AE-100 Floor Plan - Fire Barrier Upgrade.pdf

PDF 180 KB Posted

Attached to
Z1DA--RFI Responses | 595-24-105 Replace Door Frames Bldg 104 DB (VA-26-00010058)
Solicitation number
36C24426R0016
Issued by

About this file

This document is a detailed architectural floor plan for a medical facility, showcasing an extensive layout of multiple interconnected spaces across different sections. The floor plan includes numerous specialized medical areas such as PACU (Post-Anesthesia Care Unit), Pre-Op/Hold/Recovery rooms, procedure rooms (Endo, Pain), exam rooms, nurse stations, equipment alcoves, patient rooms, toilets, and various utility spaces like sterile supply, soiled utility, and specimen storage. The plan notes specific modifications including replacing clouded door frames and extending walls to decking for support, with a new 2-Hour Rated wall connecting to an existing stairwell. Room numbering is systematic, ranging from rooms 1000-1521, with detailed corridor and circulation designations (e.g., 11C1, 14C3), indicating a complex, multi-zone medical facility design with careful spatial planning for different medical functions and workflow.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DICTATION

HAND WASH

MEDS

NOURISH

COFFEE BAR

UP

UP

HAND WASH

FEC FEC

FEC

CORRIDOR

100C5

CRASH

CART

ALCOVE

NURSE

STATION

SCRUB

RESTRICTED

CORRIDOR

15C2

SCRUB

BLOOD REF

ALCOVE

WHEELCHAIR

ALCOVE

EQUIP

ALCOVE

CRASH

CART

ALCOVE

WHEELCHAIR /

STRETCHER

PATIENT RM

EQUIP

ALCOVE

NURSE

STATION

(SATELITE)

CRASH

CART

ALCOVE

SCRUB

1308 SCOPE STORAGE

1305A

CORRIDOR

100A

STORAGE

CLOSET

100B

ELEVATOR

LOBBY

ELEVATOR 4

E04

ELEVATOR 5

E05

OR

STORAGE

1404A

STAIR-A

S01

ELEVATOR LOBBY

ELEVATOR-3

E03

ELEVATOR-2

E02STAIR-B

S02

CORRIDOR

14C6

CORRIDOR

11C3

PACU

CIRCULATION

12C1

VENDING

UNISEX

TOILET

UNISEX

TOILET

STAFF TOILET

VESTIBULE

LOBBY

CORRIDOR

11C1

CORRIDOR

14C3CORRIDOR

14C7

CORRIDOR

14C4

RESTRICTED

CORRIDOR

15C3

RESTRICTED

CORRIDOR

15C4

RESTRICTED

CORRIDOR

15C5

CORRIDOR

11C7

CORRIDOR

11C6

CORRIDOR

100C13

CORRIDOR

14C2

CORRIDOR

100C12

CORRIDOR

11C4

CORRIDOR

13C1

SCOPE

STORAGE

CORRIDOR

11C5

FEMALE STAFF

LOCKER

FEMALE TOILET

STERILE

CORE

FUTURE

STAIR-2

MALE

TOILET

MALE STAFF

LOCKER

STAFF

LOUNGE

AMBULANCE

ENTRY

EMERGENCY

WAITING

ASC

REGISTRATION

NURSE

STATION

SOILED

UTILITY

1128PATIENT

TOILET

ELEVATOR 1

E 01

TRIAGE

TRIAGE

ER REGISTRATION

HALL

SOILED UTILITY

FEMALE

TOILET

ER WORK RM

BREAK RM

CONSULT RM

OR-4

GENERAL

PURPOSE

SUB-STERILE

EQUIP

STORAGE

OR-2

GENERAL

PURPOSE

OR-3

GENERAL

PURPOSE

HAC

CLEAN

SUPPLY

OR-1

GENERAL

PURPOSE

EQUIP

STORAGE

SUB-STERILE

EQUIP

ALCOVE

RESTRICTED

CORRIDOR

15C1

PACU

INPT

HOLDING

PACU

PACU

PACU

ANESTH

STORAGE

MALE

TOILET

WHEELCHAIR

ALCOVE

187A

AMBULANCE

ENTRY

TRIAGE

POLICE

OFFICE

HAC

STAFF

TOILET

ELECTRICAL

OFFICE

CORRIDOR

100C10

ANESTH

WORK RM

SOILED

UTILITY

IT CLOSET

ASST NURSE

MGR OF

EMERGENCY

SPECIMEN

STORAGE

MGR

OFFICE

PACU

1207 PACU

EQUIP

STERILE

SUPPLY

SOILED

UTILITY

MED RM

HAC

UNISEX

PATIENT

TOILET

PACU

PATIENT

TOILET

CLEAN

UTILITY

PATIENT

TOILET

CONFERENCE

PATIENT

TOILET

ANESTH

WORK RM

PATIENT RM

CONSULT

CORRIDOR

11C2

CORRIDOR

14C1

PAIN

PROCEDURE RM

ENDO

PROCEDURE RM

1306 SCOPE

CLEANUP

ENDO

PROCEDURE RM

HAC

ASST NURSE

MGR OF PRE-OP

NURSE MGR

OF PRE-OP

EXAM RM

EXAM RM

EXAM RM

PRE-OP/

HOLD/

RECOVERY

PRE-OP/

HOLD/

RECOVERY

PRE-OP/

HOLD/

RECOVERY

PRE-OP/

HOLD/

RECOVERY

PRE-OP/

HOLD/

RECOVERY

PRE-OP/

HOLD/

RECOVERY

PRE-OP/

HOLD/

RECOVERY

PRE-OP/

HOLD/

RECOVERY

PRE-OP/

HOLD/

RECOVERY

OR CLINICAL

EXPERT OFFICE

PRE-OP/

HOLD/

RECOVERY

CORRIDOR

11C8

11C7

11C5.2

11C1.111C5.111C4

14C1

13C1.1

12C1

13C1.2

14C3

14C2

100C12.2 100C12.1

15C1

Clouded door frames are to be replaced and walls extended to decking for support

Thick wall Line is new 2-Hour Rated wall connecting to existing stairwell

AREAS OF WORK

14C7

Sheets and Views
Model

File details come from the government source that posted it. Updated .