This pre-solicitation notice announces a forthcoming solicitation for construction services. The James H. Quillen VA Medical Center in Mountain Home, TN requires renovations to Administration Building 20 including offices, meeting rooms, locker rooms, and replacement of finish materials. Work includes modifications to existing areas and demolition. The estimated range for construction costs is between $1,000,000 and $5,000,000. The solicitation will be open to SDVOSB concerns only and is set aside under 38 U.S.C. 8127(d). The solicitation is expected to be released on or around October 20, 2021 and close on or around November 20, 2021. The NAICS code for this requirement is 236220 and the size standard is $39.5M. Questions regarding this pre-solicitation notice should be submitted in writing and reference the project number, name, and solicitation number.

View the file

Other files

File Type Posted
36C24921B0014 0007.pdf PDF
S04- SITE VISIT ATTENDEES - Bldg 20 - 621-15-101.pdf PDF
VHA Supplemental Contract Requirements for Combatting COVID-19 Updated 12-16-2021.pdf PDF
36C24921B0014 0006.pdf PDF
S05 - VA Comprehensive Asbestos Containing Materials Inspection Report January 2010 - 2.pdf PDF
S06 - AMENDMENT 5 - 36C24921B0014 0005.pdf PDF
S05-Mountain Home TN - VA Asbestos O AND M Plan January 2010 -1.pdf PDF
S05-RFI RESPONSE QUESTIONS - B20 Correct FCA Deficiencies 12-23-2021.pdf PDF
S02-LBP DOC-Building 20 - 36C24921B0014.pdf PDF
S02-Building 20 ACM Report - 36C24921B0014.pdf PDF
S02- Solicitation - 36C24921B0014 - 621-15-101 - Amendment - 0004.pdf PDF
36C24921B0014 0003.pdf PDF
S06- AMENDMENT2 - CO AND PROJECT CONFIRMATION DATES - 36C24921B0014 0002.pdf PDF
S02-AMENDMENT1 - 621-15-101 CORRECT ADMIN BLDG 20 ENVIRONMENT COND DEF - BID SPECIFICATIONS.pdf PDF
S02- AMENDMENT 1 - 03 1200392 VA Bldg 20 ARCH 05 13 2021 Part 1.pdf PDF
S02- AMENDMENT 1 - 06 1200392 VA Bldg 20 PLMB 05 13 2021 Part 1.pdf PDF
S06-AMENDMENT 01 - 621-15-101 - 36C24921B0014 0001 - WB.pdf PDF
621 15 101 CORRECT ADMIN BLDG 20 ENVIR COND DEF BID DOCUMENTS SPECIFICATIONS VOL 1D.pdf PDF
621 15 101 CORRECT ADMIN BLDG 20 ENVIR COND DEF BID DOCUMENTS SPECIFICATIONS VOL 1A.pdf PDF
05 1200392 VA Bldg 20 FIRE 05 13 2021.pdf PDF
06 1200392 VA Bldg 20 PLMB 05 13 2021 Part 2.pdf PDF
621 15 101 CORRECT ADMIN BLDG 20 ENVIR COND DEF BID DOCUMENTS SPECIFICATIONS VOL 2D.pdf PDF
08 1200392 VA Bldg 20 ELEC 05 13 2021.pdf PDF
07 1200392 VA Bldg 20 MECH 05 13 2021.pdf PDF
09 1200392 VA Bldg 20 COMM 05 13 2021.pdf PDF
621 15 101 CORRECT ADMIN BLDG 20 ENVIR COND DEF BID DOCUMENTS SPECIFICATIONS VOL 2C.pdf PDF
S02-Contractor EMR Certification Form - 36C24921B0014.docx DOCX document
04 1200392 VA Bldg 20 INT 05 13 2021.pdf PDF
S02-TECHNICAL SPECS - Project 621-15-101.pdf PDF
02 1200392 VA Bldg 20 CIVIL 05 13 2021.pdf PDF
S02-621-15-101 - Correct Admin Bldg 20 .pdf PDF
621 15 101 CORRECT ADMIN BLDG 20 ENVIR COND DEF BID DOCUMENTS SPECIFICATIONS VOL 1B.pdf PDF
S02-WD - WASHINGTON TN - TN20210111 - JAN 2021.pdf PDF
03 1200392 VA Bldg 20 ARCH 05 13 2021 Part 2.pdf PDF
621 15 101 CORRECT ADMIN BLDG 20 ENVIR COND DEF BID DOCUMENTS SPECIFICATIONS VOL 1C.pdf PDF
36C24921B0014.docx DOCX document
Show all 36

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Designed

Drawing Title

Approved: Chief Engineering

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

Raymond-Pond SDVOSB JV, LLC 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592

POND & Company 3500 Parkway Lane, Suite 500 Peachtree Corners, GA 30092 678-336-7740

Raymond Engineering 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

VAMC MOUNTAIN HOME, TN

CORRECT ADMIN BLDG 20

ENVIRONMENT AND

CONDITION DEFICIENCIES

MARCH 15, 2021

BID DOCUMENTS 621-15-101

G-001

COVER SHEET & SHEET INDEX

RAPJMC

Department of Veterans Affairs

CORRECT ADMIN BLDG 20 ENVIRONMENT

AND CONDITION DEFICIENCIES

BUILDING 20

VAMC MOUNTAIN HOME

MEMORIAL AVENUE AND 2ND STREET

JOHNSON CITY, TENNESSEE 37684

PROJECT # 621-15-101

PROJECT LOCATION

Date

Date

Date

Approved: Electrical Shop Supervisor Date

Approved: Contract Officer Date

Date

Date

Date

Approved: Medical Center Director Date

BID DOCUMENTS APPROVAL

Approved: Associate Director Date

Approved: FMS Chief

Approved: Energy Engineer

Approved: Project Supervisor

Approved: M & D

Approved: Safety Manager

Approved: Infection Control

MEMORIAL AVENUE AND 2ND STREET

JOHNSON CITY, TN 37684

PROJECT LOCATION

MEMORIAL AVENUE AND 2ND STREET

JOHNSON CITY, TN 37684

MARCH 15, 2021

LOCATION MAP

SCALE: N.T.S.

N

VICINITY MAP

SCALE: N.T.S.

N

BID DOCUMENTS

SHEET INDEX

SHEET NUMBER

COVER SHEET & SHEET INDEXG-001

GENERAL

SHEET NAME

GENERAL PROJECT NOTESG-002

BUILDING CODE SUMMARY & DEDUCTIVE ALTERNATESG-003

BASEMENT LIFE SAFETY PLANG-100

FIRST FLOOR LIFE SAFETY PLANG-101

SECOND FLOOR LIFE SAFETY PLANG-102

ARCHITECTURAL

ABBREVIATIONS & SYMBOLSA-001

BASEMENT DEMOLITION PLANAD100

FIRST FLOOR DEMOLITION PLANAD101

SECOND FLOOR DEMOLITION PLANAD102

BASEMENT DEMOLITION REFLECTED CEILING PLANAD130

FIRST FLOOR DEMOLITION REFLECTED CEILING PLANAD131

SECOND FLOOR DEMOLITION REFLECTED CEILING PLANAD132

BASEMENT NEW WORK PLANA-100

FIRST FLOOR NEW WORK PLANA-101

SECOND FLOOR NEW WORK PLANA-102

ATTIC NEW WORK PLANA-103

ROOF NEW WORK PLAN A-104

BASEMENT NEW WORK REFLECTED CEILING PLANA-130

FIRST FLOOR NEW WORK REFLECTED CEILING PLANA-131

SECOND FLOOR NEW WORK REFLECTED CEILING PLANA-132

EXTERIOR ELEVATIONSA-201

PARTITION TYPES & DETAILSA-501

REFLECTED CEILING DETAILSA-502

ACCESS WALL OPENING DETAILS

A-508

WINDOW SCHEDULE & DETAILSA-602

DOOR SCHEDULE, DOOR TYPES, & FRAME TYPESA-601

SHEET INDEX

SHEET NUMBER

FIRE PROTECTION GENERAL NOTES & LEGENDF-001

FIRE PROTECTION

SHEET NAME

BASEMENT FIRE PROTECTION PLANF-100

FIRST FLOOR FIRE PROTECTION PLANF-101

SECOND FLOOR FIRE PROTECTION PLANF-102

ATTIC FIRE PROTECTION PLANF-103

BASEMENT FIRE ALARM PLANFA100

FIRST FLOOR FIRE ALARM PLANFA101

SECOND FLOOR FIRE ALARM PLANFA102

PLUMBING SYMBOLS, ABBREVIATIONS, & SCHEDULESP-001

BASEMENT PLUMBING SANITARY & VENT DEMOLITION PLANPD100

FIRST FLOOR PLUMBING SANITARY & VENT DEMOLITION PLANPD101

SECOND FLOOR PLUMBING SANITARY & VENT DEMOLITION PLANPD102

BASEMENT PLUMBING WATER DEMOLITION PLANPD200

FIRST FLOOR PLUMBING WATER DEMOLITION PLANPD201

SECOND FLOOR PLUMBING WATER DEMOLITION PLANPD202

FIRST FLOOR PLUMBING SANITARY & VENT NEW WORK PLANP-101

SECOND FLOOR PLUMBING SANITARY & VENT NEW WORK PLANP-102

BASEMENT PLUMBING WATER NEW WORK PLANP-200

FIRST FLOOR PLUMBING WATER NEW WORK PLANP-201

SECOND FLOOR PLUMBING WATER NEW WORK PLANP-202

PLUMBING DETAILSP-601

ELECTRICAL NOTES & ABBREVIATIONSE-001

ELECTRICAL BASEMENT DEMOLITION PLANED100

ELECTRICAL FIRST FLOOR DEMOLITION PLANED101

ELECTRICAL SECOND FLOOR DEMOLITION PLANED102

ELECTRICAL BASEMENT LIGHTING PLANEL100

ELECTRICAL FIRST FLOOR LIGHTING PLANEL101

ELECTRICAL SECOND FLOOR LIGHTING PLANEL102

ELECTRICAL BASEMENT POWER PLANEP100

ELECTRICAL FIRST FLOOR POWER PLANEP101

ELECTRICAL SECOND FLOOR POWER PLANEP102

LIGHTING PROTECTION PLANE-131

ELECTRICAL DETAILSE-501

ELECTRICAL RISER DIAGRAM AND FEEDER SCHEDULEE-601

PLUMBING

LUMINAIRE AND MECHANICAL EQUIPMENT SCHEDULEE-611

FIRE PROTECTION DETAILSF-501

GENERAL NOTES, LEGEND, & ABBREVIATIONSC-001

CIVIL

DEMOLITION, SITE, UTILITY, & EROSION CONTROL PLANC-110

C-501

CONSTRUCTION & EROSION CONTROL DETAILSC-502

CONSTRUCTION & EROSION CONTROL DETAILS

ROOF DEMOLITION PLANAD104

ENLARGED PLAN, ELEVATION AND SECTION OF INTERIOR STAIRSA-401

ENLARGED PLAN, EXTERIOR STAIR, & ADA RAMP DETAILS

A-402

A-403

REFLECTED CEILING DETAILSA-503

MILLWORK DETAILSA-504

CORNER GUARD AND MISCELLANEOUS DETAILSA-505

MISCELLANEOUS DETAILSA-506

BASEMENT PLUMBING SANITARY & VENT NEW WORK PLANP-100

COLD AND HOT WATER RISER SCHEMATICP-603

WASTE AND VENT RISER SCHEMATICP-604

SHEET INDEX

SHEET NUMBER

ELECTRICAL

SHEET NAME

ELECTRICAL LEGENDE-002

ELECTRICAL ATTIC LIGHTING PLANEL103

ELECTRICAL ATTIC POWER PLANEP103

ELECTRICAL DETAILSE-502

E-621 PANEL SCHEDULES

TELECOM GENERAL NOTES, ABBREVIATIONS, & LEGENDT-001

TELECOMMUNICATIONS

FIRST FLOOR TELECOMMUNICATION DEMOLITION PLANTD-101

FIRST FLOOR TELECOMMUNICATION PLANT-101

SECOND FLOOR TELECOMMUNICATION PLANT-102

TELECOMMUNICATION DETAILST-501

STANDARD FIRE PROTECTION DETAILS

A-507

BASEMENT TELECOMMUNICATION DEMOLITION PLANTD-100

BASEMENT TELECOMMUNICATION PLANT-100

SECOND FLOOR TELECOMMUNICATION DEMOLITION PLANTD-102

BASEMENT SECURITY PLANT-110

FIRST FLOOR SECURITY PLANT-111

SECOND FLOOR SECURITY PLANT-112

ENLARGED SECOND FLOOR TELECOMMUNICATION ROOMT-401

TELECOMMUNICATION RISER DIAGRAMT-601

SECURITY DETAILST-502

BASEMENT PLAN - HAZARDOUS AREA REPORTAD110

FIRST FLOOR PLAN - HAZARDOUS AREA REPORTAD111

SECOND FLOOR PLAN - HAZARDOUS AREA REPORTAD112

ATTIC PLUMBING SANITARY AND VENT NEW WORK PLANP-103

PLUMBING DETAILSP-602

MECHANICAL GENERAL NOTESM-001

BASEMENT MECHANICAL DEMOLITION PLANMD100

FIRST FLOOR MECHANICAL DEMOLITION PLANMD101

SECOND FLOOR MECHANICAL DEMOLITION PLANMD102

ATTIC MECHANICAL DEMOLITION PLANMD103

BASEMENT MECHANICAL NEW WORK PLANM-100

MECHANICAL DETAILSM-503

FIRST FLOOR MECHANICAL NEW WORK PLANM-101

SECOND FLOOR MECHANICAL NEW WORK PLANM-102

ROOF MECHANICAL NEW WORK PLANM-104

MECHANICAL DETAILSM-501

MECHANICAL

MECHANICAL ABBREVIATIONS AND LEGENDSM-002

ROOF MECHANICAL DEMOLITION PLANMD104

ATTIC MECHANICAL NEW WORK PLANM-103

MECHANICAL DETAILSM-502

MECHANICAL SCHEDULES AND SEQUENCE OF OPERATIONM-601

INTERIORS

BASEMENT SIGNAGE PLANIG100

FIRST FLOOR SIGNAGE PLANIG101

SECOND FLOOR SIGNAGE PLANIG102

BASEMENT FINISH PLANIG160

FIRST FLOOR FINISH PLANIG161

SECOND FLOOR FINISH PLANIG162

SHOWER DRAIN, THRESHOLD, & TRANSITION DETAILSIG501

MOUNTING HEIGHTS & DETAILSIG571

SIGNAGE SCHEDULE & TYPICAL MOUNTING HEIGHTSIG601

SIGNAGE DETAILSIG602

ROOM FINISH SCHEDULE & LEGENDIG603

FIRST FLOOR ACCESSORY PLANIG171

SECOND FLOOR ACCESSORY PLANIG172

LOBBY ENLARGED PLANS & INTERIOR ELEVATIONSIG201

STAFF LOUNGE, WATER FOUNTAIN, & SHOWER ELEVATIONSIG202

ACCESSORY SCHEDULEIG604

FIRST FLOOR RESTROOM ELEVATIONSIG203

SECOND FLOOR RESTROOM ELEVATIONSIG204

GENERAL AND STRUCTURAL NOTESA-002

ATTIC DEMOLITION PLANAD103

DEMOLITION PHOTOSAD901

EXTERIOR ELEVATIONSA-202

MECHANICAL ROOM 212 ENLARGED PLAN & ATTIC ACCESS LADDER DETAILSA-404

ENLARGED PLAN, ELEVATION AND SECTION OF INTERIOR STAIRS

A-509 CONCRETE DETAILS

A-510 DOWNSPOUT AND GUTTER DETAILS

A-511 ROOF DETAILS

A-512 MISCELLANEOUS DETAILS

REVISIONS DATE

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Designed

Drawing Title

Approved: Chief Engineering

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

Raymond-Pond SDVOSB JV, LLC 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592

POND & Company 3500 Parkway Lane, Suite 500 Peachtree Corners, GA 30092 678-336-7740

Raymond Engineering 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

VAMC MOUNTAIN HOME, TN

CORRECT ADMIN BLDG 20

ENVIRONMENT AND

CONDITION DEFICIENCIES

MARCH 15, 2021

BID DOCUMENTS 621-15-101

G-002

GENERAL PROJECT NOTES

RAPJMC

GENERAL PROJECT NOTES:

23. DO NOT CUT INTO, REMOVE, OR ALTER ANY STRUCTURAL MEMBER OR PORTION

OF THE FLOOR SYSTEM.

24. INTERIOR PARTITION MOVEMENT CONTROL:

A. VERTICAL CONTROL JOINTS FOR ANY WALL LENGTH ARE TO OCCUR AT NOT

MORE THAN 30'-0" O.C. IN THE HORIZONTAL DIRECTION, UNLESS NOTED

OTHERWISE.

B. PROVISIONS SHALL BE MADE BY THE CONTRACTOR IN THE DESIGN,

FABRICATION, AND INSTALLATION OF INTERIOR PARTIONS FOR TYPICAL

FLOOR DEFLECTIONS OF THE STRUCTURE UNDER SUPERIMPOSED LOADS AS

FOLLOWS:TYPICAL ROOF/FLOOR MEMBERS: SPAN/360 BUT NOT LESS THAN

1/2”.

25. IF APPLICABLE THE CONTRACTOR SHALL COORDINATE THE PHASING OF THE

WORK TO BE PERFORMED IN OR ABOUT EXISTING FACILITIES, WITH THE COR

PRIOR TO START OF SUCH WORK.

26. CONTRACTOR TO FIELD VERIFY AND PROTECT EXISTING CONDUITS AND SYSTEMS

WHICH ARE TO REMAIN UNDISTURBED THROUGHOUT THE CONSTRUCTION

PERIOD. IMMEDIATELY REPORT DAMAGE TO THE ARCHITECT IN WRITING AND

REPAIR DAMAGES TO MEET CODES, MANUFACTURER'S SPECIFICATIONS AND

OWNER'S SATISFACTION. NOTIFY THE OWNER AND ARCHITECT OF ANY

DISCREPANCIES.

27. CONTRACTOR TO VERIFY DIMENSIONS/REQUIREMENTS OF THE REQUIRED SLAB

OPENINGS/DEPRESSIONS FOR EQUIPMENT (PLUMBING, ETC.) PRIOR TO

FABRICATION/CONSTRUCTION OF SLAB - TYP.

28. THE DOOR TO THE CONSTRUCTION AREA SHALL BE MIN. 36" WIDE WITH A CLOSER

AND LEVER HANDLE LATCHSET, EITHER EXISTING, NEW, OR TEMPORARY.

29. REMOVE AND STORE MATERIALS AND EQUIPMENT INDICATED TO BE REUSED OR

RELOCATED IN A COOL DRY PLACE TO PREVENT DAMAGE.

30. CONTRACTOR RESPONSIBLE FOR COORDINATING INTERIOR FINISHES LISTED IN

PLANS, SCHEDULES, NOTES, AND ELEVATIONS. NOTIFY ARCHITECT OF ANY

CONFLICTS, INCONSISTENCIES, OR DEVIATIONS IN WRITING PRIOR TO

CONSTRUCTION.

31. THE GENERAL CONTRACTOR AND SUBCONTRACTOR TO COORDINATE FINISH

HARDWARE AND KEYING WITH OWNER. CONTRACTOR TO PROVIDE A COMPLETE

AND OPERATIONAL SYSTEM - APPROVED BY OWNER.

32. CONSTRUCTION LIMITS - ALL CONTRACTOR VEHICLES AND TRAFFIC SHALL

REMAIN WITHIN THE DESIGNATED CONSTRUCTION AREAS, STAGING AREAS, OR

HAUL ROUTES.

33. ACCESS TO THE SITE - CONTRACTOR'S ACCESS TO THE SITE SHALL BE AS

DIRECTED BY THE OWNER. THE CONTRACTOR SHALL NOT PERMIT ANY

UNAUTHORIZED CONSTRUCTION PERSONNEL OR TRAFFIC ON THE SITE. THE

CONTRACTOR IS RESPONSIBLE FOR THE IMMEDIATE CLEAN-UP OF ANY DEBRIS

DEPOSITED ALONG THE ACCESS ROAD AS A RESULT OF HIS/HER CONSTRUCTION

TRAFFIC. DIRECTIONAL SIGNING AT THE ACCESS GATE AND ALONG THE DELIVERY

ROUTE TO THE STORAGE AREA OR WORK SITE SHALL BE AS DIRECTED BY THE

OWNER.

34. MATERIALS DELIVERY TO THE SITE - ALL CONTRACTOR'S MATERIAL ORDERS FOR

DELIVERY TO THE SITE WILL USE THE ACCESS POINT AT THE CONTRACTOR'S

STORAGE SITE AS APPROVED BY OWNER. THE CONTRACTOR SHALL PROVIDE

ADEQUATE ROADWAY SIGNS TO DIRECT DELIVERIES.

35. CONSTRUCTION AREA LIMITS - THE LIMITS OF CONSTRUCTION , MATERIAL

STORAGE AREAS, EQUIPMENT STORAGE AREA, PARKING AREA AND OTHER AREAS

DEFINED AS REQUIRED FOR THE CONTRACTOR'S EXCLUSIVE USE DURING

CONSTRUCTION SHALL BE MARKED BY THE CONTRACTOR AND APPROVED BY THE

OWNER. THE CONTRACTOR SHALL ERECT AND MAINTAIN AROUND THE

PERIMETER OF THESE AREAS SUITABLE FENCING, SIGNAGE, AND WARNING

DEVICES VISIBLE FOR BOTH DAY/NIGHT USE TO DELINEATE THE PERIMETER OF

ALL SUCH AREAS.

36. SUBMIT LIGHT GAUGE METAL FRAMING SHOP DRAWINGS SIGNED AND SEALED BY

A PROFESSIONAL ENGINEER LICENSED FOR APPROVAL.

37. PREPARE, APPLY, AND/OR INSTALL MATERIALS TO MEET ALL MANUFACTURER'S

WARRANTIES AND SPECIFICATIONS.

38. THE AVAILABILITY OF ALL MATERIALS DESIGNATED ON PLANS SHALL BE VERIFIED

BY CONTRACTOR AND SUBCONTRACTORS PRIOR TO ESTIMATE SUBMITTALS.

CONTRACTOR TO NOTIFY ARCHITECT IF MATCHING MATERIALS ARE NOT

AVAILABLE. ANY SUBSTITUTIONS TO BE REVIEWED AND APPROVED.

39. ESTABLISH PROCEDURES AND EXECUTE OPERATIONS TO PROVIDE CONTINUOUS

SECURITY. PROVIDE TEMPORARY PROTECTION FOR OPENINGS AND AT OTHER

LOCATIONS AS MAY BE APPROPRIATE DURING CONSTRUCTION. DENY ENTRANCE

OF UNAUTHORIZED PERSONS INTO WORK AREA.

40. IT IS THE CONTRACTOR'S SOLE RESPONSIBILITY TO DETERMINE DEMOLITION

PROCEDURE AND SEQUENCE TO INSURE THE SAFETY OF THE BUILDING AND ITS

COMPONENT PARTS DURING DEMOLITION. THIS INCLUDES, BUT IS NOT LIMITED

TO, THE ADDITION OF WHATEVER TEMPORARY BRACING, GUYS, OR TIE-DOWNS

MAY BE NECESSARY. SUCH MATERIAL SHALL BE REMOVED AND SHALL REMAIN

THE PROPERTY OF THE CONTRACTOR AFTER COMPLETION OF THE PROJECT.

1. THE FOLLOWING CONSTRUCTION DOCUMENTS ARE INTENDED TO PROVIDE

THE CONTRACTOR WITH A GENERAL KNOWLEDGE OF THE EXISTING

CONDITIONS WITHIN THE PROJECT AREA. EXISTING EQUIPMENT, STRUCTURE,

DUCTWORK, ETC. LOCATED ON DRAWINGS WERE DERIVED FROM LIMITED

FIELD OBSERVATIONS AND THE EXISTING AS-BUILTS WHICH MAY NOT BE UP

TO DATE. THEREFORE, THIS DRAWING MAY NOT BE ALL INCLUSIVE OF

SERVICES AND CONDITIONS THAT EXIST IN THE PROJECT AREA.

