MECHANICAL AND CONTROL SYSTEMS
Environmental Control System
Building Automation System
PROJECT
ARCHITECT
ENGINEER
CONTRACTOR
MODERN CONTROLS INC
7 BELLECOR DRIVE
NEW CASTLE, DE. 19720
DATE
Branch Information
CONTRACT NUMBERAPPLICATION ENGINEERPROJECT MANAGERSALES ENGINEER
REFERENCE DRAWING
NO. REVISION-LOCATION ECN DATE BY
Automatic Temperature Controls
Heating
Air Conditioning
Air Filters
Water Treatment
Coil Cleaning
Contract Operations
Time-Shared Automated Building Service
Refrigeration
Industrial Controls / Recording / Indication Equipment
Air and Water Systems Balancing
Instrumentation System Installation
Building Operations Management
Energy Conservation Control
Custom Programmed Maintenance
211-1009IW/BM 12/17/12IW/JAIW
VA MEDICAL CENTER
HVAC CONTROLS UPGRADE - PHASE 2G
WILMINGTON, DELAWARE
HATCH MOTT MACDONALD
27 BLEEKER ST.
MILLBURN, NJ 07041
BOB SMITH CONTRACTORS
281 EAST EVERGREEN ST.
WEST GROVE, PA 19390
DEPT. OF VETERANS AFFAIRS
1601 KIRKWOOD HIGHWAY
WILMINGTON, DE 19805
VA HVAC CONTROLS UPGRADE - PHASE 2G
(PARTIAL SUBMITTAL - INCLUDES BLDG. #13 REGIONAL OFFICE HVAC EQUIPMENT)
PAGE # DRAWING TITLE LAST REVISION
TP-1 TITLE PAGE 12/10/13
C-1A AIR HANDLING UNIT CONTROL – AHU-1 12/10/13
C-1B CONTROLLER WIRING DETAIL – AHU-1 12/10/13
C-1C AIR HANDLING UNIT CONTROL – AHU-2 12/10/13
C-1D CONTROLLER WIRING DETAIL – AHU-2 12/10/13
C-1E SEQUENCE OF OPERATIONS – BLDG. 13 AHU-1 & AHU-2 12/10/13
C-2 CHILLER & ASSOCIATED HEAT EXCHANGER CONTROL 12/10/13
AS-BUILT REV. FINAL POINT TERM.1 12/10/13 DB
1 2
AS-BUILT REV. ADD ‘MASTER’ NOTE1 01/28/14 DB
NOTE(S): REFER TO ‘MASTER BUILDING NETWORK ARCHITECTURE DRAWING’
PROVIDED IN OUR ATC AS-BUILT / O&M MANUAL BINDER FOR ALL
SUPERVISORY CONTROLLER INFORMATION AND ASSOCIATED IP
ADDRESSES USED BY MODERN CONTROLS.
REFER TO ‘MASTER BUILDING VALVE SCHEDULE’ PROVIDED IN OUR
ATC AS-BUILT / O&M MANUAL BINDER FOR A COMPLETE LIST OF ALL
CONTROL VALVES PROVIDED FOR AIR HANDLING UNITS AND
ASSOCIATED VAV BOXES.
7 BELLECOR DRIVE
NEW CASTLE, DE
19720
TEL: 302-325-6800
FAX: 302-325-6808
REFERENCE DRAWING NO. REVISION-LOCATION ECN DATE BY
Sales Engineer Project Manager Application Engineer
BY DATE BY DATE
DRAWN APPROVED
Branch Information CONTRACT NUMBER
DRAWING NUMBER
Drawing Title
Project Title
BM 12/17/12
211-1009
IW/BMIW/JAIW
C-1A
AIR HANDLING UNIT CONTROL-
BLDG.#13 AHU-1
AIR HANDLING UNIT CONTROL – BLDG.#13 AHU-1
OAH
OAT
GLOBAL OUTSIDE AIR
TEMPERATURE AND
HUMIDITY SIGNAL
SUPPLY
AIR OUTDOOR
AIR
SF
FILTER
UI-3
MA-T
C
C
CWS
CWR
*SEE NOTES
AO-9
V-2
BI-7
DPS
VA HVAC CONTROLS UPGRADE -
PHASE 2G
WILMINGTON, DELAWARE
HWS
HWR
*SEE NOTES
H
C
CO-6
V-1
UI-2
DA-T
DA
(D-1)CO-7
N.C.
UI-1
*SEE NOTES
T-1
(TEMP.)
N.O.
RETURN
AIR
UI-4
UI-2
110v (EXISTING)
*EXISTING EX. CP
BLDG. 13
MECH. EQUIPMENT RM. -
(MER MAIN BLDG. 13)
BILL OF MATERIALS
Designation Qty Part Number Description
FEC-1 1 MS-FEC2611-0 CNTRLR,DIG,FEC,6UI,2BI,3BO,2AO,4CO,BACNET
XM-1 1 MS-IOM4711-0 FEC EXPANSION,6UI,2BI,3BO,2AO,4CO,BACNET
VLV SEE VALVE SCHEDULE
RA-T/H
BO-1
R AO-8
VFD
H O
A *COMMAND
*START/STOP
NOTES:
UI-1
LH
SPS
FEC-26
IOM-47
IOM-47 POINT IDENTIFICATION
POINT #
UI-1
UI-2
UI-3
UI-4
UI-5
UI-6
BI-7
BI-8
POINT NAME/DESCRIPTION
STATIC PRESSURE
RETURN AIR HUMIDITY
FEC-26 POINT IDENTIFICATION
POINT #
UI-1
UI-2
UI-3
UI-4
UI-5
UI-6
BI-7
BI-8
AO-8
AO-9
BO-1
BO-2
BO-3
CO-4
CO-5
CO-6
CO-7
POINT NAME/DESCRIPTION
ZONE TEMPERATURE
DISCHARGE AIR TEMPERATURE (DA-T)
SUPPLY FAN STATUS
FREEZE STAT / SHUTDOWN
VFD COMMAND
CHILLED WATER VALVE
MIXED AIR TEMPERATURE (MA-T)
RETURN AIR TEMPERATURE (RA-T)
SUPPLY FAN START / STOP
PRE-HEAT VALVE COMMAND (V-1)
DAMPER COMMAND
AO-8
AO-9
BO-1
BO-2
BO-3
CO-4
CO-5
CO-6
CO-7
CHILLER ENABLE
AS-BUILT REV. FINAL POINT TERM.1 12/10/13 DB
*IOM
HUM.
TEMP.
BI-8
LL
*IOM
SPACE TEMP. DETAIL
EXSISTING SPACE
TEMPERATURE SENSOR
LOCATED IN HALLWAY
BY RM 25
ALL PNEUMATIC CONTROL DEVICES HAVE BEEN REPLACED (WHERE APPLICABLE). ANY
EXISTING ELECTRONIC CONTROL DEVICES IN GOOD WORKING CONDITION HAVE BEEN RE-
USED AND WIRED TO NEW JOHNSON DDC CONTROLLERS. ALL OTHER NEW ELECTRONIC
CONTROL DEVICES HAVE BEEN PROVIDED, INSTALLED AND WIRED TO THE NEW JOHNSON
DDC CONTROLLERS AS INDICATED. *REFER TO C-1B FOR CONTROLLER WIRING DETAILS
AND DRAWING C-1E FOR ASSOCIATED SEQUENCE OF OPERATIONS.
NEW ELECTRONIC CONTROL VALVES HAVE BEEN PROVIDED BY MODERN CONTROLS AND
INSTALLED BY THE GENERAL CONTRACTOR FOR ALL EQUIPMENT AS INDICATED ON THE
‘EXISTING AHU CONTROL DAMPERS AND VALVES REPLACEMENT SCHEDULE’ ON DRAWING
M-1 OF THE CONTRACT DOCUMENTS. PLEASE REFER TO VALVE SCHEDULE ‘V-1" FOR
ADDITIONAL INFORMATION.
THE CONTRACT DOCUMENTS AND SEQUENCE OF OPERATIONS REFER TO ALL EXISTING
DDC CONTROL PANELS AS ‘DCP’; AS PART OF PROJECT CLOSE OUT MODERN CONTROLS
WILL PROVIDE PERMANENT, PANEL SPECIFIC LABELS FOR ALL NEW & EXISITNG CONTROL
PANELS THAT WILL INDICATE THE ASSOCIATED EQUIPMENT SERVED. *ALL PANEL LABELS
HAVE BEEN APPROVED BY THE VA HOSPITAL.
211-1009
IW/BMIW/JAIW
7 BELLECOR DRIVE
NEW CASTLE, DE
19720
TEL: 302-325-6800
FAX: 302-325-6808
BM 8/12/11
C-1B
Sales Engineer Project Manager Application Engineer
BY DATE BY DATE
DRAWN APPROVED
Branch Information CONTRACT NUMBER
DRAWING NUMBER
VA HVAC CONTROLS UPGRADE -
PHASE 2G
WILMINGTON, DELAWARE
Drawing Title
CONTROLLER WIRING DETAIL –
AHU-1 (BLDG.13)
Project Title
CONTROLLER WIRING DETAIL – AHU-1 (BLDG. 13)
AS-BUILT REV. NEW DWG. / POINT TERM.1 12/10/13 DB
SEE AS-BUILT CONTROL DRAWINGS C-1A AND C-1E FOR
ASSOCIATED UNIT CONTROL DIAGRAM AND SEQUENCE OF
OPERATIONS.
NOTE(S):
124816326412
O N
Address:
S A
PW
R
C O
M
SA BUS
FC BUS
C O
M S
H
LD+1
5V
IN
IC
O M
IN
IC
O M
+1
5V
IN
IC
O M
IN
IC
O M
+1
5V
IN
IC
O M
IN
IC
O M
IN
IC
O M
IN
IC
O M
UNIVERSAL BINARY
BINARY
O U
T4 O
C O
M
O U
T5 O
C O
M
O U
T6 O
C O
M
O U
T7 O
C O
M
O U
T8 O
C O
M
O U
T9 O
C O
M
CONFIGURABLE ANALOG
H O
T
24V
C O
M
FEC2611
O U
T1 O
C O
M
O U
T2 O
C O
M
O U
T3 O
C O
M
FC EOL
IN
TRIAC JUMPERS
OUT1 INT
EXT
OUT2 OUT3
124816326412
O N
Address:
SA
FC
H O
T
24V
C O
M
IOM4711
FC EOL
IN
TRIAC JUMPERS
OUT1 INT
EXT
OUT2 OUT3
S A
P W
R
C O
M
+ - C
O M
S H
LD
SA/FC BUS
BINARY
O U
T4 O
C O
M
O U
T5 O
C O
M
O U
T6 O
C O
M
O U
T7 O
C O
M
O U
T8 O
C O
M
O U
T9 O
C O
M
CONFIGURABLE ANALOG
O U
T1 O
C O
M
O U
T2 O
C O
M
O U
T3 O
C O
M
+1 5V
IN
IC
O
M
IN
IC
O
M
+1 5V
IN
IC
O
M
IN
IC
O
M
+1 5V
IN
IC
O
M
IN
IC
O
M
IN
IC
O
M
IN
IC
O
M
UNIVERSAL BINARY
ZO
N
E
TE
M
PE
R A
TU
R
E
VF
D
C O
M M
A N
D
C H
IL
LE
D W
A
TE
R V
A
LV
E
SU
PP
LY
F
A N
S
TA
R T/
ST
O
P
PR
E-
H
EA
T
VA
LV
E
C O
M M
A N
D (V
-1
D A
M
PE
R C
O M
M A
N D
W H
EE
L
VF
D
C O
M M
A N
D
D
IS
C H
A R
G E
A
IR
T
EM
PE
R
A
TU
R E
(D A
-T
M
IX
ED
A
IR
T
EM
PE
R A
TU
R
E (M
A -T
R
ET
U R
N A
IR
T
EM
PE
R A
TU
R
E (R
A -T
SU
PP
LY
F
A N
S
TA
TU
S
FR
EE
ZE
S
TA
T
/ S H
U
TD
O W
N
ST
A
TI
C
P R
ES
SU
R E
R
ET
U R
N A
IR
H
U M
ID
IT
Y
19720
TEL: 302-325-6800
FAX: 302-325-6808
REFERENCE DRAWING NO. REVISION-LOCATION ECN DATE BY
Sales Engineer Project Manager Application Engineer
BY DATE BY DATE
DRAWN APPROVED
Branch Information CONTRACT NUMBER
DRAWING NUMBER
Drawing Title
Project Title
BM 12/17/12
211-1009
IW/BMIW/JAIW
C-1C
AIR HANDLING UNIT CONTROL-
BLDG.#13 AHU-2
AIR HANDLING UNIT CONTROL – BLDG.#13 AHU-2 (WEST)
OAH
OAT
GLOBAL OUTSIDE AIR
TEMPERATURE AND
HUMIDITY SIGNAL
SUPPLY
AIR OUTDOOR
AIR
SF
FILTER
UI-3
MA-T
C
C
CWS
CWR
*SEE NOTES
AO-9
V-2
BI-7
DPS
VA HVAC CONTROLS UPGRADE -
PHASE 2G
WILMINGTON, DELAWARE
HWS
HWR
*SEE NOTES
H
C
CO-6
V-1
UI-2
DA-T
DA
(D-1)CO-7
N.C.
UI-1
*SEE NOTES
T-1
(TEMP.)
N.O.
RETURN
AIR
UI-4
UI-2
110v (EXISTING)
*EXISTING EX. CP
BLDG. 13
MECH. EQUIPMENT RM. -
(MER MAIN BLDG. 13)
BILL OF MATERIALS
Designation Qty Part Number Description
FEC-1 1 MS-FEC2611-0 CNTRLR,DIG,FEC,6UI,2BI,3BO,2AO,4CO,BACNET
XM-1 1 MS-IOM4711-0 FEC EXPANSION,6UI,2BI,3BO,2AO,4CO,BACNET
VLV SEE VALVE SCHEDULE
RA-T/H
R AO-8
VFD
H O
A *COMMAND
*START/STOP
NOTES:
UI-1
LH
SPS
FEC-26
IOM-47
IOM-47 POINT IDENTIFICATION
POINT #
UI-1
UI-2
UI-3
UI-4
UI-5
UI-6
BI-7
BI-8
POINT NAME/DESCRIPTION
STATIC PRESSURE
RETURN AIR HUMIDITY
HOT WATER PUMP STATUS
CHILLED WATER PUMP STATUS
HOT WATER SUPPLY TEMPERATURE
FEC-26 POINT IDENTIFICATION
POINT #
UI-1
UI-2
UI-3
UI-4
UI-5
UI-6
BI-7
BI-8
AO-8
AO-9
BO-1
BO-2
BO-3
CO-4
CO-5
CO-6
CO-7
POINT NAME/DESCRIPTION
ZONE TEMPERATURE
DISCHARGE AIR TEMPERATURE (DA-T)
SUPPLY FAN STATUS
OUTSIDE AIR TEMPERATURE (OA-T)
OUTSIDE AIR HUMIDITY (OA-H)
FREEZE STAT / SHUTDOWN
VFD COMMAND
CHILLED WATER VALVE
MIXED AIR TEMPERATURE (MA-T)
RETURN AIR TEMPERATURE (RA-T)
SUPPLY FAN START / STOP
PRE-HEAT VALVE COMMAND (V-1)
DAMPER COMMAND
FAN COILS OCCUPIED/UNOCCUPIED
EXHAUST FAN
AO-8
AO-9
BO-1
BO-2
BO-3
CO-4
CO-5
CO-6
CO-7
HEAT EXCHANGER VALVE COMMAND
HOT WATER PUMP ENABLE
CHILLED WATER PUMP ENABLE
AS-BUILT REV. FINAL POINT TERM.1 12/10/13 DB
*IOM
HUM.
TEMP.
BI-8
LL
*IOM
SPACE TEMP. DETAIL
EXSISTING SPACE
TEMPERATURE SENSOR
LOCATED IN FRONT
HALLWAY
ALL PNEUMATIC CONTROL DEVICES HAVE BEEN REPLACED (WHERE APPLICABLE). ANY
EXISTING ELECTRONIC CONTROL DEVICES IN GOOD WORKING CONDITION HAVE BEEN RE-
USED AND WIRED TO NEW JOHNSON DDC CONTROLLERS. ALL OTHER NEW ELECTRONIC
CONTROL DEVICES HAVE BEEN PROVIDED, INSTALLED AND WIRED TO THE NEW JOHNSON
DDC CONTROLLERS AS INDICATED. *REFER TO C-1D FOR CONTROLLER WIRING DETAILS
AND DRAWING C-1E FOR ASSOCIATED SEQUENCE OF OPERATIONS.
NEW ELECTRONIC CONTROL VALVES HAVE BEEN PROVIDED BY MODERN CONTROLS AND
INSTALLED BY THE GENERAL CONTRACTOR FOR ALL EQUIPMENT AS INDICATED ON THE
‘EXISTING AHU CONTROL DAMPERS AND VALVES REPLACEMENT SCHEDULE’ ON DRAWING
M-1 OF THE CONTRACT DOCUMENTS. PLEASE REFER TO VALVE SCHEDULE ‘V-1" FOR
ADDITIONAL INFORMATION.
THE CONTRACT DOCUMENTS AND SEQUENCE OF OPERATIONS REFER TO ALL EXISTING
DDC CONTROL PANELS AS ‘DCP’; AS PART OF PROJECT CLOSE OUT MODERN CONTROLS
WILL PROVIDE PERMANENT, PANEL SPECIFIC LABELS FOR ALL NEW & EXISITNG CONTROL
PANELS THAT WILL INDICATE THE ASSOCIATED EQUIPMENT SERVED. *ALL PANEL LABELS
HAVE BEEN APPROVED BY THE VA HOSPITAL.
UI-5
OA-T
UI-6
H
OA-H
IW/BMIW/JAIW
7 BELLECOR DRIVE
NEW CASTLE, DE
19720
TEL: 302-325-6800
FAX: 302-325-6808
BM 8/12/11
C-1D
Sales Engineer Project Manager Application Engineer
BY DATE BY DATE
DRAWN APPROVED
Branch Information CONTRACT NUMBER
DRAWING NUMBER
VA HVAC CONTROLS UPGRADE -
PHASE 2G
WILMINGTON, DELAWARE
Drawing Title
CONTROLLER WIRING DETAIL –
AHU-2 (BLDG. 13)
Project Title
CONTROLLER WIRING DETAIL – AHU-2 (BLDG.#13)
AS-BUILT REV. NEW DWG. / POINT TERM.1 12/10/13 DB
SEE AS-BUILT CONTROL DRAWINGS C-1C AND C-1E FOR
ASSOCIATED UNIT CONTROL DIAGRAM AND SEQUENCE OF
OPERATIONS.
NOTE(S):
124816326412
O N
Address:
S A
PW
R
C O
M
SA BUS
FC BUS
C O
M S
H
LD+1
5V
IN
IC
O M
IN
IC
O M
+1
5V
IN
IC
O M
IN
IC
O M
+1
5V
IN
IC
O M
IN
IC
O M
IN
IC
O M
IN
IC
O M
UNIVERSAL BINARY
BINARY
O U
T4 O
C O
M
O U
T5 O
C O
M
O U
T6 O
C O
M
O U
T7 O
C O
M
O U
T8 O
C O
M
O U
T9 O
C O
M
CONFIGURABLE ANALOG
H O
T
24V
C O
M
FEC2611
O U
T1 O
C O
M
O U
T2 O
C O
M
O U
T3 O
C O
M
FC EOL
IN
TRIAC JUMPERS
OUT1 INT
EXT
OUT2 OUT3
124816326412
O N
Address:
SA
FC
H O
T
24V
C O
M
IOM4711
FC EOL
IN
TRIAC JUMPERS
OUT1 INT
EXT
OUT2 OUT3
S A
P W
R
C O
M
+ - C
O M
S H
LD
SA/FC BUS
BINARY
O U
T4 O
C O
M
O U
T5 O
C O
M
O U
T6 O
C O
M
O U
T7 O
C O
M
O U
T8 O
C O
M
O U
T9 O
C O
M
CONFIGURABLE ANALOG
O U
T1 O
C O
M
O U
T2 O
C O
M
O U
T3 O
C O
M
+1 5V
IN
IC
O
M
IN
IC
O
M
+1 5V
IN
IC
O
M
IN
IC
O
M
+1 5V
IN
IC
O
M
IN
IC
O
M
IN
IC
O
M
IN
IC
O
M
UNIVERSAL BINARY
ZO
N
E
TE
M
PE
R A
TU
R
E
VF
D
C O
M M
A N
D
C H
IL
LE
D W
A
TE
R V
A
LV
E
SU
PP
LY
F
A N
S
TA
R T/
ST
O
P
PR
E-
H
EA
T
VA
LV
E
C O
M M
A N
D (V
-1
D A
M
PE
R C
O M
M A
N D
W H
EE
L
VF
D
C O
M M
A N
D
D
IS
C H
A R
G E
A
IR
T
EM
PE
R
A
TU
R E
(D A
-T
M
IX
ED
A
IR
T
EM
PE
R A
TU
R
E (M
A -T
R
ET
U R
N A
IR
T
EM
PE
R A
TU
R
E (R
A -T
SU
PP
LY
F
A N
S
TA
TU
S
FR
EE
ZE
S
TA
T
/ S H
U
TD
O W
N
ST
A
TI
C
P R
ES
SU
R E
R
ET
U R
N A
IR
H
U M
ID
IT
Y
19720
TEL: 302-325-6800
FAX: 302-325-6808
REFERENCE DRAWING NO. REVISION-LOCATION ECN DATE BY
Sales Engineer Project Manager Application Engineer
BY DATE BY DATE
DRAWN APPROVED
Branch Information CONTRACT NUMBER
DRAWING NUMBER
Drawing Title
Project Title
BM 12/17/12
211-1009
IW/BMIW/JAIW
C-1E
SEQUENCE OF OPERATIONS -
BLDG.#13 AIR HANDLING
UNITS (AHU-1 & AHU-2)
VA HVAC CONTROLS UPGRADE -
PHASE 2G
WILMINGTON, DELAWARE
SEQUENCE OF OPERATIONS - BLDG.#13 AIR HANDLING UNITS
(TYPICAL FOR AHU-1 & AHU-2)
GENERIC AHU - SEQUENCE OF OPERATION
1. GENERAL
UNIT IS MANUALLY STARTED AND STOPPED BY THE DCP OR REMOTELY AT THE BMS. WHEN UNIT IS OFF DAMPER D-1 IS CLOSED. WHEN UNIT IS ON DAMPER D-1 IS OPEN.
2. TEMPERATURE CONTROL
DURING HEATING MODE THE SPACE TEMPERATURE SENSED BY T-1 SHALL BE MAINTAINED AT SETPOINT BY DCP MODULATING V-1. DURING COOLING MODE THE COOLING
COIL LEAVING AIR TEMPERATURE SENSED BY T-3 SHALL BE MAINTAINED AT SETPOINT BY DCP BY MODULATING V-2, AND THE SPACE TEMPERATURE SENSED BY T-1 SHALL
BE MAINTAINED AT SETPOINT BY MODULATING V-3.
3. AIR FLOW CONTROL
THE SUPPLY FAN SHALL RUN AT CONSTANT SPEED PROVIDING CONSTANT AIR FLOW.
4. FREEZE PROTECTION
IF THE AIR TEMPERATURE AS SENSED BY T-2 FALLS BELOW 45F AN ALARM SIGNAL IS INDICATED AT THE DCP AND BMS. IF THIS TEMPERATURE FALLS BELOW 40F THE UNIT
SUPPLY FAN SHALL STOP, THE DAMPER D-1 SHALL CLOSE AND A CRITICAL ALARM SHALL BE INDICATED AT THE DCP AND BMS.
5. EMERGENCY SHUTDOWN/RESTART
WHEN SMOKE IS DETECTED BY THE DUCT MOUNTED SMOKE DETECTOR THE SUPPLY FAN SHALL SHUT OFF, DAMPER D-1 CLOSE AND AN ALARM SIGNAL SHALL BE
TRANSMITTED TO THE FIRE ALARM SYSTEM. SUPPLY FAN SHALL RESTART AND DAMPER D-1 SHALL OPEN WHEN THE FIRE ALARM CIRCUIT IS MANUALLY RESET.
*SEE NOTES
NOTES: AHU-1 AND AHU-2 WERE PROGRAMMED TO MATCH THE
EXISTING CSI CONTROLLERS PROGRAM. ABOVE SEQUENCE
WAS FROM ‘AHU-1 CLINICAL’ WHICH WAS THE SAME TYPE OF
UNIT. *SEE ASSOCIATED CONTROL DIAGRAM ON DRAWING
C-1A AND C-1C.
AS-BUILT REV. NEW DWG. / POINT TERM.1 12/10/13 DB
19720
TEL: 302-325-6800
FAX: 302-325-6808
REFERENCE DRAWING NO. REVISION-LOCATION ECN DATE BY
Sales Engineer Project Manager Application Engineer
BY DATE BY DATE
DRAWN APPROVED
Branch Information CONTRACT NUMBER
DRAWING NUMBER
Drawing Title
Project Title
IW/BMIW/JAIW BM 12/17/12
C-2
CHILLER & ASSOCIATED HEAT
EXCHANGER CONTROL
CHILLER & ASSOCIATED HEAT EXCHANGER CONTROL
(REGIONAL OFFICE – BUILDING 13)
VA HVAC CONTROLS UPGRADE -
PHASE 2G
WILMINGTON, DELAWARE
OAH
OAT
LOCAL OUTSIDE AIR
TEMPERATURE AND
HUMIDITY SENSOR
LOCATED NEAR CHILLER
110v (EXISTING)
EX. CP
BLDG.#13
MECH. ROOM
(MAIN MER)
NOTE(S):
BILL OF MATERIALS
Designation Qty Part Number Description
VLV SEE VALVE SCHEDULE
HEAT
EXCHANGER
STEAM
CONDENSATE
BI-7
CT
TE
HWS
HWR
*SEE NOTES
HWP-X
R
*SEE NOTES
LPS
AO-8
EX. V
BO-2
RH
O A
C H L R E N B L
CH-1
CHWP-X
UI-6
CT
BO-2
R
AS-BUILT REV. NEW DWG. / POINT TERM.1 12/10/13 DB
FEC-26
IOM-47
AHU2 IOM47 POINT IDENTIFICATION
POINT #
UI-1
UI-2
UI-3
UI-4
UI-5
UI-6
BI-7
BI-8
POINT NAME/DESCRIPTION
STATIC PRESSURE
RETURN AIR HUMIDITY
HOT WATER PUMP STATUS
CHILLED WATER PUMP STATUS
HOT WATER SUPPLY TEMPERATURE
AHU1 FEC26 POINT IDENTIFICATION
POINT #
UI-1
UI-2
UI-3
UI-4
UI-5
UI-6
BI-7
BI-8
AO-8
AO-9
BO-1
BO-2
BO-3
CO-4
CO-5
CO-6
CO-7
POINT NAME/DESCRIPTION
ZONE TEMPERATURE
DISCHARGE AIR TEMPERATURE (DA-T)
SUPPLY FAN STATUS
OUTSIDE AIR TEMPERATURE (OA-T)
OUTSIDE AIR HUMIDITY (OA-H)
FREEZE STAT / SHUTDOWN
VFD COMMAND
CHILLED WATER VALVE
MIXED AIR TEMPERATURE (MA-T)
RETURN AIR TEMPERATURE (RA-T)
SUPPLY FAN START / STOP
PRE-HEAT VALVE COMMAND (V-1)
DAMPER COMMAND
FAN COILS OCCUPIED/UNOCCUPIED
EXHAUST FAN
AO-8
AO-9
BO-1
BO-2
BO-3
CO-4
CO-5
CO-6
CO-7
HEAT EXCHANGER VALVE COMMAND
HOT WATER PUMP ENABLE
CHILLED WATER PUMP ENABLE
THE FEC-26 AND IOM-47
CONTROLLERS / POINT
IDENTIFICATION LAYOUTS
OF AHU-1 AND AHU-2 ARE
BEING REFERENCED
FROM DRAWINGS C-1A
AND C-1C RESPECTIVELY
*IOM
*IOM
*IOM
*IOM
*IOM
*IOM
POINT BO-2 IS
FROM AHU-1 FEC26
ALL PNEUMATIC CONTROL DEVICES HAVE BEEN REPLACED (WHERE APPLICABLE). ANY
EXISTING ELECTRONIC CONTROL DEVICES IN GOOD WORKING CONDITION HAVE BEEN RE-
USED AND WIRED TO NEW JOHNSON DDC CONTROLLERS. ALL OTHER NEW ELECTRONIC
CONTROL DEVICES HAVE BEEN PROVIDED, INSTALLED AND WIRED TO THE NEW JOHNSON
DDC CONTROLLERS AS INDICATED. CONTROLLERS SHALL BE PROGRAMMED TO MATCH
EXISTING SEQUENCE OF OPERATIONS FOR ANY EQUIPMENT WITHOUT A SEQUENCE OF
OPERATION PROVIDED WITHIN THE CONTRACT DOCUMENTS. *REFER TO C-1B/C-1D FOR
CONTROLLER WIRING DETAILS.
NEW ELECTRONIC CONTROL VALVES HAVE BEEN PROVIDED BY MODERN CONTROLS AND
INSTALLED BY THE GENERAL CONTRACTOR FOR ALL EQUIPMENT AS INDICATED ON THE
‘EXISTING AHU CONTROL DAMPERS AND VALVES REPLACEMENT SCHEDULE’ ON DRAWING
M-1 OF THE CONTRACT DOCUMENTS. PLEASE REFER TO VALVE SCHEDULE ‘V-1" FOR
ADDITIONAL INFORMATION.
THE CONTRACT DOCUMENTS AND SEQUENCE OF OPERATIONS REFER TO ALL EXISTING
DDC CONTROL PANELS AS ‘DCP’; AS PART OF PROJECT CLOSE OUT MODERN CONTROLS
WILL PROVIDE PERMANENT, PANEL SPECIFIC LABELS FOR ALL NEW & EXISITNG CONTROL
PANELS THAT WILL INDICATE THE ASSOCIATED EQUIPMENT SERVED. *ALL PANEL LABELS
HAVE BEEN APPROVED BY THE VA HOSPITAL.
POINT UI-5 AND UI-6
ARE FROM AHU-2
FEC26
AHU2 FEC26 POINT IDENTIFICATION
POINT #
UI-1
UI-2
UI-3
UI-4
UI-5
UI-6
BI-7
BI-8
AO-8
AO-9
BO-1
BO-2
BO-3
CO-4
CO-5
CO-6
CO-7
POINT NAME/DESCRIPTION
ZONE TEMPERATURE
DISCHARGE AIR TEMPERATURE (DA-T)
SUPPLY FAN STATUS
OUTSIDE AIR TEMPERATURE (OA-T)
OUTSIDE AIR HUMIDITY (OA-H)
FREEZE STAT / SHUTDOWN
VFD COMMAND
CHILLED WATER VALVE
MIXED AIR TEMPERATURE (MA-T)
RETURN AIR TEMPERATURE (RA-T)
SUPPLY FAN START / STOP
PRE-HEAT VALVE COMMAND (V-1)
DAMPER COMMAND
FAN COILS OCCUPIED/UNOCCUPIED
EXHAUST FAN
*EXISTING
| Visio-2G-.TP1 |
| Visio-2G-C1A AHU 1 unit |
| Visio-2G-C1B AHU 1 controller |
| Visio-2G-C1C AHU 2 unit |
| Visio-2G-C1D AHU 2 controller |
| Visio-2G-C1E Sequence |
| Visio-2G-C2 chiller and hx |