This document is Section L of a Request for Proposal (RFP) containing proposal preparation instructions for an Asbestos Abatement Service contract with the U.S. Air Force. The Government anticipates awarding a single Firm Fixed Price (FFP) Indefinite Delivery/Indefinite Quantity (IDIQ) contract with a five-year period of performance and potential six-month option, with task orders awarded for each specific job. Funding will be obligated on each task order awarded. The Government reserves the right to award no contract if deemed not in its best interest and will not be liable for costs incurred by offerors. The Government may award without discussions; therefore, offerors must submit their best pricing and terms initially, though discussions may be held if determined beneficial.

Proposals must be submitted electronically in Adobe PDF, Microsoft Word, Excel, or PowerPoint format compatible with Microsoft operating systems to Tony Tran (Contracting Specialist, Tony.Tran.7@us.af.mil) and Steven Nattress (Contracting Officer, Steven.Nattress@us.af.mil) by the proposal closing deadline. The award will be made to the contractor with a technically acceptable proposal, favorable past performance, and lowest price. Proposals must include three volumes: Volume I (Technical Proposal with mandatory Statement of Qualifications demonstrating Hill Air Force Base qualification), Volume II (Price Proposal with completed SF 1442 blocks 14-20c and unit prices on Supplemental Schedule B posted on Beta.sam.gov with Davis-Bacon Wage Determination), and Volume III (Past Performance Information on provided sheets). Volume I qualifications include insurance with $1 Million minimum aggregate bond capacity from A.M. Best "A" rated surety; employee medical certifications for asbestos and lead work; respiratory protection programs; air sampling protocols; equipment lists with HEPA documentation; NIOSH-approved respirators; Independent Third-Party Industrial Hygienist qualifications; fit-tested employees; Utah Division of Air Quality certifications for asbestos and lead abatement; air monitoring data from previous projects; prior contract history; regulatory compliance documentation; disclosure of terminated projects, contractual penalties, enforcement actions, and legal proceedings within the past two years. All submitted information is subject to Government confirmation, and any false information results in immediate disqualification. The contracting officer has determined adequate price competition exists and will not require cost certification under FAR 15.406-2 unless that determination changes during evaluation.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section L - Instructions, Conditions and Notices to Bidders

ASBESTOS ABATEMENT SOURCE SELECTION

18 May 2026 PROPOSAL PREPARATION INSTRUCTIONS

A. The Government anticipates awarding a single Firm Fixed Price (FFP) contract for the Asbestos Abatement program. The Government reserves the right to award no contract if the Source Selection Authority (SSA) determines it is in the Government's best interest. The SSA will consider the Government's expected volume of work, available funding, adequate competition, and the availability of best value proposals. If the Government determines not to award a contract, the Government will not be liable for costs incurred by Offeror(s) in connection with any response to this Request for Proposal (RFP). The Government intends and reserves the right to award a contract without discussion(s);

therefore, it is imperative Offerors submit their best pricing and proposal terms initially. However, if during the evaluation period it is determined to be in the best interest of the Government to hold discussion(s), Offeror responses to Evaluation Notices (ENs) and the Final Proposal Revision (FPR) will be considered in making the source selection decision. The basic contract will cover a five-year period of performance (with the potential to exercise a 6-month option) and task orders will be awarded for each specific job.

B. Funding will be obligated on each task order awarded under the basic contract.

C. To ensure timely and equitable evaluation of proposals, offerors must follow the instructions contained herein. Offerors are required to meet all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements. Failure to meet a requirement may result in an offer being ineligible for award. Offerors must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale.

Proposal shall be submitted in electronic format copy (1). Electronic copies must be submitted in Adobe PDF, Microsoft Word, Microsoft Excel, or Microsoft Power Point format. Electronic formats shall be compatible with a Microsoft operating system.

D. The contractor with a technically acceptable proposal, a favorable past performance, and who is the lowest price will be awarded the basic IDIQ and this task order. Proposal must be submitted prior to the time set for proposal closing to:

Tony Tran (Senior Airmen) Contracting Specialist Tony.Tran.7@us.af.mil

AND

Steven Nattress Contracting Officer Steven.Nattress@us.af.mil

E. The contracting officer has determined there is a high probability of adequate price competition in this acquisition. Upon examination of the initial offers, the contracting officer will review this determination and if, in the contracting officer’s opinion, adequate price competition exists, no additional cost information will be requested and certification under FAR 15.406-2 will not be required.

However, if at any time during this competition, the contracting officer determines that adequate price competition no longer exists, offerors may be required to submit information to the extent necessary for the contracting officer to determine the reasonableness of the price.