2. THE DRAWINGS INDICATE THE GENERAL EXTENT OF WORK. THE DRAWINGS

ARE NOT INTENDED TO INDICATE OR DESCRIBE ALL WORK REQUIRED FOR

THE FULL PERFORMANCE AND COMPLETION OF THE REQUIREMENTS OF THE

CONTRACT DOCUMENTS.

3. THE ENUMERATION OF PARTICULAR ITEMS OF WORK IN ONE PORTION OF THE

CONTRACT DOCUMENTS SHALL NOT BE CONSTRUED TO EXCLUDE OTHER

ITEMS NECESSARY OR IMPLIED THEREFROM.

4. THE CONTRACTOR IS RESPONSIBLE FOR THE COORDINATION OF PARTS OF

THE WORK SO THAT NO WORK SHALL BE LEFT IN AN UNFINISHED OR

INCOMPLETE CONDITION.

5. WORK SHALL CONFORM TO APPLICABLE INDUSTRY AND MANUFACTURER'S

PUBLISHED STANDARDS FOR QUALITY OF MATERIALS AND WORKMANSHIP, AS

WELL AS ALL REQUIREMENTS IN THESE DRAWINGS AND SPECIFICATIONS. ANY

CONFLICTING REQUIREMENTS OF THE SOURCES LISTED ABOVE SHALL BE

BROUGHT TO THE CORS ATTENTION PRIOR TO PROCEEDING WITH THE WORK.

6. THE CONTRACTOR SHALL PROTECT EXISTING, IN-PLACE, AND NEW WORK.

7. WORK NOTED "N.I.C." IS NOT MEANT TO BE PART OF THE CONSTRUCTION

SCOPE OF WORK AGREEMENT.

8. THE CONTRACTOR SHALL PAY FOR AND COORDINATE THE REMOVAL AND

LEGAL DISPOSAL OF MATERIALS AND RUBBISH.

9. ONCE ON SITE, THE CONTRACTOR SHALL VERIFY DIMENSIONS AND SHALL

VERIFY NEW AND EXISTING CONDITIONS SHOWN ON THESE DRAWINGS. THE

CONTRACTOR SHALL NOTIFY THE COR IN WRITING OF ANY DIFFERING

CONDITIONS BEFORE COMMENCEMENT OF WORK.

10. DO NOT SCALE DRAWINGS; DIMENSIONS GOVERN, LARGE SCALE DETAILS

GOVERN OVER SMALL SCALE DETAILS. THE CONTRACTOR SHALL NOTIFY THE

COR IN WRITING OF DIFFERING CONDITIONS BEFORE COMMENCEMENT OF

WORK.

11. UNLESS NOTED OTHERWISE, GYPSUM BOARD SURFACES ARE TO RECEIVE

ONE PRIMER COAT AND TWO COATS OF PAINT.

12. NFPA 241, STANDARD FOR SAFEGUARDING CONSTRUCTION, AND ALTERATION

OPERATIONS SHALL BE APPLIED.

13. WALL AND/OR CEILING ASSEMBLIES THAT ARE IDENTIFIED WITH A FIRE

RESISTIVE RATING SHALL BE CONSTRUCTED AS DETAILED.

14. DIMENSIONS SHOWN ARE TO FACE OF STUD OR CMU (U.N.O.).

15. INTERIOR FINISH MATERIALS SHALL COMPLY WITH THE REQUIREMENTS OF

APPLICABLE CODES, ORDINANCES AND REGULATORY AGENCIES.

16. DISSIMILAR METALS SHALL BE ISOLATED FROM EACH OTHER TO AVOID

GALVANIC CORROSION.

17. NOTES APPEAR ON VARIOUS SHEETS FOR DIFFERENT SYSTEMS AND

MATERIALS. NOTES ON INDIVIDUAL SHEETS SHALL BE APPLIED TO RELATED

DRAWINGS AND DETAILS.

18. A FINISH INDICATION ON A WALL SHALL MEAN THE ENTIRE LENGTH AND

HEIGHT OF WALL IS TO BE FINISHED OR FIRE-RATED AS INDICATED.

19. WHEN NON-DIMENSIONED PARTITIONS APPEAR IN CONJUNCTION WITH DOOR

OPENINGS, THE DOOR WIDTH AND THE DOOR FRAME DETAILS DETERMINE

THE LOCATION OF ADJACENT WALLS AND FRAMES.

20. DETAILS NOT SHOWN ARE SIMILAR IN CHARACTER TO THOSE DETAILED.

WHERE SPECIFIC DIMENSIONS, DETAILS OR DESIGN INTENT CANNOT BE

DETERMINED, CONSULT THE COR BEFORE PROCEEDING WITH THE WORK.

21. THE CONTRACTOR SHALL COORDINATE ALL MECHANICAL AND ELECTRICAL

FLOOR AND WALL SLEEVES INCLUDING CONDUITS WITH ALL DRAWINGS.

22. PROVIDE ACCESS PANELS AS REQUIRED BY APPLICABLE CODES AND AS

REQUIRED FOR ACCESS TO MECHANICAL EQUIPMENT AND PLUMBING WORK

THAT REQUIRES PERIODIC MAINTENANCE. ALL ACCESS PANELS SHALL BE

CONCEALED AND LOCATIONS SHALL BE REVIEWED WITH THE ARCHITECT

PRIOR TO PROCEEDING.

41. ALL RFI's, PROPOSED CHANGES, OR PROPOSED VALUE ENGINEERING ITEMS MUST HAVE A COST SUBMITTED AND ITS IMPACT (i.e. NO COST, ADDITIONAL COST, CREDIT, CONSTRUCTION SCHEDULE IMPACT,ETC.) PRIOR TO ARCHITECT'S

APPROVAL. IT SHALL BE UNDERSTOOD OMISSION OF THESE ITEMS REPRESENTS

THERE IS NO COST OR SCHEDULE INCREASE ASSOCIATED.

42. ALL CUTTING AND PATCHING SHALL BE PERFORMED BY THE GENERAL

CONTRACTOR. GENERAL CONTRACTOR SHALL INCLUDE COST OF ALL REQUIRED

CUTTING AND PATCHING FOR ALL TRADES IN THEIR ESTIMATE.

43. SAFETY AND SECURITY - THE CONTRACTOR SHALL CONDUCT HIS/HER ACTIVITIES

IN A SAFE AND SECURE MANNER. CONTRACTOR TO COMPLY WITH ALL OSHA

STANDARDS AND REGULATIONS.

44. FLOAT OUT AND/OR GRIND FLOOR IRREGULARITIES WHERE OCCURRING AS

NECESSARY FOR SMOOTH, LEVEL FLOOR IN CONDITION TO RECEIVE SCHEDULED

FLOOR MATERIALS. COMPLY WITH ALL MATERIAL MANUFACTURERS'

RECOMMENDATIONS (INCLUDING SLAB MOISTURE REQUIREMENT), ALL CODES

(FEDERAL, STATE, AND LOCAL, ETC) AND SPECS AND DRAWINGS.

45. ALL WOOD BLOCKING AND CONCEALED LUMBER TO BE FIRE RETARDANT TREATED.

G.C. SHALL COORDINATE ALL REQUIRED BLOCKING WITH THE OWNER & OWNER'S

VENDOR(S) FOR ALL WALL MOUNTED ACCESSORIES & MISC WALL MOUNTED OR

RECESSED ITEMS.

46. CONTRACTOR TO FRAME FOR RIGID CONDITION AT ALL FRAMING CONDITIONS. TO

INCLUDE BUT NOT LIMITED TO DOORS, WINDOWS, WALLS, ROOF, ETC.

47. CONTRACTOR TO PROVIDE ALL ENGINEERING AND SHOP DRAWINGS OF ALL

GLAZED WINDOW SYSTEMS (INCLUDING ALL ANCHORAGE CONDITIONS - SIGNED

AND SEALED) . FIELD VERIFY ALL DIMENSIONS PRIOR TO FABRICATION AND

CONSTRUCTION. PROVIDE WATERPROOF CONDITION AT ALL GLAZING SYSTEMS.

48. PROVIDE OPENINGS IN NEW AND EXISTING WALLS, FLOORS, ROOF, MECHANICAL,

ELECTRICAL, PLUMBING, ETC. PROVIDE FLASHING, COUNTER-FLASHING,

SEALANTS, SMOKE BARRIERS / DAMPERS, AND FIRE-SAFING REQUIRED TO MEET

MANUFACTURER'S WARRANTIES AND SPECIFICATIONS, FEDERAL, STATE, AND

LOCAL CODES. COORDINATE WITH STRUCTURAL AND M.E.P. DRAWINGS.

COORDINATE WITH DISCIPLINE. NOTIFY ARCHITECT IN WRITING OF ALL

DISCREPANCIES.

49. UNDERGROUND UTILITY LINES AND CABLES TO REMAIN SHALL BE PROTECTED.

NOTIFY ARCHITECT IN WRITING OF ANY DAMAGE TO EXISTING ITEMS TO REMAIN.

DIMENSIONS ARE TO FACE OF EXISTING WALL/CONSTRUCTION, STRUCTURAL

COLUMN CENTERLINES, OR FACE OF STUD OR CMU UNLESS OTHERWISE NOTED.

50. PROVIDE BLOCKING AND OR SHIMS NECESSARY TO INSTALL, INCLUDING BUT NOT

LIMITED TO, DOORS, WINDOWS, FIXTURES, MILLWORK, AND EQUIPMENT, WHICH

WILL MEET MANUFACTURER'S WARRANTIES AND SPECIFICATIONS. BLOCKING TO

MEET APPLICABLE FEDERAL, STATE, AND LOCAL CODES.

51. EXPOSED INTERIOR AND EXTERIOR BUILDING FEATURES SHALL BE PAINTED

(UNLESS OTHERWISE SPECIFICALLY NOTED). IF NOT SUPPLIED AS A FINISH

PRODUCT PER OWNER OR SPECIFIED BY ARCHITECT, COORDINATE AND PROVIDE

FINISH. PAINTING EXCLUDES AND/OR PRE-FINISHED FACTORY ITEMS.

52. STRUCTURAL MEMBERS: ANY STRUCTURAL MEMBERS ACCIDENTALLY OR

INTENTIONALLY CUT WITHOUT PROPER AUTHORIZATION SHALL BE RESTORED TO

ORIGINAL INTEGRITY AND CONDITION TO THE SATISFACTION OF THE ARCHITECT,

STRUCTURAL ENGINEER, AND COR.

53. FIELD ADJUSTMENTS SHOULD COMPLY WITH THE INTENT OF THE CONTRACT

DOCUMENTS AND APPLICABLE CODES. THE CONTRACTOR IS RESPONSIBLE FOR

CORRECTNESS OF DIMENSIONS DETAILS AND QUANTITIES FOR COORDINATION OF

DISCIPLINES AND CONDITIONS (CLEARANCES, FIXTURES, EQUIPMENT, ETC) AND

ADDITIONAL COSTS INCURRED AS A RESULT OF CONTRACTOR FIELD

ADJUSTMENTS.

54. NOTHING SHALL RELIEVE THE CONTRACTOR FROM COMPLIANCE WITH

REQUIREMENTS OF THE CONTRACT DOCUMENTS AND ALL APPLICABLE CODES.

THE CONTRACTOR IS RESPONSIBLE FOR CORRECTNESS OF DIMENSIONS AND

DETAILS, QUANTITIES FOR COORDINATION OF ALL TRADES AND CONDITIONS

(CLEARANCES, FIXTURES, EQUIPMENT, ETC) AND ANY ADDITIONAL COSTS

INCURRED AS A RESULT OF CONTRACTOR REQUESTED FIELD ADJUSTMENTS.

55. ALL WORK SHALL CONFORM TO APPLICABLE INDUSTRY AND MANUFACTURERS'

PUBLISHED STANDARDS.

56. REQUIREMENTS IN THESE DRAWINGS AND SPECIFICATIONS. ANY CONFLICTING

REQUIREMENTS SHALL BE BROUGHT TO THE ARCHITECT'S ATTENTION IN WRITING

PRIOR TO COMMENCEMENT OF WORK.

57. ARCHITECT'S REVIEW OF SHOP DRAWINGS IS FOR GENERAL COMPLIANCE

WITH CONTRACT DOCUMENTS ONLY. SHOP DRAWINGS MARKED "NO

EXCEPTIONS TAKEN" OR "COMPLY WITH MARKINGS," AS WELL AS ANY

ADDITIONAL MARKINGS OR NOTES, DO NOT RELIEVE THE CONTRACTOR

FROM COMPLIANCE WITH THE REQUIREMENTS OF THE CONTRACT

DOCUMENTS. THE CONTRACTOR IS RESPONSIBLE FOR CORRECTNESS OF

DIMENSIONS AND DETAILS, AND FOR COORDINATION OF THE WORK OF ALL

TRADES.

58. PROVIDE FIRE AND SMOKE JOINT SYSTEMS , FIRE SAFEING, FIRE AND SMOKE

CLOSURES, ETC. TO MAINTAIN FIRE AND SMOKE RATINGS AT FIRE AND

SMOKE WALL LOCATIONS, AND WHERE SHAFTS AND WALLS INTERSECT

FLOOR AND ROOF DECKS. COMPLY WITH FBC 715.

59. THE CONTRACTOR SHOULD OBTAIN A HOT WORK PERMIT PRIOR TO

BEGINNING ANY WELDING, CUTTING, BRAZING, GRINDING, OR OTHER

ACTIVITY THAT GENERATES SPARKS CAPABLE OF CAUSING COMBUSTION.

SEE NFPA 51B AND APPENDIX A FOR ADDITIONAL INFORMATION. PROVIDE A

FIRE WATCH AND/OR A GUARD WATCH AS REQUIRED BY NFPA 601 DURING

THE PROCESS OF CUTTING, WELDING, BRAZING, GRINDING, OR OTHER

ACTIVITY THAT GENERATES SPARKS CAPABLE OF CAUSING COMBUSTION,

ETC.

60. CONTACT ARCHITECT TO CLARIFY ANY DRAWING DISCREPANCY AND/OR

CONFLICTS OF DIFFERENT BIDDING ELEMENTS/COMPONENTS. FOR THE

PURPOSES OF PRICING AND BIDDING ASSUME THE MORE COSTLY OPTION.

61. SOME EXCAVATION MAY BE REQUIRED FOR CRAWL SPACE UTILIZED IN THE

BASEMENT FOR DUCT WORK.

CODES:

INTERNATIONAL BUILDING CODES 2018 (IBC)

INTERNATIONAL EXISTING BUILDING CODES 2018 (IEBC)

NFPA 101- LIFE SAFETY CODES 2018 (LSC)

ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARD 2015 (ABAAS).

VA BARRIER FREE DESIGN STANDARD (SUPPLEMENT TO ABAAS) 2015

TYPE OF CONSTRUCTION:

VA (IBC); V(111) (LSC), FULLY SPRINKLERED

OCCUPANCY: BUSINESS OCCUPANCY & ACCESSORY STORAGE

FIRE RESISTANCE RATING: NFPA

- PRIMARY STRUCTURAL FRAME: 1 HR

- PRIMARY STRUCTURAL FRAME, SUPPORTING ROOF: 1 HR

- NON BEARING WALLS AND PARTITIONS - EXTERIOR: 0 HR

- NON BEARING WALLS AND PARTITION: 0 HR

- FLOOR CONSTRUCTION + SECONDARY STRUCTURAL MEMBERS: 1 HR

- ROOF CONSTRUCTION + SECONDARY STRUCTURAL MEMBERS: 1 HR

CORRIDOR WALLS: SMOKE PARTITIONS

STAIR: 1 HR FIRE RATED

SHAFTS: 2 HR FIRE BARRIER

NEW BASEMENT AREA: 567 SF TOTAL

NEW FIRST FLOOR AREA: 2,448 SF TOTAL

NEW SECOND FLOOR AREA: 2,439 SF TOTAL

TOTAL BUILDING AREA: 5,454 SF TOTAL

NUMBER OF OCCUPANTS:

CONFERENCE ROOM: 268 SF / 15 SF = 18 OCCUPANTS

CHIEF OFFICE: 181 SF / 100 SF = 2 OCCUPANT

DEPUTY CHIEF OFFICE: 154 SF / 100 SF = 2 OCCUPANT

OFFICER WORK ROOM: 375 SF / 100 SF = 4 OCCUPANTS

OFFICES: 124 SF / 100 SF = 2 OCCUPANT

RECEPTION: 110 SF / 100 SF = 2 OCCUPANT

STAFF LOUNGE: 193 SF / 50 SF = 4 OCCUPANT

LOCKER ROOMS: 129 SF / 50 SF = 3 OCCUPANTS

1ST FLOOR LOBBY: 278 SF / 100 SF = 3 OCCUPANTS

2ND FLOOR LOBBY: 207 SF / 100 SF = 3 OCCUPANTS

TOTAL: 43 OCCUPANTS

NEW BUSINESS (NFPA 101-CHAPTER 38):

MAX DEAD END: 50' (NFPA 101-38.2.5.2)

MAX. TRAVEL DISTANCE TO AN EXIT: 300' WITH SPRINKLER SYSTEM

(NFPA 101-38.2.6.3) - 128' ACTUAL

MAX. COMMON PATH OF TRAVEL: 100' WITH SPRINKLER SYSTEM (NFPA

101-38.2.5.3) - 70' ACTUAL

LIFE SAFETY CODE (NFPA 101-CHAPTER 7):

7.2.2.6.3

SEPARATION FROM OUTSIDE STAIR NOT REQUIRED.

LIFE SAFETY CODE (NFPA 101-CHAPTER 43):

43.10 REPAIR, RENOVATION, MODIFICATION OF RECONSTRUCTION OF

HISTORIC BUILDING

REPLACEMENT OF EXISTING OR MISSING FEATURES USING ORIGINAL OR

LIKE MATERIALS SHALL BE PERMITTED. PARTIAL REPLACEMENT FOR

REPAIRS THAT MATCH THE ORIGINAL IN CONFIGURATION, HEIGHT, AND SIZE

SHALL BE PERMITTED. REPLACEMENT SHALL NOT BE REQUIRED TO MEET

SPECIFIC MATERIALS, INSTALLATION, PENETRATIONS OR CONTINUITY OF

ANY COMPONENT, OR SYSTEM IN THE BUILDING.

AUTOMATIC SPRINKLER SYSTEM: NFPA 13-2019 ED.

AN AUTOMATIC SPRINKLER SYSTEM SHALL BE PROVIDED THROUGHOUT

BUILDING.

MINIMUM NUMBER OF REQUIRED PLUMBING FIXTURES (IBC-P: TABLE 403.1)

- EMPLOYEES (15 OCC.)

- WATER CLOSETS: 1:18 MALE/FEMALE = 1 MALE/FEMALE REQUIRED

- LAVATORIES: 1:18 MALE/FEMALE = 1 MALE/FEMALE REQUIRED

- VISITORS: (28 OCC.)

- WATER CLOSETS: 1:75 MALE/FEMALE = 1 MALE/FEMALE REQUIRED

- LAVATORIES: 1:100 MALE/FEMALE = 1 MALE/FEMALE REQUIRED

- EMPLOYEES & VISITORS

- WATER CLOSETS: 1 MALE/FEMALE REQUIRED

- LAVATORIES: 1 MALE/FEMALE REQUIRED

- 2 ADA ACCESSIBLE RESTROOMS PROVIDED

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Designed

Drawing Title

Approved: Chief Engineering

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

Raymond-Pond SDVOSB JV, LLC 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592

POND & Company 3500 Parkway Lane, Suite 500 Peachtree Corners, GA 30092 678-336-7740

Raymond Engineering 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

VAMC MOUNTAIN HOME, TN

CORRECT ADMIN BLDG 20

ENVIRONMENT AND

CONDITION DEFICIENCIES

MARCH 15, 2021

BID DOCUMENTS 621-15-101

G-003

BUILDING CODE SUMMARY &

DEDUCTIVE ALTERNATES

RAPJMC

DEDUCTIVE ALTERNATE #1 – DEDUCT ALL COSTS

ASSOCIATED WITH LABOR AND MATERIAL AS PART OF

THIS ALTERNATE. DEDUCT COSTS FOR MATERIAL AND

LABOR TO REPLACE THE ROOF. ALL OTHER ITEMS ON

ROOF REQUIRED TO COMPLETE OTHER SCOPE PLUS

ROOF REPAIRS AROUND THOSE PENETRATIONS MUST

STAY INCLUDED IN BASE BID.

THE EXISTING BUILDING 20 IS CURRENTLY A

VACANT OFFICE BUILDING ON THE JAMES H.

QUILLEN VA CAMPUS. THIS PROJECT WILL

RENOVATE APPROXIMATELY 5,454 SQUARE FEET,

THREE (3) FLOOR BUILDING FOR USE OF THE

POLICE SERVING THE JAMES H. QUILLEN VA

CAMPUS.

THE RECONSTRUCTED SPACE FOR THE POLICE

STAFF WILL PROVIDE OFFICES, A CONFERENCE

ROOM, AN OBSERVATION ROOM, AN INTERVIEW

ROOM, AN EVIDENCE ROOM WITH PROCESSING,

MALE AND FEMALE LOCKER ROOMS, STORAGE

SPACE, ELECTRICAL AND MECHANICAL ROOMS,

AN ARMORY WITH AMMUNITION STORAGE,

LOUNGE AREAS, WAITING AND RECEPTION AREAS,

RESTROOMS, CORRIDORS, CIRCULATION AREAS,

AND REPLACEMENT OF FINISH MATERIALS TO

INCORPORATE CURRENT VA STANDARDS.

THE SCOPE OF WORK INCLUDES TO DEMOLISH

INTERIOR, NON-STRUCTURAL ELEMENTS AND

RENOVATIONS TO INCLUDE BUT NOT LIMITED TO

NEW WALLS, COUNTERS, DOORS, HARDWARE,

FINISHES, GLASS/GLAZING, MECHANICAL,

ELECTRICAL, SPRINKLERS AND ALL ASSOCIATED

WORK. NEW SYSTEMS INSTALLED SHALL BE

DESIGNED TO VA STANDARDS AND MEET

EFFICIENCY DESIGN STANDARDS DEPLOYING THE

LATEST ENERGY SAVING TECHNOLOGY,

CONTROLS, ETC. WHERE POSSIBLE.

CODE ANALYSIS: CODE CRITERIA:

• VA HAS ADOPTED THE LATEST EDITION OF THE FOLLOWING CODES AND

STANDARDS AS A MINIMUM FOR ALL PROJECTS PERFORMED IN THE

MODERNIZATION, ALTERATION, ADDITION, OR IMPROVEMENT OF ITS REAL

PROPERTY AND THE CONSTRUCTION OF NEW STRUCTURES. VA DESIGN

MANUALS AND MASTER SPECIFICATIONS SPECIFY OTHER CODES AND

STANDARDS THE VA FOLLOWS ON ITS PROJECTS.

• VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL

CAD STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE

TECHNICAL INFORMATION LIBRARY (TIL) ( HYPERLINK "http://www.cfm.va.gov/til/"

HTTP://WWW.CFM.VA.GOV/TIL/).

• INTERNATIONAL BUILDING CODE (IBC) (ONLY WHEN SPECIFICALLY

REFERENCED IN VA DESIGN DOCUMENTS, SEE NOTES BELOW). 2012

• NFPA 101 LIFE SAFETY CODE (SEE NOTES BELOW). 2018

• NFPA NATIONAL FIRE CODES WITH THE EXCEPTION OF NFPA 5000 AND NFPA

900. 2018

• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.

• VA SEISMIC DESIGN REQUIREMENTS, H-18-8

• NATIONAL ELECTRICAL CODE (NEC) 2018

• INTERNATIONAL PLUMBING CODE (IPC) 2018

• ASME CODE FOR PRESSURE PIPING

• ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS)

INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN GUIDE (PG-18-13)

• BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, AMERICAN

CONCRETE INSTITUTE AND COMMENTARY (ACI 3-18)

• MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE FACTOR DESIGN

SPECIFICATIONS FOR STRUCTURAL STEEL BUILDINGS, AMERICAN INSTITUTE

OF STEEL CONSTRUCTION (AISC)

• ENERGY POLICY ACT OF 2005 (EPACT)

• DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW

FEDERAL, COMMERCIAL, AND MULTI-FAMILY HIGH-RISE RESIDENTIAL

BUILDINGS AND NEW LOW-RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433,

434 AND 435.

• FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS:

MEMORANDUM OF UNDERSTANDING (MOU)

• EXECUTIVE ORDER 13423: STRENGTHENING FEDERAL ENVIRONMENTAL,

ENERGY, AND TRANSPORTATION MANAGEMENT.

• THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE

GENERAL REQUIREMENTS SECTION 01 00 00 OF THE VA MASTER

CONSTRUCTION SPECIFICATION.

• VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY – ASHRAE STANDARD

62.1- 2016.

• SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE STANDARD 15 –

2016.

GENERAL DEDUCTIVE ALTERNATE

NOTES:

1. A DEDUCTIVE ALTERNATE IS AN AMOUNT PROPOSED

BY GC AND STATED ON THE BID FORM FOR CERTAIN

WORK DEFINED IN THE BIDDING REQUIREMENTS

THAT MAY BE ADDED TO OR DEDUCTED FROM THE

BASE BID AMOUNT IF VA DECIDES TO ACCEPT A

CORRESPONDING CHANGE, EITHER IN THE AMOUNT

OF CONSTRUCTION TO BE COMPLETED OR IN THE

PRODUCTS, MATERIALS, EQUIPMENT, SYSTEMS, OR

INSTALLATION METHODS DESCRIBED IN THE

CONTRACT DOCUMENTS.

2. COORDINATION: MODIFY OR ADJUST AFFECTED

ADJACENT WORK AS NECESSARY TO COMPLETELY

INTEGRATE WORK OF THE BID OPTION INTO

PROJECT. INCLUDE AS PART OF EACH DEDUCTIVE

ALTERNATE MISCELLANEOUS DEVICES, ACCESSORY

OBJECTS, AND SIMILAR ITEMS INCIDENTAL TO OR

REQUIRED FOR A COMPLETE INSTALLATION

WHETHER OR NOT INDICATED AS PART OF

DEDUCTIVE ALTERNATE.

3. EXECUTE ACCEPTED DEDUCTIVE ALTERNATE

UNDER THE SAME CONDITIONS AS OTHER WORK OF

THE CONTRACT.

DEDUCTIVE ALTERNATES:

GENERAL SCOPE OF WORK:

UP

1. ALL DEVICES HAVE NOT BEEN SHOWN, BUT THE

CONTRACTOR SHALL ENSURE THE INSTALLATION OF ALL

LIFE SAFETY DEVICES INDICATED ON THE ENGINEERING

DRAWINGS.

2. CONTRACTOR SHALL FIELD VERIFY THE LOCATION OF ANY

EXISTING FIRE RATED WALLS. ANY WORK DONE AROUND

EXISTING FIRE RATED WALLS SHALL BE DONE WITH CARE

SO AS NOT TO COMPROMISE THE RATING'S INTEGRITY.

ANY DAMAGE SHALL BE REPAIRED IMMEDIATELY.

3. CONTRACTORS SHALL FOLLOW EM-385-1-1 AND NFPA 241,

ALONG WITH THE INSTALLATION’S FIRE REGULATIONS.

4. FIRE WALLS, FIRE BARRIERS, FIRE PARTITIONS, SMOKE

BARRIERS, AND SMOKE PARTITIONS OR ANY OTHER WALL

REQUIRED TO HAVE PROTECTED OPENINGS, OR

PENETRATIONS SHALL BE EFFECTIVELY AND

PERMANENTLY IDENTIFIED WITH SIGNS OR STENCILING.

SUCH IDENTIFICATION SHALL:

A. BE LOCATED WITHIN 15 FEET OF THE END OF EACH WALL

AND AT INTERVALS NOT EXCEEDING 30 FEET MEASURED

HORIZONTALLY ALONG WITH WALL OR PARTITION.

B. INCLUDE LETTERING NOT LESS THAN 3 INCHES IN HEIGHT

WITH A MINIMUM 3/8-INCH STROKE IN A CONTRASTING

COLOR INCORPORATING THE SUGGESTED WORDING,

“FIRE AND/OR SMOKE BARRIER – PROTECT ALL

OPENINGS,” OR SIMILAR WORDING.

GENERAL SHEET NOTES:

RATED WALL LEGEND

1-HR. FIRE RATED WALLS

2-HR. FIRE RATED WALLS

SMOKE PARTITION

2-HR FIRE RATED SMOKE BARRIER

FIRE RATED CURTAIN WALL

TRAVEL DISTANCE

NOTES:

1. CABINETS TO BE SIZED TO ACCOMODATE A

MINIMUM VOLUME OF 9.5L (2-1/2 GALLON).

2. EXTINGUISHER TO BE PROVIDED BY VA

FACILITY.

3. INSTALL FIRE EXTINGUISHERS ABOVE

FINISHED FLOOR PER NFPA 10. PROVIDE

STICK - ON LETTERING AND DIRECTIONAL

ARROWS TO IDENTIFY THE CABINET OR

EXTINGUISHER'S LOCATION.

EGRESS CLEAR WIDTH

45'-0"

FEC

36"

EXIT SIGN

LIFE SAFETY PLAN LEGEND

SEMI-RECESSED FIRE EXTINGUISHER CABINET

53'

FEC

52'

36"

MECHANICAL

ROOM

B01

STORAGE

B02

CORRIDOR

B00

ARMORY /

WEAPONS

B04

CORRIDOR

B03

NOTE: BULLET PROOF

MATERIAL AT CEILING

LOCATION WITH 2HR

FIRE RATING

SEE DETAIL B4/A-507

NOTE: CEILING

ASSEMBLY WITH 1HR

FIRE RATING

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Designed

Drawing Title

Approved: Chief Engineering

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

Raymond-Pond SDVOSB JV, LLC 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592

POND & Company 3500 Parkway Lane, Suite 500 Peachtree Corners, GA 30092 678-336-7740

Raymond Engineering 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

VAMC MOUNTAIN HOME, TN

CORRECT ADMIN BLDG 20

ENVIRONMENT AND

CONDITION DEFICIENCIES

MARCH 15, 2021

BID DOCUMENTS 621-15-101

G-100

BASEMENT LIFE SAFETY PLAN

RAPJMC

NOTE: MAX DISTANCE OF TRAVEL AS SHOWN IS 53'-0"

SCALE: 3/8" = 1'-0"F1

BASEMENT LIFE SAFETY PLAN

SCALE: = 1'-0"3/8"

0 2 4 62

DN

UP

DN

DN

1. ALL DEVICES HAVE NOT BEEN SHOWN, BUT THE

CONTRACTOR SHALL ENSURE THE INSTALLATION OF ALL

LIFE SAFETY DEVICES INDICATED ON THE ENGINEERING

DRAWINGS.

2. CONTRACTOR SHALL FIELD VERIFY THE LOCATION OF ANY

EXISTING FIRE RATED WALLS. ANY WORK DONE AROUND

EXISTING FIRE RATED WALLS SHALL BE DONE WITH CARE

SO AS NOT TO COMPROMISE THE RATING'S INTEGRITY.

ANY DAMAGE SHALL BE REPAIRED IMMEDIATELY.

3. CONTRACTORS SHALL FOLLOW EM-385-1-1 AND NFPA 241,

ALONG WITH THE INSTALLATION’S FIRE REGULATIONS.

4. FIRE WALLS, FIRE BARRIERS, FIRE PARTITIONS, SMOKE

BARRIERS, AND SMOKE PARTITIONS OR ANY OTHER WALL

REQUIRED TO HAVE PROTECTED OPENINGS, OR

PENETRATIONS SHALL BE EFFECTIVELY AND

PERMANENTLY IDENTIFIED WITH SIGNS OR STENCILING.

SUCH IDENTIFICATION SHALL:

A. BE LOCATED WITHIN 15 FEET OF THE END OF EACH WALL

AND AT INTERVALS NOT EXCEEDING 30 FEET MEASURED

HORIZONTALLY ALONG WITH WALL OR PARTITION.

B. INCLUDE LETTERING NOT LESS THAN 3 INCHES IN HEIGHT

WITH A MINIMUM 3/8-INCH STROKE IN A CONTRASTING

COLOR INCORPORATING THE SUGGESTED WORDING,

“FIRE AND/OR SMOKE BARRIER – PROTECT ALL

OPENINGS,” OR SIMILAR WORDING.

GENERAL SHEET NOTES:

TRAVEL DISTANCE

NOTES:

1. CABINETS TO BE SIZED TO ACCOMODATE A

MINIMUM VOLUME OF 9.5L (2-1/2 GALLON).

2. EXTINGUISHER TO BE PROVIDED BY VA

FACILITY.

3. INSTALL FIRE EXTINGUISHERS ABOVE

FINISHED FLOOR PER NFPA 10. PROVIDE

STICK - ON LETTERING AND DIRECTIONAL

ARROWS TO IDENTIFY THE CABINET OR

EXTINGUISHER'S LOCATION.

EGRESS CLEAR WIDTH

45'-0"

FEC

36"

EXIT SIGN

LIFE SAFETY PLAN LEGEND

SEMI-RECESSED FIRE EXTINGUISHER CABINET

RATED WALL LEGEND

1-HR. FIRE RATED WALLS

2-HR. FIRE RATED WALLS

SMOKE PARTITION

2-HR FIRE RATED SMOKE BARRIER

FIRE RATED CURTAIN WALL

36"

36"

36"

79'

78'

21'

32'

OFFICE

OFFICE

WOMEN

RESTROOM

STAFF

LOUNGE

MEN

RESTROOM

CORRIDOR

CORRIDOR

OFFICER

WORK

ROOM

INTERVIEW

ROOM

EVIDENCE

PROCESSING

EVIDENCE

ROOM

OFFICE

HOUSE

KEEPING

WAITING

ROOM

RECEPTION

ELECT.

OFFICE

OFFICE

15' - 11 1/2" DEAD-END

FEC

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Designed

Drawing Title

Approved: Chief Engineering

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

Raymond-Pond SDVOSB JV, LLC 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592

POND & Company 3500 Parkway Lane, Suite 500 Peachtree Corners, GA 30092 678-336-7740

Raymond Engineering 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

VAMC MOUNTAIN HOME, TN

CORRECT ADMIN BLDG 20

ENVIRONMENT AND

CONDITION DEFICIENCIES

MARCH 15, 2021

BID DOCUMENTS 621-15-101

G-101

FIRST FLOOR LIFE SAFETY PLAN

RAPJMC

SCALE: 3/8" = 1'-0"F1

FIRST FLOOR LIFE SAFETY PLAN

SCALE: = 1'-0"3/8"

0 2 4 62

NOTE: MAX DISTANCE OF TRAVEL AS SHOWN IS 79'-0"

36"

95'

96'

33'

34'

CONFERENCE

ROOM

CHIEF

OFFICE

ELECT.

LOBBY

MECHANICAL

ROOM

HOUSE

KEEPING

OFFICE

OFFICE

CORRIDOR

OFFICE

OFFICE

MEN

RESTROOM

MEN

SHOWER &

LOCKER

ROOM

WOMEN

SHOWER &

LOCKER

ROOM

206A

WOMEN

RESTROOM

OIT

DEPUTY

CHIEF

OFFICE

CORRIDOR

CORRIDOR

37' - 1 1/2" DEAD-END

1. ALL DEVICES HAVE NOT BEEN SHOWN, BUT THE

CONTRACTOR SHALL ENSURE THE INSTALLATION OF ALL

LIFE SAFETY DEVICES INDICATED ON THE ENGINEERING

DRAWINGS.

2. CONTRACTOR SHALL FIELD VERIFY THE LOCATION OF ANY

EXISTING FIRE RATED WALLS. ANY WORK DONE AROUND

EXISTING FIRE RATED WALLS SHALL BE DONE WITH CARE

SO AS NOT TO COMPROMISE THE RATING'S INTEGRITY.

ANY DAMAGE SHALL BE REPAIRED IMMEDIATELY.

3. CONTRACTORS SHALL FOLLOW EM-385-1-1 AND NFPA 241,

ALONG WITH THE INSTALLATION’S FIRE REGULATIONS.

4. FIRE WALLS, FIRE BARRIERS, FIRE PARTITIONS, SMOKE

BARRIERS, AND SMOKE PARTITIONS OR ANY OTHER WALL

REQUIRED TO HAVE PROTECTED OPENINGS, OR

PENETRATIONS SHALL BE EFFECTIVELY AND

PERMANENTLY IDENTIFIED WITH SIGNS OR STENCILING.

SUCH IDENTIFICATION SHALL:

A. BE LOCATED WITHIN 15 FEET OF THE END OF EACH WALL

AND AT INTERVALS NOT EXCEEDING 30 FEET MEASURED

HORIZONTALLY ALONG WITH WALL OR PARTITION.

B. INCLUDE LETTERING NOT LESS THAN 3 INCHES IN HEIGHT

WITH A MINIMUM 3/8-INCH STROKE IN A CONTRASTING

COLOR INCORPORATING THE SUGGESTED WORDING,

“FIRE AND/OR SMOKE BARRIER – PROTECT ALL

OPENINGS,” OR SIMILAR WORDING.

GENERAL SHEET NOTES:

TRAVEL DISTANCE

NOTES:

1. CABINETS TO BE SIZED TO ACCOMODATE A

MINIMUM VOLUME OF 9.5L (2-1/2 GALLON).

2. EXTINGUISHER TO BE PROVIDED BY VA

FACILITY.

3. INSTALL FIRE EXTINGUISHERS ABOVE

FINISHED FLOOR PER NFPA 10. PROVIDE

STICK - ON LETTERING AND DIRECTIONAL

ARROWS TO IDENTIFY THE CABINET OR

EXTINGUISHER'S LOCATION.

EGRESS CLEAR WIDTH

45'-0"

FEC

36"

EXIT SIGN

LIFE SAFETY PLAN LEGEND

SEMI-RECESSED FIRE EXTINGUISHER CABINET

RATED WALL LEGEND

1-HR. FIRE RATED WALLS

2-HR. FIRE RATED WALLS

SMOKE PARTITION

2-HR FIRE RATED SMOKE BARRIER

FIRE RATED CURTAIN WALL

N

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Designed

Drawing Title

Approved: Chief Engineering

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

Phase

ARCHITECT/ENGINEER OF RECORD STAMP

Raymond-Pond SDVOSB JV, LLC 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592

POND & Company 3500 Parkway Lane, Suite 500 Peachtree Corners, GA 30092 678-336-7740

Raymond Engineering 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

321 4 5 6 7 8 9 10

VAMC MOUNTAIN HOME, TN

CORRECT ADMIN BLDG 20

ENVIRONMENT AND

CONDITION DEFICIENCIES

MARCH 15, 2021

BID DOCUMENTS 621-15-101

G-102

SECOND FLOOR LIFE SAFETY PLAN

RAPJMC

SCALE: 3/8" = 1'-0"F1

SECOND FLOOR LIFE SAFETY PLAN

SCALE: = 1'-0"3/8"

0 2 4 62

NOTE: MAX DISTANCE OF TRAVEL AS SHOWN IS 96'-0"

Sheets
G-001 - COVER SHEET & SHEET INDEX
G-002 - GENERAL PROJECT NOTES
G-003 - BUILDING CODE SUMMARY & DEDUCTIVE ALTERNATES
G-100 - BASEMENT LIFE SAFETY PLAN
G-101 - FIRST FLOOR LIFE SAFETY PLAN
G-102 - SECOND FLOOR LIFE SAFETY PLAN

File details come from the government source that posted it. Updated .