This statement of work outlines requirements for a construction project to build out an emergency management site at a Veterans Affairs medical center campus. The project involves renovating an existing first floor mailroom space, including repairing a water leak in the ceiling, replacing flashing and caulking, and performing full demolition and construction of HVAC, electrical, plumbing, and finish systems. The contractor must provide all labor, materials and equipment to complete the buildout according to the design drawings and specifications over a 270-day performance period. Specific responsibilities include removing construction debris, coordinating any utility outages, following infection control and safety protocols, and developing a quality control plan. The Department of Veterans Affairs will issue the solicitation and oversee the project to upgrade this facility space for the emergency management team.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A.5 STATEMENT OF WORK
STATEMENT OF WORK
BUILDOUT EMERGENCY MANAGEMENT SITE AT LAKEMONT
PROJECT NUMBER 675-21-803
I. DEFINITIONS AND ACRONYMS:
A. Construction: As defined by the Department of Veterans Affairs (DVA) is the procurement by the
Government, under one (1) contract, with one (1) firm for construction services on a specific project.
B. Contracting Officer (CO): The services to be performed under this contract are subject to the general supervision, direction, control and approval of the CO.
C. Project Manager (PM)/Contracting Officer’s Representative (COR): The COs representative responsible for administering contracts under the immediate direction of the CO.
D. Contractor: This term, as used herein, refers to the contractor under this contract.
E. Pre-Construction Risk Assessment (PRCA): Used to identify potential risks associated with renovation, construction, some maintenance, repair activities, and to develop risk mitigation strategies to minimize these risks. Prior to beginning work this assessment shall be completed.
F. Interim Life Safety Measures (ILSM): Measures that are instituted to compensate for significant hazards posed by existing life safety (fire) code deficiencies or construction/renovation activities.
G. Request for Proposal (RFP): A solicitation made, often through a bidding process, by an agency or company interested in procurement of a commodity or service, to potential suppliers to submit proposals.
II. SCOPE OF WORK:
A. Project Overview:
This project requires construction/renovation of the old mailroom area located on the first floor of the Orlando Veterans Affairs Healthcare System (OVAHCS) Lakemont Campus, 2500 S. Lakemont Ave.
Orlando FL 32814. The Emergency Management service will be relocated to the space. The project shall include repair of an existing leak in the ceiling. The contractor shall perform repair of the building joint to eliminate water intrusion affecting the project site. The contractor shall remove and replace approximately 35 feet of flashing and caulking at the building expansion joint, to eliminate water penetration into the project space. Additional project requirements include full demolition, renovation, improvement or replacement of the Heating Ventilation and Air conditioning (HVAC) system, fire protection system modifications, power and Office of Information and Technology (OI&T) infrastructure improvements, new flooring, new drop down ceiling (ceiling tiles, grid and light fixtures), new drywall partitions, refinishing of all wall surface areas in the space, new doors/frames, wall insulation/sound proofing, new lay-in ceilings, lighting, closed circuit television (CCTV), plumbing upgrades, painting, and signage. All construction/renovation work shall be completed in accordance with the project's design drawings and specifications prepared by the A&E Contractor Firm.
B. General Requirements:
The Contractor shall provide all labor, materials, tools and equipment necessary to construct the project described herein and other specific tasks as further defined by this RFP. All proposals are to provide construction services for this project. The Contractor shall be a State of Florida Certified/licensed General Contractor. This project shall result in a certified Secure Facilities/Sensitive Compartmented Information Facility.
C. Special Requirements:
a) Badges: Facility Management Services (FMS) will issue identification badges to Contractors, employees and Subcontractors which must be worn at all times while on VA property.
b) Contractor shall provide a list of all personnel who will participate on the project. Personnel can be subjected to a background investigation prior to commencement of work. Contractor will be issued appropriate quantity of badges per provided list.
c) The Contractor shall keep the area cleaned daily and haul away all construction debris. All materials shall be tracked and logged to be reported back to the Green Environmental System (GEMS) coordinator for recycling and tracking purposes. When removing construction debris from facility it must be in a covered cart when entering and exiting the building.
