This document outlines a federal contract opportunity for construction services. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 9 is seeking a contractor to correct environment and condition deficiencies at the Administration Building 20 of the James H. Quillen VA Medical Center in Mountain Home, Tennessee. Work includes office space modifications, conference rooms, locker rooms, storage areas, and mechanical/electrical rooms for a police staff as well as demolition, finishes, and compliance with VA standards. The estimated value is between $1 million and $5 million. The solicitation will be released on October 20, 2021 and close on November 20, 2021, following FAR Part 14 sealed bid procedures. This is a 100% SDVOSB set-aside requiring registration in SAM and VETS4212. The NAICS code is 236220 and size standard is $39.5 million. Questions must be submitted in writing to the listed contracting specialist by the solicitation release date.

View the file

Other files

File Type Posted
36C24921B0014 0007.pdf PDF
S04- SITE VISIT ATTENDEES - Bldg 20 - 621-15-101.pdf PDF
VHA Supplemental Contract Requirements for Combatting COVID-19 Updated 12-16-2021.pdf PDF
36C24921B0014 0006.pdf PDF
S05 - VA Comprehensive Asbestos Containing Materials Inspection Report January 2010 - 2.pdf PDF
S06 - AMENDMENT 5 - 36C24921B0014 0005.pdf PDF
S05-Mountain Home TN - VA Asbestos O AND M Plan January 2010 -1.pdf PDF
S05-RFI RESPONSE QUESTIONS - B20 Correct FCA Deficiencies 12-23-2021.pdf PDF
S02-LBP DOC-Building 20 - 36C24921B0014.pdf PDF
S02-Building 20 ACM Report - 36C24921B0014.pdf PDF
S02- Solicitation - 36C24921B0014 - 621-15-101 - Amendment - 0004.pdf PDF
36C24921B0014 0003.pdf PDF
S06- AMENDMENT2 - CO AND PROJECT CONFIRMATION DATES - 36C24921B0014 0002.pdf PDF
S02-AMENDMENT1 - 621-15-101 CORRECT ADMIN BLDG 20 ENVIRONMENT COND DEF - BID SPECIFICATIONS.pdf PDF
S02- AMENDMENT 1 - 03 1200392 VA Bldg 20 ARCH 05 13 2021 Part 1.pdf PDF
S06-AMENDMENT 01 - 621-15-101 - 36C24921B0014 0001 - WB.pdf PDF
621 15 101 CORRECT ADMIN BLDG 20 ENVIR COND DEF BID DOCUMENTS SPECIFICATIONS VOL 1D.pdf PDF
621 15 101 CORRECT ADMIN BLDG 20 ENVIR COND DEF BID DOCUMENTS SPECIFICATIONS VOL 1A.pdf PDF
05 1200392 VA Bldg 20 FIRE 05 13 2021.pdf PDF
06 1200392 VA Bldg 20 PLMB 05 13 2021 Part 2.pdf PDF
621 15 101 CORRECT ADMIN BLDG 20 ENVIR COND DEF BID DOCUMENTS SPECIFICATIONS VOL 2D.pdf PDF
08 1200392 VA Bldg 20 ELEC 05 13 2021.pdf PDF
07 1200392 VA Bldg 20 MECH 05 13 2021.pdf PDF
09 1200392 VA Bldg 20 COMM 05 13 2021.pdf PDF
621 15 101 CORRECT ADMIN BLDG 20 ENVIR COND DEF BID DOCUMENTS SPECIFICATIONS VOL 2C.pdf PDF
S02-Contractor EMR Certification Form - 36C24921B0014.docx DOCX document
04 1200392 VA Bldg 20 INT 05 13 2021.pdf PDF
S02-TECHNICAL SPECS - Project 621-15-101.pdf PDF
02 1200392 VA Bldg 20 CIVIL 05 13 2021.pdf PDF
S02-621-15-101 - Correct Admin Bldg 20 .pdf PDF
01 1200392 VA Bldg 20 GEN 05 13 2021.pdf PDF
621 15 101 CORRECT ADMIN BLDG 20 ENVIR COND DEF BID DOCUMENTS SPECIFICATIONS VOL 1B.pdf PDF
S02-WD - WASHINGTON TN - TN20210111 - JAN 2021.pdf PDF
03 1200392 VA Bldg 20 ARCH 05 13 2021 Part 2.pdf PDF
621 15 101 CORRECT ADMIN BLDG 20 ENVIR COND DEF BID DOCUMENTS SPECIFICATIONS VOL 1C.pdf PDF
36C24921B0014.docx DOCX document
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SYMBOLS:

