19) CD_Waste_Management_Plan__Reporting_Template 2026 05 12.xlsx

XLSX spreadsheet 351 KB Posted

Attached to
Harry S Truman Streetscape Perimeter Construction Project
Solicitation number
47PB5126R0024
Issued by
Not on record

About this file

This is a Waste Management Plan and Reporting Template for GSA construction projects. The template is designed to track construction and demolition (C&D) waste diversion efforts across project phases, with sections for both anticipated waste diversion planning (submitted pre-construction with final construction documents) and actual waste diversion reporting (submitted during project close-out). The template requires project managers or contractors to populate data on 13 material categories including asphalt, brick/masonry/tile, cardboard, carpet, ceiling tile, concrete, drywall, metals, painted wood, reusable items, roofing, soil/rock/land clearing debris, and unpainted wood, with customizable "Other" categories for additional materials.

For each material type, contractors must identify diversion methods (reuse, recycle/compost, or donation), establish target diversion rates by weight, and then report actual diverted and landfilled quantities in pounds with corresponding diversion rates. The template includes a volume-to-weight conversion factor reference table to enable conversion of hauler-reported volumes to weight for accurate reporting. The document requires certification by a responsible officer or employee attesting to the accuracy of reported figures, and emphasizes that manifests and receipts from haulers, recyclers, processors, or landfills must be retained for project close-out review. Final diversion tonnage figures must be reported via the ePMXpress Project Detail tab to track GSA's sustainability metrics. The template accommodates up to 12 reporting periods and includes a reuse planning section for identifying items such as cabinets, doors, shelves, and salvageable materials with onsite or offsite recipients.

View the file

Other files

File Type Posted
47PB5126R0024 0006 SF30 Amendment 2026 08 27.pdf PDF
1) HST Streetscape Perimeter- Solicitation V4 2026 08 27.pdf PDF
2) 47PB5126R0024 SF1442 2026 08 27.pdf PDF
HST Streetscape Perimeter Questions Answers V6 47PB5126R0024 2026 08 27.pdf PDF
4) HST Streetscape Perimeter Agreement V4 2026 08 27.pdf PDF
2) 47PB5126R0024 SF1442 2026 08 17.pdf PDF
47PB5126R0024_0005 Amendment SF30 2026 08 17.pdf PDF
1) HST Streetscape Perimeter- Solicitation V3 2026 08 17.pdf PDF
HST Streetscape Perimeter Questions Answers V5 47PB5126R0024 2026 08 17.pdf PDF
4) HST Streetscape Perimeter Agreement V3 2026 08 17.pdf PDF
7) DC20260001 V5 Wage Determination 2026 07 30.pdf PDF
4) HST Streetscape Perimeter Agreement V2 2026 08 10.pdf PDF
HST Streetscape Perimeter Questions Answers V4 47PB5126R0024 2026 08 10.pdf PDF
1) HST Streetscape Perimeter- Solicitation V2 2026 08 10.pdf PDF
47PB5126R0024_0004 Amendment SF30 2026 08 10.pdf PDF
47PB5126R0024_0003 Amendment SF30 2026 08 05.pdf PDF
HST Streetscape Perimeter Questions Answers V3 47PB5126R0024.pdf PDF
47PB5126R0024_0002 Amendment SF30 2026 07 15.pdf PDF
HST Streetscape Perimeter Questions Answers V2 47PB5126R0024 2026 07 15.pdf PDF
4) HST Streetscape Perimeter Agreement V1 2026 06 30.pdf PDF
2) 47PB5126R0024 SF1442 2026 06 30.pdf PDF
HST Streetscape Perimeter QA 47PB5126R0024 2026 06 30.pdf PDF
1) HST Streetscape Perimeter- Solicitation V1 2026 06 30.pdf PDF
47PB5126R0024_0001 Amendment SF30 2026 06 30.pdf PDF
47PB5126R0024 HST Streetscape Perimeter Construction Project - Site Visit Listing 2026 06 03.pdf PDF
21) HST Streetscape 95 CD Drawing Table of Contents 2026 06 22.pdf PDF
47PB5126R0024 HST Streetscape Perimeter Construction Site Visit Sign-In Sheets 2026 06 10.pdf PDF
47PB5126R0024 HST Streetscape Perimeter Constructin Pre-Proposal Conference Meeting Minutes 2026 06 09.pdf PDF
17) GACA GSAAffiliatedCustomerAccounts 2023 02 02.pdf PDF
2) SF1442 2026 05 21.pdf PDF
5) GSA527 2025 11 18 .pdf PDF
1) HST Streetscape Perimeter Construction- Solicitation- Final 2026 05 20.pdf PDF
16) PROJNET Instructions 2026 02 17.pdf PDF
8) PBS PPQ 2023 11 29.pdf PDF
9) Tips on Preparing Subcontracting Plan 2026 04 15.pdf PDF
15) NDA_Document_Security 2026 02 17.pdf PDF
4) HST Streetscape Perimeter Construction Agreement 2026 05 20.pdf PDF
3) GSA Pricing Bid Form 2026 04 22 .xlsx XLSX spreadsheet
10) Model Subcontracting Plan 2026 04 15.docx DOCX document
7) DC20260001 V4 Wage Determination 2026 05 18.pdf PDF
6) Proprietary Information Agreement 2026 04 22 .docx DOCX document
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Waste Diversion Plan

