This is a Request for Proposal (RFP) for the complete renovation of Building 10 at the Central Alabama Veterans Health Care System (CAVHCS) in Tuskegee, Alabama. The solicitation is numbered 36C24726R0095 with a project number of 619A4-23-105, issued by the Department of Veterans Affairs VISN 7 Network Contracting Office on July 31, 2026.
The project scope includes a comprehensive renovation of a two-story brick building constructed in 1923, comprising approximately 12,800 gross square feet. The work encompasses abatement of all hazardous materials, complete demolition and removal of existing utilities, fixtures, interior walls, floors, electrical and HVAC systems, and replacement of the roof assembly and floor slabs. The exterior masonry walls will be retained and repointed; all windows and doors will be replaced; an elevator and new stairwells will be added to meet current accessibility requirements; and new copper gutters and storm water systems will be installed. The renovated facility will accommodate Community Care and Call Center operations with sound-baffling features for patient privacy. The contractor must complete all work within 558 calendar days from the Notice to Proceed. This is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSBs), with contract magnitude estimated between $10,000,000 and $25,000,000 under NAICS code 236220. Sealed electronic proposals are due by 11:00 AM EST on September 4, 2026, with a mandatory site visit scheduled for August 6, 2026. A bid guarantee of 20% of the proposal price (not to exceed $3,000,000) is required, and Performance and Payment Bonds will be required within 10 days of award. Evaluation criteria include past performance (significantly more important than price) and price reasonableness, with award to be made on a firm-fixed-price basis representing best value to the Government. Offerors must be registered in SAM.gov, SBA certifications.sba.gov, and comply with VETS-4212 reporting requirements.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. SOLICITATION NUMBER
2. TYPE OF SOLICITATION
3. DATE ISSUED
PAGE OF PAGES
4. CONTRACT NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
6. PROJECT NUMBER
7. ISSUED BY
CODE
8. ADDRESS OFFER TO
a. NAME
b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
STANDARD FORM 1442 (REV. 8/2014)
STANDARD FORM 1442
Prescribed by GSA-FAR (48 CFR) 52.236-1(d)
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
SOLICITATION
SOLICITATION
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SEALED BID (IFB)
NEGOTIATED (RFP)
11. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).
YES
NO
a.
Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.
b.
An offer guarantee is, is not required.
c.
All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d.
Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
1 of
36C24726R0095
X 07-31-2026
619-26-1-5374-0001
619A4-23-105 36C247 Department of Veterans Affairs VISN 7 Network Contracting Office 2400 Hospital Rd.
Building 68 Room 72-79 Tuskegee AL 36083 Email only. Send to contract specialist:
Chantel.Gues@va.gov and CC: Joseph.Osborn@va.gov
No physical documents will be accepted.
Chantel Guest None Project No./Title: 619A4-23-105, "Renovate Building 10" Project Location: Central Alabama Veterans Health Care System, East Campus, 2400 Hospital Road, Tuskegee, AL 36083
This acquisition is 100% Set-aside for Service-Disabled Veteran Owned Small Businesses (SDVOSBs) only.
The SDVOSB Business must be 51% or more owned and controlled by one or more veterans.
Offerors are required to complete VAAR 852.219-75, Limitations on Subcontracting (See Attachment 2).
MAGNITUDE OF CONSTRUCTION: Between $10,000,000.00 and $25,000,000.00 NAICS Code: 236220; Small Business Standard: $45 Million
To be eligible for award, the offeror shall be registered at the following websites: System for Award Management at sam.gov with completed electronic annual representations certifications, SBA at certifications.sba.gov and comply with VETS 4212, Federal Contractor Veterans Employment Report. Offerors MUST ensure registration in these websites are accurate, complete, and have not expired prior to proposal due date or thereafter.
Offerors who have not done business with VA must complete VA10091 to register in financial database (see Attachment 6).
Site Visit: An organized site visit is scheduled for Thursday, August 6, 2026 at 1:00 PM CST.
Location: CAVHCS, East Campus, 2400 Hospital Road, Tuskegee, AL 36083. Please meet outside Bldg. 68
Information provided at the site visit shall not alter the terms and conditions of the solicitation and terms of the solicitation and specifications remain unchanged unless the solicitation is amended in writing. Offerors are required to submit all questions in writing to the Contracting Officer following the site visit.
Requests for Information (RFIs) are due by Monday, August 10,2026 by 1:00 PM CST, via email to Chantel.Guest@va.gov.
Late RFIs may not be accepted and offerors are responsible of ensuring questions are received on time.
Responses to RFIs will be provided in question and answer form via a posted amendment at www.sam.gov.
Offer guarantee will be accepted via email only if receivedbefore the date/time specified in block 13a below to the Email specified in block 8 above. Hand-delivered and/or mailed offer guarantees will not be accepted.
x x
52.211-10 X
1 electronic
11AM
EST
09-04-2026 X
14. NAME AND ADDRESS OF OFFEROR
15. TELEPHONE NUMBER
16. REMITTANCE ADDRESS
CODE
FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c)( 41 U.S.C. 3304(a) (
26. ADMINISTERED BY
27. PAYMENT WILL BE MADE BY
PHONE:
FAX:
28. NEGOTIATED AGREEMENT
29. AWARD
Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.
shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER
TO SIGN
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE
BY
OFFER
AWARD
STANDARD FORM 1442 (REV. 8/2014) BACK
(Include ZIP Code) (Include area code) (Include only if different than Item 14.)