SECTION NUMBER

DWG. NO. WHERE

SECTION IS DRAWN

A1

A-101

SIM

DETAIL NUMBER

DWG. NO. WHERE

SECTION IS DRAWN

DETAIL SECTION MARK

A1

A-101

SIM

WALL SECTION MARK

ELEVATION

NUMBER (TYP.)

DWG. NO. WHERE

ELEVATION IS DRAWN

A-101

INTERIOR ELEVATION MARK

DWG. NO. WHERE

DETAIL IS DRAWN

DETAIL

NUMBER (TYP.)

AREA COVERED

BY DETAIL

A-101

SIM

CALLOUT HEAD

ROOM TAG

ROOM

NAME

DOOR TAG

WINDOW &

LOUVER TAG

A

PARTITION TYPE

X

PARTITION

TYPE

KEYNOTE

TAG

CEILING HGT.

CEILING TYPE

1t 12'-0"

CEILING TAG

(TYPE & HEIGHT)

EQUIPMENT

TAG

1i

REVISION

TAG

NORTH ARROWS

N

DETAIL IDENTIFIER (MODULE LETTER AND NUMBER)

A1

ELEVATIONS, DETAILS & CALLOUTS

SCALE: 1/8" = 1'-0"

PLAN SYMBOLS:

VIEW TITLES:

PLUMBING ABBREVIATIONS

A/C ABOVE CEILING

A/E ARCHITECT / ENGINEER

AFF ABOVE FINISH FLOOR

AG AIR GAP

AS AUTOMATIC SPRINKLER

ASHRAE AMERICAN SOCIETY OF HEATING

REFRIGERATION, AIR CONDITIONING

ENGINEERS

ASME AMERICAN SOCIETY OF MECHANICAL

ENGINEERS

ASPE AMERICAN SOCIETY OF PLUMBING

ENGINEERS

BFP REDUCED PRESSURE BACKFLOW

PREVENTER

BSP BLACK STEEL PIPE

BTU BRITISH THERMAL UNIT

BTUH BRITISH THERMAL UNIT PER HOUR

C CELSIUS

CO CLEANOUT

DCW DOMESTIC COLD WATER

DHW DOMESTIC HOT WATER

DHWR DOMESTIC HOT WATER RETURN

DHWS DOMESTIC HOT WATER SUPPLY

DN DOWN

DOE DEPARTMENT OF ENERGY

DWG DRAWINGS

EL ELEVATION

EWH ELECTRIC WATER HEATER

EPA ENVIRONMENTAL PROTECTION AGENCY

(E) EXISTING

F FAHRENHEIT

FCO FLOOR CLEANOUT

FD FLOOR DRAIN

FM FLOW METER

GCO GRADE CLEANOUT

H&CW HOT AND COLD WATER

ISO ISOLATION

HB HOSE BIBB

HYD HYDRANT

M METER

NIC NOT IN CONTRACT

NTS NOT TO SCALE

IPC INTERNATIONAL PLUMBING CODE

PDI PLUMBING AND DRAINAGE INSTITUTE

PG PRESSURE GAGE

PRV PRESSURE REDUCING VALVE

TP TRAP PRIMER

TYP TYPICAL

T/P TEMPERATURE AND PRESSURE

UG UNDER GROUND

V VENT

VTR VENT THROUGH ROOF

W WASTE

WCO WALL CLEANOUT

WG WATER GAGE

WH WALL HYDRANT

WH WATER HEATER

WL WATER LINE

WM WATER METER

WSFU WATER SUPPLY FIXTURE UNITS

YH YARD HYDRANT

SD SD

DIRECTION OF PIPE PITCH (DOWN)

