LB-104-01ME-Model.pdf
PDF 929 KB Posted
- Solicitation number
- 36C24426R0016
About this file
This document appears to be a detailed mechanical and HVAC drawing for a multi-level medical facility, specifically showing floor plans, ductwork, piping, and equipment layout for various rooms and systems. The drawing includes comprehensive technical annotations for air handling units (AHUs), exhaust fans, duct sizes, piping connections, and room-specific requirements. Key technical details include specifications for return air ducts, outside air ducts, exhaust systems, chilled water supply/return pipes, and mounting instructions for air devices and grilles. The drawing references multiple mechanical rooms, air handling units (AHU-1 through AHU-5), and numerous specific rooms such as PACU, pre-op areas, procedure rooms, and support spaces. The document also contains a detailed legend explaining various mechanical and architectural symbols used throughout the drawing.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C2442600016 Amend 2 Door Frames 104 RFI responses.docx | DOCX document | |
| 36C24426R0016 0002_1.docx | DOCX document | |
| SOW - Replace Door Frames Building 104 D-B -Rev1 11042025.docx | DOCX document | |
| 36C24426R0016 0002.pdf | ||
| 595-24-105 Replace Door Frames 104 - Prebid Sign In 10142025.pdf | ||
| LB-104-01AR - Rev1 11042025-Model.pdf | ||
| 36C24426R0016 0001.docx | DOCX document | |
| AE-102 Doors-Frames-Details - Rev2.pdf | ||
| 013526 Lebanon Safety Requirements Spec 20240516.docx | DOCX document | |
| RM Language for Contracts_01.docx | DOCX document | |
| 36C24426R0016 0001_1.docx | DOCX document | |
| AE-101 Wall Types.pdf | ||
| AE-100 Floor Plan - Fire Barrier Upgrade.pdf | ||
| SOW - Replace Door Frames Building 104 D-B.docx | DOCX document | |
| 36C24426R0016_1.docx | DOCX document | |
| P03 07.08.2025 Service Determination.pdf | ||
| Davis-Bacon Act WD PA20250093 10.3.25.pdf | ||
| 36C24426R0016 10.14.25.pdf | ||
| RM Language for Contracts.docx | DOCX document | |
| P03 36C24426AP0236 liquidated damages formulation Lebanon signed.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
54x18 RA
26x24 CA
22x20 CA
8 C A
C
A
C
A
16 CA
16 CA
C
A
C
A
20x18 SA
20x18 SA
20x18 SA
20x18 SA
22x20 CA
26x24 CA x1
2 S A x1
2 S A x1
2 S A
16x12 SA 16x12 SA x1
2 S A x1
2 S A x1
4 S A
12 ISO EA
12 EA 14 EA 8 EA10 EA
x1
4 R A x1
4 R A
32x14 RA x1
4 C A
16x16 CA
44x18 CA x1
4 C A
8x 8 E
A x2
0 E A x1
6 E A x1
4 C A x1
4 C A
16x14 RA 12x14 RA
16x16 CA x1
4 S A x1
4 S A
8 CA
8 CA
8 CA
8 CA
8 CA
8 CA
10 CA
8 CA
8 CA
8 CA
8 CA
10 CA
8 CA
8 CA
8 CA
8 CA
8 CA 8 C
A
8 C A
8 CA
8 CA
10 CA
8 CA
10 CA
8 CA
8 CA
8 CA
8 CA
8 C A
8 CA
10 CA
8 CA
10 CA
8 CA
10 CA
8 CA
C
A
8 CA
14x14 SA 14x14 SA
C
A
14 CA
x1
8 C A x1
4 R A x1
4 R A x1
4 C A x1
6 R A
NOTES:
1. 14x14 RETURN DUCT DOWN THROUGH FLOOR TO THE BASEMENT.
REFERENCE DRAWING 103MH100 FOR CONTINUATION.
2. 16x14 RETURN DUCT DOWN THROUGH FLOOR TO THE BASEMENT.
REFERENCE DRAWING 103MH100 FOR CONTINUATION.
3. 18x14 RETURN DUCT DOWN THROUGH FLOOR TO THE BASEMENT.
REFERENCE DRAWING 103MH100 FOR CONTINUATION.
4. 52x24 COLD AIR DUCT DOWN THROUGH FLOOR TO THE BASEMENT.
REFERENCE DRAWING 103MH100 FOR CONTINUATION.
5. MOUNT RETURN AIR GRILLE 1'-0" ABOVE FINISHED FLOOR TO BOTTOM
OF GRILLE MINIMUM. REFERENCE AND COORDINATE WITH ARCHITECTURAL
ELEVATIONS FOR ACTUAL HEIGHT.
6. PROVIDE 48"Lx24"Hx12"W MERV-17 FILTER IN TIGHT-FITTING ANGLED
FILTER RACK WITH SIDE-ACCESS DOOR. DUCTWORK DOWNSTREAM OF
FILTER SECTION SHALL BE STAINLESS STEEL.
7. 76x24 OUTSIDE AIR DUCT UP. REFERENCE DRAWING 103MH102 FOR
CONTINUATION.
8. 42x24 OUTSIDE AIR DUCT UP FOR FUTURE. REFERENCE DRAWING
103MH102 FOR CONTINUATION.
9. 16" DIAMETER EXHAUST DUCT UP THROUGH ROOF TO EF-6-103.
REFERENCE DRAWING 103MH102 FOR CONTINUATION. TRANSITION TO
FAN AS REQUIRED.
10. 12" DIAMETER ISOLATION EXHAUST DUCT UP THROUGH ROOF TO
EF-7-103. REFERENCE DRAWING 103MH102 FOR CONTINUATION.
TRANSITION TO FAN AS REQUIRED.
11. 8x8 EXHAUST DUCT UP THROUGH ROOF TO EF-8-103. TRANSITION AS
REQUIRED TO FAN INLET. REFERENCE DRAWING 103MH102 FOR
CONTINUATION.
12. 20x20 EXHAUST DUCT UP THROUGH ROOF TO EF-9-103. TRANSITION
AS REQUIRED TO FAN INLET. REFERENCE DRAWING 103MH102 FOR
CONTINUATION.
13. 10x10 EXHAUST DUCT UP THROUGH ROOF TO EF-5-103. TRANSITION
AS REQUIRED TO FAN INLET. REFERENCE DRAWING 103MH102 FOR
CONTINUATION.
14. 54x18 RETURN AIR DUCT UP THROUGH ROOF TO AHU-3-103.
TRANSITION AS REQUIRED. REFERENCE DRAWING 103MH102 FOR
CONTINUATION.
15. 44x18 COLD AIR DUCT UP THROUGH ROOF TO AHU-3-103.
TRANSITION AS REQUIRED. REFERENCE DRAWING 103MH102 FOR
CONTINUATION.
16. 32x14 RETURN AIR DUCT UP THROUGH ROOF TO AHU-4-103.
TRANSITION AS REQUIRED. REFERENCE DRAWING 103MH102 FOR
CONTINUATION.
17. 26x14 COLD AIR DUCT UP THROUGH ROOF TO AHU-4-103.
TRANSITION AS REQUIRED. REFERENCE DRAWING 103MH102 FOR
CONTINUATION.
18. ALL AIR DEVICES ASSOCIATED WITH AHU-2-103 SHALL BE FULLY
DUCTED. FLEXIBLE DUCT IS NOT PERMITTED.
19. 24x18 OUTSIDE AIR DUCT UP FOR VENTILATION. REFERENCE DRAWING
103MH102 FOR CONTINUATION.
TU-2-1-103
TU-2-3-103
TU-2-2-103
TU-2-4-103
TU-2-5-103
TU-2-6-103
TU-2-7-103
TU-4-1-103
TU-4-2-103
TU-4-3-103
TU-4-4-103
TU-4-5-103
TU-4-6-103
TU-4-7-103
TU-4-8-103
TU-3-1-103
TU-3-2-103
TU-3-3-103
TU-3-4-103
TU-3-5-103 TU-3-8-103
TU-3-7-103
TU-3-6-103 TU-3-9-103
TU-3-10-103
TU-3-11-103
TU-3-12-103
TU-3-13-103
TU-3-14-103 TU-3-15-103
TU-3-16-103
TU-3-17-103
TU-3-18-103
TU-3-19-103
TU-3-20-103
TU-3-21-103
TU-3-22-103
TU-3-23-103
TU-3-24-103
TU-3-25-103
TU-3-26-103
TU-3-27-103
TU-3-28-103
TU-3-29-103
TU-3-30-103
TU-3-31-103
TU-3-32-103
F-12-103
F-12-103
F-12-103
F-12-103 x2
0 C A x1
4 E A
28x22 EA
12 CA
8 CA
10 CA
10 CA22x16 CA 16x12 CA x1
8 C A
6 CA
6 CA
6 CA
6 CA
10 CA
x1
6 C A
8 CA
8 E A
E
A
E
A
14 RA
32x16 CA
6 C A
8 C A
10 CA
x1
6 R A x1
2 R A
14x14 SA
10x10 SA
10 CA
58x20 RA
12 EA
8 C A
R
A
8 CA 12 SA
6 CA
6 CA6 CA
8 CA
6 CA
C
A
8 C A
10 CA
C
A
C
A
28x16 CA x1
2 S A
12x12 SA
12x12 SA
6 CA
18 EA
20 EA18 EA
14x14 RA
10 EA
12 EA
18x14 RA
6 CA
14 CA
14x14 CA
R
A
20. HEPA FILTER. TRANSITION AS REQUIRED.
21. 28X22 EXHAUST DUCT UP TO EF-2-103. TRANSITION TO 28"
DIAMETER IN VERTICAL THROUGH ROOF. REFERENCE DRAWING MH102
FOR CONTINUATION.
22. 12x14 EXHAUST DUCT UP THROUGH ROOF TO EF-1-103. REFERENCE
DRAWING MH102 FOR CONTINUATION.
23. 16" DIAMETER EXHAUST DUCT UP THROUGH ROOF TO EF-3-103.
REFERENCE DRAWING MH102 FOR OCNTINUATION.
24. 46x20 COLD AIR DUCT TRANSITION AND OFFSET AS REQUIRED TO 72x24 UP THROUGH ROOF TO AIR HANDLING UNIT AHU-1-103.
REFERENCE DRAWING MH102 FOR AIR HANDLING UNIT LOCATION.
25. 58x20 RETURN AIR DUCT TRANSITION AND OFFSET AS REQUIRED TO 72x20 UP THROUGH ROOF TO AIR HANDLING UNIT AHU-1-103.
REFERENCE DRAWING MH102 FOR AIR HANDLING UNIT LOCATION.
26. MOUNT RETURN GRILLE 1'-0" ABOVE FINISHED FLOOR TO BOTTOM OF
GRILLE MINIMUM. REFERENCE AND COORDINATE WITH ARCHITECTURAL
ELEVATIONS FOR ACTUAL HEIGHT.
27. ALL AIR DEVICES (SUPPLY AND EXHAUST) IN THE PAIN PROCEDURE
ROOM 1307 SHALL BE FULLY DUCTED WITH HARD DUCT. FLEXIBLE
DUCTWORK TO AIR DEVICES IN THIS ROOM IS NOT PERMITTED.
28. SWITCH FOR OCCUPIED/UNOCCUPIED MODE FOR VAV BOX CONTROL.
REFERENCE 2/M-801 FOR DETAILS.
29. COORDINATE LOCATION OF AIR DEVICE WITH CEILING GRID AND
LIGHTING LAYOUT THAT WILL BE INSTALLED IN FUTURE PROJECT.
30. 6" SUPPLY AIR DUCT CAP FOR FUTURE.
TU-1-16-103
TU-1-17-103
TU-1-18-103
TU-1-19-103
TU-1-20-103
TU-1-11-103
TU-1-12-103 TU-1-13-103
TU-1-14-103
TU-1-15-103
TU-1-6-103
TU-1-9-103 TU-1-10-103
TU-1-1-103
TU-1-2-103
TU-1-28-103
TU-1-30-103
TU-1-3-103
TU-1-4-103
TU-1-5-103TU-1-7-103TU-1-8-103
TU-1-21-103
TU-1-22-103
TU-1-23-103
TU-1-24-103
TU-1-25-103
TU-1-26-103
TU-1-27-103
TU-1-29-103
S
D 1
D 1
D 1
D 1
D 1
D 1
D 1
D 1
D 1
D 1
D 1
D 1
D 1
D 1
D 1
LD 1
LD 1
LD 1
D 1
D 1
D 1
D 1
D 1
D 1
D 1
D 1
D 1
D 1
D 1
D 1
LFD 1
D 1
D 1
D 1
D 1
D 1
D 1
D 1
D 1
D 1
D 1
D 1
D 1
D 1 305
D 1
D 1
D 1
D 1
D 1
D 1
D 1
LFD 1
LFD 1
LFD 1
LFD 1
LFD 1
LFD 1
LFD 1
LFD 1
LFD 1
LFD 1
LFD 1
LFD 1
LFD 1
LFD 1
LFD1
LFD 1
LFD 1
LFD 1
LFD 1
LFD 1
LFD 1
LFD 1
LFD 1
LFD 1
D 1
D 1
D 1
D 1
D 1
D 1
D1
D 1
D1
D 1
D 1
D 150
D 1
D 1
LD 1
LD 1
LD 1
LD 1
LD 1
LD 1
LD 1
LD 1
LD 1
D 1
LD 1
D 1
D 1
D 1
D 1
D 1
D 1
D 1
D 1 130
D 1 D 1
D 1
D 1
D 1
D 1
D 1
D 1
D 1
D 1
D 1
D 1
D 1
D 1
D 1
D 1
D 1
D 1
D 1
D 1
D 1
D 1
D 1
D 1
D 1
D 1
D 1
D 1
D 1115
D 1
D 1
D 1
D 1
D 1
D 1
D 1
D 1
D 1
D 1 190
D 1
D 1
D 1
D 1
D 1
D 1
D 1
D1
D1
D 1
D1
D1
D 1
D1
D 1
10X10 EXHAUST
DUCT UP THROUGH
ROOF TO EF-5-103
E 1
E 1
E 1
E 1
E 1
E 1
E 1
E 1
E 1
E 1
E 1
E 1
E 1
E 1
E 1
E 1
E 1
E 1
E 1
E 1
E 1
E 1
E 1
E 1
E 1
E 1
E 1
WR 1
WR 1
WR 1
WR 1
WR 1
WR 1
WR 1
WR 1
WR 1
655 WR 1
WR 1
250 WR 1
WR 1
WR 1
WR 1
WR 1
WR 1
WR 1
WR1
WR 1
R 1
R 1
R 1
E 1
E 1
E 1
E 1
E 1
R 1
E 1
E 1
E 1
E 1
E 1
E 1
R 1
R 1
E 180
E 1
R 1
R 1
R 1
R 1
R 1
WR 1
WR 1
E 1
E 1
R 1
R 1
E 165
R 1
E 1
E 1
E 1
E 1
E 1
E 1
R 1
R 1 325
R 1
R 1
R 1
R 1
R 1
R 1
R 1
R 1
R 1
R 1
R 1
R 1
R 1
R 1
R 1
R 1
R 1
R 1
R 1
R 1
R 1
R 1
R 1
R 1
R 1 350
R 1
R 1
R 1
R 1
R 1
R 1
R 1
R 1
R 1
R 1
R 1
R 1
R 1
R 1
R 1
R 1
LFD 1
LFD 1
LFD 1160
LFD 1160
LFD 1
WS 1
WS 1
15 15
29 29
24 23
UH-2-103
4" CHWS/R
1 1/4" PC
2" MPS
3" CHWS/R
12" CHWS/R
12" CHWS/R
10" CHWS/R
1 1/4" HWS/R
1 1/4" HWS/R
1 1/4" HWS/R
2" HWS/R
1 1/4" HWS/R
1 1/4" HWS/R
2" HWS/R
1 1/4" HWS/R
1 1/2" HWS/R
1" HWS/R
1 1/4" HWS/R
2" HWS/R
1" HWS/R
1 1/2" HWS/R
2 1/2" HWS/R
1" HWS/R
1" HWS/R
2 1/2" HWS/R
3 HWS/R
3/4" HWS/R
3" MPS, 1-1/4" SC AND 1-1/2" PC
2-1/2" MPS AND 1-1/4" SC
1-1/2" MPS AND 1-1/4" SC
2 1/2" CHWS/R
8" CHWS/R
8" CHWS/R
6" CHWS/R
3" CHWS/R
4" CHWS/R
3/4" MPS
3/4" MPS 3/4" RV
1 1/2" STEAM RELIEF VENT UP,
REFERENCE DRAWING 103MP102
3/4" RV
1 1/2" PC
1 1/4" PC
1 1/4" PC
2" MPS
DOWN TO
FLOOR DRAIN
12" CHWS/R
8" CHWS/R
4" CHWS/R
4" CHWS/R
3" 100 PSI STEAM AND 1-1/2" PC
8" CHWS/R
1"DRAIN
1"DRAIN
12" CWR UP
12" CWS UP
12" CWS UP
12" CWR UP
31. CONTINUATION OF WORK SHOWN ON ENDOSCOPY DRAWINGS (UNDER
SEPARATE CONTRACT).
32. 12" CHWS/R FROM CENTRAL UTILITY PLANT. REFERENCE CIVIL/SITE
DRAWINGS FOR CONTINUATION.
33. 4" CHWS, 4' CHWR, 2-1/2" STEAM, AND 1" PUMPED CONDENSATE UP
THROUGH ROOF INTO PIPING VESTIBULE TO CHILLED WATER COIL TO
AHU-5-103. LOCATION IS APPROXIMATE ONLY AND NEEDS TO BE
COORDINATED WITH "RENOVATE BED UNIT" PROJECT. REFERENCE
DRAWING 103MP102 FOR CONTINUATION.
34. CHWS/R TEE WITH SHUT-OFF VALVE AND DRAIN VALVES ROUTE UP
THRU ROOF FOR CONNECTION TO FUTURE AHU. REFER TO DETAIL
5/M-502 FOR PIPING DETAILS. COORDINATE LOCATION OF ROOF PIPING
WITH THE MOST CURRENT INFORMATION REGARDING THE FUTURE UNIT.
35. 2" MPS, 1-1/4" SC, 4" CHWS, 4" CHWR, 3" CHWS, 3" CHWR PIPES
DOWN TO BASEMENT. REFERENCE DRAWING 103MP100 FOR
CONTINUATION.
36. CHWS/R UP THROUGH ROOF INTO PIPING VESTIBULE TO AHU-3-103.
REFERENCE DRAWING 103MP102 FOR CONTINUATION.
37. CHWS/R UP THROUGH ROOF INTO PIPING VESTIBULE TO AHU-4-103.
REFERENCE DRAWING 103MP102 FOR CONTINUATION.
38. MPS DOWN TO STERILIZER. COORDINATE FINAL CONNECTION WITH
EQUIPMENT. FIELD VERIFY FINAL LOCATION OF EQUIPMENT.
39. 1-1/2" MPS UP THROUGH ROOF INTO PIPING VESTIBULE TO AIR
HANDLING UNIT. REFERENCE DRAWING 103MP102 FOR CONTINUATION.
40. CONNECT NEW CHWS/R TO BACKUP CHILLER CH-1-103 LOCATED ON
ROOF.
41. CONNECT NEW CHWS/R TO AHU-1-103 LOCATED ON ROOF.
42. 1-1/4" PC UP THROUGH ROOF. REFERENCE DRAWING 103MP102 FOR
CONTINUATION.
43. 1" STEAM, 1/2" NPW AND 1" DRAIN PIPING UP TO CSG-3-103
LOCATED ON ROOF.
44. 1" STEAM, 1/2" NPW AND 1" DRAIN PIPING UP TO CSG-4-103
LOCATED ON ROOF.
45. 4" CHWS, 4' CHWR, 2-1/2" STEAM, AND 1" PUMPED CONDENSATE UP
THROUGH ROOF INTO PIPING VESTIBULE TO CHILLED WATER COIL TO
ONCOLOGY AHU. LOCATION IS APPROXIMATE ONLY AND NEEDS TO BE
COORDINATED WITH "ONCOLOGY UNIT" PROJECT. REFERENCE DRAWING
103MP102 FOR CONTINUATION.
46. 1-1/2" MPS & 1-1/4" SC UP THROUGH ROOF INTO PIPING
VESTIBULE TO AIR HANDLING UNIT. REFERENCE DRAWING 103MP102
FOR CONTINUATION.
FE
4" HWS
AND HWR
1" HWS
AND HWR
1 1/4" HWS
AND HWR
2" HWS AND HWR
12/
CD1
250 cfm
CD1
300 cfm
CD1
250 cfm
16Ø
FDX
(2-HR)
CD-1
CFM
CD-1
250 CFM
(E)LD1
250 cfm
(E)LD1
250 cfm
FCU-1
HW
S
HW
R
1" HWS
AND HWR
HW
S
HW
R
CW
R
CW
S
1" CWS
AND CWR
UV-1
¾" HWS
AND HWR
¾"
UV-1
CHILLED WATER SUPPLYCHWS
CHILLED WATER RETURNCHWR
HOT WATER SUPPLYHWS
HOT WATER RETURNHWR
DICTATION
HAND WASH
MEDS
NOURISH
COFFEE BAR
UP
UP
'-0
1 2"
11'-31 2" 26'-61
2"
'-0
1 2"
7'-101 2"
'-5
1 2" 3'-
51 2"
'-0
1 2"
10'
'-0
1 2"
2'-91 2"
2'- 2" 7'-21
2"
'-5
7'
7'
'-1
1"
18'-51 2"
'-4
12'-61 2"
9'- 2"
12'-1"
9'- 51 2"
10' -3"
9'- 6"
11'-01 2"
7'-6"
7'- 91 2"
6'-7"
8'-7
4'-8"
3'
10' -10
10'-1"5'-1"
2'-10" 2'-3
" 11' -3"
14' 9'-5
1 2" 14'
9'-9
1 2"
23'
8'
9'
19'-6"
9'
'-1
9'
5'- 21 2"
8'
13'-2"
4'-10"
19'-101 2"
5'
3'- 2"
7'-61 2"
7'- 6"
'-1
1"
7'-1"
9'-6"
8'- 7"
16'-51 2"
8'- 5"
4'-4"
17'-51 2"
'-7
1 2" 8'
5'-
1 2"
17'-11"
17'-11"
5'
12' -6
1 2"
9'- 51 2"
9'-111 2"
5'-2"
8'-10" 9'-7
12' -6
1 2"
6'-2"
4'-8 12 "
9'-5 12 "
5'- 71 2"
7'-9"
6'-01 2"
3' 9'-
71 2"
10'-111 2"
7'-6 12 "
9'-
1 2"
10'
'-7
1 2"
3'
5'-11 2"5'-81
2"
8'- 6"
4'-5"
15'-7 12 "
4'-5"
10'
7'
'-1
0"
10'
7'-8"2'- 2"
'-1
0"
12'
11'-31 2" 17'-31
2"
'-5
10'-51 2"
9'- 61 2"
10'-1"
'-9
1 2"
11'
9'- 61 2"
HAND WASH
11'
'-4
1 2"
10'-41 2"
9'- 81 2"
8'-3"
3'- 6"
3'-5"
7'-5"
9'- 81 2"
5'-4"
9'- 81 2"
7'-3"
9'- 81 2"
4'-9"
8'
11'-8"
'-2
1 2" 4'-
11 2"
3'-8"
4'-4"
5'-11"
'-5
4'-3"
2'- 61 2"
8'
8'
8'
8'
8'
'-2
1 2"
16'-3" 15'
'-2
1 2"
1'-61 2"
6'-
1 2"
12'
'-7
17'-9"
'-2
1 2"
6'-
1 2"
2'-1"
7'-10"
6'- 81 2"
8'-9"
7'
9'-5"
'-5
1 2"
4'-91 2"2'-
6"
9'-4"
7'- 8"
8'- 4"
8' 11 '-1
1"
7'-21 2"
12' 12'
'-8
9'- 2"
8'
8'
8'-51 2"
5'- 51 2"
'-1
19'-4"
8'-
8'-21 2"
'-0
1 2"
11'-11 2"
8'-51 2"
5'- 21 2"
8'- 01 2"
12'
12' 12'
12' 12'
12' 12'
12' 12'-1"
9'- 5"
21'
9'- 11 2"
8'- 8"
20'
'-1
1 2"
28'-2"
18'
'-4
9'-7"
19'-2"
11'
'-3
8'- 4"
8'-10"
11'
8'- 4"
6'
'-1
1 2"
2'-2"
1'- 5" 6'-4" 6'-4"
'-7
5'-11" 5'-11"
4'
8'
5'- 31 2"
8'- 11 2"
12'-61 2"
'-2
30'-11 2"
'-3
'-6
12'-5"
4'
'-6
8'
30'-11 2"13'-2"
'-9
30'-11 2"8'
'-8
4'
'-6
12'-5"
'-6
12'-51 2"
'-9
30'-11 2"
'-6
12'-51 2"
'-8
1 2"
9'-71 2" 3' 3'
'-8
3'- 21 2"
6'-2" 1'-6"
3'
FEC FEC
FEC
CORRIDOR
100C5
10'-9"
'-1
12'-8"
10'-9"
'-1
9'- 81 2" 11
'-7 1 2"
4'-01 2"
7'- 81 2"
'-6
10'-31 2"
CRASH
CART
ALCOVE
NURSE
STATION
SCRUB
RESTRICTED
CORRIDOR
15C2
SCRUB
BLOOD REF
ALCOVE
WHEELCHAIR
ALCOVE
EQUIP
ALCOVE
CRASH
CART
ALCOVE
WHEELCHAIR /
STRETCHER
PATIENT RM
EQUIP
ALCOVE
NURSE
STATION
(SATELITE)
CRASH
CART
ALCOVE
SCRUB
1308 SCOPE STORAGE
1305A
CORRIDOR
100A
STORAGE
CLOSET
100B
ELEVATOR
LOBBY
ELEVATOR 4
E04
ELEVATOR 5
E05
OR
STORAGE
1404A
STAIR-A
S01
ELEVATOR LOBBY
ELEVATOR-3
E03
ELEVATOR-2
E02STAIR-B
S02
CORRIDOR
14C6
CORRIDOR
11C3
PACU
CIRCULATION
12C1
VENDING
UNISEX
TOILET
UNISEX
TOILET
STAFF TOILET
VESTIBULE
LOBBY
CORRIDOR
11C1
CORRIDOR
14C3CORRIDOR
14C7
CORRIDOR
14C4
RESTRICTED
CORRIDOR
15C3
RESTRICTED
CORRIDOR
15C4
RESTRICTED
CORRIDOR
15C5
CORRIDOR
11C7
CORRIDOR
11C6
CORRIDOR
100C13
CORRIDOR
14C2
CORRIDOR
100C12
CORRIDOR
11C4
CORRIDOR
13C1
SCOPE
STORAGE
CORRIDOR
11C5
FEMALE STAFF
LOCKER
FEMALE TOILET
STERILE
CORE
FUTURE
STAIR-2
MALE
TOILET
MALE STAFF
LOCKER
STAFF
LOUNGE
AMBULANCE
ENTRY
EMERGENCY
WAITING
ASC
REGISTRATION
NURSE
STATION
SOILED
UTILITY
1128PATIENT
TOILET
ELEVATOR 1
E 01
TRIAGE
TRIAGE
ER REGISTRATION
HALL
SOILED UTILITY
FEMALE
TOILET
ER WORK RM
BREAK RM
CONSULT RM
OR-4
GENERAL
PURPOSE
SUB-STERILE
EQUIP
STORAGE
OR-2
GENERAL
PURPOSE
OR-3
GENERAL
PURPOSE
HAC
CLEAN
SUPPLY
OR-1
GENERAL
PURPOSE
EQUIP
STORAGE
SUB-STERILE
EQUIP
ALCOVE
RESTRICTED
CORRIDOR
15C1
PACU
INPT
HOLDING
PACU
PACU
PACU
ANESTH
STORAGE
MALE
TOILET
WHEELCHAIR
ALCOVE
187A
AMBULANCE
ENTRY
TRIAGE
POLICE
OFFICE
HAC
STAFF
TOILET
ELECTRICAL
OFFICE
CORRIDOR
100C10
ANESTH
WORK RM
SOILED
UTILITY
IT CLOSET
ASST NURSE
MGR OF
EMERGENCY
SPECIMEN
STORAGE
MGR
OFFICE
PACU
1207 PACU
EQUIP
STERILE
SUPPLY
SOILED
UTILITY
MED RM
HAC
UNISEX
PATIENT
TOILET
PACU
PATIENT
TOILET
CLEAN
UTILITY
PATIENT
TOILET
CONFERENCE
PATIENT
TOILET
ANESTH
WORK RM
PATIENT RM
CONSULT
CORRIDOR
11C2
CORRIDOR
14C1
PAIN
PROCEDURE RM
ENDO
PROCEDURE RM
1306 SCOPE
CLEANUP
ENDO
PROCEDURE RM
HAC
ASST NURSE
MGR OF PRE-OP
NURSE MGR
OF PRE-OP
EXAM RM
EXAM RM
EXAM RM
PRE-OP/
HOLD/
RECOVERY
PRE-OP/
HOLD/
RECOVERY
PRE-OP/
HOLD/
RECOVERY
PRE-OP/
HOLD/
RECOVERY
PRE-OP/
HOLD/
RECOVERY
PRE-OP/
HOLD/
RECOVERY
PRE-OP/
HOLD/
RECOVERY
PRE-OP/
HOLD/
RECOVERY
PRE-OP/
HOLD/
RECOVERY
OR CLINICAL
EXPERT OFFICE
PRE-OP/
HOLD/
RECOVERY
CORRIDOR
11C8
FCU-18"
Ø
6" Ø
B
A
B
10x8 OA UP TO GV-1 12"x12"
8" Ø
10"x8"
8" Ø
B
B
8"Ø
10X8 UP TO EF-1
EXHAUST FAN ON ROOF CURB
12x10 RA
S& F
M
M
¾" HWS
¾" HWR
1" CHWS
1" CHWR
FROM SECOND FLOOR MECH ROOM
¾"HWS/R FROM SECOND FLOOR MECH ROOM¾"HWS/R FROM SECOND FLOOR MECH ROOM
CV-1
CV-2
TT
M
THERMOSTATIC CONTROL VALVE
FT-1
M
FT-1TT
CAP
MANUAL AIR VENT
MANUAL BALANCING VALVE
SHUT OFF VALVE
TT TEMPERATURE TRANSMITTER
PIPE GUIDE OR SLEEVE
M MOTORIZED CONTROL VALVE
BALL VALVE
S&F SMOKE AND FIRE DAMPER
LOUVER
PIPE UP
FAN COIL UNIT
FIRE DAMPER
VOLUME DAMPER
AIR FLOW DIRECTION(SUPPLY/RETURN)
UNIT-VENT
ELBOW DOWN
CONTINUATION
RETURN DIFFUSER
GRILLE
EXHAUST DIFFUSER
SUPPLY DIFFUSER
THERMOSTAT
ACCESS DOOR
AIR FILTER
LINEAR DIFFUSER
SYMBOL DESCRIPTION
LEGEND
DRAIN
AV AV
E 1
D 1
4 CA
4 CA
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text T
VHALEBDonmoM Line
VHALEBDonmoM Line
VHALEBDonmoM Line
VHALEBDonmoM Text Box Install new fire dampers
| Sheets and Views |
| Model |
File details come from the government source that posted it. Updated .