(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or print) (Contractor is required to sign this document and return _______ copies to issuing office.)
(Contractor is not required to sign this document.)
(Must be fully completed by offeror) (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
Complete Price Offer Schedule
36C247 Department of Veterans Affairs VISN 7 Network Contracting Office 2400 Hospital Road Building 68 Room 72-79 Tuskegee AL 36083
Austin Payment Center Department of Veteran Affairs
PO Box 149971 Austin TX 78714-8971
(877) 353-9791
(512) 460-5545
Joseph Osborn
VA-VHA-RPOE-2026-0037
(To be completed by Government)
Table of Contents
| PART I - THE SCHEDULE | 1 |
| SECTION A - SOLICITATION/CONTRACT FORM | 1 |
| A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair) | 1 |
| A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR)– BACK | 2 |
| INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS | 6 |
| 2.1 PRICE OFFER SCHEDULE | 6 |
| STATEMENT OF WORK | 7 |
| A. GENERAL GUIDANCE | 7 |
| B. GENERAL REQUIREMENTS | 8 |
| 2.2 PROPOSAL PREPARATION AND EVALUATION INFORMATION | 10 |
| 2.3 GENERAL SOLICITATION INFORMATION | 18 |
| 2.4 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS-SECONDARY SITE OF THE WORK. (DEVIATION SEP 2025) | 22 |
| 2.5 52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (MAY 2014) ALTERNATE II (NOV 2023) | 23 |
| 2.6 52.228-1 BID GUARANTEE (SEP 1996) | 24 |
| 2.7 52.233-2 SERVICE OF PROTEST. (SEP 2006) (DEVIATION NOV 2025) | 24 |
| 2.8 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) | 25 |
| 2.9 52.252-5 AUTHORIZED DEVIATIONS IN PROVISIONS (NOV 2020) | 25 |
| 2.10 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION (OCT 2018) | 25 |
| 2.11 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018) | 26 |
| 2.12 VAAR 852.252-70 SOLICITATION PROVISIONS OR CLAUSES INCORPORATED BY REFERENCE (JAN 2008) | 26 |
| REPRESENTATIONS AND CERTIFICATIONS | 27 |
| 3.1 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (DEVIATION NOV 2025) | 27 |
| 3.2 52.209-12 CERTIFICATION REGARDING TAX MATTERS (OCT 2025) | 28 |
| 3.3 52.209-13 Violation of Arms Control Treaties or Agreements-Certification. (DEVIATION NOV 2025) | 28 |
| 3.4 52.216-1 TYPE OF CONTRACT. (DEVIATION NOV 2025) | 30 |
| 3.5 Small Business Program Representations. (FEB 2024) (DEVIATION NOV 2025) | 31 |
| 3.6 52.240-90 SECURITY PROHIBITIONS AND EXCLUSIONS REPRESENTATIONS AND CERTIFICATIONS (DEVIATION NOV 2025) | 33 |
| 3.7 VAAR 852.209-70 ORGANIZATIONAL CONFLICTS OF INTEREST (OCT 2020) | 37 |
| GENERAL CONDITIONS | 39 |
| 4.1 52.203-14 DISPLAY OF HOTLINE POSTER(S) (NOV 2021) | 39 |
| 4.2 52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (NOV 2020) (DEVIATION OCT 2025) | 39 |
| 4.3 52.219-28 POSTAWARD SMALL BUSINESS PROGRAM REREPRESENTATION (DEVIATION OCT 2025) | 40 |
| 4.4 52.222-90 ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS (DEVIATION APR 2026) | 43 |
| 4.5 52.223-3 Hazardous Material Identification and Safety Data. Alternate I (JUL 1995) (Deviation NOV 2025) | 43 |
| 4.6 52.223-20 AEROSOLS (MAY 2024) | 45 |
| 4.7 52.223-21 FOAMS (MAY 2024) | 46 |
| 4.8 52.223-9 ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT FOR EPA-DESIGNATED ITEMS (MAY 2008) | 47 |
| 4.9 52.225-11 BUY AMERICAN-CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS. ALTERNATE I (NOV 2023) (DEVIATION OCT 2025) | 47 |
| 4.10 SUPPLEMENTAL INSURANCE REQUIREMENTS | 53 |
| 4.11 52.240-91 SECURITY PROHIBITIONS AND EXCLUSIONS (NOV 2025) (DEVIATION) | 54 |
| 4.12 52.240-93 BASIC SAFEGAURDING OF COVERED CONTRACTOR INFORMATION SYSTEMS (DEVIATION) (NOV 2025) | 63 |
| 4.13 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) | 65 |
| 4.14 52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (NOV 2020) | 65 |
| 4.15 VAAR 852.211-72 TECHNICAL INDUSTRY STANDARDS (NOV 2018) | 68 |
| 4.16 VAAR 852.201-70 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 2022) | 68 |
| 4.17 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018) | 69 |
| 4.18 VAAR 852.204-72 PERSONNEL VETTING AND CREDENTIALING (DEVIATION) (MAR 2026) | 69 |
| 4.19 VAAR 852.219-73 VA NOTICE OF TOTAL SET-ASIDE FOR CERTIFIED SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESSES (JAN 2023) (DEVIATION) | 72 |
| 4.20 VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING—CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023) (DEVIATION) | 75 |
| 4.21 VAAR 852.222-71 COMPLIANCE WITH EXECUTIVE ORDER 13899 (DEVIATION)(APR 2025) | 77 |
| 4.22 VAAR 852.223-71 SAFETY AND HEALTH (SEP 2019) | 77 |
| 4.23 VAAR 852.228-70 BOND PREMIUM ADJUSTMENT (JAN 2008) | 78 |
| 4.24 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009) | 78 |
| 4.25 VAAR 852.232-70 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (WITHOUT NAS– CPM) (NOV 2018) | 79 |
| 4.26 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018) | 82 |
| 4.27 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (APR 2019) | 83 |
| 4.28 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019) | 84 |
| 4.29 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019) | 84 |
| 4.30 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT ADMINISTRATION (OCT 2020) | 84 |
| 4.31 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020) | 86 |
| 4.32 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT (SEP 2019) | 86 |
| 4.33 List of Attachments | 87 |
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS
2.1 PRICE OFFER SCHEDULE
| Description |
| U/I |
| QTY |
| UNIT PRICE |
| TOTAL PRICE |
Furnish and provide all supervision, labor, tools, hardware, equipment, safety, protection, drawing, rigging, commissioning, site visit and materials necessary. This project will be a complete renovation of the existing Building 10 on the VA Medical Center Campus in Tuskegee, Alabama, (CAVHCS). Refer to the Statement of Work for detailed project-specific requirements, as they are too extensive to include in the line item for pricing. The construction must be carried out in accordance with the project drawings and specifications associated with this project.
Completion Time: 558 Calendar Days from Notice to Proceed (NTP)
JB
A single award will be made on line item 1 for which funds are determined available.
The Period of Performance includes submittal phase and the completion of all punch list items.
ATTACH YOUR ITEMIZED COST BREAKDOWN: Offerors are to include a construction price/cost breakdown using Attachment 4.
RENOVATE BUILDING 10
Project No. 619A4-23-105
Veterans Health Administration Central Alabama Veterans Health Care System East Campus 2400 Hospital Road Tuskegee, AL 36083
STATEMENT OF WORK
A. GENERAL GUIDANCE
1. Title of Project: 619A4-23-105, RENOVATE BUILDING 10
2. Project Overview: This project will renovate Building 10 at Tuskegee Campus to provide a secure, safe, reliable, and code-compliant facility to accommodate Community Care and all CAVHCS Call Center supporting operations. This project will support the additional staff required by the MISSION Act in the Community Care department. The Call Center will include sound baffling features within the space to ensure patient privacy and improve the staff’s ability to support patients over the phone. The current space and conditions do not fully support patient centric programs.
3. Scope of Work: Furnish and provide all supervision, labor, tools, hardware, equipment, safety, protection, drawing, rigging, commissioning, site visit and materials necessary.
This project will be a complete renovation of the existing Building 10 on the VA Medical Center Campus in Tuskegee, Alabama. Building 10 is a two-story brick building built in 1923. The building is approximately 12,800 GSF and includes an attic and a crawl space. The building is currently vacant and in poor condition. This project is to be a complete renovation of the building and will include abatement of all hazardous materials and demolition of all existing utilities. Demolition of the existing building includes the removal of all finishes, fixtures, interior walls, floors, lighting, electrical distribution, HVAC equipment, fire/alarm systems, IT, and plumbing systems. The renovation will also include the removal and replacement of the building’s structure, including the floor and roof slabs, and the roof assembly. The exterior masonry walls will remain and will be shored up while the renovation is occurring. The existing wood furring and plaster along the inside face of the exterior walls will be removed. All windows and exterior doors will be replaced. The exterior front entrance porch and stairs will be removed and replaced with a porch that reflects the original building design. Canopies will be added over the entry doors at the east and west wings, to reflect the original building design. The project will also address deficiencies as listed in the most recent VISN 7 Facilities Condition Assessments (FCA) which include the addition of an elevator and new stairwells, to meet current accessibility and exiting requirements. The project also includes repainting the concrete sills and banding on the exterior facade, and repointing areas of the brick veneer to address mortar deterioration and organic growth. New Copper Gutters and downspouts will be replaced and tied into new storm water lines. Following renovation, the building will be occupied for Whole Health and Telehealth programs for Veterans. The programs are strictly outpatient programs for Veterans.
The contractor is responsible for the correct disposal of all materials associated with this project. Details on documenting waste streams as well as a list of recycling/disposal facilities will be provided to the contractor at the start of work.
If any questions or concerns arise, the contractor shall coordinate with the Contracting Officer’s Representative (COR) for directions. All disruptions to the normal functions of the Tuskegee Camps (road closures, utility connections, etc.) shall be brought to the attention of the COR as soon as possible. Refer to the Specifications for the acceptable time frames of notification.
4. Location of Work: Central Alabama Veteran Health Care System, 2400 Hospital Road Tuskegee, AL 36083
5. Period of Performance: The required period of performance will be 558 calendar days from the date of contract award or notice to proceed.
6. Work Hours: The contractor shall be available during normal business hours of 8:00 am – 4:30 pm Monday – Friday excluding Federal Holidays.
B. GENERAL REQUIREMENTS
1. The contractor shall provide the COR with a list of contractor employees expected to enter facilities. While on VA premises, all contractor personnel shall comply with the rules, regulations, and procedures governing the conduct of personnel and the operation of the facility.
2. An access badge will be given to the contractor’s employee upon entrance into VA buildings. The contractor employee must safeguard the access badge and immediately report any lost, stolen, or destroyed badges to the COR. All contract personnel must properly display their access badges. Access badges must be worn at or above the waist (facing forward). The contractor’s employees must return the access badge(s) to the COR or designee when the work is complete.
3. It is the responsibility of the contractor’s personnel to park in the appropriate designated parking areas. Parking information shall be coordinated with each facility COR.
4. CAVHCS does not validate or make reimbursement for parking violations of the contractor’s personnel under any circumstance.
C. GOVERNMENT RESPONSIBILITIES
The Government shall be responsible for making the building available to Contractor during normal business hours 8:00 am - 4:30 pm. If there is a need for work to be done after hours, the Government will plan for Contractor to have access to the building.
D. CONTRACTOR PERSONNEL SECURITY REQUIREMENTS
The contractor shall be required to comply with all security policies/requirements. All security policies/requirements must be met, and employees cleared prior to the contractor performing work under this contract. Employees that cannot meet the security and clearance requirements shall not be allowed to perform work under this contract.
The contractor shall only access Medical Center Buildings directly associated with the project. The contractor shall not enter or attempt to enter any patient care areas. Additionally, the contractor shall provide construction site security as further identified in the Specifications or on the Drawings.
E. INTERFERENCE TO NORMAL FUNCTION
Contractors may be required to interrupt their work at any time so as not to interfere with the normal functioning of the facility, including utility services, fire protection systems, and passage of facility patients, personnel, equipment and carts.
1. In the event of an emergency, contractor services may be stopped and rescheduled at no additional cost to the government.
Contractor personnel shall inform the COR or the designated personnel of the need to gain access to secure areas. If access is required to secure areas, prearranged scheduling will be made with COR or designated personnel.
STATEMENT OF WORK (SOW)
Page 1 of
2.2 PROPOSAL PREPARATION AND EVALUATION INFORMATION
I. PROPOSAL SUBMISSION
This is a competitive Request for Proposal (RFP) that represents the best value to the Government conducted under Federal Acquisition Regulation (FAR) Subpart 15.1 using the tradeoff process and evaluated in accordance with FAR Overhaul Subpart 15.2, Evaluation and Award. This section describes the method for evaluating and selecting offers for this procurement.
A. Proposal Submission:
1. Submit one (1) Electronic Proposal to the email addresses indicated on page 1, block 8 of Standard Form 1442. The Subject Line of the email should include “Company Name, RFP number, Project Title.”
2. The size of your file shall not exceed 10 MB. If you have multiple documents, please submit them as separate emails. Emails larger than this may be rejected by the network servers and will be considered non-responsive.
3. Interested firms are responsible for ensuring electronic submission delivery by the time and the date specified. It is highly recommended that interested firms confirm that the Contracting Officer has received electronic submissions. Failure to provide a proposal in its entirety before the deadline will render the proposal non-compliant.
B. Proposal Preparation and Format Instructions:
Offerors must provide all requested information for each factor. Proposals must address each element of each factor as applicable to be considered responsive to this RFP. Factor headings should be highlighted in yellow or typed in bold text for identification. It is the contractor’s responsibility to ensure the submitted proposal is in the proper format and that the information provided is clearly understood and free of ambiguities.
Offerors’ proposals should consist of past performance and price proposals, as described below.
1. TAB A: General Information:
(1) Cover Page with Solicitation Number, Project Title
(2) Table of Contents
(3) Signed offer/Acknowledgement of Amendments (SF1442)
(4) Copy of current SDVOSB MySBA Certification.
(5) SAM UEI Number
(6) Offer Guarantee Bond (DO NOT SEND HARD COPY) Electronic copy acceptable and should be emailed to Point of Contact(s) listed on page 1, block 8.
(7) Safety or Environmental Violations and Experience Modification (EMR) Rate *Submit information regarding current experience modification rate form (See Attachment 1). An EMR of greater than 1.0 may disqualify the bidder/offeror.
(8) 852.219-75 VA Notice of Limitations on Subcontracting—Certificate of Compliance for Services and Construction (Jan 2023) (Deviation), (See Attachment 2).
(9) Provide evidence of VETS-4212 Reporting (if applicable)
2. TAB B: Relevant and Recent Past Performance Experience
3. TAB C: Price Proposal
II. EVALUATION CRITERIA AND FACTORS
A. The evaluation is subjective based on the information provided in response to the information requested in the evaluation factors. The two (2) factors to be evaluated include past performance and price.
B. Relevant and Recent Past Performance Experience will be evaluated to assess recent and relevant past performance resulting in a performance confidence assessment rating. For evaluation purposes, past performance will be significantly more important than cost or price.
