02 1200392 VA Bldg 20 CIVIL 05 13 2021.pdf
PDF 4 MB Posted
- Attached to
- Z2DZ-36C249-21-AP-3182 - 621-15-101 - Correct Admin Bldg. -20 Environment & Condition Deficiencies
- Solicitation number
- 36C24921B0014
About this file
This document provides details for a federal contract opportunity to correct environment and condition deficiencies at the Administration Building 20 of the James H. Quillen VA Medical Center in Mountain Home, Tennessee. The project involves modifications to existing areas for police staff including offices, conference rooms, observation rooms, interview rooms, evidence rooms, locker rooms, storage, electrical and mechanical rooms, and an armory. Work will include demolition, finish material replacements, and upgrades to current VA standards. The estimated contract value is between $1,000,000 and $5,000,000. The solicitation is expected to be issued on October 20, 2021 and close on November 20, 2021. This is a 100% set-aside for service-disabled veteran-owned small businesses. The awarded contractor must be verified in the CVE database and have active SAM registration. The contracting officer will determine contractor responsibility prior to award. Questions must be submitted in writing to the named contracting specialist.
View the file
Other files
Show all 36
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Designed
Drawing Title
Approved: Chief Engineering
Office of Construction and Facilities Management
U.S. Department of Veterans
Affairs
PhaseARCHITECT/ENGINEER OF RECORD STAMP
Raymond-Pond SDVOSB JV, LLC 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592
POND & Company 3500 Parkway Lane, Suite 500 Peachtree Corners, GA 30092 678-336-7740
Raymond Engineering 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
VAMC MOUNTAIN HOME, TN
CORRECT ADMIN BLDG 20
ENVIRONMENT AND
CONDITION DEFICIENCIES
MARCH 15, 2021
BID DOCUMENTS
621-15-101
HCS TLN
REVISIONS DATE
FULLY SPRINKLERED
C-001
GENERAL NOTES, LEGEND AND
ABBREVIATIONS
PROJECT NOTES:
CIVIL ENGINEER:
TANYA NORMAN
POND & COMPANY
3500 PARKWAY LANE, SUITE 500
PEACHTREE CORNERS, GA 30092
TEL: 678-336-7740
OWNER/DEVELOPER
DEPARTMENT OF VETERANS AFFAIRS
JAMES H. QUILLEN VA MEDICAL CENTER
JOHNSON CITY, TN
24-HOUR CONTACT
CONTRACTOR TO ASSIGN PRIOR TO CONSTRUCTION
GENERAL NOTES:
1. PROTECT ALL EXISTING FEATURES AND EXISTING LANDSCAPING THAT SHALL REMAIN. ANY ITEM
DAMAGED DURING THE PERFORMANCE OF THE WORK SHALL BE RESTORED TO ORIGINAL CONDITION, OR REPLACED WITH NEW AT NO ADDITIONAL COST TO THE GOVERNMENT. TAKE PRECAUTIONS TO NOT
OVERLOAD PAVEMENTS THAT SHALL REMAIN.
2. SAWCUT TO FULL DEPTH AND REMOVE FROM GOVERNMENT PROPERTY ASPHALT PAVEMENT IN THE
LOCATIONS INDICATED ON THE PLANS.
3. PROVIDE TEMPORARY SIGNS, BARRICADES, AND OTHER DEVICES TO CONTROL TRAFFIC ACCESS
AROUND CONSTRUCTION SITE. THE WORD "TRAFFIC" REFERS TO BOTH VEHICULAR AND PEDESTRIAN.
PROVIDE SIGNS, BARRICADES, AND OTHER DEVICES AS REQUIRED TO CLEARLY MARK AREAS WHERE
CONSTRUCTION TRAFFIC AND NON-CONSTRUCTION TRAFFIC MAY GO/NOT GO. COORDINATE ROAD
CLOSURE SIGNS, BARRICADES, AND OTHER DEVICES WITH OWNER'S REPRESENTATIVE PRIOR TO
PLACEMENT. PROVIDE TEMPORARY FENCING AROUND CONSTRUCTION SITE, CONTRACTOR STAGING
AREAS, AND STOCKPILE AREAS.
4. "DEMOLISH" SHALL MEAN TO REMOVE AN OBJECT IN ITS ENTIRETY. RESTORE GRADES AND SURFACE
IMPROVEMENTS TO MATCH EXISTING CONDITIONS OR REQUIREMENTS OF NEW WORK, WHICHEVER IS
APPLICABLE.
5. ALL DIMENSIONS ARE TAKEN FROM/TO FENCE LINES, EDGE OF PAVEMENT, CENTERLINE OF UTILITY, CENTER OF MANHOLE OR STRUCTURE, CENTERLINE OF ROAD, FACE OF BUILDING, CENTERLINE OF
WALL, OR CENTERLINE OF PAVEMENT STRIPING UNLESS OTHERWISE NOTED.
6. THE EXISTING CONDITIONS INFORMATION SHOWN WITHIN THESE DOCUMENTS ARE COMPILED FROM
THE FOLLOWING SOURCES:
- AERIAL IMAGERY AND AVAILABLE BASE RECORDS SHOWING EXISTING WATER DISTRIBUTION BY
THE DEPARTMENT OF VETERANS AFFAIRS (VA)
7. THE LOCATION OF EXISTING UTILITIES AND OTHER IMPROVEMENTS HAVE BEEN OBTAINED FROM THE
AVAILABLE BASE RECORDS AND CONSTRUCTION DOCUMENTS. THEREFORE, LOCATIONS OF EXISTING
CONDITIONS MUST BE CONSIDERED APPROXIMATE AND DEPTHS OF UTILITIES WITHOUT INVERTS
IDENTIFIED ARE UNKNOWN. THE VERIFICATION OF THE EXISTING UTILITIES AND OTHER IMPROVEMENTS, INCLUDING SIZE, MATERIAL, AND LOCATION EITHER SHOWN OR NOT SHOWN ON THESE PLANS SHALL BE
THE RESPONSIBILITY OF THE CONTRACTOR. LOCATE EXISTING UTILITIES VIA GEOPHYSICAL SURVEY
AND FIELD VERIFY OTHER EXISTING IMPROVEMENTS WITHOUT ADDITIONAL COST TO THE GOVERNMENT
PRIOR TO BEGINNING CONSTRUCTION. POT HOLING AND OTHER FORMS OF SURVEYING DO NOT
CONSTITUTE CONSTRUCTION ACTIVITIES. IF ANY DIFFERING CONDITIONS EXIST EITHER SHOWN OR NOT
SHOWN ON THE CONSTRUCTION DOCUMENT, THE CONTRACTOR SHALL NOTIFY THE OWNER'S
REPRESENTATIVE IMMEDIATELY.
