3) GSA Pricing Bid Form 2026 04 22 .xlsx
XLSX spreadsheet 308 KB Posted
- Solicitation number
- 47PB5126R0024
- Issued by
- Not on record
About this file
This is a GSA Pricing Bid Form for the Harry S Truman Streetscape Perimeter Construction Project (Solicitation No. 47PB5126R0024). The form is a template document designed to collect pricing information from construction contractors bidding on this General Services Administration Public Buildings Service project in the New England Region. The spreadsheet format is intended for bidders to input their cost proposals for the civil/site construction work involving approximately 162,000 square feet of streetscape improvements, including sidewalks, curb and gutter work, utilities, and related construction elements distributed across four project phases.
As a pricing template, this document does not contain substantive details regarding project specifications, timelines, or terms and conditions. Contractors responding to Solicitation 47PB5126R0024 would use this form to submit their financial proposals in accordance with the evaluation criteria and instructions outlined in the full solicitation package. The form serves as the standardized mechanism for GSA to collect and compare pricing data across competing bids for this security enhancement and streetscape renovation project located in Washington, DC.
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Instructions
| INSTRUCTIONS | |
| OBJECTIVE | |
| This form was created by the Office of Design and Construction, Small Projects Division to bring consistancy to the bids GSA receives from our vendors. The bid form is based on the Construction Specifications Institute (CSI) 50 Division Master Format. Of the 36 active divisions, 29 are listed on this form. | |
| Any word in BLUE is a link to that specific page. | |
| If a Division page for your specific project is not listed on this form, notify the assigned Contracting Officer or Contracting Specialist. They will have the Division page you need added to the form. | |
| BID SHEET | |
| This sheet is populated from the Division sheets. All calculations are done for you. Vendors only need to fill in those cells highlighted in GREEN to include the Proposal Version, Date of your proposal, percentages for Labor Burden, Overhead, Profit and Bond (if applicable). | |
| PROJECT INFORMATION: The form will come to you with the Project Name, Building Number and Project Manager Name included. If the form does not contain these items return it to your assigned Contracting Team for correction. | |
| Proposal Version: Document the version of the proposal. Any changes to the proposal will need a new identifing proposal version indicated. For Example: The base bid could be version 1. If negotiations require changes to the proposal the revised proposal could be version "2" or "R1". | |
| DATE: Enter the date of your proposal. If the proposal is revised, for example after negotiations, a current date must be included. | |
| Labor Burden: Include current certified labor burden rate. All rates will be entered as a percentage. | |
| Overhead: Enter appropriate Overhead rate as a percentage, not to exceed what is allowed per the FAR. | |
| Profit: Enter the appropriate Profit rate as a percentage, not to exceed what is allowed per the FAR. | |
| Bond: Enter the appropriate Bond rate as a percentage. | |
| Design Costs: The design costs have been separated from the Division 1 sheet to its own sheet. All design elements shall be included on sheet 1A only. | |
| Abestos Abatement (AA): GSA tracks and funds any activities for AA separately from the rest of the project. All costs associated with AA shall be listed on sheet 2A only. The appropriate Labor Burden, Overhead, Profit and Bond shall be entered on the Summary Bid Sheet in the form of a percentage. | |
| Self Performance: All contracts have a minimum self performance limit IAW the FAR or requirements of the contract. The Contracting Officer may set a more stringent minimum standard for any project. The Summary Bid Form includes a contractor Self Performing Percentange. It is located at the bottom of the page and highlited in yellow. This information allows the vendor and the Project Management team to determine if the minimum self performance requirement is being met. | |
| Add Alternate/Option Pricing: Enter the "TITLE" or identification for each Add Alt/Option pricing used. All work (divisions) included in the Add Alt/Option work will be identified on a single sheet. Enter Labor Burden, OH, Profit, Bond for each Add Alt/Option. The total will be included on the bid sheet separately. | |
| DIVISION SHEETS | |
| Division sheets are set up to calculate material and either self- performed labor or sub-performed labor. If both self-performed and sub-performed labor are entered on the sheet on the same line, the sheet will not total for that line item. If both self-performed and sub-performed labor will be used on the same activity then a separate line must be used. See the example page for more information. Vendors can only access those cells in white. All others are locked for calculations. | |
| Description of Work: Enter the description of work. Be specific in the description. For Example: If there are 5 different types of doors on the project then we should see 5 line items for doors with type, size, ect… |
| MATERIALS | |
| Quantity (QTY): Enter the quantity of each line item. | |
| Unit of Issue (UOI): Click on the cell, a drop down arrow will appear. Choose an appropriate UOI for the item being priced. A list of abbreviations are located at the bottom of this page. | |
| Material Cost: Enter the cost of the material in relation to the UOI. | |
| LABOR | |
| Quantity: Enter the quanty (QTY) in a numerical format. | |
| Unit of Issue (UOI): Click on the cell under UOI. A drop down arrow will appear. Choose from the list provided. A list of abbreviations are located at the bottom of this page. | |
| Rate: Enter the rate in relation to the UOI in either the Self-Performed or Sub-Performed columns. Note: Entering costs in both Self and Sub Performed columns will result in no total for that item. If both Self and Sub-performed labor is needed for the same activity then a second line shall be used. | |
| Additional Rows: Not enough rows for the division? Not a problem. Contact your assigned Contracting Officer or Contracting Specialist. They will have additional rows added. Just let them know how many you need. | |
| ADD ALTERNATE/OPTION SHEETS | |
| Add Alternate tabs are provided for optional pricing as requested in a SOW. They are located past the Division tabs. Add Alt/Option tabs provide input from the vendor for Labor Burden, Overhead, Profit and Bond on each sheet. A total price for each Add Alt will be shown on the Bid Sheet independent from the base bid price. | |
| The contractor shall enter the cost (difference) of the add alternate. For Example: The base contract requires paint grade doors at $10 ea. The Add Alt is for stain grade doors at $20 ea. The difference ($10 ea) shall be listed in the Add Alt pricing. | |
| The required brake down (Lump Sum vs. detailed break out) will be determined by the Contracting Officer. | |
| SUBMITTING YOUR BID | |
| When you're ready, submit the entire bid package to your assigned Contracting Officer or Contracting Specialist. Note: The entire package must be submitted. In addition, at your descretion, you may save the "Summary Bid Sheet" as a PDF format and submit it along with the entire package. |
| ABBREVIATIONS | |||
| Materials | Labor | ||
| EA | Each | HR | Hour |
| RL | Roll | DY | Day |
| PK | Package | WK | Week |
| SF | Square Foot | MN | Month |
| LF | Linear Foot | ||
| BX | Box | ||
| SQ | Square | ||
| HR | Hour | ||
| WK | Week | ||
| MN | Month | ||
| LOT | Lot | ||
| TN | Ton | ||
| SY | Square Yard | ||
| CF | Cubic Foot | ||
| CY | Cubic Yard |
Roll up sheet
| HST Streetscape Pricing - EXAMPLE | |||||||||||||
| Description of Work | MATERIALS | LABOR | TOTAL | ||||||||||
| QTY | Unit of Issue | Material Cost | Total Material Cost | QTY | Unit of Issue | Rate Self Performed | Sub Total | Rate Sub-Contracted | Sub Total | TOTAL Material & Labor | Mat/Self Perform | Mat/Sub Performed | |
| (CLIN 001 ) Base Bid - Phase 1 | $0.00 | 10 | HR | $10.00 | $100.00 | $10.00 | $100.00 | $100.00 | $100.00 | ||||
| (CLIN 002 ) Option 1 - Phase 2 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| (CLIN 003 ) Option 2 - Phase 3 | $0.00 | INCORRECT ENTRY | $0.00 | NO CALCULATION PROVIDED | ERROR:#VALUE! | $0.00 | |||||||
| (CLIN 004 ) Option 3 - Phase 4 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | NO TOTAL | $0.00 | ERROR:#VALUE! | |||||||||
| Total | $0.00 | $100.00 | $100.00 | $0.00 | ERROR:#VALUE! | ERROR:#VALUE! |
| HST Streetscape Pricing | |||||||||||
| Description of Work | MATERIALS | LABOR | TOTAL | ||||||||
| QTY | Unit of Issue | Material Cost | Total Material Cost | QTY | Unit of Issue | Rate Self Performed | Sub Total | Rate Sub-Contracted | Sub Total | TOTAL Material & Labor | |
| (CLIN 001 ) Base Bid - Phase 1 | $0.00 | 10 | HR | $10.00 | $100.00 | $0.00 | $100.00 | ||||
| (CLIN 002 ) Option 1 - Phase 2 | $0.00 | 10 | HR | $0.00 | $10.00 | $100.00 | $100.00 | ||||
| (CLIN 003 ) Option 2 - Phase 3 | $0.00 | CORRECT ENTRY | $0.00 | CALCULATION PROVIDED | |||||||
| (CLIN 004 ) Option 3 - Phase 4 | $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | TOTAL | |||||||||
| Total | $0.00 | $100.00 | $100.00 | $200.00 |
| BACK TO: |
| Instructions!A1 |
| BID SHEET |
Bid Sheet
| PROJECT NAME: | Harry S Truman Streetscape Perimeter Construction Project | |||||||||
| SOLICITATION NO: | 47PB5126R0024 | |||||||||
| PROPOSAL VERSION: | ||||||||||
| CONTRACTOR NAME: | DATE: | |||||||||
| PROPOSAL SUMMARY BID SHEET- OFFICIAL FORM | Total from all pages | |||||||||
| Division Number | Division Name | Materials | Self Performed Work | Sub-Contractor Performed | TOTAL | Mat/Self Performed | Mat/Sub Performed | |||
| 'Div 1'!A1 | General Requirements | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | $ - 0 | |||
| Div 1A | Design | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | $ - 0 | |||
| Div 2 | Existing Conditions | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | $ - 0 | |||
| Div 3 | Concrete | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | $ - 0 | |||
| DIV 4 | Masonry | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | $ - 0 | |||
| DIV 5 | Metals | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | $ - 0 | |||
| DIV 6 | Wood, Plastics and Composites | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | $ - 0 | |||
| DIV 7 | Thermal & Moisture Protection | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | $ - 0 | |||
| DIV 8 | Openings | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | $ - 0 | |||
| DIV 9 | Finishes | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | $ - 0 | |||
| DIV 10 | Specialities | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | $ - 0 | |||
| 'Div 11'!A1 | Equipment | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | $ - 0 | |||
| DIV 12 | Furnishings | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | $ - 0 | |||
| DIV 13 | Special Construction | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | $ - 0 | |||
| DIV 14 | Conveying Equipment | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | $ - 0 | |||
| DIV 21 | Fire Suppression | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | $ - 0 | |||
| DIV 22 | Plumbing | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | $ - 0 | |||
| DIV 23 | Heating, Ventilating, and AC | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | $ - 0 | |||
| DIV 25 | Integrated Automation | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | $ - 0 | |||
| DIV 26 | Electrical | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | $ - 0 | |||
| DIV 27 | Communications | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | $ - 0 | |||
| DIV 28 | Electronic Safety and Security | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | $ - 0 | |||
| DIV 31 | Earthwork | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | $ - 0 | |||
| DIV 32 | Exterior Improvements | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | $ - 0 | |||
| DIV 33 | Utilities | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | $ - 0 | |||
| DIV 34 | Transportation | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | $ - 0 | |||
| DIV 41 | Material Processing | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | $ - 0 | |||
| DIV 42 | Process Heat/Cool/Dry Equipment | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | $ - 0 | |||
| DIV 46 | Water and Wastewater Equip | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | $ - 0 | |||
| DIV 48 | Electrical Power Generation | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | $ - 0 | |||
| Sub-Total | $0.00 | $0.00 | $0.00 | $0.00 | $ - 0 | $ - 0 | Mark Up | Total | ||
| Labor Burden | Enter labor burden percentage | $0.00 | $ - 0 | $ - 0 | $0.00 | $0.00 | ||||
| Overhead | Enter percentage markup: | $0.00 | $0.00 | $0.00 | ||||||
| Profit | Enter percentage markup: | $0.00 | $0.00 | $0.00 | ||||||
| Bond | Enter Percentage of Bond: | $0.00 | $0.00 | $0.00 | ||||||
| Total (Construction) | $0.00 | $0.00 |
| Materials | Self Performed Work | Sub-Contractor Performed Work | Total | ||||
| DIV 2A | Abestos Abatement | $ - 0 | $ - 0 | $ - 0 | $0.00 | Mark Up | Total |
| Labor Burden | Enter labor burden percentage | $0.00 | $ - 0 | $0.00 | |||
| Overhead | Enter percentage markup: | $0.00 | $0.00 | $0.00 | |||
| Profit | Enter percentage markup: | $0.00 | $0.00 | $0.00 | |||
| Bond | Enter percentage of Bond: | $0.00 | $0.00 | $0.00 | |||
| Total (Abestos Abatement) | $0.00 | $0.00 |
| PROJECT TOTAL | $0.00 | |||
| Contractor is self performing | ERROR:#DIV/0! | of the project. |
| ADD OPTION PRICING | ||
| TITLE | ADD ALTERNATE | TOTAL |
| ADD OPTION 1- Phase 2 (CLIN 04) | $ - 0 | |
| ADD OPTION 2- Phase 3 (CLIN 05) | $ - 0 | |
| ADD OPTION 3- Phase 4 (CLIN 06) | $ - 0 |
| BACK TO: |
| Instructions |
| Example |
| NOTES: |
| Cells in GREEN are for contractor input. |
| Abestos abatement(AA) is funded separately from all other construction work. Input all AA work in Division 2A only. |
| Links are provided in BLUE |
Div 1
| DIVISION 1: GENERAL CONDITIONS | |||||||||||||
| Description of Work | MATERIALS | LABOR | TOTAL | ||||||||||
| QTY | Unit of Issue | Material Cost | Total Material Cost | QTY | Unit of Issue | Rate Self Performed | Sub Total | Rate Sub-Contracted | Sub Total | TOTAL Material & Labor | Mat/Self Perform | Mat/Sub Performed | |
| Project Manager | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| Superintendent | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| Quality Control/Safety Manager | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| Security | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| Total | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| BACK TO: | |||||||||||||
| Instructions | |||||||||||||
| Instructions | |||||||||||||
| Example |
Div 1A
| DIVISION 1A: DESIGN | |||||||||||||
| Description of Work | MATERIALS | LABOR | TOTAL | ||||||||||
| QTY | Unit of Issue | Material Cost | Total Material Cost | QTY | Unit of Issue | Rate Self Performed | Sub Total | Rate Sub-Contracted | Sub Total | TOTAL Material & Labor | Mat/Self Perform | Mat/Sub Performed | |
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| Total | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| BACK TO: | |||||||||||||
| Instructions | |||||||||||||
| Instructions | |||||||||||||
| Example |
Div 2
| DIVISION 2: EXISTING CONDITIONS | |||||||||||||
| Description of Work | MATERIALS | LABOR | TOTAL | ||||||||||
| QTY | Unit of Issue | Material Cost | Total Material Cost | QTY | Unit of Issue | Rate Self Performed | Sub Total | Rate Sub-Contracted | Sub Total | TOTAL Material & Labor | Mat/Self Perform | Mat/Sub Performed | |
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | ||||||||
| Total | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| BACK TO: | |||||||||||||
| Instructions | |||||||||||||
| Instructions | |||||||||||||
| Example |
Div 2A
| DIVISION 2A: ASBESTOS ABATEMENT | |||||||||||||
| Description of Work | MATERIALS | LABOR | TOTAL | ||||||||||
| QTY | Unit of Issue | Material Cost | Total Material Cost | QTY | Unit of Issue | Rate Self Performed | Sub Total | Rate Sub-Contracted | Sub Total | TOTAL Material & Labor | Mat/Self Perform | Mat/Sub Performed | |
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| Total | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| BACK TO: | |||||||||||||
| Instructions | |||||||||||||
| Instructions | |||||||||||||
| Example |
Div 3
| DIVISION 3: CONCRETE | |||||||||||||
| Description of Work | MATERIALS | LABOR | TOTAL | ||||||||||
| QTY | Unit of Issue | Material Cost | Total Material Cost | QTY | Unit of Issue | Rate Self Performed | Sub Total | Rate Sub-Contracted | Sub Total | TOTAL Material & Labor | Mat/Self Perform | Mat/Sub Performed | |
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| Total | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| Back To: | |||||||||||||
| Instructions | |||||||||||||
| Instructions | |||||||||||||
| Example |
Div 4
| DIVISION 4: MASONRY | |||||||||||||
| Description of Work | MATERIALS | LABOR | TOTAL | ||||||||||
| QTY | Unit of Issue | Material Cost | Total Material Cost | QTY | Unit of Issue | Rate Self Performed | Sub Total | Rate Sub-Contracted | Sub Total | TOTAL Material & Labor | Mat/Self Perform | Mat/Sub Performed | |
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| Total | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| BACK TO: | |||||||||||||
| Instructions | |||||||||||||
| Instructions | |||||||||||||
| Example |
Div 5
| DIVISION 5: METALS | |||||||||||||
| Description of Work | MATERIALS | LABOR | TOTAL | ||||||||||
| QTY | Unit of Issue | Material Cost | Total Material Cost | QTY | Unit of Issue | Rate Self Performed | Sub Total | Rate Sub-Contracted | Sub Total | TOTAL Material & Labor | Mat/Self Perform | Mat/Sub Performed | |
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| Total | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| BACK TO: | |||||||||||||
| Instructions | |||||||||||||
| Instructions | |||||||||||||
| Example |
Div 6
| DIVISION 6: WOOD, PLASTIC, COMPOSITES | |||||||||||||
| Description of Work | MATERIALS | LABOR | TOTAL | ||||||||||
| QTY | Unit of Issue | Material Cost | Total Material Cost | QTY | Unit of Issue | Rate Self Performed | Sub Total | Rate Sub-Contracted | Sub Total | TOTAL Material & Labor | Mat/Self Perform | Mat/Sub Performed | |
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| Total | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| BACK TO: | |||||||||||||
| Instructions | |||||||||||||
| Instructions | |||||||||||||
| Example |
Div 7
| DIVISION 7: THERMAL AND MOISTURE PROTECTION | |||||||||||||
| Description of Work | MATERIALS | LABOR | TOTAL | ||||||||||
| QTY | Unit of Issue | Material Cost | Total Material Cost | QTY | Unit of Issue | Rate Self Performed | Sub Total | Rate Sub-Contracted | Sub Total | TOTAL Material & Labor | Mat/Self Perform | Mat/Sub Performed | |
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| Total | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| BACK TO: | |||||||||||||
| Instructions | |||||||||||||
| Instructions | |||||||||||||
| Example |
Div 8
| DIVISION 8: OPENINGS | |||||||||||||
| Description of Work | MATERIALS | LABOR | TOTAL | ||||||||||
| QTY | Unit of Issue | Material Cost | Total Material Cost | QTY | Unit of Issue | Rate Self Performed | Sub Total | Rate Sub-Contracted | Sub Total | TOTAL Material & Labor | Mat/Self Perform | Mat/Sub Performed | |
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| Total | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| BACK TO: | |||||||||||||
| Instructions | |||||||||||||
| Instructions | |||||||||||||
| Example |
Div 9
| DIVISION 9: FINISHES | |||||||||||||
| Description of Work | MATERIALS | LABOR | TOTAL | ||||||||||
| QTY | Unit of Issue | Material Cost | Total Material Cost | QTY | Unit of Issue | Rate Self Performed | Sub Total | Rate Sub-Contracted | Sub Total | TOTAL Material & Labor | Mat/Self Perform | Mat/Sub Performed | |
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| Total | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| BACK TO: | |||||||||||||
| Instructions | |||||||||||||
| Instructions | |||||||||||||
| Example |
Div 10
| DIVISION 10: SPECIALITIES | |||||||||||||
| Description of Work | MATERIALS | LABOR | TOTAL | ||||||||||
| QTY | Unit of Issue | Material Cost | Total Material Cost | QTY | Unit of Issue | Rate Self Performed | Sub Total | Rate Sub-Contracted | Sub Total | TOTAL Material & Labor | Mat/Self Perform | Mat/Sub Performed | |
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| Total | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| BACK TO: | |||||||||||||
| Instructions | |||||||||||||
| Instructions | |||||||||||||
| Example |
Div 11
| DIVISION 11: EQUIPMENT | |||||||||||||
| Description of Work | MATERIALS | LABOR | TOTAL | ||||||||||
| QTY | Unit of Issue | Material Cost | Total Material Cost | QTY | Unit of Issue | Rate Self Performed | Sub Total | Rate Sub-Contracted | Sub Total | TOTAL Material & Labor | Mat/Self Perform | Mat/Sub Performed | |
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| Total | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| BACK TO: | |||||||||||||
| Instructions | |||||||||||||
| Instructions | |||||||||||||
| Example |
Div 12
| DIVISION 12: FURNISHINGS | |||||||||||||
| Description of Work | MATERIALS | LABOR | TOTAL | ||||||||||
| QTY | Unit of Issue | Material Cost | Total Material Cost | QTY | Unit of Issue | Rate Self Performed | Sub Total | Rate Sub-Contracted | Sub Total | TOTAL Material & Labor | Mat/Self Perform | Mat/Sub Performed | |
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| Total | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| BACK TO: | |||||||||||||
| Instructions | |||||||||||||
| Instructions | |||||||||||||
| Example |
Div 13
| DIVISION 13: SPECIAL CONSTRUCTION | |||||||||||||
| Description of Work | MATERIALS | LABOR | TOTAL | ||||||||||
| QTY | Unit of Issue | Material Cost | Total Material Cost | QTY | Unit of Issue | Rate Self Performed | Sub Total | Rate Sub-Contracted | Sub Total | TOTAL Material & Labor | Mat/Self Perform | Mat/Sub Performed | |
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| Total | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| BACK TO: | |||||||||||||
| Instructions | |||||||||||||
| Instructions | |||||||||||||
| Example |
Div 14
| DIVISION 14: CONVEYING EQUIPMENT | |||||||||||||
| Description of Work | MATERIALS | LABOR | TOTAL | ||||||||||
| QTY | Unit of Issue | Material Cost | Total Material Cost | QTY | Unit of Issue | Rate Self Performed | Sub Total | Rate Sub-Contracted | Sub Total | TOTAL Material & Labor | Mat/Self Perform | Mat/Sub Performed | |
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| Total | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| BACK TO: | |||||||||||||
| Instructions | |||||||||||||
| Instructions | |||||||||||||
| Example |
Div 21
| DIVISION 21: FIRE SUPPRESSION | |||||||||||||
| Description of Work | MATERIALS | LABOR | TOTAL | ||||||||||
| QTY | Unit of Issue | Material Cost | Total Material Cost | QTY | Unit of Issue | Rate Self Performed | Sub Total | Rate Sub-Contracted | Sub Total | TOTAL Material & Labor | Mat/Self Perform | Mat/Sub Performed | |
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| Total | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| BACK TO: | |||||||||||||
| Instructions | |||||||||||||
| Instructions | |||||||||||||
| Example |
Div 22
| DIVISION 22: PLUMBING | |||||||||||||
| Description of Work | MATERIALS | LABOR | TOTAL | ||||||||||
| QTY | Unit of Issue | Material Cost | Total Material Cost | QTY | Unit of Issue | Rate Self Performed | Sub Total | Rate Sub-Contracted | Sub Total | TOTAL Material & Labor | Mat/Self Perform | Mat/Sub Performed | |
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| Total | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| MOVE TO: | |||||||||||||
| Instructions | |||||||||||||
| Instructions | |||||||||||||
| Example |
Div 23
| DIVISION 23: HEATING, VENTILATING, AND AIR CONDITIONG (HVAC) | |||||||||||||
| Description of Work | MATERIALS | LABOR | TOTAL | ||||||||||
| QTY | Unit of Issue | Material Cost | Total Material Cost | QTY | Unit of Issue | Rate Self Performed | Sub Total | Rate Sub-Contracted | Sub Total | TOTAL Material & Labor | Mat/Self Perform | Mat/Sub Performed | |
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| Total | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| BACK TO: | |||||||||||||
| Instructions | |||||||||||||
| Instructions | |||||||||||||
| Example |
Div 25
| DIVISION 25: INTEGRATED AUTOMATION | |||||||||||||
| Description of Work | MATERIALS | LABOR | TOTAL | ||||||||||
| QTY | Unit of Issue | Material Cost | Total Material Cost | QTY | Unit of Issue | Rate Self Performed | Sub Total | Rate Sub-Contracted | Sub Total | TOTAL Material & Labor | Mat/Self Perform | Mat/Sub Performed | |
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| Total | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| BACK TO: | |||||||||||||
| Instructions | |||||||||||||
| Instructions | |||||||||||||
| Example |
Div 26
| DIVISION 26: ELECTRICAL | |||||||||||||
| Description of Work | MATERIALS | LABOR | TOTAL | ||||||||||
| QTY | Unit of Issue | Material Cost | Total Material Cost | QTY | Unit of Issue | Rate Self Performed | Sub Total | Rate Sub-Contracted | Sub Total | TOTAL Material & Labor | Mat/Self Perform | Mat/Sub Performed | |
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| Total | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | |||||||
| BACK TO: | |||||||||||||
| Instructions | |||||||||||||
| Instructions | |||||||||||||
| Example |
Div 27
| DIVISION 27: COMMUNICATIONS | |||||||||||||
| Description of Work | MATERIALS | LABOR | TOTAL | ||||||||||
| QTY | Unit of Issue | Material Cost | Total Material Cost | QTY | Unit of Issue | Rate Self Performed | Sub Total | Rate Sub-Contracted | Sub Total | TOTAL Material & Labor | Mat/Self Perform | Mat/Sub Performed | |
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| $0.00 | $0.00 | $0.00 | $0.00 | ||||||||||
| Total | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .