12. 95 pct_Isabella KWC_Specifications.pdf

PDF 6 MB Posted

Attached to
127EAW26Q0053 - Kern River Ranger District HVAC
Solicitation number
127EAW26Q0053
Issued by

About this file

This file is a technical specifications document for the Kernville Administration/Warehouse Buildings 2066 Project, a federal construction project. The document establishes comprehensive requirements for submittal procedures, sustainability reporting, and reference standards applicable to the construction work. The specifications require contractors to submit multiple categories of documentation including preconstruction submittals (certificates of insurance, surety bonds, construction schedules, quality control plans), shop drawings, product data, samples, design data, test reports, certificates, manufacturer's instructions, field reports, operation and maintenance data, and closeout submittals. Submittals requiring government approval are designated with a "G" designation, while those for contractor quality control approval or information only are unmarked. The document specifies quantity requirements for submittal copies, ranging from two to seven copies depending on the submittal type and approval authority.

The specifications incorporate mandatory sustainability requirements under the federally mandated Guiding Principles and Third Party Certification (TPC) standards, specifically requiring LEED GBDC Reference Guide Silver certification. The contractor must maintain a comprehensive Sustainability Notebook in Adobe PDF format documenting compliance with environmental requirements including energy-efficient equipment, water conservation, low volatile organic compound materials, indoor air quality management, recycled content (minimum 10 percent), bio-based products, construction waste diversion from landfills, and ozone-depleting substance elimination. The contractor is responsible for all costs associated with achieving sustainability goals and third-party certification, with final sustainability documentation required within 60 days after beneficial occupancy. The document references numerous industry standards and codes including ASHRAE 189.1, ANSI/SMACNA 008, and comprehensive specifications across 48 construction divisions covering concrete, masonry, metals, thermal protection, electrical systems, HVAC, plumbing, fire suppression, and exterior improvements.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

KERNVI LLE - ADMI NI STRATI ON/ WAREHOUSE BUI LDI NGS 2066

PROJECT TABLE OF CONTENTS

DI VI SI ON 01 - GENERAL REQUI REMENTS

01 33 00 SUBMI TTAL PROCEDURES

01 33 29 SUSTAI NABI LI TY REPORTI NG

01 42 00 SOURCES FOR REFERENCE PUBLI CATI ONS

01 45 35 SPECI AL I NSPECTI ONS

01 57 23 TEMPORARY STORM WATER POLLUTI ON CONTROL

01 74 19 CONSTRUCTI ON AND DEMOLI TI ON WASTE MANAGEMENT

DI VI SI ON 02 - EXI STI NG CONDI TI ONS

02 41 00 DEMOLITION

DI VI SI ON 03 - CONCRETE

03 11 13. 00 10 STRUCTURAL CAST- I N- PLACE CONCRETE FORMI NG

03 20 00. 00 10 CONCRETE REI NFORCI NG

03 30 00. 00 10 CAST- I N- PLACE CONCRETE

03 35 00. 00 10 CONCRETE FI NI SHI NG

03 39 00. 00 10 CONCRETE CURI NG

03 40 00. 00 10 PLANT- PRECAST CONCRETE PRODUCTS FOR BELOW GRADE

CONSTRUCTION

DI VI SI ON 04 - MASONRY

04 20 00 UNI T MASONRY

04 73 00 MANUFACTURED STONE VENEER

DI VI SI ON 05 - METALS

05 12 00 STRUCTURAL STEEL

05 50 13 MI SCELLANEOUS METAL FABRI CATI ONS

05 51 33 METAL LADDERS

DI VI SI ON 06 - WOOD, PLASTI CS, AND COMPOSI TES

06 10 00 ROUGH CARPENTRY

06 18 00 GLUED- LAMI NATED CONSTRUCTI ON

06 20 00 FI NI SH CARPENTRY

06 41 16. 00 10 LAMI NATE CLAD ARCHI TECTURAL CASEWORK

06 61 16 SOLI D POLYMER ( SOLI D SURFACI NG) FABRI CATI ONS

06 64 00 FI BER REI NFORCED PANELS

DI VI SI ON 07 - THERMAL AND MOI STURE PROTECTI ON

07 05 23 PRESSURE TESTI NG AN AI R BARRI ER SYSTEM FOR AI R TI GHTNESS

07 21 13 BOARD AND BLOCK I NSULATI ON

07 21 16 MI NERAL FI BER BLANKET I NSULATI ON

07 27 10. 00 10 BUI LDI NG AI R BARRI ER SYSTEM

07 46 46 FI BER CEMENT SI DI NG

07 60 00 FLASHI NG AND SHEET METAL

07 61 14. 00 20 STEEL STANDI NG SEAM ROOFI NG

07 92 00 JOI NT SEALANTS

DI VI SI ON 08 - OPENI NGS

08 11 13 STEEL DOORS AND FRAMES

PROJECT TABLE OF CONTENTS Page 1

08 14 00 WOOD DOORS

08 36 13 SECTI ONAL OVERHEAD DOORS

08 41 13 ALUMI NUM- FRAMED ENTRANCES AND STOREFRONTS

08 51 13 ALUMI NUM WI NDOWS

08 52 00 WOOD WI NDOWS

08 60 45 SKYLIGHTS

08 71 00 DOOR HARDWARE

08 81 00 GLAZING

08 91 00 METAL WALL LOUVERS

DI VI SI ON 09 - FI NI SHES

09 29 00 GYPSUM BOARD

09 30 13 CERAMI C TI LI NG

09 51 00 ACOUSTI CAL CEI LI NGS

09 65 00 RESI LI ENT FLOORI NG

09 68 00 CARPETING

09 90 00 PAI NTS AND COATI NGS

DI VI SI ON 10 - SPECI ALTI ES

10 10 00 VI SUAL COMMUNI CATI ONS SPECI ALTI ES

10 14 00. 20 I NTERI OR SI GNAGE

10 14 01 EXTERI OR SI GNAGE

10 21 13 TOI LET COMPARTMENTS

10 22 13 WI RE MESH PARTI TI ONS

10 22 43 SLI DI NG PARTI TI ONS

10 28 13 TOI LET ACCESSORI ES

10 44 16 FI RE EXTI NGUI SHERS

10 51 13 METAL LOCKERS

10 56 13 STEEL SHELVI NG

DI VI SI ON 11 - EQUI PMENT

11 31 13 ELECTRI C KI TCHEN EQUI PMENT

11 52 13 PROJECTI ON SCREENS

DI VI SI ON 12 - FURNI SHI NGS

12 93 00 SI TE FURNI SHI NGS

DI VI SI ON 13 - SPECI AL CONSTRUCTI ON

13 34 19 METAL BUI LDI NG SYSTEMS

DI VI SI ON 21 - FI RE SUPPRESSI ON

21 13 13. 00 10 WET PI PE SPRI NKLER SYSTEM, FI RE PROTECTI ON

DI VI SI ON 22 - PLUMBI NG

22 00 00 PLUMBI NG, GENERAL PURPOSE

DI VI SI ON 23 - HEATI NG, VENTI LATI NG, AND AI R CONDI TI ONI NG ( HVAC)

23 00 00 AI R SUPPLY, DI STRI BUTI ON, VENTI LATI ON, AND EXHAUST SYSTEMS

23 05 93 TESTI NG, ADJUSTI NG, AND BALANCI NG FOR HVAC

23 07 00 THERMAL I NSULATI ON FOR MECHANI CAL SYSTEMS

23 08 00. 00 10 COMMI SSI ONI NG OF HVAC SYSTEMS

PROJECT TABLE OF CONTENTS Page 2

23 11 25 FACI LI TY GAS PI PI NG

23 23 00 REFRI GERANT PI PI NG

23 54 16. 00 10 HEATI NG SYSTEM; GAS- FI RED HEATERS

23 82 02. 00 10 UNI TARY HEATI NG AND COOLI NG EQUI PMENT

DI VI SI ON 26 - ELECTRI CAL

26 00 00. 00 20 BASI C ELECTRI CAL MATERI ALS AND METHODS

26 05 00. 00 40 COMMON WORK RESULTS FOR ELECTRI CAL

26 05 19. 00 10 I NSULATED WI RE AND CABLE

26 05 48. 00 10 SEI SMI C PROTECTI ON FOR ELECTRI CAL EQUI PMENT

26 08 00 APPARATUS I NSPECTI ON AND TESTI NG

26 09 13 POWER MONI TORI NG SYSTEM

26 09 23. 00 40 LI GHTI NG CONTROL DEVI CES

26 20 00 I NTERI OR DI STRI BUTI ON SYSTEM

26 23 00 SWI TCHBOARDS AND SWI TCHGEAR

26 28 01. 00 10 COORDI NATED POWER SYSTEM PROTECTI ON

26 51 00 I NTERI OR LI GHTI NG

26 56 00 EXTERI OR LI GHTI NG

DI VI SI ON 27 - COMMUNI CATI ONS

27 05 14. 00 10 CABLE TELEVI SI ON PREMI SES DI STRI BUTI ON SYSTEM

27 10 00 BUI LDI NG TELECOMMUNI CATI ONS CABLI NG SYSTEM

DI VI SI ON 28 - ELECTRONI C SAFETY AND SECURI TY

28 20 01. 00 10 ELECTRONI C SECURI TY SYSTEM

28 23 23. 00 10 CLOSED CI RCUI T TELEVI SI ON SYSTEMS

28 31 64. 00 10 FI RE DETECTI ON AND ALARM SYSTEM, ADDRESSABLE

DI VI SI ON 31 - EARTHWORK

31 00 00 EARTHWORK

31 05 22 GEOTEXTI LES USED AS FI LTERS

31 11 00 CLEARI NG AND GRUBBI NG

31 23 00. 00 20 EXCAVATI ON AND FI LL

31 32 11 SOI L SURFACE EROSI ON CONTROL

DI VI SI ON 32 - EXTERI OR I MPROVEMENTS

32 01 19 FI ELD MOLDED SEALANTS FOR SEALI NG JOI NTS I N RI GI D

PAVEMENTS

32 05 33 LANDSCAPE ESTABLI SHMENT

32 10 00 PERVI OUS BI TUMI NOUS CONCRETE PAVEMENT

32 11 16 BASE COURSE FOR RI GI D AND SUBBASES FOR FLEXI BLE PAVI NG

32 11 16. 16 SUBBASE COURSE FOR PERVI OUS PAVI NG

32 11 23 AGGREGATE AND/ OR GRADED- CRUSHED AGGREGATE BASE COURSE

32 11 24 GRADED CRUSHED AGGREGATE BASE COURSE FOR PERVI OUS

FLEXI BLE PAVEMENT

32 12 10 BI TUMI NOUS TACK AND PRI ME COATS

32 12 16 HOT- MI X ASPHALT ( HMA) FOR ROADS

32 12 17 HOT MI X BI TUMI NOUS PAVEMENT

32 13 13. 06 PORTLAND CEMENT CONCRETE PAVEMENT FOR ROADS AND SI TE

FACILITIES

32 15 00 AGGREGATE SURFACE COURSE

32 16 13 CONCRETE SI DEWALKS, WALKWAYS AND CURBS AND GUTTERS

32 17 23. 00 20 PAVEMENT MARKI NGS

32 32 23 SEGMENTAL CONCRETE BLOCK RETAI NI NG WALL

PROJECT TABLE OF CONTENTS Page 3

32 84 24 I RRI GATI ON SPRI NKLER SYSTEMS

32 92 19 SEEDING

32 93 00 EXTERI OR PLANTS

DI VI SI ON 33 - UTI LI TI ES

33 11 00 WATER DI STRI BUTI ON

33 30 00 SANI TARY SEWERS

33 40 00 STORM DRAI NAGE UTI LI TI ES

33 46 16 SUBDRAI NAGE SYSTEM

33 51 15 NATURAL- GAS / LI QUI D PETROLEUM GAS DI STRI BUTI ON

33 56 53 PRESSURE VESSELS FOR STORAGE OF COMPRESSED GASES

DI VI SI ON 48 - ELECTRI CAL POWER GENERATI ON

48 14 00 [ 48 14 00 SOLAR ENERGY ELECTRI CAL POWER GENERATI ON

EQUIPMENT]

- - End of Pr oj ect Tabl e of Cont ent s - -

PROJECT TABLE OF CONTENTS Page 4

SECTI ON 01 33 00

SUBMI TTAL PROCEDURES

05/11

PART 1 GENERAL

1. 1 DEFINITIONS

1. 1. 1 Submi t t al Descr i pt i ons ( SD)

Submi t t al s r equi r ement s ar e speci f i ed i n t he t echni cal sect i ons.

Submi t t al s ar e i dent i f i ed by Submi t t al Descr i pt i on ( SD) number s and t i t l es as f ol l ows:

SD- 01 Pr econst r uct i on Submi t t al s

Submi t t al s whi ch ar e r equi r ed pr i or t o

Cer t i f i cat es of i nsur ance

Sur et y bonds

Li st of pr oposed Subcont r act or s

Li st of pr oposed pr oduct s

Const r uct i on pr ogr ess schedul e

Net wor k Anal ysi s Schedul e ( NAS)

Submi t t al r egi st er

Schedul e of pr i ces or Ear ned Val ue Repor t

Heal t h and saf et y pl an

Wor k pl an

Qual i t y Cont r ol ( QC) pl an

Envi r onment al pr ot ect i on pl an

SD- 02 Shop Dr awi ngs

Dr awi ngs, di agr ams and schedul es speci f i cal l y pr epar ed t o i l l ust r at e some por t i on of t he wor k.

Di agr ams and i nst r uct i ons f r om a manuf act ur er or f abr i cat or f or use i n pr oduci ng t he pr oduct and as ai ds t o t he Cont r act or f or i nt egr at i ng t he pr oduct or syst em i nt o t he pr oj ect .

Dr awi ngs pr epar ed by or f or t he Cont r act or t o show how mul t i pl e syst ems and i nt er di sci pl i nar y wor k wi l l be coor di nat ed.

SD- 03 Pr oduct Dat a

Cat al og cut s, i l l ust r at i ons, schedul es, di agr ams, per f or mance char t s, SECTI ON 01 33 00 Page 1 95% r evi ew Jan 26, 2016 i nst r uct i ons and br ochur es i l l ust r at i ng s i ze, physi cal appear ance and ot her char act er i st i cs of mat er i al s, syst ems or equi pment f or some por t i on of t he wor k.

Sampl es of war r ant y l anguage when t he cont r act r equi r es ext ended pr oduct war r ant i es.

SD- 04 Sampl es

Fabr i cat ed or unf abr i cat ed physi cal exampl es of mat er i al s, equi pment or wor kmanshi p t hat i l l ust r at e f unct i onal and aest het i c char act er i st i cs of a mat er i al or pr oduct and est abl i sh st andar ds by whi ch t he wor k can be judged.

Col or sampl es f r om t he manuf act ur er ' s st andar d l i ne ( or cust om col or sampl es i f speci f i ed) t o be used i n sel ect i ng or appr ovi ng col or s f or t he pr oj ect .

Fi el d sampl es and mock- ups const r uct ed on t he pr oj ect s i t e est abl i sh st andar ds by whi ch t he ensur i ng wor k can be j udged. I ncl udes assembl i es or por t i ons of assembl i es whi ch ar e t o be i ncor por at ed i nt o t he pr oj ect and t hose whi ch wi l l be r emoved at concl usi on of t he wor k.

SD- 05 Desi gn Dat a

Desi gn cal cul at i ons, mi x desi gns, anal yses or ot her dat a per t ai ni ng t o a par t of wor k.

SD- 06 Test Repor t s

Repor t s i gned by aut hor i zed of f i c i al of t est i ng l abor at or y t hat a mat er i al , pr oduct or syst em i dent i cal t o t he mat er i al , pr oduct or syst em t o be pr ovi ded has been t est ed i n accor d wi t h speci f i ed r equi r ement s. Unl ess speci f i ed i n anot her sect i on, t est i ng must have been wi t hi n t hr ee year s of dat e of cont r act awar d f or t he pr oj ect .

Repor t whi ch i nc l udes f i ndi ngs of a t est r equi r ed t o be per f or med by t he Cont r act or on an act ual por t i on of t he wor k or pr ot ot ype pr epar ed f or t he pr oj ect bef or e shi pment t o j ob s i t e.

Repor t whi ch i nc l udes f i ndi ng of a t est made at t he j ob s i t e or on sampl e t aken f r om t he j ob s i t e, on por t i on of wor k dur i ng or af t er installation.

I nvest i gat i on r epor t s.

Dai l y l ogs and checkl i st s.

Fi nal accept ance t est and oper at i onal t est pr ocedur e.

SD- 07 Cer t i f i cat es

St at ement s pr i nt ed on t he manuf act ur er ' s l et t er head and si gned by r esponsi bl e of f i c i al s of manuf act ur er of pr oduct , syst em or mat er i al at t est i ng t hat pr oduct , syst em or mat er i al meet s speci f i cat i on r equi r ement s. Must be dat ed af t er awar d of pr oj ect cont r act and cl ear l y name t he pr oj ect .

Document r equi r ed of Cont r act or , or of a manuf act ur er , suppl i er , SECTI ON 01 33 00 Page 2 95% r evi ew Jan 26, 2016 i nst al l er or Subcont r act or t hr ough Cont r act or . The document pur pose i s t o f ur t her pr omot e t he or der l y pr ogr essi on of a por t i on of t he wor k by document i ng pr ocedur es, accept abi l i t y of met hods or per sonnel qualifications.

Conf i ned space ent r y per mi t s.

Text of post ed oper at i ng i nst r uct i ons.

SD- 08 Manuf act ur er ' s I nst r uct i ons

Pr epr i nt ed mat er i al descr i bi ng i nst al l at i on of a pr oduct , syst em or mat er i al , i ncl udi ng speci al not i ces and ( MSDS) concer ni ng i mpedances, hazar ds and saf et y pr ecaut i ons.

SD- 09 Manuf act ur er ' s Fi el d Repor t s

Document at i on of t he t est i ng and ver i f i cat i on act i ons t aken by manuf act ur er ' s r epr esent at i ve at t he j ob s i t e, i n t he v i c i ni t y of t he j ob s i t e, or on a sampl e t aken f r om t he j ob s i t e, on a por t i on of t he wor k, dur i ng or af t er i nst al l at i on, t o conf i r m compl i ance wi t h manuf act ur er ' s st andar ds or i nst r uct i ons. The document at i on must be s i gned by an aut hor i zed of f i c i al of a t est i ng l abor at or y or agency and st at e t he t est r esul t s; and i ndi cat e whet her t he mat er i al , pr oduct , or syst em has passed or f ai l ed t he t est .

Fact or y t est r epor t s.

SD- 10 Oper at i on and Mai nt enance Dat a

Dat a t hat i s f ur ni shed by t he manuf act ur er , or t he syst em pr ovi der , t o t he equi pment oper at i ng and mai nt enance per sonnel , i ncl udi ng manuf act ur er ' s hel p and pr oduct l i ne document at i on necessar y t o mai nt ai n and i nst al l equi pment . Thi s dat a i s needed by oper at i ng and mai nt enance per sonnel f or t he saf e and ef f i c i ent oper at i on, mai nt enance and r epai r of t he i t em.

Thi s dat a i s i nt ended t o be i ncor por at ed i n an oper at i ons and mai nt enance manual or cont r ol syst em.

SD- 11 Cl oseout Submi t t al s

Document at i on t o r ecor d compl i ance wi t h t echni cal or admi ni st r at i ve r equi r ement s or t o est abl i sh an admi ni st r at i ve mechani sm.

Submi t t al s r equi r ed f or Gui di ng Pr i nci pl e Val i dat i on ( GPV) or Thi r d Par t y Cer t i f i cat i on ( TPC) .

Speci al r equi r ement s necessar y t o pr oper l y c l ose out a const r uct i on cont r act . For exampl e, Recor d Dr awi ngs and as- bui l t dr awi ngs. Al so, submi t t al r equi r ement s necessar y t o pr oper l y c l ose out a maj or phase of const r uct i on on a mul t i - phase cont r act .

I nt er i m " DD For m 1354" wi t h cost br eakout f or al l asset s 30 days pr i or t o f aci l i t y t ur nover .

1. 1. 2 Appr ovi ng Aut hor i t y

Of f i ce or desi gnat ed per son aut hor i zed t o appr ove submi t t al .

SECTI ON 01 33 00 Page 3 95% r evi ew Jan 26, 2016

1. 1. 3 Work

As used i n t hi s sect i on, on- and of f - s i t e const r uct i on r equi r ed by cont r act document s, i ncl udi ng l abor necessar y t o pr oduce submi t t al s, const r uct i on, mat er i al s, pr oduct s, equi pment , and syst ems i ncor por at ed or t o be i ncor por at ed i n such const r uct i on.

1. 2 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e [ f or Cont r act or QC appr oval . ] [ f or i nf or mat i on onl y. When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . ] Submi t t al s wi t h an " S" ar e f or i ncl usi on i n t he Sust ai nabi l i t y Not ebook, i n conf or mance t o Sect i on 01 33 29 SUSTAI NABI LI TY REPORTI NG. Submi t t he f ol l owi ng i n accor dance wi t h t hi s sect i on.

SD- 01 Pr econst r uct i on Submi t t al s

Submi t t al Regi st er [; G]

1. 3 SUBMI TTAL CLASSI FI CATI ON

Submi t t al s ar e c l assi f i ed as f ol l ows:

1. 3. 1 Gover nment Appr oved ( G)

Wi t hi n t he t er ms of t he Cont r act Cl ause ent i t l ed, " Speci f i cat i ons and Dr awi ngs f or Const r uct i on, " t hey ar e consi der ed t o be " shop dr awi ngs. "

1. 3. 2 Sust ai nabi l i t y Submi t t al s ( S)

Submi t t al s f or Gui di ng Pr i nci pl e Val i dat i on ( GPV) or Thi r d Par t y Cer t i f i cat i on ( TPC) ar e i ndi cat ed wi t h an " S" desi gnat i on. Submi t t he i nf or mat i on r equi r ed by t he t echni cal sect i ons t hat demonst r at es compl i ance wi t h t he sust ai nabl e r equi r ement , and f or i ncl usi on i n t he Sust ai nabi l i t y Not ebook as r equi r ed by Sect i on 01 33 29 SUSTAI NABI LI TY REPORTI NG. I f t he submi t t al i s al so pr ovi ded under anot her anot her SD, pr ovi de a separ at e submi t t al under SD- 11 t hat onl y pr ovi des t hat por t i on of t he submi t t al t hat demonst r at es compl i ance wi t h t he sust ai nabl e r equi r ement . Schedul e submi t t al s f or t hese i t ems t hr oughout t he cour se of const r uct i on as pr ovi ded; do not wai t unt i l c l oseout .

1. 4 PREPARATION

1. 4. 1 Tr ansmi t t al For m

1. 5 QUANTI TY OF SUBMI TTALS

1. 5. 1 Number of Copi es of SD- 02 Shop Dr awi ngs

Submi t [ s i x] [ _____] copi es of submi t t al s of shop dr awi ngs r equi r i ng r evi ew and appr oval onl y by QC or gani zat i on and [ seven] [ _____] copi es of shop dr awi ngs r equi r i ng r evi ew and appr oval by Cont r act i ng Of f i cer .

SECTI ON 01 33 00 Page 4 95% r evi ew Jan 26, 2016

1. 5. 2 Number of Copi es of SD- 03 Pr oduct Dat a and SD- 08 Manuf act ur er ' s Instructions

Submi t i n compl i ance wi t h quant i t y r equi r ement s speci f i ed f or shop dr awi ngs.

1. 5. 3 Number of Sampl es SD- 04 Sampl es

a. Submi t [ t wo] [ _____] sampl es, or [ t wo] [ _____] set s of sampl es showi ng r ange of var i at i on, of each r equi r ed i t em. One appr oved sampl e or set of sampl es wi l l be r et ai ned by appr ovi ng aut hor i t y and one wi l l be r et ur ned t o Cont r act or .

b. Submi t one sampl e panel or pr ovi de one sampl e i nst al l at i on wher e di r ect ed. I ncl ude component s l i s t ed i n t echni cal sect i on or as directed.

c. Submi t one sampl e i nst al l at i on, wher e di r ect ed.

d. Submi t one sampl e of non- sol i d mat er i al s.

1. 5. 4 Number of Copi es SD- 05 Desi gn Dat a and SD- 07 Cer t i f i cat es

Submi t i n compl i ance wi t h quant i t y r equi r ement s speci f i ed f or shop dr awi ngs.

1. 5. 5 Number of Copi es SD- 06 Test Repor t s and SD- 09 Manuf act ur er ' s Fi el d Reports

Submi t i n compl i ance wi t h quant i t y and qual i t y r equi r ement s speci f i ed f or shop dr awi ngs ot her t han f i el d t est r esul t s t hat wi l l be submi t t ed wi t h QC reports.

1. 5. 6 Number of Copi es of SD- 10 Oper at i on and Mai nt enance Dat a

Submi t [ f i ve] [ t hr ee] [ _____] copi es of O&M Dat a t o t he Cont r act i ng Of f i cer f or r evi ew and appr oval .

1. 5. 7 Number of Copi es of SD- 01 Pr econst r uct i on Submi t t al s and SD- 11 Cl oseout Submi t t al s

Unl ess ot her wi se speci f i ed, submi t [ t wo] [ t hr ee] set s of admi ni st r at i ve submittals.

1. 6 VARIATIONS

Var i at i ons f r om cont r act r equi r ement s r equi r e bot h Desi gner of Recor d ( DOR) and Gover nment appr oval pur suant t o cont r act Cl ause FAR 52. 236- 21 and wi l l be consi der ed wher e advant ageous t o Gover nment .

1. 6. 1 Consi der i ng Var i at i ons

Di scussi on wi t h Cont r act i ng Of f i cer pr i or t o submi ssi on, af t er consul t i ng wi t h t he DOR, wi l l hel p ensur e f unct i onal and qual i t y r equi r ement s ar e met and mi ni mi ze r ej ect i ons and r e- submi t t al s. When cont empl at i ng a var i at i on whi ch r esul t s i n l ower cost , consi der submi ssi on of t he var i at i on as a Val ue Engi neer i ng Change Pr oposal ( VECP) .

Speci f i cal l y poi nt out var i at i ons f r om cont r act r equi r ement s i n t r ansmi t t al l et t er s. Fai l ur e t o poi nt out devi at i ons may r esul t i n t he Gover nment r equi r i ng r ej ect i on and r emoval of such wor k at no addi t i onal cost t o t he

SECTI ON 01 33 00 Page 5 95% r evi ew Jan 26, 2016

Government.

1. 6. 2 Pr oposi ng Var i at i ons

When pr oposi ng var i at i on, del i ver wr i t t en r equest t o t he Cont r act i ng Of f i cer , wi t h document at i on of t he nat ur e and f eat ur es of t he var i at i on and why t he var i at i on i s desi r abl e and benef i c i al t o Gover nment , i ncl udi ng t he DOR' s wr i t t en anal ysi s and appr oval . I f l ower cost i s a benef i t , al so i ncl ude an est i mat e of t he cost savi ngs. I n addi t i on t o document at i on r equi r ed f or var i at i on, i ncl ude t he submi t t al s r equi r ed f or t he i t em.

Cl ear l y mar k t he pr oposed var i at i on i n al l document at i on.

1. 6. 3 War r ant i ng t hat Var i at i ons ar e Compat i bl e

When del i ver i ng a var i at i on f or appr oval , Cont r act or , i ncl udi ng i t s Desi gner ( s) of Recor d, war r ant s t hat t hi s cont r act has been r evi ewed t o est abl i sh t hat t he var i at i on, i f i ncor por at ed, wi l l be compat i bl e wi t h ot her el ement s of wor k.

1. 6. 4 Revi ew Schedul e i s Modi f i ed

I n addi t i on t o nor mal submi t t al r evi ew per i od, a per i od of [ 10] [ _____] wor ki ng days wi l l be al l owed f or consi der at i on by t he Gover nment of submi t t al s wi t h var i at i ons.

1. 7 SUBMI TTAL REGI STER

Pr epar e and mai nt ai n submi t t al r egi st er , as t he wor k pr ogr esses. Do not change dat a whi ch i s out put i n col umns ( c) , ( d) , ( e) , and ( f ) as del i ver ed by Gover nment ; r et ai n dat a whi ch i s out put i n col umns ( a) , ( g) , ( h) , and ( i ) as appr oved. A submi t t al r egi st er showi ng i t ems of equi pment and mat er i al s f or whi ch submi t t al s ar e r equi r ed by t he speci f i cat i ons i s pr ovi ded as an at t achment . Thi s l i s t may not be al l i ncl usi ve and addi t i onal submi t t al s may be r equi r ed. [ The Gover nment wi l l pr ovi de t he i ni t i al submi t t al r egi st er ] [ i n el ect r oni c f or mat ] [ wi t h t he f ol l owi ng f i el ds compl et ed, t o t he ext ent t hat wi l l be r equi r ed by t he Gover nment dur i ng subsequent usage. ]

Col umn ( c) : Li s t s speci f i cat i on sect i on i n whi ch submi t t al i s required.

Col umn ( d) : Li s t s each submi t t al descr i pt i on ( SD No. and t ype,

e. g. SD- 02 Shop Dr awi ngs) r equi r ed i n each speci f i cat i on sect i on.

Col umn ( e) : Li s t s one pr i nci pal par agr aph i n speci f i cat i on sect i on wher e a mat er i al or pr oduct i s speci f i ed. Thi s l i s t i ng i s onl y t o f aci l i t at e l ocat i ng submi t t ed r equi r ement s. Do not consi der ent r i es i n col umn ( e) as l i mi t i ng pr oj ect r equi r ement s.

[ Ther eaf t er , t he Cont r act or i s t o t r ack al l submi t t al s by mai nt ai ni ng a compl et e l i s t , i ncl udi ng compl et i on of al l dat a col umns, i ncl udi ng dat es on whi ch submi t t al s ar e r ecei ved and r et ur ned by t he Gover nment .

1. 7. 1 Use of Submi t t al Regi st er

Submi t submi t t al r egi st er . Submi t wi t h QC pl an and pr oj ect schedul e.

Ver i f y t hat al l submi t t al s r equi r ed f or pr oj ect ar e l i s t ed and add mi ssi ng submi t t al s. Coor di nat e and compl et e t he f ol l owi ng f i el ds on t he r egi st er submi t t ed wi t h t he QC pl an and t he pr oj ect schedul e:

SECTI ON 01 33 00 Page 6 95% r evi ew Jan 26, 2016

[ Col umn ( a) Act i v i t y Number : Act i v i t y number f r om t he pr oj ect schedule.

][ Col umn ( g) Cont r act or Submi t Dat e: Schedul ed dat e f or appr ovi ng aut hor i t y t o r ecei ve submi t t al s.

][ Col umn ( h) Cont r act or Appr oval Dat e: Dat e Cont r act or needs appr oval of submi t t al .

][ Col umn ( i ) Cont r act or Mat er i al : Dat e t hat Cont r act or needs mat er i al del i ver ed t o Cont r act or cont r ol .

] 1. 7. 2 Cont r act or Use of Submi t t al Regi st er

Updat e t he f ol l owi ng f i el ds[ i n t he Gover nment - f ur ni shed submi t t al r egi st er pr ogr am or equi val ent f i el ds i n pr ogr am ut i l i zed by Cont r act or ] wi t h each submi t t al t hr oughout cont r act .

Col umn ( b) Tr ansmi t t al Number : Cont r act or assi gned l i s t of consecut i ve number s.

Col umn ( j ) Act i on Code ( k) : Dat e of act i on used t o r ecor d Cont r act or ' s r evi ew when f or war di ng submi t t al s t o QC.

Col umn ( l ) Li st dat e of submi t t al t r ansmi ssi on.

Col umn ( q) Li st dat e appr oval r ecei ved.

1. 7. 3 Appr ovi ng Aut hor i t y Use of Submi t t al Regi st er

Updat e t he f ol l owi ng f i el ds[ i n t he Gover nment - f ur ni shed submi t t al r egi st er pr ogr am or equi val ent f i el ds i n pr ogr am ut i l i zed by Cont r act or ] .

Col umn ( b) Tr ansmi t t al Number : Cont r act or assi gned l i s t of consecut i ve number s.

Col umn ( l ) Li st dat e of submi t t al r ecei pt .

Col umn ( m) t hr ough ( p) Li st Dat e r el at ed t o r evi ew act i ons.

Col umn ( q) Li st dat e r et ur ned t o Cont r act or .

1. 7. 4 Copi es Del i ver ed t o t he Gover nment

Del i ver one copy of submi t t al r egi st er updat ed by Cont r act or t o Gover nment wi t h each i nvoi ce r equest .

1. 8 SCHEDULING

Schedul e and submi t concur r ent l y submi t t al s cover i ng component i t ems f or mi ng a syst em or i t ems t hat ar e i nt er r el at ed. I ncl ude cer t i f i cat i ons t o be submi t t ed wi t h t he per t i nent dr awi ngs at t he same t i me. No del ay damages or t i me ext ensi ons wi l l be al l owed f or t i me l ost i n l at e submi t t al s. An addi t i onal [ _____] cal endar days wi l l be al l owed and shown on t he r egi st er f or r evi ew and appr oval of submi t t al s f or [ f ood ser vi ce equi pment ] [ and] [ r ef r i ger at i on and HVAC cont r ol syst ems] .

a. Coor di nat e schedul i ng, sequenci ng, pr epar i ng and pr ocessi ng of

SECTI ON 01 33 00 Page 7 95% r evi ew Jan 26, 2016 submi t t al s wi t h per f or mance of wor k so t hat wor k wi l l not be del ayed by submi t t al pr ocessi ng. Al l ow f or pot ent i al r esubmi t t al of r equi r ement s.

b. Submi t t al s cal l ed f or by t he cont r act document s wi l l be l i s t ed on t he r egi st er . I f a submi t t al i s cal l ed f or but does not per t ai n t o t he cont r act wor k, t he Cont r act or i s t o i ncl ude t he submi t t al i n t he r egi st er and annot at e i t " N/ A" wi t h a br i ef expl anat i on. Appr oval by t he Cont r act i ng Of f i cer does not r el i eve t he Cont r act or of suppl y i ng submi t t al s r equi r ed by t he cont r act document s but whi ch have been omi t t ed f r om t he r egi st er or mar ked " N/ A. "

c. Re- submi t r egi st er and annot at e mont hl y by t he Cont r act or wi t h act ual submi ssi on and appr oval dat es. When al l i t ems on t he r egi st er have been f ul l y appr oved, no f ur t her r e- submi t t al i s r equi r ed.

d. Car ef ul l y cont r ol pr ocur ement oper at i ons t o ensur e t hat each i ndi v i dual submi t t al i s made on or bef or e t he Cont r act or schedul ed submi t t al dat e shown on t he appr oved " Submi t t al Regi st er . "

1. 9 GOVERNMENT APPROVI NG AUTHORI TY

When appr ovi ng aut hor i t y i s Cont r act i ng Of f i cer , t he Gover nment wi l l :

a. Not e dat e on whi ch submi t t al was r ecei ved.

b. Revi ew submi t t al s f or appr oval wi t hi n schedul i ng per i od speci f i ed and onl y f or conf or mance wi t h pr oj ect desi gn concept s and compl i ance wi t h cont r act document s.

c. I dent i f y r et ur ned submi t t al s wi t h one of t he act i ons def i ned i n par agr aph ent i t l ed, " Revi ew Not at i ons, " of t hi s sect i on and wi t h mar ki ngs appr opr i at e f or act i on i ndi cat ed.

Upon compl et i on of r evi ew of submi t t al s r equi r i ng Gover nment appr oval , st amp and dat e submi t t al s. [ _____] copi es of t he submi t t al wi l l be r et ai ned by t he Cont r act i ng Of f i cer and [ _____] copi es of t he submi t t al wi l l be r et ur ned t o t he Cont r act or .

1. 9. 1 Revi ew Not at i ons

Submi t t al s wi l l be r et ur ned t o t he Cont r act or wi t h t he f ol l owi ng not at i ons:

a. Submi t t al s mar ked " appr oved" or " accept ed" aut hor i ze t he Cont r act or t o pr oceed wi t h t he wor k cover ed.

b. Submi t t al s mar ked " appr oved as not ed" " or appr oved, except as not ed, r esubmi t t al not r equi r ed, " aut hor i ze t he Cont r act or t o pr oceed wi t h t he wor k cover ed pr ovi ded he t akes no except i on t o t he cor r ect i ons.

c. Submi t t al s mar ked " not appr oved" or " di sappr oved, " or " r evi se and r esubmi t , " i ndi cat e noncompl i ance wi t h t he cont r act r equi r ement s or desi gn concept , or t hat submi t t al i s i ncompl et e. Resubmi t wi t h appr opr i at e changes. No wor k shal l pr oceed f or t hi s i t em unt i l r esubmi t t al i s appr oved.

d. Submi t t al s mar ked " not r evi ewed" wi l l i ndi cat e submi t t al has been pr evi ousl y r evi ewed and appr oved, i s not r equi r ed, does not have evi dence of bei ng r evi ewed and appr oved by Cont r act or , or i s not compl et e. A submi t t al mar ked " not r evi ewed" wi l l be r et ur ned wi t h an expl anat i on of t he r eason i t i s not r evi ewed. Resubmi t submi t t al s

SECTI ON 01 33 00 Page 8 95% r evi ew Jan 26, 2016 r et ur ned f or l ack of r evi ew by Cont r act or or f or bei ng i ncompl et e, wi t h appr opr i at e act i on, coor di nat i on, or change.

1. 10 DI SAPPROVED[ OR REJECTED] SUBMI TTALS

Cont r act or shal l make cor r ect i ons r equi r ed by t he Cont r act i ng Of f i cer . I f t he Cont r act or consi der s any cor r ect i on or not at i on on t he r et ur ned submi t t al s t o const i t ut e a change t o t he cont r act dr awi ngs or speci f i cat i ons; not i ce as r equi r ed under t he c l ause ent i t l ed, " Changes, " i s t o be gi ven t o t he Cont r act i ng Of f i cer . Cont r act or i s r esponsi bl e f or t he di mensi ons and desi gn of connect i on det ai l s and const r uct i on of wor k.

Fai l ur e t o poi nt out devi at i ons may r esul t i n t he Gover nment r equi r i ng r ej ect i on and r emoval of such wor k at t he Cont r act or ' s expense.

I f changes ar e necessar y t o submi t t al s, make such r evi s i ons and submi ssi on of t he submi t t al s i n accor dance wi t h t he pr ocedur es above. No i t em of wor k r equi r i ng a submi t t al change i s t o be accompl i shed unt i l t he changed submi t t al s ar e appr oved.

1. 11 APPROVED[ / ACCEPTED] SUBMI TTALS

The Cont r act i ng Of f i cer ' s appr oval or accept ance of submi t t al s i s not t o be const r ued as a compl et e check, and i ndi cat es onl y t hat

Appr oval or accept ance wi l l not r el i eve t he Cont r act or of t he r esponsi bi l i t y f or any er r or whi ch may exi st , as t he Cont r act or under t he Cont r act or Qual i t y Cont r ol ( CQC) r equi r ement s of t hi s cont r act i s r esponsi bl e f or .

Af t er submi t t al s have been appr oved or accept ed by t he Cont r act i ng Of f i cer , no r esubmi t t al f or t he pur pose of subst i t ut i ng mat er i al s or equi pment wi l l be consi der ed unl ess accompani ed by an expl anat i on of why a subst i t ut i on i s necessary.

1. 12 APPROVED SAMPLES

Appr oval of a sampl e i s onl y f or t he char act er i st i cs or use named i n such appr oval and i s not be const r ued t o change or modi f y any cont r act r equi r ement s. Bef or e submi t t i ng sampl es, t he Cont r act or t o assur e t hat t he mat er i al s or equi pment wi l l be avai l abl e i n quant i t i es r equi r ed i n t he pr oj ect . No change or subst i t ut i on wi l l be per mi t t ed af t er a sampl e has been appr oved.

Mat ch t he appr oved sampl es f or mat er i al s and equi pment i ncor por at ed i n t he wor k. I f r equest ed, appr oved sampl es, i ncl udi ng t hose whi ch may be damaged i n t est i ng, wi l l be r et ur ned t o t he Cont r act or , at hi s expense, upon compl et i on of t he cont r act . Sampl es not appr oved wi l l al so be r et ur ned t o t he Cont r act or at i t s expense, i f so r equest ed.

Fai l ur e of any mat er i al s t o pass t he speci f i ed t est s wi l l be suf f i c i ent cause f or r ef usal t o consi der , under t hi s cont r act , any f ur t her sampl es of t he same br and or make of t hat mat er i al . Gover nment r eser ves t he r i ght t o di sappr ove any mat er i al or equi pment whi ch pr evi ousl y has pr oved unsat i sf act or y i n ser vi ce.

Sampl es of var i ous mat er i al s or equi pment del i ver ed on t he s i t e or i n pl ace may be t aken by t he Cont r act i ng Of f i cer f or t est i ng. Sampl es f ai l i ng t o meet cont r act r equi r ement s wi l l aut omat i cal l y voi d pr evi ous appr oval s.

Cont r act or t o r epl ace such mat er i al s or equi pment t o meet cont r act

SECTI ON 01 33 00 Page 9 95% r evi ew Jan 26, 2016 requirements.

Appr oval of t he Cont r act or ' s sampl es by t he Cont r act i ng Of f i cer does not r el i eve t he Cont r act or of hi s r esponsi bi l i t i es under t he cont r act .

PART 2 PRODUCTS

Not Used

PART 3 EXECUTI ON

Not Used

- - End of Sect i on - -

SECTI ON 01 33 00 Page 10 95% r evi ew Jan 26, 2016

SECTI ON 01 33 29

SUSTAI NABI LI TY REPORTI NG

02/15

PART 1 GENERAL

1. 1 REFERENCES

The publ i cat i ons l i s t ed bel ow f or m a par t of t hi s speci f i cat i on t o t he ext ent r ef er enced. The publ i cat i ons ar e r ef er r ed t o wi t hi n t he t ext by t he basi c desi gnat i on onl y.

AMERI CAN SOCI ETY OF HEATI NG, REFRI GERATI NG AND AI R- CONDI TI ONI NG

ENGI NEERS ( ASHRAE)

ASHRAE 189. 1 ( 2014; Er r at a 1- 2 2015) St andar d f or t he Desi gn of Hi gh- Per f or mance Gr een Bui l di ngs Except Low- Ri se Resi dent i al Bui l di ngs

SHEET METAL AND AI R CONDI TI ONI NG CONTRACTORS' NATI ONAL ASSOCI ATI ON

(SMACNA)

ANSI / SMACNA 008 ( 2007) I AQ Gui del i nes f or Occupi ed Bui l di ngs Under Const r uct i on, 2nd Edi t i on

U. S. DEPARTMENT OF ENERGY ( DOE)

I SWG Gui di ng Pr i nci pl es ( 2008) Hi gh Per f or mance and Sust ai nabl e Bui l di ngs Gui dance

U. S. NATI ONAL ARCHI VES AND RECORDS ADMI NI STRATI ON ( NARA)

40 CFR 247 Compr ehensi ve Pr ocur ement Gui del i ne f or Pr oduct s Cont ai ni ng Recover ed Mat er i al s

1. 2 SUMMARY

Thi s speci f i cat i on i ncl udes gener al r equi r ement s and pr ocedur es f or t hi s pr oj ect t o be const r uct ed and document ed per t he f eder al l y mandat ed " Gui di ng Pr i nci pl es" ( GP) , Thi r d Par t y Cer t i f i cat i on ( TPC) r equi r ement s ( i f appl i cabl e) , UFC 1- 200- 02, Hi gh Per f or mance and Sust ai nabl e Bui l di ng Requi r ement s, and ot her r equi r ement s i dent i f i ed i n t hi s speci f i cat i on.

1. 3 SUBMITTALS

Gover nment appr oval i s r equi r ed f or submi t t al s wi t h a " G" desi gnat i on;

submi t t al s not havi ng a " G" desi gnat i on ar e f or Cont r act or QC appr oval .

When used, a desi gnat i on f ol l owi ng t he " G" desi gnat i on i dent i f i es t he of f i ce t hat wi l l r evi ew t he submi t t al f or t he Gover nment . Submi t t al s wi t h an " S" ar e f or i ncl usi on i n t he Sust ai nabi l i t y Not ebook, i n conf or mance t o t hi s sect i on. Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00

SUBMI TTAL PROCEDURES:

SD- 01 Pr econst r uct i on Submi t t al s

Pr el i mi nar y Sust ai nabi l i t y Not ebook; G

SECTI ON 01 33 29 Page 1 95% r evi ew Jan 26, 2016

Pr el i mi nar y Hi gh Per f or mance and Sust ai nabl e Bui l di ng Checkl i st

[ SD- 07 Cer t i f i cat es

Thi r d Par t y Cer t i f i cat i on ( TPC)

] SD- 11 Cl oseout Submi t t al s

Fi nal Sust ai nabi l i t y Not ebook; G

Fi nal Hi gh Per f or mance and Sust ai nabl e Bui l di ng Checkl i st ; G

[ Amended Fi nal Sust ai nabi l i t y Not ebook; G

][ Thi r d Par t y Cer t i f i cat i on [ Pl aque and ] Cer t i f i cat es; G

] 1. 4 GUI DI NG PRI NCI PLES VALI DATI ON ( GPV)

Pr ovi de const r uct i on r el at ed sust ai nabi l i t y document at i on t o ver i f y achi evement of I SWG Gui di ng Pr i nci pl es Val i dat i on ( GPV) . Pr ovi de t he f ol l owi ng f or GPV:

a. Ref er t o At t achment 1, HPSB Checkl i st at t he end of t hi s speci f i cat i on section.

b. Obt ai n appr oval of any changes t o t he HPSB Checkl i st f r om t he Cont r act i ng Of f i cer at t he Pr econst r uct i on Conf er ence. Cont r act i ng Of f i cer ' s appr oval est abl i shes i dent i f i ed I SWG Gui di ng Pr i nci pl es Requi r ement s as t he pr oj ect ' s sust ai nabi l i t y goal s.

No var i at i ons or subst i t ut i ons t o t he HPSB Checkl i st ar e al l owed wi t hout wr i t t en consent f r om t he Cont r act i ng Of f i cer . I mmedi at el y br i ng t o t he at t ent i on of t he Cont r act i ng Of f i cer any changes t hat i mpact meet i ng t he appr oved I SWG Gui di ng Pr i nci pl es Requi r ement s f or t hi s pr oj ect and demonst r at e t hat change wi l l not i ncur addi t i onal const r uct i on cost or i ncr ease t he l i f e cycl e cost .

c. I ncl ude al l wor k r equi r ed t o i ncor por at e t he appl i cabl e I SWG Gui di ng Pr i nci pl es Requi r ement s i ndi cat ed on t he HPSB Checkl i st and i n t hi s cont r act .

d. I ncl ude const r uct i on r el at ed document at i on t o mai nt ai n an up- t o- dat e Sust ai nabi l i t y Not ebook. Suppl ement const r uct i on r el at ed document at i on cont ai ni ng t he f ol l owi ng component s;

( 1) HPSB Checkl i st

( 2) Sust ai nabi l i t y Act i on Pl an

[ ( 3) Document at i on i l l ust r at i ng Gui di ng Pr i nci pl e ( GP) Requi r ement s compliance

][ ( 4) Commi ssi oni ng Pl an and Repor t s

] 1. 4. 1 Sust ai nabi l i t y Act i on Pl an

I ncl ude t he f ol l owi ng i nf or mat i on i n t he Sust ai nabi l i t y Act i on Pl an:

a. Cont r act or ' s pl anned met hod t o achi eve each const r uct i on r el at ed

SECTI ON 01 33 29 Page 2 95% r evi ew Jan 26, 2016

GP r equi r ement .

[ b. For each desi gnat ed const r uct i on r el at ed I SWG Gui di ng Pr i nci pl es Requi r ement s t hat i s not achi eved, pr ovi de nar r at i ve expl ai ni ng how mi ssi on or act i v i t y pr ecl udes achi evi ng speci f i c sust ai nabi l i t y r equi r ement or goal . Pr ovi de anal ysi s of par t i cul ar r equi r ement and l evel t o whi ch pr oj ect i s abl e t o comply.

c. Name and cont act i nf or mat i on f or : Cont r act or ' s POC r esponsi bl e f or ensur i ng sust ai nabi l i t y goal s ar e accompl i shed and document at i on i s assembl ed.

] 1. 4. 2 Costs

Cont r act or i s r esponsi bl e f or al l cost s associ at ed wi t h const r uct i ng and demonst r at i ng t hat pr oj ect compl i es wi t h appr oved I SWG Gui di ng Pr i nci pl es Requirements.

[ 1. 4. 3 Calculations

Pr ovi de cal cul at i ons, pr oduct dat a, and cer t i f i cat i ons r equi r ed i n t hi s sect i on t o demonst r at e compl i ance wi t h t he I SWG Gui di ng Pr i nci pl es Requirements.

] 1. 4. 4 Thi r d Par t y Cer t i f i cat i on ( TPC)

Cont r act or i s r esponsi bl e f or al l r equi r ement s t o achi eve Thi r d Par t y Cer t i f i cat i on ( TPC) l evel of LEED GBDC Ref Gui de Si l ver . Thi r d Par t y Cer t i f i cat i on i s met when Gover nment r ecei ves TPC or gani zat i on cer t i f i cat e and pl aque.

Pr oj ect i s al r eady r egi st er ed wi t h USGBC t o achi eve l evel of LEED GBDC Ref Gui de Si l ver . The TPC Onl i ne management wi l l be t ur ned over t o t he Cont r act or , who wi l l assume f ul l r esponsi bi l i t y f or management and obt ai ni ng Fi nal Cer t i f i cat i on. Thi r d Par t y Cer t i f i cat i on i s met when Gover nment r ecei ves TPC or gani zat i on cer t i f i cat e and pl aque.

The TPC Cer t i f i cat i on r equi r es t he f ol l owi ng:

a. Ref er t o At t achment 2, TPC Checkl i st at t he end of t hi s speci f i cat i on section.

b. Obt ai n appr oval of t he TPC Checkl i st f r om t he Cont r act i ng Of f i cer at t he Pr e- Const r uct i on Conf er ence.

No var i at i ons or subst i t ut i ons t o t he appr oved TPC checkl i st ar e al l owed wi t hout wr i t t en consent f r om t he Cont r act i ng Of f i cer .

I mmedi at el y br i ng t o t he at t ent i on of t he Cont r act i ng Of f i cer any pr oj ect changes t hat i mpact meet i ng t he appr oved TPC Requi r ement s f or t hi s pr oj ect . Demonst r at e t hat change wi l l not : i ncur addi t i onal const r uct i on cost ; i ncr ease t he l i f e cycl e cost ; i mpact pr evi ous TPC Desi gn Revi ew; or i mpact r equi r ed TPC cer t i f i cat i on l evel .

c. Compl et e al l wor k r equi r ed t o i ncor por at e t he appl i cabl e TPC Requirements.

SECTI ON 01 33 29 Page 3 95% r evi ew Jan 26, 2016

d. Mai nt ai n t he const r uct i on r el at ed i nf or mat i on, and pr ovi de r epl acement pages, i n t he Sust ai nabi l i t y Not ebook per t ai ni ng t o addi t i ons and changes t o t he appr oved sust ai nabi l i t y r equi r ement s. The Sust ai nabi l i t y Not ebook i s i n el ect r oni c f or mat and i s expl ai ned i n t he par agr aph ent i t l ed " SUSTAI NABI LI TY NOTEBOOK" . The Sust ai nabi l i t y Not ebook cont ai ns t he f ol l owi ng component s i n addi t i on t o t he GPV component s above:

( 1) TPC Checkl i s t

( 2) Compl et ed TPC Onl i ne f or ms f or each i dent i f i ed pr er equi s i t e and credit

( 3) Copy of al l cor r espondence wi t h t he TPC or gani zat i on i ncl udi ng pr oof of TPC r egi st r at i on

( 4) Document at i on i l l ust r at i ng compl i ance wi t h TPC r equi r ement s

( 5) TPC Awar d Cer t i f i cat e

e. I ncl ude t he f ol l owi ng i nf or mat i on i n t he Sust ai nabi l i t y Act i on Pl an.

Pr ovi de t hi s TPC i nf or mat i on i n addi t i on t o t he GPV Act i on Pl an i t ems above:

( 1) Cont r act or ' s pl anned met hod t o achi eve each TPC r equi r ement .

( 2) For each r equi r ed TPC cr edi t t hat i s at t empt ed but not achi eved, pr ovi de nar r at i ve expl ai ni ng how mi ssi on or act i v i t y pr ecl udes achi evi ng speci f i c sust ai nabi l i t y r equi r ement or goal . Pr ovi de anal ysi s of par t i cul ar r equi r ement and l evel t o whi ch pr oj ect i s abl e t o compl y.

( 3) Name and cont act i nf or mat i on f or : Cont r act or ' s Sust ai nabi l i t y POC and ot her names of sust ai nabi l i t y pr of essi onal s on t he Cont r act or ' s St af f r esponsi bl e f or ensur i ng TPC sust ai nabi l i t y goal s ar e accompl i shed and document at i on i s assembl ed

( 4) Pr ovi de t he pl an and schedul e f or per f or mance t est i ng, dat a col l ect i on, and commi ssi oni ng t o t ake pl ace dur i ng f i r st year of f aci l i t y usage.

f . Cont r act or i s r esponsi bl e f or al l cost s associ at ed wi t h const r uct i ng and demonst r at i ng t hat pr oj ect compl i es wi t h appr oved TPC r equi r ement s, i ncl udi ng but not l i mi t ed t o:

( 1) Fi nal TPC r evi ew, cer t i f i cat i on and pl aque f ees

( 2) Onl i ne ( or of f l i ne wi t h secur e f aci l i t i es) TPC management and documentation.

( 3) Obt ai ni ng TPC cer t i f i cat i on based on Gover nment - appr oved sust ai nabi l i t y goal s.

( 4) Const r uct i on wor k r equi r ed t o i ncor por at e TPC pr er equi s i t es and credits.

( 5) Submi t t al s r equi r ed t o demonst r at e compl i ance wi t h Gover nment appr oved TPC checkl i st s.

SECTI ON 01 33 29 Page 4 95% r evi ew Jan 26, 2016

g. Pr ovi de al l cal cul at i ons, pr oduct dat a, and cer t i f i cat i ons r equi r ed i n t hi s speci f i cat i on t o demonst r at e compl i ance wi t h t he TPC Requi r ement s.

h. Pr ovi de al l onl i ne ( or of f l i ne, wi t h secur e f aci l i t i es) TPC management and document at i on.

i . Cont r act or i s r esponsi bl e f or al l r equi r ed r esponses t o TPC.

j . Pr ovi de TPC Pl aque and Cer t i f i cat es. Use f or mat bel ow t o cr eat e t he Pl aque, Cer t i f i cat e and Let t er of Congr at ul at i ons. For war d t o par t i es desi gnat ed by Cont r act i ng Of f i cer :

( 1) Pl aque:

Name: Fi nal Bui l di ng Name. I f unknown, pr ovi de For m DD1391 Pr oj ect Name.

( 2) Cer t i f i cat e:

Pr oj ect Ti t l e, f i r st l i ne: P- ( X) ; For m DD1391 Pr oj ect Name) .

Pr oj ect Ti t l e, second l i ne: UI C ( I nst al l at i on code)

( 3) Let t er Congr at ul at i ons:

Addr ess l et t er t o Faci l i t y ' s I nst al l at i on commander Name. Addr ess t he l et t er t o an i ndi v i dual per son.

1. 5 SUSTAI NABI LI TY SUBMI TTALS

Pr ovi de HPSB Checkl i st and ot her document at i on i n t he Sust ai nabi l i t y Not ebook t o i ndi cat e compl i ance wi t h t he sust ai nabi l i t y r equi r ement s of t he project.

1. 5. 1 Hi gh Per f or mance Sust ai nabl e Bui l di ng ( HPSB) Checkl i st

Pr ovi de const r uct i on document at i on t hat pr ovi des pr oof of and suppor t s compl i ance wi t h t he compl et ed HBSP Checkl i st .

1. 5. 1. 1 HPSB Checkl i st Submi t t al s

Submi t updat ed HPSB Checkl i st wi t h each Sust ai nabi l i t y Not ebook submi t t al .

At t ach f i nal HPSB Checkl i st t o DD1354 Real Pr oper t y Recor d Submi t t al .

1. 5. 1. 2 HPSB Checkl i st Publ i c Access

Wher e not i ncl uded as at t achment t o t hi s speci f i cat i on sect i on, use t he f ol l owi ng as HPSB Checkl i st f or r espect i ve ser vi ce br anch. Wher e I nt er net addr ess appear s on t wo l i nes, copy f ul l addr ess i nt o I nt er net br owser .

