Y1NB--Central Utility Plant (CUP) Construction-VA Dallas 549-820E
Solicitation number
36C10F20R0091
Issued by

About this file

This special notice document provides updated information regarding a forthcoming solicitation for construction services. The Department of Veterans Affairs, Office of Construction and Facilities Management will issue solicitation number 36C10F-20-R-0091 to construct a Central Utility Plant at the Dallas campus of the VA North Texas Health Care Systems located in Dallas, Texas. The notice revises the previously announced date for the pre-proposal conference and site visit, stating that the new date will be included in the forthcoming solicitation. It advises interested parties to monitor the beta.SAM.gov website for the solicitation posting and any additional special notices, and notes that information in the solicitation will take precedence over prior notices. The procurement will be unrestricted.

View the file

Other files

File Type Posted
36C10F20R0091 0012.docx DOCX document
36C10F20R0091 0011.zip ZIP file
Part I RFIs combined Responses CUP Bid Package KW Reviewed.pdf PDF
Part II RFIs combined Responses CUP Bid Package KW Reviewed.pdf PDF
Part IV RFIs combined Responses CUP Bid Package KW Reviewed.pdf PDF
36C10F20R0091 0010.docx DOCX document
Part III RFIs combined Responses CUP Bid Package KW Reviewed.pdf PDF
36C10F20R0091 0009.docx DOCX document
36C10F20R0091 0008.docx DOCX document
36C10F20R0091 0007.docx DOCX document
CUP Preposal Mtg Notice of Attendance -Jan62020.pdf PDF
Onsite Sign in CUP Preproposal Mtg 20210106.pdf PDF
36C10F20R0091 0006.docx DOCX document
36C10F20R0091 0005.docx DOCX document
36C10F20R0091 0004.docx DOCX document
Dallas Campus Site Plan 2018 - Bldg. 9 Engineering.pdf PDF
36C10F20R0091 0003.docx DOCX document
23 65 00 Cooling Towers ADD1.pdf PDF
00 00 01 - Table of Contents ADD1.pdf PDF
36C10F20R0091 0002.docx DOCX document
36C10F20R0091 0001.docx DOCX document
repost-70-08 Structural DWGs BP E rev.pdf PDF
70-01 Civil Dwgs BP E rev part 2of2.pdf PDF
S05 REGULATED BUILDING MATERIALS SURVEY REPORT.pdf PDF
70-23 Mechl Dwgs BP-E rev.pdf PDF
70-22 Plumbg Dwg BP-E.pdf PDF
70-09 Architectural Dwgs BP E rv.pdf PDF
70-02 Land Irrigatn Dwgs BP E rv.pdf PDF
70-08 Structural DWGs BP E rev.pdf PDF
70-26 Elecl Dwgs BP-E rev.pdf PDF
Calculation of self performed work SDVOSB.pdf PDF
70-00 General Dwgs BP-E rv.pdf PDF
Supplemental Info Bid Pack E part-1of2.pdf PDF
Contractor Evaluation Safety Guide OSHA-EMR.pdf PDF
WD-Dallas TX-TX20190241 02142020.pdf PDF
ProjMan-VA-LTSCIF-D-20200602_Vol2 r4.pdf PDF
Supplemental Info Bid Pack E part-2of2.pdf PDF
70-01 Civil Dwgs BP E rev part 1of2.pdf PDF
VAMC-D 2020-1119r JOFOC notice w-attachments.pdf PDF
ProjMan-VA-LTSCIF-D-20200602_Vol1 r4.pdf PDF
Notification of Attendance-PreProposal Site Visit.pdf PDF
Contractors Reference Form.pdf PDF
Request for Information Doc.pdf PDF
PPQ-Attachment.pdf PDF
Show all 44

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

36C10F20R0091 Section J

1. SOLICITATION NUMBER

2. TYPE OF SOLICITATION

3. DATE ISSUED

PAGE OF PAGES

4. CONTRACT NUMBER

5. REQUISITION/PURCHASE REQUEST NUMBER

6. PROJECT NUMBER

7. ISSUED BY

CODE

8. ADDRESS OFFER TO

a. NAME

b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)

10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?

(If "YES," indicate within how many calendar days after award in Item 12B.)

12b. CALENDAR DAYS

13. ADDITIONAL SOLICITATION REQUIREMENTS:

STANDARD FORM 1442 (REV. 8/2014)

STANDARD FORM 1442

Prescribed by GSA-FAR (48 CFR) 52.236-1(d)

SOLICITATION, OFFER,

AND AWARD

(Construction, Alteration, or Repair)

SOLICITATION

SOLICITATION

IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.

9. FOR INFORMATION

CALL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SEALED BID (IFB)

NEGOTIATED (RFP)

11. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).

YES

NO

a.

Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.

b.

An offer guarantee is, is not required.

c.

All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.

d.

Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

36C10F20R0091 X 11/20/2020 549-820E 003C4D Department of Veterans Affairs Office of Construction and Facilities Management (003C4D) 1425 Tri-State Parkway, Ste. 140 Gurnee IL 60031

Deontrinese Dalton 202-256-5809 The contractor must provide all Supervision, labor, materials, tools, transportation, and travel necessary to construct the Central Utility Plant (CUP) Dallas. The construction project located at the VA North Texas Health Care System 4500 S. Lancaster Road, Dallas, TX 75216. Construction for Building 70 (Energy Center) and Building 37 (Cooling Towers) work includes but is not limited to the Central Utility Plant (CUP) upgrade.

Period of performance is 426 calendar days from receipt of Notice to Proceed.

The project magnitude is between $10,000,000.00 and $20,000,000.00. Davis Bacon WD apply.

The NAICS is 238220 (Plumbing, Heating, and Air-Conditioning Contractors), Size Standard $16.5Million.

This project is being solic i ted as UNRESTRICTED competition.

please submit all questions regarding the solicitation and supporting documentation in writing using the RFI submission attachment. The RFI attachment must be submitted via email to Deontrinese.Dalton@va.gov, RFIs will be accepted until 12:00 noon, Central Time, December 14, 2020.

All offerors are responsible for monitoring and downloading attachments and amendments from Contracting Opportunities (www.BETA.SAM.Gov), Proposals are due January 25, 2021, 1:00p.m. CST.

All offerors must be registered in System for Award Management (SAM) before submitting an offer and at time of award, in compliance with FAR 52.204-7 and 52.204-8 and certify compliance with 52.204-25 via SAM.

Offerors submitting as SDVOSB or JV, in addition to the before mentioned SAM registration must be CVE certified and visible on VETBIZ at time of proposal and award.

Due to the current COVID 19 Pandemic, alternative proposal submissions processes are being used. In all clauses/provisions That specify electronic submission “facsimile” replace “Facsimile” with “email”.

X 52.211-10 X

1CD

1:00 01/25/2021 X

14. NAME AND ADDRESS OF OFFEROR

15. TELEPHONE NUMBER

16. REMITTANCE ADDRESS

CODE

FACILITY CODE

17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.

AMOUNTS

18. The offeror agrees to furnish any required performance and payment bonds.

19. ACKNOWLEDGMENT OF AMENDMENTS

AMENDMENT

NUMBER

DATE.

20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE

21. ITEMS ACCEPTED:

22. AMOUNT

23. ACCOUNTING AND APPROPRIATION DATA

24. SUBMIT INVOICES TO ADDRESS SHOWN IN

ITEM

25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO

10 U.S.C. 2304(c)( 41 U.S.C. 3304(a) (

26. ADMINISTERED BY

27. PAYMENT WILL BE MADE BY

PHONE:

FAX:

28. NEGOTIATED AGREEMENT

29. AWARD

Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.

shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.

30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER

TO SIGN

30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE

BY

OFFER

AWARD

STANDARD FORM 1442 (REV. 8/2014) BACK

(Include ZIP Code) (Include area code) (Include only if different than Item 14.)

(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)

(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or print) (Contractor is required to sign this document and return _______ copies to issuing office.)

(Contractor is not required to sign this document.)

(Must be fully completed by offeror) (To be completed by Government)

CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE

CLIN 0001 Base __________________________ CLIN 0002 Asbestos Testing & Analysis ________________________ 101F Department of Veterans Affairs Office of Construction and Facilities Management 425 I Street NW Washington DC 20001 Department of Veterans Affairs

FMS-VA-2(101)

Financial Services Center PO Box 149971 Austin TX 78714-9971

XX

Table of Contents

PART I - THE SCHEDULE1
SECTION A - SOLICITATION/CONTRACT FORM1
A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair)1
A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR)– BACK2
SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK6
SECTION E - INSPECTION AND ACCEPTANCE26
SECTION F - DELIVERIES OR PERFORMANCE26
F.1 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) ALTERNATE I (APR 1984)26
F.2 52.211-12 LIQUIDATED DAMAGES—CONSTRUCTION (SEPT 2000)26
SECTION G - CONTRACT ADMINISTRATION DATA27
SECTION H – SPECIAL CONTRACT REQUIREMENTS27
PART II - CONTRACT CLAUSES28
SECTION I - CONTRACT CLAUSES28
I.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)28
I.2 52.227-1 AUTHORIZATION AND CONSENT (DEC 2007)32
I.3 52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT COPYRIGHT INFRINGEMENT (DEC 2007)32
I.4 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC 2014)32
I.5 52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES DEVELOPED OR PROVIDED BY KASPERSKY LAB AND OTHER COVERED ENTITIES (JUL 2018)33
I.6 52.204-25 PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (AUG 2019)34
I.7 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)36
I.8 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JUL 2013)37
I.9 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (OCT 2015)38
I.10 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUL 2014)39
I.11 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT (DEC 2010)39
I.12 52.223-20 AEROSOLS (JUN 2016)40
I.13 52.225-11 BUY AMERICAN—CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (OCT 2016)41
I.14 52.227-4 PATENT INDEMNITY—CONSTRUCTION CONTRACTS (DEC 2007) ALTERNATE I (DEC 2007)45
I.15 52.236-1 PERFORMANCE OF WORK BY THE CONTRACTOR (APR 1984)45
I.16 VAAR 852.215-71 EVALUATION FACTOR COMMITMENTS (DEC 2009)46
I.17 VAAR 852.219-9 VA SMALL BUSINESS SUBCONTRACTING PLAN MINIMUM REQUIREMENTS (DEC 2009)46
I.18 VAAR 852.219-71 VA MENTOR-PROTÉGÉ PROGRAM (DEC 2009)46
I.19 VAAR 852.219-74 LIMITATIONS ON SUBCONTRACTING—MONITORING AND COMPLIANCE (JUL 2018)47
I.20 VAAR 852.219-75 SUBCONTRACTING COMMITMENTS MONITORING AND COMPLIANCE (JUL 2018)48
I.21 VAAR 852.219-76 SUBCONTRACTING PLANS MONITORING AND COMPLIANCE (JUL 2018)48
I.22 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018)49
I.23 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (APR 2019)50
I.24 VAAR 852.236-72 PERFORMANCE OF WORK BY THE CONTRACTOR (APR 2019) ALTERNATE I (APR 2019)51
I.25 VAAR 852.236-90 RESTRICTION ON SUBMISSION AND USE OF EQUAL PRODUCTS (APR 2019)51
I.26 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT ADMINISTRATION (APR 2019)52
I.27 SUPPLEMENTAL INSURANCE REQUIREMENTS53
I.28 MANDATORY WRITTEN DISCLOSURES53
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS54
SECTION J - LIST OF ATTACHMENTS54
PART IV - REPRESENTATIONS AND INSTRUCTIONS55
SECTION K - REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS55
K.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (OCT 2018)55
K.2 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)58
K.3 52.209-13 VIOLATION OF ARMS CONTROLS TREATIES OR AGREEMENTS—CERTIFICATION (JUN 2018)59
K.4 52.222-22 PREVIOUS CONTRACTS AND COMPLIANCE REPORTS (FEB 1999)61
SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS62
L.1 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)62
L.2 52.204-26 COVERED TELECOMMUNICATIONS EQUIPMENT OR SERVICES—REPRESENTATION (DEC 2019)63
L.3 VAAR 852.252-70 SOLICITATION PROVISIONS OR CLAUSES INCORPORATED BY REFERENCE (JAN 2008)63
L.4 VAAR 852.236-92 NOTICE TO BIDDERS—ADDITIVE OR DEDUCTIVE BID LINE ITEMS (APR 2019)64
L.5 52.216-1 TYPE OF CONTRACT (APR 1984)64
L.6 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014)65
L.7 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)65
L.8 52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (MAY 2014)66
L.9 52.228-1 BID GUARANTEE (SEP 1996)67
L.10 52.233-2 SERVICE OF PROTEST (SEP 2006)68
L.11 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995)68
L.12 VAAR 852.215-70 SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESS EVALUATION FACTORS (JUL 2016)(DEVIATION)69
L.13 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009)69
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS70
SECTION J - LIST OF ATTACHMENTS70

