36C24125B0003 0002.docx

DOCX document 16 KB Posted

Attached to
Z2DA--518-22-111 Elevator Replacement Ph. 3 Federal contract opportunity
Solicitation number
36C24125B0003
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1

About this file

This is Amendment 0002 to solicitation 36C24125B0003 for an elevator replacement project (Phase 3) issued by the Department of Veterans Affairs Network Contracting Office 1.

The amendment announces a second site visit scheduled for December 20, 2024, at 10:00 AM, meeting at the main entrance of Building 2. A mechanic will be available to provide access to all elevators associated with the project. The amendment maintains existing deadlines: RFI submissions are due by 4:00 PM EST on December 18, 2024, and proposals are due by 11:00 AM EST on January 9, 2025.

View the file

Other files for this federal contract opportunity

Other files attached to Z2DA--518-22-111 Elevator Replacement Ph. 3, newest first.
File Type Posted
SF 1409 36C24125B0003.pdf PDF
36C24125B0003 0006.docx DOCX document
Construction Specification Institute Division Breakdown.xlsx XLSX spreadsheet
36C24125B0003 - EMR Rating Form.pdf PDF
36C24125B0003 0005.docx DOCX document
2024-02-23_Bedford-VAMC-Bldg-9_FireScan.pdf PDF
2024-02-22_Bedford-VAMC-Bldg-7_FireScan.pdf PDF
518-22-111 - Elevator Replacement Phase 3 - 100 CD - SPECIFICATIONS - updated 7-25-24.pdf PDF
2024-03-07_Bedford-VAMC-Bldg-10_FireScan.pdf PDF
2024-08-20_Bedford-VAMC-Bldg-6_FireScan.pdf PDF
RFI Answers 2nd Batch.docx DOCX document
RFI Answers 1st Batch.docx DOCX document
36C24125B0003 0004.docx DOCX document
36C24125B0003 0003.docx DOCX document
Elevator Site Visit sign in 12-20-24.pdf PDF
Elevator Site Visit sign in 12-4-24.pdf PDF
36C24125B0003 0001.docx DOCX document
518-22-111 - Elevator Replacement Phase 3 - 100 CD - SPECIFICATIONS.pdf PDF
36C24125B0003.docx DOCX document
518-22-111 - Elevator Replacement Phase 3 - 100 CD - DRAWINGS.pdf PDF
SOW Elevator Replacement Ph 3.pdf PDF
SAM WD MA20240001 revised 10-11-2024.pdf PDF
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer) 12-04-2024 518-22-111 Department of Veterans Affairs Network Contracting Office 1 (NCO 1) Contracting Officer (90C) 718 Smyth Road Manchester

NH

03104 Department of Veterans Affairs Network Contracting Office 1 (NCO 1) Contract Specialist 200 Springs Road Bedford

MA

01730 To all Offerors/Bidders

36C24125B0003

X X X X This amendment is issued to provide a second site visit for this project. The site visit is schedule for 10:00AM on Fri.

12/20/24. The meeting place will be at the main entrance of Building 2. A mechanic will be available to provide access to all elevators associated with this project. Currently there is no changes to the deadlines for the RFI and proposal deadlines.

RFI deadline is unchanged and scheduled for 4:00PM EST on 12/18/24.

Proposal deadline is unchanged and scheduled for 11:00AM EST on 1/9/25.

Casey Pridham Contracting Officer