8. VERIFY ALL DIMENSIONAL INFORMATION PRIOR TO CONSTRUCTION AND PURCHASE OF ANY MATERIALS.
BRING ANY DIFFERING CONDITIONS TO THE ATTENTION OF THE OWNER'S REPRESENTATIVE PRIOR TO
CONSTRUCTION.
9. ALL EARTHWORK OPERATIONS REQUIRED FOR CONSTRUCTION OF THE VARIOUS STRUCTURES
INDICATED SHALL BE CONDUCTED IN ACCORDANCE WITH THE APPLICABLE PROVISIONS OF THE
SPECIFICATIONS. GRADING SHALL BE RESTORED TO THE EXISTING ELEVATIONS READY TO RECEIVE
PLANTING MATERIALS, GRASSING OR PAVEMENT SECTION.
10. ALL TOPSOIL AND EXCAVATED MATERIAL SHALL BE STOCKPILED IN AN APPROVED AREA DURING
CONSTRUCTION. EXCESS OR UNUSABLE TOPSOIL SHALL BE DISPOSED OF OFF-SITE IN A MANNER THAT
IS LEGAL AND CONSISTENT WITH ALL LOCAL, STATE AND FEDERAL REQUIREMENTS.
11. REMOVE AND PROPERLY DISPOSE OF ALL CONSTRUCTION WASTE AND DEBRIS FROM THE SITE IN A
MANNER THAT IS LEGAL AND CONSISTENT WITH ALL LOCAL, STATE, AND FEDERAL REQUIREMENTS.
12. MATCH ALL NEW PAVEMENT FLUSH WITH EXISTING PAVEMENTS AND/OR EXISTING GRADE, UNLESS
OTHERWISE NOTED.
13. ALL TRAFFIC SIGNS AND PAVEMENT MARKINGS SHALL BE IN ACCORDANCE WITH THE "MANUAL ON
UNIFORM TRAFFIC CONTROL DEVICES" (MUTCD), LATEST EDITION.
14. USE CAUTION AROUND ANY UNDERGROUND CABLE OR UTILITY TO PREVENT DAMAGE. ANY DAMAGE TO
EXISTING UTILITY LINES SHALL BE REPAIRED OR REPLACED TO THE SATISFACTION OF THE OWNER'S
REPRESENTATIVE AT NO ADDITIONAL CHARGE TO THE GOVERNMENT. HAND EXCAVATE WHERE
NECESSARY TO PROTECT EXISTING UTILITY.
15. CONTRACTOR'S MEANS, METHODS, SEQUENCE, TECHNIQUES OR PROCEDURES IN PERFORMING THE
WORK IS SOLELY THE RESPONSIBILITY OF THE CONTRACTOR. CONTRACTOR IS ALSO RESPONSIBLE
FOR COMPLYING WITH ALL HEALTH AND SAFETY PRECAUTIONS AS REQUIRED BY ANY REGULATORY
AGENCY.
16. THE DESIGN ADEQUACY AND SAFETY OF ALL BRACING, EXCAVATIONS, SHORING AND TEMPORARY
SUPPORTS, ETC. IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR
17. THE SHEETS CONTAINED WITHIN THE CONSTRUCTION DOCUMENTS ARE PART OF A MULTI-SHEET SET
OF CONSTRUCTION PLANS AND SHALL BE READ WITH THE FULL SET TO BEST ENSURE PROPER
INTERPRETATION.
18. CONTRACTOR SHALL COORDINATE LOCATION OF CONTRACTOR PARKING, STAGING, STOCK PILE AND
CONCRETE WASHOUT AREAS WITH COR.
