This is Amendment 5 to Solicitation 36C24226R0060 for the MRI AHU Modification project at James J. Peters VA Medical Center in Bronx, NY, issued by the Department of Veterans Affairs Network Contracting Office 2. The amendment addresses a Request for Information (RFI) regarding hallway fan coil unit configuration with a response deadline of August 28, 2026 at 12:00 PM EST. The contracting officer is Vladimir Stoyanov. The primary issue concerns six 18,000 BTU/h chilled water fan coil units specified in the contract documents; the contractor raised concerns that surface-mounted units would create aesthetic and safety hazards in the corridor.
The VA has approved Option A as acceptable if there is no additional cost: providing six ceiling-mounted fan coil units at 18,000 BTU/h each, with the caveat that units cannot be equally spaced due to ceiling constraints. The VA specifies that 18,000 BTU wall-mounted units require a minimum of six inches clearance below the ceiling, and given typical 8-foot corridor heights with units approximately 12-14 inches high, there would be approximately 6 feet 3 inches of clearance beneath the installed units. Option B—providing three ceiling-mounted units of higher capacity with equivalent total cooling while spaced evenly—was presented as an alternative but is not explicitly approved. The underlying design-build contract is for installation of a dedicated cooling source for the MRI suite's air handling unit, with a performance period of 270 calendar days and project magnitude between $500,000 and $1,000,000.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24226R0060 0004.docx | DOCX document | |
| 36C24226R0060 0003.docx | DOCX document | |
| Phase II Proposals.docx | DOCX document | |
| 36C24226R0060 0002.docx | DOCX document | |
| 36C24226R0060 0001.docx | DOCX document | |
| S02 Supplement A though C.pdf | ||
| S02 52.225-2 BUY AMERICAN CERTIFICATE 2.1.docx | DOCX document | |
| S02 Privacy Training for Personnel without Access to VA Computer 1.1.pdf | ||
| P02 Drawings.pdf | ||
| S02 SAFETY AND ENVIRONMENTAL RECORD 2.1.docx | DOCX document | |
| S02 Participation Goals for Minorities and Females 2.1.pdf | ||
| S02 INSTRUCTIONS TO BIDDERS REGARDING TAX EXEMPTION IN NY 2.1.docx | DOCX document | |
| S02 FAR DEVIATION FEB 2025 NOTICE 2.1.docx | DOCX document | |
| SCA 2015_4187_34 12032025.docx | DOCX document | |
| Instructions to Offers.docx | DOCX document | |
| WD NY20260003 01302026.docx | DOCX document | |
| S02 Specifications.pdf | ||
| S02 LIMITATION ON SUBCONTRACTING 2.1.docx | DOCX document | |
| S02 AUTODESK Contractors Access Instructions 1.1.pdf | ||
| SOW 12152025.docx | DOCX document | |
| 36C24226R0060_1.docx | DOCX document |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 08-26-2026 630A4-26-401 36C242 Department of Veterans Affairs Network Contracting Office 2 James J. Peters VA Medical Center 130 West Kingsbridge Road Bronx
NY
10468-3904 36C242 Department of Veterans Affairs James J. Peters VA Medical Center Network Contracting Office 2 130 West Kingsbridge Road Bronx
NY
10468-3904 To all Offerors/Bidders
36C24226R0060
X X X X
The purpose of Amendment 0005 is to submitted a response to RFI's.
Response date August 28, 2026 12pm EST.
Please see Page 2.
Vladimir Stoyanov Contracting Officer 36C24226R0060 Amendment 5 630A4-26-401 MRI AHU Modification
8. Question -Hallway Fan Coil Units-The contract documents indicate (6) 18,000 BTU/h chilled water surface-mounted fan coil units in the hallway. We have concerns with this configuration: the surface-mounted units would protrude into the corridor, presenting both an aesthetic issue and a potential head-strike hazard for pedestrians. We propose substituting ceiling-mounted fan coil units in lieu of the surface-mounted units. Please advise which of the following options is acceptable:
VA Response: Option A would be acceptable if there is no additional cost to the VA. Six ceiling mounted units would provide both the desired level of equipment redundancy and distributed air flow equivalent to the contract design wall mounted units. An 18,000 btu wall mounted evaporator fan unit requires a minimum of 6 inches of clearance below the ceiling for proper air flow. As the evaporator fan coil unit is approximately 12-14 inches high, in an 8 foot high corridor (96 inches clear), there would be a minimum of 76 inches clearance under the evaporator fan unit, or 6 foot 3 inches. If the corridor is higher than 8 feet then the clearance would increase.
Option A: Provide (6) ceiling-mounted fan coil units at 18,000 BTU/h each; note that due to ceiling constraints, the units cannot be equally spaced along the corridor.
Option B: Provide (3) ceiling-mounted fan coil units of higher capacity, sized to provide equivalent total cooling capacity, spaced evenly along the corridor.