691-20-150.603.DRAWINGS.ADDENDUM-1.pdf
PDF 25 MB Posted
- Solicitation number
- 36C10F24R0018
About this file
This document appears to be an addendum to the drawings for Solicitation 36C10F24R0018, which is a Request for Proposal (RFP) for the construction of a boiler plant at the West Los Angeles VA Medical Center. The solicitation is issued by the Department of Veterans Affairs Office of Construction and Facilities Management.
The addendum provides additional drawings and specifications related to the boiler plant construction project. It likely contains details on the design, layout, and technical requirements for the facility. Key information that may be included in the addendum are updates to the scope of work, changes to drawings or specifications, and any clarifications or modifications to the original RFP. Contractors responding to the solicitation should review this addendum carefully to ensure their proposal addresses all current requirements.
View the file
Other files
Show all 29
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT TEAM
CLIENT/ OWNER
DEPARTMENT OF VETERAN'S AFFAIRS
CONSTRUCTION AND FACILITIES MANAGEMENT,
WESTERN REGION
400 MARE ISLAND WAY, SUITE 100
VALLEJO, CA 94590
VA PROJECT NUMBER: 691-20-150
ATTN: TIMOTHY LAFAVE
ARCHITECT / INTERIORS / SIGNAGE
LEO A DALY
550 SOUTH HOPE STREET, 27TH FLR
LOS ANGELES, CA 90071
213.629.0100
ATTTN: PARI TIVAY
STRUCTURAL ENGINEER
JOHN A. MARTIN & ASSOCIATES
950 S. GRAND AVENUE, 4TH FLOOR
LOS ANGELES, CA 90015
213.785.3161
ATTN: SHANE FITZGERALD
MECHANICAL & PLUMBING
OPERATIONAL SECURITY
GUIDEPOST SOLUTIONS
2121 N. CALIFORNIA BLVD, SUITE 800
WALNUT CREEK, CA 94596
ATTN: RAY KOLODZIECZAK
FIRE PROTECTION
LEO A DALY
730 SECOND AVE SOUTH SUITE 1300
MINNEAPOLIS, MN 55402
612.341.9559
ATTN: DANIEL OLIG
LEO A DALY
8600 INDIAN HILLS DRIVE,
OMAHA, NE 68114-4039
402.390.4437
ATTN: MIKE BRADY
ELECTRICAL
LEO A DALY
8600 INDIAN HILLS DRIVE,
OMAHA, NE 68114-4039
402.390.4247
ATTN: JUERGEN NOETZEL
ELEVATOR AND TRANSPORT
ST. ONGE
1400 WILLIAMS ROAD
YORK, PA 17402
717.505.8026
ATTN: SEAN STEINER
LOW VOLTAGE
LEO A DALY
10 TENTH STREET NE SUITE 200
ATLANTA, GA 30309
404.885.7922
ATTN: STEVE DAVIS
CIVIL ENGINEER
PSOMAS
3 HUTTON CENTRE DRIVE SUITE 200
SANTA ANA, CA 92707
714.751.7353
ATTN: ROBERT J. TALAFUS
LANDSCAPE ARCHITECT
PAMELA BURTON & COMPANY
1430 OLYMPIC BOULEVARD
SANTA MONICA, CA 90404
310.828.6373
ATTN: PAUL FIEGENSCHUE
PHYSICAL SECURITY
KPFF CONSULTING ENGINEERS
45 FREEMONT ST, 28TH FLOOR
SAN FRANCISCO, CA 94105
415.989.1004
ATTN: SHARON GALLANT
COST MANAGEMENT
CUMMING CORP
660 S. FIGUEROA ST., SUITE 900
LOS ANGELES, CA 90071
213.405.0694
ATTN: TREVOR SHULTERS
GEOTECHNICAL ENGINEER
NINYO & MOORE
475 GODDARD, SUITE 200
IRVINE, CA 92618
949.753.7070
ATTN: GREG CORSON
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /0
-1
-0
V A
W
L A
-C C
C C
U P
S it e
U ti ls
R e n o o f_ B
/6
-2
-1
.6
.A
R C
H .r v t
/1
/2
:4
:2
A M
GI000
COVER SHEET
LEO A DALY COMPANY
LOS ANGELES, CA 90071
(213) 629-0100
PARI TIVAY
WEST LA MEDICAL CENTER
NEW BOILER PLANT
WEST LOS ANGELES, CA
691-20-150
10/31/2023
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
550 SOUTH HOPE STREET, 27TH FLOOR
UPGRADE BOILER PLANT by REPLACEMENT (SEISMIC and PHYSICAL SECURITY COMPLIANCE)
VA PROJECT #: 691-20-150
LAD PROJECT #: 046-10092-000
CONSTRUCTION DOCUMENTS - ADDENDUM 1
ISSUE DATE - JULY 03, 2024
11301 WILSHIRE BLVD, LOS ANGELES, CA 90073
WEST LOS ANGELES MEDICAL CENTER
VA GREATER LOS ANGELES HEALTH CARE SYSTEM
NEW BOILER PLANT (B603)
Revisions: Date:
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /0
-1
-0
V A
W
L A
-C C
C C
U P
S it e
U ti ls
R e n o o f_ B
/6
-2
-1
.6
.A
R C
H .r v t
/1
/2
:4
:5
A M
GI001
SHEET INDEX
LEO A DALY COMPANY
LOS ANGELES, CA 90071
(213) 629-0100
PARI TIVAY
WEST LA MEDICAL CENTER
NEW BOILER PLANT
WEST LOS ANGELES, CA
691-20-150
10/31/2023
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
550 SOUTH HOPE STREET, 27TH FLOOR
SHEET INDEX
SHEET
NUMBER SHEET NAME S
D
D
E C
S D
S E
P
D D
F
E B
8, C D
J
U L
7, C D
O
C T
1, A D
D E
N D
U M
J U
L
3, GENERAL
GI000 COVER SHEET X X X X X X
GI001 SHEET INDEX X X X X X X
GI002 PROJECT INFORMATION X X X X X
GI003 PROJECT ABBREVIATIONS X X X X X
GI004 ACCESSIBILITY NOTES AND DIAGRAMS X X X X X
GI005 ACCESSIBILITY DIAGRAMS X X X X X
GI006 TYPICAL MOUNTING HEIGHTS X X X
GI007 SITE ACCESSIBILITY DIAGRAMS X X X
GI100 OVERALL SITE PLAN / LIMITS OF WORK X X X X X X
GI101 SITE PHASING PLAN - PHASE 1 X X X X X X
GI102 SITE PHASING PLAN - PHASE 2A X X X X X X
GI103 SITE PHASING PLAN - PHASE 2B X X X X X X
GI104 SITE PHASING PLAN - PHASE 3 - BOILER PLANT COMPLETION X X X X X
GI106 CONSTRUCTION SEQUENCE X X X X X
GI301 ACCESSIBLE PATH OF TRAVEL PLAN X X X X X
GI302 PHYSICAL SECURITY PLAN X X X X X
GI303 FIRE ACCESS / PEDESTRIAN / VEHICLE / SERVICE CIRCULATION X X X X X
GI901 RENDERED VISUALIZATIONS X X X X X
GI902 RENDERED VISUALIZATIONS X X X X X
GI903 RENDERED VISUALIZATIONS X X X X
GI904 RENDERED VISUALIZATIONS X X X X
CIVIL
CN100 TITLE SHEET X X X X X
CE100 CIVIL EROSION CONTROL PLAN X X X X X
CD100B CIVIL DEMOLITION PLAN - AREA B X X X X X
CD100E CIVIL DEMOLITION PLAN - AREA E X X X X X
CD100H CIVIL DEMOLITION PLAN - AREA H X X X X X X
CD100L CIVIL DEMOLITION PLAN - AREA L X X X
CD100P CIVIL DEMOLITION PLAN - AREA P X X X
CG100 CIVIL GRADING PLAN X X X X X
CU100 CIVIL UTILITY PLAN X X X X X X
CU101 CIVIL UTILITY PLAN X X X
CI100 CIVIL SITE PLAN X X X X X
CJ500 CIVIL DETAILS X X X X X
CJ501 CIVIL DETAILS X X
CJ502 CIVIL UTILITY SECTIONS X X
LANDSCAPE
L100B LANDSCAPE OVERALL PLAN - AREA B X X X
L100E LANDSCAPE OVERALL PLAN - AREA E X X X X X
L100H LANDSCAPE OVERALL PLAN - AREA H X X X X X
L100P LANDSCAPE OVERALL PLAN - AREA P X X X
L200 LANDSCAPE PLAN - BOILER PLANT X X X
L300 IRRIGATION PLAN - BOILER PLANT X X
L301 IRRIGATION LEGEND AND NOTES X X
L302 IRRIGATION DETAILS X X
L303 IRRIGATION DETAILS X X
L500 LANDSCAPE DETAILS X X X
L501 FENCE DETAILS X X
L502 FENCE ELEVATIONS X X
L600 LANDSCAPE DETAILS X X
L601 LANDSCAPE DETAILS X X
ARCHTECTURE
AD110 SITE DEMO PLAN - OVERALL X X X X X X
AS110B SITE PLAN - AREA B X X X X X
AS110E SITE PLAN - AREA E X X X X X
AS110H SITE PLAN - AREA H X X X X X X
AS110L SITE PLAN - AREA L X X X
AS110P SITE PLAN - AREA P X X X X
AS111 TEMPORARY SWITCHGEAR ENCLOSURE X X X X
AE001 FUNCTIONAL FLOOR PLANS X X X X X
AE100 FLOOR PLAN - UNDERGROUND LEVEL - TANK STRUCTURES X X
AE101 SLAB PLAN - LEVEL 1 X X X
AE102 SLAB PLAN - LEVEL 2 X X X
AE110 FLOOR PLAN - UTILITY TUNNEL LEVEL X X X X
AE111 FLOOR PLAN LEVEL 1 - OVERALL X X X X X
AE112 FLOOR PLAN LEVEL 2 - OVERALL X X X X X
AE113 ROOF PLAN - OVERALL X X X X X
AE114 FLOOR PLAN - EXISTING STEAM PLANT - B295 X X X X
AC111 CEILING PLAN LEVEL 1 - OVERALL X X X
AC112 CEILING PLAN LEVEL 2 - OVERALL X X X
AE201 BUILDING ELEVATIONS X X X X X
AE301 BUILDING SECTIONS X X X X X
AE302 BUILDING SECTIONS X X X X X
AE303 BUILDING SECTIONS X X X X X
AE311 WALL SECTIONS X X X
AE312 WALL SECTIONS X X X
AE313 WALL SECTIONS X X X
AE314 WALL SECTIONS X X
AE401 STAIR PLANS & SECTIONS X X X
AE402 STAIR PLANS & SECTIONS X X X
AE403 ELEVATOR PLANS & SECTIONS X X X X
AE410 INTERIOR ELEVATIONS - BOILER ROOM X X X X
AE411 ENLARGED FLOOR PLANS / INTERIOR ELEVATIONS X X X X
AE412 ENLARGED FLOOR PLANS / RCP'S / INTERIOR ELEVATIONS X X X X
AE413 ENLARGED FLOOR PLANS / RCP'S / INTERIOR ELEVATIONS X X X X
AE414 ENLARGED FLOOR PLANS / RCP'S / INTERIOR ELEVATIONS X X X X
AE501 UL- PENETRATIONS AND FP DETAILS X X X
AE501A UL - PENETRATIONS AND FP DETAILS X X X
AE501B UL - PENETRATIONS AND FP DETAILS X X X
AE501D UL- PENETRATIONS AND FP DETAILS X X X
AE511 PARTITION TYPES X X X
AE514 PARTITION DETAILS X X X
AE515 PARTITION DETAILS X X
AE521 CEILING DETAILS X X X
AE531 STAIRS AND RAILINGS DETAILS X X X
AE535 WALL PROTECTION / BACKING DETAILS X X X
AE541 CASEWORK DETAILS X X X X
AE550 EXTERIOR DETAILS X X X X
AE560 DETAILS X X X X
AE571 ROOF DETAILS X X X
AE572 ROOF DETAILS X X X
AE573 ROOF DETAILS X X X
AE574 ROOF AND MISC DETAILS X X X
AE601 DOOR SHEDULE / DOOR AND FRAME TYPES X X X
AE602 DOOR AND FRAME DETAILS X X X
AE603 WINDOW SCHEDULE / TYPES AND DETAILS X X X
INTERIORS
AF111 FLOOR FINISH PLANS - LEVEL 1 & LEVEL 2 - OVERALL X X X X
AF121 FURNITURE AND EQUIPMENT PLANS - LEVEL 1 & LEVEL 2 X X X X
AF501 FLOOR FINISH TRANSITION DETAILS X X X X
AF621 ROOM & MATERIAL FINISH SCHEDULES X X X X
SHEET INDEX
SHEET
NUMBER SHEET NAME S
D
D
E C
S D
S E
P
D D
F
E B
8, C D
J
U L
7, C D
O
C T
1, A D
D E
N D
U M
J U
L
3, STRUCTURAL
S001 GENERAL NOTES X X X X X
S002 GENERAL NOTES X X X X X
S003 GENERAL NOTES X X X X X
S004 TYPICAL DETAILS X X X X X
S005 TYPICAL DETAILS X X X X X
S006 TYPICAL DETAILS X X X X X
S007 TYPICAL DETAILS X X X X X
S008 TYPICAL DETAILS X X X X X
S009 TYPICAL DETAILS X X X X X
S010 TYPICAL DETAILS X X X X X
S011 TYPICAL DETAILS X X X X X
S012 TYPICAL DETAILS X X X X X
S013 TYPICAL DETAILS X X X X X
S014 TYPICAL DETAILS X X X X X
S015 TYPICAL DETAILS X X X X X
S111 FOUNDATION PLAN LEVEL 1 OVERALL X X X X X
S112 FRAMING PLAN CATWALK OVERALL X X X
S113 FRAMING PLAN LEVEL 2 AND LOW ROOF OVERALL X X X X X
S114 FRAMING PLAN ROOF OVERALL X X X X X
S115 FRAMING PLAN HIGH ROOF OVERALL X X X X X
S201 FIRE WATER TANK FOUNDATION AND ROOF FRAMING PLANS X X X X
S202 INDUSTRIAL WATER TANK FND'N AND ROOF FRAMING PLANS X X X X
S203 UNDERGROUND FUEL TANKS FNDN & ROOF FRAMING PLANS X X X
S204 TEMPORARY SWITCHGEAR BLDG PLAN, ELEVATIONS AND SECTIONS X X
S205 GAS METER BLDG FOUNDATION PLAN, ELEVATIONS AND SECTIONS X
S211 FLOOR PLAN - EXISTING STEAM PLANT - B295 X X
S301 COLUMN SCHEDULE X X X
S302 MOMENT FRAME ELEVATIONS X X X
S311 WALL ELEVATIONS X X X X X
S312 WALL ELEVATIONS X X X X X
S313 WALL ELEVATIONS X X
S314 WALL ELEVATIONS X X
S320 WALL SECTIONS AND DETAILS X X X
S401 FOUNDATIONS SECTIONS AND DETAILS X X X X
S402 FOUNDATION SECTIONS AND DETAILS X X X
S403 FOUNDATION SECTIONS AND DETAILS X X X X
S404 FOUNDATION SECTIONS AND DETAILS X X
S405 FOUNDATION SECTIONS AND DETAILS X X
S501 SECTIONS AND DETAILS X X X
S502 SECTIONS AND DETAILS X X X
S503 SECTIONS AND DETAILS X X
S504 SECTIONS AND DETAILS X X
S505 SECTION AND DETAILS X X
S601 CATWALK SECTIONS AND DETAILS X X X
S602 CATWALK SECTIONS AND DETAILS X
S603 CATWALK SECTIONS AND DETAILS X X X
S701 STAIR FOUNDATION AND FRAMING PLANS X X X
S702 STAIR SECTIONS AND DETAILS X X X
S703 STAIRS SECTIONS AND DETAILS X
S801 EQUIPMENT LISTS X X X
S802 EQUIPMENT TYPICAL DETAILS X
S803 MECHANICAL EQUIPMENT ANCHORAGE DETAILS X X X
S804 MECHANICAL EQUIPMENT ANCHORAGE DETAILS X X X
S805 ELECTRICAL EQUIPMENT ANCHORAGE DETAILS X X X
S806 PLUMBING EQUIPMENT ANCHORAGE DETAILS X
FIRE PROTECTION
LS100 CODE ANALYSIS X X X X
LS101 LIFE SAFETY PLAN - LEVEL 1 X X X X
LS102 LIFE SAFETY PLAN - LEVEL 2 & ROOF X X X X
FA101 FIRE ALARM PLAN - LEVEL 1 X X X X
FA102 FIRE ALARM PLAN - LEVEL 2 & ROOF X X X
FX101 FIRE SUPPRESSION PLAN - LEVEL 1 X X X X
FX102 FIRE SUPPRESSION PLAN - LEVEL 2 & ROOF X X X
FX501 FIRE SUPPRESSION DETAILS X X X X
PLUMBING
P-001 PLUMBING SYMBOLS LEGEND AND ABBREVIATIONS X X X X
PP101 PLUMBING PLAN FOUNDATION - OVERALL X X X X
PP102 PLUMBING PLAN LEVEL 1 - OVERALL X X X X
PP103 PLUMBING PLAN LEVEL 2 - OVERALL X X X X
PP104 PLUMBING PLAN ROOF LEVEL - OVERALL X X X X
PP110A PLUMBING PLAN FOUNDATION - AREA A X X X X
PP110B PLUMBING PLAN FOUNDATION - AREA B X X X X
PP110BB PLUMBING PLAN FOUNDATION - AREA BB X X X X
PP111A PLUMBING PLAN LEVEL 1 - AREA A X X X X
PP111B PLUMBING PLAN LEVEL 1 - AREA B X X X X
PP112A PLUMBING PLAN LEVEL 2 - AREA A X X X X
PP112B PLUMBING PLAN LEVEL 2 - AREA B X X X X
P-501 PLUMBING RISER DIAGRAMS X X X X
P-601 PLUMBING DIAGRAMS AND DETAILS X X X X X
P-602 PLUMBING DETAILS AND SCHEDULES X X X X
P-603 PLUMBING SCHEDULES X X X X
MECHANICAL
MH001 MECHANICAL SYMBOL LEGEND AND ABBREVIATIONS X X X X X
MH121 HVAC PLAN LEVEL 1 X X X X X
MH122 HVAC PLAN LEVEL 2 X X X X X
MH123 HVAC PLAN ROOF X X X X X
MH301 BOILER ROOM SECTIONS X X X X X
MH401 ENLARGED HVAC PLAN LEVEL 1 - BOILER ROOM X X X X
MH402 ENLARGED HVAC PLAN LEVEL 2 - BOILER ROOM X X X X
MH501 MECHANICAL DETAILS X X X X
MH502 MECHANICAL DETAILS X X X X
MH601 AIRFLOW DIAGRAMS X X X X
MH701 MECHANICAL SCHEDULES X X X X
MH702 MECHANICAL SCHEDULES X X X X
MH801 CONTROL DIAGRAMS X X X X
MH802 CONTROL DIAGRAMS X X X X
MH803 CONTROL DIAGRAMS X X X X
MH804 CONTROL DIAGRAMS X X X X
MH805 CONTROL DIAGRAMS X X X X
MH806 CONTROL DIAGRAMS X X X X
MH807 CONTROL DIAGRAMS X X X X
MH808 CONTROL DIAGRAMS X X X X
MH809 CONTROL DIAGRAMS X X
MH810 CONTROL DIAGRAMS X X
MH811 CONTROL DIAGRAMS X X
MH812 CONTROL DIAGRAMS X X
MH813 CONTROL DIAGRAMS X X
MH816 CONTROL DIAGRAMS X X
MH817 CONTROL DIAGRAMS X X
MH818 CONTROL DIAGRAMS X X
MH819 CONTROL DIAGRAMS X X
MP001 MECHANICAL SYMBOL LEGEND AND ABBREVIATIONS X X X X X
SHEET INDEX
SHEET
NUMBER SHEET NAME S
D
D
E C
S D
S E
P
D D
F
E B
8, C D
J
U L
7, C D
O
C T
1, A D
D E
N D
U M
J U
L
3, MS100 MECHANICAL SITE PLAN - SOUTH CAMPUS - SOUTH X X X X X
MS101 MECHANICAL SITE PLAN - SOUTH CAMPUS - NORTH X X X X
MS110A MECHANICAL SITE PLAN - AREA A X X X X
MS110B MECHANICAL SITE PLAN - AREA B X X X X
MS110E MECHANICAL SITE PLAN - AREA E X X X X
MS110H MECHANICAL SITE PLAN - AREA H X X X X X
MS110L MECHANICAL SITE PLAN - AREA L X X X X
MS110P MECHANICAL SITE PLAN - AREA P X X X X
MS300 ENLARGED STEAM MANHOLE PLANS AND SECTIONS X X X X
MS301 ENLARGED STEAM MANHOLE PLANS AND SECTIONS X X X X
MS401 SITE STEAM & CONDENSATE DISTRIBUTION PLAN AND PROFILE X X X X X
MS402 SITE STEAM & CONDENSATE DISTRIBUTION PLAN AND PROFILE X X X X X
MS403 SITE STEAM & CONDENSATE DISTRIBUTION PLAN AND PROFILE X X X X X
MS404 SITE STEAM & CONDENSATE DISTRIBUTION PLAN AND PROFILE X X X X
MS405 SITE STEAM & CONDENSATE DISTRIBUTION PLAN AND PROFILE X X X X
MS406 SITE STEAM & CONDENSATE DISTRIBUTION PLAN AND PROFILE X X X X
MS407 SITE STEAM & CONDENSATE DISTRIBUTION PLAN AND PROFILE X X X X
MP121 HVAC PIPING PLAN LEVEL 1 X X X X
MP122 HVAC PIPING PLAN LEVEL 2 X X X X
MP123 HVAC PIPING PLAN ROOF X X X X
MP211 MECHANICAL PLANS - EXISTING STEAM PLANT - B295 X X X X
MP212A B500 PIPE BASEMENT AREA A X X X X
MP212B B500 PIPE BASEMENT AREA B X X X X
MP212C B500 PIPE BASEMENT AREA C X X X X
MP301 HVAC PIPING SECTIONS X X X X
MP302 HVAC PIPING SECTIONS X X X X
MP303 HVAC PIPING SECTIONS X X X X
MP304 HVAC PIPING SECTIONS X X X X
MP401 ENLARGED HVAC PIPING PLAN LEVEL 1 - BOILER ROOM X X X X
MP402 ENLARGED HVAC PIPING PLAN LEVEL 2 - BOILER ROOM X X X X
MP403 ENLARGED HVAC PIPE HANGER PLAN LEVEL 1 BOILER ROOM X X X X
MP404 ENLARGED HVAC PIPE HANGER PLAN LEVEL 2 BOILER ROOM X X X X
MP501 MECHANICAL DETAILS X X X X
MP502 MECHANICAL DETAILS X X X X
MP503 MECHANICAL DETAILS X X X X
MP504 MECHANICAL DETAILS X X X X
MP505 MECHANICAL DETAILS X X X X
MP506 MECHANICAL DETAILS X X X X
MP507 MECHANICAL DETAILS X X X X
MP508 MECHANICAL DETAILS X X X X
MP601 BOILER PLANT SCHEMATICS X X X X
MP602 BOILER PLANT SCHEMATICS X X X X
MP603 BOILER PLANT SCHEMATICS X X X X
MP604 BOILER PLANT SCHEMATICS X X X X
MP605 BOILER PLANT SCHEMATICS X X X X
MP606 HVAC PIPING SCHEMATICS X X X X
MP607 BOILER GAS PIPING RISER DIAGRAM X X X X
MP701 MECHANICAL SCHEDULES X X X X
MP702 MECHANICAL SCHEDULES X X X X
MP703 MECHANICAL SCHEDULES X X X X
MP704 MECHANICAL SCHEDULES X X X X
MP705 MECHANICAL SCHEDULES X X X X
ELECTRICAL
E-001 ELECTRICAL SYMBOL LEGEND AND GENERAL NOTES X X X X
EPS101 ELECTRICAL SITE PLAN X X X X X
EPS101P ELECTRICAL SITE PLAN - AREA P X X X
EL121 LIGHTING PLAN LEVEL 1 X X X X
EL122 LIGHTING PLAN LEVEL 2 X X X X
EL123 LIGHTING PLAN ROOF X X X X
EP120 FEEDER ROUTING PLAN LEVEL 1 X
EP121 POWER PLAN LEVEL 1 X X X X
EP122 POWER PLAN LEVEL 2 X X X X
EP123 POWER PLAN ROOF X X X X
EP211 POWER PLAN - EXISTING STEAM PLANT - B295 X X X X
E-401 ELECTRICAL LARGE-SCALE PLANS X X X X
E-501 ELECTRICAL DETAILS X X X X
E-502 ELECTRICAL DETAILS X X X X
E-601 ELECTRICAL EQUIPMENT SCHEDULES AND NAMING KEY X X X X
E-602 ELECTRICAL ONE-LINE DIAGRAM X X X X
E-603 CONTROL DIAGRAMS X X
E-604 ELECTRICAL PANEL SCHEDULES X X X X
E-605 ELECTRICAL PANEL SCHEDULES X X X X
E-701 LIGHTING SCHEDULES X X X
TELECOMMUNICATIONS
ET001 TELECOMMUNICATIONS SYMBOLS & GENERAL NOTES X X X X X
ETS101 TELECOMMUNICATIONS SITE PLAN X X X X X X
ET121 TELECOMMUNICATIONS PLAN LEVEL 1 X X X X X
ET122 TELECOMMUNICATIONS PLAN LEVEL 2 X X X X X
ET501 TELECOMMUNICATIONS DETAILS X X X X X
ET601 TELECOMMUNICATIONS RISER DIAGRAMS X X X X X
VERTICAL TRANSPORTATION
VT200 LEVEL 1 ELEVATOR LOCATION X X X X
VT201 LEVEL 2 ELEVATOR LOCATION X X X X
VT202 MACHINE ROOM LOCATION X X X X
VT300 BOILER PLANT - SERVICE ELV #1 X X X X
METHANE MITIGATION
MMS.1 COVER SHEET AND PROJECT INFORMATION X X X
MMS.2A PRELIMINARY PROJECT OVERVIEW X X X
MMS.2B LOS ANGELES COUNTY STANDARD PLAN NOTES X X X
MMS.3 METHANE TEST DATA X X X
MMS.4 E-PRO SPECIFICATIONS AND MATERIAL TABLE X X X
MMS.5A VERTICAL & HORIZONTAL VENT PIPES & METHANE MONITORING
STATIONS
X X X
MMS.5B SITE PLAN & VAPOR BARRIER X X X
MMS.7 ROOF PLAN - VERTICAL VAPOR VENTS X X X
MMS.8A DETAILS X X X
MMS.8B DETAILS (CONTINUED) X X X
MMS.9 RESEARCH REPORTS X X X
SIGNAGE
SW001 GRAPHIC STANDARDS & SIGN TYPE MENU X X X
SW100 SIGNAGE FLOOR PLANS X X X
SW501 SIGNAGE TYPES AND DETAILS TYPES 01, 03, 40 X X X
SW502 SIGNAGE TYPES AND DETAILS TYPES 45, 46, 47, 48 X X X
SW503 SIGNAGE TYPES AND DETAILS TYPES 50, 51, 52, 53 X X X
SECURITY
TY001 SECURITY DEVICE AND WIRING LEGEND AND GENERAL NOTES X X X X X
TY100 SECURITY OVERALL SITE PLAN X X X
TY111 SECURITY FLOOR PLAN LEVEL 1 - OVERALL X X X X X
TY112 SECURITY FLOOR PLAN LEVEL 2 - OVERALL X X X X X
TY113 SECURITY ROOF PLAN - OVERALL X X X X X
TY501 SECURITY DETAILS X X
TY502 SECURITY DETAILS X X
TY511 SECURITY INTERIOR CAMERA VIEWS X X X
TY512 SECURITY INTERIOR CAMERA VIEWS X X X
TY513 SECURITY INTERIOR CAMERA VIEWS X X X
TY514 SECURITY INTERIOR CAMERA VIEWS X X X
TY601 SECURITY RISER DIAGRAM AND DEVICE SCHEDULE X X X
.12
.4
.8
.0
.6
11.3
.4
.6
.0
Y IELD
METRO
STATION
(N.I.S.)
LOT 42
METRO STATION
N.I.C
SUBSTATION
YARD
+283.0
+283.0
+268
+283.0
+295.5
MC
A
D A
V A N
V A N
VAN
VAN
VAN VAN
VANVAN
VANVANVAN
VANVANVAN
V A N
N O
PA
R
KI
N
G N
O
PA
R
KI
N
G
N O
PA
R
KI
N
G
S T
OP
HC
STOP
HC HC HC HC HC HCHCHCHCHCHCHCHCHCHC
S T
OP
STOP
NO PARKING NO PARKINGNO PARKING
HCHC HCHC HCHC HC
HC HC HCHCHCHCHCHCHCHCHCHC
TSTS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
U T
U T
U T
U T
H H
H H
U T
U T
H H
U T
D
E
D
D
E
D
D
M W M W M W
D
E
D
D
E
E
E
D
E
D
D
D D M W
M W M W
D E
D
D
M WM W
D
M W
M W
P B
M WM W M W
M W
D
M W
D
D
D
M W
D D
M W
D
D
M W
M W
D
D
D
M W
T
T T
T
T
T
UP UP
UP
UP
EXISTING BUILDING
GRAPHIC LEGEND:
FUTURE BUILDINGS
(UNDER CONSTRUCTION)
FUTURE BUILDING
AREA OF WORK
NEW BOILER PLANT - B603
PROPERTY LINE
(5 0'
-0
M
IN
1'
-6
(50'-0" MIN.)
86'-6"
LIMITS OF WORK
DOWLEN DRIVE
S A
W T
E L
L E
B L
V D
NEW BOILER PLANT
B603
EXISTING STEAM PLANT
B295
B606
FISHER HOUSE
FUTURE
SCE
STATION
B605
KITCHEN
B602
FUTURE
CUP
B501
CUP
B500
EXISTING
HOSPITAL
B608
METROLINK
PARKING GARAGE
B600
FUTURE
HOSPITAL
(CCC)
B607
PATRIOT
HOUSE
B609
AMERICAN
RED CROSS
B402
B401
B345
B304
B
B522 B318
B312
B311
B307
B308
B309
B310
CALIFORNIA
NATIONAL
GUARD
US ARMY
US AIR FORCE
B91
B90
B104
B105
(E
S E
R V
IC
E
R O
A D
METRO STATION
FUTURE
CLINICS
FUTURE
PARKING
GARAGE
EXISTING METRO STATION
UTILITY TUNNEL
J K L
F G H
C D E
A B
M N P
SCE SWITCH AND
TEMPORARY SERVICE
TRANSFORMERS
GAS METER AND
ENCLOSURE
B500 STEAM AND
CONDENSATE
REPLACEMENT AT PIPE
BASEMENT
GASLINE TRENCHING
(PIPING BY OTHERS)
B295
FUTURE LTH BUILDING
N TRUE
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /0
-1
-0
V A
W
L A
-C C
C C
U P
S it e
U ti ls
R e n o o f_ B
/6
-2
-1
.6
.A
R C
H .r v t
/1
/2
:0
:2
P M
GI100
OVERALL SITE PLAN / LIMITS OF
WORKLEO A DALY COMPANY
LOS ANGELES, CA 90071
(213) 629-0100
PARI TIVAY
WEST LA MEDICAL CENTER
NEW BOILER PLANT
WEST LOS ANGELES, CA
691-20-150
10/31/2023
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
550 SOUTH HOPE STREET, 27TH FLOOR
SCALE : 1" = 120'-0"
0 120' 240'
SCALE:1" = 150'-0"
F3
LIMITS OF WORK
DC
H
J
A B
E
KEY PLAN
GF
K L
DC
H
J
A B
E
GF
K L
M N PM N P
ADDENDUM 1 07/03/2024
7.12
52.4
.89
127.0
80.6
11.31
4.4
03.6
.06
03:020:2:A
CC
W :F section:03,F,A,1,6,m ph,0.12,0.00,41.11
03:02
03:02
04:01
04:01
04:0104:02
01:030:2:L:F section:01,F,F,0,10,m ph,0.00,0.00,0.00
01:02 01:02
02:01A:2:S:R02:020:1:ACCW
:R
02:020:2
:AC
CW
:R section:02,R,A,1,6,m ph,0.39,0.00,12.92
02:01
02:01
02:01
02:01
02:02
02:02
02:02
03:020:1 :AC
CW
:F
03:02
04:01A:1:S:R
04:01A:2:S:R04:020:1:A
CC
W :R
04:020:2:ACCW
:R section:04,R,A,1,6,m ph,0.12,0.00,12.92
04:0104:02
01:01
01:01 v ehicle:WB
-50 group:A
ASH
TO 2001 (U
S) speed:5:m ph p athUni ts:feet t im e:2006 -08-15-17-47
-04 d isp la y:1,1,1,1,1
,0,0,0 ,1,0, 0,0,0 c olo r:
6,4,3,3,2, 2,3 ,4
,3,4, 3,4,4 s tyle:
0,0,0 ,0,0,0,0,0
,0,0, 0,0,0 f ill:0
,0 c lea rance
:3.000,3.
000,3.000 s pacin g:0,2.50 le ve l:11,TR
UCK T
URN
IN
G a ircra ft:N v ehicle:W
B-50 group:AASHTO
2001 (US)
speed:5:m ph p athUnits:feet tim e:2006-08-15-17-47-04 d isplay:1,1,1,1,1 ,0,0,0,1,0,0,0,0 c olor:6,4,3,3,2,2,3,4,3,4,3,4,4 s tyle:0,0,0,0,0,0,0,0,0,0,0,0,0 f ill:0
,0 c learance:3.000,3.000,3.000 s pacing:0,2.500 level:11,TRUCK TURNINGa ircraft:N
YI ELD
METRO
STATION
(N.I.S.)
LOT 42
METRO STATION
N.I.C
SUBSTATION
YARD
+283.0
+283.0
+268
+283.0
+295.5
MC
A
D A
V A N
V A N
VAN
VAN
VAN VAN
VANVAN
VANVANVAN
VANVANVAN
N O
PA
R
KI
NG
N O
PA
R
KI
NG
N O
PA
R
KI
NG
S T
OP
HC
STOP
HC HC HC HC HC HCHCHCHCHCHCHCHCHCHC
S T
OP
STOP
NO PARKING NO PARKINGNO PARKING
HCHC HCHC HCHC HC
HC HC HCHCHCHCHCHCHCHCHCHC
TSTS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
U T
U T
U T
U T
H H
H H
U T
U T
H H
U T
D
E
D
D
E
D
D
M W M W M W
D
E
D
D
E
E
E
D
E
D
D
D D M W
M W M W
D E
D
D
M WM W
D
M W
M W
P B
M WM W M W
M W
D
M W
D
D
D
M W
D D
M W
D
D
M W
M W
D
D
D
M W
T
T T
T
T
T
UP UP
UP
UP
03:020:2:A
CC
W :F section:03,F,A,1,6,m ph,0.12,0.00,41.11
03:02
03:02
04:01
04:01
04:0104:02
01:030:2:L:F section:01,F,F,0,10,m ph,0.00,0.00,0.00
01:02
01:02
02:01A:2:S:R02:020:1:ACCW
:R
02:020:2
:AC
CW
:R section:02,R,A,1,6,m ph,0.39,0.00,12.92
02:01
02:01
02:01
02:01
02:02
02:02
02:02
03:020:1 :AC
CW
:F
03:02
04:01A:1:S:R
04:01A:2:S:R 04:020:1:A
CC
W
:R
04:020:2:ACCW
:R section:04,R,A,1,6,m ph,0.12,0.00,12.92
04:0104:02
01:01
01:01 v ehicle:WB
-50 group:A
ASH
TO 2001 (U
S) speed:5:m ph p athUni ts:feet t im e:2006 -08-15-17-47
-04 d isp la y:1,1,1,1,1
,0,0,0 ,1,0, 0,0,0 c olo r:
6,4,3,3,2, 2,3 ,4
,3,4, 3,4,4 s tyle:
0,0,0 ,0,0,0,0,0
,0,0, 0,0,0 f ill:0
,0 c lea rance
:3.000,3.
000,3.000 s pacin g:0,2.50 le ve l:11,TR
UCK T
URN
IN
G a ircra ft:N v ehicle:W
B-50 group:AASHTO
2001 (US)speed:5:m ph p athUnits:feet tim e:2006-08-15-17-47-04 d isplay:1,1,1,1,1
,0,0,0,1,0,0,0,0 c olor:6,4,3,3,2,2,3,4,3,4,3,4,4 s tyle:0,0,0,0,0,0,0,0,0,0,0,0,0f ill:0
,0 c learance:3.000,3.000,3.000s pacing:0,2.500 level:11,TRUCK TURNING a ircraft:N
PHASE 1 - MAKE READY & MOBILIZATION
1.a FENCE OUT AREA & CLEAR VEGETATION AND DEBRIS FROM AREA
OF WORK. REMOVE KITCHEN YARD TEMPORARY FENCING. CURB
OFF LOT 43 PARKING STALLS WITHIN 50' SETBACK FROM BOILER
FOOTPRINT
1.b CONSTRUCTION TRAILERS (2) - VA / GC
TRAILER SIZE TO BE CONFIRMED BY VA
1.c CONTRACTOR PARKING
1.d LAYDOWN AREA
1.e MAINTAIN DAILY LOADING DOCK ENTRY ACCESS TO SEMI & BOX
TRUCK DELIVERING TO KITCHEN. TRENCH WORK AFFECTING
DOWLEN DR. OR TRENCHING CROSSING THE DOCK IS TO BE DONE
DURING OFF HOURS AND ACCESS MAINTAINED DURING BUSINESS
HOURS WITH TRENCH PLATES, ETC.
1.f MAINTAIN SEMI AND BOX TRUCK ACCESS TO B500 LOADING
DOCK VIA EXISTING SERVICE ROAD.
1.b
1.a
EXISTING BUILDING
GRAPHIC LEGEND:
FUTURE BUILDINGS
(UNDER CONSTRUCTION)
FUTURE BUILDING
AREA OF WORK
NEW BOILER PLANT - B603
1.e
1.c
1.d
PROPERTY LINE
1.f
LOT 42
LOT C
B606
FISHER HOUSE
FUTURE
SCE
STATION
B605
KITCHEN
B602
FUTURE
CUP
B501
CUP
B500
EXISTING
HOSPITAL
B608
METROLINK
PARKING GARAGE
B600
FUTURE
HOSPITAL
(CCC)
B607
PATRIOT
HOUSE
B609
AMERICAN
RED CROSS
B402
B401
B345
B304
B
B522 B318
B312
B311
B307
B308
B309
B310
CALIFORNIA
NATIONAL
GUARD
US ARMY
US AIR FORCE
B91
B90
B104
B105
(E
S E
R V
IC
E
R O
A D
METRO STATION
FUTURE
CLINICS
FUTURE
PARKING
GARAGE
1.a
1.a
1.e TRENCH PLATES TO BE
PLACED DURING
BUSINESS HOURS
N TRUE
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /0
-1
-0
V A
W
L A
-C C
C C
U P
S it e
U ti ls
R e n o o f_ B
/6
-2
-1
.6
.A
R C
H .r v t
/2
/2
:4
:1
P
M
GI101
SITE PHASING PLAN - PHASE 1
LEO A DALY COMPANY
LOS ANGELES, CA 90071
(213) 629-0100
PARI TIVAY
WEST LA MEDICAL CENTER
NEW BOILER PLANT
WEST LOS ANGELES, CA
691-20-150
10/31/2023
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
550 SOUTH HOPE STREET, 27TH FLOOR
SCALE : 1" = 120'-0"
0 120' 240'
SCALE:1" = 120'-0"
F1
SITE PHASING PLAN - PHASE 1
SCALE:1" = 30'-0"
C7
SITE PHASING PLAN - PHASE 1 - PARTIAL AREA E
SCALE : 1" = 30'-0"
0 30' 60'
DC
H
J
A B
EDC
H
J
A B
E
KEY PLAN
GGFF
KK LL
M N P
Revisions: Date:
FOR INFORMATION ONLY
7.12
52.4
.89
127.0
80.6
11.31
4.4
03.6
.06
YI ELD
METRO
STATION
(N.I.S.)
LOT 42
METRO STATION
N.I.C
SUBSTATION
YARD
+283.0
+283.0
+268
+283.0
+295.5
MC
A
D A
V A N
V A N
VAN
VAN
VAN VAN
VANVAN
VANVANVAN
VANVANVAN
UP
V A N
N O
PA
R
KI
NG
N O
PA
R
KI
NG
N O
PA
R
KI
NG
S T
OP
HC
STOP
HC HC HC HC HC HCHCHCHCHCHCHCHCHCHC
S T
OP
STOP
NO PARKING NO PARKINGNO PARKING
HCHC HCHC HCHC HC
HC HC HCHCHCHCHCHCHCHCHCHC
TSTS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
U T
U T
U T
U T
H H
H H
U T
U T
H H
U T
D
E
D
D
E
D
D
M W M W M W
D
E
D
D
E
E
E
D
E
D
D
D D M W
M W M W
D E
D
D
M WM W
D
M W
M W
P B
M WM W M W
M W
D
M W
D
D
D
M W
D D
M W
D
D
M W
M W
D
D
D
M W
T
T T
T
T
T
UP UP
UP
UP PHASE - 2A ON-SITE CONSTRUCTION
2A.a TANK AND VAULT SHORING, EXCAVATION & CONSTRUCTION
2A.b BOILER PLANT EXCAVATION
2A.c BUILDING CONSTRUCTION
2A.a
2A.b
2A.c
EXISTING BUILDING
GRAPHIC LEGEND:
FUTURE BUILDINGS
(UNDER CONSTRUCTION)
FUTURE BUILDING
AREA OF WORK
NEW BOILER PLANT - B603
PROPERTY LINE
B606
FISHER HOUSE
FUTURE
SCE
STATION
B605
KITCHEN
B602
FUTURE
CUP
B501
CUP
B500
EXISTING
HOSPITAL
B608
METROLINK
PARKING GARAGE
B600
FUTURE
HOSPITAL
(CCC)
B607
PATRIOT
HOUSE
B609
AMERICAN
RED CROSS
B402
B401
B345
B304
B
B522 B318
B312
B311
B307
B308
B309
B310
CALIFORNIA
NATIONAL
GUARD
US ARMY
US AIR FORCE
B91
B90
B104
B105
(E
S E
R V
IC
E
R O
A D
METRO STATION
FUTURE
CLINICS
FUTURE
PARKING
GARAGE
N TRUE
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /0
-1
-0
V A
W
L A
-C C
C C
U P
S it e
U ti ls
R e n o o f_ B
/6
-2
-1
.6
.A
R C
H .r v t
/2
/2
:4
:2
P
M
GI102
SITE PHASING PLAN - PHASE 2A
LEO A DALY COMPANY
LOS ANGELES, CA 90071
(213) 629-0100
PARI TIVAY
WEST LA MEDICAL CENTER
NEW BOILER PLANT
WEST LOS ANGELES, CA
691-20-150
10/31/2023
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
550 SOUTH HOPE STREET, 27TH FLOOR
SCALE : 1" = 120'-0"
0 120' 240'
SCALE:1" = 120'-0"
F1
SITE PHASING PLAN - PHASE 2A
DC
H
J
A B
EDC
H
J
A B
E
KEY PLAN
GGFF
KK LL
M N P
7.12
52.4
.89
127.0
80.6
11.31
4.4
03.6
.06
YI ELD
METRO
STATION
(N.I.S.)
LOT 42
METRO STATION
N.I.C
SUBSTATION
YARD
+283.0
+283.0
+268
+283.0
+295.5
MC
A
D A
V A N
V A N
VAN
VAN
VAN VAN
VANVAN
VANVANVAN
VANVANVAN
UP
V A N
N O
PA
R
KI
NG
N O
PA
R
KI
NG
N O
PA
R
KI
NG
S T
OP
HC
STOP
HC HC HC HC HC HC
HCHCHCHCHCHCHCHCHC
S T
OP
STOP
NO PARKING NO PARKINGNO PARKING
HCHC HCHC HCHC HC
HC HC HCHCHCHCHCHCHCHCHCHC
TSTS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
U T
U T
U T
U T
H H
H H
U T
U T
H H
U T
D
E
D
D
E
D
D
M W M W M W
D
E
D
D
E
E
E
D
E
D
D
D D M W
M W M W
D E
D
D
M WM W
D
M W
M W
P B
M WM W M W
M W
D
M W
D
D
D
M W
D D
M W
D
D
M W
M W
D
D
D
M W
T
T T
T
T
T
UP UP
UP
UP
A C
J5
C
CJ502
B
CJ502
PHASE 2B - OFF-SITE UTILITIES
2B.a GAS LINE
2B.b SCE TRANSFORMER CONNECTION TO BOILER PLANT
2B.c FENCE OFF PORTION OF PARKING LOT FOR UTILITY
TRENCHING - INSTALL SHORING AS REQUIRED FOR
TRENCHING. PROVIDE A PLAN AND EXECUTE IN A MANNER
ACCEPTABLE TO THE VA WHICH LIMITS THE DISRUPTION OF
TRAFFIC FLOW AND LOST PARKING SPACES,AND MAINTAINING
SAFETY FOR PUBLIC USE.
2B.d TELECOMMUNICATIONS DUCTBANK TO B500
2B.e TRENCH & LAY STEAM AND CONDENSATE LINES TO B500
2B.f NEW STEAM AND/OR CONDENSATE IN (E) TUNNEL/TRENCH
2B.g NEW CONDENSATE PUMP - EXISTING STEAM PLANT B295
2B.h INTERCEPT STEAM & CONDENSATE LINES FROM B501 TO
KITCHEN. ESTABLISH NEW KITCHEN CONNECTION TO NEW
BOILER PLANT
2B.i CONSTRUCT NEW TUNNEL WITH NEW STEAM AND
CONDENSATE PIPING
2B.a
2B.b
2B.c
2B.d
2B.e
2B.f
2B.h
EXISTING BUILDING
GRAPHIC LEGEND:
FUTURE BUILDINGS
(UNDER CONSTRUCTION)
FUTURE BUILDING
AREA OF WORK
NEW BOILER PLANT - B603
EXISTING STEAM AND / OR CONDENSATE LINE
TELECOM LINE
GAS LINE
UNDERGROUND WORK
ELECTRICAL LINE
DOMESTIC WATER LINE
SANITARY SEWER LINE
PROPERTY LINE
NEW STEAM AND / OR CONDENSATE LINE
EXISTING METRO TUNNEL (NIC)
2B.f
TELECOM LINE VIA DIRECTIONAL BORING
2B.i
B606
FISHER HOUSE
FUTURE
SCE
STATION
B605
KITCHEN
B602
FUTURE
CUP
B501
CUP
B500
EXISTING
HOSPITAL
B608
METROLINK
PARKING GARAGE
B600
FUTURE
HOSPITAL
(CCC)
B607
PATRIOT
HOUSE
B609
AMERICAN
RED CROSS
B402
B401
B345
B304
B
B522 B318
B312
B311
B307
B308
B309
B310
CALIFORNIA
NATIONAL
GUARD
US ARMY
US AIR FORCE
B91
B90
B104
B105
(E
S E
R V
IC
E
R O
A D
METRO STATION
FUTURE
CLINICS
FUTURE
PARKING
GARAGE
2B.g
EXISTING STEAM PLANT B295
2B.i
2B.f
N TRUE
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /0
-1
-0
V A
W
L A
-C C
C C
U P
S it e
U ti ls
R e n o o f_ B
/6
-2
-1
.6
.A
R C
H .r v t
/1
/2
:0
:5
P M
GI103
SITE PHASING PLAN - PHASE 2B
LEO A DALY COMPANY
LOS ANGELES, CA 90071
(213) 629-0100
PARI TIVAY
WEST LA MEDICAL CENTER
NEW BOILER PLANT
WEST LOS ANGELES, CA
691-20-150
10/31/2023
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
550 SOUTH HOPE STREET, 27TH FLOOR
SCALE : 1" = 120'-0"
0 120' 240'
SCALE:1" = 120'-0"
F1
SITE PHASING PLAN - PHASE 2
SCALE:1" = 120'-0"
B9
SITE PLAN - AREA P - EXISTING STEAM PLANT B295
DC
H
J
A B
EDC
H
A B
E
KEY PLAN
GGFF
K L
M N PP
7.12
52.4
.89
127.0
80.6
11.31
4.4
03.6
.06
YI ELD
METRO
STATION
(N.I.S.)
LOT 42
METRO STATION
N.I.C
SUBSTATION
YARD
+283.0
+283.0
+268
+283.0
+295.5
MC
A
D A
V A N
V A N
VAN
VAN
VAN VAN
VANVAN
VANVANVAN
VANVANVAN
V A N
N O
PA
R
KI
NG
N O
PA
R
KI
NG
N O
PA
R
KI
NG
S T
OP
HC
STOP
HC HC HC HC HC HCHCHCHCHCHCHCHCHCHC
S T
OP
STOP
NO PARKING NO PARKINGNO PARKING
HCHC HCHC HCHC HC
HC HC HCHCHCHCHCHCHCHCHCHC
TSTS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
U T
U T
U T
U T
H H
H H
U T
U T
H H
U T
D
E
D
D
E
D
D
M W M W M W
D
E
D
D
E
E
E
D
E
D
D
D D M W
M W M W
D E
D
D
M WM W
D
M W
M W
P B
M WM W M W
M W
D
M W
D
D
D
M W
D D
M W
D
D
M W
M W
D
D
D
M W
T
T T
T
T
T
UP UP
UP
UP
UP
UP
PHASE - 3 SITE WORK & CLEAN UP
3.a CONSTRUCT SITE WALLS, GATES AND FENCES.
BEGIN LANDSCAPE / HARDSCAPE / PAVING WORK
3.b CONCLUDE SITE WORK & CLEAN UP
3.b
3.a
EXISTING BUILDING
GRAPHIC LEGEND:
FUTURE BUILDINGS
(UNDER CONSTRUCTION)
FUTURE BUILDING
AREA OF WORK
NEW BOILER PLANT - B603
PROPERTY LINE
B606
FISHER HOUSE
FUTURE
SCE
STATION
B605
KITCHEN
B602
FUTURE
CUP
B501
CUP
B500
EXISTING
HOSPITAL
B608
METROLINK
PARKING GARAGE
B600
FUTURE
HOSPITAL
(CCC)
B607
PATRIOT
HOUSE
B609
AMERICAN
RED CROSS
B402
B401
B345
B304
B
B522 B318
B312
B311
B307
B308
B309
B310
CALIFORNIA
NATIONAL
GUARD
US ARMY
US AIR FORCE
B91
B90
B104
B105
(E
S E
R V
IC
E
R O
A D
METRO STATION
FUTURE
CLINICS
FUTURE
PARKING
GARAGE
N TRUE
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /0
-1
-0
V A
W
L A
-C C
C C
U P
S it e
U ti ls
R e n o o f_ B
/6
-2
-1
.6
.A
R C
H .r v t
/2
/2
:4
:0
P
M
GI104
SITE PHASING PLAN - PHASE 3 -
BOILER PLANT COMPLETIONLEO A DALY COMPANY
LOS ANGELES, CA 90071
(213) 629-0100
PARI TIVAY
WEST LA MEDICAL CENTER
NEW BOILER PLANT
WEST LOS ANGELES, CA
691-20-150
10/31/2023
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
550 SOUTH HOPE STREET, 27TH FLOOR
SCALE : 1" = 120'-0"
0 120' 240'
SCALE:1" = 120'-0"
F1
SITE PAHSING PLAN - PHASE 3
DC
H
J
A B
EDC
H
J
A B
E
KEY PLAN
GGFF
KK LL
M N P
+295.5
MC
V A N
U T
D
E
E
D
E
D
D D
M W
D
D
UP
METRO
STATION
(N.I.S.)
LOT 42
N.I.C
M W M W M W
D
E
M W M W
D E
D
P B
M WM W M W
D
M W
D
M W
M W
EXISTING STANDBY
GENERATOR & TANK
B602
FUTURE
CUP
B605
KITCHEN
B603
NEW BOILER
PLANT
KITCHEN LOADING
DOCK
D O
W L E
N D
R
S E
R V
IC
E
R O
A D
TEMPORARY EMERGENCY GENERATOR TANK
GENERAL NOTES:
50'-0" MIN SEPARATION DISTANCE FROM TANKS REQUIRED TO
PARKING AND HIGH RISK AREAS SUCH AS LOADING DOCKS,
SERVICE YARDS, MAILROOMS, AND LOBBY AREAS EXCEPT
WHEN WITHIN SECURED ACCESS PERIMETER
MISSION CRITICAL UTILITY DISTRIBUTION WITHIN STANDOFF TO BE BURIED
5'-0" BELOW GRADE MINIMUM
EXISTING SECURITY FENCE / GATE
NEW SECURITY FENCE / GATE
OUTLINE OF UTILITY CORRIDOR
MAIN (LEVEL 1) ENTRY
SECONDARY (LEVEL 2) ENTRY
NEW SCE SWITCH AND
TEMPORARY SERVICE
AND TRANSFORMERS
UNDERGROUND RESERVE FUEL TANKS
50' SETBACK
INDUSTRIAL WATER UNDERGROUND STORAGE
FIRE WATER UNDERGROUND STORAGE
EXISTING BUILDING
NEW BUILDING BOILER PLANT
B606
FISHER HOUSE
B600
FUTURE
HOSPITAL 8'-6"
8' - 6"
BUILDING ENTRANCE/ EXIT AT 50'-0" MIN. AWAY FROM DOCK
8'-6"
DROP-OFF
CURB
FUTURE BUILDING
EXISTING METRO UTILITY TUNNEL
8'-6" HORIZONTAL STANDOFF FROM UNSCREENED PARKING
STALL
GRAPHIC LEGEND:
8'-6"
8'-6"
'-0
10'-0"
REMOVE STRIPING OF
PARKING SPACES WITHIN
50-FT STANDOFF AND
PROVIDE CURB.
B501
CUP
B500
EXISTING
HOSPITAL
GAS METER ENCLOSURE
8' -6
8' -6
8'-6"
EXISTING WALKABLE TUNNEL
CONFIRM CONCRETE ENCASEMENT OR
5'-0" DEPTH FOR MISSION CRITICAL
UTILITIES WITHIN 8'-6" STANDOFF FROM
UNSCREENED PARKING
EXISTING METRO
WALKABLE TUNNEL, HPS
AND PC TO REMAIN (NIC)
8'-6" 8'-6"
B295
EXISTING
STEAM
PLANT
EXISTING WALKABLE TUNNEL
CONFIRM CONCRETE
ENCASEMENT OR 5'-0" DEPTH
FOR MISSION CRITICAL
UTILITIES WITHIN 8'-6"
STANDOFF FROM
UNSCREENED PARKING
N TRUE
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /0
-1
-0
V A
W
L A
-C C
C C
U P
S it e
U ti ls
R e n o o f_ B
/6
-2
-1
.6
.A
R C
H .r v t
/2
/2
:4
:4
P
M
GI302
PHYSICAL SECURITY PLAN
LEO A DALY COMPANY
LOS ANGELES, CA 90071
(213) 629-0100
PARI TIVAY
WEST LA MEDICAL CENTER
NEW BOILER PLANT
WEST LOS ANGELES, CA
691-20-150
10/31/2023
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
550 SOUTH HOPE STREET, 27TH FLOOR
SCALE : 1" = 50'-0"
0 50' 100'
SCALE: 1" = 50'-0"
F1
PHYSICAL SECURITY - BOILER PLANT
DC
H
J
A B
E
H
B
E
KEY PLAN
GF
K LL
M N PP
SCALE: 1" = 50'-0"
E7
PHYSICAL SECURITY - BOILER PLANT - AREA L
SCALE: 1" = 50'-0"
C7
PHYSICAL SECURITY - BOILER PLANT - AREA P
Revisions: Date:
B500 - EXISTING HOSPITAL
7.12
52.4
.89
127.0
80.6
11.31
4.4
03.6
.06
V A N
N O
PA
R
KI
NG
N O
PA
R
KI
NG
N O
PA
R
KI
NG
S T
OP
HC
STOP
HC HC HC HC HC HC
HCHCHCHCHCHCHCHCHC
S T
OP
STOP
NO PARKING NO PARKINGNO PARKING
HCHC HCHC HCHC HC
HC HC HCHCHCHCHCHCHCHCHCHC
TSTS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
U T
U T
U T
U T
H H
H H
U T
U T
H H
U T
D
E
D
D
E
D
D
M W M W M W
D
E
D
D
E
E
E
D
E
D
D
D D M W
M W M W
D E
D
D
M WM W
D
M W
M W
P B
M WM W M W
M W
D
M W
D
D
D
M W
D D
M W
D
D
M W
M W
D
D
D
M W
T
T T
T
T
T
UP
LOT A
LOT B
NEW
LOT C
LOT 6
(E) LOT 42
(E) LOT 2
LOT 6
B608 PARKING
GARAGE
LOT F
B501
B500
B304
B402 B401
B345
A.R.C
B507
B522
B318
B312 B311
B23 B307
B308
B309
B91
B90
B104
B310
U.S. ARMY
CALIFORNIA
NATIONAL GUARD
U.S. AIR FORCE
PROPERTY
B105
LOT D
EDISON
STATION
ACCESS
ROAD
ACCESS
ROAD
FH
FH
NEW BUILDING
EXISTING BUILDING
PROPERTY LINE
FH
NEW FIRE HYDRANT
LOCATION
28' -0" NEW FIRE LANE
150' - 0".
EXISTING FIRE HYDRANT
LOCATION
FH
28' -0" EXISTING FIRE
LANE
150' - 0".
FH
GRAPHIC LEGEND:
LOT 43
LOT 5
B607
PATRIOT
HOUSE
B606
FISHER HOUSE
B605
KITCHEN
B603
BOILER PLANT
METRO
STATION
SUBSTATION
YARD
FH FH
120'-0"
FH
FDC
N TRUE
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /0
-1
-0
V A
W
L A
-C C
C C
U P
S it e
U ti ls
R e n o o f_ B
/6
-2
-1
.6
.A
R C
H .r v t
/3 /2
:0
:3
P M
GI303
FIRE ACCESS / PEDESTRIAN /
VEHICLE / SERVICE CIRCULATIONLEO A DALY COMPANY
LOS ANGELES, CA 90071
(213) 629-0100
PARI TIVAY
WEST LA MEDICAL CENTER
NEW BOILER PLANT
WEST LOS ANGELES, CA
691-20-150
10/31/2023
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
550 SOUTH HOPE STREET, 27TH FLOOR
SCALE : 1" = 120'-0"
0 120' 240'
SCALE:1" = 120'-0"
F1
FIRE ACCESS PLAN
DC
H
J
A B
EDC
H
J
A B
E
KEY PLAN
GGFF
KK LL
M N P
Revisions: Date:
PARICHEHR
TIVAY
NO. C23840
REN. 11-30-17
L
IC
ENSED ARCHITECT
STATE OF CAL I FORN
IA25
John Conneally, Insp. II, #446 01/30/24
H23-112134 VAWLA BOILER PLANT
B500
EX. MAIN
HOSPITAL
CIVIL DEMOLITION PLAN - AREA H
CD100H
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date:
FULLY SPRINKLERED
5 HUTTON CENTRE DRIVE, SUITE 300
SANTA ANA, CA 92707
(714) 751-7373 FAX(714) 545-8883
PSOMAS
DAVID LUZURIAGA
CIVIL ENGINEER:
LEO A DALY COMPANY
550 SOUTH HOPE STREET, 27TH FLOOR
LOS ANGELES, CA 90071
(213) 629-0100
PARI TIVAY
ARCHITECT:
CONSTRUCTION
DOCUMENTS (CD)
WEST LA MEDICAL CENTER
NEW BOILER PLANT
WEST LOS ANGELES, CA
10.31.2023 SAB/SZMGH/RJT
691-20-150
SCALE : 1" = 30'-0"
0 30' 60'
DC
H
J
A B
E
H
B
E
KEY PLAN
GF
K LL
N TRUE
NORTH
M N P
ADDENDUM 1 07/03/2024
MATCHLINE - SEE SHEET CD100E
CONSTRUCTION NOTESMATCHLINE - SEE SHEET CD100L
LEGEND
EX. CUP
B500
EX. MAIN HOSPITAL
B345
B523
FISHER HOUSE
N O
P
AR
KI
NG
N O
PA
RK
IN
G
PA
RK
IN
G
V A N
UP
+283.0
+283.0
+268
+283.0
+295.5
MC
SUBSTATION
YARD
UP UP
UP
UP
DOWLEN DRIVE
DO
W
LE
N
D
RI
VE
SA
W
TE
LL
E B
LV
D
OHIO AVE.
B602
FUTURE
CUP
B605
EXISTING
KITCHEN
B600
FUTURE CCC
TOWER
FUTURE
RECEIVING
B601
FUTURE
AGV/LOGISTICS
B603
NEW BOILER
PLANT
V A N
UP
FUTURE CENTRAL
UTILITY PLANT
(CUP)
FU
TU
RE
U
TI
LI
TY
TU
NN
EL FUTURE UTILITYTUNNEL
KITCHEN SITE
AC
C
ES
S
R
AD
EXISTING
PARKING LOT
BOILER PLANT
B603
(FF = 286.00)
A
CJ
C
CJ502
B
CJ502
DO
W
LE
N
D
RI
VE
LEGEND
CIVIL UTILITY PLAN
CU100
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date:
FULLY SPRINKLERED
5 HUTTON CENTRE DRIVE, SUITE 300
SANTA ANA, CA 92707
(714) 751-7373 FAX(714) 545-8883
PSOMAS
DAVID LUZURIAGA
CIVIL ENGINEER:
LEO A DALY COMPANY
550 SOUTH HOPE STREET, 27TH FLOOR
LOS ANGELES, CA 90071
(213) 629-0100
PARI TIVAY
ARCHITECT:
CONSTRUCTION
DOCUMENTS (CD)
WEST LA MEDICAL CENTER
NEW BOILER PLANT
WEST LOS ANGELES, CA
10.31.2023 SAB/SZMGH/RJT
691-20-150
B523
EXISTING FISHER
HOUSE
AC
C
ES
S
AD
S. DOWLEN DRIVE
E.
D
W
LE
DR
IV
E
TEMPORARY
SCE METER
ENCLOSURE
SOUTHERN CALIFORNIA GAS
COMPANY METER EINCLOSURE
FUTURE CENTRAL
UTILITY PLANT
(CUP)
EXISTING
PARKING LOT
B501
EXISTING CUP
B500
EXIST. MAIN
HOSPITAL
E.
W
LE
IV
E
B601
FUTURE
AGV/LOGISTICS
CIVIL UTILITY PLAN
CU101
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
Revisions: Date:
FULLY SPRINKLERED
5 HUTTON CENTRE DRIVE, SUITE 300
SANTA ANA, CA 92707
(714) 751-7373 FAX(714) 545-8883
PSOMAS
DAVID LUZURIAGA
CIVIL ENGINEER:
LEO A DALY COMPANY
550 SOUTH HOPE STREET, 27TH FLOOR
LOS ANGELES, CA 90071
(213) 629-0100
PARI TIVAY
ARCHITECT:
CONSTRUCTION
DOCUMENTS (CD)
WEST LA MEDICAL CENTER
NEW BOILER PLANT
WEST LOS ANGELES, CA
10.31.2023 SAB/SZMGH/RJT
691-20-150
ADDENDUM 1 07/03/2024
MATCH LINE - SEE SHEET CU100
MATCH LINE - SEE SHEET CU100
PA
R
KI
N
G N
O
PA
R
KI
N
G
N O
PA
R
KI
N
G
S T
OP
HC
STOP
HC HC HC HC HC HC
HCHCHCHCHCHCHCHCHC
S T
OP
STOP
NO PARKING NO PARKINGNO PARKING
HCHC HCHC HCHC HC
HC HC HCHCHCHCHCHCHCHCHCHC
TSTS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
TS
STOP
STO P
BUMP
BUMP
V .A
B
U S O
N L Y
P A
T
IE
N T
-V A
N
PED PED
XING XING
H C
BUMP
B UM
P
STOP
ST O
P
STOP ENTER
M O
T O
R C
Y C
L E
S O
N L
Y
H C
H C
H C
H C
H C
H C
H C
STOP
ST OP
ST OP
ST OP
STOP
STOP
STOP
PED
HC
STOP
N O
P A
R K
IN
G
NO PAR KING
NO PARKING
N O
P A
R K
IN
G
N O
P A
R K
IN
G
N O
P A
R K
IN
G
N O
P A
R K
IN
G
N O
P A
R K
IN
G
N O
P A
R K
IN
G
N O
P A
R K
IN
G
N O
P A
R K
IN
G
N O
P A
R K
IN
G
NO PAR KING
NO PAR KINGNO PAR KING
NO PAR KING NO PAR KING
BUMP
BUMP
B UM
P
KEEP
CLEAR
LAUNDRY
NO PARKING
STOP
BUMP
H C
N O P
AR
KING
H C
N O P
AR
KING
N O
P
AR
KI
NG
N O P
AR
KING
N O P
AR
KING
N O
P
AR
KI
NG
N O
P
AR
KI
NG
PARKING
NO
PARKINGPARKINGPARKING
PARKING PARKING PARKINGNO NO NO
NONONO
PARKING
NO
F I R E L A N E
PARKINGPARKINGPARKINGPARKINGPARKINGPARKINGPARKING
PARKING
NO
NONONONONONONO
NO PARKINGNO PARKING
FIRE LANE
N O
P A
R K
I N
G
NO
P
ARK
IN
G
N O P
A R
K
IN
G
MP H
31 32
33 34
BUMP
BUMP
STOP
91011
M
PH
DO N OT ENT ER
NO
P
ARK
IN
G
35 36 37 38 39 40 41 42 43 44 45 46 47 48 49 50 51 52 53 54 55 56 57 58
STOP
HC
EXIT
S T
OP
S T
OP
S T
OP
STOP
STO
P
STOP
STOPSTOP
STOP
STO
P
H C H C H C H C H C H C H C
HCHCHCHCHCHCHCHC
HCHCHCHCHCHCHCHC
H CH CH C
H CH CH CH CH CH CH CH CH C
HC
HCHC
HC HC
S T
O P
S T
O P
HC
NO PARKI NG
N O
P A
RK
IN
G
NO PARKI NG
NO PARKI NG
N O
P A
RK
IN
G
HC HC
STOP
ONEWAY
STOP
STO
P
HC
HC
HCHC
STO
P
NO PARKING
NO PARKING
STOP
STO
P
S TOP
B UM
P
STOP
LAUNDRY
NO PARKING
STOP
BUMP
IN
O
U T
DO
NOT
ENTER
E X
IT
STOP
STOP
E
XIT
E
XIT
HC
HCHC
H CH CH C
HCHCHCHCHCHC
U T
264.55
MH/
SIGNAL
U T
291.32
MH
U T
301.32
MH/
40" DIA
U T
295.32
MH/
CITY OF LA. BP&L
H H
291.80
HH/
SD
H H
292.36
HH/
SD
U T 316.51
MH/
STEAM
U T 319.13
MH/
STEAM
H H
319.36
HH/
GAS
317.41
UTVLT/2'X2'
315.93
UTVLT/3'X3'
315.20
UTVLT/4'X4'
326.01
UTVLT/3'X3'/SD
318.45
UTVLT/4'X4'
317.36
UTVLT/3'X3'
U T 290.81
MH
D
E
D
D
E
D
D
M WM W
M W
D
E
D
D
E
E
E
D
E
D
D
D D M W
M W M W
D E
D
D
M WM W
D
M W
M W
P B
M WM W M W
M W
D
M W
D
D
D
M W
D D
M W
D
D
M W
M W
D
D
D
M W
T
T T
T
T
T
300.68
GVLT/4'X4'
315.00
TELMHT
314.67
EPB
P B
314.50
EPB
P B
308.04
SDMH/CB 4 'X6'D
283.40
EMHE
TREE/ 18"
TREE/ 18"
TREE/ 18"
PALM/ 18"
TREE/ 24"
PALM/ 30"
EUC/ 14"
EUC/ 14"
EUC/ 22"
PALM/ 30"
TREE/ 18"
TREE/ 36"
PALM/ 31"
TREE/ 18"
EUC/ 19"
TREE/ 36"
TREE /8"
TREE/ 12"
TREE/ 12"
PALM/ 26"
PALM/ 32"
PALM/ 30"
PALM/ 36"
TREE/ 24"
EUC/ 24"
TREE/ 22"
TREE/ 32"
PALM/ 34"
PALM/ 36"
PALM/ 32"
TRE E/10" MULTI
TREE /8" MU LTI
TRE E/10" MULTI
EUC/ 12"
EUC/ 12"
EUC/8"
EUC/ 12"
EUC/ 16"
EUC/ 16"
EUC/ 16"
EUC/ 12"
TREE/ 12"
TREE/ 12"
PALM/ 12"
PALM/ 12"
TREE/ 10"
PALM/ 12" PALM/ 12"
PALM/ 12"
PALM/ 12"
PALM/ 12"PALM/ 12"
PALM/ 12"
EUC/24"
EUC/24"
EUC/24"
PALM/ 24"
PALM/ 24"
PALM/ 24"
EUC/24"
PALM/24"
PALM/ 24"
PALM/ 24"
PALM/ 24"
EUC/ 12"
PALM/ 24"
EUC/12" MULTI
EUC/24"
PALM/ 24"
EUC/ 12"
EUC/ 12"
EUC/ 24"
EUC/ 24"
EUC/ 24"
EUC/ 24"
TREE/ 12"
TREE /6" MU LTI
PALM/ 24"
PALM/ 24"
PALM/ 24"
EUC/ 24"
EUC/ 24"
PALM/ 24"
PALM/ 24"
PALM/ 24" PALM/ 24"
PALM/ 24"
PALM/ 24"
PALM/ 24"
EUC/ 24"
EUC/ 24"
EUC/ 24"
EUC/ 24"
EUC/ 24"
PALM/ 12"
299.43
ICV
293.23
AREALT
EUC/1. 3 DIA
TREE/0. 6 DIA
EUC/QU AD 0. 5 DIA
293.09
WMTR
M W
292.82
ICV 29
2.
IC
V
292.87
AREALT
PALM/ 12IN
292.52
SDMHD
292.01
BOLLARD/4 .0H
292.05
BOLLARD/4 .0H
292.01
BOLLARD/4 .0H
292.03
BOLLARD/4 .0H
TREE P/MULTI TR UNK
DEMOLITION AREA - SEE CIVIL DRAWINGS
DEMOLITION LEGEND
MATCH LINE
SEE ---
SEE MECHANICAL AND CIVIL
DEMO SHEETS FOR HPS,
STEAM CONDENSATE, AND
CONCRETE TRENCH DEMO
SCOPE
SEE MECHANICAL SHEET
MSD110L FOR TEMPORARY
HPS AND STEAM
CONDENSATE DEMO SCOPE
AND DISCONNECTS FROM
EXISTING METRO UTILITIES
SEE MECHANICAL SHEET
MSD110L FOR TEMPORARY
HPS AND STEAM
CONDENSATE DEMO SCOPE
EXISTING METRO TUNNEL
WITH HPS AND STEAM
CONDUIT TO REMAIN
SEE MECHANICAL SHEET
MSD110L FOR TEMPORARY
HPS AND STEAM
CONDENSATE DEMO SCOPE
AND DISCONNECTS FROM
EXISTING METRO UTILITIES
SEE MECHANICAL SHEET
MSD110H FOR HPS AND STEAM
CONDENSATE DEMO AND
DISCONNECT FROM B500
SERVICE AT MANHOLE
STEAM PIPE TRENCHING -
UTILITY SLAB DEMOLITION
REPAIR AS REQUIRED
(STEAM PIPES TO B500
PIPE BASEMENT - VERIFY -
SEE CIVIL DRAWINGS)
SEE SHEET ETS101 FOR
TELECOMMUNICATIONS
UNDERGROUND INFORMATION
(EXISTING UNDERGROUND
CONDUITS - PRESUMED TO BE
ABANDONED)
DEMOLISH EXISTING
HARDSCAPE FOR UTILITIES TO
BOILER PLANT - SEE CIVIL
DRAWINGS
LIMITS OF WORK
DEMOLISH EXISTING
HARDSCAPE AND LANDSCAPE
FOR UTILITIES FROM BOILER
PLANT - SEE CIVIL DRAWINGS.
DEMOLISH EXISTING LANDSCAPE
FOR CONNECTION TO SCE
TRANSFORMER. SEE CIVIL
DRAWINGS.
DEMOLISH EXISTING HARDSCAPE
AND SITE FEATURES AS REQUIRED
FOR GASLINE TO BOILER PLANT -
SEE CIVIL DRAWINGS
B603 PROPOSED BOILER PLANT
B606
FISHER HOUSE
FUTURE
SCE
STATION
B605
KITCHEN
B602
FUTURE
CUP
B501
CUP
B500
EXISTING
HOSPITAL
B608
METROLINK
PARKING GARAGE
B600
FUTURE
HOSPITAL
(CCC)
B607
PATRIOT
HOUSE
B609
AMERICAN
RED CROSS
B402
B401
B345
B304
B
B522 B318
B312
B311
B307
B308
B309
B310
CALIFORNIA
NATIONAL
GUARD
US ARMY
US AIR FORCE
B91
B90
B104
B105
(E
S E
R V
IC
E
R O
A D
METRO STATION
FUTURE
CLINICS
FUTURE
PARKING
GARAGE
B295
N TRUE
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /0
-1
-0
V A
W
L A
-C C
C C
U P
S it e
U ti ls
R e n o o f_ B
/6
-2
-1
.6
.A
R C
H .r v t
/1
/2
:5
:5
P M
AD110
SITE DEMO PLAN - OVERALL
LEO A DALY COMPANY
LOS ANGELES, CA 90071
(213) 629-0100
PARI TIVAY
WEST LA MEDICAL CENTER
NEW BOILER PLANT
WEST LOS ANGELES, CA
691-20-150
10/31/2023
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
550 SOUTH HOPE STREET, 27TH FLOOR
DC
H
J
A B
E
KEY PLAN
GF
K L
M N P
GENERAL NOTES
SCALE : 1" = 30'-0"
0 30' 60'
SCALE:1" = 150'-0"
F1
DEMO SITE PLAN - AREA B
M W
M W
D
E
M W M W
D E
D M W
D
D
D
M W
M W
W
UP UP
AREA OF WORK (SEE CIVIL DRAWINGS)
LEGEND
CONCRETE PADS
EXISTING BUILDINGS
FUTURE BUILDINGS
1. FOR ADDITIONAL INFORMATION, REFER TO SHEET CI100, CIVIL
ENGINEERING DRAWINGS.
