This is a Scope of Work document for the Okaloosa County, Florida Tourist Development Department's John Beasley and Ross Marler Parking Expansion project, detailing stormwater gravity piping specifications and installation requirements. The project encompasses stormwater management infrastructure necessary to support the expansion of parking facilities at both parks, with 114 additional parking spaces planned for John Beasley Park and 113 additional spaces for Marler Park in anticipation of a new splashpad facility. The scope of work specifies the design, materials, and installation standards for gravity piping systems that will manage stormwater runoff from the expanded parking areas, including detailed specifications for pipe sizing, placement, connections, and compliance with applicable engineering standards and local regulations.
The document establishes technical requirements for stormwater gravity piping including pipe material specifications, installation methodology, depth requirements, and quality assurance standards. Contractors are required to comply with all applicable Florida Department of Environmental Protection standards and Okaloosa County ordinances governing stormwater management. The piping system must be designed to accommodate anticipated stormwater volumes from the expanded impervious surfaces while maintaining proper drainage and environmental protection. All work must be performed by qualified contractors with experience in stormwater infrastructure installation, and materials must meet specified durability and performance standards to ensure long-term functionality of the stormwater management system supporting the parking expansion project.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Okaloosa County June 2026 “ITB TDD 65-26” Issue for Bid
STORMWATER GRAVITY PIPING
33 42 11 - 1
SECTION 33 42 11
STORMWATER GRAVITY PIPING
PART 1 - GENERAL
1.1 SUMMARY
A. Section Includes:
1. Storm water utility piping and appurtenances, including:
a. Reinforced concrete storm water pipe.
b. Corrugated metal storm water pipe.
c. Polyethylene storm water pipe.
d. Flared end sections.
B. Reference Standards: Standards referenced in this section include, but are not necessarily limited to, the following:
1. Section 31 23 33 - Trenching and Backfilling.
1.2 REFERENCES
A. Reference Standards: Standards referenced in this section include, but are not necessarily limited to, the following:
1. American Association of State Highway and Transportation Officials (AASHTO):
a. M36 - Standard Specification for Corrugated Steel Pipe, Metallic-Coated, for Sewers and Drains (Equivalent ASTM A760/A760M).
b. M190 - Standard Specification for Bituminous-Coated Corrugated Metal Culvert Pipe and Pipe Arches.
2. ASTM International (ASTM):
a. A760/A760M - Standard Specification for Corrugated Steel Pipe, Metallic-Coated for Sewers and Drains.
b. C14 - Standard Specification for Nonreinforced Concrete Sewer, Storm Drain, and Culvert Pipe.
c. C76 - Standard Specification for Reinforced Concrete Culvert, Storm Drain, and Sewer Pipe.
d. C361 - Standard Specification for Reinforced Concrete Low-Head Pressure Pipe.
e. C443 - Standard Specification for Joints for Concrete Pipe and Manholes, Using
Rubber Gaskets.
f. F2510/F2510M - Standard Specification for Resilient Connectors Between Reinforced
Concrete Manhole Structures and Corrugated Dual- and Triple-Wall Polyethylene and Polypropylene Pipes.
g. F2648/F2648M - Standard Specification for 2 to 60 inches (50 to 1500 mm) Annular Corrugated Profile Wall Polyethylene (PE) Pipe and Fittings for Land Drainage Applications.
3. Standard Specifications for Road and Bridge Construction for the State of Florida:
a. Standard Details.
1.3 SUBMITTALS
A. Shop Drawings:
1. Product technical data including:
a. Acknowledgement that products submitted meet requirements of standards referenced.
2. Certifications.
3. Test reports.
STORMWATER GRAVITY PIPING
33 42 11 - 2
4. Submit all tests and certification in a single coordinated submittal.
a. Partial submittals will not be accepted.
B. Submit schedules and details for structures and joints.
1.4 WARRANTY
A. Warrant that the infiltration will not exceed the amount specified in the Exfiltration Test paragraph in the FIELD QUALITY CONTROL Article in PART 3 of this Specification Section during the one year correction period.