F. Specific Instructions – The offeror shall submit the following volumes of material. A complete proposal mailto:Tony.Tran.7@us.af.mil mailto:Steven.Nattress@us.af.mil consists of three separate volumes:

1. Volume I – Technical Proposal

**QUALIFICATION: QUALIFIED ON HILL AIR FORCE BASE TO ACCOMPLISH THIS WORK**

Contractors must submit their Statement of Qualifications (SOQ) as described in the below “Asbestos/Lead Based Paint (LBP) Abatement Contract Qualification Requirements.”

ASBESTOS/LEAD BASED PAINT (LBP) ABATEMENT CONTRACTOR QUALIFICATION REQUIREMENTS

PART 1: INSURANCE

1.1 The contractor will provide proof of insurance to handle asbestos-containing materials/LBP. The contractor will submit a prequalification letter from an A.M. Best “A” rated surety (not a bonding agent), that verified your bonding relationship and shows a minimum aggregate bond capacity of $1 Million for this IDIQ contract. The letter should also identify a single project bond amount.

PART 2: SUBMITTAL REQUIREMENTS

The following information must be submitted for prequalification in sequential order:

2.1 To be found acceptable the contractor must provide a list of employees by date of last exams, who are medically qualified to work with asbestos (29 CFR 1926.1101) and Lead (29 CFR 1926.62). Include examiner’s name, signature, medical qualifications and place of employment. At least 50% of the employees must be current at time of submittal. 100% of employees must show current medical qualification documents at the beginning of each abatement job.

2.2 To be found acceptable the contractor must provide a list of contractors’ respiratory protection program (29 CFR 1926.1101, 29 CFR 1926.62, EPA Publication 560/5-85-024, Utah Division of Air Quality R307-801).

2.3 To be found acceptable the contractor must provide a list air sampling protocol used to support sampling requirements found in 29 CFR 1926.1101, 29CFR 1926.62, and Utah Division of Air Quality R307-801.

2.4 To be found acceptable the contractor must provide a list of equipment to be used for asbestos/LBP work under this contract. Examples of equipment include negative air machines (with maintenance logs/High Efficiency Particulate Air (HEPA) filter documentation), scaffolding, decontamination facilities, disposable clothing, air pressure differential measuring devices (with proof of annual calibration), HEPA vacuums, etc. Copy of manufacturers’ certification of HEPA filter for vacuum. (EPA Publication 560/5-85- 024).

2.5 To be found acceptable the contractor must provide a list of National Institute for Occupational Safety and Health (NIOSH)-approved respirators to be used on site by employees. Include NIOSH approval numbers and proof of approval (29 CFR 1926.1101, 29 CFR 1926.62, EPA Publication 560/5-85- 024).

2.6 To be found acceptable the contractor must provide qualifications of the Independent Third-Party Industrial Hygienist (IH) who will oversee the project to include certification date, college degrees, years of experience, and any other qualifications to perform this work. It is recommended the IH overseeing the project be an American Board of Industrial Hygiene-Certified Industrial Hygienist or college graduate with at least eight years of work-related experience. The third-party on-site monitor must have current Utah Division of Air Quality Contractor/Supervisor Certification. If more than one IH consultant is used, list those who may oversee the asbestos/LBP work.

2.7 To be found acceptable the contractor must provide a list of employees fit tested for respirator use in accordance with 29 CFR 1926.1101, 29 CFR 1926.62. List these employees by date and respirator.

Include proof of employee fit testing and the name and qualifications of the fit tester. At least 50% of the employees must be current (i.e., WITHIN 6 MONTHS) at the time of submittal. 100% of employees must show current fit test documents at the beginning of each abatement job.

2.8 To be found acceptable the contractor must provide Asbestos – Proof of at least one-year minimum work experience in Utah as a Utah Division of Air Quality certified asbestos abatement company.

Provide a current list of employees who have received training in accordance with 29 CFR 1926.1101 and EPA Publication560/5-85-024. Proof of Utah Division of Air Quality certification is required for all asbestos work categories. Include proof of training (i.e. written certification of completion) from a nationally recognized EPA asbestos training course for each employee. At least 100% of the employees shall be currently certified at the time of submittal. All workers, contractors/supervisors, project designers must show current Utah Division of Air Quality certification documents before the beginning of each abatement job.

2.9 To be found acceptable the contractor must provide Lead – Proof of at least one-year minimum work experience in Utah as a Utah Division of Air Quality certified lead abatement company. Provide proof of employee training (i.e., written certification of completion) from an EPA approved course of each employee. All workers, contractors/supervisors must show current Utah Division of Air Quality certification documents before the beginning of each abatement job.

2.10 To be found acceptable the contractor must provide copies of air monitoring data taken during and after abatement from previous projects completed by contract (not to exceed five projects). (29 CFR 1926.1101, EPA Publication 560/5-85-024).

