VA Hospital Phase 2A - ATC As-Built Drawings.pdf

PDF 1 MB Posted

Attached to
J059--Direct Digital Control Services Wilmington VAMC
Solicitation number
36C24421Q0145
Issued by

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MECHANICAL AND CONTROL SYSTEMS

Environmental Control System

Building Automation System

VA MEDICAL CENTER

HVAC CONTROLS UPGRADE - PHASE 2A

WILMINGTON, DELAWARE

PROJECT

OWNER

ENGINEER

CONTRACTOR

211-1009

MODERN CONTROLS INC

7 BELLECOR DRIVE

NEW CASTLE, DE. 19720

DATE

Branch Information

CONTRACT NUMBER

IW/BM

APPLICATION ENGINEER

3/7/11IW/BM

PROJECT MANAGER

IW

SALES ENGINEER

REFERENCE DRAWING

SUB. REVISION TITLE AND DATE REVS.1 4/20/11 BM

NO. REVISION-LOCATION ECN DATE BY

SUB. REVISION REVISION DATES2 5/10/11 BM

SUB. REVISION ADDED DWG. C-3; HX3 8/8/11 BM

Automatic Temperature Controls

Heating

Air Conditioning

Air Filters

Water Treatment

Coil Cleaning

Contract Operations

Time-Shared Automated Building Service

Refrigeration

Industrial Controls / Recording / Indication Equipment

Air and Water Systems Balancing

Instrumentation System Installation

Building Operations Management

Energy Conservation Control

Custom Programmed Maintenance

HATCH MOTT MACDONALD

27 BLEEKER ST.

MILLBURN, NJ 07041

BOB SMITH CONTRACTORS

281 EAST EVERGREEN ST.

WEST GROVE, PA 19390

DEPT. OF VETERANS AFFAIRS

1601 KIRKWOOD HIGHWAY

WILMINGTON, DE 19805

PAGE # DRAWING TITLE LAST REVISION

TP-1 TITLE PAGE 01/28/14

C-1A AIR HANDLING UNIT CONTROL – AHU FOR 4TH FLOOR WEST 12/02/13

C-1B CONTROLLER WIRING DETAIL – AHU FOR 4TH FLOOR WEST 12/02/13

C-1C AHU FOR 4TH FLOOR WEST – SEQUENCE OF OPERATIONS 12/02/13

C-1D AHU FOR 4TH FLOOR WEST – VAV BOX CONTROLS 12/02/13

C-2A AIR HANDLING UNIT CONTROL – AHU FOR 4TH FLOOR EAST 12/02/13

C-2B CONTROLLER WIRING DETAIL – AHU FOR 4TH EAST 12/02/13

C-2C AHU FOR 4TH FLOOR EAST – SEQUENCE OF OPERATIONS 12/02/13

C-2D AHU FOR 4TH FLOOR EAST – VAV BOX CONTROLS 12/02/13

C-3 HEAT EXCHANGER CONTROL; 4TH FLOOR MECH. ROOM 12/02/13

1 2 3

VA HVAC CONTROLS UPGRADE - PHASE 2A

(PARTIAL SUBMITTAL - 4TH FLOOR EAST & WEST HVAC EQUIPMENT) 4

AS-BUILT REV. FINAL AS-BUILT DATES4 12/20/13 BM

NOTE(S): REFER TO ‘MASTER BUILDING NETWORK ARCHITECTURE DRAWING’

PROVIDED IN OUR ATC AS-BUILT / O&M MANUAL BINDER FOR ALL

SUPERVISORY CONTROLLER INFORMATION AND ASSOCIATED IP

ADDRESSES USED BY MODERN CONTROLS.

REFER TO ‘MASTER BUILDING VALVE SCHEDULE’ PROVIDED IN OUR

ATC AS-BUILT / O&M MANUAL BINDER FOR A COMPLETE LIST OF ALL

CONTROL VALVES PROVIDED FOR AIR HANDLING UNITS AND

ASSOCIATED VAV BOXES.

AS-BUILT REV. ADD ‘MASTER’ NOTE5 1/28/14 DB

IW/BMIW/BMIW

7 BELLECOR DRIVE

NEW CASTLE, DE

19720

TEL: 302-325-6800

FAX: 302-325-6808

BM 3/7/11

REFERENCE DRAWING

SUB. REVISION REVISE DWG. TITLE1 4/20/11 BM

C-1A

NO. REVISION-LOCATION ECN DATE BY

Sales Engineer Project Manager Application Engineer

BY DATE BY DATE

DRAWN APPROVED

Branch Information CONTRACT NUMBER

DRAWING NUMBER

VA HVAC CONTROLS UPGRADE

- PHASE 2A

WILMINGTON, DELAWARE

Drawing Title

AIR HANDLING UNIT CONTROL

– AHU FOR 4TH FLOOR WEST

Project Title

AIR HANDLING UNIT CONTROL – AHU FOR 4TH FLOOR WEST

OAH

OAT

GLOBAL OUTSIDE AIR

TEMPERATURE AND

HUMIDITY SIGNAL

BILL OF MATERIALS

Designation Qty Part Number Description

FEC-1 1 MS-FEC2611-0 CNTRLR,DIG,FEC,6UI,2BI,3BO,2AO,4CO,BACNET

XM-1 2 MS-10M4711-0 FEC EXPANSION,6UI,2BI,3BO,2AO,4CO,BACNET

CHWV SEE VALVE SCHEDULE

110v (EXISTING)

*EXISTING EX. CP

(WEST)

FOURTH FLOOR MECH.

EQUIPMENT RM. - MER

(WEST SIDE)

AS-BUILT REV. FINAL POINT TERM./NOTE2 12/20/13 DB

D-1

CO-7

NOTE(S):

SUPPLY AIR

TO TERMINAL

UNITSOUTDOOR

AIR

EXHAUST

AIR

SF

RETURN

SMK

PRE

FILTER

BI-7

H L

SPS-1

UI-6

*SEE NOTES (TYP)

UI-6

*SEE NOTES (TYP.)

UI-4

RA-T

H

RA-H

UI-5

HUMID.

HIGH LIMIT

RF

RAFM

DP1

N.C.

N.C. *SEE DETAIL

& NOTES

HUMIDIFIER

UI-2

UI-7

DPS

BO-1

R AO-8HOA

S/S

CMD.

VSMC

UI-5

BO-2

R AO-9

CMD.

VSMC

D-3

CO-7

C

C

CWS

CWR

*SEE NOTES

CO-6

V-1

HWS

HWR

*SEE NOTES

H

C

CO-5

V-2

SAFM

UI-1UI-1

DA-T

UI-3

PA-T

D-2

CO-7

N.O.

HUMIDIFIER CONTROL

LPS

HUMID.

*SEE NOTES

COND.

