36C24920R0008-0002008.pdf
PDF Posted
- Solicitation number
- 36C24920R0008
About this file
This notice solicits proposals for a construction project to renovate the clinical laboratory at the Memphis VA Medical Center. The project includes general hospital construction, plumbing, mechanical, electrical work, and other items as specified, with an estimated value between $5-10 million.
The requirement will utilize FAR Part 15 for a lowest price technically acceptable source selection. Evaluation factors will be released with the solicitation notice on or by November 6, 2019. This is a 100% set-aside for Service-Disabled Veteran Owned Small Businesses. Offerors must be listed on the Vendor Information Pages and System for Award Management databases. The awarded contractor must submit evidence of VETS-4212 enrollment. Questions must be submitted in writing with the project number and name, and solicitation number in the email subject line.
36C24920R0008 0002 2019.04.26 - FP PLUMB.pdf
View the file
Other files
Show all 46
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
V P r o j e c t s V
T C
L
R e v i t
V
A M e m p h i s B l d g C l i n i c L a b r v t
A
M
GUIDON DESIGN, INC
905 N CAPITOL AVE, SUITE 100
INDIANAPOLIS, IN 46204
TEL: 317.800.6388
ANDREW SCHAEWE
CMTA CONSULTING ENGINEERS, INC
10411 MEETING STREET
PROSPECT, KY 40059
ANDREW MYERS
RENOVATE CLINICAL
LABORATORY
MEMPHIS VAMC
614-17-112
LELAND FONG, COR/PE
MEMPHIS, TN 04/26/2019
BID SET
FULLY SPRINKLERED
TEL: 502.326.3085
Revisions: Date: AJM MJH
FX101
FIRE PROTECTION NOTES &
DETAILS
AutoCAD SHX Text FIRE PROTECTION DESIGN NOTES: 1. THE ENTIRE BUILDING IS TO BE 100% COVERED WITH A WET FIRE PROTECTION SYSTEM THE ENTIRE BUILDING IS TO BE 100% COVERED WITH A WET FIRE PROTECTION SYSTEM DESIGNED IN ACCORDANCE WITH NFPA 13. THE SYSTEM SHOULD BE DESIGNED AS LIGHT HAZARD UNLESS NOTED. THE EXISTING WET FIRE PROTECTION SYSTEM IS TO BE MODIFIED FOR THE NEW ROOM AND CEILING LAYOUTS. REMOVE ALL EXISTING PIPING AND HEADS COMPLETELY AND REINSTALL AFTER THE MECHANICAL DUCTWORK AND PIPING HAS BEEN REINSTALLED. PROVIDE ALL NEW SPRINKLER PIPING AND HEADS. 2. THE SUCCESSFUL FIRE PROTECTION CONTRACTOR SHALL OBTAIN AND UTILIZE THE THE SUCCESSFUL FIRE PROTECTION CONTRACTOR SHALL OBTAIN AND UTILIZE THE ARCHITECTURAL REFLECTED CEILING PLAN FOR LAYING OUT THE SPRINKLER HEADS. THE REFLECTED CEILING PLANS SHOWN ARE TO COORDINATE CEILING TYPES AND LOCATIONS, REFER TO THE MECHANICAL AND ELECTRICAL DRAWINGS FOR CEILING DEVICE LOCATIONS. REFER TO SPECIFICATIONS FOR COORDINATION DRAWING REQUIREMENTS. 3. ALL AREAS SHALL BE SPRINKLED WITH A WET FIRE PROTECTION SYSTEM FED FROM A ALL AREAS SHALL BE SPRINKLED WITH A WET FIRE PROTECTION SYSTEM FED FROM A RETURN BEND ARRANGEMENT. UTILIZE QUICK RESPONSE HEADS, BUT DO NOT USE THE DESIGN REDUCTION FOR THE QUICK HEADS WHEN DOING THE CALCULATIONS. US THE FOLLOWING HEADS IN SPECIFIC AREAS AS INDICATED BELOW. REFER TO SPECIFICATIONS FOR DIFFERENT TYPES OF SPRINKLER HEADS. IN AREAS WITH LAY-IN CEILING USE SEMI-RECESSED SPRINKLER HEADS. ALL SPRINKLER HEADS SHALL BE CENTERED IN BOTH DIRECTIONS OF A LAY-IN CEILING TILE. IN AREAS WITH HARD CEILINGS USE FULLY RECESSED SPRINKLED HEADS. PROVIDE COVER-PLATED TO MATCH THE CEILING COLOR. IN AREAS WITHOUT CEILING USE UPRIGHT AND/OR WALL MOUNTED SPRINKLER HEADS. IN AREAS AS NOTED USE UL LISTED OR FM APPROVED "INSTITUATIONAL" TYPE QR SPRINKLER HEADS IN ALL PSYCHIATRIC AREAS. PROVDE AND INSTALL PER VA STANDARDS (PG-18-14). 4. HVAC DUCTWORK MAINS SHALL BE INSTALLED PRIOR TO FIRE PROTECTION PIPING. PROVIDE HVAC DUCTWORK MAINS SHALL BE INSTALLED PRIOR TO FIRE PROTECTION PIPING. PROVIDE DRAIN VALVES IN THE FIRE PROTECTION SYSTEM WHERE NECESSARY TO COMPLETELY DRAIN THE SYSTEM. ALL EXISTING PIPING IS TO BE REMOVED AS REQUIRED TO INSTALL NEW MAINS. 5. INSTALL ALL PIPING AT LEAST 12" ABOVE FINISHED CEILING ELEVATION TO ALLOW FOR INSTALL ALL PIPING AT LEAST 12" ABOVE FINISHED CEILING ELEVATION TO ALLOW FOR SUITABLE ACCESS TO ABOVE CEILING. 6. RUN NO SPRINKLER MAINS/BRANCH PIPES OVER LIGHT FIXTURES. RUN NO SPRINKLER MAINS/BRANCH PIPES OVER LIGHT FIXTURES. 7. ALL PIPING SHALL BE INSTALLED AS HIGH AS POSSIBLE. LOW PIPING WILL HAVE TO BE ALL PIPING SHALL BE INSTALLED AS HIGH AS POSSIBLE. LOW PIPING WILL HAVE TO BE RELOCATED, BY THE CONTRACTOR, IF IT COULD HAVE BEEN INSTALLED HIGHER. THIS WILL BE UP TO THE DISCRETION OF THE ENGINEER. 8. PROVIDE ALL REQUIRED DRAIN PIPING TO TEST FLOW SWITCHES. DISCHARGE DRAIN PIPING TO PROVIDE ALL REQUIRED DRAIN PIPING TO TEST FLOW SWITCHES. DISCHARGE DRAIN PIPING TO OUTDOORS OR A FLOOR DRAIN. 9. NO PIPING IS TO BE ROUTED ABOVE ELECTRICAL PANELS, TRANSFORMERS, COMPUTER RACKS, NO PIPING IS TO BE ROUTED ABOVE ELECTRICAL PANELS, TRANSFORMERS, COMPUTER RACKS, ETC. AS REQUIRED BY THE ELECTRICAL CODE.. FIELD VERIFY ALL EXISTING ELECTRICAL LOCATIONS PRIOR TO DESIGNING THE FIRE PROTECTION PLANS. 10. THE SUCCESSFUL FIRE PROTECTION CONTRACTOR WILL BE REQUIRED TO OBTAIN A NEW FLOW THE SUCCESSFUL FIRE PROTECTION CONTRACTOR WILL BE REQUIRED TO OBTAIN A NEW FLOW TEST PRIOR TO STARTING CALCULATIONS. SIZE ALL FIRE PROTECTION PIPING IN ACCORDANCE WITH NFPA 13. PIPE SIZING SHALL BE ACCOMPLISHED USING HYDRAULIC CALCULATIONS. SUBMIT HYDRAULIC CALCULATIONS AND SYSTEMS DESIGN FOR REVIEW TO: THE M/E ENGINEER. USE 250 GPM FOR THE HOSE STREAM CALCULATION.
AutoCAD SHX Text
NTS
AutoCAD SHX Text
NOTE: 1.
AutoCAD SHX Text APPLICABLE TO PENETRATIONS OF ALL FIRE RATED MEMBRANES, IN ACCORDANCE WITH NFPA 101. REFER TO SPECIFICATIONS SECTION 07 84 00, FIRE STOPPING SYSTEMS.
AutoCAD SHX Text
INSULATED PIPE OR DUCT
AutoCAD SHX Text
FLOOR
AutoCAD SHX Text
FIRESTOP MATERIAL
AutoCAD SHX Text 3/4" [19mm] APPROVED FIRESTOP INSULATION WITH VAPOR BARRIER
AutoCAD SHX Text
PIPE SLEEVE WHERE SPECIFIED
AutoCAD SHX Text 1/4" [6.4mm] ANCHORROD FOR NEW CONSTRUCTION
AutoCAD SHX Text
WELD
AutoCAD SHX Text [25mm]
AutoCAD SHX Text [150mm]
AutoCAD SHX Text [150mm]
AutoCAD SHX Text
FLOOR OR DECK PENETRATION
AutoCAD SHX Text
PARTITION OR CHASE PENETRATION
AutoCAD SHX Text [150mm]
AutoCAD SHX Text [150mm]
AutoCAD SHX Text
MASONRY PARTITION
AutoCAD SHX Text
PARTITION SUPPORT
AutoCAD SHX Text
FIRESTOP MATERIAL
AutoCAD SHX Text [150mm]
AutoCAD SHX Text [150mm]
AutoCAD SHX Text 3/4" [19mm] APPROVED FIRESTOP INSULATION WITH VAPOR BARRIER
AutoCAD SHX Text
DRYWALL PARTITION
AutoCAD SHX Text
INSULATED PIPE OR DUCT
AutoCAD SHX Text
DUCT/PIPE PENETRATION OF SMOKE/FIRE BARRIERS
AutoCAD SHX Text
FIRE MAIN
AutoCAD SHX Text
%%URETURN BEND DETAIL
AutoCAD SHX Text
NTS
AutoCAD SHX Text
CEILING
AutoCAD SHX Text
SPRINKLER PIPE
AutoCAD SHX Text
FLEXIBLE RETURN BEND
AutoCAD SHX Text
MAY BE PROVIDED AS AN
AutoCAD SHX Text
RECESSED PENDANT SPRINKLER
AutoCAD SHX Text
NOTE: SIMILAR FOR TYCO "RAVEN" SPRINKLER
AutoCAD SHX Text
EQUAL.
UP
BLOOD BANK
(LMBB2)
CE120
BLOOD DRAW
(LBBD1)
CW120
BLOOD DRAW
VESTIBULE
CWC15A
BLOOD DRAW
TOILET (TLTU1)
CE122
BLOOD DRAW
TOILET (TLTU1)
CE123
BLOOD DRAW
RECEPTION (RECP1)
CE121
OFFICE
SUPERVISOR
(OFA07)
CE133
ANATOMICAL LAB
CE130
OFFICE
SUPERVISOR
(OFA07)
CE141
CLEAN ROOM BSL 3
(LMM03)
CE146
ANTE
CE145
MICROBIOLOGY LAB
(LMM02)
CE140
TEL CLOSET
CE153
DATA
CE152
ELECTRICAL
CE171
MOLECULAR LAB
CE155
OFFICE
SUPERVISOR
(OFA07)
CE166
OFFICE
SUPERVISOR
(OFA07)
CE167
OFFICE
SUPERVISOR
(OFA07)
CE168
BULK STORAGE
(SRS01)
CE169
FLOW CYTOMETRY
LAB (LMHI3)
CE170
BULK STORAGE
(SRS01)
CE165
BULK STORAGE
(CSSS2)
CE187
HAC (JANC1)
CE189
OFFICE PATHOLGIST
1 (XXYYC)
CE196
OFFICE PATHOLGIST
2 (XXYYC)
CE195
OFFICE PATHOLGIST
3 (XXYYC)
CE194
OFFICE PATHOLGIST
4 (XXYYC)
CE193
CONFERENCE ROOM
(CRA01)
CE197
STAFF LOUNGE
(SLOO1)
CE191
WOMEN'S STAFF
TOILET (TLTU1)
CE190B
LOCKER (LR001)
CE190
MEN'S STAFF
TOILET (TLTU1)
CE190A
OFFICE PATHOLGIST
5 (XXYYC)
CE192
CORRIDOR
CEC33
BLOOD DRAW
WAITING (WRC01)
CWC16
OFFICE CHIEF
(OFA09)
CE183
OFFICE CHIEF
(OFA09)
CE185
OFFICE AO
(OFA09)
CE184
LAB RECEPTION
(RECP1)
CW130
MED TECH /
TEACHING (CRA02)
CW131
RESIDENTS (OFA07)
CW132
ACCESSIONING
(LBBD2)
CE180
LAB COATS
CEC39A
11 12 12.1 13 14 15 16 17 18 19
A
B
C
D
E
F
G
H
OPEN WORK AREA
(OFA07)
CW133
WORK STATIONS
(OFA07)
CW133A
STAFF TOILET
(TLTU1)
CE186
CORRIDOR
CEC39
CORRIDOR
CWC17
CLINICAL LAB
VESTIBULE
CWC15
CLINICAL
PATHOLOGY LAB
CE160
OFFICE
SUPERVISOR
(OFA07)
CE132
STAFF ENTRY
VESTIBULE
CEC46
WOMEN'S TOILET
CE154B
MEN'S TOILET
CE154A
AIR COMPRESSOR
ROOM
CE181
ELECTRICAL
CE182
RECEPT.
OFFICE
OFFICE
SECURITY HOLDING
6110A
HOLDING
TRANSITION
WC ALCOVE
61-C1B
CANTEEN COFFEE
SHOP
CE151
CANTEEN
CE150
EXAM
CE129
OFFICE
CE128
OFFICE
STAIR
NO: 4
CONFERENCE ROOM
CE113
FIRE ALARM
COMPUTER
CE113A
OFFICE
CE114A
OFFICE
CE114
OFFICE
CE115A
OFFICE
CE115
STORAGE
CE116
CHIEF OPTOMETRY
OFFICE
CE117
STORAGE
CW165
TELE OPERATOR
CW166
ELEVATOR
TC
ELEVATOR
P-7
OFFICE
CW166A
STAIR
NO: 2
MENS TOILET
CW170
HAC
CW171
WOMENS TOILET
CW172
EC
CW173
ELEVATOR
P-6
FLAMMABLE &
TOXIC SUBSTANCE
STORAGE (SRGC2)
CE198
12.3
PREP ROOM
(LMM02)
CE144
OFFICE
SUPERVISOR
(OFA07)
CW123
MICROSCOPE
CE147
OFFICE
SUPERVISOR
(OFA07)
CE158
FREEZER
CW121
REFRIGERATOR
CW122
REFRIGERATOR
CE131
FREEZER
CE142
REFRIGERATOR
CE143
FREEZER
CE156
REFRIGERATOR
CE157
REFRIGERATOR
CE163
FREEZER
CE164
REFRIGERATOR
CE162
REFRIGERATOR
CE161
REFRIGERATOR
CE188
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
V P r o j e c t s V
T C
L
R e v i t
V
A M e m p h i s B l d g C l i n i c L a b r v t
A
M
GUIDON DESIGN, INC
905 N CAPITOL AVE, SUITE 100
INDIANAPOLIS, IN 46204
TEL: 317.800.6388
ANDREW SCHAEWE
CMTA CONSULTING ENGINEERS, INC
10411 MEETING STREET
PROSPECT, KY 40059
ANDREW MYERS
RENOVATE CLINICAL
LABORATORY
MEMPHIS VAMC
614-17-112
LELAND FONG, COR/PE
MEMPHIS, TN 04/26/2019
BID SET
FULLY SPRINKLERED
TEL: 502.326.3085
Revisions: Date: AJM MJH
FX102
FIRST FLOOR - FIRE
PROTECTION PLAN
SCALE: 1/8" = 1'-0"FX102
1 FIRST FLOOR - FIRE PROTECTION PLAN
N
NO SCALE
KEY PLAN
AutoCAD SHX Text
EXISTING FLOOR CONTROL VALVE ASSEMBLY
AutoCAD SHX Text
EXISTING FLOOR CONTROL VALVE ASSEMBLY
AutoCAD SHX Text
AutoCAD SHX Text DASHED LINE INDICATES EXISTING AREA TO BE PROVIDED WITH AN AUTOMATIC SPRINKLER SYSTEM IN ACCORDANCE WITH ALL APPLICABLE NFPA, STATE, AND LOCAL CODES. CONTRACTOR SHALL RE-WORK ALL EXISTING SPRINKLER PIPING AS REQUIRED TO AVOID CONFLICTS WITH ALL NEW CONSTRUCTION. EXISTING SPRINKLERS SHALL NOT BE RE-USED. REFER TO ELECTRICAL DRAWINGS TO PROVIDE TEMPORARY HEAT DETECTORS DURING CONSTRUCTION.
AutoCAD SHX Text
%%UPLUMBING TAGGED NOTES:
AutoCAD SHX Text
1. OFFSET EXISTING FIRE RISER TO ACCOMMODATE NEW ARCHITECTURAL LAYOUT.
XX
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
V P r o j e c t s V
T C
L
R e v i t
V
A M e m p h i s B l d g C l i n i c L a b r v t
A
M
GUIDON DESIGN, INC
905 N CAPITOL AVE, SUITE 100
INDIANAPOLIS, IN 46204
TEL: 317.800.6388
ANDREW SCHAEWE
CMTA CONSULTING ENGINEERS, INC
10411 MEETING STREET
PROSPECT, KY 40059
ANDREW MYERS
RENOVATE CLINICAL
LABORATORY
MEMPHIS VAMC
614-17-112
LELAND FONG, COR/PE
MEMPHIS, TN 04/26/2019
BID SET
FULLY SPRINKLERED
TEL: 502.326.3085
Revisions: Date: AJM MJH
PL101
PLUMBING LEGEND,
SCHEDULES, & DETAILS
AutoCAD SHX Text
ABOVE FINISHED FLOOR
AutoCAD SHX Text
CAST IRON
AutoCAD SHX Text
CLEANOUT
AutoCAD SHX Text
EXTERIOR CLEANOUT
AutoCAD SHX Text
FLOOR DRAIN
AutoCAD SHX Text
FREEZE PROOF WALL HYDRANT
AutoCAD SHX Text
GREASE INTERCEPTOR
AutoCAD SHX Text
HOSE BIBB
AutoCAD SHX Text
NEUTRALIZATION TANK
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
POLYVINYL CHLORIDE
AutoCAD SHX Text
SUMP PUMP
AutoCAD SHX Text
AFF
AutoCAD SHX Text
CI
AutoCAD SHX Text
CO
AutoCAD SHX Text
ECO
AutoCAD SHX Text
FD
AutoCAD SHX Text
FPWH
AutoCAD SHX Text
GI
AutoCAD SHX Text
HB
AutoCAD SHX Text
NT
AutoCAD SHX Text
NTS
AutoCAD SHX Text
PVC
AutoCAD SHX Text
SP
AutoCAD SHX Text
TRENCH DRAIN
AutoCAD SHX Text
TYPICAL
AutoCAD SHX Text
TD
AutoCAD SHX Text
TYP
AutoCAD SHX Text
VENT THROUGH ROOF
AutoCAD SHX Text
WATER HAMMER ARRESTOR
AutoCAD SHX Text
WATER HEATER
AutoCAD SHX Text
VTR
AutoCAD SHX Text
WHA
AutoCAD SHX Text
WH
AutoCAD SHX Text
EXPANSION TANK
AutoCAD SHX Text
ET
AutoCAD SHX Text
FLOOR SINK
AutoCAD SHX Text
FS
AutoCAD SHX Text
WATER SOFTENER
AutoCAD SHX Text
WS
AutoCAD SHX Text
SAN
AutoCAD SHX Text
SS
AutoCAD SHX Text
OSS
AutoCAD SHX Text
GL
AutoCAD SHX Text
AutoCAD SHX Text
DOMESTIC COLD WATER PIPING
AutoCAD SHX Text
DOMESTIC HOT WATER PIPING (120%%D F)
AutoCAD SHX Text
DOMESTIC HOT WATER RETURN PIPING (120%%D F)
AutoCAD SHX Text 140R
AutoCAD SHX Text
DOMESTIC HOT WATER PIPING (140%%D F)
AutoCAD SHX Text
DOMESTIC HOT WATER RETURN PIPING (140%%D F)
AutoCAD SHX Text
STORM PIPING
AutoCAD SHX Text
OVERFLOW STORM PIPING
AutoCAD SHX Text
GREASE WASTE PIPING
AutoCAD SHX Text
SANITARY VENT PIPING
AutoCAD SHX Text
SANITARY PIPING
AutoCAD SHX Text
RVD
AutoCAD SHX Text
RELIEF VALVE DISCHARGE
AutoCAD SHX Text
UNION
AutoCAD SHX Text
GATE VALVE
AutoCAD SHX Text
CHECK VALVE
AutoCAD SHX Text
BALL VALVE
AutoCAD SHX Text
BALL VALVE IN RISER
AutoCAD SHX Text
PIPING TEE (TURNED UP/DOWN)
AutoCAD SHX Text
REDUCED PRESSURE BACKFLOW PREVENTER
AutoCAD SHX Text
PRESSURE REDUCING VALVE
AutoCAD SHX Text
PRESSURE RELIEF VALVE
AutoCAD SHX Text
DIAL THERMOMETER
AutoCAD SHX Text P
AutoCAD SHX Text
PRESSURE GAUGE
AutoCAD SHX Text V
AutoCAD SHX Text
DOUBLE CHECK VALVE ASSEMBLY
AutoCAD SHX Text
PIPING ELBOW (TURNED UP/DOWN)
AutoCAD SHX Text
DI
AutoCAD SHX Text
DEIONIZED WATER
AutoCAD SHX Text
DOMESTIC WATER CIRCULATING PUMP
AutoCAD SHX Text
DP
AutoCAD SHX Text
FCW
AutoCAD SHX Text
FILTERED COLD WATER
AutoCAD SHX Text
TRAP PRIMER
AutoCAD SHX Text
TP
AutoCAD SHX Text
GAS SHUT-OFF VALVE
AutoCAD SHX Text
COLD WATER
AutoCAD SHX Text
CW
AutoCAD SHX Text
HOT WATER
AutoCAD SHX Text
HW
AutoCAD SHX Text
SOLENOID VALVE
AutoCAD SHX Text
ELECTRICAL CONTRACTOR
AutoCAD SHX Text
EC
AutoCAD SHX Text
MECHANICAL CONTRACTOR
AutoCAD SHX Text
MC
AutoCAD SHX Text
PLUMBING CONTRACTOR
AutoCAD SHX Text
PC
AutoCAD SHX Text
OPEN RECEPTACLE
AutoCAD SHX Text
OR
AutoCAD SHX Text
ROOF DRAIN
AutoCAD SHX Text
RD
AutoCAD SHX Text
GENERAL CONTRACTOR
AutoCAD SHX Text
GC
AutoCAD SHX Text
BALANCING VALVE
AutoCAD SHX Text
BELOW FINISHED FLOOR
AutoCAD SHX Text
BFF
AutoCAD SHX Text
INVERT ELEVATION
AutoCAD SHX Text
IE
AutoCAD SHX Text
MIXING VALVE
AutoCAD SHX Text
MV
AutoCAD SHX Text
TP
AutoCAD SHX Text
TRAP PRIMER PIPING
AutoCAD SHX Text
OIL
AutoCAD SHX Text
OIL WASTE PIPING
AutoCAD SHX Text
E(SAN)
AutoCAD SHX Text
EXISTING SANITARY PIPING
AutoCAD SHX Text
EXISTING DOMESTIC COLD WATER PIPING
AutoCAD SHX Text
EXISTING DOMESTIC HOT WATER PIPING
AutoCAD SHX Text
EXISTING DOMESTIC HOT WATER RETURN PIPING
AutoCAD SHX Text
EXISTING SANITARY VENT PIPING
AutoCAD SHX Text E(V)
AutoCAD SHX Text
E(CW)
AutoCAD SHX Text
E(HW)
AutoCAD SHX Text
E(HWR)
AutoCAD SHX Text
E(GAS)
AutoCAD SHX Text
EXISTING NATURAL GAS PIPING
AutoCAD SHX Text
E(SS)
AutoCAD SHX Text
E(OSS)
AutoCAD SHX Text
EXISTING STORM PIPING
AutoCAD SHX Text
EXISTING OVERFLOW STORM PIPING
AutoCAD SHX Text
E(SAN)
AutoCAD SHX Text
DEMO SANITARY PIPING
AutoCAD SHX Text
DEMO DOMESTIC COLD WATER PIPING
AutoCAD SHX Text
DEMO DOMESTIC HOT WATER PIPING
AutoCAD SHX Text
DEMO DOMESTIC HOT WATER RETURN PIPING
AutoCAD SHX Text
DEMO SANITARY VENT PIPING
AutoCAD SHX Text E(V)
AutoCAD SHX Text
E(CW)
AutoCAD SHX Text
E(HW)
AutoCAD SHX Text
E(HWR)
AutoCAD SHX Text
E(GAS)
AutoCAD SHX Text
DEMO NATURAL GAS PIPING
AutoCAD SHX Text
E(SS)
AutoCAD SHX Text
E(OSS)
AutoCAD SHX Text
DEMO STORM PIPING
AutoCAD SHX Text
DEMO OVERFLOW STORM PIPING
AutoCAD SHX Text
FREEZE PROOF ROOF HYDRANT
AutoCAD SHX Text
FPRH
AutoCAD SHX Text
PLUMBING FIXTURE SCHEDULE
AutoCAD SHX Text
FIXTURE
AutoCAD SHX Text
DESIGNATOR
AutoCAD SHX Text 1 "12"
AutoCAD SHX Text
CW
AutoCAD SHX Text
AutoCAD SHX Text
HW
AutoCAD SHX Text 4"
AutoCAD SHX Text
SAN
AutoCAD SHX Text
VENT
AutoCAD SHX Text 2"
AutoCAD SHX Text 12"
AutoCAD SHX Text 1 "12"
AutoCAD SHX Text 12"
AutoCAD SHX Text 1 "12"
AutoCAD SHX Text P-606
AutoCAD SHX Text
ELECTRIC WATER COOLER - HI-LOW - ADA
AutoCAD SHX Text 12"
AutoCAD SHX Text 1 "12"
AutoCAD SHX Text 2"
AutoCAD SHX Text P-801
AutoCAD SHX Text
UTILTY DRAIN BOX
AutoCAD SHX Text
HB
AutoCAD SHX Text
HOSE BIB
AutoCAD SHX Text SCHEDULE NOTES: PIPE SIZES ARE AS INDICATED UNLESS OTHERWISE NOTED ON FLOOR PLANS AND RISER DIAGRAMS. MINIMUM 2'' SANITARY PIPING UNDERGROUND. PROVIDE ALL REQUIRED PIPING TO FIXTURES INDICATED ON THE FLOOR PLANS, "P-X" DESIGNATION. PROVIDE PIPING OF SIZE INDICATED IN THIS SCHEDULE. P-X" DESIGNATION. PROVIDE PIPING OF SIZE INDICATED IN THIS SCHEDULE. " DESIGNATION. PROVIDE PIPING OF SIZE INDICATED IN THIS SCHEDULE. PIPE ALL EQUIPMENT (SUPPLIED BY OTHERS) AS REQUIRED TO OBTAIN A FULL AND OPERATIONAL SYSTEM. PROVIDE BACKFLOW PROTECTION AS/IF REQUIRED BY THE DETAILS AND BY THE INDIANA PLUMBING CODE. ALL EQUIPMENT SHALL BE CONNECTED PER THE MANUFACTURER'S REQUIREMENTS. THE PLUMBING CONTRACTOR SHALL ALSO INSTALL ANY DRAIN PIPING CONNECTIONS AND SPILL INDIRECTLY TO EITHER AN OPEN RECEPTACLE OR FLOOR DRAIN. REFER TO ARCHITECTURAL PLANS FOR EXACT PLACEMENT OF ALL EQUIPMENT.
AutoCAD SHX Text
FD-101
AutoCAD SHX Text
FLOOR DRAIN W/ SURE SEAL TRAP GUARD
AutoCAD SHX Text
AutoCAD SHX Text 3"
AutoCAD SHX Text 1 "12"
AutoCAD SHX Text
AutoCAD SHX Text
FS-101
AutoCAD SHX Text
AutoCAD SHX Text 4"
AutoCAD SHX Text 2"
AutoCAD SHX Text
AutoCAD SHX Text
FLOOR SINK W/ SURE SEAL TRAP GUARD
AutoCAD SHX Text
PROVIDE CHECK VALVES
AutoCAD SHX Text
ABOVE THE CEILING
AutoCAD SHX Text
BALL
AutoCAD SHX Text
3/4" HW AND CW
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
VALVES
AutoCAD SHX Text
WATER HAMMER
AutoCAD SHX Text
ARRESTOR
AutoCAD SHX Text
(TYPICAL)
AutoCAD SHX Text
FAUCET WITH
AutoCAD SHX Text
INTEGRAL VACUUM
AutoCAD SHX Text
BREAKER
AutoCAD SHX Text
MOP BASIN
AutoCAD SHX Text
PLUMBING LEGEND
AutoCAD SHX Text
MOP BASIN DETAIL
AutoCAD SHX Text GENERAL NOTES (APPLICABLE TO ALL DRAWINGS) 1. EACH CONTRACTOR, SUPPLIER AND, OR MANUFACTURER SHALL REFER TO ALL DOCUMENTS EACH CONTRACTOR, SUPPLIER AND, OR MANUFACTURER SHALL REFER TO ALL DOCUMENTS PERTAINING TO THIS PROJECT AND COORDINATE ACCORDINGLY SO AS TO ENSURE ADEQUACY OF FIT, COMPLIANCE WITH SPECIFICATIONS, PROPER VOLTAGE AND CURRENT CHARACTERISTICS AND AVOID CONFLICT WITH ANY OTHER BUILDINGS SYSTEMS. VERIFY SAME WITH SHOP DRAWINGS. 2. ALL OFFSETS, TURNS, FITTINGS, TRIM, DETAIL, ETC., MAY NOT BE INDICATED, BUT SHALL BE ALL OFFSETS, TURNS, FITTINGS, TRIM, DETAIL, ETC., MAY NOT BE INDICATED, BUT SHALL BE PROVIDED AS REQUIRED. ADDITIONAL ALLOWANCES SHALL BE INCLUDED FOR SAME AT EACH PROPOSERS' DISCRETION. 3. OBSERVE ALL APPLICABLE CODES, RULES AND REGULATIONS (CITY, COUNTY, LOCAL, STATE, OBSERVE ALL APPLICABLE CODES, RULES AND REGULATIONS (CITY, COUNTY, LOCAL, STATE, FEDERAL, MUNICIPALITY, UTILITY COMPANY, OSHA, ETC.). 4. ALL SYSTEMS, EQUIPMENT AND MATERIALS ARE TO BE INSTALLED IN A NEAT AND ALL SYSTEMS, EQUIPMENT AND MATERIALS ARE TO BE INSTALLED IN A NEAT AND WORKMANLIKE MANNER. WORK NOT DONE SO SHALL BE REMOVED AND REINSTALLED SATISFACTORILY. 5. WHERE MOUNTING HEIGHTS ARE NOT INDICATED OR ARE IN CONFLICT WITH ANY OTHER WHERE MOUNTING HEIGHTS ARE NOT INDICATED OR ARE IN CONFLICT WITH ANY OTHER BUILDING SYSTEM, CONTACT THE ENGINEERS BEFORE INSTALLATION. REFER ALSO TO ARCHITECTURAL WALL INTERIOR AND EXTERIOR WALL ELEVATIONS, CEILING HEIGHTS AND OTHER DETAIL OF THESE DOCUMENTS. 6. DO NOT SCALE FROM DRAWINGS, PRINTING DISTORTS SCALE. WORK SHALL BE LAID OUT DO NOT SCALE FROM DRAWINGS, PRINTING DISTORTS SCALE. WORK SHALL BE LAID OUT FROM DIMENSIONED DRAWINGS, OR DIMENSIONS SUPPLIED TO THE CONTRACTOR. 7. THIS CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND PATCHING REQUIRED FOR THIS CONTRACTOR SHALL BE RESPONSIBLE FOR ALL CUTTING AND PATCHING REQUIRED FOR HIS WORK. ALL CUTTING AND PATCHING SHALL MATCH ADJACENT SURFACES . REFER TO ARCHITECTURAL DRAWINGS FOR ADDITIONAL INFORMATION. 9. THESE DRAWINGS ARE ACCURATE TO THE BEST OF OUR KNOWLEDGE, HOWEVER LOCATIONS, THESE DRAWINGS ARE ACCURATE TO THE BEST OF OUR KNOWLEDGE, HOWEVER LOCATIONS, DEPTHS, ELEVATIONS AND SIZES WERE TAKEN FROM DIFFERENT SOURCES AND ARE SUBJECT TO DEVIATION. THE CONTRACTOR SHALL ASSUME SOME DEVIATIONS AND INCLUDE OFFSETS, ADDITIONAL PIPING, ETC. AT THE TIME OF BID. 10. WHERE PENETRATING ROOFING MEMBRANE OR OTHER MATERIALS USED FOR WHERE PENETRATING ROOFING MEMBRANE OR OTHER MATERIALS USED FOR WEATHERPROOFING THE BUILDING, MAKE SUCH PENETRATIONS IN A WAY THAT WILL NOT VOID OR DIMINISH THE ROOFING WARRANTY OR INTEGRITY IN ANY WAY. COORDINATE ALL SUCH PENETRATIONS WITH THE ROOFING INSTALLER. 11. ADVISE THE ENGINEERS OF ANY CONFLICTS, ERRORS, OMISSIONS, ETC. AT LEAST TEN DAYS ADVISE THE ENGINEERS OF ANY CONFLICTS, ERRORS, OMISSIONS, ETC. AT LEAST TEN DAYS PRIOR TO BID DATE, TO ALLOW CLARIFICATION BY WRITTEN ADDENDUM. 12. DEVIATION FROM SPECIFICATIONS OR PLANS REQUIRES PRIOR WRITTEN APPROVAL FROM THE DEVIATION FROM SPECIFICATIONS OR PLANS REQUIRES PRIOR WRITTEN APPROVAL FROM THE ENGINEERS AND MUST BE SUBMITTED IN WRITING NO LATER THAN TEN DAYS PRIOR TO THE BID DATE. 13. COORDINATE THE LOCATION OF DRAINS, ELECTRICAL OUTLETS, ETC. WITH ALL MECHANICAL COORDINATE THE LOCATION OF DRAINS, ELECTRICAL OUTLETS, ETC. WITH ALL MECHANICAL ROOM EQUIPMENT, ETC. PRIOR TO COMMENCING INSTALLATION. WORK NOT SO COORDINATED SHALL BE REMOVED AND PROPERLY INSTALLED AT THE EXPENSE OF THE RESPONSIBLE CONTRACTOR(S). 14. THE PURPOSE AND INTENT OF ALL THE DOCUMENTS PERTAINING TO THIS PROJECT IS TO THE PURPOSE AND INTENT OF ALL THE DOCUMENTS PERTAINING TO THIS PROJECT IS TO PROVIDE A COMPLETE, FUNCTIONAL, SAFE, NEW FACILITY. ANYTHING LESS SHALL BE UNACCEPTABLE. 15. ANY VIBRATING, OSCILLATING OR OTHER NOISE OR MOTION PRODUCING EQUIPMENT SHALL BE ANY VIBRATING, OSCILLATING OR OTHER NOISE OR MOTION PRODUCING EQUIPMENT SHALL BE ISOLATED FROM SURROUNDING SYSTEMS IN AN APPROVED MANNER. NOISY OR STRUCTURALLY DAMAGING INSTALLATIONS SHALL BE SATISFACTORILY REPLACED OR REPAIRED AT THE INSTALLING CONTRACTOR'S EXPENSE. THE FINAL DECISION ON THE SUITABILITY OF A PARTICULAR INSTALLATION'S ACCEPTABILITY SHALL BE THAT OF THE ENGINEER.
AutoCAD SHX Text
16. INSTALL EQUIPMENT, MATERIALS, ETC. IN STRICT ACCORD WITH MANUFACTURER'S INSTALL EQUIPMENT, MATERIALS, ETC. IN STRICT ACCORD WITH MANUFACTURER'S RECOMMENDATIONS AND DIRECTIONS. IF IN CONFLICT WITH THE DESIGN INDICATED IN CONTRACT DOCUMENTS, ADVISE THE ENGINEERS PRIOR TO INSTALLATION FOR CLARIFICATION. 17. ALL SUPPORTS FOR EQUIPMENT, DEVICES OR FIXTURES SHALL BE UNIQUE, FROM THE ALL SUPPORTS FOR EQUIPMENT, DEVICES OR FIXTURES SHALL BE UNIQUE, FROM THE BUILDING STRUCTURE. DO NOT SUPPORT WORK FROM OTHER TRADES, EQUIPMENT OR SUPPORTS WITHOUT WRITTEN PERMISSION FROM THE ENGINEER AND CONSENT OF THE OTHER TRADE, IN WRITING. 18. DEVIATIONS IN SIZE, CAPACITIES, FIT, FINISH, ETC. FOR EQUIPMENT FROM THAT PRIME DEVIATIONS IN SIZE, CAPACITIES, FIT, FINISH, ETC. FOR EQUIPMENT FROM THAT PRIME SPECIFIED SHALL BE THE RESPONSIBILITY OF THE PURCHASER OF THAT EQUIPMENT. ANY PROVISIONS REQUIRED TO ACCOMMODATE A DEVIATION, WHETHER APPROVED BY THE ENGINEERS OR NOT, SHALL BE THE RESPONSIBILITY OF THE PURCHASER. 19. THE GENERAL CONTRACTOR FOR THIS CONSTRUCTION IS RESPONSIBLE FOR THE THE GENERAL CONTRACTOR FOR THIS CONSTRUCTION IS RESPONSIBLE FOR THE COORDINATION, APPEARANCE, SCHEDULING AND TIMELINESS OF THE WORK OF ALL TRADES, CONTRACTORS, SUPPLIERS, INSTALLERS, ETC. 20. VALVES, BALANCING DAMPERS OR ANY MECHANICAL/ELECTRICAL ITEM SHALL NOT BE LOCATED VALVES, BALANCING DAMPERS OR ANY MECHANICAL/ELECTRICAL ITEM SHALL NOT BE LOCATED ABOVE A HARD CEILING. IF THIS IS NOT POSSIBLE, THEN AN APPROPRIATELY SIZED ACCESS DOOR SHALL BE PLACED UNDER THE ITEM TO ALLOW EASY MAINTENANCE AND ADJUSTMENT. COORDINATE LOCATION WITH ARCHITECT PRIOR TO INSTALLATION. PANELS SHALL NOT BE LOCATED ABOVE BEDS. ALL HARDWARE SHALL BE TAMPER PROOF. 21. THE GENERAL CONTRACTOR SHALL ENSURE PROPER COORDINATION BETWEEN ALL TRADES THE GENERAL CONTRACTOR SHALL ENSURE PROPER COORDINATION BETWEEN ALL TRADES SUCH THAT CONDUITS, PIPING, DUCTWORK, ETC. DO NOT BLOCK ACCESS TO VALVES, EQUIPMENT, DUCT ACCESS DOORS, ETC. ITEMS THAT HAVE BEEN INSTALLED WHERE ACCESS IS COMPROMISED SHALL BE RELOCATED AT THE CONTRACTOR'S EXPENSE. 22. THE CONTRACTOR SHALL REFER TO THE ARCHITECTURAL DRAWINGS FOR EXACT LOCATIONS OF THE CONTRACTOR SHALL REFER TO THE ARCHITECTURAL DRAWINGS FOR EXACT LOCATIONS OF ALL WALL AND CEILING DEVICES. THIS SHALL INCLUDE PLUMBING FIXTURES, MEDICAL GAS DEVICES, CEILING GRILLES AND DIFFUSERS, ETC. 23. WHERE WORK IS REQUIRED ABOVE INSTALLED EXISTING CEILINGS, THE CONTRACTOR SHALL WHERE WORK IS REQUIRED ABOVE INSTALLED EXISTING CEILINGS, THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVAL AND REINSTALLATION (OR REPLACEMENT, IF DAMAGED) OF ALL CEILING TILES, HARD CEILINGS AND GRID MEMBERS NECESSARY TO PERFORM THE WORK. NEW TILE AND GRID SHALL MATCH THE SURROUNDING AREAS. COORDINATE CLOSELY WITH ARCHITECT AND HOSPITAL ENGINEER. 24. ALL NEW SANITARY, STORM AND WATER PIPING SHALL BE CLOSELY COORDINATED WITH NEW ALL NEW SANITARY, STORM AND WATER PIPING SHALL BE CLOSELY COORDINATED WITH NEW STRUCTURE, HVAC DUCTWORK AND PIPING, AND ELECTRICAL. 25. ALL SANITARY, STORM AND VENT PIPING SHALL BE ROUTED IN BETWEEN BEAMS, AND HELD ALL SANITARY, STORM AND VENT PIPING SHALL BE ROUTED IN BETWEEN BEAMS, AND HELD HIGH AS POSSIBLE. 26. INSTALL ALL WATER SHUT-OFF VALVES IN EASILY ACCESSIBLE LOCATIONS ABOVE CEILINGS. INSTALL ALL WATER SHUT-OFF VALVES IN EASILY ACCESSIBLE LOCATIONS ABOVE CEILINGS. 27. ALL PLUMBING VENTS THROUGH THE ROOF SHALL BE A MINIMUM OF 25'-0" FROM ANY AIR ALL PLUMBING VENTS THROUGH THE ROOF SHALL BE A MINIMUM OF 25'-0" FROM ANY AIR INTAKES. 28. VERIFY EXACT LOCATION AND UTILITY REQUIREMENTS OF ALL MEDICAL EQUIPMENT WITH THE VERIFY EXACT LOCATION AND UTILITY REQUIREMENTS OF ALL MEDICAL EQUIPMENT WITH THE MEDICAL EQUIPMENT SUPPLIER PRIOR TO ROUGH-IN. PROJECT PHASING NOTES: 1. REFER TO THE ARCHITECTURAL PLANS FOR ADDITIONAL PHASING INFORMATION. REFER TO THE ARCHITECTURAL PLANS FOR ADDITIONAL PHASING INFORMATION. 2. ALL PHASING SHALL BE COORDINATED WITH THE CONSTRUCTION MANAGER PRIOR TO THE ALL PHASING SHALL BE COORDINATED WITH THE CONSTRUCTION MANAGER PRIOR TO THE START OF WORK.
AutoCAD SHX Text 1 "12"
AutoCAD SHX Text
AutoCAD SHX Text 4"
AutoCAD SHX Text 2"
AutoCAD SHX Text P-510
AutoCAD SHX Text SINGLE COMP STAINLESS STEEL SINK - COUNTERTOP - MANUAL GOOSENECK FAUCET - ADA - 1.5 GPM
AutoCAD SHX Text P-401
AutoCAD SHX Text LAVATORY - WALL HUNG - VITREOUS CHINA - MANUAL WRIST BLADE HANDLE FAUCET - ADA - 0.5 GPM
AutoCAD SHX Text
WATER CLOSET - WALL HUNG - MANUAL FLUSH VALVE - ADA - 1.28 GPM
AutoCAD SHX Text P-101
AutoCAD SHX Text P-501
AutoCAD SHX Text 34"
AutoCAD SHX Text 1 "12"
AutoCAD SHX Text SERVICE SINK MOP BASIN, FLOOR MOUNTED, 24"x24" - 2.5 GPM
AutoCAD SHX Text 34"
AutoCAD SHX Text 3"
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
FLOOR
AutoCAD SHX Text
DIELECTRIC
AutoCAD SHX Text
UNION
AutoCAD SHX Text
DRAIN BOX.
AutoCAD SHX Text
ICE MACHINE TO AUXILIARY
AutoCAD SHX Text
FLEXIBLE DRAIN LINE FROM
AutoCAD SHX Text
WILKINS MODEL 700
AutoCAD SHX Text
CLG.
AutoCAD SHX Text
DUAL CHECK VALVE.
AutoCAD SHX Text
BALL VALVE
AutoCAD SHX Text 2''
AutoCAD SHX Text
INSTALL AUXILIARY DRAIN BOX EQUAL
AutoCAD SHX Text
TO GUY GRAY FR-12 IN WALL BENEATH
AutoCAD SHX Text
COORDINATE EXACT ROUGH-IN HEIGHTS
AutoCAD SHX Text
OF DRAIN AND WATER BOXES FOR ICE
AutoCAD SHX Text
MACHINE WITH OWNER PRIOR TO ROUGH-IN.
AutoCAD SHX Text
COUNTERTOP.
AutoCAD SHX Text 1 "12"
AutoCAD SHX Text 12"
AutoCAD SHX Text
MAKER OUTLET BOX
AutoCAD SHX Text
GUY GRAY ICE
AutoCAD SHX Text
WITH WATER HAMMER
AutoCAD SHX Text
ARRESTOR.
AutoCAD SHX Text
COUNTERTOP ICE MAKER PIPING SCHEMATIC
AutoCAD SHX Text
POINT OF CONNECTION - NEW TO EXISTING
AutoCAD SHX Text
POINT OF DEMOLITION - LIMITS OF DEMOLITION
AutoCAD SHX Text
%%UTYPE "C" FLOOR DRAIN DETAIL
AutoCAD SHX Text
NOT TO SCALE
AutoCAD SHX Text
NICKLE BRONZE ADJUSTABLE STRAINER (FLUSH WITH FINISHED FLOOR)
AutoCAD SHX Text
CEMENT BED
AutoCAD SHX Text
TILE FLOOR
AutoCAD SHX Text
CONCRETE FILL
AutoCAD SHX Text
STRUCTURAL SLAB
AutoCAD SHX Text
FLASHING CLAMP WITH WEEP HOLES
AutoCAD SHX Text
THREADED, CAULKED OR NO-HUB CONNECTION
AutoCAD SHX Text LOOSE GRAVEL AT WEEP HOLES 3mm to 6mm SIZE
AutoCAD SHX Text
WATERPROOF MEMBRANE
AutoCAD SHX Text PROVIDE A METAL SUPPORT PLATE WHEN DRAIN IS INSTALLED IN AN EXISTING FLOOR - CAULK AROUND DRAIN PRIOR TO RE-GROUTING
AutoCAD SHX Text
CLAMP WATERPROOF MEMBRANE INSIDE OF DRAIN BODY TO DRAIN TO WEEP HOLES
AutoCAD SHX Text
NOTE: SLOPE MEMBRANE LINER 2% TO DRAIN.
AutoCAD SHX Text
WATER CLOSET - WALL HUNG - MANUAL FLUSH VALVE - 1.28 GPM
AutoCAD SHX Text P-102
AutoCAD SHX Text 12"
AutoCAD SHX Text
AutoCAD SHX Text 2"
AutoCAD SHX Text
URINAL - WALL HUNG - MANUAL FLUSH VALVE - 0.5 GPM
AutoCAD SHX Text P-201
AutoCAD SHX Text 1 "12"
AutoCAD SHX Text 12"
AutoCAD SHX Text 1 "12"
AutoCAD SHX Text 12"
AutoCAD SHX Text 1 "12"
AutoCAD SHX Text 12"
AutoCAD SHX Text 1 "12"
AutoCAD SHX Text 12"
AutoCAD SHX Text 1 "12"
AutoCAD SHX Text P-511
AutoCAD SHX Text SINGLE COMP SINK - WALL HUNG - VITREOUS CHINA - MANUAL GOOSENECK FAUCET - ADA - 1.5 GPM
AutoCAD SHX Text 34"
AutoCAD SHX Text 1 "12"
AutoCAD SHX Text 34"
AutoCAD SHX Text 3"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 3"
AutoCAD SHX Text 1 "12"
AutoCAD SHX Text
AutoCAD SHX Text 12"
AutoCAD SHX Text 1 "12"
AutoCAD SHX Text 12"
AutoCAD SHX Text 1 "12"
AutoCAD SHX Text P-707
COMBINATION EMERGENCY SHOWER AND EYE WASH STATION - ADA
MENS TOILET
CWG28
FIRE EXTINGUISHER
CEG 12
BECEG 13
BECEG 14
FUTURE TOXICO LAB
BECEG 15
TISSUE CULTURE
BECEG 16
BECE-C1
OFFICE
CEG 24C
STORAGE
CEG 22G
POLISE
TRAINING
CWG 20C
CORRIDOR
CE C2 CORRIDOR
CE C8
CORRIDOR
CE C1
EVIDENCE
CEG 4
CEG 5A
CEG 5
CEG 1
EXAM RM
CEG 54C
CLINICAL
CEG 54
EXAM RM
CEG 54B
RECEPT OFFICE
CEG 53
COMM
CEG 52
EXAM RM
CEG 54D
EXAM RM
CEG 54ARECEPTION
CEG 51
HSRD OFFICE
CEG 35
HSRD OFFICE
CEG 49
HSRD OFFICE
CEG 50
HSRD CONFERENCE
CEG 38
HSRD OFFICE
CEG 37TRAINEE
CEG 31CEG 30
HSRD OFFICE
CEG 36
CW-C8
POLISE
TRAINING
CWG 20D
CWG 20B
CWG 20A
CWG 20
BREAK RM
CWG 16C
OFFICE
ECSTORAGE
CEG 3
CEG 7
CEG 6 CEG 5B
CEG 5C
OFFICE
CEG 16D
POLICE
OFFICE
CEG 16A POLICE
CEG 16
OFFICE
CEG 16B CHIEF
OFFICE
CEG 16C
FIRE CONTROL
CEG 18
STAIR 4
OFFICE
CONTRACT
CEG 19B
CEG 19
CEG 20A
CEG 19A
COPY
CEG 20
VENDING RM
CEG 21
OFFICE
OFFICE
6005A
OFFICE
OFFICE
CEG 22A
OFFICE
CEG 22B
OFFICE
CEG 22C
OFFICE
CEG 22D
OFFICE
CEG 22E
FILE RM
CEG 22
C AND P EXAM
AND RATING
CEG 23
OFFICE
CEG 23E
OFFICE
CEG 22F
EXAM
OFFICE
CEG 23D
EXAM
OFFICE
CEG 23C
EXAM
OFFICE
CEG 23B
CEG 23A
EMS WORK
LENDER
CEG 24A
HAC
OFFICE
CEG 24B
OFFICE
CEG 24D
HOUSEKEEPING
CEG 24
CEG 26C
CEG 24E
CEG 26B
CEG 27
POLICE
INVESTIGATION
CEG 28
LOCKSMITH
OFFICE
CEG 29A
SUPV
CEG 26A
CEG 29
OFFICE
CWG 26
OFFICE
CWG 27
MAIL RM
CWG 30
STORAGE
CWG 31A
CWG 31B
MCCR INSURANCE AND BILLING
CEG 26
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
V P r o j e c t s V
T C
L
R e v i t
V
A M e m p h i s B l d g C l i n i c L a b r v t
A
M
GUIDON DESIGN, INC
905 N CAPITOL AVE, SUITE 100
INDIANAPOLIS, IN 46204
TEL: 317.800.6388
ANDREW SCHAEWE
CMTA CONSULTING ENGINEERS, INC
10411 MEETING STREET
PROSPECT, KY 40059
ANDREW MYERS
RENOVATE CLINICAL
LABORATORY
MEMPHIS VAMC
614-17-112
LELAND FONG, COR/PE
MEMPHIS, TN 04/26/2019
BID SET
FULLY SPRINKLERED
TEL: 502.326.3085
Revisions: Date: AJM MJH
PD101
GROUND FLOOR - PLUMBING
DEMOLITION PLAN
SCALE: 1/8" = 1'-0"PD101
1 GROUND FLOOR - PLUMBING DEMOLITION PLAN
N
NO SCALE
KEY PLAN
AutoCAD SHX Text
EX. "34"
AutoCAD SHX Text
EX.2 "12"
AutoCAD SHX Text
EX.1 "14"
AutoCAD SHX Text
EX.1"
AutoCAD SHX Text
EX.4"
AutoCAD SHX Text
EX.2"
AutoCAD SHX Text
EXISTING FIRE MAIN-UP
AutoCAD SHX Text
ST-DN
AutoCAD SHX Text
ST-UP
AutoCAD SHX Text
ST-UP
AutoCAD SHX Text
V-UP W-UP ST-UP CW-UP HW-UP
AutoCAD SHX Text
EXISTING FLOOR CONTROL VALVE ASSEMBLY
AutoCAD SHX Text
EXISTING FIRE MAIN-UP
AutoCAD SHX Text
SAN-UP
AutoCAD SHX Text
CW/HW-UP
AutoCAD SHX Text
EX.FIRE
AutoCAD SHX Text
EX.FIRE
AutoCAD SHX Text
EX.SAN
AutoCAD SHX Text
EX.SAN
AutoCAD SHX Text
EX.SAN
AutoCAD SHX Text
EX.SAN
AutoCAD SHX Text
EX.FIRE
AutoCAD SHX Text
EX.SAN
AutoCAD SHX Text
EX.SAN
AutoCAD SHX Text
EX.SAN
AutoCAD SHX Text
EX.SAN
AutoCAD SHX Text
EX.SAN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SAN-UP
AutoCAD SHX Text
EX.ST-DN
AutoCAD SHX Text
EX.SAN-UP
AutoCAD SHX Text
EX.2"
AutoCAD SHX Text
EX.2"
AutoCAD SHX Text
EX.4"
AutoCAD SHX Text
EX.2"
AutoCAD SHX Text
EX.2"
AutoCAD SHX Text
%%UPLUMBING DEMOLITION TAGGED NOTES:
AutoCAD SHX Text
XX
1. REMOVE ALL PIPING (ASSOCIATED WITH THE REMOVED PLUMBING REMOVE ALL PIPING (ASSOCIATED WITH THE REMOVED PLUMBING FIXTURES ABOVE) BACK TO THE NEAREST ACTIVE MAIN TO ELIMINATE THE POSSIBILITIES OF DEAD LEGS. ALLL WORK SHALL BE COMPLY WITH VA DIRECTIVE 1061. CAP/VALVE PIPING CAP/VALVE PIPING AS NECESSARY. DO NOT REMOVE ANY PIPING THAT SUPPLIES A PLUMBING FIXTURE/SYSTEM THAT SHALL REMAIN OPERATIONAL ONCE THIS PROJECT IS COMPLETED.
TEL CLOSET
CE153
ELEVATOR
RECEPT.
OFFICE
OFFICE
SECURITY
HOLDING
6110A
HOLDING
TRANSITION
WC ALCOVE
61-C1B
CANTEEN
COFFEE
SHOP
CE151
CANTEEN
CE150
EXAM
CE129
OFFICE
CE128
OFFICE
STAIR
NO: 4
CONFERENCE
ROOM
CE113
FIRE ALARM
COMPUTER
CE113A
OFFICE
CE114A
OFFICE
CE114
OFFICE
CE115A
OFFICE
CE115
STORAGE
CE116
CHIEF
OPTOMETRY
OFFICE
CE117
STORAGE
CW165
TELE
OPERATOR
CW166
TC
ELEVATOR
P-7
OFFICE
CW166A
STAIR
NO: 2
MENS
TOILET
CW170
HAC
CW171
WOMENS
TOILET
CW172
EC
CW173
EXAM
CW113
TESTING
CW114
TESTING
CW115
VISUAL
FIELD
CE119C
TECH OFF
CE119B
OFFICE
CE119
OFFICE
CE118
OFFICE
CE122
SUPV
OFFICE
CE119A
OFFICE
CE123
OFFICE
CE124
OFFICE
CE125
OFFICE
CE126
EXAM
OFFICE
CE126A
OFFICE
CE127A
EXAM
CE127
EXAM
CE127B
OFFICE
OFFICE
EYE CLINIC
WAITING
CW166B
AMB CLINIC
CE130
FEMALE
TOILET
CE149A
MALE
TOILET
OFFICE
CE132
OFFICE
CE133
OFFICE
CE134
OFFICE
CE147
OFFICE
CE146
OFFICE
CE145
OFFICE
CE144
OFFICE
CE135
OFFICE
CE136
OFFICE
CE143
OFFICE
CE142
EXAM
CE137
EXAM
CW119
CW120A
CW120B
TREATMENT
RM
CW120
OFFICE
CE139
OFFICE
CE138
SUPPLY /
COPY RM
CE141
TELE
DERMATOLOGY
CE140
EXAM
CW119A
WAITING RM
CE131
CE148A
ELIGIBILITY
ENROLLMENT
OFFICE
CE193
TELL RM
CE191A
AMBULATORY
CARE
OFFICE
SUPV
CE191
TOILET
CW132
ELIGIBILITY
TRAVEL
CHECK IN
CW130
PTSD
CW133
HEAD
CLERK
HEALTH
BENEFIT
SECT OFF
CW127B
SOCIAL
WORKER
ADMIN
OFFICE
CW123A
YELLOW
WAITING
CW123
COPY
AMBULATORY
CARE
CE192
PTSD
OFFICE
CW139
PTSD
OFFICE
CW139A
NURSE MGR
CE183
FEMALE
TOILET
CE181
EXAM
CE152
EXAM
CE162
EMRT
STORAGE
CE163
EXAM RM
CE173
WOMEN
RESTROOM
CE174
MEN
RESTROOM
CE174A
CMP EXAM
CE172
EXAM
CE171
EXAM
CE170
EXAM
CE169
EXAM
CE168
EXAM
CE167
EXAM
CE166
EXAM
CE165
CLEAN
LINEN
CE165A
HAC
CE161
EXAM
CE160
EXAM
CE159
EXAM
CE158
EXAM RM
CE157
EXAM
CE156
EC
CE155
BREAK RM
CE154
CLERKS
OFFICE
CE185A
BUSINESS
OFICE
CHECKING
CE185
SOCIAL
WORKER
CE186
EXAM
CE187
EC
CE188
MALE
TOILET
CE181A
AMBULATORY
CMP
CE182
AMBULATORY
CARE
CE180
AMBULATORY
CARE
GROUP RM
CE175
CMP
CE177
AMBULATORY
CARE
CE178
EXAM
CE179
TOILET
CE176T
BREAK RM
CE176
CE189B
CE189A
CE189C
VESTIBULE
CEC46
FIRE EXT
FIRE EXT
SUPPLY
CW126B
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
V P r o j e c t s V
T C
L
R e v i t
V
A M e m p h i s B l d g C l i n i c L a b r v t
A
M
GUIDON DESIGN, INC
905 N CAPITOL AVE, SUITE 100
INDIANAPOLIS, IN 46204
TEL: 317.800.6388
ANDREW SCHAEWE
CMTA CONSULTING ENGINEERS, INC
10411 MEETING STREET
PROSPECT, KY 40059
ANDREW MYERS
RENOVATE CLINICAL
LABORATORY
MEMPHIS VAMC
614-17-112
LELAND FONG, COR/PE
MEMPHIS, TN 04/26/2019
BID SET
FULLY SPRINKLERED
TEL: 502.326.3085
Revisions: Date: AJM MJH
PD102
FIRST FLOOR - PLUMBING
DEMOLITION PLAN
SCALE: 1/8" = 1'-0"PD102
1 FIRST FLOOR - PLUMBING DEMOLITION PLAN
N
NO SCALE
KEY PLAN
AutoCAD SHX Text
EX.5"
AutoCAD SHX Text O/V
AutoCAD SHX Text O/V
AutoCAD SHX Text A/V
AutoCAD SHX Text V/S
AutoCAD SHX Text V/S
AutoCAD SHX Text O
AutoCAD SHX Text
NO2
AutoCAD SHX Text A
AutoCAD SHX Text V
AutoCAD SHX Text
EXISTING ZONE VALVE BOX
AutoCAD SHX Text
EXISTING LINE PRESSURE ALARM PANEL
AutoCAD SHX Text
EXISTING FLOOR CONTROL VALVE ASSEMBLY
AutoCAD SHX Text
EXISTING FLOOR CONTROL VALVE ASSEMBLY
AutoCAD SHX Text O/A/V/S
AutoCAD SHX Text
EXISTING ZONE VALVE BOX
AutoCAD SHX Text
EX.ST-UP
AutoCAD SHX Text
EX.ST-DN
AutoCAD SHX Text
EX.ST-UP
AutoCAD SHX Text
EX.ST-DN
AutoCAD SHX Text
EX.ST-UP
AutoCAD SHX Text
EX.ST-DN
AutoCAD SHX Text
EXISTING V-UP W-UP ST-UP CW-UP HW-UP
AutoCAD SHX Text
EXISTING V-DN W-DN ST-DN CW-DN HW-DN
AutoCAD SHX Text
EXISTING MEDICAL GAS ZONE VALVE BOX
AutoCAD SHX Text
EXISTING MSA
AutoCAD SHX Text
EXISTING FIRE ALARM ANNUNCIATOR
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
EX.SAN-DN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
EXISTING HW-UP CW-UP SAN-UP
AutoCAD SHX Text
EXISTING CW/HW-DN
AutoCAD SHX Text
EXISTING SAN-DN
AutoCAD SHX Text
%%UPLUMBING DEMOLITION TAGGED NOTES:
AutoCAD SHX Text
XX
1. EXISTING PLUMBING FIXTURE/FLOOR DRAIN TO BE REMOVED EXISTING PLUMBING FIXTURE/FLOOR DRAIN TO BE REMOVED COMPLETELY. REMOVE ALL PIPING ASSOCIATED WITH THE REMOVED PLUMBING FIXTURES BACK TO THE NEAREST ACTIVE MAIN TO ELIMINATE THE POSSIBILITIES OF DEAD LEGS. ALL WORK SHALL COMPLY WITH VA DIRECTIVE 1061. CAP/VALVE PIPING AS NECESSARY. DO NOT REMOVE ANY PIPING THAT SUPPLIES A PLUMBING FIXTURE/SYSTEM THAT SHALL REMAIN OPERATIONAL ONCE THIS PROJECT IS COMPLETED. 2. CONTRACTOR SHALL OFFSET ANY EXISTING VERTICAL PIPING AS CONTRACTOR SHALL OFFSET ANY EXISTING VERTICAL PIPING AS REQUIRED TO AVOID ANY CONFLICTS WITH NEW CONSTRUCTION. 3. EXISTING MEDICAL GAS OUTLETS TO BE REMOVED COMPLETELY. EXISTING MEDICAL GAS OUTLETS TO BE REMOVED COMPLETELY. REMOVE ALL ASSOCIATED PIPING FROM REMOVED OUTLET BACK TO THE NEAREST MAIN AND CAP/VALVE. DO NOT REMOVE ANY PIPING THAT SUPPLIES AN EXISTING MEDICAL GAS OUTLET/DEVICE THAT SHALL REMAIN OPERATIONAL ONCE THIS PROJECT IS COMPLETED.
MENS TOILET
CWG28
FEMALE
TOILET
CWG 29
FIRE EXTINGUISHER
CEG 12
BECEG 12
BECEG 13
BECEG 14
FUTURE TOXICO LAB
BECEG 15
TISSUE CULTURE
BECEG 16
BECE-C1
BECE-C4
OFFICE
CEG 24C
INFO
SYSTEMS
SECURITY
CWG 16
STORAGE
CEG 22G
POLISE
TRAINING
CWG 20C
CORRIDOR
CE C2 CORRIDOR
CE C8
CORRIDOR
CE C1
EVIDENCE
CEG 4
CEG 5A
CEG 5
CEG 1
EXAM RM
CEG 54C
CLINICAL
CEG 54
EXAM RM
CEG 54B
RECEPT OFFICE
CEG 53
COMM
CEG 52
EXAM RM
CEG 54D
EXAM RM
CEG 54ARECEPTION
CEG 51
HSRD OFFICE
CEG 35
HSRD OFFICE
CEG 49
HSRD OFFICE
CEG 50
HSRD CONFERENCE
CEG 38
HSRD OFFICE
CEG 40
HSRD OFFICE
CEG 39
HSRD OFFICE
CEG 37TRAINEE
CEG 31CEG 30
HSRD OFFICE
CEG 36
HSRD OFFICE
CEG 34
CW-C8
POLISE
TRAINING
CWG 20D
CWG 20B
CWG 20A
ISS
OFFICE
CWG 16D
CWG 20
OFFICE
CWG 15C
BREAK RM
CWG 16CCWG 16A
CWG 15B
CWG 16B
OFFICE
ECSTORAGE
CEG 3
CEG 7
CEG 6 CEG 5B
CEG 5C
OFFICE
CEG 16D
POLICE
OFFICE
CEG 16A POLICE
CEG 16
OFFICE
CEG 16B CHIEF
OFFICE
CEG 16C
FIRE CONTROL
CEG 18
STAIR 4
OFFICE
CONTRACT
CEG 19B
CEG 19
CEG 20A
CEG 19A
COPY
CEG 20
VENDING RM
CEG 21
RELEASE OF INFO
GENERAL OFFICE
CORRIDOR
60-C2
OFFICE
OFFICE
6005A
OFFICE
OFFICE
CEG 22A
OFFICE
CEG 22B
OFFICE
CEG 22C
OFFICE
CEG 22D
OFFICE
CEG 22E
FILE RM
CEG 22
C AND P EXAM
AND RATING
CEG 23
OFFICE
CEG 23E
OFFICE
CEG 22F
EXAM
OFFICE
CEG 23D
EXAM
OFFICE
CEG 23C
EXAM
OFFICE
CEG 23B
CEG 23A
EMS WORK
LENDER
CEG 24A
HAC
OFFICE
CEG 24B
OFFICE
CEG 24D
HOUSEKEEPING
CEG 24
CEG 26C
CEG 24E
CEG 26B
CEG 27
POLICE
INVESTIGATION
CEG 28
LOCKSMITH
OFFICE
CEG 29A
SUPV
CEG 26A
CEG 29
OFFICE
CWG 26
OFFICE
CWG 27
MAIL RM
CWG 30
OFFICE
CWG47A
CWG 30A
BED WASHING
CWG 47
ELEVATOR
OFFICE
CWG 30C
UPS TRACKING
SYSTEM
CWG 30B
STORAGE
CWG 31A
CWG 31B
CWG 31C
MCCR INSURANCE AND BILLING
CEG 26
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
V P r o j e c t s V
T C
L
R e v i t
V
A M e m p h i s B l d g C l i n i c L a b r v t
A
M
GUIDON DESIGN, INC
905 N CAPITOL AVE, SUITE 100
INDIANAPOLIS, IN 46204
TEL: 317.800.6388
ANDREW SCHAEWE
CMTA CONSULTING ENGINEERS, INC
10411 MEETING STREET
PROSPECT, KY 40059
ANDREW MYERS
RENOVATE CLINICAL
LABORATORY
MEMPHIS VAMC
614-17-112
LELAND FONG, COR/PE
MEMPHIS, TN 04/26/2019
BID SET
FULLY SPRINKLERED
TEL: 502.326.3085
Revisions: Date: AJM MJH
PP101
GROUND FLOOR - PLUMBING
PLAN
SCALE: 1/8" = 1'-0"PP101
1 GROUND FLOOR - PLUMBING PLAN
N
NO SCALE
KEY PLAN
AutoCAD SHX Text
EX.4"SAN
AutoCAD SHX Text
EX.3"SAN
AutoCAD SHX Text
EX.4"SAN
AutoCAD SHX Text
EX.4"SAN
AutoCAD SHX Text
EX.4"SAN
AutoCAD SHX Text
EX.4"SAN
AutoCAD SHX Text
EX.4"SAN
AutoCAD SHX Text
EX.SAN-UP
AutoCAD SHX Text
EX. "34"
AutoCAD SHX Text
EX.2 "12"
AutoCAD SHX Text
EX.1 "14"
AutoCAD SHX Text
4"SAN
AutoCAD SHX Text
3"SAN
AutoCAD SHX Text
SAN
AutoCAD SHX Text
4"SAN
AutoCAD SHX Text
4"SAN
AutoCAD SHX Text
2"SAN
AutoCAD SHX Text
4"SAN
AutoCAD SHX Text
4" SAN
AutoCAD SHX Text
AutoCAD SHX Text
FIRE
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
EX.4"SAN
AutoCAD SHX Text
EX.4"SAN
AutoCAD SHX Text
EX.4"SAN
AutoCAD SHX Text
EX.4"SAN
AutoCAD SHX Text
%%UCO
AutoCAD SHX Text
%%UCO
AutoCAD SHX Text
1"ROS
AutoCAD SHX Text
1"ROS
AutoCAD SHX Text
1"ROS
AutoCAD SHX Text
1"ROS
AutoCAD SHX Text
1"ROS
AutoCAD SHX Text
1"ROS
AutoCAD SHX Text
1"ROS
AutoCAD SHX Text
1"ROR
AutoCAD SHX Text
1"ROR
AutoCAD SHX Text
1"ROR
AutoCAD SHX Text
3"SAN
AutoCAD SHX Text
1"ROS
AutoCAD SHX Text
%%UAUTOMATION LINE ABOVE
AutoCAD SHX Text
%%UAUTOMATION LINE ABOVE
AutoCAD SHX Text
%%UAUTOMATION LINE ABOVE
AutoCAD SHX Text
%%UAUTOMATION LINE ABOVE
AutoCAD SHX Text
EX.4"SAN
AutoCAD SHX Text
4"SAN
AutoCAD SHX Text
SAN
AutoCAD SHX Text
1"ROS
AutoCAD SHX Text
EX.4"SAN
AutoCAD SHX Text
EX.SAN
AutoCAD SHX Text
2"SAN
AutoCAD SHX Text
1"ROS
AutoCAD SHX Text
3"SAN
AutoCAD SHX Text
%%UCO
AutoCAD SHX Text
3"SAN
AutoCAD SHX Text
3"SAN
AutoCAD SHX Text
4"SAN
AutoCAD SHX Text
4"SAN
AutoCAD SHX Text
4"SAN
AutoCAD SHX Text
4"SAN
AutoCAD SHX Text
4"SAN
AutoCAD SHX Text
4"SAN
AutoCAD SHX Text
EXISTING V-DN W-DN ST-DN CW-DN HW-DN
AutoCAD SHX Text
EX.ST-UP
AutoCAD SHX Text
EX.ST-UP
AutoCAD SHX Text
2"SAN
AutoCAD SHX Text
%%UCO
AutoCAD SHX Text
AutoCAD SHX Text 2"
AutoCAD SHX Text
4"SAN
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text 3"
AutoCAD SHX Text 3"
AutoCAD SHX Text
2"SAN
AutoCAD SHX Text 4"
AutoCAD SHX Text
4"SAN
AutoCAD SHX Text
CA
AutoCAD SHX Text
3"SAN
AutoCAD SHX Text 2"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text 4"
AutoCAD SHX Text
3"SAN
AutoCAD SHX Text 2"
AutoCAD SHX Text 3"
AutoCAD SHX Text 2"
AutoCAD SHX Text 4"
AutoCAD SHX Text 2"
AutoCAD SHX Text 2"
AutoCAD SHX Text
1"DCW
AutoCAD SHX Text
1"DCW
AutoCAD SHX Text
1"DCW
AutoCAD SHX Text
3/4"DCW
AutoCAD SHX Text
3/4"DCW
AutoCAD SHX Text 2"
AutoCAD SHX Text
%%UFS-101
AutoCAD SHX Text
2"SAN
AutoCAD SHX Text 2"
AutoCAD SHX Text
EX.4"SAN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
3/4"DCW
AutoCAD SHX Text
3/4"DCW
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
%%UPLUMBING TAGGED NOTES:
AutoCAD SHX Text
XX
AutoCAD SHX Text 2"CW, 1"HW, "HR-UP 34"HR-UP OFFSET EXISTING FIRE RISER TO ACCOMMODATE NEW ARCHITECTURAL LAYOUT ABOVE. OFFSET EXISTING CW/HW/SAN.WASTE RISER TO ACCOMMODATE NEW ARCHITECTURAL LAYOUT ABOVE. 34"DCW, 1"ROS/ROR, & "CA-UP FOR AUTOMATION LINES. 34"CA-UP FOR AUTOMATION LINES. 1"DCW/ROS/ROR-UP. 34"CA-UP.
AutoCAD SHX Text 1.
AutoCAD SHX Text 2.
AutoCAD SHX Text 3.
AutoCAD SHX Text 4.
5.
UP
BLOOD BANK
(LMBB2)
CE120
BLOOD DRAW
(LBBD1)
CW120
BLOOD DRAW
VESTIBULE
CWC15A
BLOOD DRAW
TOILET (TLTU1)
CE122
BLOOD DRAW
TOILET (TLTU1)
CE123
BLOOD DRAW
RECEPTION (RECP1)
CE121
OFFICE
SUPERVISOR
(OFA07)
CE133
ANATOMICAL LAB
CE130
OFFICE
SUPERVISOR
(OFA07)
CE141
CLEAN ROOM BSL 3
(LMM03)
CE146
ANTE
CE145
MICROBIOLOGY LAB
(LMM02)
CE140
TEL CLOSET
CE153
DATA
CE152
ELECTRICAL
CE171
MOLECULAR LAB
CE155
OFFICE
SUPERVISOR
(OFA07)
CE166
OFFICE
SUPERVISOR
(OFA07)
CE167
OFFICE
SUPERVISOR
(OFA07)
CE168
BULK STORAGE
(SRS01)
CE169
FLOW CYTOMETRY
LAB (LMHI3)
CE170
BULK STORAGE
(SRS01)
CE165
BULK STORAGE
(CSSS2)
CE187
HAC (JANC1)
CE189
OFFICE PATHOLGIST
1 (XXYYC)
CE196
OFFICE PATHOLGIST
2 (XXYYC)
CE195
OFFICE PATHOLGIST
3 (XXYYC)
CE194
OFFICE PATHOLGIST
4 (XXYYC)
CE193
CONFERENCE ROOM
(CRA01)
CE197
STAFF LOUNGE
(SLOO1)
CE191
WOMEN'S STAFF
TOILET (TLTU1)
CE190B
LOCKER (LR001)
CE190
MEN'S STAFF
TOILET (TLTU1)
CE190A
OFFICE PATHOLGIST
5 (XXYYC)
CE192
CORRIDOR
CEC33
BLOOD DRAW
WAITING (WRC01)
CWC16
OFFICE CHIEF
(OFA09)
CE183
OFFICE CHIEF
(OFA09)
CE185
OFFICE AO
(OFA09)
CE184
LAB RECEPTION
(RECP1)
CW130
MED TECH /
TEACHING (CRA02)
CW131
RESIDENTS (OFA07)
CW132
ACCESSIONING
(LBBD2)
CE180
LAB COATS
CEC39A
11 12 12.1 13 14 15 16 17 18 19
A
B
C
D
E
F
G
H
OPEN WORK AREA
(OFA07)
CW133
WORK STATIONS
(OFA07)
CW133A
STAFF TOILET
(TLTU1)
CE186
CORRIDOR
CEC39
CORRIDOR
CWC17
CLINICAL LAB
VESTIBULE
CWC15
CLINICAL
PATHOLOGY LAB
CE160
OFFICE
SUPERVISOR
(OFA07)
CE132
STAFF ENTRY
VESTIBULE
CEC46
WOMEN'S TOILET
CE154B
MEN'S TOILET
CE154A
AIR COMPRESSOR
ROOM
CE181
ELECTRICAL
CE182
RECEPT.
OFFICE
OFFICE
SECURITY HOLDING
6110A
HOLDING
TRANSITION
WC ALCOVE
61-C1B
CANTEEN COFFEE
SHOP
CE151
CANTEEN
CE150
EXAM
CE129
OFFICE
CE128
OFFICE
STAIR
NO: 4
CONFERENCE ROOM
CE113
FIRE ALARM
COMPUTER
CE113A
OFFICE
CE114A
OFFICE
CE114
OFFICE
CE115A
OFFICE
CE115
STORAGE
CE116
CHIEF OPTOMETRY
OFFICE
CE117
STORAGE
CW165
TELE OPERATOR
CW166
ELEVATOR
TC
ELEVATOR
P-7
OFFICE
CW166A
STAIR
NO: 2
MENS TOILET
CW170
HAC
CW171
WOMENS TOILET
CW172
EC
CW173
ELEVATOR
P-6
FLAMMABLE &
TOXIC SUBSTANCE
STORAGE (SRGC2)
CE198
12.3
PREP ROOM
(LMM02)
CE144
OFFICE
SUPERVISOR
(OFA07)
CW123
MICROSCOPE
CE147
OFFICE
SUPERVISOR
(OFA07)
CE158
FREEZER
CW121
REFRIGERATOR
CW122
REFRIGERATOR
CE131
FREEZER
CE142
REFRIGERATOR
CE143
FREEZER
CE156
REFRIGERATOR
CE157
REFRIGERATOR
CE163
FREEZER
CE164
REFRIGERATOR
CE162
REFRIGERATOR
CE161
REFRIGERATOR
CE188
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant:
V P r o j e c t s V
T C
L
R e v i t
V
A M e m p h i s B l d g C l i n i c L a b r v t
A
M
GUIDON DESIGN, INC
905 N CAPITOL AVE, SUITE 100
INDIANAPOLIS, IN 46204
TEL: 317.800.6388
ANDREW SCHAEWE
CMTA CONSULTING ENGINEERS, INC
10411 MEETING STREET
PROSPECT, KY 40059
ANDREW MYERS
RENOVATE CLINICAL
LABORATORY
MEMPHIS VAMC
614-17-112
LELAND FONG, COR/PE
MEMPHIS, TN 04/26/2019
BID SET
FULLY SPRINKLERED
TEL: 502.326.3085
Revisions: Date: AJM MJH
PP102
FIRST FLOOR - PLUMBING
PLAN
SCALE: 1/8" = 1'-0"PP102
1 FIRST FLOOR - PLUMBING PLAN
N
NO SCALE
KEY PLAN
COMPRESSED AIR DROP DETAIL
SCALE: NONE01
AutoCAD SHX Text
AutoCAD SHX Text
%%UP-101
AutoCAD SHX Text
%%UP-101
AutoCAD SHX Text
%%UP-102
AutoCAD SHX Text
%%UP-201
AutoCAD SHX Text
%%UP-401
AutoCAD SHX Text
%%UP-401
AutoCAD SHX Text
%%UP-401
AutoCAD SHX Text
%%UP-401
AutoCAD SHX Text
%%UP-101
AutoCAD SHX Text
%%UP-401
AutoCAD SHX Text
%%UP-101
AutoCAD SHX Text
%%UP-401
AutoCAD SHX Text
%%UP-401
AutoCAD SHX Text
%%UP-101
AutoCAD SHX Text
%%UP-501
AutoCAD SHX Text
%%UP-707
AutoCAD SHX Text
%%UP-510
AutoCAD SHX Text
%%UP-511
AutoCAD SHX Text
%%UP-511
AutoCAD SHX Text
%%UP-511
AutoCAD SHX Text
%%UP-511
AutoCAD SHX Text
%%UP-511
AutoCAD SHX Text
%%UP-511
AutoCAD SHX Text
%%UP-511
AutoCAD SHX Text
%%UP-510
AutoCAD SHX Text
%%UP-510
AutoCAD SHX Text
%%UP-707
AutoCAD SHX Text
%%UFD-101
AutoCAD SHX Text
%%UFD-101
AutoCAD SHX Text
%%UHB
AutoCAD SHX Text
%%UHB
AutoCAD SHX Text
%%UP-510
AutoCAD SHX Text
%%UFD-101
AutoCAD SHX Text
%%UFD-101
AutoCAD SHX Text
%%UP-707
AutoCAD SHX Text
%%UFD-101
AutoCAD SHX Text
%%UFS-101
AutoCAD SHX Text
%%UFS-101
AutoCAD SHX Text
%%UFS-101
AutoCAD SHX Text
%%UFS-101
AutoCAD SHX Text
%%UFS-101
AutoCAD SHX Text
%%UP-511
AutoCAD SHX Text
%%UP-511
AutoCAD SHX Text
%%UP-511
AutoCAD SHX Text
%%UP-510
AutoCAD SHX Text
%%UP-511
AutoCAD SHX Text
%%UP-510
AutoCAD SHX Text
%%UP-510
AutoCAD SHX Text
%%UP-510
AutoCAD SHX Text
%%UP-510
AutoCAD SHX Text
%%UP-510
AutoCAD SHX Text
%%UP-510
AutoCAD SHX Text
%%UP-510
AutoCAD SHX Text
%%UP-510
AutoCAD SHX Text
%%UP-510
AutoCAD SHX Text
%%UFD-101
AutoCAD SHX Text
%%UFD-101
AutoCAD SHX Text
COLD WATER
AutoCAD SHX Text
DI/RO WATER
AutoCAD SHX Text
COLD WATER
AutoCAD SHX Text
COMP. AIR
AutoCAD SHX Text
%%UFD-101
AutoCAD SHX Text
COLD WATER
AutoCAD SHX Text
DI/RO WATER
AutoCAD SHX Text
%%UFD-101
AutoCAD SHX Text
COLD WATER
AutoCAD SHX Text
DI/RO WATER
AutoCAD SHX Text
%%UP-510
AutoCAD SHX Text
COMP. AIR
AutoCAD SHX Text
COMP. AIR
AutoCAD SHX Text
%%UP-101
AutoCAD SHX Text
%%UP-401
AutoCAD SHX Text
%%UP-401
AutoCAD SHX Text
%%UP-101
AutoCAD SHX Text
%%UFD-101
AutoCAD SHX Text
COLD WATER
AutoCAD SHX Text
DI/RO WATER
AutoCAD SHX Text
COMP. AIR
AutoCAD SHX Text
3/4"CA
AutoCAD SHX Text
CA
AutoCAD SHX Text
3/4"CA
AutoCAD SHX Text
3/4"CA
AutoCAD SHX Text
3/4"CA
AutoCAD SHX Text
3/4"CA
AutoCAD SHX Text
3/4"CA
AutoCAD SHX Text
3/4"CA
AutoCAD SHX Text
3/4"CA
AutoCAD SHX Text
3/4"CA
AutoCAD SHX Text
3/4"CA
AutoCAD SHX Text
3/4" CA
AutoCAD SHX Text
DI/RO WATER MACHINE
AutoCAD SHX Text
1"CW,ROS,ROR-DN
AutoCAD SHX Text AIR COMPRESSOR (AC-1) ATLAS COPCO ATLAS COPCO MODEL SF4. 12.5CFM, 72 GALLON TANK, AutoCAD SHX Text
%%UFD-101
AutoCAD SHX Text
%%UFD-101
AutoCAD SHX Text
EXISTING V-UP W-UP ST-UP CW-UP HW-UP
AutoCAD SHX Text
EXISTING HW-UP CW-UP SAN-UP
AutoCAD SHX Text
EXISTING CW/HW-DN
AutoCAD SHX Text
EXISTING SAN-DN
AutoCAD SHX Text
EXISTING V-DN W-DN ST-DN CW-DN HW-DN
AutoCAD SHX Text
EX.5"
AutoCAD SHX Text
EX.ST-UP
AutoCAD SHX Text
EX.ST-DN
AutoCAD SHX Text
EX.SAN-DN
AutoCAD SHX Text
EX.ST-UP
AutoCAD SHX Text
EX.ST-DN
AutoCAD SHX Text
AutoCAD SHX Text
%%UP-511
AutoCAD SHX Text
%%UP-60…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .