Pre-Bid RFI_528A5-22-506 Replace B 118 FCUs -Final.pdf

PDF 135 KB Posted

Attached to
Y1DA--528A5-22-506-Replace Building 118 FCUs Federal contract opportunity
Solicitation number
36C24226B0026
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2

About this file

This is a Request for Information (RFI) document for a federal construction project involving the replacement of Building 118 FCU (Project No. 528A5-22-506, Solicitation No. 36C24226B0026). The RFI was submitted on January 27, 2026, with Contract Specialist Devan Bertch overseeing the solicitation. The document contains nine questions and clarifications submitted by the A/E firm Miller Remick, with corresponding responses from the VA.

Key clarifications address mechanical, electrical, and structural specifications for the building renovation. Mechanical systems clarifications include correcting the DDC (direct-digital control) system manufacturer from Johnson Controls to Automated Logic Corporation (ALC), confirming that aluminum jacketing at roof and exterior ductwork does not require painting, deferring to mechanical specifications for roof support finishes (epoxy), and confirming that painting of ductwork and piping penetrations above acoustical ceilings is not required. Electrical and systems clarifications identify the fire alarm system as a Simplex 4100U panel supported by Jason Kimmel at 585-509-0330, provide the ASCO ATS representative contact as Brett Riggio at 215-776-7270, confirm that temporary services are not required during MDP panel replacement with work to be performed during off-hours per Electrical Demolition note 8, and identify the existing main distribution board manufacturer as Square D. The document also notes that the contractor is responsible for ensuring lightning protection is complete with no historical records available from the 1970s building construction.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--528A5-22-506-Replace Building 118 FCUs, newest first.
File Type Posted
36C24226B0026 0004.docx DOCX document
36C24226B0026 0003.docx DOCX document
36C24226B0026 0002.docx DOCX document
230923 03-2023 DDC for HVAC.pdf PDF
S04 - Site Visit Conference Agenda - 36C24226B0026 Replace Building 118 FCUs.docx DOCX document
S04 - Pre bid sign in sheet - 36C24226B0026 Replace Building 118 FCUs.pdf PDF
36C24226B0026 0001.docx DOCX document
P01 - Drawings - 528A5-22-506_Bid Submission.pdf PDF
P01 - Specs - 528A5-22-506_ECC_-Replace B118 FCUs -Final.pdf PDF
FAR 52.225-2 Buy American Certification.pdf PDF
S11 - LOS certification - Special Trade 75.pdf PDF
P07 - Wage determinations - 36C24226B0026 Replace Building 118 FCUs.pdf PDF
36C24226B0026_1.docx DOCX document
Show all 13

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project No.: 528A5-22-506

Project Title: Replace Building 118 FCU

Solicitation No.: 36C24226B0026

Date RFI's Submitted: 1/27/2026

Contract Specialist: Devan Bertch

RFI No. Request for Information: (A/E Miller Remick)/ VA -provided Response:

1 specification section 23 09 23 I believe I have found an error. 23 09 23 – 6 paragraph F. “This facility’s existing direct-digital control (DDC) system is manufactured by John Controls”

Specification 23 09 23 – 6 paragraph F,has been corrected to “This facility’s existing direct-digital control

(DDC) system is manufactured by Automated Logic Corporation (ALC)”.

As Shown in the drawing M-801 Controls General Notes point 13, "DDC must be 100% compatable with the existing system. there must be no interface required". Refer to the revised specification section

23 09 23 attached.

2 Is the Aluminum Jacketing at the roof and exterior ductwork painted. Didn't find a -paint type for

Aluminum in the Arch. Paint Spec.

No.

The aluminum jacket does not need to be painted.

3 Conflict: Arch Specs call for a DTM finish on roof supports but Mechanical Specs call for epoxy. Defer to Mechanical Specs.

4 Do we have to paint ductwork/piping penetrations above the Acoustical Ceilings No, painting of ductwork/piping above the ceiling is not required.

5 Lightning Protection – Please provide the contact for the contractor for the current Master UL certificate holder. We need this so they can re-certify the system after the modifications.

Contractor required to ensure lighting protection is complete, there is no record of the lighting protection company when the building was built in the 70.

6 Fire alarm system – Please provide fire alarm manufacturer and contact information for the contractor that maintains the fire alarm system.

Simplex 4100U panel. Vendor who supports are system is Jason Kimmel from simplex 585-509-0330

7 ASCO ATS – Please provide the contact for the ASCO representative that provided the information for the retrofit.

Brett Riggio - ASCO Services 215-776-7270

8 Temporary Services – What if any temporary services are required when the MDP panel is being replaced? Do any of the downstream panels need to be temporarily fed during the outage?

Temporary services is not required. Shutdown for MDP work shall be performed off hours. Refer to

Electrical Demolition note 8 on E-002.

9 Distribution Manufacturer – Please provide the manufacturer of the existing electrical distribution on site.

Existing main distribution board Is Square D

1. General Questions/Comments

Pre-Proposal - Request for Information 1 AE Works Ltd.