Project 614-17-112 - Renovate Bldg. -1 Clinical Lab
Solicitation number
36C24920R0008
Issued by

About this file

This presolicitation notice is for the renovation of Building 1 Clinical Lab at the Memphis VA Medical Center. The Department of Veterans Affairs is seeking a Service-Disabled Veteran Owned Small Business contractor experienced in healthcare construction to provide construction services including general hospital construction, plumbing, mechanical, electrical, exterior improvements and utility systems. The project work will take place in a medical environment and infection control, demolition noise, environmental dust control, and specialized facility requirements must be considered. The NAICS code is 236220 with a size standard of $39.5 million. The estimate for construction is between $5 million and $10 million. The procurement will follow FAR Part 15 using LPTA and the solicitation is anticipated to be released on or by November 6, 2019. The requirement is 100% set aside for SDVOSBs listed in the CVE database and SAM. Questions must be submitted in writing to the contracting officer by the specified date.

36C24920R0008 0006 Specification Section 00 01 10.pdf

View the file

Other files

File Type Posted
36C24920R0008-0009005.docx DOCX document
36C24920R0008-0008000.docx DOCX document
36C24920R0008-0008003.pdf PDF
36C24920R0008-0008001.pdf PDF
36C24920R0008-0008002.pdf PDF
36C24920R0008-0007000.docx DOCX document
36C24920R0008-0006004.pdf PDF
36C24920R0008-0006007.pdf PDF
36C24920R0008-0006005.pdf PDF
36C24920R0008-0006011.pdf PDF
36C24920R0008-0006006.pdf PDF
36C24920R0008-0006001.pdf PDF
36C24920R0008-0006000.docx DOCX document
36C24920R0008-0006010.pdf PDF
36C24920R0008-0006012.pdf PDF
36C24920R0008-0006008.pdf PDF
36C24920R0008-0006002.pdf PDF
36C24920R0008-0006009.pdf PDF
36C24920R0008-0005000.docx DOCX document
36C24920R0008-0004000.docx DOCX document
36C24920R0008-0004001.pdf PDF
36C24920R0008-0004002.pdf PDF
36C24920R0008-0003000.docx DOCX document
36C24920R0008-0003001.pdf PDF
36C24920R0008-0002006.pdf PDF
36C24920R0008-0002005.pdf PDF
36C24920R0008-0002008.pdf PDF
36C24920R0008-0002001.txt TXT text file
36C24920R0008-0002004.pdf PDF
36C24920R0008-0002003.pdf PDF
36C24920R0008-0002000.docx DOCX document
36C24920R0008-0002007.pdf PDF
36C24920R0008-0002002.pdf PDF
36C24920R0008-0001000.docx DOCX document
36C24920R0008-011.pdf PDF
36C24920R0008-007.pdf PDF
36C24920R0008-003.pdf PDF
36C24920R0008-004.pdf PDF
36C24920R0008-010.xlsx XLSX spreadsheet
36C24920R0008-009.xlsx XLSX spreadsheet
36C24920R0008-005.pdf PDF
36C24920R0008-006.pdf PDF
36C24920R0008-012.pdf PDF
36C24920R0008-001.docx DOCX document
36C24920R0008-008.pdf PDF
36C24920R0008-002.pdf PDF
Show all 46

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Department of Veterans Affairs Network Contracting Office 9 VA: 61417-112 Renovate Building 1 Clinical Lab Memphis VAMC, Memphis Tn.

03.04.2020 Addendum #001

11-01-17

00 01 10-1

DEPARTMENT OF VETERANS AFFAIRS

VHA MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

DIVISION 00 - SPECIAL SECTIONS DATE

00 01 15 List of Drawing Sheets 07-15

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements 10-17 01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 04-13 01 33 23 Shop Drawings, Product Data, and Samples 05-17 01 35 26 Safety Requirements 02-17 01 42 19 Reference Standards 05-16 01 45 00 Quality Control 01-18 01 57 19 Temporary Environmental Controls 01-11 01 58 16 Temporary Interior Signage 07-15 01 74 19 Construction Waste Management 09-13 01 81 13 Sustainable Construction Requirements 10-17 01 91 00 General Commissioning Requirements 10-15

DIVISION 02 – EXISTING CONDITIONS

02 41 00 Demolition 08-17 02 82 11 Traditional Asbestos Abatement 09-15 02 83 33.13 Lead-Based Paint Removal and Disposal 08-16 02 84 16 Handling of Lighting Ballasts and Lamps Containing PCBs and Mercury 12-17

DIVISION 05 – METALS

05 50 00 Metal Fabrications 07-14

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

06 10 00 Rough Carpentry 10-17 06 20 00 Finish Carpentry 08-16

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 01 50.19 Preparation for Re-Roofing 02-16 07 72 00 Roof Accessories 10-15 07 84 00 Firestopping 02-16 07 92 00 Joint Sealants 10-17 07 95 13 Expansion Joint Cover Assemblies 02-16

VA: 61417-112 Renovate Building 1 Clinical Lab Memphis VAMC, Memphis Tn.

03.04.2020

00 01 10-2

DIVISION 08 - OPENINGS

08 11 13 Hollow Metal Doors and Frames 08-16 08 14 00 Interior Wood Doors 02-16 08 31 13 Access Doors and Frames 02-16 08 41 13 Aluminum-Framed Entrances and Storefronts 08-16 08 71 00 Door Hardware 01-16 08 71 13.11 Low Energy Power Assist Door Operators 08-16 08 80 00 Glazing 10-15 08 87 16 Safety and Security Film

DIVISION 09 – FINISHES

09 05 16 Subsurface Preparation for Floor Finishes 02-15 09 06 00 Schedule for Finishes 04-15 09 22 16 Non-Structural Metal Framing 05-16 09 29 00 Gypsum Board 11-14 09 30 13 Ceramic/Porcelain Tiling 09-15 09 51 00 Acoustical Ceilings 12-16 09 65 13 Resilient Base and Accessories 02-16 09 65 16 Resilient Sheet Flooring 02-16 09 65 19 Resilient Tile Flooring 12-15 09 67 23 Resinous Flooring 09 68 00 Carpeting 10-15 09 91 00 Painting 01-16 09 96 56 Wall Epoxy Coating

DIVISION 10 – SPECIALTIES

10 11 13 Chalkboards and Markerboards 10-15 10 11 23 Tackboards 10-15 10 14 00 Signage 10-15 10 21 13 Toilet Compartments 12-15 10 21 23 Cubicle Curtain Tracks 05-15 10 26 00 Wall and Door Protection 10-15 10 28 00 Toilet, Bath, and Laundry Accessories 02-16 10 44 13 Fire Extinguisher Cabinets 08-14

DIVISION 11 – EQUIPMENT

11 26 00 Unit Kitchens 11-11 11 41 21 Walk-In Coolers and Freezers 05-15

DIVISION 12 – FURNISHINGS

12 24 00 Window Shades 08-17 12 24 21 Lightproof Shades 05-15 12 31 00 Manufactured Metal Casework 05-15 12 32 00 Manufactured Wood Casework 09-15 12 36 00 Countertops 12-15

VA: 61417-112 Renovate Building 1 Clinical Lab Memphis VAMC, Memphis Tn.

03.04.2020

00 01 10-3

DIVISION 13 - SPECIAL CONSTRUCTION

13 05 41 Seismic Restraint Requirements for Non-Structural

Components 01-14

DIVISION 21- FIRE SUPPRESSION

21 08 00 Commissioning of Fire Suppression System 11-16 21 13 13 Wet-Pipe Sprinkler Systems 06-15

DIVISION 22 – PLUMBING

22 05 11 Common Work Results for Plumbing 07-16 22 05 12 General Motor Requirements for Plumbing Equipment 09-15 22 05 23 General-Duty Valves for Plumbing Piping 09-15 22 07 11 Plumbing Insulation 09-15 22 08 00 Commissioning of Plumbing Systems 11-16 22 11 00 Facility Water Distribution 09-15 22 13 00 Facility Sanitary and Vent Piping 09-15 22 14 00 Facility Storm Drainage 09-15 22 40 00 Plumbing Fixtures 09-15 22 63 00 Gas Systems for Laboratory and Healthcare Facilities 09-15

DIVISION 23 – HEATING, VENTILATING, AND AIR

CONDITIONING (HVAC)

23 05 11 Common Work Results for HVAC 08-17 23 05 12 General Motor Requirements for HVAC and Steam

Generation Equipment 08-17

23 05 41 Noise and Vibration Control for HVAC Piping and Equipment

02-15

23 05 93 Testing, Adjusting, and Balancing for HVAC 02-15 23 07 11 HVAC and Boiler Plant Insulation 02-15 23 08 00 Commissioning of HVAC Systems 11-16 23 09 23 Direct-Digital Control System for HVAC 09-11 23 21 13 Hydronic Piping 08-17 23 21 23 Hydronic Pumps 08-17 23 22 13 Steam and Condensate Heating Piping 08-17 23 23 00 Refrigerant Piping 02-15 23 25 00 HVAC Water Treatment 02-15 23 31 00 HVAC Ducts and Casings 03-13 23 34 00 HVAC Fans 02-15 23 36 00 Air Terminal Units 02-15 23 37 00 Air Outlets and Inlets 02-15 23 40 00 HVAC Air Cleaning Devices 02-12 23 74 13 Packaged, Outdoor, Central-Station Air-Handling Units 04-11 23 82 16 Air Coils 04-11

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installations 01-16

VA: 61417-112 Renovate Building 1 Clinical Lab Memphis VAMC, Memphis Tn.

03.04.2020

00 01 10-4

26 05 19 Low-Voltage Electrical Power Conductors and Cables 01-17 26 05 26 Grounding and Bonding for Electrical Systems 01-17 26 05 33 Raceway and Boxes for Electrical Systems 05-14 26 05 41 Underground Electrical Construction 01-17 26 05 73 Overcurrent Protective Device Coordination Study 12-15 26 08 00 Commissioning of Electrical Systems 11-16 26 09 23 Lighting Controls 05-14 26 22 00 Low-Voltage Transformers 12-15 26 24 16 Panelboards 05-14 26 27 26 Wiring Devices 01-16 26 29 11 Motor Controllers 08-14 26 29 21 Enclosed Switches and Circuit Breakers 01-17 26 36 23 Automatic Transfer Switches 01-17 26 51 00 Interior Lighting 08-14

DIVISION 27 – COMMUNICATIONS

27 05 11 Requirements for Communications Installations 06-15 27 05 26 Grounding and Bonding for Communications Systems 06-15 27 05 33 Raceways and Boxes for Communications Systems 06-15 27 08 00 Commissioning of Communications Systems 11-16 27 10 00 Control, Communication and Signal Wiring 06-15 27 11 00 Communications Equipment Room Fittings 06-15 27 51 23 Intercommunications and Program Systems 06-15

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 05 00 Common Work Results for Electronic Safety and Security 09-11 28 08 00 Commissioning of Electronic Safety and Security Systems 11-16 28 13 00 Physical Access Control System 10-11 28 23 00 Video Surveillance 09-11 28 31 00 Fire Detection and Alarm 10-11