: +christopher.clever@gsa.gov +walter.tersch@gsa.gov

(For consideration as an alternate). Anticipated sections match Actual to the right for 1:1 comparison.

-Jake Begnaud - WPIDBB Fine with either, will defer to +walter.tersch@gsa.gov Seems like it only boils down to estimating method or not.

-Christopher Clever - PCBL That's correct.

-Jake Begnaud - WPIDBBProject Waste Management PlanSubmittal Type:Waste Diversion Plan (Anticipated):FALSEWaste Diversion Report (Final) :FALSE
The general info in these gray cells replicates onto the Report tabs.
Project Name:ECC (estimated construction cost):Project Manager:ePM/ePMX Project # :
Project Short Description:PM email or phone:gBUILD Project # :
Building Number:Service Center / Field Office:Budget Activity:(list all applicable)RWA # :

Anticipated Waste Diversion Plan To be filled out and submitted Pre-Construction, with final Construction Documents (PM or contractor populates this pink section) Actual Waste Diversion Report To be submitted during Project Close-Out (Reports tab figures auto-populate this green section)

Material*
(see weight conversion factors below)Diversion MethodTarget Diversion Rate for each material, by weight
(Change to actual target(s) as needed)Diverted (lbs)Landfilled (lbs)Total C&D material weight (Diverted + Landfilled) (lbs)Diversion

Rate

Reuse*Recycle or CompostDonation
AsphaltFALSEFALSEFALSE50%000n/a
Brick, Masonry, and TileFALSEFALSEFALSE50%000n/a
CardboardFALSEFALSEFALSE50%000n/a
Carpet, including PaddingFALSEFALSEFALSE50%000n/a
Ceiling tileFALSEFALSEFALSE50%000n/a
ConcreteFALSEFALSEFALSE50%000n/a
Drywall/ sheetrock (unpainted)FALSEFALSEFALSE50%000n/a
MetalsFALSEFALSEFALSE50%000n/a
Painted wood, drywall, or plywoodFALSEFALSEFALSE50%000n/a
Reusable itemsFALSEFALSEFALSE50%000n/a
RoofingFALSEFALSEFALSE50%000n/a
Soil, Rock, Land Clearing DebrisFALSEFALSEFALSE50%000n/a
Wood (unpainted)FALSEFALSEFALSE50%000n/a
Other: ____________________FALSEFALSEFALSE50%000n/a
Other: ____________________FALSEFALSEFALSE50%000n/a
Other: ____________________FALSEFALSEFALSE50%000n/a
Total**:000n/a
Reuse is encouraged. Please list any items such as cabinets, doors, shelves, bricks, framing lumber, siding, fill material, misc. millwork, etc. planned for reuse.
ItemReuse OnsiteReuse OffsiteOff-Site Recipient or Salvage/ Deconstruction Company
Volume-to-Weight Conversion Factor Reference Table
If a hauler reports materials by volume, this table enables conversion to weight, for reporting actual diversion and disposal.
Asphalt paving: 1 cubic yard = 773 lbsDirt or sand: 1 cubic yard = 929 lbs
Asphalt or composite roof shingles: 1 cubic yard = 731 lbsFiberglass insulation, loose: 1 cubic yard = 17 lbs
Brick, laid flat: 1 flat square foot = 20 lbsMixed (composite) C&D material: 1 cubic yard = 417 lbs
Brick, loose: 1 cubic yard = 3,200 lbs. (1 cubic foot = 120 lbs)Sheetrock (drywall), loose: 1 cubic yard = 393.5 lbs
Ceramic tile, scrap, loose: 1 cubic yard = 1,214 lbsRock, crushed: 1 cubic yard = 2,570 lbs
Concrete: 1 cubic yard = 860 lbsWood: 1 cubic yard = 169 lbs
*Only non-hazardous materials need to be included in this document. C&D mandates governing GSA exclude hazardous materials such as asbestos or lead-containing paint.
**At substantial completion, the final number of (a) diverted tons, and (b) total non-hazardous C&D material tons must be reported via the ePMXpress Project Detail tab. ePMXpress powers GSA's tracking metrics.

Report 1

Project Waste Management Report
Report #1Report Date
Project Name:0Building #0
Service Center / Field Office0ePM/ePMX Project #0
Project Manager0RWA #0

If waste from other projects is included in these figures, specify project:

Actual Waste Diversion Report
Diverted WasteWaste not DivertedDiversion Rate
MaterialMaterial destination/ hauling vendor(s)*Method of DiversionDiverted (lbs)Landfill (lbs)Reason Not Diverted
AsphaltN/An/a
Brick, Masonry, and TileN/An/a
CardboardN/An/a
Carpet, including PaddingN/An/a
Ceiling tileN/An/a
ConcreteN/An/a
Drywall/ sheetrock (unpainted)N/An/a
MetalsN/An/a
Painted wood, drywall, or plywoodN/An/a
Reusable itemsN/An/a
RoofingN/An/a
Soil, Rock, Land Clearing DebrisN/An/a
Wood (unpainted)N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Total**:00n/a

Certification by Firm

I, _________________________________ [name of certifier], am an officer or employee responsible for the performance of this contract and hereby certify that the waste amounts and total percentage stated on this report are true and correct to the best of my knowledge.

____________________________________________________________________________________________________
SignatureDate
____________________________________________________________________________________________________
Title of the Officer or EmployeeName of Company, Firm, or Organization
*This Waste Diversion Report or any manifests/ receipts from haulers, recyclers, processors, or landfills should be retained and available for review at project close-out.
**At substantial completion, the final number of (a) diverted tons, and (b) total non-hazardous C&D material tons must be reported via the ePMXpress Project Detail tab. ePMXpress powers GSA's tracking metrics.

Report 2

Project Waste Management Report
Report #1Report Date
Project Name:0Building #0
Service Center / Field Office0ePM/ePMX Project #0
Project Manager0RWA #0

If waste from other projects is included in these figures, specify project:

Actual Waste Diversion Report
Diverted WasteWaste not DivertedDiversion Rate
MaterialMaterial destination/ hauling vendor(s)*Method of DiversionDiverted (lbs)Landfill (lbs)Reason Not Diverted
AsphaltN/An/a
Brick, Masonry, and TileN/An/a
CardboardN/An/a
Carpet, including PaddingN/An/a
Ceiling tileN/An/a
ConcreteN/An/a
Drywall/ sheetrock (unpainted)N/An/a
MetalsN/An/a
Painted wood, drywall, or plywoodN/An/a
Reusable itemsN/An/a
RoofingN/An/a
Soil, Rock, Land Clearing DebrisN/An/a
Wood (unpainted)N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Total**:00n/a

Certification by Firm

I, _________________________________ [name of certifier], am an officer or employee responsible for the performance of this contract and hereby certify that the waste amounts and total percentage stated on this report are true and correct to the best of my knowledge.

____________________________________________________________________________________________________
SignatureDate
____________________________________________________________________________________________________
Title of the Officer or EmployeeName of Company, Firm, or Organization
*This Waste Diversion Report or any manifests/ receipts from haulers, recyclers, processors, or landfills should be retained and available for review at project close-out.
**At substantial completion, the final number of (a) diverted tons, and (b) total non-hazardous C&D material tons must be reported via the ePMXpress Project Detail tab. ePMXpress powers GSA's tracking metrics.

Report 3

Project Waste Management Report
Report #1Report Date
Project Name:0Building #0
Service Center / Field Office0ePM/ePMX Project #0
Project Manager0RWA #0

If waste from other projects is included in these figures, specify project:

Actual Waste Diversion Report
Diverted WasteWaste not DivertedDiversion Rate
MaterialMaterial destination/ hauling vendor(s)*Method of DiversionDiverted (lbs)Landfill (lbs)Reason Not Diverted
AsphaltN/An/a
Brick, Masonry, and TileN/An/a
CardboardN/An/a
Carpet, including PaddingN/An/a
Ceiling tileN/An/a
ConcreteN/An/a
Drywall/ sheetrock (unpainted)N/An/a
MetalsN/An/a
Painted wood, drywall, or plywoodN/An/a
Reusable itemsN/An/a
RoofingN/An/a
Soil, Rock, Land Clearing DebrisN/An/a
Wood (unpainted)N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Total**:00n/a

Certification by Firm

I, _________________________________ [name of certifier], am an officer or employee responsible for the performance of this contract and hereby certify that the waste amounts and total percentage stated on this report are true and correct to the best of my knowledge.

____________________________________________________________________________________________________
SignatureDate
____________________________________________________________________________________________________
Title of the Officer or EmployeeName of Company, Firm, or Organization
*This Waste Diversion Report or any manifests/ receipts from haulers, recyclers, processors, or landfills should be retained and available for review at project close-out.
**At substantial completion, the final number of (a) diverted tons, and (b) total non-hazardous C&D material tons must be reported via the ePMXpress Project Detail tab. ePMXpress powers GSA's tracking metrics.

Report 4

Project Waste Management Report
Report #1Report Date
Project Name:0Building #0
Service Center / Field Office0ePM/ePMX Project #0
Project Manager0RWA #0

If waste from other projects is included in these figures, specify project:

Actual Waste Diversion Report
Diverted WasteWaste not DivertedDiversion Rate
MaterialMaterial destination/ hauling vendor(s)*Method of DiversionDiverted (lbs)Landfill (lbs)Reason Not Diverted
AsphaltN/An/a
Brick, Masonry, and TileN/An/a
CardboardN/An/a
Carpet, including PaddingN/An/a
Ceiling tileN/An/a
ConcreteN/An/a
Drywall/ sheetrock (unpainted)N/An/a
MetalsN/An/a
Painted wood, drywall, or plywoodN/An/a
Reusable itemsN/An/a
RoofingN/An/a
Soil, Rock, Land Clearing DebrisN/An/a
Wood (unpainted)N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Total**:00n/a

Certification by Firm

I, _________________________________ [name of certifier], am an officer or employee responsible for the performance of this contract and hereby certify that the waste amounts and total percentage stated on this report are true and correct to the best of my knowledge.

____________________________________________________________________________________________________
SignatureDate
____________________________________________________________________________________________________
Title of the Officer or EmployeeName of Company, Firm, or Organization
*This Waste Diversion Report or any manifests/ receipts from haulers, recyclers, processors, or landfills should be retained and available for review at project close-out.
**At substantial completion, the final number of (a) diverted tons, and (b) total non-hazardous C&D material tons must be reported via the ePMXpress Project Detail tab. ePMXpress powers GSA's tracking metrics.

Report 5

Project Waste Management Report
Report #1Report Date
Project Name:0Building #0
Service Center / Field Office0ePM/ePMX Project #0
Project Manager0RWA #0

If waste from other projects is included in these figures, specify project:

Actual Waste Diversion Report
Diverted WasteWaste not DivertedDiversion Rate
MaterialMaterial destination/ hauling vendor(s)*Method of DiversionDiverted (lbs)Landfill (lbs)Reason Not Diverted
AsphaltN/An/a
Brick, Masonry, and TileN/An/a
CardboardN/An/a
Carpet, including PaddingN/An/a
Ceiling tileN/An/a
ConcreteN/An/a
Drywall/ sheetrock (unpainted)N/An/a
MetalsN/An/a
Painted wood, drywall, or plywoodN/An/a
Reusable itemsN/An/a
RoofingN/An/a
Soil, Rock, Land Clearing DebrisN/An/a
Wood (unpainted)N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Total**:00n/a

Certification by Firm

I, _________________________________ [name of certifier], am an officer or employee responsible for the performance of this contract and hereby certify that the waste amounts and total percentage stated on this report are true and correct to the best of my knowledge.

____________________________________________________________________________________________________
SignatureDate
____________________________________________________________________________________________________
Title of the Officer or EmployeeName of Company, Firm, or Organization
*This Waste Diversion Report or any manifests/ receipts from haulers, recyclers, processors, or landfills should be retained and available for review at project close-out.
**At substantial completion, the final number of (a) diverted tons, and (b) total non-hazardous C&D material tons must be reported via the ePMXpress Project Detail tab. ePMXpress powers GSA's tracking metrics.

Report 6

Project Waste Management Report
Report #1Report Date
Project Name:0Building #0
Service Center / Field Office0ePM/ePMX Project #0
Project Manager0RWA #0

If waste from other projects is included in these figures, specify project:

Actual Waste Diversion Report
Diverted WasteWaste not DivertedDiversion Rate
MaterialMaterial destination/ hauling vendor(s)*Method of DiversionDiverted (lbs)Landfill (lbs)Reason Not Diverted
AsphaltN/An/a
Brick, Masonry, and TileN/An/a
CardboardN/An/a
Carpet, including PaddingN/An/a
Ceiling tileN/An/a
ConcreteN/An/a
Drywall/ sheetrock (unpainted)N/An/a
MetalsN/An/a
Painted wood, drywall, or plywoodN/An/a
Reusable itemsN/An/a
RoofingN/An/a
Soil, Rock, Land Clearing DebrisN/An/a
Wood (unpainted)N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Total**:00n/a

Certification by Firm

I, _________________________________ [name of certifier], am an officer or employee responsible for the performance of this contract and hereby certify that the waste amounts and total percentage stated on this report are true and correct to the best of my knowledge.

____________________________________________________________________________________________________
SignatureDate
____________________________________________________________________________________________________
Title of the Officer or EmployeeName of Company, Firm, or Organization
*This Waste Diversion Report or any manifests/ receipts from haulers, recyclers, processors, or landfills should be retained and available for review at project close-out.
**At substantial completion, the final number of (a) diverted tons, and (b) total non-hazardous C&D material tons must be reported via the ePMXpress Project Detail tab. ePMXpress powers GSA's tracking metrics.

Report 7

Project Waste Management Report
Report #1Report Date
Project Name:0Building #0
Service Center / Field Office0ePM/ePMX Project #0
Project Manager0RWA #0

If waste from other projects is included in these figures, specify project:

Actual Waste Diversion Report
Diverted WasteWaste not DivertedDiversion Rate
MaterialMaterial destination/ hauling vendor(s)*Method of DiversionDiverted (lbs)Landfill (lbs)Reason Not Diverted
AsphaltN/An/a
Brick, Masonry, and TileN/An/a
CardboardN/An/a
Carpet, including PaddingN/An/a
Ceiling tileN/An/a
ConcreteN/An/a
Drywall/ sheetrock (unpainted)N/An/a
MetalsN/An/a
Painted wood, drywall, or plywoodN/An/a
Reusable itemsN/An/a
RoofingN/An/a
Soil, Rock, Land Clearing DebrisN/An/a
Wood (unpainted)N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Total**:00n/a

Certification by Firm

I, _________________________________ [name of certifier], am an officer or employee responsible for the performance of this contract and hereby certify that the waste amounts and total percentage stated on this report are true and correct to the best of my knowledge.

____________________________________________________________________________________________________
SignatureDate
____________________________________________________________________________________________________
Title of the Officer or EmployeeName of Company, Firm, or Organization
*This Waste Diversion Report or any manifests/ receipts from haulers, recyclers, processors, or landfills should be retained and available for review at project close-out.
**At substantial completion, the final number of (a) diverted tons, and (b) total non-hazardous C&D material tons must be reported via the ePMXpress Project Detail tab. ePMXpress powers GSA's tracking metrics.

Report 8

Project Waste Management Report
Report #1Report Date
Project Name:0Building #0
Service Center / Field Office0ePM/ePMX Project #0
Project Manager0RWA #0

If waste from other projects is included in these figures, specify project:

Actual Waste Diversion Report
Diverted WasteWaste not DivertedDiversion Rate
MaterialMaterial destination/ hauling vendor(s)*Method of DiversionDiverted (lbs)Landfill (lbs)Reason Not Diverted
AsphaltN/An/a
Brick, Masonry, and TileN/An/a
CardboardN/An/a
Carpet, including PaddingN/An/a
Ceiling tileN/An/a
ConcreteN/An/a
Drywall/ sheetrock (unpainted)N/An/a
MetalsN/An/a
Painted wood, drywall, or plywoodN/An/a
Reusable itemsN/An/a
RoofingN/An/a
Soil, Rock, Land Clearing DebrisN/An/a
Wood (unpainted)N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Total**:00n/a

Certification by Firm

I, _________________________________ [name of certifier], am an officer or employee responsible for the performance of this contract and hereby certify that the waste amounts and total percentage stated on this report are true and correct to the best of my knowledge.

____________________________________________________________________________________________________
SignatureDate
____________________________________________________________________________________________________
Title of the Officer or EmployeeName of Company, Firm, or Organization
*This Waste Diversion Report or any manifests/ receipts from haulers, recyclers, processors, or landfills should be retained and available for review at project close-out.
**At substantial completion, the final number of (a) diverted tons, and (b) total non-hazardous C&D material tons must be reported via the ePMXpress Project Detail tab. ePMXpress powers GSA's tracking metrics.

Report 9

Project Waste Management Report
Report #1Report Date
Project Name:0Building #0
Service Center / Field Office0ePM/ePMX Project #0
Project Manager0RWA #0

If waste from other projects is included in these figures, specify project:

Actual Waste Diversion Report
Diverted WasteWaste not DivertedDiversion Rate
MaterialMaterial destination/ hauling vendor(s)*Method of DiversionDiverted (lbs)Landfill (lbs)Reason Not Diverted
AsphaltN/An/a
Brick, Masonry, and TileN/An/a
CardboardN/An/a
Carpet, including PaddingN/An/a
Ceiling tileN/An/a
ConcreteN/An/a
Drywall/ sheetrock (unpainted)N/An/a
MetalsN/An/a
Painted wood, drywall, or plywoodN/An/a
Reusable itemsN/An/a
RoofingN/An/a
Soil, Rock, Land Clearing DebrisN/An/a
Wood (unpainted)N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Total**:00n/a

Certification by Firm

I, _________________________________ [name of certifier], am an officer or employee responsible for the performance of this contract and hereby certify that the waste amounts and total percentage stated on this report are true and correct to the best of my knowledge.

____________________________________________________________________________________________________
SignatureDate
____________________________________________________________________________________________________
Title of the Officer or EmployeeName of Company, Firm, or Organization
*This Waste Diversion Report or any manifests/ receipts from haulers, recyclers, processors, or landfills should be retained and available for review at project close-out.
**At substantial completion, the final number of (a) diverted tons, and (b) total non-hazardous C&D material tons must be reported via the ePMXpress Project Detail tab. ePMXpress powers GSA's tracking metrics.

Report 10

Project Waste Management Report
Report #1Report Date
Project Name:0Building #0
Service Center / Field Office0ePM/ePMX Project #0
Project Manager0RWA #0

If waste from other projects is included in these figures, specify project:

Actual Waste Diversion Report
Diverted WasteWaste not DivertedDiversion Rate
MaterialMaterial destination/ hauling vendor(s)*Method of DiversionDiverted (lbs)Landfill (lbs)Reason Not Diverted
AsphaltN/An/a
Brick, Masonry, and TileN/An/a
CardboardN/An/a
Carpet, including PaddingN/An/a
Ceiling tileN/An/a
ConcreteN/An/a
Drywall/ sheetrock (unpainted)N/An/a
MetalsN/An/a
Painted wood, drywall, or plywoodN/An/a
Reusable itemsN/An/a
RoofingN/An/a
Soil, Rock, Land Clearing DebrisN/An/a
Wood (unpainted)N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Total**:00n/a

Certification by Firm

I, _________________________________ [name of certifier], am an officer or employee responsible for the performance of this contract and hereby certify that the waste amounts and total percentage stated on this report are true and correct to the best of my knowledge.

____________________________________________________________________________________________________
SignatureDate
____________________________________________________________________________________________________
Title of the Officer or EmployeeName of Company, Firm, or Organization
*This Waste Diversion Report or any manifests/ receipts from haulers, recyclers, processors, or landfills should be retained and available for review at project close-out.
**At substantial completion, the final number of (a) diverted tons, and (b) total non-hazardous C&D material tons must be reported via the ePMXpress Project Detail tab. ePMXpress powers GSA's tracking metrics.

Report 11

Project Waste Management Report
Report #1Report Date
Project Name:0Building #0
Service Center / Field Office0ePM/ePMX Project #0
Project Manager0RWA #0

If waste from other projects is included in these figures, specify project:

Actual Waste Diversion Report
Diverted WasteWaste not DivertedDiversion Rate
MaterialMaterial destination/ hauling vendor(s)*Method of DiversionDiverted (lbs)Landfill (lbs)Reason Not Diverted
AsphaltN/An/a
Brick, Masonry, and TileN/An/a
CardboardN/An/a
Carpet, including PaddingN/An/a
Ceiling tileN/An/a
ConcreteN/An/a
Drywall/ sheetrock (unpainted)N/An/a
MetalsN/An/a
Painted wood, drywall, or plywoodN/An/a
Reusable itemsN/An/a
RoofingN/An/a
Soil, Rock, Land Clearing DebrisN/An/a
Wood (unpainted)N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Total**:00n/a

Certification by Firm

I, _________________________________ [name of certifier], am an officer or employee responsible for the performance of this contract and hereby certify that the waste amounts and total percentage stated on this report are true and correct to the best of my knowledge.

____________________________________________________________________________________________________
SignatureDate
____________________________________________________________________________________________________
Title of the Officer or EmployeeName of Company, Firm, or Organization
*This Waste Diversion Report or any manifests/ receipts from haulers, recyclers, processors, or landfills should be retained and available for review at project close-out.
**At substantial completion, the final number of (a) diverted tons, and (b) total non-hazardous C&D material tons must be reported via the ePMXpress Project Detail tab. ePMXpress powers GSA's tracking metrics.

Report 12

Project Waste Management Report
Report #1Report Date
Project Name:0Building #0
Service Center / Field Office0ePM/ePMX Project #0
Project Manager0RWA #0

If waste from other projects is included in these figures, specify project:

Actual Waste Diversion Report
Diverted WasteWaste not DivertedDiversion Rate
MaterialMaterial destination/ hauling vendor(s)*Method of DiversionDiverted (lbs)Landfill (lbs)Reason Not Diverted
AsphaltN/An/a
Brick, Masonry, and TileN/An/a
CardboardN/An/a
Carpet, including PaddingN/An/a
Ceiling tileN/An/a
ConcreteN/An/a
Drywall/ sheetrock (unpainted)N/An/a
MetalsN/An/a
Painted wood, drywall, or plywoodN/An/a
Reusable itemsN/An/a
RoofingN/An/a
Soil, Rock, Land Clearing DebrisN/An/a
Wood (unpainted)N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Other: ____________________N/An/a
Total**:00n/a

Certification by Firm

I, _________________________________ [name of certifier], am an officer or employee responsible for the performance of this contract and hereby certify that the waste amounts and total percentage stated on this report are true and correct to the best of my knowledge.

____________________________________________________________________________________________________
SignatureDate
____________________________________________________________________________________________________
Title of the Officer or EmployeeName of Company, Firm, or Organization
*This Waste Diversion Report or any manifests/ receipts from haulers, recyclers, processors, or landfills should be retained and available for review at project close-out.
**At substantial completion, the final number of (a) diverted tons, and (b) total non-hazardous C&D material tons must be reported via the ePMXpress Project Detail tab. ePMXpress powers GSA's tracking metrics.