MECHANICAL AND CONTROL SYSTEMS
Environmental Control System
Building Automation System
VA MEDICAL CENTER
HVAC CONTROLS UPGRADE - PHASE 2A
WILMINGTON, DELAWARE
PROJECT
OWNER
ENGINEER
CONTRACTOR
211-1009
MODERN CONTROLS INC
7 BELLECOR DRIVE
NEW CASTLE, DE. 19720
DATE
Branch Information
CONTRACT NUMBER
IW/BM
APPLICATION ENGINEER
3/7/11IW/BM
PROJECT MANAGER
IW
SALES ENGINEER
REFERENCE DRAWING
SUB. REVISION TITLE AND DATE REVS.1 4/20/11 BM
NO. REVISION-LOCATION ECN DATE BY
SUB. REVISION REVISION DATES2 5/10/11 BM
SUB. REVISION ADDED DWG. C-3; HX3 8/8/11 BM
Automatic Temperature Controls
Heating
Air Conditioning
Air Filters
Water Treatment
Coil Cleaning
Contract Operations
Time-Shared Automated Building Service
Refrigeration
Industrial Controls / Recording / Indication Equipment
Air and Water Systems Balancing
Instrumentation System Installation
Building Operations Management
Energy Conservation Control
Custom Programmed Maintenance
HATCH MOTT MACDONALD
27 BLEEKER ST.
MILLBURN, NJ 07041
BOB SMITH CONTRACTORS
281 EAST EVERGREEN ST.
WEST GROVE, PA 19390
DEPT. OF VETERANS AFFAIRS
1601 KIRKWOOD HIGHWAY
WILMINGTON, DE 19805
PAGE # DRAWING TITLE LAST REVISION
TP-1 TITLE PAGE 01/28/14
C-1A AIR HANDLING UNIT CONTROL – AHU FOR 4TH FLOOR WEST 12/02/13
C-1B CONTROLLER WIRING DETAIL – AHU FOR 4TH FLOOR WEST 12/02/13
C-1C AHU FOR 4TH FLOOR WEST – SEQUENCE OF OPERATIONS 12/02/13
C-1D AHU FOR 4TH FLOOR WEST – VAV BOX CONTROLS 12/02/13
C-2A AIR HANDLING UNIT CONTROL – AHU FOR 4TH FLOOR EAST 12/02/13
C-2B CONTROLLER WIRING DETAIL – AHU FOR 4TH EAST 12/02/13
C-2C AHU FOR 4TH FLOOR EAST – SEQUENCE OF OPERATIONS 12/02/13
C-2D AHU FOR 4TH FLOOR EAST – VAV BOX CONTROLS 12/02/13
C-3 HEAT EXCHANGER CONTROL; 4TH FLOOR MECH. ROOM 12/02/13
1 2 3
VA HVAC CONTROLS UPGRADE - PHASE 2A
(PARTIAL SUBMITTAL - 4TH FLOOR EAST & WEST HVAC EQUIPMENT) 4
AS-BUILT REV. FINAL AS-BUILT DATES4 12/20/13 BM
NOTE(S): REFER TO ‘MASTER BUILDING NETWORK ARCHITECTURE DRAWING’
PROVIDED IN OUR ATC AS-BUILT / O&M MANUAL BINDER FOR ALL
SUPERVISORY CONTROLLER INFORMATION AND ASSOCIATED IP
ADDRESSES USED BY MODERN CONTROLS.
REFER TO ‘MASTER BUILDING VALVE SCHEDULE’ PROVIDED IN OUR
ATC AS-BUILT / O&M MANUAL BINDER FOR A COMPLETE LIST OF ALL
CONTROL VALVES PROVIDED FOR AIR HANDLING UNITS AND
ASSOCIATED VAV BOXES.
AS-BUILT REV. ADD ‘MASTER’ NOTE5 1/28/14 DB
IW/BMIW/BMIW
7 BELLECOR DRIVE
NEW CASTLE, DE
19720
TEL: 302-325-6800
FAX: 302-325-6808
BM 3/7/11
REFERENCE DRAWING
SUB. REVISION REVISE DWG. TITLE1 4/20/11 BM
C-1A
NO. REVISION-LOCATION ECN DATE BY
Sales Engineer Project Manager Application Engineer
BY DATE BY DATE
DRAWN APPROVED
Branch Information CONTRACT NUMBER
DRAWING NUMBER
VA HVAC CONTROLS UPGRADE
- PHASE 2A
WILMINGTON, DELAWARE
Drawing Title
AIR HANDLING UNIT CONTROL
– AHU FOR 4TH FLOOR WEST
Project Title
AIR HANDLING UNIT CONTROL – AHU FOR 4TH FLOOR WEST
OAH
OAT
GLOBAL OUTSIDE AIR
TEMPERATURE AND
HUMIDITY SIGNAL
BILL OF MATERIALS
Designation Qty Part Number Description
FEC-1 1 MS-FEC2611-0 CNTRLR,DIG,FEC,6UI,2BI,3BO,2AO,4CO,BACNET
XM-1 2 MS-10M4711-0 FEC EXPANSION,6UI,2BI,3BO,2AO,4CO,BACNET
CHWV SEE VALVE SCHEDULE
110v (EXISTING)
*EXISTING EX. CP
(WEST)
FOURTH FLOOR MECH.
EQUIPMENT RM. - MER
(WEST SIDE)
AS-BUILT REV. FINAL POINT TERM./NOTE2 12/20/13 DB
D-1
CO-7
NOTE(S):
SUPPLY AIR
TO TERMINAL
UNITSOUTDOOR
AIR
EXHAUST
AIR
SF
RETURN
SMK
PRE
FILTER
BI-7
H L
SPS-1
UI-6
*SEE NOTES (TYP)
UI-6
*SEE NOTES (TYP.)
UI-4
RA-T
H
RA-H
UI-5
HUMID.
HIGH LIMIT
RF
RAFM
DP1
N.C.
N.C. *SEE DETAIL
& NOTES
HUMIDIFIER
UI-2
UI-7
DPS
BO-1
R AO-8HOA
S/S
CMD.
VSMC
UI-5
BO-2
R AO-9
CMD.
VSMC
D-3
CO-7
C
C
CWS
CWR
*SEE NOTES
CO-6
V-1
HWS
HWR
*SEE NOTES
H
C
CO-5
V-2
SAFM
UI-1UI-1
DA-T
UI-3
PA-T
D-2
CO-7
N.O.
HUMIDIFIER CONTROL
LPS
HUMID.
*SEE NOTES
COND.
CO-4BO-3
V-4V-3
FEC-26
IOM-47-1,2 (TYP. OF 2)
IOM-47-1 POINT IDENTIFICATION
POINT #
UI-1
UI-2
UI-3
UI-4
UI-5
UI-6
BI-7
BI-8
POINT NAME/DESCRIPTION
SUPPLY AIRFLOW MONITOR STATION (SAFM)
RETURN AIRFLOW MONITOR STATION (RAFM)
FINAL FILTER DIFFERENTIAL PRESSURE STATUS (DP2)
RETURN FAN STATUS (DPS)
PRE-FILTER DIFFERENTIAL PRESSURE (DP1)
PRE-HEAT COIL PUMP STATUS (CT)
FEC-26 POINT IDENTIFICATION
POINT #
UI-1
UI-2
UI-3
UI-4
UI-5
UI-6
BI-7
BI-8
AO-8
AO-9
BO-1
BO-2
BO-3
CO-4
CO-5
CO-6
CO-7
POINT NAME/DESCRIPTION
DISCHARGE AIR TEMPERATURE (DA-T)
MIXED AIR TEMPERATURE (MA-T)
SUPPLY FAN STATUS (DPS)
RETURN AIR HUMIDITY (RA-H)
DUCT STATIC PRESSURE (SPS)
FREEZE STAT / SHUTDOWN (LL)
SUPPLY FAN VFD COMMAND
RETURN FAN VFD COMMAND
PRE-HEAT COIL LEAVING AIR TEMPERATURE (PH-T)
RETURN AIR TEMPERATURE (RA-T)
SUPPLY FAN START / STOP
COOLING VALVE COMMAND (V-1)
PRE-HEAT COIL PUMP CMD.
PRE-HEAT VALVE COMMAND (V-2)
MIXED AIR DAMPER COMMAND (D1~D3)
RETURN FAN START / STOP
HUMIDIFIER ISOLATION VALVE COMMAND (V-3)
AO-8
AO-9
BO-1
BO-2
BO-3
CO-4
CO-5
CO-6
CO-7
HUMIDIFIER COMMAND
IOM-47-2 POINT IDENTIFICATION
POINT #
UI-1
UI-2
UI-3
UI-4
UI-5
UI-6
BI-7
BI-8
POINT NAME/DESCRIPTION
SUPPLY AIR DUCT HIGH STATIC PRESSURE (SP-HL)
SUPPLY FAN VFD ALARM
DISCHARGE AIR SMOKE DETECTOR (SMK)
DISCHARGE AIR HUMIDITY (DA-H)
MECH. RM. ZONE TEMPERATURE (SEE DWG C-3)
HUMIDIFIER STATUS (CT)
RETURN FAN VFD ALARM
PRE-HEAT PUMP LOCKOUT SWITCH
AO-8
AO-9
BO-1
BO-2
BO-3
CO-4
CO-5
CO-6
CO-7
UNIT HEATER COMMAND (SEE DRAWING C-3)
*IOM-47-1 *IOM-47-1
*IOM-47-1
*IOM-47-1
BI-8
LL
*IOM-47-1
ALL PNEUMATIC CONTROL DEVICES HAVE BEEN REPLACED (WHERE APPLICABLE). ANY
EXISTING ELECTRONIC CONTROL DEVICES IN GOOD WORKING CONDITION HAVE BEEN RE-
USED AND WIRED TO NEW JOHNSON DDC CONTROLLERS. ALL OTHER NEW ELECTRONIC
CONTROL DEVICES HAVE BEEN PROVIDED, INSTALLED AND WIRED TO THE NEW JOHNSON
DDC CONTROLLERS AS INDICATED. *REFER TO C-1B FOR CONTROLLER WIRING DETAILS
AND DRAWING C-1C FOR ASSOCIATED SEQUENCE OF OPERATIONS.
NEW ELECTRONIC CONTROL VALVES HAVE BEEN PROVIDED BY MODERN CONTROLS AND
INSTALLED BY THE GENERAL CONTRACTOR FOR ALL EQUIPMENT AS INDICATED ON THE
‘EXISTING AHU CONTROL DAMPERS AND VALVES REPLACEMENT SCHEDULE’ ON DRAWING
M-1 OF THE CONTRACT DOCUMENTS. PLEASE REFER TO VALVE SCHEDULE ‘V-1" FOR
ADDITIONAL INFORMATION.
THE CONTRACT DOCUMENTS AND SEQUENCE OF OPERATIONS REFER TO ALL EXISTING
DDC CONTROL PANELS AS ‘DCP’; AS PART OF PROJECT CLOSE OUT MODERN CONTROLS
WILL PROVIDE PERMANENT, PANEL SPECIFIC LABELS FOR ALL NEW & EXISITNG CONTROL
PANELS THAT WILL INDICATE THE ASSOCIATED EQUIPMENT SERVED. *ALL PANEL LABELS
HAVE BEEN APPROVED BY THE VA HOSPITAL.
L
H
SP-HL
HI-LIMIT
UI-1
*IOM-47-2
H
DA-H
UI-5
*IOM-47-2
UI-2
*IOM-47-2
ALARM
UI-3
*IOM-47-2
ALARM
FINAL
DP2
BI-7
*IOM-47-1
MA-T
BI-8
CTCO-4
R
PRE-HEAT COIL
PUMP CONTROL
*IOM-47-1
*IOM-47-1
PRE-HEAT COIL
PUMP - LOCKOUT
*IOM-47-2
UI-4
BI-8
CT
IW/BMIW/JAIW
7 BELLECOR DRIVE
NEW CASTLE, DE
19720
TEL: 302-325-6800
FAX: 302-325-6808
BM 8/12/11
C-1B
Sales Engineer Project Manager Application Engineer
BY DATE BY DATE
DRAWN APPROVED
Branch Information CONTRACT NUMBER
DRAWING NUMBER
VA HVAC CONTROLS UPGRADE -
PHASE 2A
WILMINGTON, DELAWARE
Drawing Title
CONTROLLER WIRING DETAIL –
AHU FOR 4TH FLOOR WEST
Project Title
CONTROLLER WIRING DETAIL – AHU FOR 4TH FLOOR WEST
AS-BUILT REV. NEW DWG. / POINT TERM.1 12/20/13 DB
124816326412
O N
Address:
S A
PW
R
C O
M
SA BUS
FC BUS
C O
M S
H
LD+1
5V
IN
IC
O M
IN
IC
O M
+1
5V
IN
IC
O M
IN
IC
O M
+1
5V
IN
IC
O M
IN
IC
O M
IN
IC
O M
IN
IC
O M
UNIVERSAL BINARY
BINARY
O U
T4 O
C O
M
O U
T5 O
C O
M
O U
T6 O
C O
M
O U
T7 O
C O
M
O U
T8 O
C O
M
O U
T9 O
C O
M
CONFIGURABLE ANALOG
H O
T
24V
C O
M
FEC2611
O U
T1 O
C O
M
O U
T2 O
C O
M
O U
T3 O
C O
M
FC EOL
IN
TRIAC JUMPERS
OUT1 INT
EXT
OUT2 OUT3
124816326412
O N
Address:
SA
FC
H O
T
24V
C O
M
IOM4711-1
FC EOL
IN
TRIAC JUMPERS
OUT1 INT
EXT
OUT2 OUT3
S A
P W
R
C O
M
+ - C
O M
S H
LD
SA/FC BUS
BINARY
O U
T4 O
C O
M
O U
T5 O
C O
M
O U
T6 O
C O
M
O U
T7 O
C O
M
O U
T8 O
C O
M
O U
T9 O
C O
M
CONFIGURABLE ANALOG
O U
T1 O
C O
M
O U
T2 O
C O
M
O U
T3 O
C O
M
+1 5V
IN
IC
O
M
IN
IC
O
M
+1 5V
IN
IC
O
M
IN
IC
O
M
+1 5V
IN
IC
O
M
IN
IC
O
M
IN
IC
O
M
IN
IC
O
M
UNIVERSAL BINARY
D
IS
C H
A R
G E
A
IR
T
EM
PE
R
A
TU
R E
(D A
-T
SU
PP
LY
F
A N
E N
A B
LE
R
ET
U R
N F
A N
E N
A B
LE
SU
PP
LY
F
A N
S
TA
R T/
ST
O
P
C O
O
LI
N G
V A
LV
E
C M
D
U
PP
ER
P
R
EH
EA
T
VA
LV
E C
M D
M
IX
ED
A
IR
D
A M
PE
R
C O
M M
A N
D
R
ET
U R
N F
A N
S
TA
R T/
ST
O
P
H U
M
ID
IF
IE
R
IS
O
LA
TI
O
N V
LV
. C
M D
M
IX
ED
A
IR
T
EM
PE
R A
TU
R
E (M
A -T
PR
E-
H
EA
T C
O
IL
D
IS
C H
A R
G E
TE
M
P.
(P
H -T
R
ET
U R
N A
IR
T
EM
PE
R A
TU
R
E (R
A -T
R
ET
U R
N A
IR
H
U M
ID
IT
Y (R
A -H
D U
C T
ST
A
TI
C
P R
ES
SU
R E
(S
PS
SU
PP
LY
F
A N
S
TA
TU
S
(D
PS
FR
EE
ZE
S
TA
T
/ S H
U
TD
O W
N (L
L)
SU
PP
LY
A
IR
FL
O W
M O
N
IT
O R
S
TA
TI
O
N (S
A
FM
R
ET
U R
N A
IR
FL
O W
M O
N
IT
O R
S
TA
TI
O
N (R
A
FM
R
ET
U R
N F
A N
S
TA
TU
S
(D
PS
PR
E-
FI
LT
ER
D
IF
FE
R
EN
TI
A
L
PR
ES
SU
R E
(D P1
PR
E-
H
EA
T C
O
IL
P U
M P
ST
A
TU
S
(C T)
124816326412
O N
Address:
SA
FC
H O
T
24V
C O
M
IOM4711-2
FC EOL
IN
TRIAC JUMPERS
OUT1 INT
EXT
OUT2 OUT3
S A
P W
R
C O
M
+ - C
O M
S H
LD
SA/FC BUS
BINARY
O U
T4 O
C O
M
O U
T5 O
C O
M
O U
T6 O
C O
M
O U
T7 O
C O
M
O U
T8 O
C O
M
O U
T9 O
C O
M
CONFIGURABLE ANALOG
O U
T1 O
C O
M
O U
T2 O
C O
M
O U
T3 O
C O
M
+1 5V
IN
IC
O
M
IN
IC
O
M
+1 5V
IN
IC
O
M
IN
IC
O
M
+1 5V
IN
IC
O
M
IN
IC
O
M
IN
IC
O
M
IN
IC
O
M
UNIVERSAL BINARY
SEE AS-BUILT CONTROL DRAWINGS C-1A, C-1C AND C-1D FOR
ASSOCIATED UNIT CONTROL DIAGRAM, VAV DIAGRAM AND
SEQUENCE OF OPERATIONS.
NOTE(S):1
SU
PP
LY
D
U C
T H
IG
H
S
TA
TI
C
P R
ES
SU
R E
(S P-
H L)
SU
PP
LY
F
A N
V
FD
A
LA
R M
R
ET
U R
N F
A N
V
FD
A
LA
R M
PR
E-
H
EA
T
PU
M P
LO
C
K O
U T
SW
IT
C H
D
IS
C H
A R
G E
A
IR
H U
M
ID
IT
Y
(D A
-H
M
EC
H A
N
IC
A L
R O
O M
Z O
N E
TE
M
PE
R
A
TU
R E
(S
EE
D R
A W
IN
G
C -3
D
IS
C H
A R
G E
A
IR
S M
O K
E D
ET
EC
TO
R
(S M
K
H U
M
ID
IF
IE
R S
TA
TU
S (C
T)
FI
N
A L
FI
LT
ER
D
IF
FE
R
EN
TI
A
L
PR
ES
SU
R E
ST
A
TU
S
(D P2
H U
M
ID
IF
IE
R C
O N
TR
O
L
VA
LV
E
C O
M M
A N
D (V
-4
U N
IT
H
EA
TE
R C
O M
M A
N D
(S
EE
D R
A W
IN
G
C -3
7 BELLECOR DRIVE
NEW CASTLE, DE
19720
TEL: 302-325-6800
FAX: 302-325-6808
BM 3/7/11
C-1C
Sales Engineer Project Manager Application Engineer
BY DATE BY DATE
DRAWN APPROVED
Branch Information CONTRACT NUMBER
DRAWING NUMBER
VA HVAC CONTROLS UPGRADE
- PHASE 2A
WILMINGTON, DELAWARE
Drawing Title
AHU FOR 4TH FLOOR WEST -
VAV BOX CONTROLS
Project Title
H
C
HWR
EX. V
HWS
AHU FOR 4TH FLOOR WEST - VAV BOX CONTROLS
(TYP. OF 25)
BILL OF MATERIALS
Designation Qty Part Number Description Field Devices:
STT-1 25 NS-BTP7002-0 SENSOR,TEMP.,W/C,NETWORK,WALL MNT.
TE-1 25 TE-6311M-1 SENSOR,TEMP.8IN,DUCT MNT.,
VMA-1 25 MS-VMA1620-0 VAV MODULAR ASSY.,CLG W/ REHEAT,MS/TP
SEQUENCE OF OPERATIONS
VAV SYSTEM CONTROL:
COOLING MODE:
On a rise in space temperature above the space temperature cooling set point, the damper will modulate from the minimum CFM set point to the maximum CFM set point. As the space temperature drops, the damper will modulate to the minimum CFM set point.
HEATING MODE:
On a drop in space temperature below the heating space temperature set point, the damper will modulate to the minimum heating CFM set point. On a further drop in space temperature below the space temperature set point, the heating coil valve will modulate to maintain the heating space temperature to it’s set point. As the temperature rises the reverse will occur.
VMA-16
(SEE NOTES)
MOUNT DIRECTLY TO
DAMPER ACTUATOR SHAFT
WITH THE DAMPER IN THE
"OPEN" POSITION.
CONNECT TO VAV BOX
VELOCITY PROBES
*SEE NOTES
VAV BOX SCHEDULE
SERVES / SERVED BY
WEST SIDE 4TH FLOOR / AHU-4 WEST
WEST SIDE 4TH FLOOR / AHU-4 WEST
WEST SIDE 4TH FLOOR / AHU-4 WEST
WEST SIDE 4TH FLOOR / AHU-4 WEST
WEST SIDE 4TH FLOOR / AHU-4 WEST
VAV # MIN CFM
MAX CFM
VAV-1
VAV-2
VAV-3
VAV-4
VAV-5
VELOCITY PROBES
*SEE NOTES
TEMP. / ADJ.
STT-1
SPACE TEMP.
SENSOR W/ OVERRIDE
TO VMA
TO VMA
TE-1
WEST SIDE 4TH FLOOR / AHU-4 WEST
WEST SIDE 4TH FLOOR / AHU-4 WEST
WEST SIDE 4TH FLOOR / AHU-4 WEST
WEST SIDE 4TH FLOOR / AHU-4 WEST
WEST SIDE 4TH FLOOR / AHU-4 WEST
VAV-6
VAV-7
VAV-8
VAV-9
VAV-10
WEST SIDE 4TH FLOOR / AHU-4 WEST
WEST SIDE 4TH FLOOR / AHU-4 WEST
WEST SIDE 4TH FLOOR / AHU-4 WEST
WEST SIDE 4TH FLOOR / AHU-4 WEST
WEST SIDE 4TH FLOOR / AHU-4 WEST
VAV-11
VAV-12
VAV-13
VAV-14
VAV-15
WEST SIDE 4TH FLOOR / AHU-4 WEST
WEST SIDE 4TH FLOOR / AHU-4 WEST
WEST SIDE 4TH FLOOR / AHU-4 WEST
WEST SIDE 4TH FLOOR / AHU-4 WEST
WEST SIDE 4TH FLOOR / AHU-4 WEST
VAV-16
VAV-17
VAV-18
VAV-19
VAV-20
WEST SIDE 4TH FLOOR / AHU-4 WEST
WEST SIDE 4TH FLOOR / AHU-4 WEST
WEST SIDE 4TH FLOOR / AHU-4 WEST
WEST SIDE 4TH FLOOR / AHU-4 WEST
WEST SIDE 4TH FLOOR / AHU-4 WEST
VAV-21
VAV-22
VAV-23
VAV-24
VAV-25
24V FROM EXISTING XFMR(S) MOUNTED
IN THE AHU-4 WEST CONTROL PANEL
*EXISTING
TRANSFORMER
OAH
OAT
GLOBAL OUTSIDE AIR
TEMPERATURE AND
HUMIDITY SIGNAL
AS-BUILT REV. FINAL POINT TERM./NOTE2 12/2/13 BM
TYPICAL CONSTRUCTION NOTES
THE NEW MODULATING ELECTRONIC CONTROL VALVES SHALL BE
PROVIDED BY MODERN CONTROLS AND INTEGRATED TO THE NEW
DDC CONTROLLERS. FIELD INSTALLATION SHALL BE PROVIDED BY
THE PROJECT GENERAL CONTRACTOR. SEE VALVE SCHEDULE FOR
MORE INFORMATION.
AIR FLOW SCHEDULE PROVIDED BY THE VA FOR REFERENCE ONLY;
SEE AS-BUILT DOCUMENTATION FOR MORE INFO.
FREEZE PROTECTION AND SUPPLY AIR TEMPERATURE MONITORING
PROVIDED BY ASSOCIATED AHU CONTROLS.
NEW PANEL MOUNTED TRANSFORMER(S) SHALL PROVIDE 24V
POWER TO NEW VAV CONTROLLERS AS REQUIRED IN THE FIELD.
ALL CONTROL POINT DESCRIPTIONS AND TERMINAL DESIGNATION
SHALL BE RECORDED IN THE FIELD FOR AS-BUILT DOCUMENTATION.
AS-BUILT NOTE
OUR O&M MANUAL PROVIDED FOR PROJECT CLOSEOUT
INCLUDEDS ALL COMMISSION AND CHECKOUT INFORMATON
FOR ALL VAV BOXES.
THE O&M MANUAL INCLUDES A TYPCIAL VAV CONTROLLER
COMMISSIONING SHEET AND ALSO A COMPLETE VAV BOX
COMMISSIONG CHECK LIST FOR ALL VAV BOXES AS SERVED
BY THEIR ASSOCIATED UNIT.
7 BELLECOR DRIVE
NEW CASTLE, DE
19720
TEL: 302-325-6800
FAX: 302-325-6808
VD 3/7/11
C-1D
Sales Engineer Project Manager Application Engineer
BY DATE BY DATE
DRAWN APPROVED
Branch Information CONTRACT NUMBER
DRAWING NUMBER
VA HVAC CONTROLS UPGRADE
- PHASE 2A
WILMINGTON, DELAWARE
Drawing Title
AIR HANDLING UNIT;
AHU FOR 4TH FLOOR WEST -
SEQUENCE OF OPERAITONS
Project Title
AIR HANDLING UNIT; AHU FOR 4TH FLOOR WEST - SEQUENCE OF OPERATIONS
GENERAL:
Unit AHU and return fan are normally started and stopped by the DCP (EX.CP) or remotely at the BMS. H-O-A switch shall be kept in the ‘AUTO’ position.
‘HAND’ and ‘OFF’ positions shall be used for maintenance only. When the unit is ‘OFF’ D-1 and D-3 shall be closed. When the unit is ‘ON’ D-1 and D-3 shall be open.
TEMPERATURE CONTROL:
Supply air temperature sensed by T-1 shall be maintained at set point via DCP (EX.CP) by modulating either V-1 and V-2 or D-1, D-2 and D-3 in sequence.
When the temperature of the outside air provided by BMS is above 65 F DCP (EX.CP) prevents modulation of D-1, D-2 and D-3; D-1 assumes minimum outside air position (D-3 is closed and D-2 is open). V-1 modulates to maintain supply air temperature sensed by T-1.
When the temperature of the outside air provided by the BMS is between 65F and the supply air temperature sensed by T-1 damper D-2 is closed. Damper D-1 is open (maximum outside air position) and damper D-3 is open. V-1 modulates to maintain the supply air temperature sensed by T-1.
When the temperature of the outside air provided by the BMS is below the supply air temperature sensed by T-1 then dampers D-1, D-2 and D-3 modulate to maintain the schedules supply air temperature and the pump at the reheat coil runs. If D-2 is open and D-1 is closed to minimum outside air in the mode V-2 modulates open to maintain the supply air temperature.
AIR FLOW CONTROLS:
The supply air flow is controlled by the DCP (EX.CP) modulating supply fan variable speed motor controller (VSMC) to maintain the duct static pressure set point as sensed by SPS-1
The DCP (EX.CP) by using total supply air and return air flow signals shall reset the return air fan VSMC to maintain a constant CFM difference between the supply air fan CFM and the return air fan CFM.
The DCP (EX.CP) by using high pressure sensor SPS-2 located at the supply air fan discharge prevents the supply air fan from developing over 3" static pressure. If static pressure at SPS-2 exceeds 3" the supply fan stops.
HUMIDITY CONTROL:
When the DCP (EX.CP) is not calling for humidification sensed by exhaust air humidistat H-1, the stand alone electric humidifier shall be off. When the DCP (EX.CP) is calling for humidity, the humidifier shall operate under it’s built in controls to maintain desired humidity sensed by H-1.
The BMS shall override the control to maintain humidity in supply duct below 80% as sensed by H-2. BMS shall shut the humidifier off whenever the supply fan is off.
FREEZE PROTECTION:
If the air temperature sensed by T-2 falls below 45F an alarm signal shall indicate at the DCP (EX.CP) and BMS. If the temperature falls below 40F the supply fan shall shut down, damper D-1 shall close and a critical alarm shall indicate at the DCP (EX.CP) and BMS.
EMERGENCY SHUTDOWN/RESTART
When smoke is detected by the duct mounted smoke detector the supply and return fans shall stop and the alarm signal shall be transmitted to the fire alarm system, dampers D-1, D-2, SD-1 and SD-2 shall close, damper D-3 shall open. Supply and return fans shall restart and dampers open when the fire alarm circuit is manually reset.
EMERGENCY CONSTANT SPEED OPERATION
Upon failure of VSMC the supply and return fans shall be started/stopped manually at the DCP (EX.CP) or the BMS through the bypass starter. Fans shall then operate at constant speed.
AS-BUILT REV. NEW DWG. / DATES2 12/2/13 BM
7 BELLECOR DRIVE
NEW CASTLE, DE
19720
TEL: 302-325-6800
FAX: 302-325-6808
BM 3/7/11
C-2A
Sales Engineer Project Manager Application Engineer
BY DATE BY DATE
DRAWN APPROVED
Branch Information CONTRACT NUMBER
DRAWING NUMBER
VA HVAC CONTROLS UPGRADE
- PHASE 2A
WILMINGTON, DELAWARE
Drawing Title
AIR HANDLING UNIT CONTROL;
AHU FOR 4TH FLOOR EAST
Project Title
AIR HANDLING UNIT CONTROL; AHU FOR 4TH FLOOR EAST
OAH
OAT
GLOBAL OUTSIDE AIR
TEMPERATURE AND
HUMIDITY SIGNAL
BILL OF MATERIALS
Designation Qty Part Number Description
FEC-1 1 MS-FEC2611-0 CNTRLR,DIG,FEC,6UI,2BI,3BO,2AO,4CO,BACNET
XM-1 2 MS-10M4711-0 FEC EXPANSION,6UI,2BI,3BO,2AO,4CO,BACNET
CHWV SEE VALVE SCHEDULE
110v (EXISTING)
*EXISTING EX. CP
(EAST)
FOURTH FLOOR MECH.
EQUIPMENT RM. - MER
(EAST SIDE)
1 2
AS-BUILT REV. FINAL POINT TERM./NOTE2 12/2/13 BM
NOTE(S):
FEC-26
IOM-47-1,2 (TYP. OF 2)
ALL PNEUMATIC CONTROL DEVICES HAVE BEEN REPLACED (WHERE APPLICABLE). ANY
EXISTING ELECTRONIC CONTROL DEVICES IN GOOD WORKING CONDITION HAVE BEEN RE-
USED AND WIRED TO NEW JOHNSON DDC CONTROLLERS. ALL OTHER NEW ELECTRONIC
CONTROL DEVICES HAVE BEEN PROVIDED, INSTALLED AND WIRED TO THE NEW JOHNSON
DDC CONTROLLERS AS INDICATED. *REFER TO C-2B FOR CONTROLLER WIRING DETAILS
AND DRAWING C-2C FOR ASSOCIATED SEQUENCE OF OPERATIONS.
NEW ELECTRONIC CONTROL VALVES HAVE BEEN PROVIDED BY MODERN CONTROLS AND
INSTALLED BY THE GENERAL CONTRACTOR FOR ALL EQUIPMENT AS INDICATED ON THE
‘EXISTING AHU CONTROL DAMPERS AND VALVES REPLACEMENT SCHEDULE’ ON DRAWING
M-1 OF THE CONTRACT DOCUMENTS. PLEASE REFER TO VALVE SCHEDULE ‘V-1" FOR
ADDITIONAL INFORMATION.
THE CONTRACT DOCUMENTS AND SEQUENCE OF OPERATIONS REFER TO ALL EXISTING
DDC CONTROL PANELS AS ‘DCP’; AS PART OF PROJECT CLOSE OUT MODERN CONTROLS
WILL PROVIDE PERMANENT, PANEL SPECIFIC LABELS FOR ALL NEW & EXISITNG CONTROL
PANELS THAT WILL INDICATE THE ASSOCIATED EQUIPMENT SERVED. *ALL PANEL LABELS
HAVE BEEN APPROVED BY THE VA HOSPITAL.
D-1
CO-7
SUPPLY AIR
TO TERMINAL
UNITSOUTDOOR
AIR
EXHAUST
SF
RETURN
PRE
BI-7
H L
SPS-1
UI-6
*SEE NOTES (TYP)
*SEE NOTES (TYP.)
UI-4
RA-T
H
RA-H
UI-5
HUMID.
HIGH LIMIT
RF
RAFM
DP1
N.C.
N.C. *SEE DETAIL
& NOTES
HUMIDIFIER
UI-7
BO-1
R AO-8HOA
CMD.
VSMC
UI-5
BO-2
R AO-9
CMD.
VSMC
D-3
CO-7
C
C
CWS
CWR
*SEE NOTES
CO-6
V-1
HWS
HWR
*SEE NOTES
H
C
CO-5
V-2
SAFM
UI-1UI-1
DA-T
UI-3
PA-T
D-2
CO-7
N.O.
HUMIDIFIER CONTROL
LPS
HUMID.
*SEE NOTES
COND.
AO-8BO-3
V-4V-3
IOM-47-1 POINT IDENTIFICATION
POINT #
UI-1
UI-2
UI-3
UI-4
UI-5
UI-6
BI-7
BI-8
POINT NAME/DESCRIPTION
SUPPLY AIRFLOW MONITOR STATION (SAFM)
RETURN AIRFLOW MONITOR STATION (RAFM)
RETURN FAN STATUS (DPS)
PRE-FILTER DIFFERENTIAL PRESSURE (DP1)
PRE-HEAT COIL PUMP STATUS (CT)
FEC-26 POINT IDENTIFICATION
POINT #
UI-1
UI-2
UI-3
UI-4
UI-5
UI-6
BI-7
BI-8
AO-8
AO-9
BO-1
BO-2
BO-3
CO-4
CO-5
CO-6
CO-7
POINT NAME/DESCRIPTION
DISCHARGE AIR TEMPERATURE (DA-T)
MIXED AIR TEMPERATURE (MA-T)
SUPPLY FAN STATUS (DPS)
RETURN AIR HUMIDITY (RA-H)
DUCT STATIC PRESSURE (SPS)
FREEZE STAT / SHUTDOWN (LL)
SUPPLY FAN VFD COMMAND
RETURN FAN VFD COMMAND
PRE-HEAT COIL LEAVING AIR TEMPERATURE (PH-T)
RETURN AIR TEMPERATURE (RA-T)
SUPPLY FAN START / STOP
COOLING VALVE COMMAND (V-1)
PRE-HEAT COIL PUMP CMD.
PRE-HEAT VALVE COMMAND (V-2)
MIXED AIR DAMPER COMMAND (D1~D3)
RETURN FAN START / STOP
HUMIDIFIER ISOLATION VALVE COMMAND (V-3)
AO-8
AO-9
BO-1
BO-2
BO-3
CO-4
CO-5
CO-6
CO-7
HUMIDIFIER CONTROL VALVE CMD. (V-4)
IOM-47-2 POINT IDENTIFICATION
POINT #
UI-1
UI-2
UI-3
UI-4
UI-5
UI-6
BI-7
BI-8
POINT NAME/DESCRIPTION
SUPPLY AIR DUCT HIGH STATIC PRESSURE (SP-HL)
SUPPLY FAN VFD ALARM
DISCHARGE AIR SMOKE DETECTOR (SMK)
DISCHARGE AIR HUMIDITY (DA-H)
PRE-HEAT COIL PUMP LOCKOUT SWITCH
HUMIDIFIER STATUS (CT)
RETURN FAN VFD ALARM
FINAL FILTER DIFFERENTIAL PRESSURE (DP2)
AO-8
AO-9
BO-1
BO-2
BO-3
CO-4
CO-5
CO-6
CO-7
*IOM-47-1 *IOM-47-1
*IOM-47-1
*IOM-47-1
BI-8
LL
*IOM-47-1
L
H
SP-HL
HI-LIMIT
UI-1
*IOM-47-2
H
DA-H
UI-5
*IOM-47-2
UI-2
*IOM-47-2
ALARM
UI-3
ALARM
FINAL
DP2
UI-4
*IOM-47-2
MA-T
BI-8
CTCO-4
PRE-HEAT COIL
PUMP CONTROL
*IOM-47-1
*IOM-47-1
PRE-HEAT COIL
PUMP - LOCKOUT
*IOM-47-2
UI-2
BI-8
CT
IW/BMIW/JAIW
7 BELLECOR DRIVE
NEW CASTLE, DE
19720
TEL: 302-325-6800
FAX: 302-325-6808
BM 8/12/11
C-2B
Sales Engineer Project Manager Application Engineer
BY DATE BY DATE
DRAWN APPROVED
Branch Information CONTRACT NUMBER
DRAWING NUMBER
VA HVAC CONTROLS UPGRADE -
PHASE 2A
WILMINGTON, DELAWARE
Drawing Title
CONTROLLER WIRING DETAIL –
AHU FOR 4TH FLOOR EAST
Project Title
CONTROLLER WIRING DETAIL – AHU FOR 4TH FLOOR EAST
AS-BUILT REV. NEW DWG. / POINT TERM.1 12/2/13 BM
SEE AS-BUILT CONTROL DRAWINGS C-2A, C-2C AND C-2D FOR
ASSOCIATED UNIT CONTROL DIAGRAM, VAV DIAGRAM AND
SEQUENCE OF OPERATIONS.
NOTE(S):1
124816326412
O N
Address:
S A
PW
R
C O
M
SA BUS
FC BUS
C O
M S
H
LD+1
5V
IN
IC
O M
IN
IC
O M
+1
5V
IN
IC
O M
IN
IC
O M
+1
5V
IN
IC
O M
IN
IC
O M
IN
IC
O M
IN
IC
O M
UNIVERSAL BINARY
BINARY
O U
T4 O
C O
M
O U
T5 O
C O
M
O U
T6 O
C O
M
O U
T7 O
C O
M
O U
T8 O
C O
M
O U
T9 O
C O
M
CONFIGURABLE ANALOG
H O
T
24V
C O
M
FEC2611
O U
T1 O
C O
M
O U
T2 O
C O
M
O U
T3 O
C O
M
FC EOL
IN
TRIAC JUMPERS
OUT1 INT
EXT
OUT2 OUT3
124816326412
O N
Address:
SA
FC
H O
T
24V
C O
M
IOM4711-1
FC EOL
IN
TRIAC JUMPERS
OUT1 INT
EXT
OUT2 OUT3
S A
P W
R
C O
M
+ - C
O M
S H
LD
SA/FC BUS
BINARY
O U
T4 O
C O
M
O U
T5 O
C O
M
O U
T6 O
C O
M
O U
T7 O
C O
M
O U
T8 O
C O
M
O U
T9 O
C O
M
CONFIGURABLE ANALOG
O U
T1 O
C O
M
O U
T2 O
C O
M
O U
T3 O
C O
M
+1 5V
IN
IC
O
M
IN
IC
O
M
+1 5V
IN
IC
O
M
IN
IC
O
M
+1 5V
IN
IC
O
M
IN
IC
O
M
IN
IC
O
M
IN
IC
O
M
UNIVERSAL BINARY
D
IS
C H
A R
G E
A
IR
T
EM
PE
R
A
TU
R E
(D A
-T
SU
PP
LY
F
A N
E N
A B
LE
R
ET
U R
N F
A N
E N
A B
LE
SU
PP
LY
F
A N
S
TA
R T/
ST
O
P
C O
O
LI
N G
V A
LV
E
C M
D
U
PP
ER
P
R
EH
EA
T
VA
LV
E C
M D
M
IX
ED
A
IR
D
A M
PE
R
C O
M M
A N
D
R
ET
U R
N F
A N
S
TA
R T/
ST
O
P
H U
M
ID
IF
IE
R
IS
O
LA
TI
O
N V
LV
. C
M D
H U
M
ID
IF
IE
R C
O N
TR
O
L
VA
LV
E
C O
M M
A N
D (V
-4
M
IX
ED
A
IR
T
EM
PE
R A
TU
R
E (M
A -T
PR
E-
H
EA
T C
O
IL
D
IS
C H
A R
G E
TE
M
P.
(P
H -T
R
ET
U R
N A
IR
T
EM
PE
R A
TU
R
E (R
A -T
R
ET
U R
N A
IR
H
U M
ID
IT
Y (R
A -H
D U
C T
ST
A
TI
C
P R
ES
SU
R E
(S
PS
SU
PP
LY
F
A N
S
TA
TU
S
(D
PS
FR
EE
ZE
S
TA
T
/ S H
U
TD
O W
N (L
L)
SU
PP
LY
A
IR
FL
O W
M O
N
IT
O R
S
TA
TI
O
N (S
A
FM
R
ET
U R
N A
IR
FL
O W
M O
N
IT
O R
S
TA
TI
O
N (R
A
FM
R
ET
U R
N F
A N
S
TA
TU
S
(D
PS
PR
E-
FI
LT
ER
D
IF
FE
R
EN
TI
A
L
PR
ES
SU
R E
(D P1
PR
E-
H
EA
T C
O
IL
P U
M P
ST
A
TU
S
(C T)
124816326412
O N
Address:
SA
FC
H O
T
24V
C O
M
IOM4711-2
FC EOL
IN
TRIAC JUMPERS
OUT1 INT
EXT
OUT2 OUT3
S A
P W
R
C O
M
+ - C
O M
S H
LD
SA/FC BUS
BINARY
O U
T4 O
C O
M
O U
T5 O
C O
M
O U
T6 O
C O
M
O U
T7 O
C O
M
O U
T8 O
C O
M
O U
T9 O
C O
M
CONFIGURABLE ANALOG
O U
T1 O
C O
M
O U
T2 O
C O
M
O U
T3 O
C O
M
+1 5V
IN
IC
O
M
IN
IC
O
M
+1 5V
IN
IC
O
M
IN
IC
O
M
+1 5V
IN
IC
O
M
IN
IC
O
M
IN
IC
O
M
IN
IC
O
M
UNIVERSAL BINARY
SU
PP
LY
D
U C
T H
IG
H
S
TA
TI
C
P R
ES
SU
R E
(S P-
H L)
SU
PP
LY
F
A N
V
FD
A
LA
R M
R
ET
U R
N F
A N
V
FD
A
LA
R M
FI
N
A L
FI
LT
ER
D
IF
FE
R
EN
TI
A
L
PR
ES
SU
R E
(D P2
D
IS
C H
A R
G E
A
IR
H U
M
ID
IT
Y
(D A
-H
PR
E-
H
EA
T C
O
IL
P U
M P
LO
C
K O
U T
SW
IT
C H
D
IS
C H
A R
G E
A
IR
S M
O K
E D
ET
EC
TO
R
(S M
K
H U
M
ID
IF
IE
R S
TA
TU
S (C
T)
7 BELLECOR DRIVE
NEW CASTLE, DE
19720
TEL: 302-325-6800
FAX: 302-325-6808
BM 3/7/11
C-2C
Sales Engineer Project Manager Application Engineer
BY DATE BY DATE
DRAWN APPROVED
Branch Information CONTRACT NUMBER
DRAWING NUMBER
Drawing Title
AHU FOR 4TH FLOOR EAST -
VAV BOX CONTROLS
Project Title
VA HVAC CONTROLS UPGRADE
- PHASE 2A
WILMINGTON, DELAWARE
AHU FOR 4TH FLOOR EAST - VAV BOX CONTROLS
(TYP. OF 24)
BILL OF MATERIALS
Designation Qty Part Number Description Field Devices:
STT-1 24 NS-BTP7002-0 SENSOR,TEMP.,W/C,NETWORK,WALL MNT.
TE-1 24 TE-6311M-1 SENSOR,TEMP.8IN,DUCT MNT.,
VMA-1 24 MS-VMA1620-0 VAV MODULAR ASSY.,CLG W/ REHEAT,MS/TP
SEQUENCE OF OPERATIONS
VAV SYSTEM CONTROL:
COOLING MODE:
On a rise in space temperature above the space temperature cooling set point, the damper will modulate from the minimum CFM set point to the maximum CFM set point. As the space temperature drops, the damper will modulate to the minimum CFM set point.
HEATING MODE:
On a drop in space temperature below the heating space temperature set point, the damper will modulate to the minimum heating CFM set point. On a further drop in space temperature below the space temperature set point, the heating coil valve will modulate to maintain the heating space temperature to it’s set point. As the temperature rises the reverse will occur.
VMA-16
(SEE NOTES)
MOUNT DIRECTLY TO
DAMPER ACTUATOR SHAFT
WITH THE DAMPER IN THE
"OPEN" POSITION.
CONNECT TO VAV BOX
VELOCITY PROBES
*SEE NOTES
VAV BOX SCHEDULE
SERVES / SERVED BY
EAST SIDE 4TH FLOOR / AHU-4 WEST
EAST SIDE 4TH FLOOR / AHU-4 WEST
EAST SIDE 4TH FLOOR / AHU-4 WEST
EAST SIDE 4TH FLOOR / AHU-4 WEST
VAV # MIN CFM
MAX CFM
VAV-1
VAV-2
VAV-3
VAV-4
VAV-5
VELOCITY PROBES
*SEE NOTES
TEMP. / ADJ.
STT-1
SPACE TEMP.
SENSOR W/ OVERRIDE
OAH
OAT
GLOBAL OUTSIDE AIR
TEMPERATURE AND
HUMIDITY SIGNAL
TO VMA
TE-1
EAST SIDE 4TH FLOOR / AHU-4 WEST
EAST SIDE 4TH FLOOR / AHU-4 WEST
EAST SIDE 4TH FLOOR / AHU-4 WEST
EAST SIDE 4TH FLOOR / AHU-4 WEST
EAST SIDE 4TH FLOOR / AHU-4 WEST
VAV-6
VAV-7
VAV-8
VAV-9
VAV-10
EAST SIDE 4TH FLOOR / AHU-4 WEST
EAST SIDE 4TH FLOOR / AHU-4 WEST
EAST SIDE 4TH FLOOR / AHU-4 WEST
EAST SIDE 4TH FLOOR / AHU-4 WEST
EAST SIDE 4TH FLOOR / AHU-4 WEST
VAV-11
VAV-12
VAV-13
VAV-14
VAV-15
EAST SIDE 4TH FLOOR / AHU-4 WEST
EAST SIDE 4TH FLOOR / AHU-4 WEST
EAST SIDE 4TH FLOOR / AHU-4 WEST
EAST SIDE 4TH FLOOR / AHU-4 WEST
EAST SIDE 4TH FLOOR / AHU-4 WEST
VAV-16
VAV-17
VAV-18
VAV-19
VAV-20
EAST SIDE 4TH FLOOR / AHU-4 WEST
EAST SIDE 4TH FLOOR / AHU-4 WEST
EAST SIDE 4TH FLOOR / AHU-4 WEST
EAST SIDE 4TH FLOOR / AHU-4 WEST
VAV-21
VAV-22
VAV-23
VAV-24
H
C
HWR
EX. V
HWS
TO VMA
EAST SIDE 4TH FLOOR / AHU-4 WEST
24V FROM EXISTING XFMR(S) MOUNTED
IN THE AHU-4 EAST CONTROL PANEL
*EXISTING
TRANSFORMER
TYPICAL CONSTRUCTION NOTES
THE NEW MODULATING ELECTRONIC CONTROL VALVES SHALL BE
PROVIDED BY MODERN CONTROLS AND INTEGRATED TO THE NEW
DDC CONTROLLERS. FIELD INSTALLATION SHALL BE PROVIDED BY
THE PROJECT GENERAL CONTRACTOR. SEE VALVE SCHEDULE FOR
MORE INFORMATION.
AIR FLOW SCHEDULE PROVIDED BY THE VA FOR REFERENCE ONLY;
SEE AS-BUILT DOCUMENTATION FOR MORE INFO.
FREEZE PROTECTION AND SUPPLY AIR TEMPERATURE MONITORING
PROVIDED BY ASSOCIATED AHU CONTROLS.
NEW PANEL MOUNTED TRANSFORMER(S) SHALL PROVIDE 24V
POWER TO NEW VAV CONTROLLERS AS REQUIRED IN THE FIELD.
ALL CONTROL POINT DESCRIPTIONS AND TERMINAL DESIGNATION
SHALL BE RECORDED IN THE FIELD FOR AS-BUILT DOCUMENTATION.
AS-BUILT NOTE
OUR O&M MANUAL PROVIDED FOR PROJECT CLOSEOUT
INCLUDEDS ALL COMMISSION AND CHECKOUT INFORMATON
FOR ALL VAV BOXES.
THE O&M MANUAL INCLUDES A TYPCIAL VAV CONTROLLER
COMMISSIONING SHEET AND ALSO A COMPLETE VAV BOX
COMMISSIONG CHECK LIST FOR ALL VAV BOXES AS SERVED
BY THEIR ASSOCIATED UNIT.
AS-BUILT REV. FINAL POINT TERM./NOTE2 12/2/13 BM
7 BELLECOR DRIVE
NEW CASTLE, DE
19720
TEL: 302-325-6800
FAX: 302-325-6808
BM 3/7/11
C-2D
Sales Engineer Project Manager Application Engineer
BY DATE BY DATE
DRAWN APPROVED
Branch Information CONTRACT NUMBER
DRAWING NUMBER
Drawing Title
AIR HANDLING UNIT;
AHU FOR 4TH FLOOR EAST
- SEQUENCE OF OPERATIONS
Project Title
VA HVAC CONTROLS UPGRADE
- PHASE 2A
WILMINGTON, DELAWARE
GENERAL:
Unit AHU and return fan are normally started and stopped by the DCP (EX.CP) or remotely at the BMS. H-O-A switch shall be kept in the ‘AUTO’ position.
‘HAND’ and ‘OFF’ positions shall be used for maintenance only. When the unit is ‘OFF’ D-1 and D-3 shall be closed. When the unit is ‘ON’ D-1 and D-3 shall be open.
TEMPERATURE CONTROL:
Supply air temperature sensed by T-1 shall be maintained at set point via DCP (EX.CP) by modulating either V-1 and V-2 or D-1, D-2 and D-3 in sequence.
When the temperature of the outside air provided by BMS is above 65 F DCP (EX.CP) prevents modulation of D-1, D-2 and D-3; D-1 assumes minimum outside air position (D-3 is closed and D-2 is open). V-1 modulates to maintain supply air temperature sensed by T-1.
When the temperature of the outside air provided by the BMS is between 65F and the supply air temperature sensed by T-1 damper D-2 is closed. Damper D-1 is open (maximum outside air position) and damper D-3 is open. V-1 modulates to maintain the supply air temperature sensed by T-1.
When the temperature of the outside air provided by the BMS is below the supply air temperature sensed by T-1 then dampers D-1, D-2 and D-3 modulate to maintain the schedules supply air temperature and the pump at the reheat coil runs. If D-2 is open and D-1 is closed to minimum outside air in the mode V-2 modulates open to maintain the supply air temperature.
AIR FLOW CONTROLS:
The supply air flow is controlled by the DCP (EX.CP) modulating supply fan variable speed motor controller (VSMC) to maintain the duct static pressure set point as sensed by SPS-1
The DCP (EX.CP) by using total supply air and return air flow signals shall reset the return air fan VSMC to maintain a constant CFM difference between the supply air fan CFM and the return air fan CFM.
The DCP (EX.CP) by using high pressure sensor SPS-2 located at the supply air fan discharge prevents the supply air fan from developing over 3" static pressure. If static pressure at SPS-2 exceeds 3" the supply fan stops.
HUMIDITY CONTROL:
When the DCP (EX.CP) is not calling for humidification sensed by exhaust air humidistat H-1, the stand alone electric humidifier shall be off. When the DCP (EX.CP) is calling for humidity, the humidifier shall operate under it’s built in controls to maintain desired humidity sensed by H-1.
The BMS shall override the control to maintain humidity in supply duct below 80% as sensed by H-2. BMS shall shut the humidifier off whenever the supply fan is off.
FREEZE PROTECTION:
If the air temperature sensed by T-2 falls below 45F an alarm signal shall indicate at he DCP (EX.CP) and BMS. If the temperature falls below 40F the supply fan shall shut down, damper D-1 shall close and a critical alarm shall indicate at the DCP (EX.CP) and BMS.
EMERGENCY SHUTDOWN/RESTART
When smoke is detected by the duct mounted smoke detector the supply and return fans shall stop and the alarm signal shall be transmitted to the fire alarm system, dampers D-1, D-2, SD-1 and SD-2 shall close, damper D-3 shall open. Supply and return fans shall restart and dampers open when the fire alarm circuit is manually reset.
EMERGENCY CONSTANT SPEED OPERATION
Upon failure of VSMC the supply and return fans shall be started/stopped manually at the DCP(EX.CP) or the BMS through the bypass starter. Fans shall then operate at constant speed.
AIR HANDLING UNIT; AHU FOR 4TH FLOOR EAST - SEQUENCE OF OPERATIONS
AS-BUILT REV. NEW DWG. / DATE2 12/2/13 BM
7 BELLECOR DRIVE
NEW CASTLE, DE
19720
TEL: 302-325-6800
FAX: 302-325-6808
BM 7/20/11
SUB. REVISION NEW DWG. FOR HX CONTROL1 7/20/11 BM
C-3
Sales Engineer Project Manager Application Engineer
BY DATE BY DATE
DRAWN APPROVED
Branch Information CONTRACT NUMBER
DRAWING NUMBER
VA HVAC CONTROLS UPGRADE -
PHASE 2A
WILMINGTON, DELAWARE
Drawing Title
HEAT EXCHANGER CONTROL;
4TH FLOOR MECH. ROOM 40M2
Project Title
HEAT EXCHANGER CONTROL; 4TH FLOOR MECH. ROOM 40M2
OAH
OAT
GLOBAL OUTSIDE AIR
TEMPERATURE AND
HUMIDITY SIGNAL
HEAT
EXCHANGER
STEAM
CONDENSATE
TE
HWS
HWR
P-1
*SEE NOTES
SEQUENCE OF OPERATIONS
BOOSTER HEATER HOT WATER HEATER (PUMP P-X)
1. PUMP P-X STARTS AND STOPS BY BMS BASED ON HOT WATER DEMAND FROM HOT
WATER CONSUMING EQUIPMENT.
2. SENSOR T-1(TE) MODULATES NORMALLY CLOSED VALVES V-1 AND V-2 TO MAINTAIN 180
F SUPPLY WATER TEMPERATURE.
LPS
DO-4
EX. V
110v (EXISTING)
*EXISTING EX. CP
FOURTH FLOOR
MECH. ROOM 40M2
(CENTRAL 4TH FLOOR)
AS-BUILT REV. FINAL POINT TERM.2 12/20/13 BM
FX-1FX-07 POINT IDENTIFICATION
POINT #
AI-2
AI-3
AI-4
DI-1
DI-2
DI-3
DI-4
DI-5
AO-1
AO-2
DO-1
DO-2
DO-3
DO-4
DO-5
DO-6
AI-1
POINT NAME/DESCRIPTION
HOT WATER TEMP.
PUMP 1 STATUS
PUMP 2 STATUS
FLOW SWITCH
ROOM TEMP.
PUMP 1 COMMAND
PUMP 2 COMMAND
VALVE COMMAND
VALVE COMMAND
UNIT HEATER FAN COMMAND
NOTE(S):
UNIT HEATER CONTROL DETAIL
ALL PNEUMATIC CONTROL DEVICES HAVE BEEN REPLACED (WHERE APPLICABLE). ANY
EXISTING ELECTRONIC CONTROL DEVICES IN GOOD WORKING CONDITION HAVE BEEN RE-
USED AND WIRED TO NEW JOHNSON DDC CONTROLLERS. ALL OTHER NEW ELECTRONIC
CONTROL DEVICES HAVE BEEN PROVIDED, INSTALLED AND WIRED TO THE NEW JOHNSON
DDC CONTROLLERS AS INDICATED. *REFER TO C-1B FOR CONTROLLER WIRING DETAILS
AND DRAWING C-1C FOR ASSOCIATED SEQUENCE OF OPERATIONS.
NEW ELECTRONIC CONTROL VALVES HAVE BEEN PROVIDED BY MODERN CONTROLS AND
INSTALLED BY THE GENERAL CONTRACTOR FOR ALL EQUIPMENT AS INDICATED ON THE
‘EXISTING AHU CONTROL DAMPERS AND VALVES REPLACEMENT SCHEDULE’ ON DRAWING
M-1 OF THE CONTRACT DOCUMENTS. PLEASE REFER TO VALVE SCHEDULE ‘V-1" FOR
ADDITIONAL INFORMATION.
THE CONTRACT DOCUMENTS AND SEQUENCE OF OPERATIONS REFER TO ALL EXISTING
DDC CONTROL PANELS AS ‘DCP’; AS PART OF PROJECT CLOSE OUT MODERN CONTROLS
WILL PROVIDE PERMANENT, PANEL SPECIFIC LABELS FOR ALL NEW & EXISITNG CONTROL
PANELS THAT WILL INDICATE THE ASSOCIATED EQUIPMENT SERVED. *ALL PANEL LABELS
HAVE BEEN APPROVED BY THE VA HOSPITAL.
SPACE TEMP.
SENSOR
(EXISTING)
AI‐4 TEMP.H
DO-5
P-2
DO-3
DI-1
CT
DO-1
*SEE NOTES
*INCREMENTAL
FS
DI-3
PUMP 1 CONTROL
DI-2
CT
*SEE NOTES
DO-2
PUMP 2 CONTROL
BILL OF MATERIALS
Designation Qty Part Number Description
FEC-1 1 FX07 CNTRLR,DIG,FX-07, BACNET, NO DISPLAY
XX-T 2 TE-6315P-1 SENSOR,T-NI,0.1%,8FT AVG.
1 TE-6311M-1 SENSOR,T-NI,0.1%,8IN DUCT
LL 1 A70HA-1C LOW LIMIT,MANUAL RESET,20FT ELEM.
FEC-1 1 MS-FEC2611-0 CNTRLR,DIG,FEC,6UI,2BI,3BO,2AO,4CO,BACNET
XM-1 1 MS-10M2711-0 FEC EXPANSION,2UI,2UO,BACNET
V-X SEE VALVE SCHEDULE
ADDRESS: #67
| Visio-.Title Page |
| Visio-C-1A AHU-4 WEST |
| Visio-C-1B AHU-4 WEST DETAIL |
| Visio-C-1C AHU-4 WEST VAVS |
| Visio-C-1D AHU-4 WEST SEQUENCE |
| Visio-C-2A AHU-4 EAST |
| Visio-C-2B AHU-4 EAST DETAIL |
| Visio-C-2C AHU-4 EAST VAVS |
| Visio-C-2D AHU-4 EAST SEQUENCE |
| Visio-C-3 heat exchanger |
File details come from the government source that posted it. Updated .