AND
ADDITIVE BID ITEM
ALABAMA DEPARTMENT OF TRANSPORTATION
ANTI-TERRORISM FORCE PROTECTION
AMERICAN WATER WORKS ASSOCIATION
BACK OF CURB AND GUTTER (AT FINISHED GRADE)
BACK FLOW PREVENTER
BUILDING
CATCH BASIN
CAST IRON
CHAIN LINK FENCE
CLEANOUT
COMMUNICATIONS
CONCRETE
CONTRACTING OFFICER'S REPRESENTATIVE
CORRUGATED METAL PIPE
DOUBLE
DEPARTMENT
DROP INLET
DIAMETER
DUCTILE IRON PIPE
DEPARTMENT OF DEFENSE
EASTING
EACH
ELECTRIC
ELEVATION
ENGINEER OF RECORD
EDGE OF PAVEMENT
EXISTING
EACH WAY
FIRE DEPARTMENT CONNECTION
FINISHED FLOOR ELEVATION
FLANGE
FORCE MAIN
FOREIGN OBJECTS & DEBRIS
FOOT
FIRE WATER
GAS
GROUND
HEIGHT
HIGH VELOCITY OXYGEN FUEL
HORIZONTAL
HIGH POINT
HORSEPOWER
HEADWALL
INVERT
JUNCTION BOX
POUND
LINEAR FEET
LIMITS OF DISTURBANCE
LIQUID OXYGEN
MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES
MAXIMUM
MITERED END SECTION
MECHANICAL
MANHOLE
MINIMUM
MONITORING WELL
NOT APPLICABLE
NOT IN CONTRACT
NITROGEN
NUMBER
NOT TO SCALE
ON CENTER
OUTLET CONTROL STRUCTURE
POINT OF CURVATURE
PORTLAND CONCRETE CEMENT
POST INDICATOR VALVE
PERSONAL OCCUPANCY VEHICLE
PARKING
PROPOSED
POUNDS PER SQUARE INCH
POINT OF TANGENCY
POLYVINYL CHLORIDE PIPE
POTABLE WATER
REINFORCED CONCRETE PAVEMENT
ROOF DRAIN
REINFORCED CONCRETE PIPE
REINFORCING
REDUCED PRESSURE BACKFLOW
PREVENTER
SANITARY
SMALL AIR TERMINAL
SPECIFICATION
STORM DRAIN
SILT FENCE
SANITARY SEWER
STANDARD
STEAM
STORMWATER MANAGEMENT
TENNESSEE DEPARTMENT OF ENVIRONMENTAL CONTROL
TENNESSEE EXOTIC PEST PLAN COUNCIL
TENNESSEE DEPARTMENT OF TRANSPORTATION
TO BE DETERMINED
TOP OF PAVEMENT
TOP OF SLAB
TYPICAL
UNDERGROUND ELECTRIC
UNLESS NOTED OTHERWISE
VETERANS AFFAIRS
VERTICAL
VITRIFIED CLAY PIPE
WATER
WITH
ABI
ALDOT
ATFP
AWWA
BC
BFP
BLDG
CB
CI
CLF
CO
COMM
CONC
COR
CMP
DBL
DEPT
DI
DIA
DIP
DOD
E
EA
ELEC.
ELEV/EL
EOR
EP
EX
E.W.
FDC
FFE
FLG
FM
FOD
FT
FW
G
GRND
H
HVOF
HORIZ.
HP
Hp
HW
INV
JB
LB
LF
LOD
LOX
MUTCD
MAX
MES
MECH
MH
MIN
MW
N/A
NIC
N
NO.
NTS
O.C.
OCS
PC
PCC
PIV
POV
PRKG
PROP
PSI
PT
PVC
PW
R
RD
RCP
REINF
RPZ
SAN
S.A.T.
SPEC
SD
SF
SS
STD
STM
SWM
TDEC
TNEPPC
TDOT
TBD
T.O.P.
T.O.S.
TYP
UGE
UNO
VA
VERT.
VCP
W
W/
ABBREVIATIONS
EXISTING PROPOSEDDESCRIPTION
CIVIL LEGEND
FWFIRE SERVICE LINE
REMOVAL
N/A
WATER VALVE
CONCRETE THRUST BLOCK
N/A
GENERAL EROSION & SEDIMENT CONTROL NOTES:
1. DURING CONSTRUCTION, THE CONTRACTOR SHALL MAINTAIN CAREFUL SCHEDULING AND PERFORMANCE
TO ENSURE THAT LAND STRIPPED OF ITS NATURAL GROUND COVER IS EXPOSED ONLY IN SMALL
QUANTITIES AND THEREFORE LIMITED DURATIONS, BEFORE PERMANENT EROSION PROTECTION IS
ESTABLISHED.
2. EROSION & SEDIMENT CONTROL PRACTICES SHALL MEET THE STANDARDS OF THE TENNESSEE EROSION
AND SEDIMENT CONTROL HANDBOOK , AND ANY APPLICABLE LOCAL HANDBOOKS.
3. A COPY OF THE APPROVED LAND DISTURBANCE PLAN AND PERMIT SHALL BE PRESENT ON THE SITE
WHENEVER LAND DISTURBANCE ACTIVITY IS IN PROGRESS.
4. PRIOR TO THE LAND DISTURBING CONSTRUCTION, THE CONTRACTOR SHALL SCHEDULE A
PRE-CONSTRUCTION MEETING WITH THE AREA SITE DEVELOPMENT INSPECTOR.
5. PRIOR TO COMMENCING LAND DISTURBANCE ACTIVITY, THE LIMITS OF LAND DISTURBANCE SHALL BE
CLEARLY AND ACCURATELY DEMARCATED WITH STAKES, RIBBONS, OR OTHER APPROPRIATE MEANS.
THE LOCATION AND EXTENT OF ALL AUTHORIZED LAND DISTURBANCE ACTIVITY SHALL BE DEMARCATED
FOR THE DURATION OF THE CONSTRUCTION ACTIVITY. NO LAND DISTURBANCE SHALL OCCUR OUTSIDE
THE APPROVED LIMITS INDICATED ON THE APPROVED PLANS.
6. CONSTRUCTION MAY BEGIN ONLY AFTER THE INSTALLATION OF EROSION & SEDIMENT CONTROL
MEASURES ARE DEEMED SUFFICIENT TO CONTROL SEDIMENT DEPOSITS AND PREVENT EROSION. ALL
CONTROL MEASURES SHALL BE MAINTAINED UNTIL UPSTREAM DISTURBANCE WITHIN THE
CONSTRUCTION AREA HAS BEEN COMPLETELY STABILIZED.
7. DISTURBED AREAS SHALL BE STABILIZED WITH TEMPORARY VEGETATION OR MULCH IF LAND-DISTURBING
ACTIVITIES CEASE FOR MORE THAN 14 CALENDAR DAYS.
8. ADDITIONAL EROSION & SEDIMENT CONTROL MEASURES SHALL BE EMPLOYED WHERE DETERMINED
NECESSARY BY ACTUAL SITE CONDITIONS.
