Asbestos/Lead Based Paint Abatement Contractor Qualification Requirements
This document is an appendix outlining the prequalification requirements for asbestos and lead-based paint (LBP) abatement contractors at Hill Air Force Base, Utah. Contractors must comply with multiple federal and state regulations including 40 CFR 61 Subpart M, 29 CFR 1910 and 1926 standards for asbestos and lead exposure, Air Force Occupational Safety and Health Standard 48-8, and Utah Asbestos Rule R307-801.
Contractors must submit comprehensive prequalification documentation demonstrating regulatory compliance and technical capability. Required submissions include: employee medical qualification records with at least 50% current at submittal; respiratory protection programs; air sampling protocols; equipment lists with maintenance documentation and HEPA filter certifications; NIOSH-approved respirator specifications; qualifications of an American Board of Industrial Hygiene-certified or equivalent Industrial Hygienist to oversee projects; employee fit-test documentation with at least 50% current at submittal; proof of minimum one-year work experience within the past 12 months as a Utah Department of Air Quality (UDAQ)-certified abatement company; employee training certifications from EPA-approved courses; air monitoring data from previous projects; references from prior contracts within two years; disclosure of premature project terminations, contractual penalties, enforcement actions, and legal proceedings related to asbestos within two years; and proof of occurrence-type insurance providing up to $1,000,000 in coverage. All submitted information is subject to government verification, with false information resulting in immediate disqualification. Qualified contractors must requalify every two years, except IDIQ contractors qualified for the contract duration. Contractors must coordinate all abatement work through the 75 CES/CEOHA Abatement Shop and submit prequalification packages via email and hardcopy mail to the specified Hill Air Force Base address.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UNCLASSIFIED
HEADQUARTERS 75TH AIR BASE WING
Hill Air Force Base, Utah 84056-5206
April 2025
APPENDIX A: ASBESTOS / LEAD BASED PAINT (LBP) ABATEMENT CONTRACTOR
QUALIFICATION REQUIREMENTS
PART 1: REGULATORY COMPLIANCE
The contractor must comply with all applicable provisions of the following:
1.1 40 Code of Federal Regulations (CFR) 61 Subpart M (All notifications will be made to
UDAQ
1.2 29 CFR 19190.1001 (Asbestos) 29 CFR 1910.1025 (Lead)
1.3 Air Force Occupational Safety and Health AFOSH Standard 48-8
1.4 29 CFR 1926.1101 (Asbestos) 29 CFR 1926.62 (Lead)
1.5 Utah Asbestos Rule R307-801
PART 2: SUBMITTAL REQUIREMENTS
The following information must be submitted for prequalification in sequential order:
2.1 List of employees by date of last exams, who are medically qualified to work with asbestos (29 CFR 1926.1101). Include examiner’s name, signature, medical qualifications and place of employment. At least 50% of the employees must be current at time of submittal. 100% of employees must show current medical qualification documents at the beginning of each abatement job.
2.2 Contractor’s respiratory protection program (29 CFR 1926.1101, EPA Publication 560/5-85- 024).
2.3 Air sampling protocol used to support sampling requirement found in 29 CFR 1926.1101, 29
CFR 1926.62.
2.4 List of equipment to be used for asbestos/LBP work under this contract. Examples of equipment include negative air machines (with maintenance logs / High Efficiency Particulate Air [HEPA] filter documentation), scaffolding, decontamination facilities, disposable clothing, air pressure differential measuring devices (with proof of annual calibration), HEPA vacuums, etc., and copy of manufacturer certification of HEPA filter for vacuum (EPA Publication 560-5-85-024).
2.5 List of National Institute for Occupational Safety and Health (NIOSH)-approved respirators to be used on site by employees. Include NIOSH approval numbers and proof of approval (29 CFR 1926.1101, 29 CFR 1926.62, EPA Publication 560/5-85-024).
2.6 Qualifications of the Independent, Third-Party Industrial Hygienist (IH) who will oversee the project to include certification date, college, degrees, years of experience, and any other qualifications to perform this work. It is required that the IH overseeing the project be an American Board of Industrial Hygiene-Certified Industrial Hygienist or college graduate with at least four years of work-related experience. The third-party on-site monitor must have current UDAQ Contractor/Supervisor Certification. If more than one IH consultant is used, list those who may oversee the asbestos/LBP work.
2.7 List of employees fit-tested for respirator use in accordance with 29 CFR 1926.1101, 29 CFR
1926.62. List the employees by date and respirator. Include proof of employee fit testing and the name and qualifications of the fit tester. At least 50% of the employees must be
Hill Air Force Base, Utah 84056-5206
April 2025 current (i.e., WITHIN SIX MONTHS) at the time of submittal. 100% of employees must show current fit test documents at the beginning of each abatement job.
2.8 Asbestos – Proof of at least one year minimum work experience as a UDAQ-certified asbestos abatement company, work shall have taken place within the last 12 months. Provide a current list of employees who have received training in accordance with 29 CFR 1926.1101 and EPA Publication 560/5-85-024. Proof of UDAQ certification is required for all asbestos work categories. Include proof of training (i.e., written certification of completion) from a nationally recognized EPA asbestos training course for each employee. At least 100% of the employees submitted as having received training must be currently certified at the time of submittal. All workers, contractor/supervisors, project designers must show current UDAQ certification documents before the beginning of each abatement job.
2.9 Lead – Proof of at least one year minimum work experience in Utah as a UDAQ certified lead abatement company. Provide proof of employee training in accordance with 29 CFR
1926.62 (i.e., written certification of completion) from an EPA approved course for each employee. All workers, contractor/supervisors must show current UDAQ certification documents before the beginning of each abatement job.
2.10 Copies of air monitoring data taken during and after abatement from previous projects completed by contractor (not to exceed five projects) (29 CFR 1926.1101, EPA Publication 560/5-85-024).
2.11 List of prior asbestos abatement contracts performed during the past two years. Include the names, addresses, telephone numbers and dates the projects were performed (EPA Publication 560/5-85-024).
2.12 Additional information to adequately show compliance with applicable laws and regulations in the following areas:
o Medical certification o NIOSH Analytical Lab Certification (independent lab) o Disposal of waste o Department of Transportation transport of asbestos waste o Cleanup procedures
2.13 List of any asbestos/LBP abatement projects that have been prematurely terminated including those of any corporation, Limited Liability Company, partnership, or sole proprietorship of which any director, officer, or agent of the contractor now making application was a director, officer, partner, or agent. Include the circumstances surrounding the termination (EPA Publication 560/5-85-024).
2.14 List of any contractual penalties within the past two years including those of any corporation, limited liability company, partnership, or sole proprietorship of which any director, officer, or agent of the contractor now making application was a director, officer, partner, or agent, whom the contractor has paid for breach or noncompliance with contract specifications (EPA Publication 560/5-85-024).
2.15 List any enforcement action levied by any Federal, State or local government agencies against the contractor for violations related to asbestos within the past two years including those of any corporation, limited liability company, partnership, or sole proprietorship of which any director, officer, or agent of the contractor now making application was a director, officer, partner, or agent. The citations will be identified by contractor including the name
Hill Air Force Base, Utah 84056-5206
April 2025 and location of the project, the date(s) and how the allegations were resolved (EPA Publication 560/5-85-024).
2.16 Description of all legal proceedings, lawsuits or claims which have been filed or levied against the contractor or any of their past or present employees for asbestos related activities within the past two years including those of any corporation, limited liability company, partnership, or sole proprietorship of which any director, officer, or agent of the contractor now making application was a director, officer, partner, or agent (EPA Publication 560/5-85- 024).
PART 3: INSURANCE
3.1 The contractor will provide proof of insurance to work with asbestos-containing materials.
Insurance must be occurrence type and provide up to $1,000,000.00 in coverage.
ALL INFORMATION SUBMITTED IS SUBJECT TO CONFIRMATION BY GOVERNMENT
PERSONNEL. ANY INFORMATION FOUND TO BE FALSE WILL BE GROUNDS FOR
IMMEDIATE DISQUALIFICATION OF CONTRACTOR.
UPDATE/REQUALIFICATION OF ALL QUALIFIED CONTRACTORS IS REQUIRED EVERY
TWO YEARS WITH THE EXCEPTION OF IDIQ CONTRACTORS WHICH SHALL BE
QUALIFIED FOR THE DURATION OF THE CONTRACT. (The update will require that all qualified contractors show proof of compliance with the sections listed above.)
THE GOVERNMENT RESERVES THE RIGHT TO DISQUALIFY ANY ABATEMENT
CONTRACTOR FOR INTENTIONALLY REMOVING ASBESTOS/LBP MATERIALS IN
VIOLATION OF APPLICABLE REGULATIONS.
ABATEMENT CONTRACTORS ARE REQUIRED TO COORDINATE ALL ABATEMENT WORK
/ PROJECT DOCUMENTATION THROUGH THE 75 CES/CEOHA ABATEMENT SHOP.
(Issue date: 12 June 1997; updated 26 June 2023)
PLEASE EMAIL PREQUALIFICATION PACKAGE TO:
75CES.CEOHA.AbatementShop@us.af.mil
THEN PROCEED TO MAIL THE HARDCOPY PREQUALIFICATION PACKAGE TO:
DEPARTMENT OF THE AIR FORCE
75 CES/CEOHA
5713 Lahm Ln., Bldg. 593 S.
HILL AIR FORCE BASE, UT 84056-5300
ATTN: Abatement Shop Supervisor; telephone 801-586-7094
File details come from the government source that posted it. Updated .