REPAIR / REPLACE EXISTING
PAVING / STRIPING AS REQUIRED
(AFTER STEAM PIPE INSTALLATION)
EXISTING PAVED PARKING
D O
W L E N
D R
IV
E
DOWLEN DRIVE
SEE SHEET ETS-101 FOR
TELECOMMUNICATIONS
UNDERGROUND INFORMATION
(EXISTING UNDERGROUND
CONDUITS - PRESUMED TO BE
ABANDONED)
SEE MECHANICAL SHEET
MS110H FOR TEMPORARY 8"
HPS AND 4" STEAM
CONDENSATE AND
CONNECTION TO EXISTING
SERVICE AT B500
SEE TELECOMMUNICATIONS
SHEET ETS101 - (4" CONDUITS
IN CONCRETE-ENCASED
DUCTBANK)
FUTURE UTILITY TUNNEL FROM CUP TO B500
B602
FUTURE CUP
SEE MECHANICAL SHEET
MS110H FOR TEMPORARY
STEAM CONDENSATE AND
CONNECTIONS TO EXISTING
SERVICE AT B500 MANHOLE
B500
EXISTING
HOSPITAL
MATCH LINE
SEE ---
MATCH LINE
SEE ---MATCH LINE
SEE ---
B500 - EXISTING HOSPITAL
N TRUE
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /0
-1
-0
V A
W
L A
-C C
C C
U P
S it e
U ti ls
R e n o o f_ B
/6
-2
-1
.6
.A
R C
H .r v t
/2
/2
:4
:2
P
M
AS110H
SITE PLAN - AREA H
LEO A DALY COMPANY
LOS ANGELES, CA 90071
(213) 629-0100
PARI TIVAY
WEST LA MEDICAL CENTER
NEW BOILER PLANT
WEST LOS ANGELES, CA
691-20-150
10/31/2023
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
550 SOUTH HOPE STREET, 27TH FLOOR
DC
H
J
A B
E
H
KEY PLAN
GF
K L
M N P
GENERAL NOTES
SCALE : 1" = 30'-0"
0 30' 60'
KEYNOTE LEGEND
SCALE: 1" = 30'-0"
F1
SITE PLAN - AREA H
1" R
IS
ER
S
S
SS
S
S
SUBSTATION
YARD
B608
METRO
PARKING
STRUCTURE
+283.0
+283.0
+268
+283.0
+295.5
MC
A
D A
V A N
V A N
VAN
VAN VAN
VANVAN
VANVANVAN
VANVANVAN
V A N
N O
PA
R
KI
NG
N O
PA
R
KI
NG
N O
PA
R
KI
NG
S T
OP
HC
STOP
HC HC HC HC HC HCHCHCHCHCHCHCHCHCHC
S T
OP
STOP
NO PARKING NO PARKINGNO PARKING
HCHC HCHC HCHC HC
HC HC HCHCHCHCHCHCHCHCHCHC
U T
U T
U T
U T
H H
H H
U T
D
D
D
M W
D
D
D
D
D
D
D D M W
D
D
D D
M W
D
D
M W
D
D
D
M W
T
T T
T
UP UP
UP
UP
A C
J5
C
CJ50 2
B
CJ502
MH MH
MH
MH
MH
MH
MH
SSSSS S S
S
S S S
S
S
S
S
S
U.S. ARMY
B507
B304
B501CALIFORNIA
NATIONAL
GUARD
B345
B401
B402
B607
PATRIOT
HOUSE
B606
FISHER HOUSE
B608
METROLINK
PARKING
GARAGE
A.R.C.
B500
B602
(FUTURE CUP)
B600
(FUTURE HOSPITAL - CCC)
B605
KITCHEN
B603
BOILER PLANT
EDISON
YARD
EDISON
YARD
B601
EXISTING STEAM SERVICE
TEMPORARY 10" HPS AND 4" STEAM
CONDENSATE
CONNECT 10" HPS AND 4"
STEAM CONDENSATE TO
EXISTNG IN BLDG. 500
MS401
D1
MS402
F1
MS403
F1
GENERAL NOTES
1. OPERATION OF THE NEW BOILER PLANT SHALL BE PHASED
WITH INSTALLATION OF NEW PIPING. SEE PROJECT PHASING
NOTES ON SHEET MP001.
2. INVERT ELEVATION SHOWN FOR DIRECT BURIED PIPING IS FOR
PRE-ENGINEERED PIPE CASING.
N TRUE
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /0
-1
-0
V A
W
L A
-C C
C C
U P
S it e
U ti ls
R e n o o f_
B
/6
-2
-1
.6
.M E
P .r v t
/1
/2
:5
:3
A M
MS100
MECHANICAL SITE PLAN - SOUTH
CAMPUS - SOUTHLEO A DALY COMPANY
LOS ANGELES, CA 90071
(213) 629-0100
PARI TIVAY
WEST LA MEDICAL CENTER
NEW BOILER PLANT
WEST LOS ANGELES, CA
691-20-150
10/31/2023 RLA JNL
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
550 SOUTH HOPE STREET, 27TH FLOOR
SCALE: 1" = 80'-0"
F1
MECHANICAL SITE PLAN - SOUTH CAMPUS - SOUTH
SCALE : 1" = 80'-0"
0 80' 160'
DC
H
J
A B
EDC
H
A B
E
KEY PLAN
GGFF
K L
M N P
M W
D
M W M W
D D M W
D
D
D
M W
M W
W
UP UP
GENERAL NOTES
1. OPERATION OF THE NEW BOILER PLANT SHALL BE PHASED
WITH INSTALLATION OF NEW PIPING. SEE PROJECT PHASING
NOTES ON SHEET MP001.
2. INVERT ELEVATION SHOWN FOR DIRECT BURIED PIPING IS FOR
PRE-ENGINEERED PIPE CASING.
B500
B601
EXISTING MANHOLE 13
MS403
F1
MS402
F1
MS404
F1
FOR CONTINUATION SEE SHEET MP212A.
N TRUE
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /0
-1
-0
V A
W
L A
-C C
C C
U P
S it e
U ti ls
R e n o o f_
B
/6
-2
-1
.6
.M E
P .r v t
/1
/2
:5
:3
A M
MS110H
MECHANICAL SITE PLAN - AREA H
LEO A DALY COMPANY
LOS ANGELES, CA 90071
(213) 629-0100
PARI TIVAY
WEST LA MEDICAL CENTER
NEW BOILER PLANT
WEST LOS ANGELES, CA
691-20-150
10/31/2023 RLA JNL
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
550 SOUTH HOPE STREET, 27TH FLOOR
DC
H
J
A B
E
H
KEY PLAN
GF
K L
M N P
SCALE : 1" = 30'-0"
0 30' 60'
SCALE: 1" = 30'-0"
F1
MECHANICAL SITE PLAN - AREA H
U T
D
D
D
B602
(FUTURE CUP)
NEW DIRECT BURIED 10" HPS AND 4" PC TO SERVE BUILDING 500
AND NORTH CAMPUS UNTIL PERMANENT STEAM SERVICE IS INSTALLED WITH FUTURE
CENTRAL UTILITY PLANT
EXPANSION LOOP DESIGNED BY DIRECT
BURIED PIPING SYSTEM MANUFACTURER
AND TO AVOID CONFLICT WITH EXISTING
COLUMN FOUNDATION. APPROXIMATE
EXPANSION LOOP WIDTH = 90'
STEAM MANHOLE #2: 8'x'8'
000-ST2
10" HPS PIPE AND 4" PC INVERT IN AT 283.31'
10" HPS PIPE AND 4" PC INVERT OUT AT 293.5'
STEAM TRAP MANHOLE #3: 8'x'8'
000-ST3
10" HPS PIPE AND 4" PC INVERT IN AT 291.9'
10" HPS PIPE AND 4" PC
INVERT OUT AT 301.5'
5+
5+
6+
6+
7+
8+00
9+
8+50
EXPANSION LOOP SHALL BE LOCATED TO
AVOID EXISTING PV VAULT AND LINES IN THIS
AREA. SEE CIVIL PLANS FOR APPROXIMATE
LOCATIONS. FIELD VERIFY EXACT LOCATIONS
PRIOR TO INSTALLATION.
4+
4+
7+
9+00
MS300
B4
MS300
B7
GENERAL NOTES
1. OPERATION OF THE NEW BOILER PLANT SHALL BE PHASED
WITH INSTALLATION OF NEW PIPING. SEE PROJECT PHASING
NOTES ON SHEET MP001.
2. INVERT ELEVATION SHOWN FOR DIRECT BURIED PIPING IS FOR
PRE-ENGINEERED PIPE CASING.
3+50 4+00 4+50 5+00 5+50 6+00
STEAM TRAP MANHOLE #2
GRADE STEAM TRAP MANHOLE
299"
6+50
10" HPS AND 4" PC (BEYOND) ENTRY AT STEAM MANHOLE #2
283.31' I.E.
10" HPS AND 4" PC (BEYOND) ENTRY AT STEAM MANHOLE #2
293.5' I.E.
10" HPS AND 4" PC (BEYOND) STA. 3+50
283.87' I.E.
10" HPS AND 4" PC EXPANSION LOOP
10" HPS AND 4" PC (BEYOND)
STA. 7+00 292.33' I.E.
BOTTOM OF
MANHOLE 280.31'
ELEV
7+00
GRADE
GRADE AT STA. 7+00 304.5'
GRADE AT STA 3+50 294'-6"
7+00 7+50 8+00 8+50
STEAM TRAP MANHOLE #3
GRADE AT STA 9+50 310.5'
10" HPS AND 4" PC (BEYOND) ENTRY AT STEAM MANHOLE #3
291.9' I.E.
10" HPS AND 4" PC (BEYOND) ENTRY AT STEAM TRAP MANHOLE
#3 301.5' I.E.
10" HPS AND 4" PC (BEYOND) STA. 7-00
292.33' I.E.
BOTTOM OF MANHOLE
288.9' ELEV
GRADE
9+00
GRADE GRADE AT STA 7+00 304.5'
GRADE STEAM TRAP
MANHOLE#3 307'
10" HPS AND 4" PC (BEYOND)
STA. 9-50 299.3' I.E.
90º ELBOW
ELBOW
9+50
N TRUE
NORTH
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD
A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
A u to d e s k D o c s /0
-1
-0
V A
W
L A
-C C
C C
U P
S it e
U…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .