This is Amendment 3 to Solicitation 36C24226R0060 for the MRI AHU Modification project at James J. Peters VA Medical Center in Bronx, New York. The amendment extends the response deadline from July 9, 2026 to August 7, 2026 at 3:00 PM EDT to allow offerors additional time to submit responses to Requests for Information (RFIs) issued by the Department of Veterans Affairs.
The RFIs address three critical design decisions: selection between three chiller system options (air-cooled package with glycol and pump, air-cooled package with glycol and plate-frame heat exchanger, or air-cooled split chiller with clear water only); clarification on the necessity of inline pumps for fan coil units versus series pump configurations; and verification of cooling load calculations for six new corridor fan coil units (9 tons) and the 21-ton MRI load capacity. The Contracting Officer's responses indicate that Option 2 appears most effective, series pump configurations are not acceptable, and the A/E design team bears responsibility for performing independent heat load calculations to verify actual cooling requirements rather than relying solely on VA-provided general information. The underlying project involves providing a design-build service for installation of a dedicated air-cooled chilled water cooling system to support an existing AHU serving the MRI suite, with a performance period of 270 calendar days and a project magnitude between $500,000 and $1,000,000.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24226R0060 0005.docx | DOCX document | |
| 36C24226R0060 0004.docx | DOCX document | |
| Phase II Proposals.docx | DOCX document | |
| 36C24226R0060 0002.docx | DOCX document | |
| 36C24226R0060 0001.docx | DOCX document | |
| S02 Supplement A though C.pdf | ||
| S02 52.225-2 BUY AMERICAN CERTIFICATE 2.1.docx | DOCX document | |
| Instructions to Offers.docx | DOCX document | |
| WD NY20260003 01302026.docx | DOCX document | |
| S02 Privacy Training for Personnel without Access to VA Computer 1.1.pdf | ||
| P02 Drawings.pdf | ||
| S02 SAFETY AND ENVIRONMENTAL RECORD 2.1.docx | DOCX document | |
| S02 Participation Goals for Minorities and Females 2.1.pdf | ||
| S02 INSTRUCTIONS TO BIDDERS REGARDING TAX EXEMPTION IN NY 2.1.docx | DOCX document | |
| S02 FAR DEVIATION FEB 2025 NOTICE 2.1.docx | DOCX document | |
| SCA 2015_4187_34 12032025.docx | DOCX document | |
| S02 Specifications.pdf | ||
| S02 LIMITATION ON SUBCONTRACTING 2.1.docx | DOCX document | |
| S02 AUTODESK Contractors Access Instructions 1.1.pdf | ||
| SOW 12152025.docx | DOCX document | |
| 36C24226R0060_1.docx | DOCX document |
Show all 21
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE
7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER
3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO.
1. CONTRACT ID CODE
FACILITY CODE
CODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.
is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER
16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30
PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer) 07-23-2026 630A4-26-401 36C242 Department of Veterans Affairs Network Contracting Office 2 James J. Peters VA Medical Center 130 West Kingsbridge Road Bronx
NY
10468-3904 36C242 Department of Veterans Affairs James J. Peters VA Medical Center Network Contracting Office 2 130 West Kingsbridge Road Bronx
NY
10468-3904 To all Offerors/Bidders
36C24226R0060 04-27-2026
X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to: 08-07-2026 3PM EDT X
The purpose of Amendment 0003 is to submitted response to RFI's. Response date is changed to August 7, 2026 3pm EST.
Please see the attached.
Vladimir Stoyanov Contracting Officer 36C24226R0060 Amendment 3 630A4-26-401 MRI AHU Modification
6. Per our teams meeting this morning, please see below RFI's;
· There are 3 potential options for the MRI chiller:
1. Air cooled package at grade with glycol and pump package.
2. Air cooled package at grade using glycol but also using a plate and frame heat exchanger to separate the glycol from the clear water.
3. Air cooled split chiller with outdoor condenser and indoor evaporator using clear water only.
Does The VA have a preference for which system works better for them?
· The scope of work calls for an inline pump to serve the fan coil units. Can the VA share the reason for these extra pumps as series pumping can present issues. If the additional head is included in the new chiller pumps does that suffice?
· There are 6 new fan coil units called for in the corridor. This is 9 tons of cooling. Does the corridor have that kind of a load? Typically, corridors are only lighting and a few transient people. Also, if 9 tons is used for fan coil units, is 21 tons sufficient for the MRI Load?
COR answer(s):
1) It appears that Option 2 may be the more effective choice; however, as this is a design-build project, we rely on the A/E team’s expertise to design the system in accordance with VA requirements and specifications.
2) Accordingly, a series pump configuration is not considered an acceptable design.
3) The A/E team should perform its own heat load calculation for the corridor to determine the required cooling capacity. The VA has provided only general information; it is the contractor’s design team’s responsibility to determine the actual requirements and verify whether the chiller recommended by the VA is sufficient.