9. WHEN ANY CONSTRUCTION BORDERS A DRAINAGE COURSE:
a. THE CONTRACTOR IS RESPONSIBLE FOR REMOVING ANY EXCAVATION SPOIL DIRT, CONSTRUCTION
TRASH OR DEBRIS, ETC. FROM THE DRAINAGE AREAS SHOWN HEREON IN AN EXPEDITIOUS MANNER
AS CONSTRUCTION PROGRESSES.
b. THE CONTRACTOR HEREBY AGREES TO STOP ALL WORK AND RESTORE THESE AREAS IMMEDIATELY
UPON NOTIFICATION BY THE INSPECTOR AND/OR THE PROFESSIONAL ENGINEER.
10. FAILURE TO INSTALL, OPERATE OR MAINTAIN EROSION & SEDIMENT CONTROL MEASURES WILL RESULT
IN CONSTRUCTION BEING STOPPED UNTIL DEFICIENCIES ARE CORRECTED.
11. MAINTENANCE OF ALL SOIL EROSION AND SEDIMENTATION CONTROL MEASURES AND PRACTICES, WHETHER TEMPORARY OR PERMANENT, SHALL BE AT ALL TIMES THE RESPONSIBILITY OF THE
CONTRACTOR.
12. ALL DISTURBED AREAS LEFT MULCHED AFTER 30 DAYS SHALL BE STABILIZED WITH TEMPORARY
VEGETATION IN ACCORDANCE WITH DETAILS D1 AND C5 ON SHEET C-502.
WATER SERVICE LINE
W
N/A
N/A
SANITARY SEWER
SS
N/A
UNDERGROUND ELECTRIC
UE
UNDERGROUND COMMUNICATIONS
UC
N/A
STORM SEWER
ST
N/A
STEAM DISTRIBUTION SERVICE
SM
N/A
03/15/2021
UE UE
W W
W W
W W
W W
W W
W
W
L O
D L O
D L O
D L O
D L O
D
L O
D
LOD
L O
D
LOD
LOD
LOD
L O
D L O
D L O
D L O
D L O
D
L O
D
F W
F W
F W
F W
F W
F W
U E
U E
U E
U E
U E
U E
DN
DN
UP
124 SF
OFFICE
124 SF
OFFICE
68 SF
WOMEN
RESTROOM
175 SF
STAFF
LOUNGE
61 SF
MEN
RESTROOM
115 SF
CORRIDOR
255 SF
CORRIDOR
375 SF
OFFICER
WORK
ROOM
139 SF
INTERVIEW
ROOM
68 SF
EVIDENCE
PROCESSING
67 SF
EVIDENCE
ROOM
11492 SF
OFFICE
14 SF
HOUSE
KEEPING
278 SF
WAITING
ROOM
110 SF
RECEPTION
19 SF
ELECT.
131 SF
OFFICE
131 SF
OFFICE
IG201
C1
IG202
C1
IG202
C4
IG203
E1
IG203
C1
LOD
LOD
LOD
L O
D L O
D L O
D
L O
D
L O
D
LOD
L O
D
LOD
LOD
L O
D L
O D
LOD
LOD
LOD
L O
D
UE
UE
UE
UE
UE
UE
UE
UE
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
S
T
ST
S T
S T
S T
S T
ST
S
T
UE
UE
UE
UE
UE
UE
U
E
U
E
U
E
U
E
U
E
U
E
U
E
U
E
U
E
U
E
U
E
U
E
U
E
U
E
S M
S M
S M
S M
S M
S M
S M
U
C
U
C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U
C
U
C
U
C
U
C
U
C
U
C
PIV
W W
W W
W W
W W
W
L O
D L O
D L O
D L O
D L O
D
L O
D
LOD
L O
D
LOD
LOD
LOD
L O
D L O
D L O
D L O
D L O
D
L O
D
124 SF
OFFICE
124 SF
OFFICE
68 SF
WOMEN
RESTROOM
175 SF
STAFF
LOUNGE
61 SF
MEN
RESTROOM
115 SF
CORRIDOR
255 SF
CORRIDOR
375 SF
OFFICER
WORK
ROOM
139 SF
INTERVIEW
ROOM
68 SF
EVIDENCE
PROCESSING
67 SF
EVIDENCE
ROOM
92 SF
OFFICE
14 SF
HOUSE
KEEPING
278 SF
WAITING
ROOM
110 SF
RECEPTION
19 SF
ELECT.
131 SF
OFFICE
131 SF
OFFICE
IG201
C1
IG202
C1
IG202
C4
IG203
E1
IG203
C1
LOD
LOD
LOD
L O
D L O
D L O
D
L O
D
L O
D
LOD
L O
D
LOD
LOD
L O
D L
O D
LOD
LOD
LOD
L O
D
UE
UE
UE
UE
UE
UE
UE
UE
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
SS
S
T
ST
S T
S T
S T
S T
ST
S
T
UE
UE
UE
UE
UE
UE
U
E
U
E
U
E
U
E
U
E
U
E
U
E
U
E
U
E
U
E
U
E
U
E
U
E
U
E
S M
S M
S M
S M
S M
S M
S M
U
C
U
C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U
C
U
C
U
C
U
C
U
C
U
C
W W
W W
W W
W W
W W
W
LOD
L O
D L O
D L O
D L O
D L
O D
L O
D L
O D
L O
D L
O D
L O
D
L O
D L
O D
L O
D L
O D
L O
D L
O D
L O
D L O
D
LOD
LOD
124 SF
OFFICE
124 SF
OFFICE
68 SF
WOMEN
RESTROOM
175 SF
STAFF
LOUNGE
61 SF
MEN
RESTROOM
115 SF
CORRIDOR
255 SF
CORRIDOR
375 SF
OFFICER
WORK
ROOM
139 SF
INTERVIEW
ROOM
68 SF
EVIDENCE
PROCESSING
67 SF
EVIDENCE
ROOM
11492 SF
OFFICE
14 SF
HOUSE
KEEPING
278 SF
WAITING
ROOM
110 SF
RECEPTION
19 SF
ELECT.
131 SF
OFFICE
131 SF
OFFICE
IG201
C1
IG202
C1
IG202
C4
IG203
E1
IG203
C1
LOD
LOD
LOD
LOD
LOD
LOD
L O
D L
O D
L O
D L O
D L
O D
L O
D
L O
D
L O
D
L O
D
L O
D
LOD
LOD
LOD
L O
D
L O
D
LOD
LOD
LOD
L O
D L
O D
L O
D L
O D
L O
D
LOD
LOD
LOD
LOD
LOD
L O
D
L O
D
UE
UE
UE
UE
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S S
S S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
SS
SS
SS
SS
SS
SS
SS
SS
S
T
S
T
ST
ST
ST
S T
S T
S T
S T
S T
S T
S T
ST
ST
ST
S
T
S
T
U
E
S M
S M
S M
S M
S M
S M
S M
S M
S M
U
C
U
C
U
C
U
C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U
C
U
C
U
C
U
C
U C
U
C
U
C
U
C
U
C
W W
W W
W W
W W
W W
W
LOD
L O
D L O
D L O
D L O
D L O
D L O
D L O
D L O
D L O
D L O
D
L O
D L O
D L O
D L O
D L O
D L O
D L O
D L O
D
LOD
LOD
F W
F W
F W
F W
F W
F W
F W
F W
F W
F W
F W
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
U E
124 SF
OFFICE
124 SF
OFFICE
68 SF
WOMEN
RESTROOM
175 SF
STAFF
LOUNGE
61 SF
MEN
RESTROOM
115 SF
CORRIDOR
255 SF
CORRIDOR
375 SF
OFFICER
WORK
ROOM
139 SF
INTERVIEW
ROOM
68 SF
EVIDENCE
PROCESSING
67 SF
EVIDENCE
ROOM
11492 SF
OFFICE
14 SF
HOUSE
KEEPING
278 SF
WAITING
ROOM
110 SF
RECEPTION
19 SF
ELECT.
131 SF
OFFICE
131 SF
OFFICE
IG201
C1
IG202
C1
IG202
C4
IG203
E1
IG203
C1
LOD
LOD
LOD
LOD
LOD
LOD
L O
D L O
D L O
D L O
D L O
D
L O
D
L O
D
L O
D
L O
D
L O
D
LOD
LOD
LOD
L O
D
L O
D
LOD
LOD
LOD
L O
D L O
D L O
D L O
D L O
D
LOD
LOD
LOD
LOD
LOD
L O
D
L O
D
UE
UE
UE
UE
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S
T
S S
S S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
S
SS
SS
SS
SS
SS
SS
SS
SS
S
T
S
T
ST
ST
ST
S T
S T
S T
S T
S T
S T
S T
ST
ST
ST
S
T
S
T
U
E
S M
S M
S M
S M
S M
S M
S M
S M
S M
U
C
U
C
U
C
U
C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U C
U
C
U
C
U
C
U
C
U C
U
C
U
C
U
C
U
C
W W
W W
W
L O
D
LOD
LOD
LOD
L O
D
L O
D
LOD
LOD
LOD
LOD LOD
LOD
L O
D L O
D
S
T
S
S
S
S
S
S
S M
S M
S M
S M
U C
U C
U C
U C
W W
W W
W
W
L O
D
LOD
LOD
LOD
L O
D
L O
D
LOD
LOD
LOD
LOD LOD
LOD
L O
D L O
D L O
D
FW
FW
F W
F W
U E
U E
S
T
S
S
S
S
S
S
S M
S M
S M
S M
U C
U C
U C
PIV
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Designed
Drawing Title
Approved: Chief Engineering
Office of Construction and Facilities Management
U.S. Department of Veterans
Affairs
PhaseARCHITECT/ENGINEER OF RECORD STAMP
Raymond-Pond SDVOSB JV, LLC 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592
POND & Company 3500 Parkway Lane, Suite 500 Peachtree Corners, GA 30092 678-336-7740
Raymond Engineering 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
VAMC MOUNTAIN HOME, TN
CORRECT ADMIN BLDG 20
ENVIRONMENT AND
CONDITION DEFICIENCIES
MARCH 15, 2021
BID DOCUMENTS
621-15-101
HCS TLN
REVISIONS DATE
FULLY SPRINKLERED
KEYNOTES
1. APPROXIMATE LOCATION OF EXISTING 2" WATER LINE TO REMAIN.
2. APPROXIMATE LOCATION OF EXISTING VALVE TO REMAIN.
3. DEMOLISH EXISTING ASPHALT PAVEMENT AS NECESSARY FOR
INSTALLATION OF NEW 4" FIRE SERVICE LINE AND RAMP AND STAIR
COLUMNS/FOUNDATIONS.
4. NEW 4" C900 PVC UNDERGROUND FIRE WATER SERVICE PIPE.
CONNECT TO EXISTING 4" UNDERGROUND WATER SERVICE PIPE WITH
TAPPING SLEEVE AND VALVE.
5. ASPHALT PAVEMENT PATCH. REPLACE ASPHALT PAVEMENT AFTER
INSTALLATION OF 4" FIRE WATER SERVICE LINE. SEE DETAIL C5/C-501.
CONTRACTOR TO MATCH EXISTING ASPHALT DEPTH AND BASE.
RESTRIPE PAVEMENT TO MATCH EXISTING PAVEMENT STRIPING
PATTERN AND COLOR.
6. 4" GATE VALVE. SEE DETAIL C7/C-501.
7. COMPOST FILTER SOCK. SEE DETAIL C1/C-501.
8. APPROXIMATE LOCATION OF EXISTING 4" WATER LINE. PROTECT
WATER LINE DURING CONSTRUCTION.
9. LIMITS OF DISTURBANCE.
10. THRUST BLOCK. SEE DETAIL F5/C-501.
11. ACCESSIBLE RAMP, SEE SHEETS A-101 AND A-402 FOR DETAILS.
ACCESSIBLE RAMP SLOPE SHALL NOT EXCEED 1:20. INSTALL LANDINGS
AT TOP AND BOTTOM OF RAMP WITH CROSS SLOPES NOT TO EXCEED
2. CONTRACTOR SHALL VERIFY EXISTING GRADES PRIOR TO START
OF WORK TO ENSURE ACCESSIBLE SLOPES ARE NOT EXCEEDED.
12. CONCRETE SIDEWALK. SEE DETAIL F1/C-501.
13. MATCH PAVEMENT FLUSH WITH EXISTING PAVEMENT.
14. NEW EXTERIOR STAIR TO SECOND FLOOR. REPLACE PAVEMENT AS
NEEDED AFTER STAIR COLUMNS AND FOUNDATIONS ARE INSTALLED.
SEE SHEETS A-101 AND A-402 FOR INFORMATION.
15. DEMOLISH EXISTING HEADER CURB.
16. BOLLARD. SEE DETAIL E9/C-501.
17. DEMOLISH EXISTING CONCRETE RAMP.
18. CONCRETE HEADER CURB. SEE DETAIL F3/C-501.
19. EXISTING MECHANICAL EQUIPMENT.
20. NEW MECHANICAL EQUIPMENT AND CONCRETE PAD. SEE M-101 FOR
ADDITIONAL INFORMATION.
21. FDC. SEE F-101 FOR ADDITIONAL INFORMATION.
22. BACKFLOW PREVENTER TEST HEADER. SEE F-101 FOR ADDITIONAL
INFORMATION.
23. DEMOLISH EXISTING CURB AND GUTTER.
24. PROTECT EXISTING FIRE HYDRANT TO REMAIN.
25. APPROXIMATE LOCATION OF EXISTING 6" SANITARY SEWER TO
REMAIN.
26. CURB AND GUTTER. SEE DETAIL F9/C-502.
27. POST INDICATOR VALVE (PIV). SEE DETAIL C9/C-501.
SHEET NOTES
1. REFER TO SHEET C-001 FOR GENERAL NOTES, LEGEND AND
ABBREVIATIONS.
2. NEW FIRE WATER SERVICE LINE MATERIAL SHALL BE IN ACCORDANCE
WITH AWWA C900 AND NFPA 12 AND 24.
3. REFER TO DETAIL B5/C-501 FOR PIPE BEDDING DETAILS FOR NEW FIRE
WATER SERVICE LINE
4. MULCH AND SEED ALL GRASSED AREAS DISTURBED BY INSTALLATION
OF FIRE WATER SERVICE LINE AND APPURTENANCES UPON
COMPLETION OF WORK. SEE DETAILS ON SHEET C-502.
5. INFORMATION SHOWN IS BASED ON AERIAL IMAGERY AND GIS DATA
PROVIDED BY THE VA. THE CONTRACTOR SHALL VERIFY LOCATION OF
EXISTING UTILITIES AND SITE FEATURES WITHIN THE LIMITS OF
DISTURBANCE PRIOR TO START OF WORK AND NOTIFY COR OF ANY
DISCREPANCIES IF FOUND.
6. CONTRACTOR SHALL NOTIFY COR AT LEAST 7 DAYS PRIOR TO
DISCONNECTION OF UTILITIES.
7. INSTALL EXPANSION JONIT IN ACCORDANCE WITH DETAIL D1 ON
SHEET C-501 WHERE NEW CONCRETE SIDEWALK AND/OR RAMPS ABUT
BUILDING FOUNDATION AND AT THE END OF RAMPS AND STAIRS.
8. REFER TO SHEET A-402 FOR STAIR AND RAMP DIMENSIONS. MATCH
NEW SIDEWALK TO WIDTH OF ADJOINING STAIR AND RAMP.
LEGEND
DEMOLISH UTILITY.
DEMOLISH CONCRETE HEADER CURB.
DEMOLISH ASPHALT.
ASPHALT PAVEMENT PATCH.
LIMITS OF DISTURBANCE.
SCALE: 1" = 20'
F1
SITE, UTILITY PLAN & EROSION CONTROL
SCALE: 1" = 20'
0 20' 40' 60'10'
C1
DEMOLITION PLAN
COMPOST FILTER SOCK .
STABILIZATION WITH STRAW MULCH.
SEE DETAIL D1/C-502.
STABILIZATION WITH PERMANENT
VEGETATION. SEE DETAIL F1/C-502.
STABILIZATION WITH TEMPORARY
VEGETATION. SEE DETAIL C5/C-502.
C6
ENLARGED DEMOLITION PLAN
F6
ENLARGED SITE, UTILITY PLAN & EROSION CONTROL
C-110
DEMOLITION, SITE, UTILITY, &
EROSION CONTROL PLAN
LOD
MU
PS
SCALE: 1" = 10'
0 30'
SCALE: 1" = 10'
5' 20'10'
MU
PS
SEE ENLARGED VIEW
F6 THIS SHEET
SEE FIRE
PROTECTION PLANS
FOR CONTINUATION
SEE ENLARGED VIEW
C6 THIS SHEET
EX. BLDG 20
EX. BLDG 20
EX. BLDG 20
EX. BLDG 20
N
TS
TS
PROTECT EXISTING UTILITIES WITHIN
WORK AREA DURING ALL PHASES OF
CONSTRUCTION.
PROTECT EXISTING UTILITIES WITHIN
WORK AREA DURING ALL PHASES OF
CONSTRUCTION.
MATCHLINE - SEE C6 THIS SHEET
MATCHLINE - SEE C6 THIS SHEET
MATCHLINE - SEE F6 THIS SHEET
MATCHLINE - SEE F6 THIS SHEET
PS
3/4" GALVANIZED RIGID
STEEL CONDUIT
03/15/2021
MU
TS
SCALE: 1" = 20'
SCALE: 1" = 10'
Drawing Number
Project Title
Location
Issue Date Checked Designed
Drawing Title
Approved: Chief Engineering
Office of Construction and Facilities Management
U.S. Department of Veterans
Affairs
PhaseARCHITECT/ENGINEER OF RECORD STAMP
Raymond-Pond SDVOSB JV, LLC 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592
POND & Company 3500 Parkway Lane, Suite 500 Peachtree Corners, GA 30092 678-336-7740
Raymond Engineering 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
VAMC MOUNTAIN HOME, TN
CORRECT ADMIN BLDG 20
ENVIRONMENT AND
CONDITION DEFICIENCIES
MARCH 15, 2021
BID DOCUMENTS
621-15-101
HCS TLN
REVISIONS DATE
FULLY SPRINKLERED
C-501
CONSTRUCTION & EROSION
CONTROL DETAILS
SCALE: N.T.S.
B5
PIPE BEDDING DETAIL
MIN.
P
I P
E
O
D
UNDISTURBED
INITIAL BACKFILL
BEDDING MATERIAL
1'-0"
SOIL (TYP.)
M
I N
P I P
E
O D
P I P
E
O
D
M
I N
INSTALLATION NOTES:
1. COMPOST FILTER SOCKS SHOULD BE INSTALLED
PARALLEL TO THE BASE OF THE SLOPE OR OTHER
DISTURBED AREA. IN EXTREME CONDITIONS (I.E., 2:1
SLOPES), A SECOND COMPOST FILTER SOCK SHALL
BE CONSTRUCTED AT THE TOP OF THE SLOPE.
2. SINCE THE SITE IS PAVED, HEAVY CONCRETE BLOCKS
SHALL BE USED BEHIND THE COMPOST FILTER
SOCKS TO HELP STABILIZE DURING
RAINFALL/RUNOFF EVENTS.
3. LOOSE COMPOST MAY BE BACKFILLED ALONG THE
UPSIDE OF THE COMPOST FILTER SOCK, FILLING THE
SEAM BETWEEN THE SOIL SURFACE AND THE DEVICE,
IMPROVING FILTRATION AND SEDIMENT RETENTION.
ENSURE CONTINUOUS CONTACT BETWEEN COMPOST
FILTER SOCK AND PAVEMENT.
MAINTENANCE NOTE:
1. SEDIMENT SHALL BE REMOVED ONCE IT HAS
ACCUMULATED TO ONE-HALF THE ORIGINAL HEIGHT
OF THE BARRIER. COMPOST FILTER SOCKS SHALL BE
REPLACED WHENEVER IT HAS DETERIORATED TO
SUCH AN EXTENT THAT THE EFFECTIVENESS OF
COMPOST FILTER SOCK IS REDUCED. COMPOST
FILTER SOCKS SHALL REMAIN IN PLACE UNTIL
DISTURBED AREAS HAVE BEEN PERMANENTLY
STABILIZED. ALL SEDIMENT ACCUMULATION AT THE
COMPOST FILTER SOCK SHALL BE REMOVED AND
PROPERLY DISPOSED OF BEFORE THE COMPOST
FILTER SOCK IS REMOVED.
TO BE USED INSTEAD OF SILT FENCE AROUND PAVEMENT CUTS AND EXCAVATION
SCALE: N.T.S.
F5
THRUST BLOCKING DETAIL & DIMENSIONS
SCALE: N.T.S.
C5
ASPHALT PAVEMENT PATCH
SCALE: N.T.S.
C7
GATE VALVE & VALVE BOX
SCALE: N.T.S.
C1
COMPOST FILTER SOCK
DISTURBED (WORK) AREA
FLOW
DISTURBED
(WORK) AREA
AREA TO BE PROTECTED
FLOW
AREA TO BE PROTECTED
CROSS-SECTION
PLAN
NOTE: FILTER SOCK SIZED TO SUIT
CONDITIONS AND AT LEAST 18" DIA
FILTER SOCK
EXISTING CONTOURS
COMPOST FILTER SOCK
WOODEN STAKES
(2' O.C. FOR TYPE NS),
SEE INSTALLATION NOTE
3 FOR INSTALLATION IN
PAVED AREAS.
COMPACTED BACKFILL
SAWCUT EXISTING PAVEMENT TO PROVIDE STRAIGHT VERTICAL JOINT.
CLEAN SURFACES OF DIRT, CLAY AND OTHER OBJECTIONABLE MATERIAL.
SOIL (TYP.)
1.
2.
NOTES:
PIPE
UNDISTURBED
OF REMOVAL (TYP.)
SAWCUT AT LIMITS
EXISTING BASE
1'-0" (MIN.)
EXISTING PAVEMENT
ASPHALT PAVEMENT
MATCH EXISTING
PAVEMENT & BASE
THICKNESS
VARIES (SEE SITE PLAN)
COMPACTED SUBGRADE
1/2" EXPANSION JOINT BETWEEN WALK AND
PAVING OR ADJACENT STRUCTURE
4" THICK CONCRETE (3500 PSI @ 28 DAYS)
MATCH FLUSH WITH RAMP
SEE A-402 FOR RAMP DETAILS
SCALE: N.T.S.
F1
CONCRETE SIDEWALK
MATCH FLUSH
WITH EX. GRADE
TABLE TBD2 - THRUST BLOCK DIMENSIONS
EXPANSION JOINTS @ 50' MAX.
SPACING AND AT JUNCTIONS WITH
OTHER STRUCTURES (I.E. CURBS,
FOUNDATIONS, BUILDINGS, ETC.)
AND RIGID PAVING.
EXPANSION JOINT
CONTRACTION JOINT SHALL DIVIDE
SIDEWALK INTO SQUARE PANELS.
SPACING OF CONTRACTION JOINTS
SHALL EQUAL THE WIDTH OF THE
SIDEWALK.
CONTRACTION JOINT
NOTE:
NOTE:
1/4" RADIUS
FINISH
1/8" 1/2"
PREMOLDED JOINT FILLER
EXTENDING TO BOTTOM
SURFACE OF CONCRETE.
*1"R
C O
M
P. SU
BG
R
AD
E
BASE
SU
R
FAC
E
*4"
F3
HEADER CURB DETAIL
NO SCALE
FINISHED
GRADE
CONCRETE
*NOTE: IF PROPOSED HEADER CURB ABUTS
EXISTING CURB, DIMENSIONS TO MATCH
EXISTING CURB
MATCH EXISTING
CURB HEIGHT
JOINT SEALANT
COLD APPLIED
1/4"
BACKER ROD
1"(SEE JOINT NOTE NO. 2)
POCKET OF 1/2" TO 3/4"
OVERCUT TO PROVIDE
RESILIENT FIBERBOARD
JOINT FILLER- ONE
PIECE, FULL DEPTH, FULL
WIDTH (CAST-IN-PLACE,
TOP PORTION CUT OUT
FOR JOINT SEALER &
BACKER ROD)
SEE JOINT
NOTE NO. 3
JOINT NOTES:
1. FOR ALL JOINTS THE BACKER ROD MATERIAL SHALL BE COMPATIBLE
WITH THE COLD POURED SEALANT AND SLIGHTLY OVERSIZED TO
PREVENT MOVEMENT DURING THE JOINT SEALANT OPERATION.
2. THE WIDTH OF THE JOINTS SHALL BE CORRECTED FOR 68°F.
3. JOINT CONFIGURATION SHALL MEET JOINT SEAL MANUFACTURER'S
SPECIFICATIONS (EXCEPT AS NOTED ON PLANS AND IN
SPECIFICATIONS).
4. INSTALL SILICONE JOINT SEALANT IN POURED IN PLACE JOINTS. USE
THE MANUFACTURER'S RECOMMENDED SHAPE FACTOR. TYPICALLY
T = 1/2 W, WHERE T = THE THICKNESS OF THE MATERIAL, AND W =
THE WIDTH OF THE JOINT.
1/4" (TO TOP
OF SEALANT)
SCALE: N.T.S.
D1
EXPANSION JOINT
WIDTH
SEE DETAIL B5
POST INDICATOR
VALVE BOX WITH
EXTENSION
GATE VALVE
M
I N
6'-0" FROM PAVEMENT (MIN.)
FIRE WATER SUPPLY TO
INTERIOR WET PIPE
SPRINKLER SYSTEM.
POURED CONCRETE 1'-4"
SQUARE x 6" THICK.
(POUR AGAINST
UNDISTURBED SOIL)
WIRING & CONDUIT TO FIRE
ALARM SYSTEM. SEE FA
PLANS FOR ADDITIONAL
INFORMATION
SCALE: N.T.S.
C9
POST INDICATOR VALVE
TAMPER SWITCH, REFER TO
FA PLANS FOR ADDITIONAL
INFORAMTION
03/15/2021
7'-0"
3'-6"
1'-6"
18"Ø CONC. BASE
UNDISTURBED
EARTH
CONCRETE CAP
6" STANDARD STEEL PIPE
(GALVANIZED) FILLED
WITH CONCRETE
FINISH PAVEMENT
6"
4'-0"
PAINT BOLLARD YELLOW
SCALE: N.T.S.
E9
POST INDICATOR VALVE
Drawing Number
Project Title
Location
Issue Date Checked Designed
Drawing Title
Approved: Chief Engineering
Office of Construction and Facilities Management
U.S. Department of Veterans
Affairs
PhaseARCHITECT/ENGINEER OF RECORD STAMP
Raymond-Pond SDVOSB JV, LLC 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592
POND & Company 3500 Parkway Lane, Suite 500 Peachtree Corners, GA 30092 678-336-7740
Raymond Engineering 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
321 4 5 6 7 8 9 10
VAMC MOUNTAIN HOME, TN
CORRECT ADMIN BLDG 20
ENVIRONMENT AND
CONDITION DEFICIENCIES
MARCH 15, 2021
BID DOCUMENTS
621-15-101
HCS TLN
REVISIONS DATE
FULLY SPRINKLERED
C-502
PS
MU
CONSTRUCTION & EROSION
CONTROL DETAILS
SCALE: N.T.S.
D1
STABILIZATION WITH STRAW MULCH
SCALE: N.T.S.
F1
STABILIZATION WITH PERMANENT VEGETATION
SCALE: N.T.S.
C5
STABILIZATION WITH TEMPORARY SEEDING
see detail F1/C-502.
TS
NOTES:
1. CURB AND GUTTER TO BE CONSTRUCTED IN 10 FOOT LENGTHS.
2. 1/2" EXPANSION JOINTS SHALL BE PROVIDED AT INTERVALS
NOT TO EXCEED 50 FEET, AT THE ENDS AND MID-POINT OF
RETURNS, AND AT ANY POINT WHERE THE NEW CURB AND
GUTTER ABUTS OTHER CONCRETE STRUCTURES.
3. 5' LONG TRANSITIONS SHALL BE PROVIDED BETWEEN NORMAL
GUTTER AND PITCHED GUTTER, UNLESS OTHERWISE NOTED ON
THE PAVING PLANS.
8"
6"
7"
6"
7"
R
6"
R
24" (UNLESS NOTED)
24" (UNLESS NOTED)
REVERSE PITCH CURB AND GUTTER
REGULAR CURB AND GUTTER
SCALE: N.T.S.
F9
CONCRETE CURB AND GUTTER
03/15/2021
| Sheets |
| C-001 - GENERAL NOTES, LEGEND AND ABBREVIATIONS |
| C-110 - DEMOLITION, SITE, UTILITY, & EROSION CONTROL PLAN |
| C-501 - CONSTRUCTION & EROSION CONTROL DETAILS |
| C-502 - CONSTRUCTION & EROSION CONTROL DETAILS |