SECTION C - DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

CONSTRUCTION CENTRAL UTILITY PLANT (CUP)

PROJECT NO. 549-820E

VA NORTH TEXAS HEALTH CARE SYSTEM-DALLAS CAMPUS

4500 S. Lancaster Road

DALLAS, TEXAS 75216

A. PART I – GENERAL

A1. SOW for CUP Project 549-820E

Building 70 (Energy Center) and Building 37 (Cooling Towers) work includes but is not limited to Central Utility Plant Upgrade. Work is to include an additional new 1,500-ton chiller; and associated related work, equipment and piping within Building 70. Also, to be included are provisions for underground connections from this equipment to the cooling towers. The Building 70 footprint is to remain the same as it currently exists. The work includes removal of four existing field erected cooling towers. It also includes the addition of six new pre-packaged stainless-steel cooling towers and installing them on existing and extended concrete basins. (There will be three new concrete basins added.) The work includes the provision of sluice gates to allow them to connect with each other. Also included is the addition of basin sweepers with centrifugal separators for the new cooling tower cells. Also included are other related provisions for pumps, piping, etc. within and near Building 70 and other items described in the documents.

ASBESTOS TESTING – Asbestos surveys were conducted for Building 70 (Energy Center) and Building 37 (Cooling Towers). No asbestos containing material was found. It should be noted however, that an inspection of and sample collection from the electrical components [electrical components specifically for four existing chillers and for four existing cooling towers to be impacted by activities within the current project] were excluded because the systems were energized during the time that asbestos surveys were being conducted. The CONTRACTOR must have the electrical components for these specific items inspected for the presence of suspect asbestos-containing materials (ACM) and samples tested after the affected systems have been de-energized and before the components are disturbed. CONTRACTOR must use proper lock-out tag-out procedures. Samples must be collected in sufficient quantity and analyzed to assure compliance with the Texas Asbestos Health Protection Rules and collected by a properly trained individual who is licensed by the Texas Department of State Health Services as either an Asbestos Inspector or an Asbestos Individual Consultant. Testing results will be provided to the Resident Engineer and the Architect within twelve (12) calendar days of completion of each phase of sample collection activities. Abatement of any asbestos containing materials found by this testing process is excluded from the base bid scope for this project, but the testing and analysis for such specific items is included. [[ CONTRACTOR is responsible to account for scheduling of asbestos surveys (for inspection and sample collection), including receipt of testing results, within the schedule for the work effort and for any impacts of these to the work effort and its sequencing. (Abatement if required, is not included within base bid scheduling/ sequencing provisions.) It is possible that the inspection/testing and analysis will need to be phased just like the work on the equipment is phased. Contractor is responsible for repair to any electrical casings and to any other portions of existing equipment if damage occurs by such inspection/testing and related activities (and if damage occurs by other construction/ renovation activities) to any equipment and related items slated to remain in service.]]

SCHEDULE OF CONTRACT LINE ITEMS AND PRICES

A single award will be made on the BASE CLIN-CLIN 0001, and CLIN 0002 Asbestos testing and analysis.

CLIN 0001 BASE CLIN is defined herein in general terms as cost for all labor, materials, tools, equipment, transportation, management, supervision, quality control and all other necessary services and incidental related work IAW the RFP, project specifications and drawings for the Dallas CUP, VAMC North Dallas, TX

CLIN 0002 Asbestos Testing and Analysis is defined herein in general terms as cost for all labor, materials, tools, equipment, transportation, management, supervision, quality control and all other necessary services and incidental related work IAW the RFP (ASBESTOS TESTING), project specifications and drawings for the Dallas CUP, VAMC North Dallas, TX

Safety or Environmental Violations and Experience Modification Rate All Bidders/Offerors shall submit the following information pertaining to their past Safety and Environmental record. The information shall contain, at a minimum, a certification that the bidder/offeror has no more than three (3) serious, or one (1) repeat or one (1) willful OSHA or any EPA violation(s) in the past three years. All Bidders/Offerors shall submit information regarding their current Experience Modification Rate (EMR) equal to or less than 1.0. This information shall be obtained from the bidder’s /offeror’s insurance company and be furnished on the insurance carrier’s letterhead. Self-insured contractor or other contractors that cannot provide their EMR rating on insurance letterhead must obtain a rating from the National Council on Compensation Insurance, Inc. (NCCI) by completing/submitting form ERM-6 and providing the rating on letterhead from NCCI.

Note: Self-insured contractors or other contractors that cannot provide EMR rating on insurance letterhead from the states or territories of CA, DE, MI,NJ, ND, OH,PA, WA, WY, and PR shall obtain their EMR rating from their state run worker’s compensation insurance rating bureau.

A Determination of Responsibility will be accomplished for the apparent awardee prior to processing the award. The above information, along with other information obtained from Government systems, such as the OSHA and EPA online inspection history databases will be used to make the Determination of Responsibility. Failure to affirm being within the guidelines above or submit this information will result in a determination of “Non-Responsibility” for the bidder/offeror. NOTE: Any information received by the Government that would cause for a negative Determination of Responsibility will make the bidder/offeror ineligible for award.

This requirement is applicable to all subcontracting tiers, and prospective prime contractors are responsible for determining the responsibility of their prospective subcontractors.

A2.Definitions
1.Contracting Officer: The services to be performed under this contract are subject to the general supervision, direction, control and approval of the Contracting Officer.
2.Project Manager (PM): The Contracting Officer's representative responsible for administering contracts under the immediate direction of the Contracting Officer.
3.Resident Engineer (RE): The Contracting Officer's authorized representative at the construction site. When more than one Resident Engineer is assigned to a construction project one is designated as being incharge and is called the "Senior Resident Engineer" (SRE). The Resident Engineer is responsible for protecting the Government's interest in the execution of the construction contract work. His duties include surveillance of all construction work to assure compliance with the contract documents, interpretation of the contract documents, approval of changed work, approval of all submittals, samples, shop drawings, etc. The Resident Engineer may issue change orders to the Contractor within the limitations set forth in his delegation of authority from the Contracting Officer.
4.Contract: This term, as used herein, refers to the Contract(s) to perform the construction of the project.
5.Contractor: This term, as used herein, refers to the successful Offeror (Contractor or Joint Venture) providing construction services under this contract.
6.AE: This term, as used herein, refers to the Architect/Engineer firm hired by the VA for the preparation of the contract drawings and specifications and to provide other technical assistance to the VA.

7. Construction Manager (CM): This is a contracted employee who works under the direct supervision of the VA CFM Resident Engineer Office and as such takes direction from the VA CFM Resident Engineer Office. Duties may include but are not limited to surveillance of all construction work to assure compliance with the contract documents, interpretation of the contract documents, approval of changed work, approval of all submittals, samples, shop drawings, schedule review, cost estimating etc.

A3. Source Selection Procedures

1.Source Selection Overview: In accordance with FAR 15.3, the objective of source selection is to select the proposal that represents the best value. A contracting officer is designated as the source selection authority (SSA), unless the agency head appoints another individual. The SSA establishes an evaluation team that includes appropriate contracting, legal, and technical expertise to ensure a comprehensive evaluation of offers. The award decision is based on evaluation factors and significant sub-factors that are tailored to the acquisition. The factors represent the key areas of importance and emphasis to be considered in the source selection decision.
2.Evaluation: The proposal evaluation is an assessment of the proposal and the offeror’s ability to perform the prospective contract successfully. The technical, price, and source selection boards will evaluate competitive proposals and then assess their qualities solely on the factors and subfactors specified in the solicitation. Evaluations may be conducted using any rating method or combination of methods, including color or adjectival ratings, and ordinal rankings. The relative strengths, deficiencies, significant weaknesses, and risks supporting proposal evaluation shall be documented in the contract file.
3.Past Performance: Past performance information is one indicator of an offeror’s ability to perform the contract successfully. The currency and relevance of the information, source of the information, context of the data, and general trends in contractor’s performance shall be considered. This comparative assessment of past performance information is separate from the responsibility determination required under FAR Subpart 9.1. The SSA reserves the right to obtain information concerning past performance from any source available even if it is not provided by the offeror.
4.SSA’s Final Decision: The SSA’s decision shall be based on a comparative assessment of proposals against all source selection criteria in the solicitation. While the SSA may use reports and analyses prepared by others, the source selection decision shall represent the SSA’s independent judgment. The source selection decision shall be documented, and the documentation shall include the rationale for any business judgments made and relied on by the SSA, including benefits associated with additional costs. Rationale for the selection decision will be documented.
6.The Government reserves the right to reject any or all proposals at any time prior to award; to negotiate with any or all offerors; to award the contract to other than the offeror submitting the lowest total price; and to award to the offeror submitting the highest technically rated or the lowest total price proposal; and to award to the offeror submitting the proposal determined to be the most advantageous best value to the Government. Offerors are advised an award may be made without discussion or any contact concerning the proposals received. Offerors should not assume that they would be contacted or afforded an opportunity to qualify, discuss, or revise their proposals. However, the Government reserves the right to clarify certain aspects of proposals or conduct discussions providing an opportunity for the offeror to revise its proposal.
7.Schedule Objectives - The anticipated completion of this project is 426 calendar days after “Notice to Proceed” (NTP).

Tentative Schedule:

Solicitation issued
November 20, 2020
Request for Information Submission Deadline
December 14, 2020
Pre-proposal conference
January 6, 2021
Proposal submitted
January 25, 2021
Contract award
February 25, 2021(on or around)
Notice to proceed
March 25, 2021(on or around)
Construction completion/final inspection/ custody receipt
May 25, 2022 (on or around)
A4.Cost Range
The magnitude of this construction this project is between $10,000,000.00 And $20,000,000.00.
A5.Pre-Proposal Conference
The date of a site visit/pre-proposal conference is anticipated on or around January 6, 2021. All offerors submitting as Prime Construction Contractors are encouraged to attend. All consultants, subcontractors, manufacturers and suppliers are invited to attend. The following agenda is furnished for this meeting:
1.Open meeting;
2.Review of project and design-bid-build method for construction contracting;
3.Specifications, Network analysis system and project phasing;
4.General requirements, Solicitation Documents and Offer Submission Procedure;
5.Questions and answers;
6.Small business/ potential subcontractors communication. (See below **).
7.Close; and
8.Site walk-through: attendance is encouraged. All Contractor’s that did not previously provide notice of attendance IAW the pre-solicitation advertisement must complete the attached “Notification of Attendance Pre-Proposal Site Visit” and return to the Contracting Officer on or before December 1, 2020 close of business. All attendees are asked for follow all state and local health guidelines set forth for the current COVID 19 pandemic. Please consider personal health and safety in decisions of public exposure. All conference attendees will be required to wear masks. A virtual presentation will be provided but will only cover the administration outline of the project and its requirement. There will not be a virtual tour of the physical site of the anticipated construction area and/or buildings.

Requests for additional site visits will not be considered.

**All contractors in attendance shall sign in providing all contact information. The sign in sheet will be posted after the meeting on www.beta.sam.gov. All contractors shall register in Contracting Opportunities www.beta.sam.gov under this solicitation 36C10F20R0091 as an interested vendor/party to receive any notifications, communication with other contractors and query to this requirement.

A6. Selection Criteria and Weightings

1. Award will be made to the offeror whose price and technical proposals provide the best overall value to the Government. Importance of price will increase if offerors in the competitive range are essentially equal in terms of technical capability, or if a price is so significantly high as to diminish the value of technical superiority to the Government.

2. Proposals will be evaluated, and award will be made on the basis of all price and technical, considered most advantageous to the government as per FAR Part 15. The offeror’s initial proposal should contain the offeror’s best terms from a price and technical standpoint. Responsibility determination will be made in accordance with FAR 9.1, Responsible Prospective Contractors.

3. Technical Evaluations - Technical and Non-Technical factors are equal, and when combined are equal in importance to price. Evaluations will be based on the following: Factor I Construction Management and Experience (sub-factors: a) Corporate Project Experience, b) Project Personnel Experience, c) Technical/Management Approach; Factor II Schedule; Factor III Small Business Participation/Subcontracting Plan; Factor IV Past Performance. (All subfactors are equal in importance). Price will be evaluated separately. Selection of an offeror for contract award will be made on the basis of an assessment of each offeror’s response to the Request for Proposal (RFP). The basis of evaluation for each factor is indicated in each section.

4. Price Proposal – Price proposals are submitted & evaluated separately. Price will be evaluated to determine price reasonableness, and acceptability to the Government. Analysis will be performed using one or more of the below techniques to ensure a fair and reasonable price:

(a) Comparison of proposed prices received in response to the RFP.

(b) Comparison of proposed prices with the Independent Government Cost Estimate.

(c) Comparison of proposed prices with available historical information

B. PART II - RESPONSIBILITIES

B1 VA Team

1. The VA Architect/Engineer (A/E) is the A/E of record hired by the VA to produce the contract drawings and specifications. The VA will retain the A/E Team for the remainder of the project’s development for construction period review, and monitoring purposes.

2. The VA team is also comprised of VA Office of Facilities Management and others at the Central Region Office, located in Gurnee, IL and the VA Headquarters located in Washington, DC, a SRE and Resident Engineer Staff who will be located at the construction site and VA medical center staff. The coordinator/manager of the VA team will be the SRE. Neither the AE nor the local VA staff have the authority to provide contractual direction during the solicitation and proposal period or the construction period. All authority is delegated formally in writing by the Contracting Officer. Please do not contact the A/E of record or the local VA in Dallas.

B2. CONSTRUCTION TEAM

1. The Construction Team includes the Contractor or all J/V partners, Subcontractors, and other entities who shall provide construction services for construction of the project.

2. The RFP Documents are intended to define the contract requirements. It is the Construction Team’s responsibility to complete the construction in a manner consistent with the intent of the RFP Documents within the required time period (contract length).

C.PART III - PROPOSAL INSTRUCTIONS
C1.General

1. Submit offers to:

a) Electronic Submission to:

Email: Deontrinese.Dalton@va.gov

b) US Postal Service Deliveries:

Deontrinese Dalton, Contracting Officer (003C4D) c/o Andrea Morris, Director of Acquisitions Office of Construction & Facilities Management Department of Veterans Affairs 1425 Tri-State Parkway, Ste. 140 Gurnee, IL 60031

OR

c) Commercial Delivery Services / Hand Carry (Monday- Friday, 7:30 am to 4:30 PM):

Deontrinese Dalton, Contracting Officer (003C4D) c/o Andrea Morris, Director of Acquisitions Office of Construction & Facilities Management Department of Veterans Affairs 1425 Tri-State Parkway, Suite 140 Gurnee, IL 60031

2. Technical and Price sections of the Offers proposals will be evaluated independently. Offeror shall separately compile each section. Each section must therefore be labeled with the Offeror's organization, business address, and Solicitation Number. Offerors shall affix their names and return addresses on their envelope/packaging.

3. Carefully follow “Solicitation, Offer, and Award” (Construction, Alteration, or Repair. Standard Form 1442 “Solicitation, Offer, and Award” (Construction, Alteration, or Repair) shall be used for submitting cost offers. Submit SF1442 with a bid guarantee as stipulated in the Section “Instructions, Conditions, and Notices to Offerors”:

1.Offeror shall submit separate prices for any Bid Items indicated on the RFP Offer and award;
2.Offeror shall include all required Representations and Certifications; and acknowledge receiving amendments by number.

3. Offerors are to ensure vendorization via self-service portal:

https://vaww.cpm.fsc.va.gov/

· ID.me Walkthrough v2.pdf

· Customer Engagement Portal (CEP) Vendor File Webform User Guide v1.pdf

Include verification of such with the price proposal package under TAB 2, this is not an evaluated item. All information submitted will be kept in strict confidence and will only be used if contractor is made award.

4. The offeror shall demonstrate that it has adequate bonding capacity or the ability to obtain the required bonds. The offeror shall submit documentation such as a commitment letter from its bonding company to be included in the price proposal package TAB 4. The documentation submitted shall provide the offeror’s total aggregate bonding capacity, the amount currently in use to bond other contracts and the remaining amount., current available bonding capacity and expected available capacity in 2019 and 2020. The offeror shall demonstrate that it has adequate financial resources required to successfully perform the work required for a project of this magnitude or the ability to obtain them include documentation of this requirement in TAB G of the technical Proposal.

These pages are not included in the proposal count page.

The Offeror is notified that the Government may further review the Offeror’s financial stability through other sources such as the Dun & Bradstreet report as required of all potential contractors for projects of this magnitude. Any negative information may be provided to the Offeror to address.

C2. Proposal Revisions (FAR 52.215-1)

1. OFFERORS ARE ADVISED THAT IN ACCORDANCE WITH FAR 15.306(a)(3) and FAR 52.215-1, THE GOVERNMENT INTENDS TO EVALUATE PROPOSALS AND MAKE AWARD WITHOUT DISCUSSIONS. Therefore, the offeror’s initial proposal should contain the offeror’s best terms from a price and technical standpoint. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary.

2. Proposal revisions will be submitted as per Part III.C1 above, except as noted below. The contracting officer will establish a common cut-off date only for receipt of final proposal revisions. Offerors submitting proposal revisions will not be requested to re-submit any documents which are unchanged from their initial proposals. They should provide necessary changes to individual paragraphs, as briefly as possible, together with a table of contents that clarifies where within the initial proposal the additional information or changed documents would be placed. Proposal revisions shall include a completed Standard Form 1442 “Solicitation, Offer and Award” (Construction, alteration, or Repair) and Standard Form 30 “Amendment of Solicitation/Modifications of Contract” that acknowledges receiving all amendments, by number. A new bid bond shall be submitted only if the final proposal revisions of the offeror’s price proposal is greater than its initial price proposal.

C3. Technical Proposal Requirements

1. TECHNICAL PROPOSAL – The technical proposal shall be limited to no more than 160 single-sided, 8 ½” x 11” pages and shall address the evaluation factors. Pages beyond the stated limit will NOT be considered. The pages of the technical proposal must be numbered. Offers are required to submit one (1) technical package via email attachment and one (1) CD via mail (USPS)of the technical evaluation factors/responses CLEARLY MARKED; “TEB – DO NOT OPEN IN MAILROOM” Offerors shall prepare Technical proposals with the Selection Criteria and Evaluation Factors in mind, in terms of both content and organization, to facilitate the evaluation.

Technical Proposal package must be in .pdf, maximum size 20MB attachment for email submission. Package shall not contain more than 160 single-sided pages, if the attachment is larger than 20MB the attachment will have to be divided into two attachments and sent in two separate email submissions labeled 1of 2 and 2 of 2 etc., (the total pages contained in the two attachments must not be larger than the before stated 160 single-sided 8 ½ X 11 page size in .pdf.

2. Technical proposals shall be tabbed and contain the following in the below order:

TECHNICAL PROPOSAL PACKAGE SUBMITTAL CHECKLIST

(One original and one CD) Page # [if the pages range for the entire proposal]

Cover
RFP: 36C10F-20-R-0091

Project: Central Utility Plant (CUP), VANTHCS – Dallas Campus Dallas, TX

INTRO PAGE
First page MUST clearly indicate:

Name and Address of Offeror Business Arrangement (Joint Venture or Teaming Arrangements clearly identified) Contact Name and Phone Number Email Address DUNS Number CAGE Code Tax Identification Number

Table of Contents (optional)
Listing of Tabs below.
TAB A
Factor I, Construction Management and Experience, Subfactor I (a): Corporate Project Experience (with supporting documentation per RFP)
TAB B
Factor I, Construction Management and Experience, Subfactor I (b): Project Personnel Experience (Specialized experience and technical competence) (with supporting documentation per RFP)
TAB C
Factor I, Construction Management and Experience, Subfactor I (c): Technical/Management Approach (with supporting documentation per the RFP)
TAB D
Factor II, Schedule
TAB E
Factor III, Small Business Participation/Sub-Contracting Plan
TAB F
Factor IV, Past performance (with supporting documentation per RFP)
TAB G
Responsibility Documents (OSHA Safety Report, EMR document, Financial Resource availability)

3. Evaluation ratings will be based on the evaluation criteria and weightings as stated in Part I, A6, 3.

GENERAL NOTE FOR PROPOSAL SUBMISSIONS AND EVALUATION PROPOSSES:

Failure to provide the required information or to meet the minimum requirement will result in a lower or unacceptable technical proposal rating.

The proposal shall address the following evaluation factors:

I. Factor I: Construction Management and Experience

a. Subfactor I (a) Corporate Project Experience

(i) Submittal Requirements: The Offeror (prime contractor only) shall demonstrate relevant corporate experience with a minimum of three (3), maximum of five (5) projects completed within the last five (5) years, similar in size, scope, and complexity to this project.

In describing project construction experience, provide the following information:

1)Project title, location and brief description
2)Project owner and name and telephone number of owner’s contact person.
3)Project Design Architect and Engineers and name and telephone number of contact person(s).
4)Provide a list of Subcontractors who have worked on the corporate projects indicated. Include the address of the subcontracting firm. Clearly indicate each firm and managing persons (project manager/superintendent/foreman as the case may be) Indicate clearly, which of the subcontractors in this list are also proposed for this solicitation.
5)Project Statistics including start and completion dates (original vs. actual) for construction; cost (original award price versus final, with brief explanation of what is included in the cost); square footage; foundation type; number of levels; and any awards (prizes) received.

(ii) Basis of Evaluation: The basis of evaluation will include the Offeror’s experience in performing relevant construction projects as defined in the solicitation submittal requirements. The assessment of the Offeror’s relevant experience will be used as a means of evaluating the capability of the Offeror to successfully meet the requirements of the RFP. Proposals that fail to provide required and complete information may result in a lower or unfavorable rating. Relevant projects where the Prime and Sub-contractors have previously worked together may receive a higher rating.

Relevancy is defined as similar in scope and size (dollar value and square footage). The offeror should include detailed information and describe in the technical proposal any coordination and phasing challenges & how they were met.

b. Subfactor I (b): Project personnel Experience (Specialized experience and technical competence).

(i) Submittal Requirements: The Offeror shall demonstrate the relevant experience of key project personnel.

1) Supply biographical data for at least the following key personnel (Note if one individual is proposed for more than one position listed):

a) Project Executive;

b) Project Manager;

c) Project Superintendent(s);

d) Project Engineer;

e) QA/QC Specialist

f) Site Safety & Health Officer (SSHO)

g) Scheduler

2) Biographical data shall include the following:

a)Name of individual.
b)Company employed by.
c)Company position title.
d)Years with the company.

e) Describe work experience with projects that were new construction of comparable size (sq. ft) or type (health care or hospital) on active campuses or environments and the company (by name) they worked for when involved in the project. Key project personnel with experience (or more experience) on comparable projects will be rated more favorably.

f) Provide an indication of which (if any) projects submitted under Corporate Project Experience (above) the individual participated in and what the individual’s responsibility was for that project.

g) Provide an indication of which other individuals submitted under Project Personnel Experience this individual has worked with and the project they worked on together, noting if that project has been submitted under Corporate Project Experience (above). Please submit this information in the form of a table.

h) Indicate the position that the individual will hold regarding this contract/Construction Team, description of duties and what percentage of the individual’s time that would be committed to the project during the construction of the project. Though a proposed individual may hold two roles, a more favorable rating will be accorded to a proposal that has individuals in single key roles.

h) Describe job related education, licenses, and certifications including degrees, certificates, etc. and granting institutions.

i) For the scheduler: Provide acknowledgement in the form of a narrative, that the individual will meet paragraph 1.2 of specification section 01 32 16.13.

(ii) Basis of Evaluation: The basis of evaluation will include the Offeror’s proposed personnel’s experience in performing relevant construction projects as defined in the solicitation submittal requirements. The assessment of the personnel’s experience will be used as a means of evaluating the capability of the Offeror’s personnel to successfully meet the requirements of the RFP.

Offerors who demonstrate that the proposed team has relevant experience working together on similar projects may be rated higher on project personnel experience. A higher rating will be accorded for this factor for teams (general & subcontractors) which have previously and/or frequently worked together.

All Key Personnel, Competent Persons (CP) and/or Qualified Persons must be in compliance with the required training per Specification Section 01 35 26.

An engineering, architectural or construction management degree from an accredited university for the PM will be rated more favorably than if the PM does not have this credential. Offerors who indicate that the Superintendent has USACE Safety & Health Requirements Manual EM-385-1-1 40-hour training certificate in addition to the minimum requirements (OSHA 30-hour Construction Safety Course) within the past 5 years) will be rated more favorably than those who do not.

Offerors who demonstrate the proposed SSHO currently holds the required certifications IAW Section 01 35 26 will be rated more favorably than a proposed individual having to meet the maximum 60day of award to obtain certifications.

Any additional safety or health training for the SSHO will be considered more favorably. For any of the indicated roles, extensive experience in relevant and/or comparable projects will be considered favorably.

IAW CFR Title 48, Section 1352.237-75-Key Personnel. No change in fixed prices shall occur as a result of key personnel substitution.

c. Subfactor I (c): Technical/Management Approach

(i) Submittal Requirements: The Offeror shall demonstrate the following, relevant to the subject procurement:

1)Project Delivery:

a) Describe offeror’s approach to performing the work of the project, including avoiding or minimizing adverse impact to medical center operations and avoiding or minimizing cost or schedule growth.

b) Describe approach to Successful Partnering, Communication, Commitment, and Conflict Resolution.

2) Provide Project Organizational Chart and Narrative - Include team members submitted under Project Personnel Experience above. Clearly describe the prime responsible firm (or firms if a J/V) and individuals as well as the roles and responsibilities of individuals proposed as subcontractors. Provide a list of all proposed Subcontractors, including address, telephone number, primary name of contact and discipline of work.

(Note, identifying multiple “potential” subcontractors for each major trade, who may or may not end up part of the offeror’s team, will be considered ambiguous and will be evaluated as though the major subcontractor had not been identified, which may be rated lower).

3) Capability to perform: Provide the Offeror's current workload and availability of adequate staff listed under Project Personnel Experience to execute the project. Include project schedules for current and pending projects, as well as the anticipated impact of this project on those schedules and staffing plans. An example of an illustration of workload will indicate the other projects that the offeror has & illustrate the percentage of time that each team member who is listed for this project will also participate in other projects.

4) The Offeror shall describe in a written narrative, the plan for sequencing the work to avoid or minimize adverse impact to the Medical Center ensuring that the facility remains operational while modifying the structure & architecture & building systems of existing building 74 (acute care SCI), and/or demolition of underground utilities are performed. The narrative shall also detail how the Offeror intends to prepare the site, disassemble, relocate, reassemble, and reactivate utility services to the facility within any specified time limits.

5) Offeror shall identify which elements of the work it intends to self-perform, the percentage of the work, and the overall percentage it represents of the proposed total price.

6) Offeror shall provide QA/QC plan specific to this project. The manager of this plan must be the QA/QC specialist indicated under the key personnel section.

(ii) Basis of Evaluation: The basis of evaluation is the consideration of Offeror’s proposed technical/management approach for this construction project as defined in the solicitation submittal requirements. The assessment of the Offeror’s method to manage the project shall be used as a means of evaluating the Offeror’s ability to successfully meet the requirements of the RFP.

Factor II: Schedule

(i) Submittal Requirements: The progress schedule will be in a time scaled bar graph format. The horizontal axis will be scaled for time beginning with the tentative Notice to Proceed and concluding with contract completion. The vertical axis will show the milestones and major portions of the contract work including all phasing. All schedule items will show a start date and a completion date. The detailed schedule will indicate specific tasks with dates for each step of the process including:

1)Construction Period: Mobilization; abatement; demolition method and sequencing; excavation; provisions for overtime or shift work; site utilities, roadway realignment including temporary re-routed Medical Center vehicular and pedestrian routes; final grading; punch list; final inspection; demobilization.
2)General Project Delivery Schedule and Narrative – Show relationships between construction activities for (at a minimum), abatement, demolition, utility removal and/or relocation, excavation, and grading.

a) The Offeror shall specify how much allowance has been made for bad weather in the schedule, the days of the week and the hours of construction operations during each sequence of the work, and the percentage of contract completion that will be achieved at the end of each month of the contract.

b) The offeror will clearly show on the schedule, the sequence of activation of each cooling tower Illustrating how the downtime for the system or system components will be minimized. This may be shown in a separate bar graph or other graphic form that also shows relationship to the overall schedule.) Please refer to specification section 01 00 00 paragraph “1.6 I. Phasing” and drawing 70-GS-001 for the requirements. The offeror must clearly indicate that he understands the criticality of maintaining function for existing system & understands the requirements for advance notification to the VA.

3) Short Schedules - Short schedules will not be accepted and will be evaluated unfavorably. Critical path activity durations shall total the number of days indicated on Standard Form 1442, Construction, Offer and Award (Construction, Alteration or Repair) block 11, and in section F, F.1 paragraph 1. This duration shall establish the contract completion date (see preceding section titled “Definitions”) for definition of “completion” as it relates to duration) and assessment of liquidated damages (see FAR 52.211-12 Liquidated Damages – Construction, Sept 2000).

(ii.) Basis of evaluation: The factor will be evaluated based on the extent to which the Offeror demonstrates a clear understanding of the construction period and general project delivery including the logic and reasonableness of the schedule including sufficient time for VA activities such as approvals & evacuations of spaces by VA. The Government will evaluate how reasonably and realistically the proposed schedule captures and addresses key elements and project phasing with respect to conditions, the stated schedule given the technical requirements of the RFP. Narratives and/or graphic representations of schedules that do not provide time for VA activities (as indicated in other parts of the specification), narratives and/or graphs which list events out of logical sequence or required phasing, or failure to provide any information as requested or in the format requested above will result in a lower or unacceptable rating. A schedule that results in minimal downtime for the existing cooling system will be evaluated more favorably.

Factor III: Small Business Participation/Subcontracting Plan

(i) Submittal Requirements: Offeror shall provide information based on whether it is a large or small business. Offerors submitting as a large business shall, in accordance with FAR 52.219-9 Small Business Subcontracting Plan, submit a subcontracting plan that shall indicate the total target as a percentage of contract value for each of the categories listed in Factor III, 1) a.