PART 2 - PRODUCTS
2.1 MATERIALS
A. Reinforced Concrete Pipe (RCP):
1. Reinforced concrete culvert, storm drain, and sewer pipe: ASTM C76, Classes III, IV, and V.
B. RCP Joint Sealer:
1. Rubber gasket: ASTM C443, and oil resistant.
C. Flared End Sections:
1. Conform to State of Florida Specifications.
2. Bituminous coated: AASHTO M190, Type A.
3. Jointing: Same as pipe.
D. Corrugated Metal Pipe (CMP):
1. AASHTO M36 (ASTM A760/A760M), 16 GA.
2. Bituminous coated: AASHTO M190, Type A.
3. Jointing: Connecting bands of same base metal coated as pipe.
E. High Density Polyethylene Pipe (HDPE):
1. ASTM F2648/F2648M.
2. ASTM F2510/F2510M.
F. CMP Joint Sealer:
1. Cold applied asphalt joint compound.
2. Preformed flexible pipe joint sealing compound.
G. Concrete and Reinforcing for Inlets, Cast-in-place Chambers, Headwalls, and Other Cast-in-place Storm Water Facilities:
1. Comply with the Specifications of Division 03 - Concrete.
2. Layout, dimensions, and reinforcing for cast-in-place concrete Work in show and indicated on the Drawings.
H. Concrete and Reinforcing for Concrete Flared End Sections:
1. Comply with the Specifications of Division 03 - Concrete.
2. Layout, dimensions, and reinforcing for cast-in-place concrete Work in show and indicated on the Drawings.
PART 3 - EXECUTION
3.1 PREPARATION
A. Comply with Specification Section 31 23 33.
STORMWATER GRAVITY PIPING
33 42 11 - 3
3.2 INSTALLATION
A. Install materials in accordance with the Contract Documents, Laws and Regulations, and manufacturer's written instructions.
B. Comply with Section 31 23 33 - Trenching and Backfilling.
3.3 FIELD QUALITY CONTROL
A. Verify and coordinate installation.
B. Exfiltration Test:
1. Perform an exfiltration test on each reach of sewer between manholes.
a. Test the first reach after backfilling and prior to installing any of the remaining pipe, or any additional reach.
b. Single or multiple reaches may be tested thereafter, at Contractor's option.
c. Subject each manhole to at least one test.
d. Provide all necessary piping between the reach to be tested and the water supply, and other necessary materials and equipment.
e. Air testing may be allowed.
1) Submit complete information to Engineer for review describing the proposed test method, scheduling, and duration, including the method of testing manholes before beginning testing.
2. Procedure:
a. Block off all manhole openings, except those connecting with the reach being tested.
b. Fill the line.
1) Average depth: 10 feet above invert, except as required by manhole depth.
2) Depth at lower end: 25 feet maximum above crown.
3) Depth at upper end: 5 feet minimum above crown.
c. Add and measure water as required to maintain a constant level.
1) Exfiltration: 100 GAL maximum per inch of nominal diameter per mile per day.
2) Manholes are considered section of 48 inches pipe.
d. Maintain test for at least 2 hours, or as long as necessary in Engineer's opinion, to locate all leaks.
3. Repair and retest any reach that exceeds the allowable exfiltration.
C. Infiltration Test:
1. If at any time prior to expiration of the correction or warranty period infiltration exceeds 200 GAL/IN of nominal diameter/mile/day, locate the leaks and make repairs.
D. In case of conflict, do not relocate piping without prior approval from the Engineer.
END OF SECTION
| SECTION 33 42 11 |
| Part 1 - GENERAL |
| 1.1 SUMMARY |
| A. Section Includes: |
| 1. Storm water utility piping and appurtenances, including: |
| a. Reinforced concrete storm water pipe. |
| b. Corrugated metal storm water pipe. |
| c. Polyethylene storm water pipe. |
| d. Flared end sections. |
| B. Reference Standards: Standards referenced in this section include, but are not necessarily limited to, the following: |
| 1. Section 31 23 33 - Trenching and Backfilling. |
| 1.2 References |
| A. Reference Standards: Standards referenced in this section include, but are not necessarily limited to, the following: |
| 1. American Association of State Highway and Transportation Officials (AASHTO): |
| a. M36 - Standard Specification for Corrugated Steel Pipe, Metallic-Coated, for Sewers and Drains (Equivalent ASTM A760/A760M). |
| b. M190 - Standard Specification for Bituminous-Coated Corrugated Metal Culvert Pipe and Pipe Arches. |
| 2. ASTM International (ASTM): |
| a. A760/A760M - Standard Specification for Corrugated Steel Pipe, Metallic-Coated for Sewers and Drains. |
| b. C14 - Standard Specification for Nonreinforced Concrete Sewer, Storm Drain, and Culvert Pipe. |
| c. C76 - Standard Specification for Reinforced Concrete Culvert, Storm Drain, and Sewer Pipe. |
| d. C361 - Standard Specification for Reinforced Concrete Low-Head Pressure Pipe. |
| e. C443 - Standard Specification for Joints for Concrete Pipe and Manholes, Using Rubber Gaskets. |
| f. F2510/F2510M - Standard Specification for Resilient Connectors Between Reinforced Concrete Manhole Structures and Corrugated Dual- and Triple-Wall Polyethylene and Polypropylene Pipes. |
| g. F2648/F2648M - Standard Specification for 2 to 60 inches (50 to 1500 mm) Annular Corrugated Profile Wall Polyethylene (PE) Pipe and Fittings for Land Drainage Applications. |
| 3. Standard Specifications for Road and Bridge Construction for the State of Florida: |
| a. Standard Details. |
| 1.3 SUBMITTALS |
| A. Shop Drawings: |
| 1. Product technical data including: |
| a. Acknowledgement that products submitted meet requirements of standards referenced. |
| 2. Certifications. |
| 3. Test reports. |
| 4. Submit all tests and certification in a single coordinated submittal. |
| a. Partial submittals will not be accepted. |
B. Submit schedules and details for structures and joints.
| 1.4 WARRANTY |
| A. Warrant that the infiltration will not exceed the amount specified in the Exfiltration Test paragraph in the FIELD QUALITY CONTROL Article in PART 3 of this Specification Section during the one year correction period. |
| Part 2 - PRODUCTS |
| 2.1 MATERIALS |
| A. Reinforced Concrete Pipe (RCP): |
| 1. Reinforced concrete culvert, storm drain, and sewer pipe: ASTM C76, Classes III, IV, and V. |
| B. RCP Joint Sealer: |
| 1. Rubber gasket: ASTM C443, and oil resistant. |
| C. Flared End Sections: |
| 1. Conform to State of Florida Specifications. |
| 2. Bituminous coated: AASHTO M190, Type A. |
| 3. Jointing: Same as pipe. |
| D. Corrugated Metal Pipe (CMP): |
| 1. AASHTO M36 (ASTM A760/A760M), 16 GA. |
| 2. Bituminous coated: AASHTO M190, Type A. |
| 3. Jointing: Connecting bands of same base metal coated as pipe. |
| E. High Density Polyethylene Pipe (HDPE): |
| 1. ASTM F2648/F2648M. |
| 2. ASTM F2510/F2510M. |
| F. CMP Joint Sealer: |
| 1. Cold applied asphalt joint compound. |
| 2. Preformed flexible pipe joint sealing compound. |
| G. Concrete and Reinforcing for Inlets, Cast-in-place Chambers, Headwalls, and Other Cast-in-place Storm Water Facilities: |
| 1. Comply with the Specifications of Division 03 - Concrete. |
| 2. Layout, dimensions, and reinforcing for cast-in-place concrete Work in show and indicated on the Drawings. |
| H. Concrete and Reinforcing for Concrete Flared End Sections: |
| 1. Comply with the Specifications of Division 03 - Concrete. |
| 2. Layout, dimensions, and reinforcing for cast-in-place concrete Work in show and indicated on the Drawings. |
| Part 3 - EXECUTION |
| 3.1 PREPARATION |
| A. Comply with Specification Section 31 23 33. |
| 3.2 INSTALLATION |
| A. Install materials in accordance with the Contract Documents, Laws and Regulations, and manufacturer's written instructions. |
| B. Comply with Section 31 23 33 - Trenching and Backfilling. |
| 3.3 FIELD QUALITY CONTROL |
| A. Verify and coordinate installation. |
| B. Exfiltration Test: |
| 1. Perform an exfiltration test on each reach of sewer between manholes. |
| a. Test the first reach after backfilling and prior to installing any of the remaining pipe, or any additional reach. |
| b. Single or multiple reaches may be tested thereafter, at Contractor's option. |
| c. Subject each manhole to at least one test. |
| d. Provide all necessary piping between the reach to be tested and the water supply, and other necessary materials and equipment. |
| e. Air testing may be allowed. |
| 1) Submit complete information to Engineer for review describing the proposed test method, scheduling, and duration, including the method of testing manholes before beginning testing. |
| 2. Procedure: |
| a. Block off all manhole openings, except those connecting with the reach being tested. |
| b. Fill the line. |
| 1) Average depth: 10 feet above invert, except as required by manhole depth. |
| 2) Depth at lower end: 25 feet maximum above crown. |
| 3) Depth at upper end: 5 feet minimum above crown. |
| c. Add and measure water as required to maintain a constant level. |
| 1) Exfiltration: 100 GAL maximum per inch of nominal diameter per mile per day. |
| 2) Manholes are considered section of 48 inches pipe. |
d. Maintain test for at least 2 hours, or as long as necessary in Engineer's opinion, to locate all leaks.
3. Repair and retest any reach that exceeds the allowable exfiltration.
| C. Infiltration Test: |
| 1. If at any time prior to expiration of the correction or warranty period infiltration exceeds 200 GAL/IN of nominal diameter/mile/day, locate the leaks and make repairs. |
D. In case of conflict, do not relocate piping without prior approval from the Engineer.
END OF SECTION