854200-3220 23NR5JA02

_ x _

90C

Network Contracting Office 9

Department of Veterans Affairs

Will Blassingame c/o

1639 Medical Center Parkway Suite 400

Murfreesboro TN 37129

90C FSC e-Invoicing Payment http://www.fsc.va.gov/fsc/einvoice.asp

Invoice Setup Information 1-877-489-6135

Invoice must be submitted electronically

Setup 1-877-489-6135

Dewayne L. Knowles

Contracting Officer

Table of Contents

PART I - THE SCHEDULE

SECTION A - SOLICITATION/CONTRACT FORM

A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or

Repair)

A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION,

ALTERATION, OR REPAIR)– BACK

A.3 PRICE/COST SCHEDULE

ITEM INFORMATION

A.4 Statement of Work

A.5 VHA Supplemental Contract Requirements for Ensuring Adequate COVID-19 Safety

Protocols for Federal Contractors (Amended October 25, 2021)

INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS

2.1 52.216-1 TYPE OF CONTRACT (APR 1984)

2.2 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE

OF THE WORK (MAY 2014)

2.3 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE

EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)

2.4 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION

MATERIALS (MAY 2014)

2.5 52.228-1 BID GUARANTEE (SEP 1996)

2.6 52.233-2 SERVICE OF PROTEST (SEP 2006)

2.7 52.236-1 PERFORMANCE OF WORK BY THE CONTRACTOR (APR 1984)

2.8 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)

2.9 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB

1998)

2.10 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND

VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009)

2.11 VAAR 852.232-70 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION

CONTRACTS (WITHOUT NAS– CPM) (NOV 2018)

2.12 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)

2.13 VAAR 852.223-70 INSTRUCTIONS TO OFFERORS—SUSTAINABLE

ACQUISITION PLAN (SEP 2019)

2.14 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE

RESOLUTION (OCT 2018)

2.15 VAAR 852.236-92 NOTICE TO BIDDERS—ADDITIVE OR DEDUCTIVE BID LINE

ITEMS (APR 2019)

REPRESENTATIONS AND CERTIFICATIONS

3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2020) .. 24

3.2 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS

AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (OCT 2020)

3.3 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)

3.4 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—

CERTIFICATION (JUL 2020)

GENERAL CONDITIONS

4.1 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND

CERTIFICATIONS (DEC 2014)

4.2 52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE,

AND SERVICES DEVELOPED OR PROVIDED BY KASPERSKY LAB AND OTHER

COVERED ENTITIES (JUL 2018)

4.3 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING

RESPONSIBILITY MATTERS (OCT 2018)

4.4 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK

(APR 1984) ALTERNATE I (APR 1984)

4.5 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION

(NOV 2020)

4.6 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)

4.7 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL

LABOR RELATIONS ACT (DEC 2010)

4.8 52.223-9 ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT

FOR EPA-DESIGNATED ITEMS (MAY 2008)

4.9 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (MAY 2014)

4.10 SUPPLEMENTAL INSURANCE REQUIREMENTS

4.11 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

4.12 52.223-99 Ensuring Adequate COVID-19 Safety Protocols for Federal Contractors.

4.13 VAAR 852.219-10 VA NOTICE OF TOTAL SERVICE-DISABLED VETERAN-

OWNED SMALL BUSINESS SET-ASIDE (JUL 2019) (DEVIATION)

4.14 VAAR 852.219-74 LIMITATIONS ON SUBCONTRACTING—MONITORING AND

COMPLIANCE (JUL 2018)

4.15 VAAR 852.223-71 SAFETY AND HEALTH (SEP 2019)

4.16 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV

2018)

4.17 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION

(APR 2019)

4.18 VAAR 852.236-72 PERFORMANCE OF WORK BY THE CONTRACTOR (APR

2019)

4.19 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019)

4.20 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019)

4.21 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT

(SEP 2019)

4.22 VAAR 852.270-1 REPRESENTATIVES OF CONTRACTING OFFICERS (JAN

2008)

4.23 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018)

4.24 VAAR 852.228-70 BOND PREMIUM ADJUSTMENT (JAN 2008)

4.25 VAAR 852.232-71 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION

CONTRACTS (INCLUDING NAS– CPM) (NOV 2018)

A.3 PRICE/COST SCHEDULE

ITEM INFORMATION

ITEM

NUMB

ER

DESCRIPTION OF

SUPPLIES/SERVICES QUANTITY

UNI

T

UNIT

PRICE AMOUNT

0001 The Construction period of reconstructed space for the police staff will provide offices, a conference room, an observation room, an interview room, an evidence room with processing, male and female locker rooms, storage space, electrical and mechanical rooms, an armory with ammunition storage, lounge areas, waiting and reception areas, restrooms, corridors, circulation areas, and replacement of finish materials to incorporate current VA Standards. The design includes associated work required to demolish interior, non-structural elements and renovations to include but not limited to new walls, counters, doors, hardware, finishes, glass/glazing, mechanical, electrical, sprinklers and all associated work. New systems installed shall be designed to VA standards and meet efficiency design standards deploying the latest energy saving technology, controls, etc.

1.0 JB

GRAND

TOTAL

A.4 Statement of Work

Correct Admin Bldg. 20 Environment & Conditions Deficiencies

The reconstructed space for the police staff will provide offices, a conference room, an observation room, an interview room, an evidence room with processing, male and female locker rooms, storage space, electrical and mechanical rooms, an armory with ammunition storage, lounge areas, waiting and reception areas, restrooms, corridors, circulation areas, and replacement of finish materials to incorporate current VA Standards. The design includes associated work required to demolish interior, non-structural elements and renovations to include but not limited to new walls, counters, doors, hardware, finishes, glass/glazing, mechanical, electrical, sprinklers and all associated work. New systems installed shall be designed to VA standards and meet efficiency design standards deploying the latest energy saving technology, controls, etc. where possible.

The existing Building 20 is currently a vacant office building on the James H. Quillen VA

Campus. A previous A/E Design Task Order was awarded in February of 2015. This previous project resulted in the VA receiving design documents in PDF files representing approximately 75% design effort. The previous A/E firm is now out of business. This project will build off of the previous design to renovate approximately 5,454 square feet, two floors and a basement for use of the police serving the James. H. Quillen VA campus. The reconstructed space for the police staff will provide offices, a conference room, an observation room, an interview room, an evidence room with processing, male and female locker rooms, storage space, electrical and mechanical rooms, an armory with ammunition storage, lounge areas, waiting and reception areas, restrooms, corridors, circulation areas, and replacement of finish materials to incorporate current VA Standards. The design includes associated work required to demolish interior, non-structural elements and renovations to include but not limited to new walls, counters, doors, hardware, finishes, glass/glazing, mechanical, electrical, sprinklers and all associated work. New systems installed shall be designed to VA standards and meet efficiency design standards deploying the latest energy saving technology, controls, etc. where possible.

Statement of Bid Item(s):

A. Base Bid Item 1: Scope of Work - The Contractor shall furnish all labor, supervision, materials and equipment to perform the followings the renovation of approximately 5,454 GSF on two (2) floors and a basement of Building 20 at the

James H. Quillen VA Medical Center in Mountain Home, TN.

B. Completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work as required by drawings and specifications.

C. This work includes, but is not limited to, architectural plans, Civil, Structural, fire protection, plumbing, mechanical, electrical, data/communications, and physical security systems, within the Project Area.

Period of Performance: 365 calendar days from the issuance of the Notice to Proceed to complete the work.

The area of work is located within a complex environment and will require ALL contractor personnel and subcontractors to comply with both security and infection control procedures outlined in the specifications. All selections of materials shall be in compliance with applicable standards and codes described in VA Program Guides &

Design Specifications and shall be determined in coordination with Interior Designers at the VA facility. Master Construction Specifications Index, VA Construction Standards

Index, VA Standards Index, and Criteria are available in the Technical Information Library

(TIL): http://www.cfm.va.gov/til/.

Tasks to be accomplished:

a. Supervision/Communication - The Contractor shall provide support which shall include:

i. Single Point of Contact: Contractor will designate a representative as project manager to act as a point of contact during the planning, submittal and construction phase of the period of performance. The contractor shall also designate a Site

Superintendent that shall be present when work is being performed on site at the

VA. Prior to beginning any work, the Contractor shall supply the COR with the telephone number for the Superintendent.

ii. Manufacturers’ Representatives: Contractor will identify each manufacturer’s representative to answer any questions regarding product and service requests.

b. Planning and Drawing - Contractor will coordinate construction and phasing schedules with the COR and provide the following:

i. Contractor shall provide memo samples of final finish selections to the COR and

Interior Designer prior to order placement with manufacturer. These samples are to be organized in a 2” White D-Ring Binder and identify each line item on which the finish is to be used.

ii. Contractor shall provide “as-built” installation drawings to the COR upon project completion.

c. Site Visits - The contractor shall coordinate the following site visits with the James

H. Quillen VA Medical Center’s COR and the Contractor’s Project Manager and/or

Site Superintendent:

i. A post-award walkthrough prior to ordering materials and fixtures to field verify all measurements and existing conditions. If necessary, the contractor communicate any noted differences based on the site walkthrough to the COR and the Architect of Record.

ii. Contractor’s Project Manager and/or Site Superintendent shall be present for a post-installation walkthrough to assess, document, and address any punch-list items.

d. Deliveries - Deliveries of materials and equipment shall be made at times when the

Contractor and/or the Subcontractor are available to accept. The VA will not be responsible for accepting, receiving, or storing Contractor's and/or

Subcontractor's delivered materials.

http://www.cfm.va.gov/til/

e. Final Inspection and Acceptance - Contractor’s Project Manager and/or Site

Superintendent shall be present for a post-installation walkthrough to assess, document, and address any punch- list items.

i. Upon identification of punch-list items, contractor shall submit a remediation plan to correct deficiencies to the Interior Designers within five (5) working days.

ii. Contractor shall prepare and provide inventory spreadsheet outlining excess or unused materials and deliver those items to the main campus’ storage warehouse at the James H. Quillen VA Medical Center or coordinate storage location with the COR.

iii. Contractor shall provide a detailed list of installed property. All items that can be identified by make, model, and serial number for the purpose of routine maintenance, repair or replacement of minor and major components unique to that products assembly or system shall be included.

iv. Complete field welding and finishing shall be completed as necessary.

v. Integrated sink bowls shall be fabricated with the same material as countertops and meet the dimensions specified on the drawings.

f. Submittals

i. Submit product data, shop drawings, samples, fabrication specifications and installation instructions as specified in GENERAL REQUIREMENTS and as described herein.

ii. Submit two (2) copies of manufacturer’s data shop drawings and instructions. One

(1) copy will be retained by the Interior Designer. Submit two sets of samples, both will be retained by the Interior Designer.

iii. Submit test data from independent testing agencies indicating that all performance characteristics specified have been complied with.

iv. Submit samples of each required finish and color. Prepare samples on same materials which will be used in wall assemblies.

1. Place of Performance - James H. Quillen VAMC, Building 200, Mountain Home, TN

37684.

2. Period of Performance - All work shall be completed within 365 calendar days from the issuance of the Notice to Proceed (NTP).

3. Scheduling - Work will be performed after normal business hours Monday-Thursday, 8:00 am to 5:00 pm. All other work that is required to be performed outside of established hours will need to be approved and coordinated with the COR 10 workdays in advance. The schedule shall be coordinated with the COR prior to submission.

All other work that may be required to be performed outside of established hours will need to be approved and coordinated with the Contracting Officer’s

Representative (COR) 10 working days in advance. The schedule shall be coordinated with the COR prior to submission.

National holidays observed by the Federal Government are as follows:

New Year's Day January 1st

Martin Luther King's Birthday 3rd Monday in January

President's Day 3rd Monday in February

Memorial Day Last Monday in May

Independence Day July 4th

Labor Day 1st Monday in September

Columbus Day 2nd Monday in October

Veterans Day November 11th

Thanksgiving Day 4th Thursday in November

Christmas Day December 25th

4. Security Requirements - Contractor personnel are required to obtain VA identification badges or temporary badges for certain subcontractors were approved by the COR.

Badges are required to be worn and visible at all times.

5. Smoking Policy - The Contractor shall not allow smoking on campus. VA Mountain

Home is a smoke-free facility. Violators may receive a warning or be issued a citation.

6. Parking/Traffic Regulations - Parking Permit Request form must be completed if required. The Contractor shall not park on grassy areas unless approved by the

COR and the Contractor agrees to restore areas back to VA standards. Drivers should be particularly concerned with pedestrian traffic. Yield to pedestrians in crosswalks. Posted speed limits and all other traffic controls are to be observed by operators at all times. Seat belt use is mandatory on the VA grounds.

7. Access and Outages – The contractor shall coordinate access needs and system outages well in advance of scheduled work, but not less than 10 working days, with the COR. Contractor is responsible for investigation and research with regard to these areas and systems. System outage durations should be limited to reduce impact on other facility services, patients, visitors, and staff.

8. Noisy and Disruptive Work – The contractor shall limit impact of work activities with respect to noise, vibration, material transport and the like through scheduling, engineering controls, equipment selection, and advanced coordination with COR. Work activities shall not detrimentally impact continuous operations at the facility.

End of Statement of Work

A.5 VHA Supplemental Contract Requirements for Ensuring Adequate

COVID-19 Safety Protocols for Federal Contractors (Amended

October 25, 2021)

1. Contractor employees who work in or travel to VHA locations must comply with the following:

a. Documentation requirements:

1) If fully vaccinated, shall show proof of vaccination.

i. NOTE: Acceptable proof of vaccination includes a signed record of immunization from a health care provider or pharmacy, a copy of the COVID-19 Vaccination

Record Card (CDC Form MLS-319813_r, published on September 3, 2020), or a copy of medical records documenting the vaccination.

2) If unvaccinated and granted a medical or religious exception, shall show negative COVID-19 test results dated within three calendar days prior to desired entry date.

Test must be approved by the Food and Drug Administration (FDA) for emergency use or full approval. This includes tests available by a doctor’s order or an FDA approved over-the-counter test.

3) Documentation cited in this section shall be digitally or physically maintained on each contractor employee while in a VA facility and is subject to inspection prior to entry to VA facilities and after entry for spot inspections by Contracting Officer Representatives (CORs) or other hospital personnel.

4) Documentation will not be collected by the VA; contractors shall, at all times, adhere to and ensure compliance with federal laws designed to protect contractor employee health information and personally identifiable information.

2. Contractor employees are subject to daily screening for COVID-19 and may be denied entry to VA facilities if they fail to pass screening protocols. As part of the screening process contractors may be asked screening questions found on the COVID-19

Screening Tool. Check regularly for updates.

a. Contractor employees who work away from VA locations, but who will have direct contact with VA patients shall self-screen utilizing the COVID-19 Screening Tool, in advance, each day that they will have direct patient contact and in accordance with their person or persons who coordinate COVID-19 workplace safety efforts at covered contractor workplaces. Contractors shall, at all times, adhere to and ensure compliance with federal laws designed to protect contractor employee health information and personally identifiable information.

3. Contractor must immediately notify their COR or Contracting Officer if contract performance is jeopardized due to contractor employees being denied entry into VA

Facilities.

4. For indefinite delivery contracts: Contractor agrees to comply with FAR 52.232-99 and

VHA Supplemental Contract Requirements for any task or delivery orders issued prior to this modification when performance has already commenced.

https://www.va.gov/covid19screen/ https://www.va.gov/covid19screen/ https://www.va.gov/covid19screen/

INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO

BIDDERS/OFFERORS

2.1 52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a Firm-Fixed-Price contract resulting from this solicitation.

(End of Provision)

2.2 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—

SECONDARY SITE OF THE WORK (MAY 2014)

(a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.

(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.

(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.

(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.

(End of Provision)

2.3 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO

ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION

(FEB 1999)

(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action

Compliance Requirements for Construction clause of this solicitation.

(b) The goals for minority and female participation, expressed in percentage terms for the

Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:

Goals for minority participation for each trade

Goals for female participation for each trade

7.2 % 6.9 %

These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance

Programs office.

(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action

Compliance Requirements for Construction," and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order

11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.

(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for

Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the—

(1) Name, address, and telephone number of the subcontractor;

(2) Employer's identification number of the subcontractor;

(3) Estimated dollar amount of the subcontract;

(4) Estimated starting and completion dates of the subcontract; and

(5) Geographical area in which the subcontract is to be performed.

(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is

Murfreesboro, Tennesse

(End of Provision)

2.4 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—

CONSTRUCTION MATERIALS (MAY 2014)

(a) Definitions. "Commercially available off-the-shelf (COTS) item," "construction material,"

"domestic construction material," and "foreign construction material," as used in this provision, are defined in the clause of this solicitation entitled "Buy American—Construction Materials"

(Federal Acquisition Regulation (FAR) clause 52.225-9).

(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the

Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.

(c) Evaluation of offers.

(1) The Government will evaluate an offer requesting exception to the requirements of the

Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.

(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.

(d) Alternate offers.

(1) When an offer includes foreign solicitation in paragraph (b)(2) of the clause at FAR

52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.

(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.

(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested—

(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or

(ii) May be accepted if revised during negotiations.

(End of Provision)

2.5 52.228-1 BID GUARANTEE (SEP 1996)

(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.

(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury

Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds—

(1) To unsuccessful bidders as soon as practicable after the opening of bids; and

(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.

(c) The amount of the bid guarantee shall be 20 percent of the bid price or $3,000,000.00, whichever is less.

(d) If the successful bidder, upon acceptance of its bid by the Government within the period specified for acceptance, fails to execute all contractual documents or furnish executed bond(s) within 10 days after receipt of the forms by the bidder, the Contracting Officer may terminate the contract for default.

(e) In the event the contract is terminated for default, the bidder is liable for any cost of acquiring the work that exceeds the amount of its bid, and the bid guarantee is available to offset the difference.

(End of Provision)

2.6 52.233-2 SERVICE OF PROTEST (SEP 2006)

Protests, as defined in section 33.101 of the Federal Acquisition Regulation, that are filed directly with an agency, and copies of any protests that are filed with the Government

Accountability Office (GAO), shall be served on the Contracting Officer (addressed as follows) by obtaining written and dated acknowledgment of receipt from:

William Blassingame

Hand-Carried Address:

Department of Veterans Affairs

Network Contracting Office - 9 Attn: =William Blassingame 1639 Medical Center Parkway Murfreesboro TN 37129 Mailing Address:

Department of Veterans Affairs

Network Contracting Office - 9 Attn: William Blassingame 1639 Medical Center Parkway Murfreesboro TN 37129

(b) The copy of any protest shall be received in the office designated above within one day of filing a protest with the GAO.

2.7 52.236-1 PERFORMANCE OF WORK BY THE CONTRACTOR (APR

1984)

The Contractor shall perform on the site, and with its own organization, work equivalent to at least 15 percent of the total amount of work to be performed under the contract. This percentage may be reduced by a supplemental agreement to this contract if, during performing the work, the Contractor requests a reduction and the Contracting Officer determines that the reduction would be to the advantage of the Government.

(End of Clause)

2.8 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I

(FEB 1995)

(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and

Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, offerors or quoters are urged and expected to inspect the site where the work will be performed.

(b) An organized site visit has been scheduled for—

Friday, December 4, 2021 @ 8 AM CT

(c) Participants will meet at—

Mt. Home VAMC / Building 37 / Conference RM.103

POC: Jose Lopez / jose.lopez61@va.gov / (423)926-1171, ext. 7558

2.9 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY

REFERENCE (FEB 1998)

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):

http://www.acquisition.gov/far/index.html http://www.va.gov/oal/library/vaar/

FAR

Number

Title Date

52.204-7 SYSTEM FOR AWARD MANAGEMENT OCT 2018

mailto:jose.lopez61@va.gov

52.204-16 COMMERCIAL AND GOVERNMENT ENTITY CODE

REPORTING

AUG 2020

52.204-22 ALTERNATIVE LINE ITEM PROPOSAL JAN 2017

52.214-3 AMENDMENTS TO INVITATIONS FOR BIDS DEC 2016

52.214-4 FALSE STATEMENTS IN BIDS APR 1984

52.214-5 SUBMISSION OF BIDS DEC 2016

52.214-6 EXPLANATION TO PROSPECTIVE BIDDERS APR 1984

52.214-7 LATE SUBMISSIONS, MODIFICATIONS, AND

WITHDRAWALS OF BIDS

NOV 1999

52.214-18 PREPARATION OF BIDS—CONSTRUCTION APR 1984

52.214-19 CONTRACT AWARD—SEALED BIDDING—

CONSTRUCTION

AUG 1996

52.214-34 SUBMISSION OF OFFERS IN THE ENGLISH LANGUAGE APR 1991

52.214-35 SUBMISSION OF OFFERS IN U.S. CURRENCY APR 1991

2.10 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED

AND VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC

2009)

Prime contractors are encouraged to assist service-disabled veteran-owned and veteran-owned small business potential subcontractors in obtaining bonding, when required. Mentor firms are encouraged to assist protégé firms under VA's Mentor-Protégé Program in obtaining acceptable bid, payment, and performance bonds, when required, as a prime contractor under a solicitation or contract and in obtaining any required bonds under subcontracts.

(End of Clause)

2.11 VAAR 852.232-70 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION

CONTRACTS (WITHOUT NAS– CPM) (NOV 2018)

The clause FAR 52.232–5, Payments Under Fixed-Price Construction Contracts, is implemented as follows:

(a) Retainage.

(1) The Contracting Officer may retain funds—

(i) Where performance under the contract has been determined to be deficient or the Contractor has performed in an unsatisfactory manner in the past; or

(ii) As the contract nears completion, to ensure that deficiencies will be corrected and that completion is timely.

(2) Examples of deficient performance justifying a retention of funds include, but are not restricted to, the following—

(i) Unsatisfactory progress as determined by the Contracting Officer;

(ii) Failure to meet schedule in Schedule of Work Progress;

(iii) Failure to present submittals in a timely manner; or

(iv) Failure to comply in good faith with approved subcontracting plans, certifications, or contract requirements.

(3) Any level of retention shall not exceed 10 percent either where there is determined to be unsatisfactory performance, or when the retainage is to ensure satisfactory completion. Retained amounts shall be paid promptly upon completion of all contract requirements, but nothing contained in this paragraph (a)(3) shall be construed as limiting the Contracting Officer’s right to withhold funds under other provisions of the contract or in accordance with the general law and regulations regarding the administration of Government contracts.

(b) The Contractor shall submit a schedule of cost to the Contracting Officer for approval within 30 calendar days after date of receipt of notice to proceed. Such schedule will be signed and submitted in triplicate. The approved cost schedule will be one of the bases for determining progress payments to the

Contractor for work completed. This schedule shall show cost by the work activity/event for each building or unit of the contract, as instructed by the resident engineer.

(1) The work activities/events shall be subdivided into as many sub-activities/events as are necessary to cover all component parts of the contract work.

(2) Costs as shown on this schedule must be true costs and the resident engineer may require the

Contractor to submit the original estimate sheets or other information to substantiate the detailed makeup of the schedule.

(3) The sums of the sub-activities/events, as applied to each work activity/event, shall equal the total cost of such work activity/event. The total cost of all work activities/events shall equal the contract price.

(4) Insurance and similar items shall be prorated and included in the cost of each branch of the work.

(5) The cost schedule shall include separate cost information for the systems listed in the table in this paragraph (b)(5). The percentages listed in the following table are proportions of the cost listed in the

Contractor’s cost schedule and identify, for payment purposes, the value of the work to adjust, correct and test systems after the material has been installed. Payment of the listed percentages will be made only after the Contractor has demonstrated that each of the systems is substantially complete and operates as required by the contract.

(c) In addition to this cost schedule, the Contractor shall submit such unit costs as may be specifically requested. The unit costs shall be those used by the Contractor in preparing its bid and will not be binding as pertaining to any contract changes.

(d) The Contracting Officer will consider for monthly progress payments material and/or equipment procured by the Contractor and stored on the construction site, as space is available, or at a local approved location off the site, under such terms and conditions as the Contracting Officer approves, including but not limited to the following—

(1) The materials or equipment are in accordance with the contract requirements and/or approved samples and shop drawings;

(2) The materials and/or equipment are approved by the resident engineer;

(3) The materials and/or equipment are stored separately and are readily available for inspection and inventory by the resident engineer;

(4) The materials and/or equipment are protected against weather, theft and other hazards and are not subjected to deterioration; and

(5) The Contractor obtains the concurrence of its surety for off-site storage.

(e) The Government reserves the right to withhold payment until samples, shop drawings, engineer’s certificates, additional bonds, payrolls, weekly statements of compliance, proof of title, nondiscrimination compliance reports, or any other requirements of this contract, have been submitted to the satisfaction of the Contracting Officer.

(f) The Contracting Officer will notify the Contractor in writing within 10 calendar-days of exercising retainage against any payment in accordance with FAR clause 52.232–5(e). The notice shall disclose the amount of the retainage in value and percent retained from the payment, and provide explanation for the retainage.

(End of Clause)

2.12 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018)

(a) As an alternative to filing a protest with the Contracting Officer, an interested party may file a protest by mail or electronically with: Executive Director, Office of Acquisition and Logistics, Risk Management and Compliance Service (003A2C), Department of Veterans Affairs, 810

Vermont Avenue NW, Washington, DC 20420 or Email: EDProtests@va.gov.

(b) The protest will not be considered if the interested party has a protest on the same or similar issue(s) pending with the Contracting Officer.

(End of Provision)

2.13 VAAR 852.223-70 INSTRUCTIONS TO OFFERORS—SUSTAINABLE

ACQUISITION PLAN (SEP 2019)

Offerors shall include a Sustainable Acquisition Plan in their technical proposals. The plan must describe the approach and quality assurance mechanisms for applying FAR subpart 23.1, Sustainable Acquisition Policy and other Federal laws, regulations and Executive Orders governing sustainable acquisition. The plan shall clearly identify those products and services included in the proposal.

PLEASE NOTE: The correct mailing information for filing alternate protests is as follows:

Deputy Assistant Secretary for Acquisition and Logistics, Risk Management Team, Department of Veterans Affairs 810 Vermont Avenue, N.W.

Washington, DC 20420 Or for solicitations issued by the Office of Construction and Facilities Management:

Director, Office of Construction and Facilities Management 811 Vermont Avenue, N.W.

Washington, DC 20420

2.14 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE

RESOLUTION (OCT 2018)

(a) Any protest filed by an interested party shall—

(1) Include the name, address, fax number, email and telephone number of the protester;

(2) Identify the solicitation and/or contract number;

(3) Include an original signed by the protester or the protester’s representative and at least one copy;

(4) Set forth a detailed statement of the legal and factual grounds of the protest, including a description of resulting prejudice to the protester, and provide copies of relevant documents;

(5) Specifically request a ruling of the individual upon whom the protest is served;

(6) State the form of relief requested; and

(7) Provide all information establishing the timeliness of the protest.

(b) Failure to comply with the above may result in dismissal of the protest without further consideration.

(c) Bidders/offerors and Contracting Officers are encouraged to use alternative dispute resolution (ADR) procedures to resolve protests at any stage in the protest process. If ADR is used, the Department of Veterans Affairs will not furnish any documentation in an ADR proceeding beyond what is allowed by the Federal Acquisition Regulation.

(End of Provision)

2.15 VAAR 852.236-92 NOTICE TO BIDDERS—ADDITIVE OR DEDUCTIVE

BID LINE ITEMS (APR 2019)

(a) Additive or deductive line items in the bid schedule shall be evaluated to determine the low offeror and the items to be awarded. The evaluation shall be made as follows—

(1) Prior to the opening of bids, the Government will determine the amount of funds available for the project.

(2) The low bid shall be the Bidder that—

(i) Is otherwise eligible for award; and

(ii) Offers the lowest aggregate amount for the first or base line item, plus or minus (in the order stated in the list of priorities in the bid schedule) those additive or deductive line items that provide the most features within the funds determined available.

(3) All bids shall be evaluated on the basis of the same additive or deductive line items.

(i) If adding another item from the bid schedule list of priorities would make the award exceed the available funds for all offerors, the Contracting Officer will skip that item and go to the next item from the bid schedule of priorities; and

(ii) Add that next item if an award may be made that includes that line item and is within the available funds.

(b) The Contracting Officer will use the list of priorities in the bid schedule only to determine the low offeror. After determining the low offeror, an award may be made on any combination of items if—

(1) It is in the best interest of the Government;

(2) Funds are available at the time of award; and

(3) The low offeror’s price for the combination to be awarded is less than the price offered by any other responsive, responsible offeror.

(c) Example: ‘‘The amount available is $100,000. Offeror A’s base bid and four additives (in the order stated in the list of priorities in the bid schedule) are $85,000, $10,000, $8,000, $6,000, and $4,000. Offeror B’s base bid and four additives are $80,000, $16,000, $9,000, $7,000, and

$4,000. Offeror A is the low offeror. The aggregate amount of offeror A’s bid for purposes of award would be $99,000, which includes a base bid plus the first and fourth additives. The second and third additives were skipped because each of them would cause the aggregate bid to exceed $100,000.’’

(End of Clause)

REPRESENTATIONS AND CERTIFICATIONS

3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR

2020)

(a)(1) The North American Industry Classification System (NAICS) code for this acquisition is

236220.

(2) The small business size standard is $39.5 Million.

(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.

(b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.

(2) If the provision at 52.204–7, System for Award Management, is not included in this solicitation, and the Offeror has an active registration in the System for Award Management

(SAM), the Offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The Offeror shall indicate which option applies by checking one of the following boxes:

[ ] (i) Paragraph (d) applies.

[ ] (ii) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.

(c)(1) The following…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .