AE-100 Floor Plan - Fire Barrier Upgrade.pdf
PDF 180 KB Posted
- Solicitation number
- 36C24426R0016
About this file
This document is a detailed architectural floor plan for a medical facility, showcasing an extensive layout of multiple interconnected spaces across different sections. The floor plan includes numerous specialized medical areas such as PACU (Post-Anesthesia Care Unit), Pre-Op/Hold/Recovery rooms, procedure rooms (Endo, Pain), exam rooms, nurse stations, equipment alcoves, patient rooms, toilets, and various utility spaces like sterile supply, soiled utility, and specimen storage. The plan notes specific modifications including replacing clouded door frames and extending walls to decking for support, with a new 2-Hour Rated wall connecting to an existing stairwell. Room numbering is systematic, ranging from rooms 1000-1521, with detailed corridor and circulation designations (e.g., 11C1, 14C3), indicating a complex, multi-zone medical facility design with careful spatial planning for different medical functions and workflow.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SOW - Replace Door Frames Building 104 D-B -Rev1 11042025.docx | DOCX document | |
| 36C24426R0016 0002.pdf | ||
| 595-24-105 Replace Door Frames 104 - Prebid Sign In 10142025.pdf | ||
| 36C2442600016 Amend 2 Door Frames 104 RFI responses.docx | DOCX document | |
| 36C24426R0016 0002_1.docx | DOCX document | |
| LB-104-01AR - Rev1 11042025-Model.pdf | ||
| LB-104-01ME-Model.pdf | ||
| AE-102 Doors-Frames-Details - Rev2.pdf | ||
| 013526 Lebanon Safety Requirements Spec 20240516.docx | DOCX document | |
| RM Language for Contracts_01.docx | DOCX document | |
| 36C24426R0016 0001_1.docx | DOCX document | |
| 36C24426R0016 0001.docx | DOCX document | |
| AE-101 Wall Types.pdf | ||
| P03 07.08.2025 Service Determination.pdf | ||
| Davis-Bacon Act WD PA20250093 10.3.25.pdf | ||
| 36C24426R0016 10.14.25.pdf | ||
| RM Language for Contracts.docx | DOCX document | |
| SOW - Replace Door Frames Building 104 D-B.docx | DOCX document | |
| 36C24426R0016_1.docx | DOCX document | |
| P03 36C24426AP0236 liquidated damages formulation Lebanon signed.pdf |
Show all 20
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DICTATION
HAND WASH
MEDS
NOURISH
COFFEE BAR
UP
UP
HAND WASH
FEC FEC
FEC
CORRIDOR
100C5
CRASH
CART
ALCOVE
NURSE
STATION
SCRUB
RESTRICTED
CORRIDOR
15C2
SCRUB
BLOOD REF
ALCOVE
WHEELCHAIR
ALCOVE
EQUIP
ALCOVE
CRASH
CART
ALCOVE
WHEELCHAIR /
STRETCHER
PATIENT RM
EQUIP
ALCOVE
NURSE
STATION
(SATELITE)
CRASH
CART
ALCOVE
SCRUB
1308 SCOPE STORAGE
1305A
CORRIDOR
100A
STORAGE
CLOSET
100B
ELEVATOR
LOBBY
ELEVATOR 4
E04
ELEVATOR 5
E05
OR
STORAGE
1404A
STAIR-A
S01
ELEVATOR LOBBY
ELEVATOR-3
E03
ELEVATOR-2
E02STAIR-B
S02
CORRIDOR
14C6
CORRIDOR
11C3
PACU
CIRCULATION
12C1
VENDING
UNISEX
TOILET
UNISEX
TOILET
STAFF TOILET
VESTIBULE
LOBBY
CORRIDOR
11C1
CORRIDOR
14C3CORRIDOR
14C7
CORRIDOR
14C4
RESTRICTED
CORRIDOR
15C3
RESTRICTED
CORRIDOR
15C4
RESTRICTED
CORRIDOR
15C5
CORRIDOR
11C7
CORRIDOR
11C6
CORRIDOR
100C13
CORRIDOR
14C2
CORRIDOR
100C12
CORRIDOR
11C4
CORRIDOR
13C1
SCOPE
STORAGE
CORRIDOR
11C5
FEMALE STAFF
LOCKER
FEMALE TOILET
STERILE
CORE
FUTURE
STAIR-2
MALE
TOILET
MALE STAFF
LOCKER
STAFF
LOUNGE
AMBULANCE
ENTRY
EMERGENCY
WAITING
ASC
REGISTRATION
NURSE
STATION
SOILED
UTILITY
1128PATIENT
TOILET
ELEVATOR 1
E 01
TRIAGE
TRIAGE
ER REGISTRATION
HALL
SOILED UTILITY
FEMALE
TOILET
ER WORK RM
BREAK RM
CONSULT RM
OR-4
GENERAL
PURPOSE
SUB-STERILE
EQUIP
STORAGE
OR-2
GENERAL
PURPOSE
OR-3
GENERAL
PURPOSE
HAC
CLEAN
SUPPLY
OR-1
GENERAL
PURPOSE
EQUIP
STORAGE
SUB-STERILE
EQUIP
ALCOVE
RESTRICTED
CORRIDOR
15C1
PACU
INPT
HOLDING
PACU
PACU
PACU
ANESTH
STORAGE
MALE
TOILET
WHEELCHAIR
ALCOVE
187A
AMBULANCE
ENTRY
TRIAGE
POLICE
OFFICE
HAC
STAFF
TOILET
ELECTRICAL
OFFICE
CORRIDOR
100C10
ANESTH
WORK RM
SOILED
UTILITY
IT CLOSET
ASST NURSE
MGR OF
EMERGENCY
SPECIMEN
STORAGE
MGR
OFFICE
PACU
1207 PACU
EQUIP
STERILE
SUPPLY
SOILED
UTILITY
MED RM
HAC
UNISEX
PATIENT
TOILET
PACU
PATIENT
TOILET
CLEAN
UTILITY
PATIENT
TOILET
CONFERENCE
PATIENT
TOILET
ANESTH
WORK RM
PATIENT RM
CONSULT
CORRIDOR
11C2
CORRIDOR
14C1
PAIN
PROCEDURE RM
ENDO
PROCEDURE RM
1306 SCOPE
CLEANUP
ENDO
PROCEDURE RM
HAC
ASST NURSE
MGR OF PRE-OP
NURSE MGR
OF PRE-OP
EXAM RM
EXAM RM
EXAM RM
PRE-OP/
HOLD/
RECOVERY
PRE-OP/
HOLD/
RECOVERY
PRE-OP/
HOLD/
RECOVERY
PRE-OP/
HOLD/
RECOVERY
PRE-OP/
HOLD/
RECOVERY
PRE-OP/
HOLD/
RECOVERY
PRE-OP/
HOLD/
RECOVERY
PRE-OP/
HOLD/
RECOVERY
PRE-OP/
HOLD/
RECOVERY
OR CLINICAL
EXPERT OFFICE
PRE-OP/
HOLD/
RECOVERY
CORRIDOR
11C8
11C7
11C5.2
11C1.111C5.111C4
14C1
13C1.1
12C1
13C1.2
14C3
14C2
100C12.2 100C12.1
15C1
Clouded door frames are to be replaced and walls extended to decking for support
Thick wall Line is new 2-Hour Rated wall connecting to existing stairwell
AREAS OF WORK
14C7
| Sheets and Views |
| Model |
File details come from the government source that posted it. Updated .