2. Schedule B 5.5 Year-Options (Fill-In).xlsx

XLSX spreadsheet 29 KB Posted

Attached to
ABATEMENT 2026-2031
Solicitation number
Abatement-2026-2031
Issued by

About this file

This is a pricing schedule template for an Indefinite-Delivery, Indefinite-Quantity (IDIQ) contract covering abatement, repair, remediation, and minor construction projects at Hill Air Force Base (HAFB) and associated sites in Utah and Wyoming for the period 2026-2031. The schedule is structured as a five-year base contract with an optional six-month extension and requires contractors to provide unit costs for all line items across multiple categories.

The schedule contains three primary line item groups: Line Item Group 1 encompasses removal and demolition services including asbestos-containing materials (ACM), lead-based paint (LBP), insulation, roofing materials, transite pipes, and general demolition work measured in linear feet, square feet, hours, or each; Line Item Group 2 covers replacement and restoration services including pipe insulation, ceiling tiles, flooring, paint repair, and door replacement; Line Item Group 3 includes support services and specialized work such as emergency response, scaffolding, air and clearance sampling, laboratory analysis, licensed professionals (electricians, plumbers, architects), containment systems, heavy equipment rental (lifts, excavators, generators), waste disposal, mobilization/demobilization, certified industrial hygienist services, project management, and general labor. Contractors must enter unit costs for all line items and apply annual escalation rates as percentages. The template automatically calculates yearly totals and contract totals, with all formulas to remain intact. Unit of measure abbreviations include linear feet (LF), square feet (SF), each (EA), hours (HR), days (DA), weeks (WK), square yards (SY), pounds (LB), and jobs (JB).

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2026-2031

Abatement IDIQ
Schedule
Year 1Year 2Year 3Year 4Year 56 Month Extension
Item #Item DescriptionUnitsAmountUnit costTotalsAmountUnit costTotalsAmountUnit costTotalsAmountUnit costTotalsAmountUnit costTotalsAmountUnit costTotals
EscalationEscalationEscalationEscalationEscalation
LINE ITEM GROUP 10%0%0%0%0%
A.REMOVE PIPE INSULATION LT 8" DIALF1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
B.REMOVE PIPE INSULATION GT 8" DIALF1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
C.PIPE FITTINGS LT 8" DIAEA1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
D.PIPE FITTINGS GT 8" DIAEA1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
E.PIPE SADDLES ANY DIAEA1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
F.REMOVE BOILER/TANK INSULATIONSF1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
G.REMOVE GASKET MATERIALLF1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
H.REMOVE DUCT INSULATIONSF1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
I.REMOVE VIBRATION COLLARLF1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
J.REMOVE ASBESTOS CEILING TILESF1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
K.REMOVE 12" ACCOUSTICAL TILESSF1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
L.REMOVE ACCOUSTICAL TILE ADHESIVESF1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
M.REMOVE HEAVY PAINTSF1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
N.REMOVE FIRE SPRAY ON FIREPRROFINGSF1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
O.REMOVE VINYL FLOOR TILESSF1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
P.REMOVE FLOOR TILE MASTIC/ADHESIVESF1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
Q.REMOVE SHEET VINYL FLOOR COVERINGSF1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
R.REMOVE SHEET VINYL FLOOR ADHESIVESF1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
S.REMOVE ROOF FLASHING LT 300'LF1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
T.REMOVE ROOF FLASHING GT 300'LF1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
U.REMOVE GALBESTOS PANELSSF1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
V.REMOVE TRANSITE PANELSSF1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
W.DECONTAMINATE SOIL UP TO 3"SF1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
X.REMOVE TRANSITE PIPE LT 12" DIALF1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
Y.REMOVE TRANSITE PIPE GT 12" DIALF1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
Z.DECONTAMINATE FINISHED AREASSF1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
AA.DECONTAMINATE HVAC DUCT WORKSF1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
BB.DECONTAMINATE CABLE AND CONDUITLF1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
CC.REMOVE CEILING TRACKLF1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
DDWET WIPE CEILING TRACKLF1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
EEREMOVE SUB-FLOORINGSF1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
FFLOCKDOWNSF1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
GGPRE-CLEAN TRANSITE ROOFINGSF1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
HHGLOVE BAG WITH NEGATIVE AIREA1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
IIREMOVE ACM LT 10' DIA - WRAP & CUTLF1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
JJREMOVE ACM GT 10' DIA - WRAP & CUTSF1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
KKREMOVE LBP/CHEMICAL STRIPPERSF1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
LLREMOVE LBP/MECHANICALSF1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
MMREMOVE LBP/WET SCRAPESF1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
NNREMOVE LBP COMPONENTSSF1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
OOCLEAN-UP HEAVY METALSSF1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
PPCLEAN-UP RODENT/PIGEON EXCREMENTSF1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
QQREMOVE MOLDSF1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
RRREMOVE FURNITURE/COMPONENTSHR1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
SSREMOVE ROLLED CARPET/SQUARESSF1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
TTDRYWALL DEMOLITIONSF1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
UULATH/PLASTER DEMOLITIONSF1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
VVBLOCK/BRICK DEMOLITIONSF1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
WWREMOVE ACM FUEL LINELF1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
XXREMOVE STEAM LINE RICKWELLLF1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
YYGENERAL DEMOLITIONHR1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
LINE ITEM GROUP 2
A.REPLACE PIPE INSULATION LT 8" DIALF1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
B.REPLACE PIPE INSULATION GT 8' DIALF1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
C.REPLACE PIPE FITTING INSULATION LT 8"EA1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
D.REPLACE PIPE FITTING INSULATION GT 8"EA1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
E.REPLACE PIPE SADDLES 3-8' DIAEA1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
F.REPLACE PIPE SADDLES GT 8" DIAEA1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
G.REPLACE BOILER/TANK INSULATIONSF1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
H.REPLACE DUCT INSULATIONSF1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
I.REPLACE BATT INSULATIONSF1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
J.REPLACE BATT INSULATION STICK PINSEA1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
K.REPLACE 2' X 2' CEILING TILESSF1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
L.REPLACE 2' X 4' CEILING TILESSF1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
M.REPLACE WOOD/PLYWOOD SUB-FLOORSF1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
N.CONSTRUCT TEMPORARY HARD WALLS/STRUCTURESSF1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
O.PROVIDE PLYWOOD/OSB SHEETINGEA1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
P.REPAIR PAINT DAMAGESF1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
Q.REPAIR/REPLACE FLOOR TILESF1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
R.REPAIR/REPLACE EPOXY FLOORINGSF1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
S.REPAIR/REPLACE LVPSY1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
T.REPAIR/REPLACE CARPETSY1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
U.REPAIR/REPLACE DOOREA1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
V.INSTALL MISC. LABELINGEA1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
LINE ITEM GROUP 3
A.EMERGENCY RESPONSEEA1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
B.SCAFFOLDING SIMPLE SETUPEA1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
C.SCAFFOLDING COMPLEX SETUPEA1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
D.ASBESTOS AIR SAMPLES (PERSONAL/BACKGROUND)EA1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
E.TAKE AIR CLEARANCE SAMPLESEA1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
F.LBP SAMPLES (PERSONNAL/BACKGROUND)EA1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
G.LBP CLEARANCE WIPE SAMPLESEA1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
H.HEAVY METAL SAMPLESEA1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
I.LAB ANALYSIS TEM TESTINGEA1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
J.LAB ANALYSIS PCM TESTINGEA1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
K.LAB ANALYSIS FOR LBPEA1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
L.LAB ANALYSIS FOR LBP WIPESEA1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
M.LAB ANALYSIS FOR HEAVY METALEA1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
N.TCLP LAB ANALYSISEA1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
O.LICENSED ELECTRICIANHR1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
P.LICENSED PLUMBERHR1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
Q.LICENSED ARCHITECURAL FIRMHR1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
R.3 STAGE DECON UNITEA1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
S.STANDARD SIZE CONTAINMENTEA1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
T.CONTAINMENT GT THAN STANDARDSF1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
U.CONTAINMENT ABOVE 20'SF1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
V.GENERATOR/COMPRESSORWK1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
W.BACKHOE/EXCAVATORWK1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
X.SCISSOR LIFT (ANY SIZE)DA1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
Y.SCISSOR LIFT (ANY SIZE)WK1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
Z.BOOM LIFT (ANY SIZE)DA1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
AA.BOOM LIFT (ANY SIZE)WK1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
BB.ISOLATED CONSTRUCTION DISPOSAL FEELB1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
CC.MOBILIZATION AND DEMOBILZATIONEA1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
DDCIH: CONSULTINGJB1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
EECIH: ON SITEDA1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
FFCIH: JOB SITE REP.DA1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
GGSUPERINTENDENT/PROJECT MANAGEMENTDA1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
HHGENERAL LABORHR1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
IIMOBILIZATION: Work at Little MountainDA1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
JJMOBILIZATION: Work at UTTR/Wendover/Boulder WYDA1$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 01$ - 0$ - 0
Yearly Total$ - 0Yearly Total$ - 0Yearly Total$ - 0Yearly Total$ - 0Yearly Total$ - 0Yearly Total$ -
Contract Total$ - 0
FOR OFFICIAL USE ONLYW/ 6 Month Extension$ - 0
NOTES to Contractors:
1. Contractor(s) shall enter a unit cost for every item (Column B) in the spreadsheet. The yearly totals should calculate automatically. **Please DO NOT delete any formulas and double‑check the totals update correctly.** 2. At the top of this excel sheet, contractors shall fill in yellow fields, this includes the yellow escalation box under the unit cost section. Enter your yearly escalation rate (as a percentage), which reflects your expected annual cost increase over the contract term.
Units Of Measure (UoM)
LF= Linear FooT
SF= Square Foot
EA= Each
HR=Hour
DA= Day
WK= Week
SY=Square Yard
LB- Pounds
JB- Job