CO-4BO-3

V-4V-3

FEC-26

IOM-47-1,2 (TYP. OF 2)

IOM-47-1 POINT IDENTIFICATION

POINT #

UI-1

UI-2

UI-3

UI-4

UI-5

UI-6

BI-7

BI-8

POINT NAME/DESCRIPTION

SUPPLY AIRFLOW MONITOR STATION (SAFM)

RETURN AIRFLOW MONITOR STATION (RAFM)

FINAL FILTER DIFFERENTIAL PRESSURE STATUS (DP2)

RETURN FAN STATUS (DPS)

PRE-FILTER DIFFERENTIAL PRESSURE (DP1)

PRE-HEAT COIL PUMP STATUS (CT)

FEC-26 POINT IDENTIFICATION

POINT #

UI-1

UI-2

UI-3

UI-4

UI-5

UI-6

BI-7

BI-8

AO-8

AO-9

BO-1

BO-2

BO-3

CO-4

CO-5

CO-6

CO-7

POINT NAME/DESCRIPTION

DISCHARGE AIR TEMPERATURE (DA-T)

MIXED AIR TEMPERATURE (MA-T)

SUPPLY FAN STATUS (DPS)

RETURN AIR HUMIDITY (RA-H)

DUCT STATIC PRESSURE (SPS)

FREEZE STAT / SHUTDOWN (LL)

SUPPLY FAN VFD COMMAND

RETURN FAN VFD COMMAND

PRE-HEAT COIL LEAVING AIR TEMPERATURE (PH-T)

RETURN AIR TEMPERATURE (RA-T)

SUPPLY FAN START / STOP

COOLING VALVE COMMAND (V-1)

PRE-HEAT COIL PUMP CMD.

PRE-HEAT VALVE COMMAND (V-2)

MIXED AIR DAMPER COMMAND (D1~D3)

RETURN FAN START / STOP

HUMIDIFIER ISOLATION VALVE COMMAND (V-3)

AO-8

AO-9

BO-1

BO-2

BO-3

CO-4

CO-5

CO-6

CO-7

HUMIDIFIER COMMAND

IOM-47-2 POINT IDENTIFICATION

POINT #

UI-1

UI-2

UI-3

UI-4

UI-5

UI-6

BI-7

BI-8

POINT NAME/DESCRIPTION

SUPPLY AIR DUCT HIGH STATIC PRESSURE (SP-HL)

SUPPLY FAN VFD ALARM

DISCHARGE AIR SMOKE DETECTOR (SMK)

DISCHARGE AIR HUMIDITY (DA-H)

MECH. RM. ZONE TEMPERATURE (SEE DWG C-3)

HUMIDIFIER STATUS (CT)

RETURN FAN VFD ALARM

PRE-HEAT PUMP LOCKOUT SWITCH

AO-8

AO-9

BO-1

BO-2

BO-3

CO-4

CO-5

CO-6

CO-7

UNIT HEATER COMMAND (SEE DRAWING C-3)

*IOM-47-1 *IOM-47-1

*IOM-47-1

*IOM-47-1

BI-8

LL

*IOM-47-1

ALL PNEUMATIC CONTROL DEVICES HAVE BEEN REPLACED (WHERE APPLICABLE). ANY

EXISTING ELECTRONIC CONTROL DEVICES IN GOOD WORKING CONDITION HAVE BEEN RE-

USED AND WIRED TO NEW JOHNSON DDC CONTROLLERS. ALL OTHER NEW ELECTRONIC

CONTROL DEVICES HAVE BEEN PROVIDED, INSTALLED AND WIRED TO THE NEW JOHNSON

DDC CONTROLLERS AS INDICATED. *REFER TO C-1B FOR CONTROLLER WIRING DETAILS

AND DRAWING C-1C FOR ASSOCIATED SEQUENCE OF OPERATIONS.

NEW ELECTRONIC CONTROL VALVES HAVE BEEN PROVIDED BY MODERN CONTROLS AND

INSTALLED BY THE GENERAL CONTRACTOR FOR ALL EQUIPMENT AS INDICATED ON THE

‘EXISTING AHU CONTROL DAMPERS AND VALVES REPLACEMENT SCHEDULE’ ON DRAWING

M-1 OF THE CONTRACT DOCUMENTS. PLEASE REFER TO VALVE SCHEDULE ‘V-1" FOR

ADDITIONAL INFORMATION.

THE CONTRACT DOCUMENTS AND SEQUENCE OF OPERATIONS REFER TO ALL EXISTING

DDC CONTROL PANELS AS ‘DCP’; AS PART OF PROJECT CLOSE OUT MODERN CONTROLS

WILL PROVIDE PERMANENT, PANEL SPECIFIC LABELS FOR ALL NEW & EXISITNG CONTROL

PANELS THAT WILL INDICATE THE ASSOCIATED EQUIPMENT SERVED. *ALL PANEL LABELS

HAVE BEEN APPROVED BY THE VA HOSPITAL.

L

H

SP-HL

HI-LIMIT

UI-1

*IOM-47-2

H

DA-H

UI-5

*IOM-47-2

UI-2

*IOM-47-2

ALARM

UI-3

*IOM-47-2

ALARM

FINAL

DP2

BI-7

*IOM-47-1

MA-T

BI-8

CTCO-4

R

PRE-HEAT COIL

PUMP CONTROL

*IOM-47-1

*IOM-47-1

PRE-HEAT COIL

PUMP - LOCKOUT

*IOM-47-2

UI-4

BI-8

CT

IW/BMIW/JAIW

7 BELLECOR DRIVE

NEW CASTLE, DE

19720

TEL: 302-325-6800

FAX: 302-325-6808

BM 8/12/11

C-1B

Sales Engineer Project Manager Application Engineer

BY DATE BY DATE

DRAWN APPROVED

Branch Information CONTRACT NUMBER

DRAWING NUMBER

VA HVAC CONTROLS UPGRADE -

PHASE 2A

WILMINGTON, DELAWARE

Drawing Title

CONTROLLER WIRING DETAIL –

AHU FOR 4TH FLOOR WEST

Project Title

CONTROLLER WIRING DETAIL – AHU FOR 4TH FLOOR WEST

AS-BUILT REV. NEW DWG. / POINT TERM.1 12/20/13 DB

124816326412

O N

Address:

S A

PW

R

C O

M

SA BUS

FC BUS

C O

M S

H

LD+1

5V

IN

IC

O M

IN

IC

O M

+1

5V

IN

IC

O M

IN

IC

O M

+1

5V

IN

IC

O M

IN

IC

O M

IN

IC

O M

IN

IC

O M

UNIVERSAL BINARY

BINARY

O U

T4 O

C O

M

O U

T5 O

C O

M

O U

T6 O

C O

M

O U

T7 O

C O

M

O U

T8 O

C O

M

O U

T9 O

C O

M

CONFIGURABLE ANALOG

H O

T

24V

C O

M

FEC2611

O U

T1 O

C O

M

O U

T2 O

C O

M

O U

T3 O

C O

M

FC EOL

IN

TRIAC JUMPERS

OUT1 INT

EXT

OUT2 OUT3

124816326412

O N

Address:

SA

FC

H O

T

24V

C O

M

IOM4711-1

FC EOL

IN

TRIAC JUMPERS

OUT1 INT

EXT

OUT2 OUT3

S A

P W

R

C O

M

+ - C

O M

S H

LD

SA/FC BUS

BINARY

O U

T4 O

C O

M

O U

T5 O

C O

M

O U

T6 O

C O

M

O U

T7 O

C O

M

O U

T8 O

C O

M

O U

T9 O

C O

M

CONFIGURABLE ANALOG

O U

T1 O

C O

M

O U

T2 O

C O

M

O U

T3 O

C O

M

+1 5V

IN

IC

O

M

IN

IC

O

M

+1 5V

IN

IC

O

M

IN

IC

O

M

+1 5V

IN

IC

O

M

IN

IC

O

M

IN

IC

O

M

IN

IC

O

M

UNIVERSAL BINARY

D

IS

C H

A R

G E

A

IR

T

EM

PE

R

A

TU

R E

(D A

-T

SU

PP

LY

F

A N

E N

A B

LE

R

ET

U R

N F

A N

E N

A B

LE

SU

PP

LY

F

A N

S

TA

R T/

ST

O

P

C O

O

LI

N G

V A

LV

E

C M

D

U

PP

ER

P

R

EH

EA

T

VA

LV

E C

M D

M

IX

ED

A

IR

D

A M

PE

R

C O

M M

A N

D

R

ET

U R

N F

A N

S

TA

R T/

ST

O

P

H U

M

ID

IF

IE

R

IS

O

LA

TI

O

N V

LV

. C

M D

M

IX

ED

A

IR

T

EM

PE

R A

TU

R

E (M

A -T

PR

E-

H

EA

T C

O

IL

D

IS

C H

A R

G E

TE

M

P.

(P

H -T

R

ET

U R

N A

IR

T

EM

PE

R A

TU

R

E (R

A -T

R

ET

U R

N A

IR

H

U M

ID

IT

Y (R

A -H

D U

C T

ST

A

TI

C

P R

ES

SU

R E

(S

PS

SU

PP

LY

F

A N

S

TA

TU

S

(D

PS

FR

EE

ZE

S

TA

T

/ S H

U

TD

O W

N (L

L)

SU

PP

LY

A

IR

FL

O W

M O

N

IT

O R

S

TA

TI

O

N (S

A

FM

R

ET

U R

N A

IR

FL

O W

M O

N

IT

O R

S

TA

TI

O

N (R

A

FM

R

ET

U R

N F

A N

S

TA

TU

S

(D

PS

PR

E-

FI

LT

ER

D

IF

FE

R

EN

TI

A

L

PR

ES

SU

R E

(D P1

PR

E-

H

EA

T C

O

IL

P U

M P

ST

A

TU

S

(C T)

124816326412

O N

Address:

SA

FC

H O

T

24V

C O

M

IOM4711-2

FC EOL

IN

TRIAC JUMPERS

OUT1 INT

EXT

OUT2 OUT3

S A

P W

R

C O

M

+ - C

O M

S H

LD

SA/FC BUS

BINARY

O U

T4 O

C O

M

O U

T5 O

C O

M

O U

T6 O

C O

M

O U

T7 O

C O

M

O U

T8 O

C O

M

O U

T9 O

C O

M

CONFIGURABLE ANALOG

O U

T1 O

C O

M

O U

T2 O

C O

M

O U

T3 O

C O

M

+1 5V

IN

IC

O

M

IN

IC

O

M

+1 5V

IN

IC

O

M

IN

IC

O

M

+1 5V

IN

IC

O

M

IN

IC

O

M

IN

IC

O

M

IN

IC

O

M

UNIVERSAL BINARY

SEE AS-BUILT CONTROL DRAWINGS C-1A, C-1C AND C-1D FOR

ASSOCIATED UNIT CONTROL DIAGRAM, VAV DIAGRAM AND

SEQUENCE OF OPERATIONS.

NOTE(S):1

SU

PP

LY

D

U C

T H

IG

H

S

TA

TI

C

P R

ES

SU

R E

(S P-

H L)

SU

PP

LY

F

A N

V

FD

A

LA

R M

R

ET

U R

N F

A N

V

FD

A

LA

R M

PR

E-

H

EA

T

PU

M P

LO

C

K O

U T

SW

IT

C H

D

IS

C H

A R

G E

A

IR

H U

M

ID

IT

Y

(D A

-H

M

EC

H A

N

IC

A L

R O

O M

Z O

N E

TE

M

PE

R

A

TU

R E

(S

EE

D R

A W

IN

G

C -3

D

IS

C H

A R

G E

A

IR

S M

O K

E D

ET

EC

TO

R

(S M

K

H U

M

ID

IF

IE

R S

TA

TU

S (C

T)

FI

N

A L

FI

LT

ER

D

IF

FE

R

EN

TI

A

L

PR

ES

SU

R E

ST

A

TU

S

(D P2

H U

M

ID

IF

IE

R C

O N

TR

O

L

VA

LV

E

C O

M M

A N

D (V

-4

U N

IT

H

EA

TE

R C

O M

M A

N D

(S

EE

D R

A W

IN

G

C -3

7 BELLECOR DRIVE

NEW CASTLE, DE

19720

TEL: 302-325-6800

FAX: 302-325-6808

BM 3/7/11

C-1C

Sales Engineer Project Manager Application Engineer

BY DATE BY DATE

DRAWN APPROVED

Branch Information CONTRACT NUMBER

DRAWING NUMBER

VA HVAC CONTROLS UPGRADE

- PHASE 2A

WILMINGTON, DELAWARE

Drawing Title

AHU FOR 4TH FLOOR WEST -

VAV BOX CONTROLS

Project Title

H

C

HWR

EX. V

HWS

AHU FOR 4TH FLOOR WEST - VAV BOX CONTROLS

(TYP. OF 25)

BILL OF MATERIALS

Designation Qty Part Number Description Field Devices:

STT-1 25 NS-BTP7002-0 SENSOR,TEMP.,W/C,NETWORK,WALL MNT.

TE-1 25 TE-6311M-1 SENSOR,TEMP.8IN,DUCT MNT.,

VMA-1 25 MS-VMA1620-0 VAV MODULAR ASSY.,CLG W/ REHEAT,MS/TP

SEQUENCE OF OPERATIONS

VAV SYSTEM CONTROL:

COOLING MODE:

On a rise in space temperature above the space temperature cooling set point, the damper will modulate from the minimum CFM set point to the maximum CFM set point. As the space temperature drops, the damper will modulate to the minimum CFM set point.

HEATING MODE:

On a drop in space temperature below the heating space temperature set point, the damper will modulate to the minimum heating CFM set point. On a further drop in space temperature below the space temperature set point, the heating coil valve will modulate to maintain the heating space temperature to it’s set point. As the temperature rises the reverse will occur.

VMA-16

(SEE NOTES)

MOUNT DIRECTLY TO

DAMPER ACTUATOR SHAFT

WITH THE DAMPER IN THE

"OPEN" POSITION.

CONNECT TO VAV BOX

VELOCITY PROBES

*SEE NOTES

VAV BOX SCHEDULE

SERVES / SERVED BY

WEST SIDE 4TH FLOOR / AHU-4 WEST

WEST SIDE 4TH FLOOR / AHU-4 WEST

WEST SIDE 4TH FLOOR / AHU-4 WEST

WEST SIDE 4TH FLOOR / AHU-4 WEST

WEST SIDE 4TH FLOOR / AHU-4 WEST

VAV # MIN CFM

MAX CFM

VAV-1

VAV-2

VAV-3

VAV-4

VAV-5

VELOCITY PROBES

*SEE NOTES

TEMP. / ADJ.

STT-1

SPACE TEMP.

SENSOR W/ OVERRIDE

TO VMA

TO VMA

TE-1

WEST SIDE 4TH FLOOR / AHU-4 WEST

WEST SIDE 4TH FLOOR / AHU-4 WEST

WEST SIDE 4TH FLOOR / AHU-4 WEST

WEST SIDE 4TH FLOOR / AHU-4 WEST

WEST SIDE 4TH FLOOR / AHU-4 WEST

VAV-6

VAV-7

VAV-8

VAV-9

VAV-10

WEST SIDE 4TH FLOOR / AHU-4 WEST

WEST SIDE 4TH FLOOR / AHU-4 WEST

WEST SIDE 4TH FLOOR / AHU-4 WEST

WEST SIDE 4TH FLOOR / AHU-4 WEST

WEST SIDE 4TH FLOOR / AHU-4 WEST

VAV-11

VAV-12

VAV-13

VAV-14

VAV-15

WEST SIDE 4TH FLOOR / AHU-4 WEST

WEST SIDE 4TH FLOOR / AHU-4 WEST

WEST SIDE 4TH FLOOR / AHU-4 WEST

WEST SIDE 4TH FLOOR / AHU-4 WEST

WEST SIDE 4TH FLOOR / AHU-4 WEST

VAV-16

VAV-17

VAV-18

VAV-19

VAV-20

WEST SIDE 4TH FLOOR / AHU-4 WEST

WEST SIDE 4TH FLOOR / AHU-4 WEST

WEST SIDE 4TH FLOOR / AHU-4 WEST

WEST SIDE 4TH FLOOR / AHU-4 WEST

WEST SIDE 4TH FLOOR / AHU-4 WEST

VAV-21

VAV-22

VAV-23

VAV-24

VAV-25

24V FROM EXISTING XFMR(S) MOUNTED

IN THE AHU-4 WEST CONTROL PANEL

*EXISTING

TRANSFORMER

OAH

OAT

GLOBAL OUTSIDE AIR

TEMPERATURE AND

HUMIDITY SIGNAL

AS-BUILT REV. FINAL POINT TERM./NOTE2 12/2/13 BM

TYPICAL CONSTRUCTION NOTES

THE NEW MODULATING ELECTRONIC CONTROL VALVES SHALL BE

PROVIDED BY MODERN CONTROLS AND INTEGRATED TO THE NEW

DDC CONTROLLERS. FIELD INSTALLATION SHALL BE PROVIDED BY

THE PROJECT GENERAL CONTRACTOR. SEE VALVE SCHEDULE FOR

MORE INFORMATION.

AIR FLOW SCHEDULE PROVIDED BY THE VA FOR REFERENCE ONLY;

SEE AS-BUILT DOCUMENTATION FOR MORE INFO.

FREEZE PROTECTION AND SUPPLY AIR TEMPERATURE MONITORING

PROVIDED BY ASSOCIATED AHU CONTROLS.

NEW PANEL MOUNTED TRANSFORMER(S) SHALL PROVIDE 24V

POWER TO NEW VAV CONTROLLERS AS REQUIRED IN THE FIELD.

ALL CONTROL POINT DESCRIPTIONS AND TERMINAL DESIGNATION

SHALL BE RECORDED IN THE FIELD FOR AS-BUILT DOCUMENTATION.

AS-BUILT NOTE

OUR O&M MANUAL PROVIDED FOR PROJECT CLOSEOUT

INCLUDEDS ALL COMMISSION AND CHECKOUT INFORMATON

FOR ALL VAV BOXES.

THE O&M MANUAL INCLUDES A TYPCIAL VAV CONTROLLER

COMMISSIONING SHEET AND ALSO A COMPLETE VAV BOX

COMMISSIONG CHECK LIST FOR ALL VAV BOXES AS SERVED

BY THEIR ASSOCIATED UNIT.

7 BELLECOR DRIVE

NEW CASTLE, DE

19720

TEL: 302-325-6800

FAX: 302-325-6808

VD 3/7/11

C-1D

Sales Engineer Project Manager Application Engineer

BY DATE BY DATE

DRAWN APPROVED

Branch Information CONTRACT NUMBER

DRAWING NUMBER

VA HVAC CONTROLS UPGRADE

- PHASE 2A

WILMINGTON, DELAWARE

Drawing Title

AIR HANDLING UNIT;

AHU FOR 4TH FLOOR WEST -

SEQUENCE OF OPERAITONS

Project Title

AIR HANDLING UNIT; AHU FOR 4TH FLOOR WEST - SEQUENCE OF OPERATIONS

GENERAL:

Unit AHU and return fan are normally started and stopped by the DCP (EX.CP) or remotely at the BMS. H-O-A switch shall be kept in the ‘AUTO’ position.

‘HAND’ and ‘OFF’ positions shall be used for maintenance only. When the unit is ‘OFF’ D-1 and D-3 shall be closed. When the unit is ‘ON’ D-1 and D-3 shall be open.

TEMPERATURE CONTROL:

Supply air temperature sensed by T-1 shall be maintained at set point via DCP (EX.CP) by modulating either V-1 and V-2 or D-1, D-2 and D-3 in sequence.

When the temperature of the outside air provided by BMS is above 65 F DCP (EX.CP) prevents modulation of D-1, D-2 and D-3; D-1 assumes minimum outside air position (D-3 is closed and D-2 is open). V-1 modulates to maintain supply air temperature sensed by T-1.

When the temperature of the outside air provided by the BMS is between 65F and the supply air temperature sensed by T-1 damper D-2 is closed. Damper D-1 is open (maximum outside air position) and damper D-3 is open. V-1 modulates to maintain the supply air temperature sensed by T-1.

When the temperature of the outside air provided by the BMS is below the supply air temperature sensed by T-1 then dampers D-1, D-2 and D-3 modulate to maintain the schedules supply air temperature and the pump at the reheat coil runs. If D-2 is open and D-1 is closed to minimum outside air in the mode V-2 modulates open to maintain the supply air temperature.

AIR FLOW CONTROLS:

The supply air flow is controlled by the DCP (EX.CP) modulating supply fan variable speed motor controller (VSMC) to maintain the duct static pressure set point as sensed by SPS-1

The DCP (EX.CP) by using total supply air and return air flow signals shall reset the return air fan VSMC to maintain a constant CFM difference between the supply air fan CFM and the return air fan CFM.

The DCP (EX.CP) by using high pressure sensor SPS-2 located at the supply air fan discharge prevents the supply air fan from developing over 3" static pressure. If static pressure at SPS-2 exceeds 3" the supply fan stops.

HUMIDITY CONTROL:

When the DCP (EX.CP) is not calling for humidification sensed by exhaust air humidistat H-1, the stand alone electric humidifier shall be off. When the DCP (EX.CP) is calling for humidity, the humidifier shall operate under it’s built in controls to maintain desired humidity sensed by H-1.

The BMS shall override the control to maintain humidity in supply duct below 80% as sensed by H-2. BMS shall shut the humidifier off whenever the supply fan is off.

FREEZE PROTECTION:

If the air temperature sensed by T-2 falls below 45F an alarm signal shall indicate at the DCP (EX.CP) and BMS. If the temperature falls below 40F the supply fan shall shut down, damper D-1 shall close and a critical alarm shall indicate at the DCP (EX.CP) and BMS.

EMERGENCY SHUTDOWN/RESTART

When smoke is detected by the duct mounted smoke detector the supply and return fans shall stop and the alarm signal shall be transmitted to the fire alarm system, dampers D-1, D-2, SD-1 and SD-2 shall close, damper D-3 shall open. Supply and return fans shall restart and dampers open when the fire alarm circuit is manually reset.

EMERGENCY CONSTANT SPEED OPERATION

Upon failure of VSMC the supply and return fans shall be started/stopped manually at the DCP (EX.CP) or the BMS through the bypass starter. Fans shall then operate at constant speed.

AS-BUILT REV. NEW DWG. / DATES2 12/2/13 BM

7 BELLECOR DRIVE

NEW CASTLE, DE

19720

TEL: 302-325-6800

FAX: 302-325-6808

BM 3/7/11

C-2A

Sales Engineer Project Manager Application Engineer

BY DATE BY DATE

DRAWN APPROVED

Branch Information CONTRACT NUMBER

DRAWING NUMBER

VA HVAC CONTROLS UPGRADE

- PHASE 2A

WILMINGTON, DELAWARE

Drawing Title

AIR HANDLING UNIT CONTROL;

AHU FOR 4TH FLOOR EAST

Project Title

AIR HANDLING UNIT CONTROL; AHU FOR 4TH FLOOR EAST

OAH

OAT

GLOBAL OUTSIDE AIR

TEMPERATURE AND

HUMIDITY SIGNAL

BILL OF MATERIALS

Designation Qty Part Number Description

FEC-1 1 MS-FEC2611-0 CNTRLR,DIG,FEC,6UI,2BI,3BO,2AO,4CO,BACNET

XM-1 2 MS-10M4711-0 FEC EXPANSION,6UI,2BI,3BO,2AO,4CO,BACNET

CHWV SEE VALVE SCHEDULE

110v (EXISTING)

*EXISTING EX. CP

(EAST)

FOURTH FLOOR MECH.

EQUIPMENT RM. - MER

(EAST SIDE)

1 2

AS-BUILT REV. FINAL POINT TERM./NOTE2 12/2/13 BM

NOTE(S):

FEC-26

IOM-47-1,2 (TYP. OF 2)

ALL PNEUMATIC CONTROL DEVICES HAVE BEEN REPLACED (WHERE APPLICABLE). ANY

EXISTING ELECTRONIC CONTROL DEVICES IN GOOD WORKING CONDITION HAVE BEEN RE-

USED AND WIRED TO NEW JOHNSON DDC CONTROLLERS. ALL OTHER NEW ELECTRONIC

CONTROL DEVICES HAVE BEEN PROVIDED, INSTALLED AND WIRED TO THE NEW JOHNSON

DDC CONTROLLERS AS INDICATED. *REFER TO C-2B FOR CONTROLLER WIRING DETAILS

AND DRAWING C-2C FOR ASSOCIATED SEQUENCE OF OPERATIONS.

NEW ELECTRONIC CONTROL VALVES HAVE BEEN PROVIDED BY MODERN CONTROLS AND

INSTALLED BY THE GENERAL CONTRACTOR FOR ALL EQUIPMENT AS INDICATED ON THE

‘EXISTING AHU CONTROL DAMPERS AND VALVES REPLACEMENT SCHEDULE’ ON DRAWING

M-1 OF THE CONTRACT DOCUMENTS. PLEASE REFER TO VALVE SCHEDULE ‘V-1" FOR

ADDITIONAL INFORMATION.

THE CONTRACT DOCUMENTS AND SEQUENCE OF OPERATIONS REFER TO ALL EXISTING

DDC CONTROL PANELS AS ‘DCP’; AS PART OF PROJECT CLOSE OUT MODERN CONTROLS

WILL PROVIDE PERMANENT, PANEL SPECIFIC LABELS FOR ALL NEW & EXISITNG CONTROL

PANELS THAT WILL INDICATE THE ASSOCIATED EQUIPMENT SERVED. *ALL PANEL LABELS

HAVE BEEN APPROVED BY THE VA HOSPITAL.

D-1

CO-7

SUPPLY AIR

TO TERMINAL

UNITSOUTDOOR

AIR

EXHAUST

SF

RETURN

PRE

BI-7

H L

SPS-1

UI-6

*SEE NOTES (TYP)

*SEE NOTES (TYP.)

UI-4

RA-T

H

RA-H

UI-5

HUMID.

HIGH LIMIT

RF

RAFM

DP1

N.C.

N.C. *SEE DETAIL

& NOTES

HUMIDIFIER

UI-7

BO-1

R AO-8HOA

CMD.

VSMC

UI-5

BO-2

R AO-9

CMD.

VSMC

D-3

CO-7

C

C

CWS

CWR

*SEE NOTES

CO-6

V-1

HWS

HWR

*SEE NOTES

H

C

CO-5

V-2

SAFM

UI-1UI-1

DA-T

UI-3

PA-T

D-2

CO-7

N.O.

HUMIDIFIER CONTROL

LPS

HUMID.

*SEE NOTES

COND.

AO-8BO-3

V-4V-3

IOM-47-1 POINT IDENTIFICATION

POINT #

UI-1

UI-2

UI-3

UI-4

UI-5

UI-6

BI-7

BI-8

POINT NAME/DESCRIPTION

SUPPLY AIRFLOW MONITOR STATION (SAFM)

RETURN AIRFLOW MONITOR STATION (RAFM)

RETURN FAN STATUS (DPS)

PRE-FILTER DIFFERENTIAL PRESSURE (DP1)

PRE-HEAT COIL PUMP STATUS (CT)

FEC-26 POINT IDENTIFICATION

POINT #

UI-1

UI-2

UI-3

UI-4

UI-5

UI-6

BI-7

BI-8

AO-8

AO-9

BO-1

BO-2

BO-3

CO-4

CO-5

CO-6

CO-7

POINT NAME/DESCRIPTION

DISCHARGE AIR TEMPERATURE (DA-T)

MIXED AIR TEMPERATURE (MA-T)

SUPPLY FAN STATUS (DPS)

RETURN AIR HUMIDITY (RA-H)

DUCT STATIC PRESSURE (SPS)

FREEZE STAT / SHUTDOWN (LL)

SUPPLY FAN VFD COMMAND

RETURN FAN VFD COMMAND

PRE-HEAT COIL LEAVING AIR TEMPERATURE (PH-T)

RETURN AIR TEMPERATURE (RA-T)

SUPPLY FAN START / STOP

COOLING VALVE COMMAND (V-1)

PRE-HEAT COIL PUMP CMD.

PRE-HEAT VALVE COMMAND (V-2)

MIXED AIR DAMPER COMMAND (D1~D3)

RETURN FAN START / STOP

HUMIDIFIER ISOLATION VALVE COMMAND (V-3)

AO-8

AO-9

BO-1

BO-2

BO-3

CO-4

CO-5

CO-6

CO-7

HUMIDIFIER CONTROL VALVE CMD. (V-4)

IOM-47-2 POINT IDENTIFICATION

POINT #

UI-1

UI-2

UI-3

UI-4

UI-5

UI-6

BI-7

BI-8

POINT NAME/DESCRIPTION

SUPPLY AIR DUCT HIGH STATIC PRESSURE (SP-HL)

SUPPLY FAN VFD ALARM

DISCHARGE AIR SMOKE DETECTOR (SMK)

DISCHARGE AIR HUMIDITY (DA-H)

PRE-HEAT COIL PUMP LOCKOUT SWITCH

HUMIDIFIER STATUS (CT)

RETURN FAN VFD ALARM

FINAL FILTER DIFFERENTIAL PRESSURE (DP2)

AO-8

AO-9

BO-1

BO-2

BO-3

CO-4

CO-5

CO-6

CO-7

*IOM-47-1 *IOM-47-1

*IOM-47-1

*IOM-47-1

BI-8

LL

*IOM-47-1

L

H

SP-HL

HI-LIMIT

UI-1

*IOM-47-2

H

DA-H

UI-5

*IOM-47-2

UI-2

*IOM-47-2

ALARM

UI-3

ALARM

FINAL

DP2

UI-4

*IOM-47-2

MA-T

BI-8

CTCO-4

PRE-HEAT COIL

PUMP CONTROL

*IOM-47-1

*IOM-47-1

PRE-HEAT COIL

PUMP - LOCKOUT

*IOM-47-2

UI-2

BI-8

CT

IW/BMIW/JAIW

7 BELLECOR DRIVE

NEW CASTLE, DE

19720

TEL: 302-325-6800

FAX: 302-325-6808

BM 8/12/11

C-2B

Sales Engineer Project Manager Application Engineer

BY DATE BY DATE

DRAWN APPROVED

Branch Information CONTRACT NUMBER

DRAWING NUMBER

VA HVAC CONTROLS UPGRADE -

PHASE 2A

WILMINGTON, DELAWARE

Drawing Title

CONTROLLER WIRING DETAIL –

AHU FOR 4TH FLOOR EAST

Project Title

CONTROLLER WIRING DETAIL – AHU FOR 4TH FLOOR EAST

AS-BUILT REV. NEW DWG. / POINT TERM.1 12/2/13 BM

SEE AS-BUILT CONTROL DRAWINGS C-2A, C-2C AND C-2D FOR

ASSOCIATED UNIT CONTROL DIAGRAM, VAV DIAGRAM AND

SEQUENCE OF OPERATIONS.

NOTE(S):1

124816326412

O N

Address:

S A

PW

R

C O

M

SA BUS

FC BUS

C O

M S

H

LD+1

5V

IN

IC

O M

IN

IC

O M

+1

5V

IN

IC

O M

IN

IC

O M

+1

5V

IN

IC

O M

IN

IC

O M

IN

IC

O M

IN

IC

O M

UNIVERSAL BINARY

BINARY

O U

T4 O

C O

M

O U

T5 O

C O

M

O U

T6 O

C O

M

O U

T7 O

C O

M

O U

T8 O

C O

M

O U

T9 O

C O

M

CONFIGURABLE ANALOG

H O

T

24V

C O

M

FEC2611

O U

T1 O

C O

M

O U

T2 O

C O

M

O U

T3 O

C O

M

FC EOL

IN

TRIAC JUMPERS

OUT1 INT

EXT

OUT2 OUT3

124816326412

O N

Address:

SA

FC

H O

T

24V

C O

M

IOM4711-1

FC EOL

IN

TRIAC JUMPERS

OUT1 INT

EXT

OUT2 OUT3

S A

P W

R

C O

M

+ - C

O M

S H

LD

SA/FC BUS

BINARY

O U

T4 O

C O

M

O U

T5 O

C O

M

O U

T6 O

C O

M

O U

T7 O

C O

M

O U

T8 O

C O

M

O U

T9 O

C O

M

CONFIGURABLE ANALOG

O U

T1 O

C O

M

O U

T2 O

C O

M

O U

T3 O

C O

M

+1 5V

IN

IC

O

M

IN

IC

O

M

+1 5V

IN

IC

O

M

IN

IC

O

M

+1 5V

IN

IC

O

M

IN

IC

O

M

IN

IC

O

M

IN

IC

O

M

UNIVERSAL BINARY

D

IS

C H

A R

G E

A

IR

T

EM

PE

R

A

TU

R E

(D A

-T

SU

PP

LY

F

A N

E N

A B

LE

R

ET

U R

N F

A N

E N

A B

LE

SU

PP

LY

F

A N

S

TA

R T/

ST

O

P

C O

O

LI

N G

V A

LV

E

C M

D

U

PP

ER

P

R

EH

EA

T

VA

LV

E C

M D

M

IX

ED

A

IR

D

A M

PE

R

C O

M M

A N

D

R

ET

U R

N F

A N

S

TA

R T/

ST

O

P

H U

M

ID

IF

IE

R

IS

O

LA

TI

O

N V

LV

. C

M D

H U

M

ID

IF

IE

R C

O N

TR

O

L

VA

LV

E

C O

M M

A N

D (V

-4

M

IX

ED

A

IR

T

EM

PE

R A

TU

R

E (M

A -T

PR

E-

H

EA

T C

O

IL

D

IS

C H

A R

G E

TE

M

P.

(P

H -T

R

ET

U R

N A

IR

T

EM

PE

R A

TU

R

E (R

A -T

R

ET

U R

N A

IR

H

U M

ID

IT

Y (R

A -H

D U

C T

ST

A

TI

C

P R

ES

SU

R E

(S

PS

SU

PP

LY

F

A N

S

TA

TU

S

(D

PS

FR

EE

ZE

S

TA

T

/ S H

U

TD

O W

N (L

L)

SU

PP

LY

A

IR

FL

O W

M O

N

IT

O R

S

TA

TI

O

N (S

A

FM

R

ET

U R

N A

IR

FL

O W

M O

N

IT

O R

S

TA

TI

O

N (R

A

FM

R

ET

U R

N F

A N

S

TA

TU

S

(D

PS

PR

E-

FI

LT

ER

D

IF

FE

R

EN

TI

A

L

PR

ES

SU

R E

(D P1

PR

E-

H

EA

T C

O

IL

P U

M P

ST

A

TU

S

(C T)

124816326412

O N

Address:

SA

FC

H O

T

24V

C O

M

IOM4711-2

FC EOL

IN

TRIAC JUMPERS

OUT1 INT

EXT

OUT2 OUT3

S A

P W

R

C O

M

+ - C

O M

S H

LD

SA/FC BUS

BINARY

O U

T4 O

C O

M

O U

T5 O

C O

M

O U

T6 O

C O

M

O U

T7 O

C O

M

O U

T8 O

C O

M

O U

T9 O

C O

M

CONFIGURABLE ANALOG

O U

T1 O

C O

M

O U

T2 O

C O

M

O U

T3 O

C O

M

+1 5V

IN

IC

O

M

IN

IC

O

M

+1 5V

IN

IC

O

M

IN

IC

O

M

+1 5V

IN

IC

O

M

IN

IC

O

M

IN

IC

O

M

IN

IC

O

M

UNIVERSAL BINARY

SU

PP

LY

D

U C

T H

IG

H

S

TA

TI

C

P R

ES

SU

R E

(S P-

H L)

SU

PP

LY

F

A N

V

FD

A

LA

R M

R

ET

U R

N F

A N

V

FD

A

LA

R M

FI

N

A L

FI

LT

ER

D

IF

FE

R

EN

TI

A

L

PR

ES

SU

R E

(D P2

D

IS

C H

A R

G E

A

IR

H U

M

ID

IT

Y

(D A

-H

PR

E-

H

EA

T C

O

IL

P U

M P

LO

C

K O

U T

SW

IT

C H

D

IS

C H

A R

G E

A

IR

S M

O K

E D

ET

EC

TO

R

(S M

K

H U

M

ID

IF

IE

R S

TA

TU

S (C

T)

7 BELLECOR DRIVE

NEW CASTLE, DE

19720

TEL: 302-325-6800

FAX: 302-325-6808

BM 3/7/11

C-2C

Sales Engineer Project Manager Application Engineer

BY DATE BY DATE

DRAWN APPROVED

Branch Information CONTRACT NUMBER

DRAWING NUMBER

Drawing Title

AHU FOR 4TH FLOOR EAST -

VAV BOX CONTROLS

Project Title

VA HVAC CONTROLS UPGRADE

- PHASE 2A

WILMINGTON, DELAWARE

AHU FOR 4TH FLOOR EAST - VAV BOX CONTROLS

(TYP. OF 24)

BILL OF MATERIALS

Designation Qty Part Number Description Field Devices:

STT-1 24 NS-BTP7002-0 SENSOR,TEMP.,W/C,NETWORK,WALL MNT.

TE-1 24 TE-6311M-1 SENSOR,TEMP.8IN,DUCT MNT.,

VMA-1 24 MS-VMA1620-0 VAV MODULAR ASSY.,CLG W/ REHEAT,MS/TP

SEQUENCE OF OPERATIONS

VAV SYSTEM CONTROL:

COOLING MODE:

On a rise in space temperature above the space temperature cooling set point, the damper will modulate from the minimum CFM set point to the maximum CFM set point. As the space temperature drops, the damper will modulate to the minimum CFM set point.

HEATING MODE:

On a drop in space temperature below the heating space temperature set point, the damper will modulate to the minimum heating CFM set point. On a further drop in space temperature below the space temperature set point, the heating coil valve will modulate to maintain the heating space temperature to it’s set point. As the temperature rises the reverse will occur.

VMA-16

(SEE NOTES)

MOUNT DIRECTLY TO

DAMPER ACTUATOR SHAFT

WITH THE DAMPER IN THE

"OPEN" POSITION.

CONNECT TO VAV BOX

VELOCITY PROBES

*SEE NOTES

VAV BOX SCHEDULE

SERVES / SERVED BY

EAST SIDE 4TH FLOOR / AHU-4 WEST

EAST SIDE 4TH FLOOR / AHU-4 WEST

EAST SIDE 4TH FLOOR / AHU-4 WEST

EAST SIDE 4TH FLOOR / AHU-4 WEST

VAV # MIN CFM

MAX CFM

VAV-1

VAV-2

VAV-3

VAV-4

VAV-5

VELOCITY PROBES

*SEE NOTES

TEMP. / ADJ.

STT-1

SPACE TEMP.

SENSOR W/ OVERRIDE

OAH

OAT

GLOBAL OUTSIDE AIR

TEMPERATURE AND

HUMIDITY SIGNAL

TO VMA

TE-1

EAST SIDE 4TH FLOOR / AHU-4 WEST

EAST SIDE 4TH FLOOR / AHU-4 WEST

EAST SIDE 4TH FLOOR / AHU-4 WEST

EAST SIDE 4TH FLOOR / AHU-4 WEST

EAST SIDE 4TH FLOOR / AHU-4 WEST

VAV-6

VAV-7

VAV-8

VAV-9

VAV-10

EAST SIDE 4TH FLOOR / AHU-4 WEST

EAST SIDE 4TH FLOOR / AHU-4 WEST

EAST SIDE 4TH FLOOR / AHU-4 WEST

EAST SIDE 4TH FLOOR / AHU-4 WEST

EAST SIDE 4TH FLOOR / AHU-4 WEST

VAV-11

VAV-12

VAV-13

VAV-14

VAV-15

EAST SIDE 4TH FLOOR / AHU-4 WEST

EAST SIDE 4TH FLOOR / AHU-4 WEST

EAST SIDE 4TH FLOOR / AHU-4 WEST

EAST SIDE 4TH FLOOR / AHU-4 WEST

EAST SIDE 4TH FLOOR / AHU-4 WEST

VAV-16

VAV-17

VAV-18

VAV-19

VAV-20

EAST SIDE 4TH FLOOR / AHU-4 WEST

EAST SIDE 4TH FLOOR / AHU-4 WEST

EAST SIDE 4TH FLOOR / AHU-4 WEST

EAST SIDE 4TH FLOOR / AHU-4 WEST

VAV-21

VAV-22

VAV-23

VAV-24

H

C

HWR

EX. V

HWS

TO VMA

EAST SIDE 4TH FLOOR / AHU-4 WEST

24V FROM EXISTING XFMR(S) MOUNTED

IN THE AHU-4 EAST CONTROL PANEL

*EXISTING

TRANSFORMER

TYPICAL CONSTRUCTION NOTES

THE NEW MODULATING ELECTRONIC CONTROL VALVES SHALL BE

PROVIDED BY MODERN CONTROLS AND INTEGRATED TO THE NEW

DDC CONTROLLERS. FIELD INSTALLATION SHALL BE PROVIDED BY

THE PROJECT GENERAL CONTRACTOR. SEE VALVE SCHEDULE FOR

MORE INFORMATION.

AIR FLOW SCHEDULE PROVIDED BY THE VA FOR REFERENCE ONLY;

SEE AS-BUILT DOCUMENTATION FOR MORE INFO.

FREEZE PROTECTION AND SUPPLY AIR TEMPERATURE MONITORING

PROVIDED BY ASSOCIATED AHU CONTROLS.

NEW PANEL MOUNTED TRANSFORMER(S) SHALL PROVIDE 24V

POWER TO NEW VAV CONTROLLERS AS REQUIRED IN THE FIELD.

ALL CONTROL POINT DESCRIPTIONS AND TERMINAL DESIGNATION

SHALL BE RECORDED IN THE FIELD FOR AS-BUILT DOCUMENTATION.

AS-BUILT NOTE

OUR O&M MANUAL PROVIDED FOR PROJECT CLOSEOUT

INCLUDEDS ALL COMMISSION AND CHECKOUT INFORMATON

FOR ALL VAV BOXES.

THE O&M MANUAL INCLUDES A TYPCIAL VAV CONTROLLER

COMMISSIONING SHEET AND ALSO A COMPLETE VAV BOX

COMMISSIONG CHECK LIST FOR ALL VAV BOXES AS SERVED

BY THEIR ASSOCIATED UNIT.

AS-BUILT REV. FINAL POINT TERM./NOTE2 12/2/13 BM

7 BELLECOR DRIVE

NEW CASTLE, DE

19720

TEL: 302-325-6800

FAX: 302-325-6808

BM 3/7/11

C-2D

Sales Engineer Project Manager Application Engineer

BY DATE BY DATE

DRAWN APPROVED

Branch Information CONTRACT NUMBER

DRAWING NUMBER

Drawing Title

AIR HANDLING UNIT;

AHU FOR 4TH FLOOR EAST

- SEQUENCE OF OPERATIONS

Project Title

VA HVAC CONTROLS UPGRADE

- PHASE 2A

WILMINGTON, DELAWARE

GENERAL:

Unit AHU and return fan are normally started and stopped by the DCP (EX.CP) or remotely at the BMS. H-O-A switch shall be kept in the ‘AUTO’ position.

‘HAND’ and ‘OFF’ positions shall be used for maintenance only. When the unit is ‘OFF’ D-1 and D-3 shall be closed. When the unit is ‘ON’ D-1 and D-3 shall be open.

TEMPERATURE CONTROL:

Supply air temperature sensed by T-1 shall be maintained at set point via DCP (EX.CP) by modulating either V-1 and V-2 or D-1, D-2 and D-3 in sequence.

When the temperature of the outside air provided by BMS is above 65 F DCP (EX.CP) prevents modulation of D-1, D-2 and D-3; D-1 assumes minimum outside air position (D-3 is closed and D-2 is open). V-1 modulates to maintain supply air temperature sensed by T-1.

When the temperature of the outside air provided by the BMS is between 65F and the supply air temperature sensed by T-1 damper D-2 is closed. Damper D-1 is open (maximum outside air position) and damper D-3 is open. V-1 modulates to maintain the supply air temperature sensed by T-1.

When the temperature of the outside air provided by the BMS is below the supply air temperature sensed by T-1 then dampers D-1, D-2 and D-3 modulate to maintain the schedules supply air temperature and the pump at the reheat coil runs. If D-2 is open and D-1 is closed to minimum outside air in the mode V-2 modulates open to maintain the supply air temperature.

AIR FLOW CONTROLS:

The supply air flow is controlled by the DCP (EX.CP) modulating supply fan variable speed motor controller (VSMC) to maintain the duct static pressure set point as sensed by SPS-1

The DCP (EX.CP) by using total supply air and return air flow signals shall reset the return air fan VSMC to maintain a constant CFM difference between the supply air fan CFM and the return air fan CFM.

The DCP (EX.CP) by using high pressure sensor SPS-2 located at the supply air fan discharge prevents the supply air fan from developing over 3" static pressure. If static pressure at SPS-2 exceeds 3" the supply fan stops.

HUMIDITY CONTROL:

When the DCP (EX.CP) is not calling for humidification sensed by exhaust air humidistat H-1, the stand alone electric humidifier shall be off. When the DCP (EX.CP) is calling for humidity, the humidifier shall operate under it’s built in controls to maintain desired humidity sensed by H-1.

The BMS shall override the control to maintain humidity in supply duct below 80% as sensed by H-2. BMS shall shut the humidifier off whenever the supply fan is off.

FREEZE PROTECTION:

If the air temperature sensed by T-2 falls below 45F an alarm signal shall indicate at he DCP (EX.CP) and BMS. If the temperature falls below 40F the supply fan shall shut down, damper D-1 shall close and a critical alarm shall indicate at the DCP (EX.CP) and BMS.

EMERGENCY SHUTDOWN/RESTART

When smoke is detected by the duct mounted smoke detector the supply and return fans shall stop and the alarm signal shall be transmitted to the fire alarm system, dampers D-1, D-2, SD-1 and SD-2 shall close, damper D-3 shall open. Supply and return fans shall restart and dampers open when the fire alarm circuit is manually reset.

EMERGENCY CONSTANT SPEED OPERATION

Upon failure of VSMC the supply and return fans shall be started/stopped manually at the DCP(EX.CP) or the BMS through the bypass starter. Fans shall then operate at constant speed.

AIR HANDLING UNIT; AHU FOR 4TH FLOOR EAST - SEQUENCE OF OPERATIONS

AS-BUILT REV. NEW DWG. / DATE2 12/2/13 BM

7 BELLECOR DRIVE

NEW CASTLE, DE

19720

TEL: 302-325-6800

FAX: 302-325-6808

BM 7/20/11

SUB. REVISION NEW DWG. FOR HX CONTROL1 7/20/11 BM

C-3

Sales Engineer Project Manager Application Engineer

BY DATE BY DATE

DRAWN APPROVED

Branch Information CONTRACT NUMBER

DRAWING NUMBER

VA HVAC CONTROLS UPGRADE -

PHASE 2A

WILMINGTON, DELAWARE

Drawing Title

HEAT EXCHANGER CONTROL;

4TH FLOOR MECH. ROOM 40M2

Project Title

HEAT EXCHANGER CONTROL; 4TH FLOOR MECH. ROOM 40M2

OAH

OAT

GLOBAL OUTSIDE AIR

TEMPERATURE AND

HUMIDITY SIGNAL

HEAT

EXCHANGER

STEAM

CONDENSATE

TE

HWS

HWR

P-1

*SEE NOTES

SEQUENCE OF OPERATIONS

BOOSTER HEATER HOT WATER HEATER (PUMP P-X)

1. PUMP P-X STARTS AND STOPS BY BMS BASED ON HOT WATER DEMAND FROM HOT

WATER CONSUMING EQUIPMENT.

2. SENSOR T-1(TE) MODULATES NORMALLY CLOSED VALVES V-1 AND V-2 TO MAINTAIN 180

F SUPPLY WATER TEMPERATURE.

LPS

DO-4

EX. V

110v (EXISTING)

*EXISTING EX. CP

FOURTH FLOOR

MECH. ROOM 40M2

(CENTRAL 4TH FLOOR)

AS-BUILT REV. FINAL POINT TERM.2 12/20/13 BM

FX-1FX-07 POINT IDENTIFICATION

POINT #

AI-2

AI-3

AI-4

DI-1

DI-2

DI-3

DI-4

DI-5

AO-1

AO-2

DO-1

DO-2

DO-3

DO-4

DO-5

DO-6

AI-1

POINT NAME/DESCRIPTION

HOT WATER TEMP.

PUMP 1 STATUS

PUMP 2 STATUS

FLOW SWITCH

ROOM TEMP.

PUMP 1 COMMAND

PUMP 2 COMMAND

VALVE COMMAND

VALVE COMMAND

UNIT HEATER FAN COMMAND

NOTE(S):

UNIT HEATER CONTROL DETAIL

ALL PNEUMATIC CONTROL DEVICES HAVE BEEN REPLACED (WHERE APPLICABLE). ANY

EXISTING ELECTRONIC CONTROL DEVICES IN GOOD WORKING CONDITION HAVE BEEN RE-

USED AND WIRED TO NEW JOHNSON DDC CONTROLLERS. ALL OTHER NEW ELECTRONIC

CONTROL DEVICES HAVE BEEN PROVIDED, INSTALLED AND WIRED TO THE NEW JOHNSON

DDC CONTROLLERS AS INDICATED. *REFER TO C-1B FOR CONTROLLER WIRING DETAILS

AND DRAWING C-1C FOR ASSOCIATED SEQUENCE OF OPERATIONS.

NEW ELECTRONIC CONTROL VALVES HAVE BEEN PROVIDED BY MODERN CONTROLS AND

INSTALLED BY THE GENERAL CONTRACTOR FOR ALL EQUIPMENT AS INDICATED ON THE

‘EXISTING AHU CONTROL DAMPERS AND VALVES REPLACEMENT SCHEDULE’ ON DRAWING

M-1 OF THE CONTRACT DOCUMENTS. PLEASE REFER TO VALVE SCHEDULE ‘V-1" FOR

ADDITIONAL INFORMATION.

THE CONTRACT DOCUMENTS AND SEQUENCE OF OPERATIONS REFER TO ALL EXISTING

DDC CONTROL PANELS AS ‘DCP’; AS PART OF PROJECT CLOSE OUT MODERN CONTROLS

WILL PROVIDE PERMANENT, PANEL SPECIFIC LABELS FOR ALL NEW & EXISITNG CONTROL

PANELS THAT WILL INDICATE THE ASSOCIATED EQUIPMENT SERVED. *ALL PANEL LABELS

HAVE BEEN APPROVED BY THE VA HOSPITAL.

SPACE TEMP.

SENSOR

(EXISTING)

AI‐4 TEMP.H

DO-5

P-2

DO-3

DI-1

CT

DO-1

*SEE NOTES

*INCREMENTAL

FS

DI-3

PUMP 1 CONTROL

DI-2

CT

*SEE NOTES

DO-2

PUMP 2 CONTROL

BILL OF MATERIALS

Designation Qty Part Number Description

FEC-1 1 FX07 CNTRLR,DIG,FX-07, BACNET, NO DISPLAY

XX-T 2 TE-6315P-1 SENSOR,T-NI,0.1%,8FT AVG.

1 TE-6311M-1 SENSOR,T-NI,0.1%,8IN DUCT

LL 1 A70HA-1C LOW LIMIT,MANUAL RESET,20FT ELEM.

FEC-1 1 MS-FEC2611-0 CNTRLR,DIG,FEC,6UI,2BI,3BO,2AO,4CO,BACNET

XM-1 1 MS-10M2711-0 FEC EXPANSION,2UI,2UO,BACNET

V-X SEE VALVE SCHEDULE

ADDRESS: #67

Visio-.Title Page
Visio-C-1A AHU-4 WEST
Visio-C-1B AHU-4 WEST DETAIL
Visio-C-1C AHU-4 WEST VAVS
Visio-C-1D AHU-4 WEST SEQUENCE
Visio-C-2A AHU-4 EAST
Visio-C-2B AHU-4 EAST DETAIL
Visio-C-2C AHU-4 EAST VAVS
Visio-C-2D AHU-4 EAST SEQUENCE
Visio-C-3 heat exchanger

File details come from the government source that posted it. Updated .