2.11 To be found acceptable the contractor must provide a list of prior asbestos abatement contracts performed during the past two years. Include the names, addresses, telephone numbers, and dates of the projects performed. (EPA Publication560/5-85-024).

2.12 To be found acceptable the contractor must provide additional information to adequately show compliance with applicable laws and regulations in the following areas:

A. Medical certification B. NIOSH Analytical Lab Certification (independent lab) C. Disposal of waste D. Department of Transportation transport of asbestos waste E. Cleanup procedures

2.13 To be found acceptable the contractor must provide a list of any asbestos/LBP abatement projects including those of any corporation, limited liability company, partnership, or sole proprietorship of which any director, officer, or agent of the contractor now making application was a director officer, partner, or agent, to have been prematurely terminated. Include the circumstances surrounding the termination. (EPA Publication 560/5-85-024).

2.14 To be found acceptable the contractor must provide a list of any contractual penalties within the past two years including those of any corporation, limited liability company, partnership, or sole proprietorship of which any director, officer, or agent of the contractor now making application was a direct, officer, partner, or agent, whom the contractor has paid for breach or noncompliance with contract specifications. (EPA Publication 560/5-024).

2.15 To be found acceptable the contractor must provide a list any enforcement action levied by any Federal, State or local government agencies against the contractor for violations related to asbestos/LBP within the past two years including those of any corporation, Limited Liability Company, partnership, or sole proprietorship of which any director, officer, or agent of the contractor now making application was a director, officer, partner, or agent. The citations will be identified by contractor including the name of location of the project, the date(s) and how the allegations were resolved. (EPA Publication560/5-024).

2.16 To be found acceptable the contractor must provide a description of all legal proceedings, lawsuits, or claims which have been filed or levied against the contractor or any of his past or present employees for asbestos/LBP related activities within the past two years including those of any corporation limited liability company, partnership, or sole proprietorship of which any director, officer, or agent of the contract now making application was a director, officer, partner, or agent. (EPA Publication 560/5-85- 024).

ALL INFORMATION SUBMITTED IS SUBJECT TO CONFIRMATION BY GOVERNMENT. ANY INFORMATION

FOUND TO BE FALSE WILL BE GROUNDS FOR IMMEDIATE DISQUALIFICATION OF CONTRACTOR.

**THESE ARE PREQUALIFICATIONS FOR THIS REQUIREMENT AND MUST BE SUBMITTED

WITH YOUR PROPOSAL. ANY PROPOSAL RECEIVED WITHOUT THESE QUALIFICATIONS

WILL BE CONSIDERED INELIGIBLE FOR THIS AWARD.**

2. VOLUME II – PRICE PROPOSAL Submit (1) copy electronically

a. Complete blocks 14-20c of the RFP Section A, SF 1442. In doing so the offeror accedes to the contract terms and conditions as written in the RFP Sections A through K. These actions constitute the model contract.

b. Complete the necessary fill-ins and certifications in Sections I through K. Section K shall be returned in its entirety. For Sections C through I, the offeror shall submit only those pages that require a fill-in.

c. Insert proposed unit prices in the attached Supplemental Schedule B – Price List on the excel spreadsheet posted on Beta.sam.gov for each location and the applicable Davis-Bacon Wage Determination. Quantities listed on the Supplemental Schedule B – Price List are estimates used for evaluation purposes only.

3. VOLUME III – Past Performance

a. Offerors may submit recent, relevant contracts as defined in Section M. The government will consider this information, along with information obtained from other sources (e.g.

www.cpars.gov, customer interviews, etc).

I. Offerors are encouraged to address any performance problems/issues that the Government may identify and explain corrective action taken and current status. The Government will consider this information in determining the offerors past performance rating.

II. An offeror’s failure to address performance problems/issues within this volume does not preclude the government from using such information in determining a past performance rating.

b. Offerors shall submit all Past Performance information on Past Performance Information Sheets (Section J Attachment).

Submitted volumes shall comply with the following:

Volume No. **

Volume Title Electronic Copy

Maximum Number of Pages

I Technical Proposal 1 NA II Price Proposal 1 NA III Past Performance 1 NA

*Offers must be submitted to tony.tran.7@us.af.mil (Contracting Specialist) & Steven.Nattress@us.af.mil (Contracting Officer) and via Sam.gov/.*

**Advanced Leave Notification for Aaron Parr (out of office 21 May – 22 August 2026). Please direct all questions related to Abatement Solicitation to Tony Tran and Steven Nattress.** mailto:tony.tran.7@us.af.mil mailto:Steven.Nattress@us.af.mil%20

File details come from the government source that posted it. Updated .