1. 5. 2 " S" Submi t t al s f or Sust ai nabi l i t y Document at i on

Submi t t he GPV and TPC sust ai nabi l i t y document at i on r equi r ed i n t hi s speci f i cat i on as " S" submi t t al s. Hi ghl i ght GPV and TPC compl i ance dat a i n " S" submi t t al .

SECTI ON 01 33 29 Page 5 95% r evi ew Jan 26, 2016

1. 5. 3 SUSTAI NABI LI TY NOTEBOOK

Pr ovi de and mai nt ai n a compr ehensi ve Sust ai nabi l i t y Not ebook t o document compl i ance wi t h t he sust ai nabi l i t y r equi r ement s i dent i f i ed i n t he appr oved HPSB and TPC Checkl i st s. Sust ai nabi l i t y Not ebook must cont ai n al l r equi r ed dat a t o suppor t f ul l compl i ance wi t h t he I SWG Gui di ng Pr i nci pl es Requi r ement s and TPC r equi r ement s. Sust ai nabi l i t y Not ebook i s i n t he f or m of an Adobe PDF f i l e; bookmar ked at each I SWG Gui di ng Pr i nci pl es Requi r ement , TPC r equi r ement , and sub- bookmar ked at each document . Mat ch f or mat t o I SWG Gui di ng Pr i nci pl es number i ng syst em i ndi cat ed her ei n.

Mai nt ai n up t o dat e i nf or mat i on, spr eadsheet s, t empl at es, and ot her r equi r ed document at i on wi t h each cur r ent submi t t al . For TPC pr oj ect s, pr ovi de a second Tabl e of cont ent s usi ng TPC number i ng syst em. Locat e document at i on uni que t o TPC her e. Wher e TPC document at i on woul d r epeat GP document at i on, i nser t not e r ef er r i ng r evi ewer t o GP document at i on.

Cont r act i ng Of f i cer may deduct f r om t he mont hl y pr ogr ess payment accor di ngl y i f Sust ai nabi l i t y Not ebook i nf or mat i on i s not cur r ent , unt i l i nf or mat i on i s updat ed and on t r ack per pr oj ect goal s.

1. 5. 3. 1 Sust ai nabi l i t y Not ebook Submi t t al Schedul e

Pr ovi de Sust ai nabi l i t y Not ebook Submi t t al s at t he f ol l owi ng mi l est ones of t he pr oj ect :

a. Pr el i mi nar y Sust ai nabi l i t y Not ebook

Submi t pr el i mi nar y Sust ai nabi l i t y Not ebook f or appr oval at t he Pr e- const r uct i on conf er ence. I nc l ude Pr el i mi nar y Hi gh Per f or mance and Sust ai nabl e Bui l di ng Checkl i st .

b. Const r uct i on Pr ogr ess Meet i ngs. Updat e GP and TPC document at i on i n t he Sust ai nabi l i t y Not ebook and TPC Onl i ne t ool f or each meet i ng.

c. Fi nal Sust ai nabi l i t y Not ebook

Submi t updat ed Sust ai nabi l i t y Not ebook wi t hi n 60 days af t er t he Benef i c i al Occupancy Dat e ( BOD) . Fi nal pr ogr ess payment r et ai nage may be hel d by Cont r act i ng Of f i cer unt i l f i nal sust ai nabi l i t y document at i on i s compl et e. Submi t t hr ee ( 3) el ect r oni c copi es of t he Fi nal Sust ai nabi l i t y Not ebook on DVDs t o t he Gover nment . I ncl ude Fi nal Hi gh Per f or mance and Sust ai nabl e Bui l di ng Checkl i st .

d. Amended Fi nal Sust ai nabi l i t y Not ebook

Amend and r esubmi t t he Fi nal Sust ai nabi l i t y Not ebook t o i ncl ude commi ssi oni ng, t est i ng and bal anci ng, and col l ect i on of per f or mance r equi r ement s. Submi t t hr ee ( 3) f i nal el ect r oni c copi es of t he Amended Fi nal Sust ai nabi l i t y Not ebook Submi t t al on DVDs t o t he Gover nment no l onger t han 30 days af t er t he GP, TPC, and Cx desi gnat ed dat a col l ect i on per i od.

1. 6 DOCUMENTATI ON REQUI REMENTS

[ Thi r d Par t y Cer t i f i cat i on r equi r ement s or cr edi t s ar e mandat or y when t hey have r equi r ement s t hat mat ch a Gui di ng Pr i nci pl e Requi r ement .

Document at i on used t o demonst r at e TPC compl i ance may be used t o demonst r at e GP compl i ance.

SECTI ON 01 33 29 Page 6 95% r evi ew Jan 26, 2016

I ncor por at e each of t he f ol l owi ng I SWG Gui di ng Pr i nci pl es Requi r ement s i nt o pr oj ect const r uct i on; and pr ovi de document at i on t hat pr oves compl i ance wi t h each l i s t ed r equi r ement . I t ems bel ow ar e or gani zed accor di ng t o t he I SWG Gui di ng Pr i nci pl es. For pr oj ect s t hat r equi r e TPC, r ef er t o Thi r d Par t y Cer t i f i er ' s r ef er ence manual s f or TPC r equi r ement s.

1. 6. 1 Commissioning

Wor k wi t h t he Commi ssi oni ng Aut hor i t y ( CxA) t o achi eve r equi r ement s of t he Commi ssi oni ng pl an and ot her cont r act document r equi r ement s at each st age of commi ssi oni ng. Mai nt ai n up- t o- dat e r ecor ds of commi ssi oni ng act i v i t i es i n t he Sust ai nabi l i t y Not ebook, t o i ncl ude commi ssi oni ng pl an and summar y commi ssi oni ng r epor t .

1. 6. 2 Ener gy Ef f i c i ent Equi pment

Pr ovi de onl y ener gy- usi ng equi pment t hat i s Ener gy St ar r at ed, or has t he Feder al Ener gy Management Pr ogr am ( FEMP) r ecommended ef f i c i ency. Wher e Ener gy St ar or FEMP r ecommendat i ons have not been est abl i shed, pr ovi de most ef f i c i ent equi pment avai l abl e. Pr ovi de onl y ener gy usi ng equi pment t hat meet s FEMP r equi r ement s f or l ow st andby power consumpt i on. Ener gy ef f i c i ent equi pment can be f ound at : ht t p: / / www1. eer e. ener gy. gov/ f emp/ and http://www.energystar.gov/ . Pr ovi de t he f ol l owi ng document at i on:

Pr oof t hat equi pment i s l abel ed ener gy ef f i c i ent and compl i es wi t h t he c i t ed r equi r ement s.

1. 6. 3 Benchmarking

Pr ovi de r epor t of i ni t i al act ual ener gy per f or mance wi t h t he ener gy desi gn t ar get s. Pr ovi de t he f ol l owi ng document at i on:

Pr ef i nal Per f or mance Repor t wi t h dat a col l ect ed f r om t he f i r st 60 days of oper at i on of t he f aci l i t y af t er Benef i c i al Occupancy Dat e ( BOD) . Submi t t hi s i nf or mat i on wi t h t he Fi nal Sust ai nabi l i t y Not ebook Submi t t al .

1. 6. 4 Wat er Conser vi ng Fi xt ur es

Pr ovi de onl y wat er - consumi ng pr oduct s t hat ar e EPA Wat er Sense l abel ed, or t he most ef f i c i ent wat er f i x t ur es avai l abl e when EPA Wat er sense pr oduct s ar e not avai l abl e. Pr ovi de t he f ol l owi ng document at i on:

Pr oof t hat wat er f i x t ur es ar e ef f i c i ent and compl y wi t h t he c i t ed requirements.

1. 6. 5 Reduce Vol at i l e Or gani c Compounds ( VOC) ( Low Emi t t i ng Mat er i al s)

Pr ovi de mat er i al s and pr oduct s wi t h l ow pol l ut ant emi ssi ons, i ncl udi ng composi t e wood pr oduct s, adhesi ves, seal ant s, i nt er i or pai nt s and f i ni shes, car pet syst ems, and f ur ni shi ngs. Meet i ng t he r equi r ement s of ASHRAE 189. 1 Sect i ons 8. 4. 2 ( Pr escr i pt i ve Opt i on: Mat er i al s) or Sect i on 8. 5. 2 ( Per f or mance Opt i on: Mat er i al s) demonst r at es compl i ance.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .