534-23-910 - Environmental Survey Report.pdf

PDF 15 MB Posted

Attached to
VISN 7 CONSTRUCTION MATOC 36C24726R0026 - SOLICITATION
Solicitation number
36C24726R0026
Issued by

About this file

This is a Regulated Building Materials Survey Report prepared for the A/E Renovate Restrooms, Stairwells, and Doors project (VA Project No. 534-23-910) at the Charleston VA Medical Center located at 109 Bee Street, Charleston, South Carolina. The survey was conducted by Mabbett & Associates, Inc. on September 25-26, 2024, by SCDES licensed asbestos inspectors in coordination with ECS Southeast, LLP.

The survey identified asbestos-containing materials (ACM) and lead-containing paint (LCP) within the facility to support abatement planning and scope development. For ACM assessment, 329 bulk samples were collected from 57 homogeneous areas and analyzed via polarized light microscopy (PLM) and transmission electron microscopy (TEM) according to EPA NESHAP and AHERA protocols. Results identified six materials containing asbestos: black pipe insulation mastic (8% chrysotile, 20 linear feet); ceramic wall tile mortar (2% chrysotile, 1,200 square feet); cream floor tile mastic (3% chrysotile, 100 square feet); fire doors on floors 3-5 (650 each, assumed ACM); black and yellow floor mastic in stairwell landings (1,260 square feet, previously identified); and round cementitious transite pipe on floors 2-5 (300 square feet, previously identified). For LCP assessment, 27 paint chip samples were collected and analyzed via atomic absorption spectroscopy; one sample from a plaster wall on the first floor stairwell tested at 0.018% lead concentration, below the HUD threshold of 0.5% by weight. All samples were submitted under chain of custody procedures to the EPA and NIST-accredited Scientific Analytical Institute in Greensboro, North Carolina. The report recommends appropriate handling and abatement procedures for identified regulated materials during renovation activities.

View the file

Other files

File Type Posted
RFI LOG AMENDMENT 0013_ SEED 1 AND 2.pdf PDF
Seed 2_Project 557-20-101_27 13 23_Comm Optical Fiber Backbone Cabling.pdf PDF
RFI LOG AMENDMENT 0011_ SEED 2 REVISED.pdf PDF
36C24726R0026 0012.pdf PDF
36C24726R0026 0011.pdf PDF
RFI LOG AMENDMENT 0011_ SEED 2.pdf PDF
RFI LOG AMENDMENT 0009_SEED 1_ SEED 2_ MATOC RFP.pdf PDF
36C24726R0026 0008.pdf PDF
ATTACHMENT 14 - SEED 2_WAGE DETERMINATION GA20260095 05 18 2026.pdf PDF
RFI LOG AMENDMENT 0006_SEED 2 - Revised.pdf PDF
ATTACHMENT 11 - SEED 1_WAGE DETERMINATION SC20260023 05 18 2026.pdf PDF
Seed 1_534-23-910 SOW Rev1 - Final.pdf PDF
Seed 3_619A4-25-102 Wage Rates AL20260078 01 02 2026.pdf PDF
Seed 2_557-20-101 - Photos_RFI 262 263.docx DOCX document
Seed 2_557-20-101 - Monitors.jpg JPG image
Seed 2_557-20-101 - Zone Valve.jpg JPG image
Seed 2_557-20-101 -Zone Valve A133-5.jpg JPG image
Seed 2_557-20-101- CT_GE Revolution Apex spec sheet_brosh.pdf PDF
Seed 2_557-20-101 -Signa Voyager 1_5 MRI.pdf PDF
Seed 2_557-20-101 -GC85A Site planning - Samsung Healthcare.pdf PDF
Seed 2_557-20-101 -HME_DR_GC85A_Datasheet_v43_230316_FDA.pdf PDF
Seed 2_557-20-101 -gehealthcare-brochure_idxa_pdf.pdf PDF
Seed 2_557-20-101 Ultrasound_RS85PrestigeTechSpecv2051RS85145rev01.pdf PDF
RFI LOG AMENDMENT 0006_MATOC RFP.pdf PDF
Seed 2_557-20-101 - VA Radiology - CD100 Final Bid Documents - Combined Set - SIGNED.pdf PDF
Seed 2_557-20-101 - Med Gas Master Alarm Panel.jpg JPG image
Seed 2_557-20-101 -Probe Cabinet specs.pdf PDF
RFI LOG AMENDMENT 0005_Seed 1.pdf PDF
534-23-910 VA Charleston Stairwells Restrooms and Doors - Revision 2.pdf PDF
36C24726R0026 0004.pdf PDF
RFI LOG AMENDMENT 0004_RFP.pdf PDF
RFI LOG AMENDMENT 0003.pdf PDF
RFI LOG AMENDMENT 0002.pdf PDF
SEED 2 - SPECIFICATION COMBINED - FINAL BID DOCUMENTS.pdf PDF
36C24726R0026 0002.pdf PDF
36C24726R0026 0001.docx DOCX document
36C24726R0026 AMENDMENT 0001 RFI LOG.pdf PDF
ATTACHMENT 8R - SEED 1_PROJECT 534-23-910_SPECIFICATIONS REV 4.pdf PDF
ATTACHMENT 3 - PAST PERFORMANCE QUESTIONAIRE.docx DOCX document
ATTACHMENT 6 - INVOICING.pdf PDF
ATTACHMENT 8 - SEED 1_PROJECT 534-23-910_SPECIFICATIONS.pdf PDF
ATTACHMENT 9 - SEED 1_PROJECT 534-23-910_ FINAL CONSTRUCTION DOCUMENTS VOL I.pdf PDF
ATTACHMENT 12 - SEED 2_PROJECT 557-20-101 SPECS FINAL.pdf PDF
ATTACHMENT 16 - SEED 3_PROJECT 619A4-25-102_100 FINAL DWGs.pdf PDF
ATTACHMENT 1 - CONTRACTOR EXPERIENCE FORM.docx DOCX document
ATTACHMENT 2 - CONTRACTOR SURETY LIMITATION.docx DOCX document
ATTACHMENT 7 - ITEMIZED COST BREAKDOWN.xlsx XLSX spreadsheet
ATTACHMENT 19 - VAAR 852.219-75 VA Notice of Limitations on Subcontracting Jan 2023 Deviation.pdf PDF
ATTACHMENT 10 - SEED 1_ PROJECT 534-23-910_ FINAL CONSTRUCTION DOCUMENTS VOL II.pdf PDF
ATTACHMENT 13 - SEED 2_PROJECT 557-20-101 DRAWINGS.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

p

REGULATED BUILDING MATERIALS

SURVEY REPORT

A/E Renovate Restrooms, Stairwells, and Doors VA Project No. 534-23-910

Charleston VA Medical Center 109 Bee Street Charleston, SC 29401

Mabbett Project No. R2024076.000

November 20, 2024

Prepared For:

ThinkForm Design Architect, LLC 38 East Broad Street, Suite 3 Hopewell, NJ 08525

© 2024, Mabbett & Associates, Inc.

Mabbett & Associates, Inc. www.mabbett.com 105 Central Street, Suite 4100 Stoneham, MA 02180-1260 T. 781-275-6050 F. 781-954-5155 Massachusetts | Virginia | Rhode Island | New York

REGULATED BUILDING MATERIALS SURVEY REPORT

Renovate Restrooms, Stairwells, and Doors | Charleston VAMC

© 2024, Mabbett & Associates, Inc. Page i November 20, 2024 Project No. R2024076.000 ThinkForm_Charleston VAMC Stairs, Etc_RBM Survey Report

ACKNOWLEDGEMENT

This Regulated Building Materials Survey Report has been prepared by Mabbett & Associates, Inc. (Mabbett®) for the Renovate Restrooms, Stairwells, and Doors Project, VA Project No. 534-23-910 at the Charleston VA Medical Center located at 109 Bee Street in Charleston, South Carolina. The information presented herein is based on the facts and information conveyed to or received by Mabbett during the preparation of this report. If any of the information provided to Mabbett that was used in preparing this report is incorrect, incomplete, or subject to change, Mabbett would wish to alter its opinions accordingly. In addition, the professional opinions and information contained in this report are based solely on the requirements of the applicable regulations and technical data as known to Mabbett as of the date of this report and considered applicable to this report.

Mabbett does not claim to have identified all hazardous materials that could be present in the facility. Mabbett has conducted this assessment with reasonable care and has performed this project in accordance with industry standards. There can be no assurances, and Mabbett makes no assurances, that the information, research, and technology used to prepare this report may not change in the future, thus affecting the results reported herein.

The attached Regulated Building Materials Survey Report was prepared by Mr. Kevin M. Donovan, Regulated Building Materials Consultant of Mabbett & Associates, Inc.

This report has been reviewed and approved by:

Michael F. Delaney Practice Lead, Building Sciences

KMD/MFD

© 2024, Mabbett & Associates, Inc. Page ii November 20, 2024

TABLE OF CONTENTS

SECTION PAGE

1.0 INTRODUCTION

1.1 Purpose and Objectives

1.2 Summary of Survey Results

2.0 ASBESTOS CONTAINING MATERIAL (ACM) SURVEY

2.1 Sampling Methodology

2.2 Analytical Methodology

2.3 ACM Results

3.0 LEAD CONTAINING PAINT (LCP) SURVEY

3.1 Sampling Methodology

3.2 Analytical Methodology

3.3 LCP Results

4.0 RECOMMENDATIONS

4.1 Asbestos

4.2 Lead Containing Paint

TABLES

Table 1 Estimated Quantities of Asbestos Containing Materials Table 2 Summary of Lead Paint Chip Analytical Results

FIGURES

RBM-1 ACM and LCP Sampling Location Plan – Level 1 RBM-2 ACM and LCP Sampling Location Plan – Level 2 RBM-3 ACM and LCP Sampling Location Plan – Level 3 RBM-4 ACM and LCP Sampling Location Plan – Level 4 RBM-5 ACM and LCP Sampling Location Plan – Level 5 RBM-6 ACM and LCP Sampling Location Plan – Level 6

APPENDICES

Appendix A Summary of Asbestos Bulk Sampling Results Appendix B ACM Laboratory Report and Chain of Custody Documentation Appendix C Paint Chip Laboratory Report and Chain of Custody Documentation

© 2024, Mabbett & Associates, Inc. Page 1 November 20, 2024

1.0 INTRODUCTION

Mabbett and Associates, Inc. (Mabbett®), with support from local asbestos inspection consulting firm ECS Southeast, LLP (ECS), performed a survey for regulated building materials (RBM) as part of the A/E Renovate Restrooms, Stairwells, and Doors project at the Charleston VA Medical Center located in Charleston, South Carolina, VA Project No. 534-23-910. The survey was limited to the locations outlined in the A/E SOW. Site survey work was performed on September 25 and 26, 2024, by SCDES licensed asbestos inspectors Mr. Jacob T. Walsh and Mr. Kevin M. Donovan of Mabbett and Mr. Julian P. Lago of ECS and consisted of the following activities:

Asbestos Containing Material (ACM) survey of suspect materials (analysis by Polarized Light Microscopy [PLM] and Transmission Electron Microscopy [TEM]); and

Lead Containing Paint (LCP) sampling (analysis by atomic absorption [AA] spectroscopy).

1.1 Purpose and Objectives

This regulated building material survey was comprised of three primary project tasks including:

Evaluation of existing site conditions and formulation of a sampling plan;

Site survey to collect building material samples for laboratory analysis; and Development of this Regulated Building Materials Survey Report.

This project was designed to accomplish two primary objectives: (1) to collect a representative number of building materials for laboratory analysis and reporting; and (2) to use data from the laboratory analysis efforts to estimate the volume of hazardous and regulated building materials present within the building’s interior and exterior for subsequent use in development of an abatement scope. These two objectives were met through a combination of a site inspection to collect building material samples for laboratory analysis; interpretation of qualitative data collected in the field; and the quantitative laboratory data generated from analysis of the building materials as summarized in this survey report.

1.2 Summary of Survey Results

As required by State and Federal regulations, bulk samples of suspected ACM were collected by Mabbett and submitted using chain of custody (COC) procedures to Scientific Analytical Institute (SAI) of Greensboro, North Carolina. SAI is accredited by the National Voluntary Laboratory Accreditation Program (NVLAP) and National Institute Standards and Technology (NIST). The Environmental Protection Agency (EPA) and the Occupational Safety and Health Administration (OSHA) defines ACM as any material that contains greater than one percent (>1%) asbestos.

Paint chip samples were collected by Mabbett for lead analysis using AA spectroscopy and submitted under COC procedures to SAI.

Current survey efforts yielded the following results:

Three hundred and twenty-nine (329) bulk samples for suspect ACM were collected for laboratory analysis and reporting. Six (6) materials were determined to contain asbestos or were previously identified as ACM.

Twenty-seven (27) Paint chip samples were collected from painted building surfaces collected during this survey effort. One (1) revealed concentrations of lead in paint that exceed the U.S. Department of Housing and Urban Development (HUD) threshold of 0.5 percent by weight.

© 2024, Mabbett & Associates, Inc. Page 2 November 20, 2024 Project No. R2024076.000 ThinkForm_Charleston VAMC Stairs, Etc_RBM Survey Report

2.0 ASBESTOS CONTAINING MATERIAL (ACM) SURVEY

The asbestos survey was performed on September 25 and 26, 2024, by Mabbett’s SCDES licensed asbestos inspectors Mr. Jacob T. Walsh (BI-002304) and Mr. Julian P. Lago (BI-01643) of ECS Southeast. Prior to collecting samples, a visual screening assessment was conducted to identify locations of suspect ACM and develop a sampling plan.

Only areas that were accessible during the field work phase were included in the survey, with reasonable efforts made to access areas needed to complete the asbestos survey and sampling program. Any unsampled or new materials discovered during demolition activities must be sampled and submitted to a laboratory for analysis.

Destructive investigation of operating equipment was not conducted.

2.1 Sampling Methodology

Bulk samples for asbestos analysis were collected using EPA National Emissions Standards for Hazardous Air Pollutants (NESHAP), 40 CFR Part 763, and Asbestos Hazard Emergency Response Act (AHERA) protocols. Bulk suspect ACM sampling was conducted according to the following standard sampling protocol:

Friable surfacing material:

• At least three bulk samples shall be collected from each homogeneous area of surfacing material that is 1,000 ft2 or less;

• At least five bulk samples shall be collected from each homogeneous area of surfacing material that is greater than 1,000 ft2 but less than or equal to 5,000 ft2; and

• At least seven bulk samples shall be collected from each homogeneous area of surfacing material that is greater than 5,000 ft2.

Thermal system insulation:

• At least three bulk samples shall be collected from each homogeneous area of thermal system insulation;

• At least one bulk sample shall be collected from each homogeneous area of patched thermal system insulation;

• Sufficient samples shall be collected from elbows and fittings; and

• Bulk samples shall not be collected from any homogeneous area where the inspector determines that the thermal system insulation is fiberglass, foam glass, rubber, or other non-ACM.

Miscellaneous material (e.g., joint compound, roofing, gaskets, floor coverings, decorative coatings, wire insulation):

• At least two bulk samples shall be collected from each homogeneous area of miscellaneous material that is less than 100 ft2; and

• At least three bulk samples shall be collected from each homogeneous area of miscellaneous material that is greater than 100 ft2.

Areas that were inaccessible or where the survey was limited to visual observation only:

Within walls Within enclosed pipe/duct chases Inside mechanical equipment/ductwork Inside electrical equipment Fire doors

© 2024, Mabbett & Associates, Inc. Page 3 November 20, 2024 Project No. R2024076.000 ThinkForm_Charleston VAMC Stairs, Etc_RBM Survey Report

2.2 Analytical Methodology

Three-hundred and twenty-nine (329) bulk samples were collected from fifty-seven (57) homogeneous areas and submitted under chain of custody (COC) procedures to SAI. Bulk samples were analyzed by phase light microscopy (PLM) with EPA Method 600/R-93/116. In accordance with ASTM E2356, samples of Non-Friable Organically Bound (NOB) materials were analyzed by PLM, NOB samples that were identified as non-ACM by PLM methods were re-analyzed by at least one TEM analysis.

2.3 ACM Results

The EPA, Occupational Safety and Health Administration (OSHA), and the SCDES define any material that contains greater than one percent (>1%) asbestos as ACM. Three (3) of the materials sampled as part of this survey were determined to contain greater than one percent (>1%) asbestos. Three (3) materials were previously identified or assumed to be ACM. A summary of bulk sample results is provided in Appendix A.

Estimated quantities of materials identified as ACM during this survey are presented in Table 1.

TABLE 1

Estimated Quantities of Asbestos Containing Materials

Renovate Restrooms, Stairwells, and Doors Charleston VAMC, Charleston SC

Sample Location Description of Material Percent and Type of Asbestos

Estimated Quantity

4th Floor, Rooms 463 & 464 Black Pipe Insulation Mastic 8% Chrysotile 20 LF

1st Floor, Rooms A183, B136, and B152 Ceramic Wall Tile Mortar 2% Chrysotile 1,200 SF

1st Floor, Stairwell 2 by Landing 12” x 12” Cream Floor Tile Mastic 3% Chrysotile 100 SF

3rd, 4th, and 5th Floor Hallways Fire Doors Assumed ACM 650 EA

Stairwells 1, 2, 3, 4, 5, and 6 at Landings

Black Floor Mastic Below Yellow Floor Mastic

Previously Identified 1,260 SF

2nd to 5th Floor, by Stairwell 4 Round Cementitious "Transite" ACM Pipe Previously

Identified 300 SF

Notes: SF = Square Feet, LF = Lineal Feet, EA = Each

© 2024, Mabbett & Associates, Inc. Page 4 November 20, 2024 Project No. R2024076.000 ThinkForm_Charleston VAMC Stairs, Etc_RBM Survey Report

3.0 LEAD CONTAINING PAINT (LCP) SURVEY

An LCP survey was conducted by collecting and analyzing paint chips from painted surfaces and systems that may be impacted by the Renovate Restrooms, Stairwells, and Doors project.

3.1 Sampling Methodology

Paint chip samples are collected using a sharp hand tool to score and peel paint off an approximate 1 square inch area of the substrate. Different tools such as chisels, putty knives, and hammers may also be needed in the collection of paint chips. All tools are cleaned after each sampling to prevent cross contamination. Collected paint chip samples are submitted under COC procedures to an accredited laboratory and analyzed via atomic absorption

(AA).

3.2 Analytical Methodology

The regulations addressing LCP in non-residential buildings are focused on occupational exposures involved with paint-disturbing activities and related waste-disposal activities. Occupational exposure to lead is regulated by OSHA regulation 29 CFR 1926.62, Lead in Construction, as well as other applicable state and local regulations.

An LCP survey cannot determine a safe level of lead for the purpose of paint-disturbing/waste-disposal activities but is intended to provide guidance as to the locations of surfaces containing lead. Contractors may use this information to better determine where worker exposures to airborne lead and other hazards may occur. They can then assess the potential magnitude of exposure to their employees and identify the controls necessary to limit health risks. This information can also be used for pre-characterization of demolition waste streams prior to toxicity characteristic leaching procedure (TCLP) sampling in accordance with 40 CFR Part 261.

Twenty-seven (27) samples, each from a different homogenous areas were collected during this survey. Paint chip samples were submitted using COC procedures to Scientific Analytical Institute (SAI) of Greensboro, North Carolina for analysis. Analysis was conducted using EPA SW-846 Test Method 7000B: Flame Atomic Absorption Spectrophotometry.

3.3 LCP Results

A concentration of lead greater than or equal to 0.5 percent by weight (equivalent to 5,000 ppm) or 1.0 mg/cm² exceeds EPA and HUD residential standards and is considered an indicator of risk. The results of this LCP sampling survey indicate one (1) sample that indicates risk and is presented in Table 2. The laboratory report and COC documentation are provided in Appendix C.

© 2024, Mabbett & Associates, Inc. Page 5 November 20, 2024 Project No. R2024076.000 ThinkForm_Charleston VAMC Stairs, Etc_RBM Survey Report

TABLE 2

Summary of Lead Paint Chip Analytical Results

Renovate Restrooms, Stairwells, and Doors Charleston VAMC, Charleston SC

Sample # Location Substrate and Component Color Concentration (% by weight)

PC-Pb-01 1st Floor, Stairwell 1 Plaster Wall White 0.018% PC-Pb-02 2nd Floor, Stairwell 1 Metal Pipe Red <0.0050% PC-Pb-03 5th Floor, Stairwell 1 Metal Railing Brown 0.11% PC-Pb-04 2nd Floor, Stairwell 2 Metal Door Frame Brown <0.0054 PC-Pb-05 4th Floor, Stairwell 2 Metal Newl Post Brown <0.0060 PC-Pb-06 4th Floor, Stairwell 2 Plaster Ceiling White <0.0050 PC-Pb-07 1st Floor, Stairwell 3 Plaster Wall White <0.0036 PC-Pb-08 4th Floor, Stairwell 3 Metal Stair Stringer Blue 0.0078% PC-Pb-09 5th Floor, Stairwell 3 Plaster Wall Yellow <0.0047 PC-Pb-10 5th Floor, Stairwell 4 Metal Newl Post Brown 0.0080% PC-Pb-11 5th Floor, Stairwell 4 Metal Door Frame White <0.0030 PC-Pb-12 1st Floor, Stairwell 5 Metal Pipe Red 0.88% PC-Pb-13 3rd Floor, Stairwell 5 Gypsum Wall Blue <0.0037 PC-Pb-14 2nd Floor, Stairwell 6 Metal Railing Brown 0.29% PC-Pb-15 3rd Floor, Stairwell 6 Metal Stair Stringer Brown 0.013% PC-Pb-16 3rd Floor, Stairwell 6 Plaster Ceiling White 0.0065% PC-Pb-17 1st Floor, Room BB133 Metal Door Frame Brown 0.0046% PC-Pb-18 1st Floor, Room B136 Metal Door Tan <0.0050 PC-Pb-19 1st Floor, Room B152 Gypsum Wall Tan 0.0053% PC-Pb-20 3rd Floor, Room A378 Gypsum Wall White 0.028% PC-Pb-21 3rd Floor, Room B320 Metal Door Frame Tan 0.0039% PC-Pb-22 3rd Floor, Room B367 Metal Door Tan <0.0059 PC-Pb-23 4th Floor, Room A460 Gypsum Wall Yellow 0.0051% PC-Pb-24 4th Floor, Room B407 Metal Door Frame Tan 0.0049% PC-Pb-25 4th Floor, Room B418 Metal Door Tan <0.0035 PC-Pb-26 5th Floor, Room A549 Metal Door Tan 0.0045% PC-Pb-27 5th Floor, Room B558 Metal Door Frame Tan 0.0055%

© 2024, Mabbett & Associates, Inc. Page 6 November 20, 2024 Project No. R2024076.000 T hinkForm_Charleston VAMC Stairs, Etc_RBM Survey Report

4.0 RECOMMENDATIONS

4.1 Asbestos

The planned renovations will disturb the ACM listed in Table 1 and will require removal of these materials by a licensed asbestos abatement contractor prior to being disturbed. Any suspect materials encountered during renovation activities that were not identified in this report as being non-ACM should be assumed to be ACM unless sample results prove otherwise. Suspect ACM that may be present within the walls, above inaccessible hard ceilings, or in other inaccessible locations, should be assumed to contain asbestos if discovered during any renovation or demolition process or until otherwise verified.

4.2 Lead Containing Paint

The purpose of the LCP screening survey was to identify patterns of LCP. For the purpose of this LCP screening survey a limited amount of representative interior building components tested. The regulations addressing LCP in non-residential buildings are focused on protecting workers involved with paint-disturbing activities and related waste-disposal activities.

Occupational exposure to lead in construction is regulated by OSHA regulation 29 CFR 1926.62 “Lead in Construction”, as well as other applicable state and local regulations. These regulations involve the air monitoring of workers to determine exposure levels when disturbing paint containing measurable concentrations of lead. An LCP survey cannot determine the safe level of lead for the purpose of paint-disturbing activities but is intended to provide guidance as to the locations of LCP. Employers and contractors may use this information to better determine where worker exposures to airborne lead may occur and, through the interpretation of LCP concentration data, assess the potential magnitude of exposure to their employees and identify the controls necessary to limit health risks.

A concentration of lead greater than or equal to 0.5 mg/Kg percent by weight or 1.0 mg/cm2 exceeds EPA and HUD residential standards is considered an indicator of risk. Representative samples of LCP waste to be generated during building renovation, or following demolition but prior to disposal, should be collected and analyzed using toxicity characteristic leaching procedure (TCLP) in accordance with 40 CFR Part 261. Management and disposal of lead containing waste must be done in accordance with all applicable local, state, and federal regulations. OSHA regulations may require certain procedures for any paint that contains lead, even if it is below these levels. All LCP identified, regardless of the lead content, should either be sampled and analyzed by TCLP and then handled/disposed of accordingly, or segregated from other large-scale debris and then managed as hazardous waste in accordance with federal, state, and local hazardous waste disposal regulations.

© 2024, Mabbett & Associates, Inc. FIGURES November 20, 2024 Project No. R2024076.000 ThinkForm_Charleston VAMC Stairs, Etc_RBM Survey Report

FIGURES

ACM & LCP Sampling Location Plans

Pr oj ec t N um be r

Bu ild in g

Nu m be r

Dr aw in g

Nu m be r

Pr oj ec t T itl e

Lo ca tio n

Iss ue

D at e Ch ec ke d Dr aw n

Dr aw in g

Ti tle

Ap pr ov ed

VA

F

O R

M

A

File Path6/14/2009 12:39:03 PM

Of fic e o f

Co ns tru cti on an d F ac ilit ies

Ma na ge me nt

U S

D e p a r t m e n t o f

V e t e r a n s

A f f a i r s

B C D E F

A B C D E F

Ph as e

AR

CH

IT

EC

T

OF

R

EC

OR

D

ST

AM

P

CO

NS

UL

TA

NT

En vir on m en ta l C on su lta nt s:

Pr oj ec t D ire ct or

/21

/20

Re vis io ns

Da te

R2

.00

9 B ee S t, C ha rle sto n, SC

RE

NO

VA

TE

R

ES

TR

OO

MS

ST

AI

RW

EL

LS

, A

ND

D

OO

RS

S c i e n t i s t s

I

E n g i n e e r

P r o g r a m

M a n a g e r s

M a b b e t

A s o c i a t e s

I n c

C e n t r a l

S t r e e t

S t o n e h a m

M

A

T w w w m a b b e t t c o m

M a b b e t t

R

R E

G U

L A

T E

D

B

U I L D

I N

G S

T

E R

I A

L S

S A

M P

L I N

G

L O

C A

T I O

N

P

L A

N L E

V E

L

R B

M

D J A

M F

D

P C

P b

.D

R A

W

IN

G S

D O

N O

T C

LA

IM

T O

ID

EN

TI

FY

A

LL

T H

E A

SB

ES

TO

S

C O

N

TA

IN

IN

G M

A

TE

R

IA

L (A

C M

P

R

ES

EN

T

IN

T

H E

B U

IL

D

IN

G

A N

D S

H O

U

LD

N O

T B

E

TH

E

SO

LE

B

A

SI

S

FO

R

ID

EN

TI

FY

IN

G A

C M

F O

R F

U

TU

R E

R

EN

O V

A

TI

O N

O R

D

EM

O

LI

TI

O

N P

R O

JE

C

TS

A B

A

TE

M

EN

T

SP

EC

IF

IC

A

TI

O

N S, E

TC

. M A

B B

ET

TS

'S S

U R

V

EY

W A

S P

ER

FO

R M

ED

W

IT

H

LI

M

IT

A

TI

O

N S

IN

H

ER

EN

T

TO

N O

N -D

ES

TR

U C

TI

V

E V

IS

U

A L

IN

SP

EC

TI

O N

S.

A

N Y

SU

SP

EC

T

M A

TE

R

IA

L

EN

C

O U

N

TE

R

ED

D U

R

IN

G R

EN

O

V A

TI

O

N /D

EM

O

LI

TI

O N

T H

A T

IS

N

O T

ID

EN

TI

FI

ED

A

S B

EI

N

G N

O N

-A C

M S

H O

U

LD

B E

A

SS

U M

ED

T

O B

E A

C M

U N

LE

SS

SA

M

P

LE

R

ES

U

LT

S P

R O

V E

O

TH

ER

W

IS

E.

B A

SE

P

LA

N

O B

TA

IN

ED

F

R O

M R

O M

A N

YK

C

O N

SU

LT

IN

G

C O

R P

A

N D

P R

EP

A

R

ED

B Y

R O

M A

N

YK

C O

N

SU

LT

IN

G C

O R

P

, R

EC

EI

V

ED

/2

/2

4.

.S U

R V

EY

C

O M

P

LE

TE

D

O N

/2

/2

4 B Y

M A

B B

ET

T

A

SS

O

C

IA

TE

S, IN

C

AP

PR

O

XI

M

AT

E

SA

M

PL

E

LO

C

AT

IO

N

SA

M

PL

E

PO

SI

TI

VE

F O

R A

SB

ES

TO

S

ST

O

P

PO

SI

TI

VE

F

O R

A

SB

ES

TO

S

N O

A

SB

ES

TO

S D

ET

EC

TE

D

(N

AD

LE

AD

P

AI

N T

SA

M

PL

E

LO

C

AT

IO

N

A

A

A

P C

P b

P C

P b

P C

P b

A

A

A

P C

P b

D

A

P C

P b

P C

P b

A

A

A

B

C B

B

A

A

B

C

A

B

C

A

A

B

E

A B

C

C

C

A ec t N um be r

Bu ild in g

Nu m be r

Dr aw in g

Nu m be r

Pr oj ec t T itl e

Lo ca tio n

Iss ue

D at e Ch ec ke d Dr aw n

Dr aw in g

Ti tle

Ap pr ov ed

VA

F

O

A

File Path6/14/2009 12:39:03 PM

Of fic e o f

Co ns tru cti on an d F ac ilit ies

Ma na ge me nt

U S

D e p a r t m e n t o f

V e t e r a n s

A f f a i r s

B C D E F

A B C D E F

Ph as e

AR

CH

IT

EC

T

OF

R

EC

OR

D

ST

AM

P

CO

NS

UL

TA

NT

En vir on m en ta l C on su lta nt s:

Pr oj ec t D ire ct or

/21

/20

Re vis io ns

Da te

R2

.00

9 B ee S t, C ha rle sto n, SC

RE

NO

VA

TE

R

ES

TR

OO

MS

ST

AI

RW

EL

LS

, A

ND

D

OO

RS

S c i e n t i s n g i n e e r o g r a m

M a n a g e r s

M a b b e t s o c i a t e s

I n c

C e n t r a l

S t r e e t

S t o n e h a m

M

A w w w m a b b e t t c o m

M a b b e t t

R

R E

G U

L A

T E

D

B

U I L D

I N

T

E R

I A

L S

S A

M P

L I N

G

L O

C A

T I O

N

P

L A

N L E

V E

L

R B

M

D J A

M F

D

C

C

.D

R A

W

IN

G S

D O

N O

T C

LA

IM

T O

ID

EN

TI

FY

A

LL

T H

E A

SB

ES

TO

S

C O

N

TA

IN

IN

G M

A

TE

R

IA

L (A

C M

P

R

ES

EN

T

IN

T

H E

B U

IL

D

IN

G

A N

D S

H O

U

LD

N O

T B

E

TH

E

SO

LE

B

A

SI

S

FO

R

ID

EN

TI

FY

IN

G A

C M

F O

R F

U

TU

R E

R

EN

O V

A

TI

O N

O R

D

EM

O

LI

TI

O

N P

R O

JE

C

TS

A B

A

TE

M

EN

T

SP

EC

IF

IC

A

TI

O

N S, E

TC

. M A

B B

ET

TS

'S S

U R

V

EY

W A

S P

ER

FO

R M

ED

W

IT

H

LI

M

IT

A

TI

O

N S

IN

H

ER

EN

T

TO

N O

N -D

ES

TR

U C

TI

V

E V

IS

U

A L

IN

SP

EC

TI

O N

S.

A

N Y

SU

SP

EC

T

M A

TE

R

IA

L

EN

C

O U

N

TE

R

ED

D U

R

IN

G R

EN

O

V A

TI

O

N /D

EM

O

LI

TI

O N

T H

A T

IS

N

O T

ID

EN

TI

FI

ED

A

S B

EI

N

G N

O N

-A C

M S

H O

U

LD

B E

A

SS

U M

ED

T

O B

E A

C M

U N

LE

SS

SA

M

P

LE

R

ES

U

LT

S P

R O

V E

O

TH

ER

W

IS

E.

B A

SE

P

LA

N

O B

TA

IN

ED

F

R

M A

N

YK

C O

N

SU

LT

IN

G C

O R

P

A N

D P

R

EP

A R

ED

B

Y R

O M

A N

YK

C

O N

SU

LT

IN

G

C O

R P

, R

EC

EI

V

ED

/2

/2

4.

.S

U R

V

EY

C O

M P

LE

TE

D

/2

/2

4 B Y

M A

B B

ET

T

A

SS

O

C

IA

TE

S, IN

C

AP

PR

O

XI

M

AT

E

SA

M

PL

E

LO

C

AT

IO

N

N O

A

SB

ES

TO

S D

ET

EC

TE

D

(N

AD

LE

AD

P

AI

N T

SA

M

PL

E

LO

C

AT

IO

N

A

A

P C

P b

P C

P b

C

P C

P b

P C

P b

B

B ec t N um be r

Bu ild in g

Nu m be r

Dr aw in g

Nu m be r

Pr oj ec t T itl e

Lo ca tio n

Iss ue

D at e Ch ec ke d Dr aw n

Dr aw in g

Ti tle

Ap pr ov ed

VA

F

O

A

File Path6/14/2009 12:39:03 PM

Of fic e o f

Co ns tru cti on an d F ac ilit ies

Ma na ge me nt

U S

D e p a r t m e n t o f

V e t e r a n s

A f f a i r s

B C D E F

A B C D E F

Ph as e

AR

CH

IT

EC

T

OF

R

EC

OR

D

ST

AM

P

CO

NS

UL

TA

NT

En vir on m en ta l C on su lta nt s:

Pr oj ec t D ire ct or

/21

/20

Re vis io ns

Da te

R2

.00

9 B ee S t, C ha rle sto n, SC

RE

NO

VA

TE

R

ES

TR

OO

MS

ST

AI

RW

EL

LS

, A

ND

D

OO

RS

S c i e n t i s n g i n e e r o g r a m

M a n a g e r s

M a b b e t s o c i a t e s

I n c

C e n t r a l

S t r e e t

S t o n e h a m

M

A w w w m a b b e t t c o m

M a b b e t t

R

R E

G U

L A

T E

D

B

U I L D

I N

T

E R

I A

L S

S A

M P

L I N

G

L O

C A

T I O

N

P

L A

N L E

V E

L

R B

M

D J A

M F

D

.D

R A

W

IN

G S

D O

N O

T C

LA

IM

T O

ID

EN

TI

FY

A

LL

T H

E A

SB

ES

TO

S

C O

N

TA

IN

IN

G M

A

TE

R

IA

L (A

C M

P

R

ES

EN

T

IN

T

H E

B U

IL

D

IN

G

A N

D S

H O

U

LD

N O

T B

E

TH

E

SO

LE

B

A

SI

S

FO

R

ID

EN

TI

FY

IN

G A

C M

F O

R F

U

TU

R E

R

EN

O V

A

TI

O N

O R

D

EM

O

LI

TI

O

N P

R O

JE

C

TS

A B

A

TE

M

EN

T

SP

EC

IF

IC

A

TI

O

N S, E

TC

. M A

B B

ET

TS

'S S

U R

V

EY

W A

S P

ER

FO

R M

ED

W

IT

H

LI

M

IT

A

TI

O

N S

IN

H

ER

EN

T

TO

N O

N -D

ES

TR

U C

TI

V

E V

IS

U

A L

IN

SP

EC

TI

O N

S.

A

N Y

SU

SP

EC

T

M A

TE

R

IA

L

EN

C

O U

N

TE

R

ED

D U

R

IN

G R

EN

O

V A

TI

O

N /D

EM

O

LI

TI

O N

T H

A T

IS

N

O T

ID

EN

TI

FI

ED

A

S B

EI

N

G N

O N

-A C

M S

H O

U

LD

B E

A

SS

U M

ED

T

O B

E A

C M

U N

LE

SS

SA

M

P

LE

R

ES

U

LT

S P

R O

V E

O

TH

ER

W

IS

E.

B A

SE

P

LA

N

O B

TA

IN

ED

F

R

M A

N

YK

C O

N

SU

LT

IN

G C

O R

P

A N

D P

R

EP

A R

ED

B

Y R

O M

A N

YK

C

O N

SU

LT

IN

G

C O

R P

, R

EC

EI

V

ED

/2

/2

4.

.S

U R

V

EY

C O

M P

LE

TE

D

/2

/2

4 B Y

M A

B B

ET

T

A

SS

O

C

IA

TE

S, IN

C

AP

PR

O

XI

M

AT

E

SA

M

PL

E

LO

C

AT

IO

N

N O

A

SB

ES

TO

S D

ET

EC

TE

D

(N

AD

LE

AD

P

AI

N T

SA

M

PL

E

LO

C

AT

IO

N

A

A

P C

P b

A

B

C

C

A

A

B

C

P C

P b

P C

P b

D

B

D

P C

P b

C

E

A

E

B

D

A

A B

C

B

B

D

E

C

B

A

B

C

A

B

A

P C

P b

P C

P b

C

A

A

A

A

B

C

P C

P b

D

A

B

C

A

B ec t N um be r

Bu ild in g

Nu m be r

Dr aw in g

Nu m be r

Pr oj ec t T itl e

Lo ca tio n

Iss ue

D at e Ch ec ke d Dr aw n

Dr aw in g

Ti tle

Ap pr ov ed

VA

F

O

A

File Path6/14/2009 12:39:03 PM

Of fic e o f

Co ns tru cti on an d F ac ilit ies

Ma na ge me nt

U S

D e p a r t m e n t o f

V e t e r a n s

A f f a i r s

B C D E F

A B C D E F

Ph as e

AR

CH

IT

EC

T

OF

R

EC

OR

D

ST

AM

P

CO

NS

UL

TA

NT

En vir on m en ta l C on su lta nt s:

Pr oj ec t D ire ct or

/21

/20

Re vis io ns

Da te

R2

.00

9 B ee S t, C ha rle sto n, SC

RE

NO

VA

TE

R

ES

TR

OO

MS

ST

AI

RW

EL

LS

, A

ND

D

OO

RS

S c i e n t i s n g i n e e r o g r a m

M a n a g e r s

M a b b e t s o c i a t e s

I n c

C e n t r a l

S t r e e t

S t o n e h a m

M

A w w w m a b b e t t c o m

M a b b e t t

R

R E

G U

L A

T E

D

B

U I L D

I N

T

E R

I A

L S

S A

M P

L I N

G

L O

C A

T I O

N

P

L A

N L E

V E

L

R B

M

D J A

M F

D

.D

R A

W

IN

G S

D O

N O

T C

LA

IM

T O

ID

EN

TI

FY

A

LL

T H

E A

SB

ES

TO

S

C O

N

TA

IN

IN

G M

A

TE

R

IA

L (A

C M

P

R

ES

EN

T

IN

T

H E

B U

IL

D

IN

G

A N

D S

H O

U

LD

N O

T B

E

TH

E

SO

LE

B

A

SI

S

FO

R

ID

EN

TI

FY

IN

G A

C M

F O

R F

U

TU

R E

R

EN

O V

A

TI

O N

O R

D

EM

O

LI

TI

O

N P

R O

JE

C

TS

A B

A

TE

M

EN

T

SP

EC

IF

IC

A

TI

O

N S, E

TC

. M A

B B

ET

TS

'S S

U R

V

EY

W A

S P

ER

FO

R M

ED

W

IT

H

LI

M

IT

A

TI

O

N S

IN

H

ER

EN

T

TO

N O

N -D

ES

TR

U C

TI

V

E V

IS

U

A L

IN

SP

EC

TI

O N

S.