DIRECTION OF FLOW

ANCHOR

REDUCER OF INCREASER

ECCENTRIC REDUCER

TOP CONNECTION, 45° OR 90°

BOTTOM CONNECTION, 45° OR 90°

SIDE CONNECTION

CAPPED OUTLET

RISE OR DROP IN PIPE

UNION

PIPE UP

PIPE DOWN

LIMIT OF DEMOLITION

STRAINER

THERMOMETER

PRESSURE GAUGE

HOSE BIBB

DOMESTIC COLD WATER, COLD WATER

GENERAL PLUMBING SYMBOLS

PIPE DROP AND CONTINUED

POINT OF CONNECTION BETWEEN NEW AND EXISTING WORK

DOMESTIC HOT WATER, HOT WATER

DOMESTIC HOT WATER RETURN, HOT WATER RETURN

VENT PIPING

SANITARY WASTE PIPING

STORM WATER PIPING

NON-FREEZE WALL HYDRANT

TP TRAP PRIMER

AV

GATE VALVE

GLOBE VALVE

GATE VALVE WITH 3/4" HOSE ADAPTER

CHECK VALVE

ANGLE GLOBE VALVE

BUTTERFLY VALVE

BALL VALVE

MODULATING CONTROL VALVE

TWO POSITION CONTROL VALVE

THREE-WAY MODULATING CONTROL

VALVE

THREE-WAY TWO POSITION CONTROL

VALVE

PRESSURE REGULATING VALVE

AUTOMATIC FLOW CONTROL VALVE

PRESSURE RELIEF VALVE

MANUAL AIR VENT

TEST PLUG (PRESSURE/TEMPERATURE)

AUTOMATIC AIR VENT

PLUMBING VALVE SYMBOLS

PLUMBING GENERAL NOTES

1. PLUMBING WORK SHALL BE IN ACCORDANCE WITH THE 2018 IBC, 2018 IPC, AND 2018 IFGC.

2. SLOPES AND INVERT ELEVATIONS SHALL BE ESTABLISHED BEFORE ANY PIPE IS INSTALLED IN ORDER TO MAINTAIN PROPER

SLOPES. ANY DISCREPANCIES SHALL BE REPORTED TO CONTRACTING OFFICER'S REPRESENTATIVE. ALL PIPING SHALL BE

LOCATED AND DETERMINED WHEN TO BE INSTALLED TO AVOID CONFLICT WITH OTHER TRADES.

3. PIPING SHALL BE CONCEALED UNLESS OTHERWISE NOTED.

4. KEEP ALL BURIED PIPING CLEAR OF FOOTINGS.

5. ALL WALL CLEANOUTS SHALL BE PROVIDED WITH WALL COVERS AND MOUNTED IN UNOBTRUSIVE LOCATIONS WHILE MAINTAINING

ACCESSIBILITY. ALL FLOOR CLEANOUTS SHOWN SHALL BE SET FLUSH WITH FLOOR AREAS OR FINISHED GRADE.

6. COORDINATE LOCATION OF PIPING AND DRAINS WITH ALL MECHANICAL AND ELECTRICAL EQUIPMENT. NO PIPING SHALL BE

INSTALLED ABOVE ELECTRICAL, COMMUNICATIONS, OR DATA EQUIPMENT OR PANELS. COMPLY WITH ARCHITECTURAL PLANS FOR

EXACT LOCATION OF PLUMBING FIXTURES, COMPLIANCE TO ADA CLEARANCES, AND FINISHES.

7. PROVIDE REQUIRED WATER, WASTE, AND VENT PIPING, FITTINGS, AND INSULATION, AND MAKE FINAL CONNECTIONS TO EQUIPMENT. THESE PLANS ARE SCHEMATIC AND DIAGRAMMATIC ONLY. THEY DO NOT SHOW ALL REQUIRED BENDS, OFFSETS, VALVES, AND MISCELLANEOUS FITTINGS FOR A COMPLETE INSTALLATION. ALL PIPING, EQUIPMENT, AND CONNECTIONS SHALL BE INSTALLED IN ACCORDANCE WITH SPECIFICATIONS, LOCAL CODES AND ORDINANCES, AND MANUFACTURER'S INSTRUCTIONS.

