This is a Selective Demolition specification section (024119) for the KRRD District Office HVAC Repair project at Sequoia National Forest. The specification establishes requirements for the selective demolition of the KRRD District Office HVAC system and associated utilities.

Key execution requirements include: recording existing conditions through digital preconstruction photographs; maximizing salvage and recycling of demolished materials through dismantling and material separation; protecting relics, antiques, commemorative plaques, and historical artifacts as USDA Forest Service property with prior architect notification and acceptance before removal; and removing and disposing of all other materials. Contractors must comply with applicable demolition codes and regulations, obtain required permits, prohibit explosives use, prevent catastrophic structure collapse, maintain temporary barriers and security devices, and minimize dust production without using water that causes ice, flooding, sedimentation, or pollution. Coordination with utility companies is mandatory with notification before work begins. Contractors must protect utilities remaining in service, mark them with highly visible identification tags, provide 7 days' notice before disrupting life safety systems and 3 days' notice before disrupting utility branches. Work cannot begin until receipt of notification to proceed from the USDA Forest Service Contracting Officer Representative (COR). Weekly debris removal and site cleanup are required, with spillage and wind-blown debris cleaned from public and private lands.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

KRRD HVAC Repair

Sequoia National Forest

SELECTIVE DEMOLITION 024119 – pg. 1

SECTION 024119 – SELECTIVE DEMOLITION

PART 1 – GENERAL

1.1 DESCRIPTION

A. Related Documents:

1. Drawings and general provisions of the Contract, including General and Supplementary

Conditions and Division 01, General Requirements, specification sections, apply to this section.

B. Section Includes:

1. Demolition of site elements and existing building elements, selective paving and underlayment and utilities.

2. Specific structures/site elements to be included:

a. Selective demolition – KRRD District Office HVAC and necessary associated systems.

1.2 RELATED SECTIONS

A. Comply with Division 01, General Requirements.

1.3 REFERENCE DOCUMENTS

A. Existing Design Documents

1.4 SUBMITTALS

A. General: Submit in conformance with Section 013300, Submittal Procedures.

1.5 PROJECT CONDITIONS

A. Minimize production of dust due to demolition operations. Do not use water if that will result in ice, flooding, sedimentation of public waterways or storm sewers, or other pollution.

PART 2 – PRODUCTS – Not Used

PART 3 – EXECUTION

3.1 EXAMINATION

A. Survey of Existing Conditions: Record conditions of existing buildings and site areas to be renovated by preconstruction photographs in digital format.

3.2 SCOPE

A. Demolished items shall be salvaged, relocated, or recycled where feasible.

B. Relics, antiques, and similar objects remain the property of USDA Forest Service. Notify the

Architect prior to removal and obtain acceptance regarding method of removal. Relics and antiques may include:

1. Commemorative plaques.

2. Discovered historical remains or artifacts.

C. Remove and dispose of all other materials.

SELECTIVE DEMOLITION 024119 – pg. 2

3.3 GENERAL PROCEDURES AND PROJECT CONDITIONS

A. Comply with applicable codes and regulations for demolition operations and safety of adjacent structures and the public.

1. Obtain required permits.

2. Use of explosives is not permitted.

3. Take precautions to prevent catastrophic or uncontrolled collapse of structures to be removed; do not allow worker or public access within range of potential collapse of unstable structures.

4. Provide, erect, and maintain temporary barriers and security devices to ensure safe passage of people around the demolition area.

5. Use physical barriers to prevent access to areas that could be hazardous to workers or government employees.

6. Conduct operations to minimize effects on and interference with adjacent structures and occupants.

7. Do not close or obstruct roadways or sidewalks without permission.

8. Conduct operations to minimize obstruction of public and private roads; do not obstruct required exits at any time; protect persons using entrances and exits from removal operations.

B. Do not begin removal until receipt of notification to proceed from USDA Forest Service COR.

C. Protect site elements that are not to be removed.

1. Provide bracing and shoring.

2. Prevent movement or settlement of adjacent structures.

3. Stop work immediately if adjacent structures appear to be in danger.

4. If elements shown to be protected are damaged, they are to be repaired to original condition or replaced.

5.

D. Perform demolition in a manner that maximizes salvage and recycling of materials.

1. Dismantle existing construction and separate materials.

2. Set aside reusable, recyclable, and salvageable materials; store and deliver to collection point or point of reuse.

3.4 EXISTING UTILITIES

A. Coordinate work with utility companies; notify before starting work and comply with their requirements; obtain required permits.

B. Protect existing utilities to remain from damage.

C. Do not disrupt public utilities without permit from authority having jurisdiction.

D. Do not close, shut off, or disrupt existing life safety systems that are in use without at least 7 days prior written notification to USDA Forest Service.

E. Do not close, shut off, or disrupt existing utility branches or take-offs that are in use without at least 3 days prior written notification to USDA Forest Service.

F. Locate and mark utilities to remain; mark using highly visible tags or flags, with identification of utility type; protect from damage due to subsequent construction, using substantial barricades if necessary.

G. Remove exposed piping, valves, meters, equipment, supports, and foundations of disconnected and abandoned utilities.

SELECTIVE DEMOLITION 024119 – pg. 3

3.5 DEBRIS AND WASTE REMOVAL

A. Remove and dispose debris, junk, and trash from site on at least a weekly basis.

B. Leave site in clean condition, ready for subsequent work.

C. Clean up spillage and wind-blown debris from public and private lands.

END OF SECTION