36C24920R0008-004.pdf
PDF Posted
- Solicitation number
- 36C24920R0008
About this file
This presolicitation notice provides information about a construction services requirement for Project 614-17-112 to renovate the clinical laboratory at the Memphis VA Medical Center. The work includes general hospital construction, plumbing, mechanical, electrical, exterior improvements and utility systems with an estimated value between $5-10 million. The project is a 100% SDVOSB set-aside to be awarded using LPTA source selection. Questions must be submitted in writing by November 6, 2019, with the solicitation to be released on or by that date. The construction work will take place in a medical environment requiring specialized considerations for infection control, noise, and dust control. The NAICS code is 236220 and size standard is $39.5 million.
36C24920R0008 2019.04.26 - MECHANICAL.pdf
View the file
Other files
Show all 46
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
V P r o j e c t s V
T C
L
R e v i t
V
A M e m p h i s B l d g C l i n i c L a b r v t
A
M
GUIDON DESIGN, INC
905 N CAPITOL AVE, SUITE 100
INDIANAPOLIS, IN 46204
TEL: 317.800.6388
ANDREW SCHAEWE
CMTA CONSULTING ENGINEERS, INC
10411 MEETING STREET
PROSPECT, KY 40059
ANDREW MYERS
RENOVATE CLINICAL
LABORATORY
MEMPHIS VAMC
614-17-112
LELAND FONG, COR/PE
MEMPHIS, TN 04/26/2019
BID SET
FULLY SPRINKLERED
TEL: 502.326.3085
Revisions: Date: AJM MJH
ML100
MECHANICAL LEGEND AND
GENERAL NOTES
AutoCAD SHX Text
DIGITAL THERMOMETER
AutoCAD SHX Text
ACCESS DOOR IN CEILING
AutoCAD SHX Text
THERMOSTAT
AutoCAD SHX Text
DIRECTION OF FLOW (PIPING)
AutoCAD SHX Text
PIPE SIZE TRANSITION
AutoCAD SHX Text
REDUCED PRESSURE BACKFLOW PREVENTER
AutoCAD SHX Text
VOLUME DAMPER (MANUAL)
AutoCAD SHX Text
DUCT ELBOW WITH TURNING VANES
AutoCAD SHX Text
FLEXIBLE DUCT
AutoCAD SHX Text
OPPOSED BLADE DAMPER (MOTORIZED)
AutoCAD SHX Text M
AutoCAD SHX Text
CONTROL VALVE (2-WAY)
AutoCAD SHX Text
FIRE DAMPER
AutoCAD SHX Text
SMOKE DAMPER
AutoCAD SHX Text
FD
AutoCAD SHX Text
SPECIFICATION (L=LOUVER, T=TRANSFER
AutoCAD SHX Text
E=EXHAUST GRILLE OR REGISTER)
AutoCAD SHX Text
R=RETURN GRILLE OR REGISTER,
AutoCAD SHX Text
INDICATES AIR DISTRIBUTION DEVICE
AutoCAD SHX Text
BALANCING VALVE
AutoCAD SHX Text
BALL VALVE
AutoCAD SHX Text
CHILLED/HOT WATER SUPPLY
AutoCAD SHX Text
GLOBE VALVE
AutoCAD SHX Text
CHECK VALVE
AutoCAD SHX Text
O S & Y VALVE (GATE)
AutoCAD SHX Text
SAFETY OR RELIEF VALVE
AutoCAD SHX Text
PRESSURE REDUCING VALVE (STEAM)
AutoCAD SHX Text
PRESSURE REDUCING VALVE (WATER)
AutoCAD SHX Text
CHS
AutoCAD SHX Text
TAGGED NOTE
AutoCAD SHX Text
CHILLED WATER SUPPLY
AutoCAD SHX Text
CHILLED WATER RETURN
AutoCAD SHX Text
NORMALLY OPEN
AutoCAD SHX Text
NORMALLY CLOSED
AutoCAD SHX Text
NOT IN CONTRACT
AutoCAD SHX Text
CWS
AutoCAD SHX Text
CWR
AutoCAD SHX Text
NC
AutoCAD SHX Text
NO
AutoCAD SHX Text
NIC
AutoCAD SHX Text
BELOW FLOOR
AutoCAD SHX Text
ABOVE FINISHED FLOOR
AutoCAD SHX Text
ABOVE FINISHED CEILING
AutoCAD SHX Text
EXPOSED AT CEILING
AutoCAD SHX Text
TYPICAL
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
BF
AutoCAD SHX Text
NTS
AutoCAD SHX Text
TYP
AutoCAD SHX Text
EAC
AutoCAD SHX Text
AFF
AutoCAD SHX Text
AFC
AutoCAD SHX Text
GATE VALVE (NORMALLY OPEN)
AutoCAD SHX Text
PETE'S PLUG OR EQUIVALENT
AutoCAD SHX Text
GATE VALVE (NORMALLY CLOSED)
AutoCAD SHX Text
PIPING TEE (TURNED UP/DOWN)
AutoCAD SHX Text
PIPING ELBOW (TURNED UP/DOWN)
AutoCAD SHX Text
STRAINER
AutoCAD SHX Text D
AutoCAD SHX Text
UNION
AutoCAD SHX Text
DIELECTRIC UNION
AutoCAD SHX Text
FLANGE
AutoCAD SHX Text
FLEXIBLE CONNECTOR
AutoCAD SHX Text T
AutoCAD SHX Text
MECHANICAL LEGEND
AutoCAD SHX Text
MANUAL AIR VENT
AutoCAD SHX Text
SD
AutoCAD SHX Text
CHR
AutoCAD SHX Text
CHILLED/HOT WATER RETURN
AutoCAD SHX Text
EOM
AutoCAD SHX Text
STEAM END OF MAIN (SEE DETAIL SHEET)
AutoCAD SHX Text
AD
AutoCAD SHX Text
14" DIAMETER
AutoCAD SHX Text
SUPPLY AIR DUCT - ROUND
AutoCAD SHX Text
14"%%C SA
AutoCAD SHX Text E( )
AutoCAD SHX Text
EXISTING PIPE/DUCT
AutoCAD SHX Text
HYDRONIC RUNOUT (SUPPLY/RETURN)
AutoCAD SHX Text
TO TERMINAL UNIT
AutoCAD SHX Text
NC
AutoCAD SHX Text
DDC TEMPERATURE SENSOR
AutoCAD SHX Text T
AutoCAD SHX Text s
AutoCAD SHX Text
ACCESS DOOR IN DUCT
AutoCAD SHX Text
AD
AutoCAD SHX Text
AIR VENT PIPE
AutoCAD SHX Text V
AutoCAD SHX Text GENERAL NOTES (APPLICABLE TO ALL DRAWINGS): 1. EACH CONTRACTOR, SUPPLIER AND, OR MANUFACTURER SHALL REFER TO ALL DOCUMENTS PERTAINING EACH CONTRACTOR, SUPPLIER AND, OR MANUFACTURER SHALL REFER TO ALL DOCUMENTS PERTAINING TO THIS PROJECT AND COORDINATE ACCORDINGLY SO AS TO ENSURE ADEQUACY OF FIT, COMPLIANCE WITH SPECIFICATIONS, PROPER VOLTAGE AND CURRENT CHARACTERISTICS AND AVOID CONFLICT WITH ANY OTHER BUILDINGS SYSTEMS. VERIFY SAME WITH SHOP DRAWINGS. 2. ALL OFFSETS, TURNS, FITTINGS, TRIM, DETAIL, ETC., MAY NOT BE INDICATED, BUT SHALL BE PROVIDED AS ALL OFFSETS, TURNS, FITTINGS, TRIM, DETAIL, ETC., MAY NOT BE INDICATED, BUT SHALL BE PROVIDED AS REQUIRED. ADDITIONAL ALLOWANCES SHALL BE INCLUDED FOR SAME AT EACH PROPOSERS' DISCRETION. 3. INSTALL NO PIPING, CONDUIT, DUCTWORK, ETC., IN A LOCATION OR IN A MANNER WHICH WILL ALLOW INSTALL NO PIPING, CONDUIT, DUCTWORK, ETC., IN A LOCATION OR IN A MANNER WHICH WILL ALLOW FREEZING AND/OR THE COLLECTION OF CONDENSATION THEREON. 4. OBSERVE ALL APPLICABLE CODES, RULES AND REGULATIONS (CITY, COUNTY, LOCAL, STATE, FEDERAL, OBSERVE ALL APPLICABLE CODES, RULES AND REGULATIONS (CITY, COUNTY, LOCAL, STATE, FEDERAL, MUNICIPALITY, UTILITY COMPANY, OSHA, ETC.). THIS INCLUDES EXISTING FACILITY STANDARDS FOR CONSTRUCTION. 5. ALL SYSTEMS, EQUIPMENT AND MATERIALS ARE TO BE INSTALLED IN A NEAT AND WORKMANLIKE MANNER. ALL SYSTEMS, EQUIPMENT AND MATERIALS ARE TO BE INSTALLED IN A NEAT AND WORKMANLIKE MANNER. WORK NOT DONE SO SHALL BE REMOVED AND REINSTALLED SATISFACTORILY. 6. WHERE MOUNTING HEIGHTS ARE NOT INDICATED OR ARE IN CONFLICT WITH ANY OTHER BUILDING SYSTEM, WHERE MOUNTING HEIGHTS ARE NOT INDICATED OR ARE IN CONFLICT WITH ANY OTHER BUILDING SYSTEM, CONTACT THE ENGINEERS BEFORE INSTALLATION. REFER ALSO TO ARCHITECTURAL WALL INTERIOR AND EXTERIOR WALL ELEVATIONS, CEILING HEIGHTS AND OTHER DETAILS OF THESE DOCUMENTS. 7. DO NOT SCALE FROM DRAWINGS, PRINTING DISTORTS SCALE. WORK SHALL BE LAID OUT FROM DO NOT SCALE FROM DRAWINGS, PRINTING DISTORTS SCALE. WORK SHALL BE LAID OUT FROM DIMENSIONED DRAWINGS, OR DIMENSIONS SUPPLIED TO THE CONTRACTOR. 8. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND PATCHING REQUIRED FOR HIS WORK. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND PATCHING REQUIRED FOR HIS WORK. ALL CUTTING AND PATCHING SHALL MATCH EXISTING ADJACENT SURFACES AND BE IN ACCORD WITH HOSPITAL STANDARDS FOR SUCH WORK. 9. TURNING VANES SHALL BE INSTALLED IN ALL SUPPLY, RETURN, AND EXHAUST DUCT WORK ELBOWS. TURNING VANES SHALL BE INSTALLED IN ALL SUPPLY, RETURN, AND EXHAUST DUCT WORK ELBOWS. 10. THESE DRAWINGS ARE ACCURATE TO THE BEST OF OUR KNOWLEDGE, HOWEVER LOCATIONS, DEPTHS, THESE DRAWINGS ARE ACCURATE TO THE BEST OF OUR KNOWLEDGE, HOWEVER LOCATIONS, DEPTHS, ELEVATIONS AND SIZES WERE TAKEN FROM DIFFERENT SOURCES AND ARE SUBJECT TO DEVIATION. THE CONTRACTOR SHALL ASSUME SOME DEVIATIONS AND INCLUDE OFFSETS, ADDITIONAL PIPING, ETC AT THE TIME OF BID. 11. WHERE PENETRATING ROOFING MEMBRANE OR OTHER MATERIALS USED FOR WEATHERPROOFING THE WHERE PENETRATING ROOFING MEMBRANE OR OTHER MATERIALS USED FOR WEATHERPROOFING THE BUILDING, MAKE SUCH PENETRATIONS IN A WAY THAT WILL NOT VOID OR DIMINISH THE ROOFING WARRANTY OR INTEGRITY IN ANY WAY. COORDINATE ALL SUCH PENETRATIONS WITH THE ROOFING INSTALLER AND GENERAL CONTRACTOR. 12. ADVISE THE ENGINEERS OF ANY CONFLICTS, ERRORS, OMISSIONS, ETC. AT LEAST TEN DAYS PRIOR TO BID ADVISE THE ENGINEERS OF ANY CONFLICTS, ERRORS, OMISSIONS, ETC. AT LEAST TEN DAYS PRIOR TO BID AT LEAST TEN DAYS PRIOR TO BID DATE, TO ALLOW CLARIFICATION BY WRITTEN ADDENDUM. , TO ALLOW CLARIFICATION BY WRITTEN ADDENDUM. 13. DEVIATION FROM SPECIFICATIONS OR PLANS REQUIRES PRIOR WRITTEN APPROVAL FROM THE ENGINEERS DEVIATION FROM SPECIFICATIONS OR PLANS REQUIRES PRIOR WRITTEN APPROVAL FROM THE ENGINEERS AND MUST BE SUBMITTED IN WRITING NO LATER THAN TEN DAYS PRIOR TO THE BID DATE. MUST BE SUBMITTED IN WRITING NO LATER THAN TEN DAYS PRIOR TO THE BID DATE. . 14. THE PURPOSE AND INTENT OF ALL THE DOCUMENTS PERTAINING TO THIS PROJECT IS TO PROVIDE A THE PURPOSE AND INTENT OF ALL THE DOCUMENTS PERTAINING TO THIS PROJECT IS TO PROVIDE A COMPLETE, FUNCTIONAL, SAFE, LIKE-NEW FACILITY. ANYTHING LESS SHALL BE UNACCEPTABLE. 15. ANY VIBRATING, OSCILLATING OR OTHER NOISE/MOTION PRODUCING EQUIPMENT SHALL BE ISOLATED FROM ANY VIBRATING, OSCILLATING OR OTHER NOISE/MOTION PRODUCING EQUIPMENT SHALL BE ISOLATED FROM SURROUNDING SYSTEMS IN AN APPROVED MANNER. NOISY OR STRUCTURALLY DAMAGING INSTALLATIONS SHALL BE SATISFACTORILY REPLACED OR REPAIRED AT THE INSTALLING CONTRACTOR'S EXPENSE. THE FINAL DECISION ON THE SUITABILITY OF A PARTICULAR INSTALLATION AND ITS ACCEPTANCE SHALL BE THAT OF THE ENGINEER. 16. INSTALL EQUIPMENT, MATERIALS, ETC. IN STRICT ACCORDANCE WITH THE MANUFACTURER'S INSTALL EQUIPMENT, MATERIALS, ETC. IN STRICT ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS AND DIRECTION. IF IN CONFLICT WITH THE DESIGN INDICATED IN CONTRACT DOCUMENTS, ADVISE THE ENGINEERS PRIOR TO INSTALLATION FOR CLARIFICATION. ADVISE THE ENGINEERS PRIOR TO INSTALLATION FOR CLARIFICATION. FOR CLARIFICATION. 17. ALL SUPPORTS FOR EQUIPMENT, DEVICES OR FIXTURES SHALL BE UNIQUE AND FROM THE BUILDING ALL SUPPORTS FOR EQUIPMENT, DEVICES OR FIXTURES SHALL BE UNIQUE AND FROM THE BUILDING STRUCTURE. DO NOT SUPPORT WORK FROM OTHER TRADES, EQUIPMENT OR SUPPORTS WITHOUT WRITTEN PERMISSION FROM THE ENGINEER AND CONSENT OF THE OTHER TRADE, IN WRITING. DO NOT SUPPORT EQUIPMENT FROM WALLS OR PARTITIONS. SUPPORT FROM STRUCTURAL BRIDGING IS UNACCEPTABLE. SUPPORT FROM STRUCTURAL BRIDGING IS UNACCEPTABLE. 18. DEVIATIONS IN SIZE, CAPACITIES, FIT, FINISH, ETC. FOR EQUIPMENT FROM THAT PRIME SPECIFIED SHALL DEVIATIONS IN SIZE, CAPACITIES, FIT, FINISH, ETC. FOR EQUIPMENT FROM THAT PRIME SPECIFIED SHALL BE THE RESPONSIBILITY OF THE PURCHASER OF THAT EQUIPMENT. ANY PROVISIONS REQUIRED TO ACCOMMODATE A DEVIATION, WHETHER APPROVED BY THE ENGINEERS OR NOT, SHALL BE THE RESPONSIBILITY OF THE PURCHASER. 19. THE GENERAL CONTRACTOR FOR THIS CONSTRUCTION IS RESPONSIBLE FOR THE COORDINATION, THE GENERAL CONTRACTOR FOR THIS CONSTRUCTION IS RESPONSIBLE FOR THE COORDINATION, APPEARANCE, SCHEDULING AND TIMELINESS OF THE WORK OF ALL TRADES, CONTRACTORS, SUPPLIERS, INSTALLERS, ETC. EACH TRADE SHALL COORDINATE THEIR WORK WITH OTHER TRADES AND THE GENERAL CONTRACTOR. THIS INCLUDES ANY REQUIRED SHUTDOWNS THAT WILL NEED TO BE COORDINATED WITH THE THIS INCLUDES ANY REQUIRED SHUTDOWNS THAT WILL NEED TO BE COORDINATED WITH THE HOSPITAL. 20. VALVES, BALANCING DAMPERS OR ANY OTHER MECHANICAL/ELECTRICAL ITEM REQUIRING SERVICE ACCESS VALVES, BALANCING DAMPERS OR ANY OTHER MECHANICAL/ELECTRICAL ITEM REQUIRING SERVICE ACCESS SHALL NOT BE LOCATED ABOVE A HARD CEILING. IF THIS IS NOT POSSIBLE, THEN AN APPROPRIATELY SIZED ACCESS DOOR (REFER TO SPECIFICATIONS FOR ACCESS DOOR REQUIREMENTS) SHALL BE PLACED UNDER THE ITEM TO ALLOW EASY MAINTENANCE AND ADJUSTMENT. ANY VALVES ADDED DURING THE PROJECT FOR TESTING/PURGING PURPOSES MUST MEET THE MINIMUM REQUIREMENTS FOR VALVES OUTLINED WITHIN THE SPECIFICATIONS. 21. ENSURE PROPER COORDINATION BETWEEN ALL TRADES SUCH THAT CONDUITS, PIPING, DUCTWORK, ETC. ENSURE PROPER COORDINATION BETWEEN ALL TRADES SUCH THAT CONDUITS, PIPING, DUCTWORK, ETC. DO NOT BLOCK ACCESS TO VALVES, EQUIPMENT, DUCT ACCESS DOORS, ETC. ITEMS THAT HAVE BEEN INSTALLED WHERE ACCESS IS COMPROMISED SHALL BE RELOCATED AT THE CONTRACTOR'S EXPENSE. REFER TO SPECIFICATIONS FOR COORDINATION DRAWING REQUIREMENTS. 22. INCLUDE IN BID ALL COST ASSOCIATED WITH DRAINING AND FILLING ALL PIPING SYSTEMS AS REQUIRED INCLUDE IN BID ALL COST ASSOCIATED WITH DRAINING AND FILLING ALL PIPING SYSTEMS AS REQUIRED TO INSTALL WORK. THIS INCLUDES: * HOT WATER HEATING PIPING SYSTEM HOT WATER HEATING PIPING SYSTEM * CHILLED WATER PIPING SYSTEM CHILLED WATER PIPING SYSTEM * STEAM AND CONDENSATE PIPING SYSTEMSTEAM AND CONDENSATE PIPING SYSTEM
AutoCAD SHX Text E( )
AutoCAD SHX Text
DEMOLISH EXISTING PIPE/DUCT
AutoCAD SHX Text
MECHANICAL EQUIPMENT DESIGNATOR
AutoCAD SHX Text
DIFFERENTIAL PRESSURE SENSOR
AutoCAD SHX Text
PRESSURE SENSOR
AutoCAD SHX Text D
AutoCAD SHX Text P
AutoCAD SHX Text
BUTTERFLY VALVE
AutoCAD SHX Text
20X12 RA
AutoCAD SHX Text
20X12 EA
AutoCAD SHX Text
20X12 SA
AutoCAD SHX Text
SUPPLY AIR DUCT - INSIDE DIMENSION -
AutoCAD SHX Text
20"HORZ.X12"VERT. (TURNED UP/DOWN)
AutoCAD SHX Text
RETURN AIR DUCT - INSIDE DIMENSION -
AutoCAD SHX Text
EXHAUST AIR DUCT - INSIDE DIMENSION -
AutoCAD SHX Text
(TURNED UP/DOWN)
AutoCAD SHX Text
(TURNED UP/DOWN)
AutoCAD SHX Text
20X12 OA
AutoCAD SHX Text
OUTSIDE AIR DUCT - INSIDE DIMENSION -
AutoCAD SHX Text
(TURNED UP/DOWN)
AutoCAD SHX Text
DUCT MOUNTED SMOKE DETECTOR
AutoCAD SHX Text
(COORDINATE WITH ELEC. CONTRACTOR)
AutoCAD SHX Text P
AutoCAD SHX Text
CONTROL VALVE (3-WAY)
AutoCAD SHX Text
DS
AutoCAD SHX Text
LOW PRESSURE STEAM
AutoCAD SHX Text
LOW PRESSURE RETURN
AutoCAD SHX Text
LPS
AutoCAD SHX Text
LPR
AutoCAD SHX Text
HOT WATER SUPPLY
AutoCAD SHX Text
HOT WATER RETURN
AutoCAD SHX Text
HWS
AutoCAD SHX Text
HWR
MENS TOILET
CWG28
FEMALE
TOILET
CWG 29
FIRE EXTINGUISHER
CEG 12
BECEG 14
FUTURE TOXICO LAB
BECEG 15
TISSUE CULTURE
BECEG 16
BECE-C1
OFFICE
CEG 24C
STORAGE
CEG 22G
CORRIDOR
CE C1
EVIDENCE
CEG 4
CEG 5A
CEG 5
CEG 1
EXAM RM
CEG 54C
CLINICAL
CEG 54
EXAM RM
CEG 54B
RECEPT OFFICE
CEG 53
COMM
CEG 52
EXAM RM
CEG 54D
EXAM RM
CEG 54ARECEPTION
CEG 51PASSENGER ELEVATOR LOBBY
CW-C8
TRAINING
CWG 20D
OFFICE
CWG 16D
CWG 20
OFFICE
ECSTORAGE
CEG 3
CEG 7
CEG 6 CEG 5B
CEG 5C
OFFICE
CEG 16D
POLICE
OFFICE
CEG 16A POLICE
CEG 16
OFFICE
CEG 16B CHIEF
OFFICE
CEG 16C
FIRE CONTROL
CEG 18
STAIR 4
OFFICE
CONTRACT
CEG 19B
CEG 19
CEG 20A
CEG 19A
COPY
CEG 20
VENDING RM
CEG 21
OFFICE
OFFICE
6005A
OFFICE
OFFICE
CEG 22A
OFFICE
CEG 22B
OFFICE
CEG 22C
OFFICE
CEG 22D
OFFICE
CEG 22E
FILE RM
CEG 22
C AND P EXAM
AND RATING
CEG 23
OFFICE
CEG 23E
OFFICE
CEG 22F
EXAM
OFFICE
CEG 23D
EXAM
OFFICE
CEG 23C
EXAM
OFFICE
CEG 23B
CEG 23A
EMS WORK
LENDER
CEG 24A
HAC
OFFICE
CEG 24B
OFFICE
CEG 24D
HOUSEKEEPING
CEG 24
CEG 26C
CEG 24E
CEG 26B
CEG 27
POLICE
INVESTIGATION
CEG 28
LOCKSMITH
OFFICE
CEG 29A
SUPV
CEG 26A
CEG 29
OFFICE
CWG 26
OFFICE
CWG 27
MAIL RM
CWG 30
OFFICE
CWG47A
CWG 30A
BED WASHING
CWG 47
ELEVATOR
P7
OFFICE
CWG 30C
UPS TRACKING
SYSTEM
CWG 30B
STORAGE
CWG 31A
CWG 31B
CWG 31C
MCCR INSURANCE AND BILLING
CEG 26
10 11 201918171615141312.112
G
A
B
C
D
E
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
V P r o j e c t s V
T C
L
R e v i t
V
A M e m p h i s B l d g C l i n i c L a b r v t
A
M
GUIDON DESIGN, INC
905 N CAPITOL AVE, SUITE 100
INDIANAPOLIS, IN 46204
TEL: 317.800.6388
ANDREW SCHAEWE
CMTA CONSULTING ENGINEERS, INC
10411 MEETING STREET
PROSPECT, KY 40059
ANDREW MYERS
RENOVATE CLINICAL
LABORATORY
MEMPHIS VAMC
614-17-112
LELAND FONG, COR/PE
MEMPHIS, TN 04/26/2019
BID SET
FULLY SPRINKLERED
TEL: 502.326.3085
Revisions: Date: AJM MJH
MD100
PARTIAL GROUND FLOOR PLAN -
MECHANICAL DEMOLITION
SCALE: 1/8" = 1'-0"MD100
1 PARTIAL GROUND FLOOR PLAN - MECHANICAL DEMOLITION
N
NO SCALE
KEY PLAN
AutoCAD SHX Text
E(CHS)
AutoCAD SHX Text
E(CHR)
AutoCAD SHX Text
E(CHS)
AutoCAD SHX Text
E(CHR)
AutoCAD SHX Text
E(CHS)
AutoCAD SHX Text
E(CHR)
AutoCAD SHX Text
E(CD)
AutoCAD SHX Text
E(CD)
AutoCAD SHX Text
E(CD)
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
1. COMPLETELY REMOVE EXISTING DUCTWORK INCLUDING ALL ASSOCIATED COMPLETELY REMOVE EXISTING DUCTWORK INCLUDING ALL ASSOCIATED HANGERS, INSULATION, AND FITTINGS TO POINT INDICATED AND CAP. 2. COMPLETELY REMOVE EXISTING PIPING AND DUCTWORK UP TO INDUCTION COMPLETELY REMOVE EXISTING PIPING AND DUCTWORK UP TO INDUCTION UNITS INCLUDING ALL ASSOCIATED INSULATION, FITTINGS, AND HANGERS TO POINT INDICATED AND CAP. 3. COMPLETELY REMOVE EXISTING DUCTWORK INCLUDING ALL ASSOCIATED COMPLETELY REMOVE EXISTING DUCTWORK INCLUDING ALL ASSOCIATED HANGERS, INSULATION, AND FITTINGS TO POINT INDICATED. 4. 14"ø SA DUCT UP. REFER TO MD101 FOR CONTINUATION. 14"ø SA DUCT UP. REFER TO MD101 FOR CONTINUATION. 5. 16"ø SA DUCT UP. REFER TO MD101 FOR CONTINUATION. 16"ø SA DUCT UP. REFER TO MD101 FOR CONTINUATION. 6. 24x16 RA DUCT UP. REFER TO MD101 FOR CONTINUATION. 24x16 RA DUCT UP. REFER TO MD101 FOR CONTINUATION. 7. 12x10 RA DUCT UP. REFER TO MD101 FOR CONTINUATION. 12x10 RA DUCT UP. REFER TO MD101 FOR CONTINUATION. 8. 24x12 RA AND 23x14 SA DUCT UP. REFER TO MD101 FOR CONTINUATION.24x12 RA AND 23x14 SA DUCT UP. REFER TO MD101 FOR CONTINUATION.
AutoCAD SHX Text X
AutoCAD SHX Text
MECHANICAL TAG NOTES: DEMOLITION
GENERAL NOTES - MECHANICAL DEMOLITION: A. ANY WORK REQUIRED OUTSIDE OF THE PROJECTS LIMITS SHALL BE ANY WORK REQUIRED OUTSIDE OF THE PROJECTS LIMITS SHALL BE PERFORMED AT NIGHTS OR ON WEEKENDS AND SCHEDULED THROUGH THE HOSPITAL ENGINEER. B. INACCESSIBLE PIPING BURIED IN EXISTING WALLS REMAINING AND INACCESSIBLE PIPING BURIED IN EXISTING WALLS REMAINING AND CONCRETE SLABS MAY BE ABANDONED IN PLACE. C. PATCH HOLES, IN WALLS, FLOORS, CEILINGS, ROOFS, ETC. TO MATCH PATCH HOLES, IN WALLS, FLOORS, CEILINGS, ROOFS, ETC. TO MATCH ADJACENT SURFACES AS A RESULT OF MECHANICAL SYSTEMS. PATCH SHALL BE PERFORMED BY QUALIFIED TRADESMAN. D. WHERE WORK IS REQUIRED ABOVE EXISTING CEILINGS AND/OR OUTSIDE WHERE WORK IS REQUIRED ABOVE EXISTING CEILINGS AND/OR OUTSIDE OF WORKSCOPE AREA, THIS CONTRACTOR SHALL BE RESPONSIBLE FOR CUT, PATCH, REMOVAL, AND REINSTALLATION (OR REPLACEMENT IF DAMAGED) OF ALL CEILING TILES, HARD CEILINGS, AND GRID MEMBERS NECESSARY TO PERFORM THE WORK. THIS SHALL BE PERFORMED AT THIS CONTRACTOR'S EXPENSE. E. PROVIDE AND INSTALL BLANK STAINLESS STEEL COVERPLATE OVER PROVIDE AND INSTALL BLANK STAINLESS STEEL COVERPLATE OVER OPENINGS WHERE THERMOSTATS AND OTHER WALL-MOUNTED CONTROL DEVICES ARE REMOVED AND NOT REPLACED. F. ALL SYSTEM SHUTDOWN SHALL BE SCHEDULED WITH THE FACILITIES ALL SYSTEM SHUTDOWN SHALL BE SCHEDULED WITH THE FACILITIES ENGINEER A MINIMUM OF 96 HOURS IN ADVANCE. G. MECHANICAL CONTRACTOR SHALL CLEAN UP CONSTRUCTION DEBRIS MECHANICAL CONTRACTOR SHALL CLEAN UP CONSTRUCTION DEBRIS DURING AND AFTER MECHANICAL EQUIPMENT DEMOLITION. H. MECHANICAL CONTRACTOR SHALL DISPOSE OF DEMOLISHED MECHANICAL MECHANICAL CONTRACTOR SHALL DISPOSE OF DEMOLISHED MECHANICAL EQUIPMENT AND COORDINATE WITH THE CONSTRUCTION MANAGER. I. PRIOR TO START OF DEMOLITION WORK, MECHANICAL CONTRACTOR SHALL PRIOR TO START OF DEMOLITION WORK, MECHANICAL CONTRACTOR SHALL VERIFY WITH ELECTRICAL CONTRACTOR THAT POWER FEEDS AND CONTROL WIRING HAVE BEEN DISCONNECTED AND LOCKED OUT FROM MECHANICAL EQUIPMENT WHICH IS TO BE REMOVED. J. MECHANICAL CONTRACTOR SHALL REPAIR OR REPLACE ANY DUCT OR MECHANICAL CONTRACTOR SHALL REPAIR OR REPLACE ANY DUCT OR PIPING INSULATION DAMAGED DURING DEMOLITION WORK. K. WHERE DUCT WORK OR PIPING IS REMOVED TO A MAIN, CAP AT MAIN WHERE DUCT WORK OR PIPING IS REMOVED TO A MAIN, CAP AT MAIN AIRTIGHT. FIELD VERIFY EXACT CONDITIONS. PROVIDE ALL MATERIALS AS REQUIRED. PROVIDE NEW VALVES AT MAINS AS REQUIRED TO ALLOW FOR WORK. L. NOT ALL NOTES USED ON SHEETS.NOT ALL NOTES USED ON SHEETS.
TEL CLOSET
CE153
11 12 12.1 13 14 15 16 17 18 19
A
B
C
D
E
F
G
H
RECEPT.
OFFICE
OFFICE
SECURITY
HOLDING
6110A
HOLDING
TRANSITION
WC ALCOVE
61-C1B
CANTEEN
COFFEE
SHOP
CE151
CANTEEN
CE150
EXAM
CE129
OFFICE
CE128
OFFICE
STAIR
NO: 4
CONFERENCE
ROOM
CE113
FIRE ALARM
COMPUTER
CE113A
OFFICE
CE114A
OFFICE
CE114
OFFICE
CE115A
OFFICE
CE115
STORAGE
CE116
CHIEF
OPTOMETRY
OFFICE
CE117
EXAM
CW113
TESTING
CW114
TESTING
CW115
VISUAL
FIELD
CE119C
TECH OFF
CE119B
OFFICE
CE119
OFFICE
CE118
OFFICE
CE122
SUPV
OFFICE
CE119A
OFFICE
CE123
OFFICE
CE124
OFFICE
CE125
OFFICE
CE126
EXAM
OFFICE
CE126A
OFFICE
CE127A
EXAM
CE127
EXAM
CE127B
OFFICE
OFFICE
EYE CLINIC
WAITING
CW166B
AMB CLINIC
CE130
FEMALE
TOILET
CE149A
MALE
TOILET
OFFICE
CE132
OFFICE
CE133
OFFICE
CE134
OFFICE
CE147
OFFICE
CE146
OFFICE
CE145
OFFICE
CE144
OFFICE
CE135
OFFICE
CE136
OFFICE
CE143
OFFICE
CE142
EXAM
CE137
EXAM
CW119
CW120A
CW120B
TREATMENT
RM
CW120
OFFICE
CE139
OFFICE
CE138
SUPPLY /
COPY RM
CE141
TELE
DERMATOLOGY
CE140
EXAM
CW119A
WAITING RM
CE131
CE148A
ELIGIBILITY
ENROLLMENT
OFFICE
CE193
TELL RM
CE191A
AMBULATORY
CARE
OFFICE
SUPV
CE191
TOILET
CW132
ELIGIBILITY
TRAVEL
CHECK IN
CW130
PTSD
CW133
HEAD
CLERK
HEALTH
BENEFIT
SECT OFF
CW127B
SOCIAL
WORKER
ADMIN
OFFICE
CW123A
YELLOW
WAITING
CW123
COPY
AMBULATORY
CARE
CE192
PTSD
OFFICE
CW139
PTSD
OFFICE
CW139A
NURSE MGR
CE183
FEMALE
TOILET
CE181
EXAM
CE152
EXAM
CE162
EMRT
STORAGE
CE163
EXAM RM
CE173
WOMEN
RESTROOM
CE174
MEN
RESTROOM
CE174A
CMP EXAM
CE172
EXAM
CE171
EXAM
CE170
EXAM
CE169
EXAM
CE168
EXAM
CE167
EXAM
CE166
EXAM
CE165
CLEAN
LINEN
CE165A
HAC
CE161
EXAM
CE160
EXAM
CE159
EXAM
CE158
EXAM RM
CE157
EXAM
CE156
EC
CE155
BREAK RM
CE154
CLERKS
OFFICE
CE185A
BUSINESS
OFICE
CHECKING
CE185
SOCIAL
WORKER
CE186
EXAM
CE187
EC
CE188
MALE
TOILET
CE181A
AMBULATORY
CMP
CE182
AMBULATORY
CARE
CE180
AMBULATORY
CARE
GROUP RM
CE175
CMP
CE177
AMBULATORY
CARE
CE178
EXAM
CE179
TOILET
CE176T
BREAK RM
CE176
CE189B
CE189A
CE189C
VESTIBULE
CEC46
FIRE EXT
FIRE EXT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
V P r o j e c t s V
T C
L
R e v i t
V
A M e m p h i s B l d g C l i n i c L a b r v t
A
M
GUIDON DESIGN, INC
905 N CAPITOL AVE, SUITE 100
INDIANAPOLIS, IN 46204
TEL: 317.800.6388
ANDREW SCHAEWE
CMTA CONSULTING ENGINEERS, INC
10411 MEETING STREET
PROSPECT, KY 40059
ANDREW MYERS
RENOVATE CLINICAL
LABORATORY
MEMPHIS VAMC
614-17-112
LELAND FONG, COR/PE
MEMPHIS, TN 04/26/2019
BID SET
FULLY SPRINKLERED
TEL: 502.326.3085
Revisions: Date: AJM MJH
MD101
PARTIAL FIRST FLOOR PLAN -
AIR DISTRIBUTION DEMOLITION
SCALE: 1/8" = 1'-0"MD101
1 PARTIAL FIRST FLOOR PLAN - AIR DISTRITBUTION DEMOLITION
N
NO SCALE
KEY PLAN
AutoCAD SHX Text
VAV
AutoCAD SHX Text E
AutoCAD SHX Text
VAV
AutoCAD SHX Text E
AutoCAD SHX Text
VAV
AutoCAD SHX Text E
AutoCAD SHX Text
VAV
AutoCAD SHX Text E
AutoCAD SHX Text
VAV
AutoCAD SHX Text E
AutoCAD SHX Text
VAV
AutoCAD SHX Text E
AutoCAD SHX Text
VAV
AutoCAD SHX Text E
AutoCAD SHX Text
VAV
AutoCAD SHX Text E
AutoCAD SHX Text
VAV
AutoCAD SHX Text E
AutoCAD SHX Text
VAV
AutoCAD SHX Text E
AutoCAD SHX Text
VAV
AutoCAD SHX Text E
AutoCAD SHX Text
VAV
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
VAV
AutoCAD SHX Text E
AutoCAD SHX Text
VAV
AutoCAD SHX Text E
AutoCAD SHX Text
VAV
AutoCAD SHX Text E
AutoCAD SHX Text
VAV
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
VAV
AutoCAD SHX Text E
AutoCAD SHX Text
VAV
AutoCAD SHX Text E
AutoCAD SHX Text
VAV
AutoCAD SHX Text E
AutoCAD SHX Text
VAV
AutoCAD SHX Text E
AutoCAD SHX Text
VAV
AutoCAD SHX Text E
AutoCAD SHX Text
VAV
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text
VAV
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text
VAV
AutoCAD SHX Text E
AutoCAD SHX Text T
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text C
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text T
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
TYP.
AutoCAD SHX Text
AutoCAD SHX Text
TYP.
AutoCAD SHX Text
AutoCAD SHX Text
TYP.
AutoCAD SHX Text
AutoCAD SHX Text
TYP.
AutoCAD SHX Text
AutoCAD SHX Text
TYP.
AutoCAD SHX Text
AutoCAD SHX Text
TYP.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text T2
AutoCAD SHX Text
AutoCAD SHX Text T1
AutoCAD SHX Text
AutoCAD SHX Text T3
AutoCAD SHX Text
AutoCAD SHX Text T4
AutoCAD SHX Text
AutoCAD SHX Text T5
AutoCAD SHX Text
AutoCAD SHX Text T7
AutoCAD SHX Text
AutoCAD SHX Text T6
AutoCAD SHX Text
AutoCAD SHX Text T8
AutoCAD SHX Text
AutoCAD SHX Text T9
AutoCAD SHX Text
AutoCAD SHX Text T10
AutoCAD SHX Text
AutoCAD SHX Text T11
AutoCAD SHX Text
AutoCAD SHX Text T13
AutoCAD SHX Text
AutoCAD SHX Text T12
AutoCAD SHX Text
AutoCAD SHX Text T14
AutoCAD SHX Text
AutoCAD SHX Text T17
AutoCAD SHX Text
AutoCAD SHX Text T16
AutoCAD SHX Text
AutoCAD SHX Text T15
AutoCAD SHX Text
FCU
AutoCAD SHX Text E
AutoCAD SHX Text
FCU
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text C
AutoCAD SHX Text
AutoCAD SHX Text C
AutoCAD SHX Text
AutoCAD SHX Text C
AutoCAD SHX Text
AutoCAD SHX Text C
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
1. COMPLETELY REMOVE EXISTING DUCTWORK INCLUDING ALL ASSOCIATED COMPLETELY REMOVE EXISTING DUCTWORK INCLUDING ALL ASSOCIATED HANGERS, INSULATION, AND FITTINGS TO POINT INDICATED AND CAP. 2. COMPLETELY REMOVE EXISTING DUCTWORK INCLUDING ALL ASSOCIATED COMPLETELY REMOVE EXISTING DUCTWORK INCLUDING ALL ASSOCIATED HANGERS, INSULATION, AND FITTINGS TO POINT INDICATED. 3. EXISTING INDUCTION UNIT TO BE REMOVED COMPLETE, INCLUDING ALL EXISTING INDUCTION UNIT TO BE REMOVED COMPLETE, INCLUDING ALL MECHANICAL, ELECTRICAL, AND CONTROL CONNECTIONS. COORDINATE REMOVAL WITH ALL OTHER TRADES. 4. EXISTING THERMOSTAT TO BE REMOVED COMPLETE, INCLUDING ALL EXISTING THERMOSTAT TO BE REMOVED COMPLETE, INCLUDING ALL CONTROL WIRING. (TYPICAL) 5. EXISTING VAV BOX TO BE REMOVED COMPLETE, INCLUDING ALL EXISTING VAV BOX TO BE REMOVED COMPLETE, INCLUDING ALL MECHANICAL, ELECTRICAL, AND CONTROL CONNECTIONS. COORDINATE REMOVAL WITH ALL OTHER TRADES. 6. EXISTING VAV BOX SHALL REMAIN. EXISTING VAV BOX SHALL REMAIN. 7. EXISTING THERMOSTAT SHALL REMAIN. EXISTING THERMOSTAT SHALL REMAIN. 8. EXISTING DUCTWORK UP TO INDUCTION UNIT ON SECOND FLOOR SHALL EXISTING DUCTWORK UP TO INDUCTION UNIT ON SECOND FLOOR SHALL REMAIN. 9. 16"ø SA DUCT DOWN. REFER TO MD100 FOR CONTINUATION. 16"ø SA DUCT DOWN. REFER TO MD100 FOR CONTINUATION. 10. 14"ø SA DUCT DOWN. REFER TO MD100 FOR CONTINUATION. 14"ø SA DUCT DOWN. REFER TO MD100 FOR CONTINUATION. 11. 24x16 RA DUCT DOWN. REFER TO MD100 FOR CONTINUATION. 24x16 RA DUCT DOWN. REFER TO MD100 FOR CONTINUATION. 12. 12x10 RA DUCT DOWN. REFER TO MD100 FOR CONTINUATION. 12x10 RA DUCT DOWN. REFER TO MD100 FOR CONTINUATION. 13. 24x12 RA AND 23x14 SA DUCT DOWN. REFER TO MD100 FOR 24x12 RA AND 23x14 SA DUCT DOWN. REFER TO MD100 FOR CONTINUATION. 14. REWORK EXISTING DUCTWORK AS REQUIRED FOR INSTALLATION OF NEW REWORK EXISTING DUCTWORK AS REQUIRED FOR INSTALLATION OF NEW WORK. REFER TO MH101. 15. RELOCATE EXISTING VAV BOX AS REQUIRED FOR INSTALLATION OF NEW RELOCATE EXISTING VAV BOX AS REQUIRED FOR INSTALLATION OF NEW WORK. REFER TO MH101. 16. PRIOR TO DEMOLITION: PROVIDE DUCT TRAVERSES AT THE FOLLOWING PRIOR TO DEMOLITION: PROVIDE DUCT TRAVERSES AT THE FOLLOWING PROVIDE DUCT TRAVERSES AT THE FOLLOWING LOCATIONS AND PROVIDE EXISTING AIRFLOW TO ENGINEER. 17. PROVIDE TEMPORARY HEATING AND COOLING FOR THIS AREA DURING PROVIDE TEMPORARY HEATING AND COOLING FOR THIS AREA DURING CONSTRUCTION.
AutoCAD SHX Text X
AutoCAD SHX Text
MECHANICAL TAG NOTES: DEMOLITION
GENERAL NOTES - MECHANICAL DEMOLITION: A. ANY WORK REQUIRED OUTSIDE OF THE PROJECTS LIMITS SHALL BE ANY WORK REQUIRED OUTSIDE OF THE PROJECTS LIMITS SHALL BE PERFORMED AT NIGHTS OR ON WEEKENDS AND SCHEDULED THROUGH THE HOSPITAL ENGINEER. B. INACCESSIBLE PIPING BURIED IN EXISTING WALLS REMAINING AND INACCESSIBLE PIPING BURIED IN EXISTING WALLS REMAINING AND CONCRETE SLABS MAY BE ABANDONED IN PLACE. C. PATCH HOLES, IN WALLS, FLOORS, CEILINGS, ROOFS, ETC. TO MATCH PATCH HOLES, IN WALLS, FLOORS, CEILINGS, ROOFS, ETC. TO MATCH ADJACENT SURFACES AS A RESULT OF MECHANICAL SYSTEMS. PATCH SHALL BE PERFORMED BY QUALIFIED TRADESMAN. D. WHERE WORK IS REQUIRED ABOVE EXISTING CEILINGS AND/OR OUTSIDE WHERE WORK IS REQUIRED ABOVE EXISTING CEILINGS AND/OR OUTSIDE OF WORKSCOPE AREA, THIS CONTRACTOR SHALL BE RESPONSIBLE FOR CUT, PATCH, REMOVAL, AND REINSTALLATION (OR REPLACEMENT IF DAMAGED) OF ALL CEILING TILES, HARD CEILINGS, AND GRID MEMBERS NECESSARY TO PERFORM THE WORK. THIS SHALL BE PERFORMED AT THIS CONTRACTOR'S EXPENSE. E. PROVIDE AND INSTALL BLANK STAINLESS STEEL COVERPLATE OVER PROVIDE AND INSTALL BLANK STAINLESS STEEL COVERPLATE OVER OPENINGS WHERE THERMOSTATS AND OTHER WALL-MOUNTED CONTROL DEVICES ARE REMOVED AND NOT REPLACED. F. ALL SYSTEM SHUTDOWN SHALL BE SCHEDULED WITH THE FACILITIES ALL SYSTEM SHUTDOWN SHALL BE SCHEDULED WITH THE FACILITIES ENGINEER A MINIMUM OF 96 HOURS IN ADVANCE. G. MECHANICAL CONTRACTOR SHALL CLEAN UP CONSTRUCTION DEBRIS MECHANICAL CONTRACTOR SHALL CLEAN UP CONSTRUCTION DEBRIS DURING AND AFTER MECHANICAL EQUIPMENT DEMOLITION. H. MECHANICAL CONTRACTOR SHALL DISPOSE OF DEMOLISHED MECHANICAL MECHANICAL CONTRACTOR SHALL DISPOSE OF DEMOLISHED MECHANICAL EQUIPMENT AND COORDINATE WITH THE CONSTRUCTION MANAGER. I. PRIOR TO START OF DEMOLITION WORK, MECHANICAL CONTRACTOR SHALL PRIOR TO START OF DEMOLITION WORK, MECHANICAL CONTRACTOR SHALL VERIFY WITH ELECTRICAL CONTRACTOR THAT POWER FEEDS AND CONTROL WIRING HAVE BEEN DISCONNECTED AND LOCKED OUT FROM MECHANICAL EQUIPMENT WHICH IS TO BE REMOVED. J. MECHANICAL CONTRACTOR SHALL REPAIR OR REPLACE ANY DUCT OR MECHANICAL CONTRACTOR SHALL REPAIR OR REPLACE ANY DUCT OR PIPING INSULATION DAMAGED DURING DEMOLITION WORK. K. WHERE DUCT WORK OR PIPING IS REMOVED TO A MAIN, CAP AT MAIN WHERE DUCT WORK OR PIPING IS REMOVED TO A MAIN, CAP AT MAIN AIRTIGHT. FIELD VERIFY EXACT CONDITIONS. PROVIDE ALL MATERIALS AS REQUIRED. PROVIDE NEW VALVES AT MAINS AS REQUIRED TO ALLOW FOR WORK. L. NOT ALL NOTES USED ON SHEETS.NOT ALL NOTES USED ON SHEETS.
TEL CLOSET
CE153
11 12 12.1 13 14 15 16 17 18 19
A
B
C
D
E
F
G
H
RECEPT.
OFFICE
OFFICE
SECURITY
HOLDING
6110A
HOLDING
TRANSITION
WC ALCOVE
61-C1B
CANTEEN
COFFEE
SHOP
CE151
CANTEEN
CE150
EXAM
CE129
OFFICE
CE128
OFFICE
STAIR
NO: 4
CONFERENCE
ROOM
CE113
FIRE ALARM
COMPUTER
CE113A
OFFICE
CE114A
OFFICE
CE114
OFFICE
CE115A
OFFICE
CE115
STORAGE
CE116
CHIEF
OPTOMETRY
OFFICE
CE117
TELE
OPERATOR
CW166
EXAM
CW113
TESTING
CW114
TESTING
CW115
VISUAL
FIELD
CE119C
TECH OFF
CE119B
OFFICE
CE119
OFFICE
CE118
OFFICE
CE122
SUPV
OFFICE
CE119A
OFFICE
CE123
OFFICE
CE124
OFFICE
CE125
OFFICE
CE126
EXAM
OFFICE
CE126A
OFFICE
CE127A
EXAM
CE127
EXAM
CE127B
OFFICE
OFFICE
EYE CLINIC
WAITING
CW166B
AMB CLINIC
CE130
FEMALE
TOILET
CE149A
MALE
TOILET
OFFICE
CE132
OFFICE
CE133
OFFICE
CE134
OFFICE
CE147
OFFICE
CE146
OFFICE
CE145
OFFICE
CE144
OFFICE
CE135
OFFICE
CE136
OFFICE
CE143
OFFICE
CE142
EXAM
CE137
EXAM
CW119
CW120A
CW120B
TREATMENT
RM
CW120
OFFICE
CE139
OFFICE
CE138
SUPPLY /
COPY RM
CE141
TELE
DERMATOLOGY
CE140
EXAM
CW119A
WAITING RM
CE131
CE148A
ELIGIBILITY
ENROLLMENT
OFFICE
CE193
TELL RM
CE191A
AMBULATORY
CARE
OFFICE
SUPV
CE191
TOILET
CW132
ELIGIBILITY
TRAVEL
CHECK IN
CW130
PTSD
CW133
HEAD
CLERK
HEALTH
BENEFIT
SECT OFF
CW127B
SOCIAL
WORKER
ADMIN
OFFICE
CW123A
YELLOW
WAITING
CW123
COPY
AMBULATORY
CARE
CE192
PTSD
OFFICE
CW139
PTSD
OFFICE
CW139A
NURSE MGR
CE183
FEMALE
TOILET
CE181
EXAM
CE152
EXAM
CE162
EMRT
STORAGE
CE163
EXAM RM
CE173
WOMEN
RESTROOM
CE174
MEN
RESTROOM
CE174A
CMP EXAM
CE172
EXAM
CE171
EXAM
CE170
EXAM
CE169
EXAM
CE168
EXAM
CE167
EXAM
CE166
EXAM
CE165
CLEAN
LINEN
CE165A
HAC
CE161
EXAM
CE160
EXAM
CE159
EXAM
CE158
EXAM RM
CE157
EXAM
CE156
EC
CE155
BREAK RM
CE154
CLERKS
OFFICE
CE185A
BUSINESS
OFICE
CHECKING
CE185
SOCIAL
WORKER
CE186
EXAM
CE187
EC
CE188
MALE
TOILET
CE181A
AMBULATORY
CMP
CE182
AMBULATORY
CARE
CE180
AMBULATORY
CARE
GROUP RM
CE175
CMP
CE177
AMBULATORY
CARE
CE178
EXAM
CE179
TOILET
CE176T
BREAK RM
CE176
CE189B
CE189A
CE189C
VESTIBULE
CEC46
FIRE EXT
FIRE EXT
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
V P r o j e c t s V
T C
L
R e v i t
V
A M e m p h i s B l d g C l i n i c L a b r v t
A
M
GUIDON DESIGN, INC
905 N CAPITOL AVE, SUITE 100
INDIANAPOLIS, IN 46204
TEL: 317.800.6388
ANDREW SCHAEWE
CMTA CONSULTING ENGINEERS, INC
10411 MEETING STREET
PROSPECT, KY 40059
ANDREW MYERS
RENOVATE CLINICAL
LABORATORY
MEMPHIS VAMC
614-17-112
LELAND FONG, COR/PE
MEMPHIS, TN 04/26/2019
BID SET
FULLY SPRINKLERED
TEL: 502.326.3085
Revisions: Date: AJM MJH
MD102
PARTIAL FIRST FLOOR PLAN -
HYDRONICS DEMOLITION
SCALE: 1/8" = 1'-0"MD102
1 PARTIAL FIRST FLOOR PLAN - HYDRONICS DEMOLITION
N
NO SCALE
KEY PLAN
AutoCAD SHX Text 3/4"
AutoCAD SHX Text 1"
AutoCAD SHX Text 3/4"
AutoCAD SHX Text 3/4"
AutoCAD SHX Text 3/4"
AutoCAD SHX Text 3/4"
AutoCAD SHX Text 3/4"
AutoCAD SHX Text 3/4"
AutoCAD SHX Text 3/4"
AutoCAD SHX Text 3/4"
AutoCAD SHX Text 1-1/2"
AutoCAD SHX Text 3/4"
AutoCAD SHX Text 3/4"
AutoCAD SHX Text 3/4"
AutoCAD SHX Text 3/4"
AutoCAD SHX Text 3/4"
AutoCAD SHX Text 3/4"
AutoCAD SHX Text 3/4"
AutoCAD SHX Text 3/4"
AutoCAD SHX Text 3/4"
AutoCAD SHX Text 3/4"
AutoCAD SHX Text 3/4"
AutoCAD SHX Text
E(HWR)
AutoCAD SHX Text
E(HWS)
AutoCAD SHX Text
E(HWR)
AutoCAD SHX Text
E(HWS)
AutoCAD SHX Text
E(HWR)
AutoCAD SHX Text
E(HWS)
AutoCAD SHX Text
E(HWR)
AutoCAD SHX Text
E(HWS)
AutoCAD SHX Text
E(HWR)
AutoCAD SHX Text
E(HWS)
AutoCAD SHX Text
E(HWR)
AutoCAD SHX Text
E(HWS)
AutoCAD SHX Text
E(CWR)
AutoCAD SHX Text
E(CWS)
AutoCAD SHX Text
E(CD)
AutoCAD SHX Text
E(CD)
AutoCAD SHX Text
E(CD)
AutoCAD SHX Text
E(CD)
AutoCAD SHX Text
E(CD)
AutoCAD SHX Text
E(CD)
AutoCAD SHX Text 1-1/2"
AutoCAD SHX Text 1-1/4"
AutoCAD SHX Text 1-1/4"
AutoCAD SHX Text
E(CWR)
AutoCAD SHX Text
E(CWS)
AutoCAD SHX Text
E(CWR)
AutoCAD SHX Text
E(CWS)
AutoCAD SHX Text
E(CWR)
AutoCAD SHX Text
E(CWS)
AutoCAD SHX Text
E(CWR)
AutoCAD SHX Text
E(CWS)
AutoCAD SHX Text
E(CWR)
AutoCAD SHX Text
E(CWS)
AutoCAD SHX Text
E(CWR)
AutoCAD SHX Text
E(CWS)
AutoCAD SHX Text
E(CD)
AutoCAD SHX Text
E(CD)
AutoCAD SHX Text
E(CD)
AutoCAD SHX Text 1-1/2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 3"
AutoCAD SHX Text 2"
AutoCAD SHX Text 3/4"
AutoCAD SHX Text 3"
AutoCAD SHX Text 1-1/2"
AutoCAD SHX Text 4"
AutoCAD SHX Text 1-1/2"
AutoCAD SHX Text
E(CWR)
AutoCAD SHX Text
E(CWS)
AutoCAD SHX Text
E(CWR)
AutoCAD SHX Text
E(CWS)
AutoCAD SHX Text 1"
AutoCAD SHX Text
E(CWR)
AutoCAD SHX Text
E(CWS)
AutoCAD SHX Text
E(CWR)
AutoCAD SHX Text
E(CWS)
AutoCAD SHX Text 2-1/2"
AutoCAD SHX Text
E(CD)
AutoCAD SHX Text
E(CD)
AutoCAD SHX Text
E(CD)
AutoCAD SHX Text
E(CD)
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text 2-1/2"
AutoCAD SHX Text
E(HWR)
AutoCAD SHX Text
E(HWR)
AutoCAD SHX Text
E(HWR)
AutoCAD SHX Text
E(HWS)
AutoCAD SHX Text
E(HWR)
AutoCAD SHX Text
E(HWS)
AutoCAD SHX Text
E(HWR)
AutoCAD SHX Text
E(HWS)
AutoCAD SHX Text
E(HWS)
AutoCAD SHX Text
E(HWR)
AutoCAD SHX Text
E(CD)
AutoCAD SHX Text 2-1/2"
AutoCAD SHX Text 2-1/2"
AutoCAD SHX Text 2-1/2"
AutoCAD SHX Text 2"
AutoCAD SHX Text
E(CD)
AutoCAD SHX Text 1"
AutoCAD SHX Text 3"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2-1/2"
AutoCAD SHX Text 3"
AutoCAD SHX Text 1-1/2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 3"
AutoCAD SHX Text
E(CD)
AutoCAD SHX Text
E(CD)
AutoCAD SHX Text
E(CWR)
AutoCAD SHX Text
E(CWS)
AutoCAD SHX Text
E(CWR)
AutoCAD SHX Text
E(CWS)
AutoCAD SHX Text 2"
AutoCAD SHX Text 1-1/2"
AutoCAD SHX Text 3"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2 1/2"
AutoCAD SHX Text 1"
AutoCAD SHX Text
E(CWS)
AutoCAD SHX Text
E(CWR)
AutoCAD SHX Text 1"
AutoCAD SHX Text
E(CWR)
AutoCAD SHX Text
E(CWR)
AutoCAD SHX Text 1-1/2"
AutoCAD SHX Text 1-1/4"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1"
AutoCAD SHX Text 3/4"
AutoCAD SHX Text 3/4"
AutoCAD SHX Text 1-1/2"
AutoCAD SHX Text
E(HWR)
AutoCAD SHX Text
E(HWS)
AutoCAD SHX Text
E(HWR)
AutoCAD SHX Text
E(HWS)
AutoCAD SHX Text
E(CWR)
AutoCAD SHX Text
E(CWS)
AutoCAD SHX Text
E(CWR)
AutoCAD SHX Text
E(CWS)
AutoCAD SHX Text
E(CWR)
AutoCAD SHX Text
E(CWS)
AutoCAD SHX Text
E(CWR)
AutoCAD SHX Text
E(CWS)
AutoCAD SHX Text 2"
AutoCAD SHX Text 2-1/2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 3"
AutoCAD SHX Text 1-1/2"
AutoCAD SHX Text
E(HWR)
AutoCAD SHX Text
E(HWS)
AutoCAD SHX Text
E(HWR)
AutoCAD SHX Text
E(HWS)
AutoCAD SHX Text 3/4"
AutoCAD SHX Text 1-1/2"
AutoCAD SHX Text 3"
AutoCAD SHX Text 1-1/4"
AutoCAD SHX Text
E(CD)
AutoCAD SHX Text
E(CD)
AutoCAD SHX Text
E(CD)
AutoCAD SHX Text
E(CD)
AutoCAD SHX Text
E(CD)
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
E(CWR)
AutoCAD SHX Text
E(CWS)
AutoCAD SHX Text 2 1/2"
AutoCAD SHX Text 1"
AutoCAD SHX Text 2"
AutoCAD SHX Text 1"
AutoCAD SHX Text 1"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text C
AutoCAD SHX Text
AutoCAD SHX Text C
AutoCAD SHX Text
AutoCAD SHX Text C
AutoCAD SHX Text
AutoCAD SHX Text C
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text C
AutoCAD SHX Text
AutoCAD SHX Text C
AutoCAD SHX Text
AutoCAD SHX Text C
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
E(CWR)
AutoCAD SHX Text
E(CWS)
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text 4"
AutoCAD SHX Text
E(CWS)
AutoCAD SHX Text
E(CWS)
AutoCAD SHX Text
E(CWR)
AutoCAD SHX Text 2 1/2"
AutoCAD SHX Text 2 1/2"
AutoCAD SHX Text 2 1/2"
AutoCAD SHX Text 3"
AutoCAD SHX Text
E(CWS)
AutoCAD SHX Text
E(CWR)
AutoCAD SHX Text 4"
AutoCAD SHX Text 3"
AutoCAD SHX Text
E(CWR)
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
IU
AutoCAD SHX Text E
AutoCAD SHX Text
AutoCAD SHX Text
E(CWR)
AutoCAD SHX Text
E(CWS)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text C
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text C
AutoCAD SHX Text
AutoCAD SHX Text
1. COMPLETELY REMOVE EXISTING PIPING INCLUDING ALL ASSOCIATED COMPLETELY REMOVE EXISTING PIPING INCLUDING ALL ASSOCIATED HANGERS, INSULATION, AND FITTINGS TO POINT INDICATED AND CAP. 2. COMPLETELY REMOVE EXISTING PIPING INCLUDING ALL ASSOCIATED COMPLETELY REMOVE EXISTING PIPING INCLUDING ALL ASSOCIATED HANGERS, INSULATION, AND FITTINGS TO POINT INDICATED. 3. EXISTING INDUCTION UNIT TO BE REMOVED COMPLETE, INCLUDING ALL EXISTING INDUCTION UNIT TO BE REMOVED COMPLETE, INCLUDING ALL MECHANICAL, ELECTRICAL, AND CONTROL CONNECTIONS. COORDINATE REMOVAL WITH ALL OTHER TRADES. 4. EXISTING VAV BOX TO BE REMOVED COMPLETE, INCLUDING ALL EXISTING VAV BOX TO BE REMOVED COMPLETE, INCLUDING ALL MECHANICAL, ELECTRICAL, AND CONTROL CONNECTIONS. COORDINATE REMOVAL WITH ALL OTHER TRADES. 5. EXISTING VAV BOX TO REMAIN. EXISTING VAV BOX TO REMAIN. 6. REWORK EXISTING PIPING AS REQUIRED FOR INSTALLATION OF NEW WORK. REWORK EXISTING PIPING AS REQUIRED FOR INSTALLATION OF NEW WORK. REFER TO MP101 AND MH101.
AutoCAD SHX Text X
AutoCAD SHX Text
MECHANICAL TAG NOTES: DEMOLITION
GENERAL NOTES - MECHANICAL DEMOLITION: A. ANY WORK REQUIRED OUTSIDE OF THE PROJECTS LIMITS SHALL BE ANY WORK REQUIRED OUTSIDE OF THE PROJECTS LIMITS SHALL BE PERFORMED AT NIGHTS OR ON WEEKENDS AND SCHEDULED THROUGH THE HOSPITAL ENGINEER. B. INACCESSIBLE PIPING BURIED IN EXISTING WALLS REMAINING AND INACCESSIBLE PIPING BURIED IN EXISTING WALLS REMAINING AND CONCRETE SLABS MAY BE ABANDONED IN PLACE. C. PATCH HOLES, IN WALLS, FLOORS, CEILINGS, ROOFS, ETC. TO MATCH PATCH HOLES, IN WALLS, FLOORS, CEILINGS, ROOFS, ETC. TO MATCH ADJACENT SURFACES AS A RESULT OF MECHANICAL SYSTEMS. PATCH SHALL BE PERFORMED BY QUALIFIED TRADESMAN. D. WHERE WORK IS REQUIRED ABOVE EXISTING CEILINGS AND/OR OUTSIDE WHERE WORK IS REQUIRED ABOVE EXISTING CEILINGS AND/OR OUTSIDE OF WORKSCOPE AREA, THIS CONTRACTOR SHALL BE RESPONSIBLE FOR CUT, PATCH, REMOVAL, AND REINSTALLATION (OR REPLACEMENT IF DAMAGED) OF ALL CEILING TILES, HARD CEILINGS, AND GRID MEMBERS NECESSARY TO PERFORM THE WORK. THIS SHALL BE PERFORMED AT THIS CONTRACTOR'S EXPENSE. E. PROVIDE AND INSTALL BLANK STAINLESS STEEL COVERPLATE OVER PROVIDE AND INSTALL BLANK STAINLESS STEEL COVERPLATE OVER OPENINGS WHERE THERMOSTATS AND OTHER WALL-MOUNTED CONTROL DEVICES ARE REMOVED AND NOT REPLACED. F. ALL SYSTEM SHUTDOWN SHALL BE SCHEDULED WITH THE FACILITIES ALL SYSTEM SHUTDOWN SHALL BE SCHEDULED WITH THE FACILITIES ENGINEER A MINIMUM OF 96 HOURS IN ADVANCE. G. MECHANICAL CONTRACTOR SHALL CLEAN UP CONSTRUCTION DEBRIS MECHANICAL CONTRACTOR SHALL CLEAN UP CONSTRUCTION DEBRIS DURING AND AFTER MECHANICAL EQUIPMENT DEMOLITION. H. MECHANICAL CONTRACTOR SHALL DISPOSE OF DEMOLISHED MECHANICAL MECHANICAL CONTRACTOR SHALL DISPOSE OF DEMOLISHED MECHANICAL EQUIPMENT AND COORDINATE WITH THE CONSTRUCTION MANAGER. I. PRIOR TO START OF DEMOLITION WORK, MECHANICAL CONTRACTOR SHALL PRIOR TO START OF DEMOLITION WORK, MECHANICAL CONTRACTOR SHALL VERIFY WITH ELECTRICAL CONTRACTOR THAT POWER FEEDS AND CONTROL WIRING HAVE BEEN DISCONNECTED AND LOCKED OUT FROM MECHANICAL EQUIPMENT WHICH IS TO BE REMOVED. J. MECHANICAL CONTRACTOR SHALL REPAIR OR REPLACE ANY DUCT OR MECHANICAL CONTRACTOR SHALL REPAIR OR REPLACE ANY DUCT OR PIPING INSULATION DAMAGED DURING DEMOLITION WORK. K. WHERE DUCT WORK OR PIPING IS REMOVED TO A MAIN, CAP AT MAIN WHERE DUCT WORK OR PIPING IS REMOVED TO A MAIN, CAP AT MAIN AIRTIGHT. FIELD VERIFY EXACT CONDITIONS. PROVIDE ALL MATERIALS AS REQUIRED. PROVIDE NEW VALVES AT MAINS AS REQUIRED TO ALLOW FOR WORK. L. NOT ALL NOTES USED ON SHEETS.NOT ALL NOTES USED ON SHEETS.
MENS TOILET
CWG28
FEMALE
TOILET
CWG 29
FIRE EXTINGUISHER
CEG 12
BECEG 14
FUTURE TOXICO LAB
BECEG 15
TISSUE CULTURE
BECEG 16
BECE-C1
OFFICE
CEG 24C
STORAGE
CEG 22G
CORRIDOR
CE C1
EVIDENCE
CEG 4
CEG 5A
CEG 5
CEG 1
EXAM RM
CEG 54C
CLINICAL
CEG 54
EXAM RM
CEG 54B
RECEPT OFFICE
CEG 53
COMM
CEG 52
EXAM RM
CEG 54D
EXAM RM
CEG 54ARECEPTION
CEG 51PASSENGER ELEVATOR LOBBY
CW-C8
TRAINING
CWG 20D
OFFICE
CWG 16D
CWG 20
OFFICE
ECSTORAGE
CEG 3
CEG 7
CEG 6 CEG 5B
CEG 5C
OFFICE
CEG 16D
POLICE
OFFICE
CEG 16A POLICE
CEG 16
OFFICE
CEG 16B CHIEF
OFFICE
CEG 16C
FIRE CONTROL
CEG 18
STAIR 4
OFFICE
CONTRACT
CEG 19B
CEG 19
CEG 20A
CEG 19A
COPY
CEG 20
VENDING RM
CEG 21
OFFICE
OFFICE
6005A
OFFICE
OFFICE
CEG 22A
OFFICE
CEG 22B
OFFICE
CEG 22C
OFFICE
CEG 22D
OFFICE
CEG 22E
FILE RM
CEG 22
C AND P EXAM
AND RATING
CEG 23
OFFICE
CEG 23E
OFFICE
CEG 22F
EXAM
OFFICE
CEG 23D
EXAM
OFFICE
CEG 23C
EXAM
OFFICE
CEG 23B
CEG 23A
EMS WORK
LENDER
CEG 24A
HAC
OFFICE
CEG 24B
OFFICE
CEG 24D
HOUSEKEEPING
CEG 24
CEG 26C
CEG 24E
CEG 26B
CEG 27
POLICE
INVESTIGATION
CEG 28
LOCKSMITH
OFFICE
CEG 29A
SUPV
CEG 26A
CEG 29
OFFICE
CWG 26
OFFICE
CWG 27
MAIL RM
CWG 30
OFFICE
CWG47A
CWG 30A
BED WASHING
CWG 47
ELEVATOR
P7
OFFICE
CWG 30C
UPS TRACKING
SYSTEM
CWG 30B
STORAGE
CWG 31A
CWG 31B
CWG 31C
MCCR INSURANCE AND BILLING
CEG 26
10 11 201918171615141312.112
G
A
B
C
D
E
F
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
V P r o j e c t s V
T C
L
R e v i t
V
A M e m p h i s B l d g C l i n i c L a b r v t
A
M
GUIDON DESIGN, INC
905 N CAPITOL AVE, SUITE 100
INDIANAPOLIS, IN 46204
TEL: 317.800.6388
ANDREW SCHAEWE
CMTA CONSULTING ENGINEERS, INC
10411 MEETING STREET
PROSPECT, KY 40059
ANDREW MYERS
RENOVATE CLINICAL
LABORATORY
MEMPHIS VAMC
614-17-112
LELAND FONG, COR/PE
MEMPHIS, TN 04/26/2019
BID SET
FULLY SPRINKLERED
TEL: 502.326.3085
Revisions: Date: AJM MJH
MH100
PARTIAL GROUND FLOOR PLAN -
MECHANICAL
SCALE: 1/8" = 1'-0"MH100
1 PARTIAL GROUND FLOOR PLAN - MECHANICAL
N
NO SCALE
KEY PLAN
AutoCAD SHX Text
E(CHS)
AutoCAD SHX Text
E(CHR)
AutoCAD SHX Text
E(CHS)
AutoCAD SHX Text
E(CHR)
AutoCAD SHX Text
E(CHS)
AutoCAD SHX Text
E(CHR)
AutoCAD SHX Text
E(CD)
AutoCAD SHX Text
E(CD)
AutoCAD SHX Text
E(CD)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text GENERAL NOTES - MECHANICAL: A. ALL DUCT TAKE-OFFS ARE TO BE HIGH EFFICIENCY TYPE. REFER DETAIL ALL DUCT TAKE-OFFS ARE TO BE HIGH EFFICIENCY TYPE. REFER DETAIL SHEET FOR ADDITIONAL INFORMATION. B. INSTALL CAV/VAV BOXES IN AN ACCESSIBLE LOCATION. DO NOT INSTALL INSTALL CAV/VAV BOXES IN AN ACCESSIBLE LOCATION. DO NOT INSTALL DUCTWORK, PIPING, CABLE TRAY OR CONDUITS BELOW BOX. MAINTAIN MAINTAIN 30" SERVICE ACCESS CLEARANCE TO BOX CONTROLLER. C. OFFSETS WHERE DUCT CONFLICTS ARE ANTICIPATED HAVE BEEN INDCATED. OFFSETS WHERE DUCT CONFLICTS ARE ANTICIPATED HAVE BEEN INDCATED.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .