LB-104-01AR - Rev1 11042025-Model.pdf

PDF 460 KB Posted

Attached to
Z1DA--RFI Responses | 595-24-105 Replace Door Frames Bldg 104 DB (VA-26-00010058)
Solicitation number
36C24426R0016
Issued by

About this file

This document is a detailed architectural floor plan for a medical facility, showing an extensive layout of various medical spaces and functional areas. The floor plan includes multiple Pre-Op/Hold/Recovery rooms (numbered 1101-1116), numerous patient rooms, specialized medical spaces such as PACU (Post-Anesthesia Care Unit) areas, procedure rooms (Endo Procedure Rooms, Pain Procedure Room), nurse stations, equipment alcoves, sterile and soiled utility rooms, medication rooms, and support spaces like restrooms, corridors, and elevators. A notable technical specification indicates that doors and frames are to be 2-hour rated, with a new 2-Hour Rated Fire Wall noted in section 11C7. The design appears comprehensive, covering multiple interconnected clinical and support zones with a complex, well-organized spatial arrangement typical of modern healthcare facilities.

View the file

Other files

Show all 20

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WASH

MEDS

NOURISH

COFFEE BAR

HAND HAND

DICTATION

WASH

UP

UP

21'-01

8"

9' -1

1 4"

19'-113 4"

8' -7

3 4"

CRASH

CART

ALCOVE

NURSE

STATION

SCRUB

RESTRICTED

CORRIDOR

15C2

SCRUB

BLOOD

REF

ALCOVE

EQUIP

ALCOVE

CRASH

CART

ALCOVE

WHEELCHAIR /

STRETCHER

PATIENT RM

EQUIP

ALCOVE

NURSE

STATION

(SATELITE)

CRASH

CART

ALCOVE

SCOPE STORAGE

1305A

STAIR A

S01

ELEVATOR LOBBY

ELEVATOR 3

E 03

ELEVATOR 2

E 02STAIR B

S02

CORRIDOR

14C6

CORRIDOR

11C3

PACU

CIRCULATION

12C1

VENDING

UNISEX

TOILET

UNISEX

TOILET

STAFF TOILET

VESTIBULE

LOBBY

CORRIDOR

11C1

CORRIDOR

14C3CORRIDOR

14C7

CORRIDOR

14C4

RESTRICTED

CORRIDOR

15C3

RESTRICTED

CORRIDOR

15C4

RESTRICTED

CORRIDOR

15C5

CORRIDOR

11C7

CORRIDOR

11C6

CORRIDOR

100C13

CORRIDOR

14C2

CORRIDOR

100C12

CORRIDOR

11C4

CORRIDOR

13C1

SCOPE

STORAGE

CORRIDOR

11C5

STAFF LOCKERS

WOMENS TOILET

STERILE

CORE

FUTURE

STAIR-2

MENS TOILET

STAFF

LOCKERS

STAFF

LOUNGE

AMBULANCE

ENTRY

EMERGENCY

WAITING

ASC

REGISTRATION

NURSE

STATION

SOILED

UTILITY

1128PATIENT

TOILET

ELEVATOR 1

E 01

TRIAGE

TRIAGE

ER REGISTRATION

HALL

SOILED UTILITY

WOMENS

TOILET

ER WORK RM

BREAK

RM

CONSULT

OR-4

GENERAL

PURPOSE

SUB-STERILE

EQUIP

STORAGE

OR-2

GENERAL

PURPOSE

OR-3

GENERAL

PURPOSE

HAC

CLEAN

SUPPLY

OR-1

GENERAL

PURPOSE

EQUIP

STORAGE

SUB-STERILE

EQUIP

ALCOVE

RESTRICTED

CORRIDOR

15C1

PACU

INPT

HOLDING

PACU

PACU

PACU

ANESTH

WORK RM

MENS

TOILET

WHEELCHAIR

ALCOVE

187A

AMBULANCE

ENTRY

TRIAGE

POLICE

OFFICE

HAC

STAFF

TOILET

ELECTRICAL

CORRIDOR

100C5

OFFICE

CORRIDOR

100C10

ANESTH

WORK RM

SOILED

UTILITY

UTILITY

RM

WHEELCHAIR

ALCOVE

CONTROL RM

SPECIMEN

STORAGE

MGR

OFFICE

PACU

1207 PACU

EQUIP

STERILE

SUPPLY

SOILED

UTILITY

MEDICATION

RM

HAC

PATIENT

TOILET

PACU

PATIENT

TOILET

CLEAN

UTILITY

PATIENT

TOILET

CONFERENCE

PATIENT

TOILET

ANESTH

WORK RM

PATIENT RM

CONSULT

CORRIDOR

11C2

CORRIDOR

14C1

PAIN

PROCEDURE

RM

ENDO

PROCEDURE

RM

SCRUB

SCOPE

CLEANUP

ENDO

PROCEDURE

RM

HAC

PRE-OP/

HOLD/

RECOVERY

PRE-OP/

HOLD/

RECOVERY

PRE-OP/

HOLD/

RECOVERY

PRE-OP/

HOLD/

RECOVERY

PRE-OP/

HOLD/

RECOVERY

PRE-OP/

HOLD/

RECOVERY

PRE-OP/

HOLD/

RECOVERY

PRE-OP/

HOLD/

RECOVERY

PRE-OP/

HOLD/

RECOVERY

PRE-OP/

HOLD/

RECOVERY

PRE-OP/

HOLD/

RECOVERY

PRE-OP/

HOLD/

RECOVERY

PRE-OP/

HOLD/

RECOVERY

PRE-OP/

HOLD/

RECOVERY

PRE-OP/

HOLD/

RECOVERY

PRE-OP/

HOLD/

RECOVERY

CORRIDOR

11C8

Doors and frames to be 2-hour rated

New 2-Hour Rated Fire Wall

11C7

15C1

100C12.2 100C12.1

Sheets and Views
Model

File details come from the government source that posted it. Updated .