III. SCHEDULING, PHASING, AND WORKING HOURS:
A. All work hours SHALL be coordinated with the project’s COR to minimize interference with normal clinic functions. All work shall be performed during normal business hours (7:30 am to 4:00 pm) Monday through Friday. However, areas may require work to be completed OUTSIDE normal business hours (4:00 pm to 10:00 pm). Any work required on the weekends must be coordinated and approved by the project’s COR. Construction shall be performed (scheduled and phased) to ensure that areas which can be completed ahead of schedule, or priority for early acceptance and operation, can be rendered back to the facility.
B. Length of Project
1. Below is the allotted schedule for construction. Any deviations or alternations must be approved by the COR.
a) New Construction – 270 calendar days
(1) 240 calendar days for construction
(2) 30 calendar days for Punch list/Closeout
2. Project’s construction phase MUST be completed in no more than 270 calendar days from Government issuance of Notice to Proceed (NTP).
3. The contractor shall submit a Critical Path Method (CPM) schedule for the Construction with estimated dates and itemized cost of work to the Contracting Officer for review and approval prior to issuance of the NTP.
C. Utility shutdowns/Outages: All shutdowns involving temporary impairment of utilities shall be requested by the Contractor at least 14 calendar days in advance.
IV. PROJECT CLASSIFICATION:
A. The Contractor shall secure area prior to commencement of work and follow the Orlando VA Medical
Center guidelines and policies for PCRA and ILSM.
B. Risk Assessment: This project has been classified per the Construction Infection Control Risk
Assessment as a Type D, Low Risk Group, Class III (ISLM Level II) project.
V. SAFETY REQUIREMENTS:
A. All Contractor's personnel are required to have completed an Occupational Safety and Health
Administration (OSHA) approved ten (10) hour construction worker course prior to working on-site. The on-site general superintendent/supervisor is required to have completed an OSHA approved thirty (30) hour construction course prior to working on-site. The CO must receive a copy of current certificates identifying successful completion of training for every worker, prior to executing work for the Veterans Administration. In addition, Contractor shall provide submittals for contract construction or renovation work which include the names, qualifications, and training dates for Contractor’s Competent Persons (CP), who has been designated to administer the site-specific safety program, as well as the CP for other activities as required by OSHA regulation 29 Code of Federal Regulations (CFR) 1926.32 (such as scaffolds, cranes, excavations, etc.). Contractor’s CP are required to implement and maintain effective safety programs that identify and control hazards that may cause injury or illness to VA patients, staff, visitors, and Contractor employees. The VA CP does not take place of the Contractor’s CP, nor acts on their behalf. The VA CP determines if the Contractor is meeting VA standards and contractual requirements for safety and OSHA compliance. When these standards and contract requirements are not being met, the VA COR and/or CP will take immediate action to prevent injury, non-compliance, and/or property damage. The Contractor shall submit an Activity Hazard Analysis (AHA), and an Accident Prevention Plan (APA) as per Federal Acquisition Regulation (FAR) 52.236-13 prior to commencement of site activities. The Government shall have twenty-one (21) calendar days to review the AHA and
APP.
B. The Contractor shall submit documentation validating completion of the OSHA construction safety course for all personnel.
VI. GOVERNMENT FURNISHED INFORMATION:
All available record drawings will be provided upon request to the Contractor. They should not however, be considered “as-built”. These drawing files are provided without warranty or obligation as to the accuracy or information contained in the files. All information in the files shall be independently verified by the user.
Any user shall agree to indemnify and hold the VA harmless from any and all claims, damages, losses, and expenses, including, but not limited to, attorney fees arising out of the use of the Computer Aided Design and Drafting (CADD) drawing files.
VII. RESOURCES:
All designs shall comply with applicable sections of VA standards and publications, and all references therein. Ensure that construction documents comply with the latest edition of these VA construction and design standards. VA standards can be found on the World Wide Web at http://www.cfm.va.gov/TIL/. VA publications and standards shall include but shall not be limited to:
1. Office of Construction & Facilities Management Site Map: http://www.cfm.va.gov/sitemap.asp
2. The Technical Information Library (TIL): http://www.cfm.va.gov/TIL/
a) Master Construction Specifications Index (PG-18-1)
b) Design and Construction Procedures (PG-18-3)
c) VA Standard Details and CAD Standards (PG-18-4)
d) Equipment Guide List (PG-18-5)
e) Equipment Inspection Manual (Program Guide 7610.2)
f) Equipment Reference Manual (PG-18-6)
g) Space Planning Criteria (PG-18-9)
h) Design Manuals (by discipline) (PG-18-10)
i) Design Guides (graphical, by function) (PG-18-12)
j) Barrier Free Design Guide (PG-18-13)
k) Room Finishes, Door and Hardware Schedules (PG-18-14)
l) Minimum Requirements for A/E Submissions (PG-18-15)
m) Environmental Planning Guidance (PG-18-17)
n) HVAC Design Manual for Hospitals Amendment B
o) Lighting Study
p) Design Alerts
q) Quality Alerts
r) VA Signage Design Guide
s) Fire Protection Design Manual – Latest Edition
t) Cost Estimating
u) Physical Security Design Manuals for VA Facilities – Mission Critical Facilities (VA Handbook
0730)
v) Information Security Handbook VA 6500
w) Sustainable Design and Energy Reduction Manual (First Draft)
3. TIL - Master Construction Specifications: http://www.cfm.va.gov/til/spec.asp.
4. Department of Veterans Affair Utilities Design Manual
B. Office of Construction & Facilities Management: http://www.cfm.va.gov/index.asp http://www.cfm.va.gov/TIL/ http://www.cfm.va.gov/sitemap.asp http://www.cfm.va.gov/TIL/ http://www.cfm.va.gov/til/spec.asp http://www.cfm.va.gov/index.asp
1. VA Office of Facilities Management citations of the AIA design standards found on the world wide web at http://cfm.va.gov.TIL/
2. VA Office of Health and Safety (OHS): http://www1.va.gov/vasafety/
3. Construction Infection Control Risk Assessment Memorandum
C. Other design and construction standards and publications that shall be applied to this work includes, but are not limited to:
1. American Society of Heating, Refrigerating and Air-Conditioning Engineers Manual (ASHRAE)
2. National Fire Protection Association (NFPA) Codes & Standards - www.nfpa.org
3. OSHA Rules and Regulations
4. International Building Code (IBC) latest edition
5. Life Safety Code (NFPA 101) latest edition
D. The Joint Commission (TJC) Accreditation manual (latest edition). Applicable sections of the VA Master Construction Specifications shall be prepared by the Architect/Engineer, including all the necessary adaptations.
E. Particular attention is called to CD4, Symbol Identification of Contract Drawings.
F. Equipment symbols shall be in accordance with PG-18-6, Equipment Reference Manual (previously List of Equipment Symbols, H-08-6).
G. Standard Drawing Details, in accordance with PG-18-4, shall be utilized to the greatest extent practicable.
H. Cost estimates shall be developed in strict conformance with VA’s Manual for Preparation of Cost
Estimates & Related Documents for VA Facilities (March 8, 2011).
http://www.cfm.va.gov/til/dManual/dmCost.pdf
I. Guidelines for Design and Construction of Health Care Facilities, Latest Edition, published by The Facilities Guidelines Institute (FGI). http://www.fgiguidelines.org/
J. Physical Security Standard, compliance with Medical Center Policy 138-3 and VHA Handbook 0730/2 dated May 27, 2010 “Space Key Control”.
VIII. SUBMITTALS
A. Proof of OSHA construction safety course B. General Contractor License and Insurance C. Submittals as per Construction Documents and Specifications D. Warranties E. Bid Bond
IX. QUALITY ASSURANCE/QUALITY CONTROL:
A. The Construction Contractor shall develop and execute a Quality Assurance/Quality Control (QA/QC) plan that demonstrates the project plans and specifications have gone through a rigorous, thorough review and coordination effort.
B. Within two (2) weeks of receipt of the NTP, the Construction Contractor shall submit a detailed QA/QC plan describing each QA/QC task that will be taken during the construction phase, and the name of the Contractor’s team member responsible for QA/QC.
C. Upon its completion, each task shall be initialed and dated by the responsible Contractor’s team member.
X. RECORDS MANAGEMENT OBLIGATIONS
A. Applicability This clause applies to all Contractors whose employees create, work with, or otherwise handle Federal records, as defined in Section B, regardless of the medium in which the record exists.
B. Definitions http://cfm.va.gov.til/ http://www1.va.gov/vasafety/ http://www.nfpa.org/ http://www.cfm.va.gov/til/dManual/dmCost.pdf http://www.fgiguidelines.org/
“Federal record” as defined in 44 United States Code (U.S.C.) § 3301, includes all recorded information, regardless of form or characteristics, made or received by a Federal agency under Federal law or in connection with the transaction of public business and preserved or appropriate for preservation by that agency or its legitimate successor as evidence of the organization, functions, policies, decisions, procedures, operations, or other activities of the United States Government or because of the informational value of data in them.
The term Federal record:
1. Includes VHA records.
2. Does not include personal materials.
3. Applies to records created, received, or maintained by Contractors pursuant to their VHA contract.
4. May include deliverables and documentation associated with deliverables.
C. Requirements
1. Contractor shall comply with all applicable records management laws and regulations, as well as
National Archives and Records Administration (NARA) records policies, including but not limited to the Federal Records Act (44 U.S.C. chs. 21, 29, 31, 33), NARA regulations at 36 CFR Chapter XII Subchapter B, and those policies associated with the safeguarding of records covered by the Privacy Act of 1974 (5 U.S.C. 552a). These policies include the preservation of all records, regardless of form or characteristics, mode of transmission, or state of completion.
2. In accordance with 36 CFR 1222.32, all data created for Government use and delivered to, or falling under the legal control of, the Government are Federal records subject to the provisions of 44 U.S.C.
chapters 21, 29, 31, and 33, the Freedom of Information Act (FOIA) (5 U.S.C. 552), as amended, and the Privacy Act of 1974 (5 U.S.C. 552a), as amended and must be managed and scheduled for disposition only as permitted by statute or regulation.
3. In accordance with 36 CFR 1222.32, the Contractor shall maintain all records created for Government use or created in the course of performing the contract and/or delivered to, or under the legal control of the Government and must be managed in accordance with Federal law. Electronic records and associated metadata must be accompanied by sufficient technical documentation to permit understanding and use of the records and data.
4. VHA and its contractors are responsible for preventing the alienation or unauthorized destruction of records, including all forms of mutilation. Records may not be removed from the legal custody of VHA or destroyed except in accordance with the provisions of the agency records schedules and with the written concurrence of the Head of the Contracting Activity.
5. Willful and unlawful destruction, damage, or alienation of Federal records is subject to the fines and penalties imposed by 18 U.S.C. 2701. In the event of any unlawful or accidental removal, defacing, alteration, or destruction of records, the Contractor must report to VHA. The agency must report promptly to NARA in accordance with 36 CFR 1230.
6. The Contractor shall immediately notify the appropriate Contracting Officer upon discovery of any inadvertent or unauthorized disclosures of information, data, documentary materials, records, or equipment. Disclosure of non-public information is limited to authorized personnel with a need-to-know as described in the [contract vehicle].
7. The Contractor shall ensure that the appropriate personnel, administrative, technical, and physical safeguards are established to ensure the security and confidentiality of this information, data, documentary material, records, and/or equipment is properly protected.
8. The Contractor shall not remove material from Government facilities or systems, or facilities or systems operated or maintained on the Government’s behalf, without the express written permission of the Head of the Contracting Activity. When information, data, documentary material, records, and/or equipment is no longer required, it shall be returned to VHA control or the Contractor must hold it until otherwise directed. Items returned to the Government shall be hand-carried, mailed, emailed, or securely electronically transmitted to the Contracting Officer or address prescribed in the [contract vehicle]. Destruction of records is EXPRESSLY PROHIBITED unless in accordance with Paragraph (4).
9. The Contractor is required to obtain the Contracting Officer's approval prior to engaging in any contractual relationship (sub-contractor) in support of this contract requiring the disclosure of information, documentary material, and/or records generated under, or relating to, contracts. The Contractor (and any sub-contractor) is required to abide by Government and VHA guidance for protecting sensitive, proprietary information, classified, and controlled unclassified information.
10. The Contractor shall only use Government IT equipment for purposes specifically tied to or authorized by the contract and in accordance with VHA policy.
11. The Contractor shall not create or maintain any records containing any non-public VHA information that is not specifically tied to or authorized by the contract.
12. The Contractor shall not retain, use, sell, or disseminate copies of any deliverable that contains information covered by the Privacy Act of 1974 or that which is generally protected from public disclosure by an exemption to the Freedom of Information Act.
13. The VHA owns the rights to all data and records produced as part of this contract. All deliverables under the contract are the property of the U.S. Government for which VHA shall have unlimited rights to use, dispose of, or disclose such data contained therein as it determines to be in the public interest. Any Contractor rights in the data or deliverables must be identified as required by FAR 52.227-11 through FAR 52.227-20.
14. Training. All Contractor employees assigned to this contract who create, work with or otherwise handle records are required to take VHA-provided records management training. The Contractor is responsible for confirming training has been completed according to agency policies, including initial training and any annual or refresher training.
D. Flow down of requirements to subcontractors The Contractor shall incorporate the substance of this clause, its terms, and requirements including this paragraph, in all subcontracts under this [contract vehicle], and require written subcontractor acknowledgment of same. Violation by a subcontractor of any provision set forth in this clause will be attributed to the Contractor.
VHA Supplemental Contract Requirements for Combating COVID-19
a. Contractor employees who work in or travel to VHA locations must comply with the following:
b. Documentation requirements:
i. If fully vaccinated, contractors shall show proof of vaccination.
1. NOTE: Acceptable proof of vaccination includes a signed record of immunization from a health care provider or pharmacy, a copy of the COVID-19 Vaccination Record Card (CDC Form MLS-319813_r, published on September 3, 2020), or a copy of medical records documenting the vaccination.
2. If unvaccinated, contractors shall show negative COVID-19 test results dated within three calendar days prior to desired entry date. Test must be approved by the Food and Drug Administration (FDA) for emergency use or full approval.
This includes tests available by a doctor’s order or an FDA approved over-the-counter test that includes an affiliated telehealth service.
3. Documentation cited in this section shall be digitally or physically maintained on each contractor employee while in a VA facility and is subject to inspection prior to entry to VA facilities and after entry for spot inspections by Contracting Officer Representatives (CORs) or other hospital personnel.
4. Documentation will not be collected by the VA; contractors shall, at all times, adhere to and ensure compliance with federal laws designed to protect contractor employee health information and personally identifiable information.
c. Contractor employees are subject to daily screening for COVID-19 and may be denied entry to VA facilities if they fail to pass screening protocols. As part of the screening process contractors may be asked screening questions found on the COVID-19 Screening Tool. Check regularly for updates.
d. Contractor employees who work away from VA locations, but who will have direct contact with VA patients shall self-screen utilizing the COVID-19 Screening Tool, in advance, each day that they will have direct patient contact and in accordance with their person or persons who coordinate COVID-19 workplace safety efforts at covered contractor workplaces. Contractors shall, at all times, adhere to and ensure compliance with federal laws designed to protect contractor employee health information and personally identifiable information.
e. Contractor must immediately notify their COR or Contracting Officer if contract performance is jeopardized due to contractor employees being denied entry into VA Facilities