C. Offerors proposal shall address the following:
1. FACTOR 1 – RELEVANT AND RECENT PAST PERFORMANCE EXPERIENCE:
*** Relevant is defined as performance similar or greater in scope, magnitude, and complexity than the effort described in this solicitations scope of work, to include Renovations of buildings project per SOW, Drawings, Specifications, and solicitation documents. This relevant work can be a portion of a larger requirement, which was issued by the VA, Federal, State, Local Government agencies, and/or commercial facilities.
***Recent is defined as performance within the last five (5) years, to include ongoing projects.
Proposal shall include:
(1) Offeror must submit a minimum of one (1) but no more than three (3) references.
(2) The submission shall include a brief description of the project, the Contracting Officer’s Representative (COR) contact information for references, Contract Number, and Dollar Value.
(3) Provide a brief narrative describing the firms (primary and sub) specialized experience working with complete renovations of buildings per project SOW, to include abatement of all hazardous materials in accordance with Drawings, Specifications, and solicitation documents.
i. Further note: If utilizing the past performance of a subcontractor, subcontractors identified in the proposal must remain on the contract for its duration unless there is a compelling reason to replace them. The prime contractor will need to obtain approval from the contracting officer before making changes to key subcontractors.
(4) Respondents with no previous past performance shall state this when addressing the selection criteria. Where there is no record of past performance, the proposal will be evaluated neither favorably nor unfavorably. Superior performance ratings on relevant projects may be considered more favorably in the evaluation.
(5) The Government will evaluate the offeror’s past performance on active and completed contracts. The Government will contact the offeror’s submitted references on contracts if deemed necessary. Past performance information may be obtained from any other sources available to the Government, to include, but not limited to: Contract Performance Assessment Reporting System (CPARS) or other databases, past performance questionaries, and interviews with Program Managers, Contracting Officers, and/or Contracting Officer Representatives. The past performance evaluation will assess the relative risks associated with an offeror’s likelihood of success in performing the scope of work requirements as indicated by the offeror’s record of past performance.
(6) The following evaluation documents are acceptable:
i. Contractor Performance Assessment Report System (CPARS), or
ii. Past Performance Questionnaire (PPQ) evaluation (Attachment 3).
(7) If a completed CPARS evaluation is available, it shall be submitted with the proposal. If using Attachment 3 PPQ, it should be emailed to the construction contract administrator of the entity (Government or civilian) for which the construction was completed and emailed to Chantel Guest at email joseph.osborn@va.gov, and CC: Chantel.Guest@va.gov.
2. FACTOR 2 – PRICE PROPOSAL:
(1) Complete the price offer schedule in section A.3.
(2) Price shall be addressed using the attached price breakdown worksheet, which is included in Attachment 4 to include cost elements such as:
a. Labor (Direct & Indirect),
b. Materials, Material Markups, Materials overhead,
c. Equipment
d. Subcontractor Cost
e. Other Direct Costs
f. Overhead expenses
g. Indirect Cost
h. Profit
i. Bonds
j. Breakdown of G&A expenses inclusive of all project staff and general requirements of the Prime Contractor.
(3) Provide supporting documentation showing quotes/price breakdowns for both prime and subcontractors.
NOTE: Price breakdown shall be indicative of showing at least 15% percent of the cost of the contract performance incurred for personnel will be spent on the concern's employees or the employees of other eligible service-disabled veteran owned small business concerns in accordance with VAAR 852.219-73(d)(3).
III. EVALUATION CRITERIA/OVERVIEW
A. Proposals will be evaluated on the basis of two evaluation criteria: Past Performance and Price. Past performance will be evaluated for relevancy and confidence levels. Past performance will be considered significantly more important than price.
B. Past Performance: The basis of the evaluation will be the degree to which past performance evaluations and all other past performance information reviewed by the Government reflect a trend of satisfactory performance considering 1) compliance with the contract requirements, 2) effectiveness of the Offeror's on-site management; 3) use of appropriate personnel for contract requirements); 4) timeliness in the submission of schedules, reports, and submittals; 5) adherence to the construction schedule; 6) coordination and control of subcontractors; 7) ability to effectively deal with the customer and other Government personnel; 8) cooperativeness in solving problems and negotiating changes; 9) response to warranty notifications, and other pertinent information obtained from past performance evaluations that have affected the overall performance of previous or ongoing projects.
C. The Government reserves the right to obtain information for use in the evaluation of past performance from any and all sources, including sources outside of the Government. Other sources may include but are not limited to past performance information retrieved through the (CPARS), for Contractors who are part of a partnership or joint venture identified in the offeror’s proposal, inquiries of owner representative(s), and any other known sources not provided by the offeror.
D. In evaluating past performance, the government reserves the right to give greater consideration to information on those contracts deemed most relevant to the effort described in this solicitation. Common aspects of relevancy include similarity of service/support, complexity, dollar value, contract type, and degree of subcontract/teaming.
E. Past performance evaluation will allow the government to assess the offeror’s ability to perform the effort described in this solicitation based on the offeror’s demonstrated present and past performance. The assessment process will result in an overall performance confidence assessment of Substantial Confidence, Satisfactory Confidence, Limited Confidence, No Confidence or Neutral/Unknown Confidence.
F. In evaluating price, the government may use various price analysis techniques and procedures to determine price reasonableness. Price will be evaluated for Price Reasonableness. The Government reserves the right to evaluate proposals and award a contract without discussions (except clarifications as described FAR Overhaul 15.202(a)(2)(i-iv)). Therefore, the offeror’s initial proposal should contain the offeror’s best terms from a performance and price standpoint. The Government will evaluate price based on the total price.
IV. EVALUATION AND BASIS FOR AWARD:
A. FAR Overhaul 15.103-1 shall apply to the government’s evaluation of proposals. The factors that shall be used to evaluate offers are Past Performance and Price. Past Performance is significantly more important than Price.
B. Discussions: The Government intends to evaluate proposals and award a contract without discussions with offerors (except clarifications as described in FAR Overhaul 15.202(a)(2)(i-iv)). Offerors should not automatically assume that they will have an opportunity to participate in discussions or be asked to submit a revised offer. Communication conducted to resolve minor or clerical errors would not constitute discussions. The Government reserves the right to conduct discussions if the Contracting Officer later determines them necessary.
C. The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation, will be most advantageous to the Government, past performance, and price considered. The proposals must conform to the RFP's requirements and be evaluated to represent the Best Value to the Government. The Best Value is the most advantageous offer, consistent with the Government's stated importance of evaluation criteria. This may result in award being made to a high-rated, higher-priced offeror where the Contracting Officer determines that it is worth the price premium to do so.
D. Offerors must provide all requested information for each factor. Proposals must separately address each of the factors as applicable to be considered responsive to this RFP. It is the contractor’s responsibility to ensure the submitted proposal is in the proper format and that the information provided is clearly understood and free of ambiguities (Reference Proposal Preparation and Format Instruction).
E. To determine which proposal represents the best overall value, the Government will conduct a tradeoff analysis, comparing the strengths and weaknesses of the competing proposals to determine which proposal represents the best value to the Government and thus shall receive contract award.
F. The Government reserves the right to accept other than the lowest priced offer. The right is also reserved to reject any and all offers. The basis of the award will be a conforming offer, the price or cost of which may or may not be the lowest. If other than the lowest offer, it must be sufficiently more advantageous than the lowest offer to justify the payment of additional amounts.
G. Award will result in a firm-fixed-price contract. It is the Offeror’s responsibility to ensure the submitted price proposal includes all costs for total project requirements and completion in accordance with the specifications and drawings herein. The Offeror assumes all risk for omissions in prime and/or subcontractor proposals.
H. The Government evaluation team will consider all information provided in the proposal individually. Once these individual analyses are completed, the team will meet and determine a rating by consensus decision.
I. Exceptions to the contractual terms and conditions of the solicitation (e.g., standard company terms and conditions) may result in a determination to reject a proposal.
J. Failure to submit all the data in the format indicated in this section may be cause for determining a proposal incomplete and, therefore, not considered for evaluation and for subsequent award.
K. A Determination of Responsibility will be accomplished for the apparent awardee prior to processing the award. Information obtained from government and commercial systems will be used to determine responsibility. Any information received by the Government that would be cause for an adverse Determination of Responsibility will make the offeror ineligible for award.
SDVOSB Verification: The Government will review SBA certification database (https://certifications.sba.gov/) to confirm Service-Disabled Veteran-owned Small Business (SDVOSB) status certification for the submitted proposals. Evaluations will be performed on proposals submitted by verified SDVOSBs only. Subsequent confirmation of SDVOSB certification status will be performed for the apparent award. For a Joint Venture to be considered eligible as a SDVOSB if the joint venture 13 CFR 128.402 and the managing joint venture partner makes the representations under paragraph (c) of this clause. A joint venture agrees that, in the performance of the contract, the applicable percentage specified in paragraph 852.219-73(d)(3) of the clause will be performed by the aggregate of the joint venture participants. Failure of a prospective SDVOSB to meet these certification requirements by the SBA shall result in elimination from consideration. Joint Venture -- Any offeror submitting a proposal as a joint venture must provide a certification from each SDVOSB joint partner, signed by an authorized official of each partner to the joint venture, stating that the parties to the joint venture:
1) Have entered into a joint venture agreement that fully complies with paragraph (c) of 13 CFR § 128.402; and
2) Will perform the contract in compliance with the joint venture agreement. Failure to submit the certification with the offeror’s proposal will render the offeror ineligible for award.
L. Limitations on Subcontracting Certificate. The prospective offeror must complete certification -- 852.219-75 VA Notice of Limitations on Subcontracting—Certificate of Compliance for Services and Construction (Jan 2023) (DEVIATION)
M. To be eligible for an award, if applicable, offerors must have submitted the required Federal Contractor Veterans’ Employment Report (VETS-4212 Report) with respect to the preceding fiscal year if the contractor was subject to the reporting requirements in accordance with 52.222-37.
N. Safety or Environmental Violations and Experience Modification Rate (EMR):
a. Offerors shall submit information pertaining to their past Safety and Environmental record. The information must contain a certification that the bidder/offeror has no more than three (3) serious, or one (1) repeat or one (1) willful OSHA or any EPA violation(s) in the past three years. If such certification cannot be made, a Bidder/Offeror shall explain why and submit as much information as possible regarding the circumstances of its past safety and environmental record, including the number of EPA violations and/or the number of serious, repeat, and/or willful OSHA violations, along with a detailed description of those violations.
b. Offerors shall submit information regarding their current Experience Modification Rate (EMR). This information shall be obtained from the Bidder’s/Offeror’s insurance carrier and be furnished on the insurance carrier’s letterhead. If a Bidder/Offeror’s EMR is above 1.0, the Offeror must submit a written explanation of the EMR from its insurance carrier furnished on the insurance carrier’s letterhead, describing the reasons for the EMR, and the anticipated date the EMR may be reduced to 1.0 or below.
c. Self-insured contractors or other contractors who cannot provide their EMR rating on insurance letterhead must obtain a rating from the National Council on Compensation.
d. Insurance, Inc. (NCCI) by completing/submitting form ERM-6 and providing the rating on letterhead from NCCI. Note: Self-insured contractors or other contractors that cannot provide EMR rating on insurance letterhead from the states or territories of CA, DE, MI, NJ, ND, OH, PA, WA, WY, and PR shall obtain their EMR rating from their state-run worker’s compensation insurance rating bureau.
e. If the NCCI cannot issue an EMR because the Bidder/Offeror lacks insurance history, the Offeror shall submit a letter indicating so from its insurance carrier furnished on the insurance carrier’s letterhead and include a letter from the NCCI indicating that is has assigned Bidder/Offeror a Unity Rating of 1.0.
f. The above information, along with other information obtained from Government systems, such as the OSHA and EPA online inspection history databases, will be used to make an initial Determination of Responsibility.
g. This requirement applies to all subcontracting tiers, and prospective prime contractors are responsible for determining the responsibility of their prospective subcontractors.
2.3 GENERAL SOLICITATION INFORMATION
I. GENERAL PROPOSAL INFORMATION
A. PROPOSAL MATERIALS
Proposal materials consisting of drawings, specifications, contract forms, and any issued Amendments will be posted at www.sam.gov. This is the only official location where these documents can be obtained, and updates are posted. No ‘hard copy’ proposal materials are available.
B. WAGE DETERMINATION:
Wages for all contractors and subcontractors must comply with Construction Wage Rate Requirements (Reference 52.222-6 for further information). The current determination is General Decision AL20260078 dated 5/18/2026, Attachment 5. Be advised the determination that is current at the time of the contract award is the determination that will apply to the contract. Current determinations are always available at https://sam.gov.
II. DATABASE REGISTRATION INFORMATION
A. SYSTEM FOR AWARD MANAGEMENT REGISTRATION
The System for Award Management (SAM) is the Official U.S. Government system that consolidated the capabilities of the Central Contractor Registration (CCR including FedReg), Online Representations and Certifications Application (ORCA), and the Excluded Parties List System (EPLS). Federal Acquisition Registrations require that federal contractors register in SAM at www.sam.gov and enter all mandatory information into the system.
Please Note: System updates may lag policy updates. The System for Award Management (SAM) may continue to require entities to complete representations based on provisions that are not included in agency solicitations. Examples include 52.222-25, Affirmative Action Compliance, and paragraph (d) of 52.212-3, Offeror Representations and Certifications—Commercial Products and Commercial Services. Contracting Officers will not consider these representations when making award decisions or enforce requirements. Entities are not required to, nor are they able to, update their entity registration to remove these representations in SAM.
B. THE EXCLUDED PARTIES LIST SYSTEM (EPLS)
To ensure that the individuals or businesses providing services under the contract have not engaged in fraud or abuse regarding Sections 1128 and 1128A of the Social Security Act regarding federal health care programs, the contractor is required to check the Excluded Parties List System (EPLS) located at www.sam.gov for each person or business providing services under this contract. During the performance of this contract, the Contractor is prohibited from using any individual or business listed on the List of Excluded Individuals/Entities.
C. VETS-4212 REPORTING REQUIREMENT
Contractors are required to submit a required annual Form VETS-4212, Federal Contractor Veterans' Employment Report in all cases where the contractor or subcontractor has received an award of $150,000 or more in any fiscal year. Contracting Officers are prohibited from awarding a contract to a contractor that has not submitted a required VETS-4212 Report with respect to the preceding fiscal year if the contractor was subject to the reporting requirement of 38 U.S.C. 4212(d). Submit this report as soon as possible, if not already submitted, to avoid delays in the contract award process.
For more information on this requirement and/or for completing the web-based reporting form, visit https://www.dol.gov/agencies/vets/programs/vets4212.
Certifications and Other Statements of Offerors, and FAR clause 52.222-37, Employment Reports on Veterans (JUN 2020) under the General Conditions.
III. BONDING INFORMATION
A. BID GUARANTEE
A bid guarantee is required in an amount not less than 20 percent of the proposal price but shall not exceed $3,000,000. Failure to furnish the required bid guarantee in the proper form and amount by the proposal submission date and time shall require rejection in all cases except those listed in Federal Acquisition Regulation (FAR) 28.101-4. Bid Bonds must be provided using Standard Form 24 (see FAR 28.106-1), and the form must be a scanned copy of an original (no whiteouts, clear signatures, seals must be evident and visible) and contain the proper solicitation number, proposal due date, and be from a corporate surety listed in Department of Treasury Circular 570. Individual sureties have to be acceptable to the Contracting Officer (see FAR 28.203) and be accompanied by Standard Form 28 Affidavit of Individual Surety.
B. PERFORMANCE AND PAYMENT BONDS
In accordance with Contract Clause 52.228-15 and FAR 28.102, Contractors are reminded that any amount awarded between $35,000.00 to $150,000 shall require a Payment Bond (SF 25A) or an Irrevocable Letter of Credit (ILC), and awards exceeding $150,000.00 shall require both Payment and Performance Bonds (SF 25). Payment and Performance bonds are due no later than 10 days after notification of award as instructed by the contracting officer. The bonds shall contain no whiteouts or other corrections. Payment and Performance bonds are required in the penal sum of 100% of the contract's price.
IV. SECURITY/BADGING
A. Contractor employee (s) may be required to obtain security screenings and/or ID badges for employees through VA prior to the start of any work on site depending upon length of work time on site. The contractor must coordinate badge requests with the respective Contracting Officer Representative (COR). Any PIV Badging requires two (2) trips to a VA facility and the time required to complete the necessary paperwork. One trip is for completing the electronic fingerprinting, and the other to pick up the PIV Badge.
B. ROSTER: Within 15 days after issuance of the notice to proceed or as agreed to with the Contracting Officer, the Contractor should provide a roster of Contractor and Subcontractor employees to the COR to begin their background investigation.
C. FORMS: Contractor personnel will need to complete the forms listed below depending upon the length of facility access needed:
D. Employee access for less than 6 months: Fingerprint request form (PIV Office Fingerprint Request Form (Updated 3-1-2020)) and SAC form (SAC FORM (NEW)) Any VA PIV facility can take fingerprints; not necessarily where the work is to be performed.
E. Employee access for les greater than 6 months: Fingerprint request form, SAC form, Contractor Background Investigation Request (Contractor Background Investigation Request Form 06-03-2021), OPM optional form 306 (of306) Personnel shall submit all required information related to their background investigations utilizing the Office of Personnel Management’s (OPM) Electronic Questionnaire for Investigations Processing (e-QIP) after receiving an email notification from the Security and Investigation Center (SIC). Emails will be sent to employees requiring completion.
F. BADGING STEPS: After completing forms, the following steps need to be followed to obtain a badge.
1) Fingerprints: Need to schedule fingerprinting in coordination PIV Office. Fingerprint request form and SAC form must be brought to the PIV office along with two forms of valid ID when Contractor gets fingerprinted. Contractor informs COR of employees that have been fingerprinted and sends COR all the required forms. Only electronic fingerprints are authorized.
2) Adjudication: COR submits the paperwork to the required office for adjudication. COR receives confirmation that the Contractor is favorably adjudicated, or contractor answers follow up questions. The Contractor, when notified of an unfavorably adjudicated background investigation on a Contractor employee as determined by the Government, shall withdraw the employee from consideration in working under the contract.
3) Sponsor: COR will let the Contractor know when they have been sponsored.
4) Badging: Contractor schedules an appointment using https://portal.usaccess.gsa.gov/scheduler. Note: This link is best used in Google Chrome. Contractor personnel must bring two forms of valid ID when picking up a badge.
C. COMPLIANCE: Failure to comply with the Contractor personnel security investigative requirements may result in loss of physical and/or logical access to the VA Facility and systems by Contractor and Subcontractor employees. Employees must follow all HSPD-12 policies and procedures and use and protect their assigned identity credentials per VA policies and procedures, display their badges at all times, and return the identity credentials upon termination of their relationship with VA.
NOTE: VA SECURITY PROCEDURES ARE SUBJECT TO CHANGE WITHOUT NOTICE.
V. INVOICES:
A. All payments by the Government to the contractor will be made in accordance with: FAR 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER – SYSTEM FOR AWARD MANAGEMENT (OCT 2018)
B. Invoices shall be submitted per FAR 52.232-5 Payments under Fixed-Price Construction Contracts (May 2014) and 852.232-70 Payments Under Fixed-Price Construction Contracts (Without NAS-CPM) (NOV 2018). For detailed instructions, refer to Attachment 6 Invoicing.
2.4 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS-SECONDARY SITE OF THE WORK. (DEVIATION SEP 2025)
(a) (1) The offeror must notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror must request a determination from the Contracting Officer.
(b) (1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror must request a wage determination from the Contracting Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror’s request for a wage determination for a secondary site of the work.
(End of provision)
2.5 52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (MAY 2014) ALTERNATE II (NOV 2023)
(a) Definitions. "Bahraini, Mexican, or Omani construction material," "commercially available off-the-shelf (COTS) item," "construction material," "designated country construction material," "domestic construction material," and "foreign construction material," as used in this provision, are defined in the clause of this solicitation entitled "Buy American—Construction Materials Under Trade Agreements" (Federal Acquisition Regulation (FAR) clause 52.225-11).
(b) Requests for determination of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute should submit the request to the Contracting Officer in time to allow a determination before submission of offers. The offeror shall include the information and applicable supporting data required by paragraphs (c) and (d) of FAR clause 52.225-11 in the request. If an offeror has not requested a determination regarding the inapplicability of the Buy American statute before submitting its offer, or has not received a response to a previous request, the offeror shall include the information and supporting data in the offer.
(c) Evaluation of offers.
(1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction materials, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(4)(i) of FAR clause 52.225-11.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers.
(1) When an offer includes foreign construction material, except foreign construction material from a designated country other than…