8. SANITARY SEWER PIPING SHALL BE INSTALLED TO PROVIDE A MINIMUM SLOPE OF 1%. WASTE PIPING 3" AND SMALLER SHALL BE

INSTALLED TO PROVIDE A MINIMUM SLOPE OF 2%.

9. DO NOT SCALE DRAWINGS. REFER TO ARCHITECTURE DRAWINGS FOR EXACT DIMENSIONS, FIXTURE LOCATIONS, ROOM NAMES, AND NUMBERS.

10. EXTENSION OF EQUIPMENT DRAINS TO FLOOR DRAINS, FLOOR SINKS, AND OPEN SITE DRAINS SHALL BE PROVIDED BY

EQUIPMENT CONTRACTOR.

11. WHERE POSSIBLE, INSTALL SHUT-OFF VALVES AND EQUIPMENT REQUIRING MAINTENANCE, CLEANING AND ADJUSTMENT ABOVE ACCESSIBLE CEILINGS OR IN SERVICE AREAS SUCH AS JANITOR'S CLOSETS. IN OTHER LOCATIONS, PROVIDE ACCESS PANELS IN

INCONSPICUOUS LOCATIONS WITH FINISH TO MATCH ARCHITECTURAL.

12. ALL HOSE BIBBS, WALL HYDRANTS, AND VALVES WITH THREADED HOSE CONNECTIONS SHALL BE EQUIPPED WITH VACUUM

BREAKER.

13. WHERE CONNECTING TO A UTILITY OR SERVICE, VERIFY LOCATION, SIZES, MATERIALS, FLUID BEING HANDLED, AND INVERTS OF ALL EXISTING UTILITIES AND CONFIRM THAT NEW PIPES BEING ROUTED TO EXISTING UTILITIES CAN BE INSTALLED CONFORMING TO CODE AND AS SHOWN. NOTIFY CONTRACTING OFFICER OF ANY CONFLICTS OR DISCREPANCIES PRIOR TO PURCHASING ANY MATERIALS OR PERFORMING ANY WORK OR EXTENSION OF CONNECTION, WITH THE EXCEPTION OF EXCAVATION OR OTHER

WORK TO PROVIDE ACCESS TO THE CONCEALED UTILITY.

14. PROVIDE INSULATION, PIPE IDENTIFICATION, AND OTHER REQUIREMENTS AS LISTED IN SPECIFICATIONS.

15. REFER TO ARCHITECTURAL DRAWINGS FOR EXACT LOCATIONS AND ELEVATIONS OF ALL PLUMBING FIXTURES.

16. ALL PIPING ABOVE GRADE SHALL BE PROPERLY SUPPORTED FROM THE BUILDING STRUCTURE AND SHALL NOT REST ON CEILING

TILES OR BE SUPPORTED FROM CEILING TILES.

17. WATER PIPING ROUTED ABOVE CEILINGS AND IN EXTERIOR WALLS SHALL BE ROUTED ON HEATED SIDE (UNDERSIDE) OF CEILING

INSULATION AND HEATED SIDE (INSIDE) OF WALL INSULATION.

18. TOPS OF ALL FLOOR DRAINS AND CLEANOUTS SHALL BE SET FLUSH WITH FINISHED FLOOR, UNLESS NOTED OTHERWISE.

19. LOCATE ALL SECTIONAL OR MAIN CONTROL VALVES WITHIN 1'-0" FROM ACCESS PANELS, CEILING TILES, OR OTHER POINT OF

ACCESS.

20. PROVIDE WATER HAMMER ARRESTORS SIZED PER PDI SPECIFICATIONS ON ALL DOMESTIC WATER LINES SERVING FLUSH VALVE

FIXTURES, WASHING MACHINES SUPPLIES, PRV STATIONS, AND OTHER INSTALLATIONS WITH QUICK CLOSING VALVES.

21. PROVIDE A MANUFACTURED EXPANSION DEVICE OR FABRICATED EXPANSION LOOP ON ALL PIPING SYSTEMS CROSSING BUILDING

EXPANSION JOINTS.

22. COORDINATE ELECTRICAL CHARACTERISTICS AND REQUIREMENTS OF ALL PLUMBING EQUIPMENT WITH THE ELECTRICAL

DRAWINGS AND THE ELECTRICAL CONTRACTOR, AND FURNISH EQUIPMENT WIRED FOR THE VOLTAGES SHOWN THEREIN.

23. ALL PLUMBING EQUIPMENT AND SYSTEMS SHALL BE GUARANTEED FOR A MINIMUM PERIOD OF ONE YEAR AFTER OWNER'S FINAL

ACCEPTANCE.

24. ALL PIPE PENETRATIONS OF FIRE AND/OR SMOKE-RATED ASSEMBLIES SHALL BE FIRE-STOPPED AS REQUIRED TO RESTORE

ASSEMBLY TO ORIGINAL INTEGRITY. FIRE BARRIER PRODUCTS SHALL BE AS MANUFACTURED BY 3M COMPANY, CP25 CAULK, CS195 COMPOSITE PANEL, FS195 WRAP/STRIP, OR PSS 7900 SERIES SYSTEMS AS RECOMMENDED BY MANUFACTURER FOR PARTICULAR APPLICATION, OR EQUIVALENT SYSTEM AS APPROVED BY LOCAL CODE OFFICIALS.

25. ALL WATER CLOSET FLUSH VALVE LEVERS SHALL BE LOCATED ON THE APPROACH SIDE OF THE WATER CLOSET.

26. ALL VENTS THROUGH ROOF SHALL BE LOCATED A MINIMUM OF 10'-0" FROM ANY OUTSIDE AIR INTAKE.

27. ALL COLD WATER, HOT WATER, AND DRAIN PIPING AT HANDICAPPED FIXTURES SHALL BE INSULATED WITH HANDI-LAV GUARD

MODELS 102 AND 105 (OR APPROVED EQUAL) INSULATION KITS.

28. NOT ALL PLUMBING ABBREVIATIONS SHOWN WILL BE USED FOR THIS PROJECT.

PLUMBING FIXTURES SCHEDULE

MARK DESCRIPTION CW HW VENT WASTE

P-103

WATER CLOSET -

WALL HUNG

P-601

DRINKING

FOUNTAIN

1" 2" 4"

1/2" 1 1/2" 2"

WASTE

FIXTURE

UNITS

WATER

FIXTURE

UNITS

ELECTRIC

SENSOR

REMARKS

WATER CLOSET,WALL HUNG,

ELONGATED BOWL, 1.28 GPFYES

P-702 1/2" 1 1/2" 2"SHOWER 1/2"

6 6

1/2

FD-1

FLOOR DRAIN W

TRAP PRIMER

1 1/2" 2" 22

SEE SPEC 22 40 00

HB-1 HOSE BIBB 1/2" 2 NON FREEZE HOSE BIBB

P-202 1 1/2" 2"URINAL 3/4" 54 YES

P-418 1 1/2" 2"

LAVATORY -

WALL HUNG 1/2" 1/2" YES2 2

P-502 MOP SINK 1/2" 1/2" 1 1/2" 3" 32

P-528 1 1/2" 2"SINK- SINGLE BOWL 1/2" 1/2" 2 2 DROP IN SS SINK

WITH 1/2" TRAP PRIMER CONNECTION

ELECTRIC WATER HEATER SCHEDULE

MARK LOCATION

BASIS OF

DESIGN

EWH-1 BASEMENT

REMARKS

SERVICE

HOT

WATER

RHEEM

ELD40-TB

VOLUME

(GAL)

ELEMENT

WATTAGE

V/PH

208/1

ELECTRICAL

DIA HEIGHT

DIMENSIONS (IN)

20.25 48.25

WEIGHT

(LBS)

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Designed

Drawing Title

Approved: Chief Engineering

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

Raymond-Pond SDVOSB JV, LLC 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592

POND & Company 3500 Parkway Lane, Suite 500 Peachtree Corners, GA 30092 678-336-7740

Raymond Engineering 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

VAMC MOUNTAIN HOME, TN

CORRECT ADMIN BLDG 20

ENVIRONMENT AND

CONDITION DEFICIENCIES

MARCH 15, 2021

BID DOCUMENTS 621-15-101

P-001

PLUMBING SYMBOLS, ABBREVIATIONS

& SCHEDULES

ANCH

REVISIONS DATE

veerendra Image

CR

3"ø W (E) UNDERFLOOR

6"ø W (E) UNDERFLOOR

GENERAL

STORAGE

STORAGE

CLOSET

CRAWL SPACE

CRAWL SPACE

CRAWL SPACE

CRAWL SPACE

SLAB ON GRADE

DEMOLITION WORK

PIPE TO BE DEMOLISHED

DEMOLITION LEGEND

EXISTING PIPE TO REMAIN

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Designed

Drawing Title

Approved: Chief Engineering

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

Raymond-Pond SDVOSB JV, LLC 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592

POND & Company 3500 Parkway Lane, Suite 500 Peachtree Corners, GA 30092 678-336-7740

Raymond Engineering 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

VAMC MOUNTAIN HOME, TN

CORRECT ADMIN BLDG 20

ENVIRONMENT AND

CONDITION DEFICIENCIES

MARCH 15, 2021

BID DOCUMENTS 621-15-101

PD100

BASEMENT PLUMBING SANITARY &

VENT DEMOLITION PLAN

ANCH

SCALE: 3/8" = 1'-0"F1

BASEMENT PLUMBING SANITARY AND VENT DEMOLITION PLAN

1. POINT OF CONNECTION TO THE BUILDING.

2. EXISTING 5" SANITARY PIPE UP TO FIRST FLOOR TO BE DEMOLISHED.

3. EXISTING 3" SANITARY PIPE UP TO FIRST FLOOR TO BE DEMOLISHED.

4. EXISTING 6" SANITARY PIPE UP TO FIRST FLOOR TO BE DEMOLISHED.

5. REMOVE PIPE AS NEEDED FOR NEW WORK. REMAINING PIPE TO BE ABANDONED

IN PLACE AND SEAL BOTH ENDS.

KEYNOTES:#

SCALE: = 1'-0"3/8"

0 2 4 62

REVISIONS DATE

3"ø (E)

OFFICE OFFICE

STORAGE

TOILET

COPY RM OFFICE OFFICE OFFICE

HSK

OFFICE

OFFICEOFFICE

RECEPTION

OFFICEOFFICE

STORAGE

EQUIP RM

CORRIDOR

LOBBY

CORRIDOR CORRIDOR

107106 109 111 112 113

116117

103104

101A

DEMOLITION WORK

PIPE TO BE DEMOLISHED

DEMOLITION LEGEND

EXISTING PIPE TO REMAIN

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Designed

Drawing Title

Approved: Chief Engineering

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

Raymond-Pond SDVOSB JV, LLC 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592

POND & Company 3500 Parkway Lane, Suite 500 Peachtree Corners, GA 30092 678-336-7740

Raymond Engineering 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

VAMC MOUNTAIN HOME, TN

CORRECT ADMIN BLDG 20

ENVIRONMENT AND

CONDITION DEFICIENCIES

MARCH 15, 2021

BID DOCUMENTS 621-15-101

PD101

FIRST FLOOR PLUMBING SANITARY &

VENT DEMOLITION PLAN

ANCH

SCALE: 3/8" = 1'-0"F1

FIRST FLOOR PLUMBING SANITARY AND VENT DEMOLITION PLAN

1. EXISTING 6" SANITARY RISER TO BE DEMOLISHED.

2. DEMOLISH SANITARY AND VENT.

3. DEMOLISH FIXTURES AS SHOWN.

KEYNOTES:#

SCALE: = 1'-0"3/8"

0 2 4 62

REVISIONS DATE

OFFICE

CLOSET

204A

CONFERENCE RM

KITCHEN

203A

OFFICE

CLOSET

CORRIDOR

LOBBY

CORRIDOR

STORAGE

TOILET

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

MECH RM

HSK

DEMOLITION WORK

PIPE TO BE DEMOLISHED

DEMOLITION LEGEND

EXISTING PIPE TO REMAIN

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Designed

Drawing Title

Approved: Chief Engineering

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

Raymond-Pond SDVOSB JV, LLC 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592

POND & Company 3500 Parkway Lane, Suite 500 Peachtree Corners, GA 30092 678-336-7740

Raymond Engineering 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

VAMC MOUNTAIN HOME, TN

CORRECT ADMIN BLDG 20

ENVIRONMENT AND

CONDITION DEFICIENCIES

MARCH 15, 2021

BID DOCUMENTS 621-15-101

PD102

SECOND FLOOR PLUMBING SANITARY

& VENT DEMOLITION PLAN

ANCH

SCALE: 3/8" = 1'-0"F1

SECOND FLOOR PLUMBING SANITARY AND VENT DEMOLITION PLAN

1. DEMOLISH SANITARY AND VENT PIPING AS SHOWN.

2. DEMOLISH SANITARY BACK TO BASEMENT. DEMOLISH VENT PIPE UP AND VTR.

3. DEMOLISH FIXTURES AS SHOWN.

KEYNOTES:#

SCALE: = 1'-0"3/8"

0 2 4 62

REVISIONS DATE

CR

1/2" CW UP TO DRINKING FOUNTAINS

TO BE DEMOLISHED.

1 1/2" CW & 3/4" HW

UP TO BE

DEMOLISHED.

3/4" HW & CW UP TO

BE DEMOLISHED.

GENERAL

STORAGE

STORAGE

CLOSET

CRAWL SPACE

CRAWL SPACE

CRAWL SPACE

CRAWL SPACE

SLAB ON GRADE

DEMOLITION WORK

PIPE TO BE DEMOLISHED

DEMOLITION LEGEND

EXISTING PIPE TO REMAIN

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Designed

Drawing Title

Approved: Chief Engineering

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

Raymond-Pond SDVOSB JV, LLC 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592

POND & Company 3500 Parkway Lane, Suite 500 Peachtree Corners, GA 30092 678-336-7740

Raymond Engineering 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

VAMC MOUNTAIN HOME, TN

CORRECT ADMIN BLDG 20

ENVIRONMENT AND

CONDITION DEFICIENCIES

MARCH 15, 2021

BID DOCUMENTS 621-15-101

PD200

BASEMENT PLUMBING WATER

DEMOLITION PLAN

ANCH

SCALE: 3/8" = 1'-0"F1

BASEMENT PLUMBING WATER DEMOLITION PLAN

1. DEMOLISH DOMESTIC HOT AND COLD WATER PIPING IN BUILDING.

2. EXISTING WATER HEATER TO BE DEMOLISHED.

3. EXISTING BACK FLOW PREVENTER ASSEMBLY TO BE DEMOLISHED.

4. EXISTING CW SERVICE TO REMAIN.

KEYNOTES:#

SCALE: = 1'-0"3/8"

0 2 4 62

REVISIONS DATE

OFFICE OFFICE

STORAGE

TOILET

COPY RM OFFICE OFFICE OFFICE

HSK

OFFICE

OFFICEOFFICE

RECEPTION

OFFICEOFFICE

STORAGE

EQUIP RM

CORRIDOR

LOBBY

CORRIDOR CORRIDOR

107106 109 111 112 113

116117

103104

101A

DEMOLITION WORK

PIPE TO BE DEMOLISHED

DEMOLITION LEGEND

EXISTING PIPE TO REMAIN

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Designed

Drawing Title

Approved: Chief Engineering

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

Raymond-Pond SDVOSB JV, LLC 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592

POND & Company 3500 Parkway Lane, Suite 500 Peachtree Corners, GA 30092 678-336-7740

Raymond Engineering 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

VAMC MOUNTAIN HOME, TN

CORRECT ADMIN BLDG 20

ENVIRONMENT AND

CONDITION DEFICIENCIES

MARCH 15, 2021

BID DOCUMENTS 621-15-101

PD201

FIRST FLOOR PLUMBING WATER

DEMOLITION PLAN

ANCH

SCALE: 3/8" = 1'-0"F1

FIRST FLOOR PLUMBING WATER DEMOLITION PLAN

2 2

1. DEMOLISH EXISTING PIPING AS SHOWN.

2. DEMOLISH FIXTURES AS SHOWN.

KEYNOTES:#

SCALE: = 1'-0"3/8"

0 2 4 62

REVISIONS DATE

OFFICE

CLOSET

204A

CONFERENCE RM

KITCHEN

203A

OFFICE

CLOSET

CORRIDOR

LOBBY

CORRIDOR

STORAGE

TOILET

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

MECH RM

HSK

DEMOLITION WORK

PIPE TO BE DEMOLISHED

DEMOLITION LEGEND

EXISTING PIPE TO REMAIN

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Designed

Drawing Title

Approved: Chief Engineering

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

Raymond-Pond SDVOSB JV, LLC 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592

POND & Company 3500 Parkway Lane, Suite 500 Peachtree Corners, GA 30092 678-336-7740

Raymond Engineering 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

VAMC MOUNTAIN HOME, TN

CORRECT ADMIN BLDG 20

ENVIRONMENT AND

CONDITION DEFICIENCIES

MARCH 15, 2021

BID DOCUMENTS 621-15-101

PD202

SECOND FLOOR PLUMBING WATER

DEMOLITION PLAN

ANCH

SCALE: 3/8" = 1'-0"F1

SECOND FLOOR PLUMBING WATER DEMOLITION PLAN

1. DEMOLISH PIPING AS SHOWN.

2. DEMOLISH FIXTURES AS SHOWN.

KEYNOTES:#

SCALE: = 1'-0"3/8"

0 2 4 62

REVISIONS DATE

3"ø W UNDERFLOOR

4"ø W UP

P-528

2"ø W UNDERFLOOR

FD-1

1 1/2"ø V UP

2"ø W UP

EWH-1

INSTALL 3/4" CONNECTION

ON SINK TAIL PIECE AHEAD

OF P TRAP. EXTEND

PIPING IN WALL AS SHOWN

IN DETAIL D6/P-601.

6"ø W UNDERFLOOR (E)

2" DRAIN PIPE

FROM BACKFLOW

PREVENTER

4"ø W UNDERFLOOR

4"ø W UNDERFLOOR

MECHANICAL

ROOM

B01

CORRIDOR

B00

STORAGE

B02

ARMORY /

WEAPONS

B04

CRAWL SPACE

CRAWL SPACE

CRAWL SPACECRAWL SPACE

4"ø W IN CRAWL

SPACE

AREAWAY

4" W DROP BELOW

BASEMENT FLOOR

3"ø W A/C

3" W UP TO P-502

ON FIRST FLOOR

P-TRAP3" W UP

SLAB ON GRADE

2"ø W

CO

4"ø W

4"ø W

CO

CO

PENETRATE EXISTING

FOUNDATION WALL UNDER

SLAB

3"ø W

FCO

4"ø W UP

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Designed

Drawing Title

Approved: Chief Engineering

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

Raymond-Pond SDVOSB JV, LLC 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592

POND & Company 3500 Parkway Lane, Suite 500 Peachtree Corners, GA 30092 678-336-7740

Raymond Engineering 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

VAMC MOUNTAIN HOME, TN

CORRECT ADMIN BLDG 20

ENVIRONMENT AND

CONDITION DEFICIENCIES

MARCH 15, 2021

BID DOCUMENTS 621-15-101

P-100

BASEMENT PLUMBING SANITARY &

VENT NEW WORK PLAN

ANCH

SCALE: 3/8" = 1'-0"F1

BASEMENT PLUMBING SANITARY AND VENT NEW WORK PLAN

SCALE: = 1'-0"3/8"

0 2 4 62

1. FOR PIPING UP, SEE P-101 FOR CONTINUATION.

GENERAL NOTES:

REVISIONS DATE

Sheets
P-001 - PLUMBING SYMBOLS, ABBREVIATIONS & SCHEDULES
PD100 - BASEMENT PLUMBING SANITARY & VENT DEMOLITION PLAN
PD101 - FIRST FLOOR PLUMBING SANITARY & VENT DEMOLITION PLAN
PD102 - SECOND FLOOR PLUMBING SANITARY & VENT DEMOLITION PLAN
PD200 - BASEMENT PLUMBING WATER DEMOLITION PLAN
PD201 - FIRST FLOOR PLUMBING WATER DEMOLITION PLAN
PD202 - SECOND FLOOR PLUMBING WATER DEMOLITION PLAN
P-100 - BASEMENT PLUMBING SANITARY & VENT NEW WORK PLAN