A

N Y

SU

SP

EC

T

M A

TE

R

IA

L

EN

C

O U

N

TE

R

ED

D U

R

IN

G R

EN

O

V A

TI

O

N /D

EM

O

LI

TI

O N

T H

A T

IS

N

O T

ID

EN

TI

FI

ED

A

S B

EI

N

G N

O N

-A C

M S

H O

U

LD

B E

A

SS

U M

ED

T

O B

E A

C M

U N

LE

SS

SA

M

P

LE

R

ES

U

LT

S P

R O

V E

O

TH

ER

W

IS

E.

B A

SE

P

LA

N

O B

TA

IN

ED

F

R

M A

N

YK

C O

N

SU

LT

IN

G C

O R

P

A N

D P

R

EP

A R

ED

B

Y R

O M

A N

YK

C

O N

SU

LT

IN

G

C O

R P

, R

EC

EI

V

ED

/2

/2

4.

.S

U R

V

EY

C O

M P

LE

TE

D

/2

/2

4 B Y

M A

B B

ET

T

A

SS

O

C

IA

TE

S, IN

C

AP

PR

O

XI

M

AT

E

SA

M

PL

E

LO

C

AT

IO

N

SA

M

PL

E

PO

SI

TI

VE

F O

R A

SB

ES

TO

S

ST

O

P

PO

SI

TI

VE

F

O R

A

SB

ES

TO

S

N O

A

SB

ES

TO

S D

ET

EC

TE

D

(N

AD

LE

AD

P

AI

N T

SA

M

PL

E

LO

C

AT

IO

N

A

A

A

P C

P b

B

P C

P b

C

E

C

A

A

D

B

E

B

C

C

P C

P b

P C

P b

P C

P b

A

C

B

E

A

B

C

A

B

C

B

P C

P b

P C

P b

A

B C

D

B

B

A

B

B C

B

A

B

A

B

C

A

B

C

A

B

C

A ec t N um be r

Bu ild in g

Nu m be r

Dr aw in g

Nu m be r

Pr oj ec t T itl e

Lo ca tio n

Iss ue

D at e Ch ec ke d Dr aw n

Dr aw in g

Ti tle

Ap pr ov ed

VA

F

O

A

File Path6/14/2009 12:39:03 PM

Of fic e o f

Co ns tru cti on an d F ac ilit ies

Ma na ge me nt

U S

D e p a r t m e n t o f

V e t e r a n s

A f f a i r s

B C D E F

A B C D E F

Ph as e

AR

CH

IT

EC

T

OF

R

EC

OR

D

ST

AM

P

CO

NS

UL

TA

NT

En vir on m en ta l C on su lta nt s:

Pr oj ec t D ire ct or

/21

/20

Re vis io ns

Da te

R2

.00

9 B ee S t, C ha rle sto n, SC

RE

NO

VA

TE

R

ES

TR

OO

MS

ST

AI

RW

EL

LS

, A

ND

D

OO

RS

S c i e n t i s n g i n e e r o g r a m

M a n a g e r s

M a b b e t s o c i a t e s

I n c

C e n t r a l

S t r e e t

S t o n e h a m

M

A w w w m a b b e t t c o m

M a b b e t t

R

R E

G U

L A

T E

D

B

U I L D

I N

T

E R

I A

L S

S A

M P

L I N

G

L O

C A

T I O

N

P

L A

N L E

V E

L

R B

M

D J A

M F

D

.D

R A

W

IN

G S

D O

N O

T C

LA

IM

T O

ID

EN

TI

FY

A

LL

T H

E A

SB

ES

TO

S

C O

N

TA

IN

IN

G M

A

TE

R

IA

L (A

C M

P

R

ES

EN

T

IN

T

H E

B U

IL

D

IN

G

A N

D S

H O

U

LD

N O

T B

E

TH

E

SO

LE

B

A

SI

S

FO

R

ID

EN

TI

FY

IN

G A

C M

F O

R F

U

TU

R E

R

EN

O V

A

TI

O N

O R

D

EM

O

LI

TI

O

N P

R O

JE

C

TS

A B

A

TE

M

EN

T

SP

EC

IF

IC

A

TI

O

N S, E

TC

. M A

B B

ET

TS

'S S

U R

V

EY

W A

S P

ER

FO

R M

ED

W

IT

H

LI

M

IT

A

TI

O

N S

IN

H

ER

EN

T

TO

N O

N -D

ES

TR

U C

TI

V

E V

IS

U

A L

IN

SP

EC

TI

O N

S.

A

N Y

SU

SP

EC

T

M A

TE

R

IA

L

EN

C

O U

N

TE

R

ED

D U

R

IN

G R

EN

O

V A

TI

O

N /D

EM

O

LI

TI

O N

T H

A T

IS

N

O T

ID

EN

TI

FI

ED

A

S B

EI

N

G N

O N

-A C

M S

H O

U

LD

B E

A

SS

U M

ED

T

O B

E A

C M

U N

LE

SS

SA

M

P

LE

R

ES

U

LT

S P

R O

V E

O

TH

ER

W

IS

E.

B A

SE

P

LA

N

O B

TA

IN

ED

F

R

M A

N

YK

C O

N

SU

LT

IN

G C

O R

P

A N

D P

R

EP

A R

ED

B

Y R

O M

A N

YK

C

O N

SU

LT

IN

G

C O

R P

, R

EC

EI

V

ED

/2

/2

4.

.S

U R

V

EY

C O

M P

LE

TE

D

/2

/2

4 B Y

M A

B B

ET

T

A

SS

O

C

IA

TE

S, IN

C

AP

PR

O

XI

M

AT

E

SA

M

PL

E

LO

C

AT

IO

N

N O

A

SB

ES

TO

S D

ET

EC

TE

D

(N

AD

LE

AD

P

AI

N T

SA

M

PL

E

LO

C

AT

IO

N

A

A

P C

P b

P C

P b

F

A

B

C

C

A

B

C

G

C

A

B

C

A

B

C

A

B C

C

A

B

C

A

B

C

P C

P b

P C

P b

P C

P b

A

B

C

C

B

A

B

C

P C

P b

A

B

C

C

C

A

B

C

A

A

B

C

F

E

P C

P b

C

A

B

C

A

B

C

C

C

A

B

C

A

B

C

A

B

C

A

B ec t N um be r

Bu ild in g

Nu m be r

Dr aw in g

Nu m be r

Pr oj ec t T itl e

Lo ca tio n

Iss ue

D at e Ch ec ke d Dr aw n

Dr aw in g

Ti tle

Ap pr ov ed

VA

F

O

A

File Path6/14/2009 12:39:03 PM

Of fic e o f

Co ns tru cti on an d F ac ilit ies

Ma na ge me nt

U S

D e p a r t m e n t o f

V e t e r a n s

A f f a i r s

B C D E F

A B C D E F

Ph as e

AR

CH

IT

EC

T

OF

R

EC

OR

D

ST

AM

P

CO

NS

UL

TA

NT

En vir on m en ta l C on su lta nt s:

Pr oj ec t D ire ct or

/21

/20

Re vis io ns

Da te

R2

.00

9 B ee S t, C ha rle sto n, SC

RE

NO

VA

TE

R

ES

TR

OO

MS

ST

AI

RW

EL

LS

, A

ND

D

OO

RS

S c i e n t i s n g i n e e r o g r a m

M a n a g e r s

M a b b e t s o c i a t e s

I n c e n t r a l

S t r e e t

S t o n e h a m

M

A w w w m a b b e t t c o m

M a b b e t t

R

R E

G U

L A

T E

D

B

U I L D

I N

T

E R

I A

L S

S A

M P

L I N

G

L O

C A

T I O

N

P

L A

N

P E

N T

H O

U S

E

R B

M

D J A

M F

D

.D

R A

W

IN

G S

D O

N O

T C

LA

IM

T O

ID

EN

TI

FY

A

LL

T H

E A

SB

ES

TO

S

C O

N

TA

IN

IN

G M

A

TE

R

IA

L (A

C M

P

R

ES

EN

T

IN

T

H E

B U

IL

D

IN

G

A N

D S

H O

U

LD

N O

T B

E

TH

E

SO

LE

B

A

SI

S

FO

R

ID

EN

TI

FY

IN

G A

C M

F O

R F

U

TU

R E

R

EN

O V

A

TI

O N

O R

D

EM

O

LI

TI

O

N P

R O

JE

C

TS

A B

A

TE

M

EN

T

SP

EC

IF

IC

A

TI

O

N S, E

TC

. M A

B B

ET

TS

'S S

U R

V

EY

W A

S P

ER

FO

R M

ED

W

IT

H

LI

M

IT

A

TI

O

N S

IN

H

ER

EN

T

TO

N O

N -D

ES

TR

U C

TI

V

E V

IS

U

A L

IN

SP

EC

TI

O N

S.

A

N Y

SU

SP

EC

T

M A

TE

R

IA

L

EN

C

O U

N

TE

R

ED

D U

R

IN

G R

EN

O

V A

TI

O

N /D

EM

O

LI

TI

O N

T H

A T

IS

N

O T

ID

EN

TI

FI

ED

A

S B

EI

N

G N

O N

-A C

M S

H O

U

LD

B E

A

SS

U M

ED

T

O B

E A

C M

U N

LE

SS

SA

M

P

LE

R

ES

U

LT

S P

R O

V E

O

TH

ER

W

IS

E.

B A

SE

P

LA

N

O B

TA

IN

ED

F

R

M A

N

YK

C O

N

SU

LT

IN

G C

O R

P

A N

D P

R

EP

A R

ED

B

Y R

O M

A N

YK

C

O N

SU

LT

IN

G

C O

R P

, R

EC

EI

V

ED

/2

/2

4.

.S

U R

V

EY

C O

M P

LE

TE

D

/2

/2

4 B Y

M A

B B

ET

T

A

SS

O

C

IA

TE

S, IN

C

AP

PR

O

XI

M

AT

E

SA

M

PL

E

LO

C

AT

IO

N

N O

A

SB

ES

TO

S D

ET

EC

TE

D

(N

AD

A

A

C

© 2024, Mabbett & Associates, Inc. APPENDIX A November 20, 2024 Project No. R2024076.000 T hinkForm_Charleston VAMC Stairs, Etc_RBM Survey Report

APPENDIX A

Summary of Asbestos Bulk Sampling Results

© 2024, Mabbett & Associates, Inc.

Project No. R2024076.000

Appendix A Page 1 of 10 November 20, 2024 ThinkForm_Charleston VAMC Stairs, Etc_RBM Survey Report

APPENDIX A

Summary of ACM Sampling Results

Renovate Restrooms, Stairwells, and Doors Charleston VAMC, Charleston, SC

Sample No. Sample Location Description of Material Percent and Type of Asbestos

01A Room 367 Red Fire Stop NAD 01B Room 460 Red Fire Stop NAD 01C Room 548 Red Fire Stop NAD

02A - A Room 368 Wallboard NAD 02A - B Room 368 Joint Compound NAD 02B - A Room 367 Wallboard NAD 02B - B Room 367 Joint Compound NAD 02C - A Room 319 Wallboard NAD 02C - B Room 319 Joint Compound NAD 02D - A Room 361 Wallboard NAD 02D - B Room 361 Joint Compound NAD 02E - A Room 356 Wallboard NAD 02E - B Room 356 Joint Compound NAD 03A - A Room 463 Wallboard NAD 03A - B Room 463 Joint Compound NAD 03B - A Room 463 Wallboard NAD 03B - B Room 463 Joint Compound NAD 03C - A Room 465 Wallboard NAD 03C - B Room 465 Joint Compound NAD 03D - A Room 403 Wallboard NAD 03D - B Room 403 Joint Compound NAD 03E - A Room 465 Wallboard NAD 03E - B Room 465 Joint Compound NAD

04A Room 464 Joint Compound NAD 04B Room 402 Joint Compound NAD 04C Room 463 Joint Compound NAD

05A - A Room 510 Wallboard NAD 05A - B Room 510 Joint Compound NAD 05B - A Room 510 Wallboard NAD 05B - B Room 510 Joint Compound NAD 05C - A Room 510 Wallboard NAD 05C - B Room 510 Joint Compound NAD 06A - A Room 534 Wallboard NAD 06A - B Room 534 Joint Compound NAD

© 2024, Mabbett & Associates, Inc.

Project No. R2024076.000

Appendix A Page 2 of 10 November 20, 2024 ThinkForm_Charleston VAMC Stairs, Etc_RBM Survey Report

APPENDIX A

Summary of ACM Sampling Results

Renovate Restrooms, Stairwells, and Doors Charleston VAMC, Charleston, SC

Sample No. Sample Location Description of Material Percent and Type of Asbestos

06B - A Room 534 Wallboard NAD 06B - B Room 534 Joint Compound NAD 06C - A Room 534 Wallboard NAD 06C - B Room 534 Joint Compound NAD 07A - A Room 548 Wallboard NAD 07A - B Room 548 Joint Compound NAD 07B - A Room 548 Wallboard NAD 07B - B Room 548 joint Compound NAD 07C - A Room 548 Wallboard NAD 07C - B Room 548 Joint Compound NAD 08A - A Room 555 Wallboard NAD 08A - B Room 555 Joint Compound NAD 08B - A Room 555 Wallboard NAD 08B - B Room 555 Joint Compound NAD 08C - A Room 555 Wallboard NAD 08C - B Room 555 Joint Compound NAD 09A - A Room A118 Wallboard NAD 09A - B Room A118 Joint Compound NAD 09B - A RoomA331 Wallboard NAD 09B - B RoomA331 Joint Compound NAD 09C - A Room A378 Wallboard NAD 09C - B Room A378 Joint Compound NAD 09D - A Room A183 Wallboard NAD 09D - B Room A183 Joint Compound NAD 09E - A Room B152 Wallboard NAD 09E - B Room B152 Joint Compound NAD 10A - A Room B136 Wall Plaster Finish NAD 10A - B Room B136 Wall Plaster Base NAD

10B Room 316 Wall Plaster NAD 10C Room 423 Wall Plaster NAD 10D Room 460 Wall Plaster NAD 10E Room 525 Wall Plaster NAD 10G Room 548 Wall Plaster NAD 11A Room B152 Pipe Insulation Mastic NAD

© 2024, Mabbett & Associates, Inc.

Project No. R2024076.000

Appendix A Page 3 of 10 November 20, 2024 ThinkForm_Charleston VAMC Stairs, Etc_RBM Survey Report

APPENDIX A

Summary of ACM Sampling Results

Renovate Restrooms, Stairwells, and Doors Charleston VAMC, Charleston, SC

Sample No. Sample Location Description of Material Percent and Type of Asbestos

11B Room B152 Pipe Insulation Mastic NAD 11C Room B152 Pipe Insulation Mastic NAD 12A Room 316 Wall Texture NAD 12B Room 316 Wall Texture NAD 12C Room 316 Wall Texture NAD 12D Room 317 Wall Texture NAD 12E Room 317 Wall Texture NAD

13A - A Room 401 Wood Vinyl Floor NAD 13 A -B Room 401 Wood Vinyl Floor Adhesive NAD 13B - A Room 403R Wood Vinyl Floor NAD 13B - B Room 403R Wood Vinyl Floor Adhesive NAD 13C - A Room 424 Wood Vinyl Floor NAD 13C - B Roo 424 Wood Vinyl Floor Adhesive NAD 13D - A Room A331 Wood Vinyl Floor NAD 13D - B Room A331 Wood Vinyl Floor Adhesive NAD 13D - C Room A331 Wood Vinyl Floor Leveling NAD 13E - A Room A378 Wood Vinyl Floor Adhesive NAD 13E - B Room A378 Wood Vinyl Floor NAD 13E - C Room A378 Wood Vinyl Floor Leveling NAD

14A Room B136 Black Duct Mastic NAD 14B Room B136 Black Duct Mastic NAD 14C Room B136 Black Duct Mastic NAD 15A Room 369 White Duct Mastic NAD 15B Room 463 White Duct Mastic NAD 15C Room 548 White Duct Mastic NAD 16A Room 361 Gray Duct Mastic NAD 16B Room 432 Gray Duct Mastic NAD 16C Room 510 Gray Duct Mastic NAD 17A Room 446 Gray Sink Coat NAD 17B Room 446 Gray Sink Coat NAD 17C Room 446 Gray Sink Coat NAD

18A Room 536 2'x2' White Ceiling Tile (Rough Textured) NAD

© 2024, Mabbett & Associates, Inc.

Project No. R2024076.000

Appendix A Page 4 of 10 November 20, 2024 ThinkForm_Charleston VAMC Stairs, Etc_RBM Survey Report

APPENDIX A

Summary of ACM Sampling Results

Renovate Restrooms, Stairwells, and Doors Charleston VAMC, Charleston, SC

Sample No. Sample Location Description of Material Percent and Type of Asbestos

18B Room 536 2'x2' White Ceiling Tile (Rough Textured) NAD

18C Room 536 2'x2' White Ceiling Tile (Rough Textured) NAD

19A Room 315 2'x2' White Ceiling Tile (Textured) NAD 19B Room 315 2'x2' White Ceiling Tile (Textured) NAD 19C Room 315 2'x2' White Ceiling Tile (Textured) NAD 20A Room 319 2'x2' White Ceiling Tile (Textured 2) NAD 20B Room 423 2'x2' White Ceiling Tile (Textured 2) NAD 20C Room 510 2'x2' White Ceiling Tile (Textured 2) NAD 21A Room 369 2'x2' White Ceiling Tile (Pin Dot) NAD 21B Room 465 2'x2' White Ceiling Tile (Pin Dot) NAD 21C Room 510 2'x2' White Ceiling Tile (Pin Dot) NAD 22A Room 369 White Counter Caulk NAD 22B Room 465 White Counter Caulk NAD 22C Room 555 White Counter Caulk NAD 23A Room 463 Black Pipe Insulation Mastic 8% Chrysotile 23B Room 463 Black Pipe Insulation Mastic NA/PS 23C Room 464 Black Pipe Insulation Mastic NA/PS

24A - A Room 534 12"x12" Gray Floor Tile NAD 24A - B Room 534 12" x 12" Gray Floor Tile Mastic/Leveling NAD 24B - A Room 536 12"x12" Gray Floor Tile NAD 24B - B Room 536 12" x 12" Gray Floor Tile Mastic/Leveling NAD 24C - A Room 536 12"x12" Gray Floor Tile NAD 24C - B Room 536 12" x 12" Gray Floor Tile Mastic/Leveling NAD 25A - A Room BB133 Ceramic Tile NAD 25A - B Room BB133 Grout NAD 25B - A Room B126 Ceramic Tile NAD 25B - B Room B126 Ceramic Tile Grout NAD 25C - A B153 Ceramic Tile NAD 25C - B B153 Ceramic Tile Grout NAD 26A - A Room A183 Ceramic Tile Grout NAD 26A - B Room A183 Ceramic Tile Mortar NAD 26B - A Room B136 Ceramic Tile Grout NAD

© 2024, Mabbett & Associates, Inc.

Project No. R2024076.000

Appendix A Page 5 of 10 November 20, 2024 ThinkForm_Charleston VAMC Stairs, Etc_RBM Survey Report

APPENDIX A

Summary of ACM Sampling Results

Renovate Restrooms, Stairwells, and Doors Charleston VAMC, Charleston, SC

Sample No. Sample Location Description of Material Percent and Type of Asbestos

26B - B Room B136 Ceramic Tile Mortar 2% Chrysotile 26C Room B152 Ceramic Wall Tile NA/PS

27A - A Room 315 Ceramic Tile NAD 27A - B Room 315 Ceramic Tile Grout NAD 27A - C Room 315 Ceramic Tile Adhesive NAD 27B - A Room 351 Ceramic Tile NAD 27B - B Room 351 Ceramic Tile Grout NAD 27B - C Room 351 Ceramic Tile Adhesive NAD 27C - A Room 368 Ceramic Tile NAD 27C - B Room 368 Ceramic Tile Grout NAD 27C - C Room 368 Ceramic Tile Adhesive NAD 28A - A Room 319 Brown Cove Base NAD 28A - B Room 319 Brown Cove Base Adhesive NAD 28B - A Room 319 Brown Cove Base NAD 28B - B Room 319 Brown Cove Base Adhesive NAD 28C - A Room 319 Brown Cove Base NAD 28C - B Room 319 Brown Cove Base Adhesive NAD 29A - A Room 369 Tan Cove Base NAD 29A - B Room 369 Tan Cove Base Adhesive NAD 29B - A Room 369 Tan Cove Base NAD 29B - B Room 369 Tan Cove Base Adhesive NAD 29C - A Room 369 Tan Cove Base NAD 29C - B Room 369 Tan Cove Base Adhesive NAD 30A - A Room 534 Cream Cove Base NAD 30A - B Room 534 Cream Cove Base Adhesive NAD 30B - A Room 534 Cream Cove Base NAD 30B - B Room 534 Cream Cove Base Adhesive NAD 30C - A Room 534 Cream Cove Base NAD 30C - B Room 534 Cream Cove Base Adhesive NAD 31A - A Room 536 Ceramic Wall Tile NAD 31A - B Room 536 Ceramic Wall Tile Grout 1 NAD 31A - C Room 536 Ceramic Wall Tile Grout 2 NAD 31B - A Room 536 Ceramic Wall Tile NAD 31B - B Room 536 Ceramic Wall Tile Grout 1 NAD

© 2024, Mabbett & Associates, Inc.

Project No. R2024076.000

Appendix A Page 6 of 10 November 20, 2024 ThinkForm_Charleston VAMC Stairs, Etc_RBM Survey Report

APPENDIX A

Summary of ACM Sampling Results

Renovate Restrooms, Stairwells, and Doors Charleston VAMC, Charleston, SC

Sample No. Sample Location Description of Material Percent and Type of Asbestos

31B - C Room 536 Ceramic Wall Tile Grout 2 NAD 31C - A Room 536 Ceramic Wall Tile NAD 31C - B Room 536 Ceramic Wall Tile Grout 1 NAD 31C - C Room 536 Ceramic Wall Tile Grout 2 NAD 31C - D Room 536 Ceramic Wall Tile Grout 3 NAD 32A - A Room 555 Ceramic Floor Tile NAD 32A - B Room 555 Ceramic Floor Tile Grout NAD 32B - A Room 554 Ceramic Floor Tile NAD 32B - B Room 554 Ceramic Floor Tile Grout NAD 32C - A Room 554 Ceramic Floor Tile NAD 32C - B Room 554 Ceramic Floor Tile Grout NAD 33A - A Room 525 Ceramic Flor Tile NAD 33A - B Room 525 Ceramic Floor Tile Grout NAD 33B - A Room 525 Ceramic Floor Tile NAD 33B - B Room 525 Ceramic Floor Tile Grout NAD 33C - A Room 525 Ceramic Floor Tile NAD 33C - B Room 525 Ceramic Floor Tile Grout NAD 34A - A Stairwell 3 Plaster Wall Finish NAD 34A - B Stairwell 3 Plaster Wall Base NAD 34B - A Stairwell 2 Plaster Wall Finish NAD 34B - B Stairwell 2 Plaster Wall Base NAD

34C Stairwell 4 Plaster Wall NAD 34D Stairwell 6 Plaster Ceiling NAD 34E Stairwell 1 Plaster Ceiling NAD

34F - A Stairwell 3 Plaster Wall Finish NAD 34F - B Stairwell 3 Plaster Wall Base NAD 34G - A Stairwell 3 Plaster Wall Finish NAD 34G - B Stairwell 3 Plaster Wall Base NAD

35A Hallway at C322 White Water Fountain Caulk NAD 35B Hallway at C416 White Water Fountain Caulk NAD 35C Hallway at A550 White Water Fountain Caulk NAD 36A Stairwell 2 Red Fire Stop NAD 36B Stairwell 2 Red Fire Stop NAD 36C Stairwell 2 Red Fire Stop NAD

© 2024, Mabbett & Associates, Inc.

Project No. R2024076.000

Appendix A Page 7 of 10 November 20, 2024 ThinkForm_Charleston VAMC Stairs, Etc_RBM Survey Report

APPENDIX A

Summary of ACM Sampling Results

Renovate Restrooms, Stairwells, and Doors Charleston VAMC, Charleston, SC

Sample No. Sample Location Description of Material Percent and Type of Asbestos

37A Stairwell 2 2'x2' White Ceiling Tile (Pin Dot) NAD 37B Stairwell 2 2'x2' White Ceiling Tile (Pin Dot) NAD 37C Stairwell 2 2'x2' White Ceiling Tile (Pin Dot) NAD

38A - A Stairwell 2 12" x 12" Cream Floor Tile NAD 38A - B Stairwell 2 12" x 12" Cream Floor Tile Mastic 3% Chrysotile 38B - A Stairwell 2 12" x 12" Cream Floor Tile NAD 38B - B Stairwell 2 12" x 12" Cream Floor Tile Mastic NA/PS 38C - A Stairwell 2 12" x 12" Cream Floor Tile NAD 38C - B Stairwell 2 12" x 12" Cream Floor Tile Mastic NA/PS 39A - A Stairwell 6 Rubber Stair Tread Adhesive NAD 39A - B Stairwell 6 Rubber Stair Tread Adhesive NAD 39B - A Stairwell 2 Rubber Stair Tread Adhesive NAD 39B - B Stairwell 2 Rubber Stair Tread Adhesive NAD

39C Stairwell 5 Rubber Stair Tread Adhesive NAD 40A - A Stairwell 6 Joint Compound NAD 40B - A Stairwell 2 Wallboard NAD 40B -B Stairwell 2 Joint Compound NAD 40C - A Stairwell 3 Wallboard NAD 45C - B Stairwell 3 Joint Compound NAD 40D - A Stairwell 5 Wallboard NAD 40D - B Stairwell 5 Joint Compound NAD 40E - A Stairwell 3 Wallboard NAD 40E - B Stairwell 3 Joint Compound NAD

41A Stairwell 1 Gray Floor Leveler NAD 41B Stairwell 1 Gray Floor Leveler NAD 41C Stairwell 4 Gray Floor Leveler NAD

42A - A Stairwell 2 6" Cove Base NAD 42A - B Stairwell 2 6" Cove Base Mastic NAD 42B - A Stairwell 2 6" Cove Base NAD 42B - B Stairwell 2 6" Cove Base Mastic NAD 42C - A Stairwell 3 6" Cove Base NAD 42C - B Stairwell 3 6" Cove Base Mastic NAD 43A - A Room 368 Ceramic Wall Tile NAD 43A - B Room 368 Ceramic Wall Tile Grout NAD

© 2024, Mabbett & Associates, Inc.

Project No. R2024076.000

Appendix A Page 8 of 10 November 20, 2024 ThinkForm_Charleston VAMC Stairs, Etc_RBM Survey Report

APPENDIX A

Summary of ACM Sampling Results

Renovate Restrooms, Stairwells, and Doors Charleston VAMC, Charleston, SC

Sample No. Sample Location Description of Material Percent and Type of Asbestos

43A - C Room 368 Ceramic Wall Tile Adhesive NAD 43B - A Room 368 Ceramic Wall Tile NAD 43B - B Room 368 Ceramic Wall Tile Grout NAD 43B - C Room 368 Ceramic Wall Tile Adhesive NAD 43C - A Room 368 Ceramic Wall Tile NAD 43C - B Room 368 Ceramic Wall Tile Grout NAD 43C - C Room 368 Ceramic Wall Tile Adhesive NAD 44A - A Room 432 Ceramic Wall Tile NAD 44A - B Roo m 432 Ceramic Wall Tile Grout NAD 44B - A Room 433 Ceramic Wall Tile NAD 44B - B Roo m 433 Ceramic Wall Tile Grout NAD 44C - A Room 434 Ceramic Wall Tile NAD 44C -B Roo m 434 Ceramic Wall Tile Grout NAD 45A - A Room 464 Ceramic Wall Tile NAD 45A - B Room 464 Ceramic Wall Tile Grout NAD 45B- A Room 464 Ceramic Wall Tile NAD 45B - B Room 464 Ceramic Wall Tile Grout NAD 45C - A Room 464 Ceramic Wall Tile NAD 45C - B Room 464 Ceramic Wall Tile Grout NAD 46A - A Room 510 Ceramic Wall Tile NAD 46A - B Room 510 Ceramic Wall Tile Grout NAD 46B - A Room 510 Ceramic Wall Tile NAD 46B - B Room 510 Ceramic Wall Tile Grout NAD 46C - A Room 510 Ceramic Wall Tile NAD 46C - B Room 510 Ceramic Wall Tile Grout NAD 47A - A Room 548 Ceramic Wall Tile NAD 47A - B Room 548 Ceramic Wall Tile Grout NAD 47B - A Room 548 Ceramic Wall Tile NAD 47B - B Room 548 Ceramic Wall Tile Grout NAD 47C - A Room 548 Ceramic Wall Tile NAD 47C - B Room 548 Ceramic Wall Tile Grout NAD 48A - A Room 549 Ceramic Wall Tile NAD 48A - B Room 549 Ceramic Wall Tile Grout NAD 48B - A Room 549 Ceramic Wall Tile NAD

© 2024, Mabbett & Associates, Inc.

Project No. R2024076.000

Appendix A Page 9 of 10 November 20, 2024 ThinkForm_Charleston VAMC Stairs, Etc_RBM Survey Report

APPENDIX A

Summary of ACM Sampling Results

Renovate Restrooms, Stairwells, and Doors Charleston VAMC, Charleston, SC

Sample No. Sample Location Description of Material Percent and Type of Asbestos

48B -B Room 549 Ceramic Wall Tile Grout NAD 48C - A Room 549 Ceramic Wall Tile NAD 48C - B Room 549 Ceramic Wall Tile Grout NAD 49A - A Room 555 Ceramic Wall Tile NAD 49 A - B Room 555 Ceramic Wall Tile Grout NAD 49B - A Room 555 Ceramic Wall Tile NAD 49B - B Room 555 Ceramic Wall Tile Grout NAD 49C - A Room 555 Ceramic Wall Tile NAD 49C - B Room 555 Ceramic Wall Tile Grout NAD

50A Room 356 Ceramic Floor Tile Grout NAD 50B Room 356 Ceramic Floor Tile Grout NAD 50C Room 356 Ceramic Floor Tile Grout NAD

51A - A Room 423 Ceramic Floor Tile NAD 51A - B Room 423 Ceramic Floor Tile Grout NAD 51A - C Room 423 Ceramic Floor Tile Bedding NAD 51B - A Room 423 Ceramic Floor Tile NAD 51B - B Room 423 Ceramic Floor Tile Grout NAD 51B - C Room 423 Ceramic Floor Tile Bedding NAD 51C - A Room 423 Ceramic Floor Tile NAD 51C - B Room 423 Ceramic Floor Tile Grout NAD 51C - C Room 423 Ceramic Floor Tile Bedding NAD 52A - A Room 460 Ceramic Floor Tile NAD 52A - B Room 460 Ceramic Floor Tile Grout NAD 52B - A Room 460 Ceramic Floor Tile NAD 52B - B Room 460 Ceramic Floor Tile Grout NAD 52B - C Room 460 Ceramic Floor Tile Bedding NAD 52C - A Room 460 Ceramic Floor Tile NAD 52C - B Room 460 Ceramic Floor Tile Grout NAD 52C - C Room 460 Ceramic Floor Tile Bedding NAD 53A - A Room 460 Ceramic Floor Tile Grout NAD 53A - B Room 460 Ceramic Floor Tile Bedding NAD 53B - A Room 460 Ceramic Floor Tile NAD 53B - B Room 460 Ceramic Floor Tile Grout NAD 53B - C Room 460 Ceramic Floor Tile Bedding NAD

© 2024, Mabbett & Associates, Inc.

Project No. R2024076.000

Appendix A Page 10 of 10 November 20, 2024 ThinkForm_Charleston VAMC Stairs, Etc_RBM Survey Report

APPENDIX A

Summary of ACM Sampling Results

Renovate Restrooms, Stairwells, and Doors Charleston VAMC, Charleston, SC

Sample No. Sample Location Description of Material Percent and Type of Asbestos

53C - A Room 460 Ceramic Floor Tile NAD 53C - B Room 460 Ceramic Floor Tile Grout NAD 53C - C Room 460 Ceramic Floor Tile Bedding NAD 54A - A Room 510 Ceramic Floor Tile NAD 54A - B Room 510 Ceramic Floor Tile Grout NAD 54B - A Room 510 Ceramic Floor Tile NAD 54B - B Room 510 Ceramic Floor Tile Grout NAD 54C - A Room 510 Ceramic Floor Tile NAD 54C - B Room 510 Ceramic Floor Tile Grout NAD 55A - A Room 525 Ceramic Floor Tile NAD 55A - B Room 525 Ceramic Floor Tile Grout NAD 55B - A Room 525 Ceramic Floor Tile NAD 55B - B Room 525 Ceramic Floor Tile Grout NAD 55C - A Room 525 Ceramic Floor Tile NAD 55C - B Room 525 Ceramic Floor Tile Grout NAD 56A - A Room 548 Ceramic Floor Tile NAD 56A - B Room 548 Ceramic Floor Tile Grout NAD 56B - A Room 548 Ceramic Floor Tile NAD 56B - B Room 548 Ceramic Floor Tile Grout NAD 56C - A Room 548 Ceramic Floor Tile NAD 56C - B Room 548 Ceramic Floor Tile Grout NAD 57A - A Room 548 Ceramic Floor Tile NAD 57A -B Room 548 Ceramic Floor Tile Grout NAD 57B - A Room 548 Ceramic Floor Tile NAD 57B - B Room 548 Ceramic Floor Tile Grout NAD 57C - A Room 548 Ceramic Floor Tile NAD 57C-B Room 548 Ceramic Floor Tile Grout NAD

Notes: NAD = No Asbestos Detected ; NA/PS = Positive Stop

Renovate Restrooms, Stairwells and Doors | Charleston VAMC

© 2024, Mabbett & Associates, Inc.

Project No. R2024076.000

APPENDIX B November 20, 2024 ThinkForm_Charleston VAMC Stairs, Etc_RBM Survey Report

APPENDIX B

ACM Laboratory Reports and Chain of Custody Documentation

Bulk Asbestos Analysis By Polarized Light Microscopy EPA Method: 600/R-93/116 and

40 CFR, Part 763, Subpart E, App.E

Lab Order ID:Attn: 10063907Customer: Mabbett & Associates, Inc.

105 Central Street Suite 4100 Stoneham, MA 02180

Analysis:

Date Received:

Mike Delaney

PLM

09/30/2024

Project: Charleston VAMC - Bldg #1 #R2024076.000 Date Reported: 10/03/2024

Sample ID

Lab Sample ID

Description

Lab Notes Asbestos

Fibrous Components

Non-Fibrous Components Treatment

Attributes

01A

10063907_0001

Red fire stop

None Detected 2% Fiber Glass 98% Other

Non-Fibrous

Dissolved

Red

Homogeneous

01B

10063907_0002

Red fire stop

None Detected 2% Fiber Glass 98% Other

Non-Fibrous

Dissolved

Red

Homogeneous

01C

10063907_0003

Red fire stop

None Detected 2% Fiber Glass 98% Other

Non-Fibrous

Dissolved

Red

Homogeneous

02A - A

10063907_0004

Gypsum wallboard/Joint compound

None Detected 10% Cellulose 90% Other

Fibrous

Crushed

White

Homogeneous wallboard

02A - B

10063907_0147

Gypsum wallboard/Joint compound

None Detected 100% Other

Non-Fibrous

Crushed

White

Homogeneous joint compound

02B - A

10063907_0005

Gypsum wallboard/Joint compound

None Detected 10% Cellulose 90% Other

Fibrous

Crushed

White

Homogeneous wallboard

02B - B

10063907_0148

Gypsum wallboard/Joint compound

None Detected 100% Other

Non-Fibrous

Crushed

White

Homogeneous joint compound

02C - A

10063907_0006

Gypsum wallboard/Joint compound

None Detected 10% Cellulose 90% Other

Fibrous

Crushed

White

Homogeneous wallboard

Disclaimer: Due to the nature of the EPA 600 method, asbestos may not be detected in samples containing low levels of asbestos. We strongly recommend that analysis of floor tiles, vermiculite, and/or heterogenous soil samples be conducted by TEM for confirmation of "None Detected" by PLM. This report relates only to the samples tested and may not be reproduced, except in full, without the written approval of SAI. This report may not be used by the client to claim product endorsement by NVLAP or any other agency of the U.S. government. Analytical uncertainty available upon request. Scientific Analytical Institute participates in the NVLAP Proficiency Testing program.

Unless otherwise noted blank sample correction was not performed. Estimated MDL is 0.1%.

Charmel Dozier (234)

Analyst Approved Signatory

Page 1 of 30P-F-002 r15 1/15/2028 Scientific Analytical Institute, Inc. 4604 Dundas Dr. Greensboro, NC 27407 (336) 292-3888

EPA Method: 600/R-93/116 and

40 CFR, Part 763, Subpart E, App.E

Lab Order ID:Attn: 10063907Customer: Mabbett & Associates, Inc.

105 Central Street Suite 4100 Stoneham, MA 02180

Analysis:

Date Received:

Mike Delaney

PLM

09/30/2024

Project: Charleston VAMC - Bldg #1 #R2024076.000 Date Reported: 10/03/2024

Sample ID

Lab Sample ID

Description

Lab Notes Asbestos

Fibrous Components

Non-Fibrous Components Treatment

Attributes

02C - B

10063907_0149

Gypsum wallboard/Joint compound

None Detected 100% Other

Non-Fibrous

Crushed

White

Homogeneous joint compound

02D - A

10063907_0007

Gypsum wallboard/Joint compound

None Detected 10% Cellulose 90% Other

Fibrous

Crushed

White

Homogeneous wallboard

02D - B

10063907_0150

Gypsum wallboard/Joint compound

None Detected 100% Other

Non-Fibrous

Crushed

White

Homogeneous joint compound

02E - A

10063907_0008

Gypsum wallboard/Joint compound

None Detected 10% Cellulose 90% Other

Fibrous

Crushed

White

Homogeneous wallboard

02E - B

10063907_0151

Gypsum wallboard/Joint compound

None Detected 100% Other

Non-Fibrous

Crushed

White

Homogeneous joint compound

03A - A

10063907_0009

Gypsum wallboard/Joint compound

None Detected 10% Cellulose 90% Other

Fibrous

Crushed

White

Homogeneous wallboard

03A - B

10063907_0152

Gypsum wallboard/Joint compound

None Detected 100% Other

Non-Fibrous

Crushed

White

Homogeneous joint compound

03B - A

10063907_0010

Gypsum wallboard/Joint compound

None Detected 10% Cellulose 90% Other

Fibrous

Crushed

White

Homogeneous wallboard

Disclaimer: Due to the nature of the EPA 600 method, asbestos may not be detected in samples containing low levels of asbestos. We strongly recommend that analysis of floor tiles, vermiculite, and/or heterogenous soil samples be conducted by TEM for confirmation of "None Detected" by PLM.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .