3-321216 - Asphalt Paving.pdf
PDF 179 KB Posted
- Attached to
- IFB - Highland Park Elementary - Plaza Remodel
- Solicitation number
- TB2673-HPA
- Issued by
- Salt Lake County, Salt Lake City, Utah
About this file
This is a specification document for asphalt paving work at Highland Park Elementary School's plaza remodel project in Salt Lake City, Utah, issued by the Salt Lake City School District (SLCSD). The project encompasses cold milling of existing asphalt pavement, hot-mix asphalt patching and paving, asphalt surface treatments, pavement marking, and installation of traffic-calming devices. The specification establishes detailed requirements for materials, workmanship, and quality standards aligned with ASTM and AASHTO specifications. A mandatory pre-bid site visit is scheduled for Tuesday, May 26, 2026, at 10:00 A.M. at Highland Park Elementary School (1738 East 2700 South, Salt Lake City, Utah 84106), and contractors who fail to attend will be ineligible to bid. All contractor questions must be submitted in writing through the Bonfire/U3P system or posed at the pre-bid meeting, with official responses issued only through Bonfire/U3P or authorized addenda. Bids must be submitted electronically through Bonfire/U3P and must include the base bid, alternate bids, bid bond, licensing documentation, and any other documents required by the bid documents.
The specification requires hot-mix asphalt mixes approved by local authorities with a minimum stability of 1200 per ASTM D5581, compacted to 96 percent of reference laboratory density with tolerances between 94 and 100 percent. Surface courses must achieve a minimum compacted thickness of 3 inches with a tolerance of plus 1/4 inch with no minus, and surface smoothness must not exceed 1/8 inch variance when tested with a 10-foot straightedge. Pavement marking paint must be applied after a minimum 7-day curing period in colors designated as yellow for parking stalls and pedestrian crossings, blue for handicap insignia, red for fire lanes, and white for directional arrows. A qualified testing agency engaged by the owner will perform field quality control testing, including in-place density testing with a minimum of three core samples per 1,000 square yards of installed pavement. The contractor is responsible for replacing and compacting asphalt at core test locations and removing any deficient pavement that does not meet specification requirements.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Salt Lake School District – High-land Park Elementary – Plaza
321216 - 1 Asphalt Paving
SECTION 321216 - ASPHALT PAVING
PART 1 - GENERAL
1.1 RELATED DOCUMENTS
A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
1.2 SUMMARY
A. Section Includes:
1. Cold milling of existing hot-mix asphalt pavement.
2. Hot-mix asphalt patching.
3. Hot-mix asphalt paving.
4. Hot-mix asphalt paving overlay.
5. Asphalt surface treatments.
6. Pavement-marking paint.
7. Traffic-calming devices.
B. Related Sections:
1. Division 02 Section "Structure Demolition" for demolition, removal, and recycling of existing asphalt pavements, and for geotextiles that are not embedded within courses of asphalt paving.
2. Division 31 Section "Earth Moving" for aggregate subbase and base courses and for aggregate pavement shoulders.
3. Division 32 Sections for other paving installed as part of crosswalks in asphalt pavement areas.
4. Division 32 Section "Concrete Paving Joint Sealants" for joint sealants and fillers at paving terminations.
5. Division 32 Section "Unit Paving" for bituminous setting bed for pavers.
1.3 UNIT PRICES
A. Work of this Section is affected by unit prices and as defined in Division 1.
1.4 DEFINITION
A. Hot-Mix Asphalt Paving Terminology: Refer to ASTM D 8 for definitions of terms.
1.5 SUBMITTALS
A. Product Data: For each type of product indicated. Include technical data and tested physical and performance properties.
321216 - 2 Asphalt Paving
1. Job-Mix Designs: Certification, by authorities having jurisdiction, of approval of each job mix proposed for the Work.
2. Job-Mix Designs: For each job mix proposed for the Work.
B. Shop Drawings: Indicate pavement markings, lane separations, and defined parking spaces.
Indicate, with international symbol of accessibility, spaces allocated for people with disabilities.
C. Samples: For each paving fabric, 12 by 12 inches minimum if used.
D. Samples for Verification: For the following products, in manufacturer's standard sizes unless otherwise indicated:
1. Each paving fabric, 12 by 12 inches minimum.
2. Each type and color of preformed traffic-calming device.
3. Each pattern and color of imprinted asphalt and precut marking material.
E. Qualification Data: For qualified manufacturer and Installer.
F. Material Certificates: For each paving material, from manufacturer.
G. Material Test Reports: For each paving material.
H. Fire Marshal Approval: For the striping plan as it relates to fire lanes and the marking therof.
1.6 QUALITY ASSURANCE
A. Manufacturer Qualifications: Provide copy of manufactures experience for verification of qualifications.
B. Installer Qualifications: Imprinted-asphalt manufacturer's authorized installer who is trained and approved for installation of imprinted asphalt required for this Project.
C. Testing Agency Qualifications: Qualified according to ASTM D 3666 for testing indicated.
D. Regulatory Requirements: Comply with materials, workmanship, and other applicable requirements of city and DOT for asphalt paving work.
1. Measurement and payment provisions and safety program submittals included in standard specifications do not apply to this Section.
E. Preinstallation Conference: Conduct conference at Project site
1. Review methods and procedures related to hot-mix asphalt paving including, but not limited to, the following:
a. Review proposed sources of paving materials, including capabilities and location of plant that will manufacture hot-mix asphalt.
b. Review condition of subgrade and preparatory work.
c. Review requirements for protecting paving work, including restriction of traffic during installation period and for remainder of construction period.
321216 - 3 Asphalt Paving
d. Review and finalize construction schedule and verify availability of materials, Installer's personnel, equipment, and facilities needed to make progress and avoid delays.
1.7 DELIVERY, STORAGE, AND HANDLING
A. Deliver pavement-marking materials to Project site in original packages with seals unbroken and bearing manufacturer's labels containing brand name and type of material, date of manufacture, and directions for storage.
B. Store pavement-marking materials in a clean, dry, protected location within temperature range required by manufacturer. Protect stored materials from direct sunlight.
1.8 PROJECT CONDITIONS
A. Environmental Limitations: Do not apply asphalt materials if subgrade is wet or excessively damp, if rain is imminent or expected before time required for adequate cure, or if the following conditions are not met:
1. Prime Coat: Minimum surface temperature of 60 deg F. Not used if paving takes place within 48 hours of final grading and final compaction of road base.
2. Tack Coat: Minimum surface temperature of 60 deg F.
3. Slurry Coat: Comply with weather limitations in ASTM D 3910.
4. Asphalt Base Course: Minimum surface temperature of 40 deg F and rising at time of placement.
5. Asphalt Surface Course: Minimum surface temperature of 60 deg F at time of placement.
B. Pavement-Marking Paint: Proceed with pavement marking only on clean, dry surfaces and at a minimum ambient or surface temperature of 40 deg F for oil-based materials 55 deg F for water-based materials, and not exceeding 95 deg F.
PART 2 - PRODUCTS
2.1 AGGREGATES
A. General: Use materials and gradations that have performed satisfactorily in previous installations.
B. Coarse Aggregate: ASTM D 692, sound; angular crushed stone, crushed gravel, or cured, crushed blast-furnace slag.
C. Fine Aggregate: ASTM D 1073 or AASHTO M 29, sharp-edged natural sand or sand prepared from stone, gravel, cured blast-furnace slag, or combinations thereof.
1. For hot-mix asphalt, limit natural sand to a maximum of 20 percent by weight of the total aggregate mass.
D. Mineral Filler: ASTM D 242 or AASHTO M 17, rock or slag dust, hydraulic cement, or other inert material.
321216 - 4 Asphalt Paving
2.2 ASPHALT MATERIALS
A. Asphalt Cement: AC 20 per ASTM D 3381 for viscosity-graded material except use ductility at
39.2 deg. F., >5 for AC 20 and delete the loss on heating requirement on residue from “Thin- Film Oven Test”.
B. Prime Coat: Not required if paving is done within 48 hours of final compaction.
C. Tack Coat: ASTM D 977 or AASHTO M 140 emulsified asphalt, or ASTM D 2397 or AASHTO M 208 cationic emulsified asphalt, slow setting, diluted in water, of suitable grade and consistency for application.
D. Fog Seal: ASTM D 977 or AASHTO M 140 emulsified asphalt, or ASTM D 2397 or AASHTO M 208 cationic emulsified asphalt, slow setting, factory diluted in water, of suitable grade and consistency for application.
E. Water: Potable.
F. Undersealing Asphalt: ASTM D 3141, pumping consistency.
2.3 AUXILIARY MATERIALS
A. Herbicide: Commercial chemical for weed control, registered by the EPA. Provide in granular, liquid, or wettable powder form.
B. Sand: ASTM D 1073 or AASHTO M 29, Grade Nos. 2 or 3.
C. Paving Geotextile: AASHTO M 288, nonwoven polypropylene; resistant to chemical attack, rot, and mildew; and specifically designed for paving applications.
D. Joint Sealant: ASTM D 6690 or AASHTO M 324, Type I Type II or III Type IV, hot-applied, single-component, polymer-modified bituminous sealant.
E. Pavement-Marking Paint: Alkyd-resin type, lead and chromate free, ready mixed, complying with AASHTO M 248, Type N, Type F, and Type S; colors complying with FS TT-P-1952.
1. Color: White, Yellow, Blue, and As indicated.
F. Pavement-Marking Paint: MPI #32 Alkyd Traffic Marking Paint.
1. Color: White, Yellow, Blue, and As indicated.
G. Pavement-Marking Paint: Latex, waterborne emulsion, lead and chromate free, ready mixed, complying with FS TT-P-1952, Type II, with drying time of less than 45 minutes.
1. Color: White, Yellow, Blue, and As indicated.
H. Pavement-Marking Paint: MPI #97 Latex Traffic Marking Paint.
1. Color: White, Yellow, Blue, and As indicated.
I. Glass Beads: AASHTO M 247, Type 1.
321216 - 5 Asphalt Paving
J. Wheel Stops: Precast, air-entrained concrete, 2500-psi minimum compressive strength, 4-1/2 inches high by 9 inches wide by 72 inches. Provide chamfered corners, drainage slots on underside, and holes for anchoring to substrate.
1. Dowels: Galvanized steel, 3/4-inch diameter, 20-inch minimum length.
2.4 MIXES
A. Hot-Mix Asphalt: Dense, hot-laid, hot-mix asphalt plant mixes approved by authorities having jurisdiction; designed according to procedures in AI MS-2, "Mix Design Methods for Asphalt Concrete and Other Hot-Mix Types"; and complying with the following requirements:
1. Provide mixes with a history of satisfactory performance in geographical area where Project is located. Provide mix with the following characteristics:
a. Number of compaction blows each end of specimen: 50.
b. Stability based on ASTM D5581: 1200 minimum.
c. Flow in 0.01-inch units per ASTM D5581: 10-18.
d. Voids in mineral aggregate VMA: 14.
e. The percentage of bituminous material by weight added to aggregate will be between 4% and 7% of the weight of the bituminous mixture.
2. Surface Course: 3-inch minimum compacted thickness and as indicated on the drawings with aggregate meeting the following gradation table ¾ inch 100 ½ inch 74-99 3/8 inch 69-91 No. 4 49-65 No. 8 33-47 No. 16 21-35 No. 50 6-18 No. 200 2-6
B. Emulsified-Asphalt Slurry: ASTM D 3910, Type 1.
PART 3 - EXECUTION
3.1 EXAMINATION
A. Verify that subgrade is dry and in suitable condition to begin paving.
B. Verify that the road base has been properly compacted and is at the correct line, grade, and slope.
C. Verify that the road base thickness is as indicated on the project plans.
D. Verify that sufficient depth at curbs, walks, lips and other vertical edges is available to place the required thickness of compacted asphalt.
E. Proof-roll subgrade below pavements with heavy pneumatic-tired equipment to identify soft pockets and areas of excess yielding. Do not proof-roll wet or saturated subgrades.
321216 - 6 Asphalt Paving
1. Completely proof-roll subgrade in one direction. Limit vehicle speed to 3 mph.
2. Proof roll with a loaded 10-wheel, tandem-axle dump truck weighing not less than 15 tons or other vehicle with similar axel weight.
3. Excavate soft spots, unsatisfactory soils, and areas of excessive pumping or rutting, as determined by Architect, and replace with compacted backfill or fill as directed.
F. Proceed with paving only after unsatisfactory conditions have been corrected.
G. Verify that utilities, traffic loop detectors, and other items requiring a cut and installation beneath the asphalt surface have been completed and that asphalt surface has been repaired flush with adjacent asphalt prior to beginning installation of imprinted asphalt.
3.2 PATCHING
A. Hot-Mix Asphalt Pavement: Saw cut perimeter of patch and excavate existing pavement section to sound base. Excavate rectangular or trapezoidal patches, extending 12 inches into adjacent sound pavement, unless otherwise indicated. Cut excavation faces vertically.
Remove excavated material. Recompact existing unbound-aggregate base course to form new subgrade.
B. Portland Cement Concrete Pavement: Break cracked slabs and roll as required to reseat concrete pieces firmly.
1. Pump hot undersealing asphalt under rocking slab until slab is stabilized or, if necessary, crack slab into pieces and roll to reseat pieces firmly.
2. Remove disintegrated or badly cracked pavement. Excavate rectangular or trapezoidal patches, extending into adjacent sound pavement, unless otherwise indicated. Cut excavation faces vertically. Recompact existing unbound-aggregate base course to form new subgrade.
C. Tack Coat: Apply uniformly to vertical surfaces abutting or projecting into new, hot-mix asphalt paving at a rate of 0.05 to 0.15 gal./sq. yd.
1. Allow tack coat to cure undisturbed before applying hot-mix asphalt paving.
2. Avoid smearing or staining adjoining surfaces, appurtenances, and surroundings.
Remove spillages and clean affected surfaces.
D. Patching: Fill excavated pavements with hot-mix asphalt base mix for full thickness of patch and, while still hot, compact flush plus 1/8” with adjacent surface.
E. Patching: Partially fill excavated pavements with hot-mix asphalt base mix and, while still hot, compact. Cover asphalt base course with compacted, hot-mix surface layer finished flush with adjacent surfaces.
3.3 REPAIRS
A. Leveling Course: Install and compact leveling course consisting of hot-mix asphalt surface course to level sags and fill depressions deeper than 1 inch in existing pavements.
1. Install leveling wedges in compacted lifts not exceeding 3 inches thick.
321216 - 7 Asphalt Paving
B. Crack and Joint Filling: Remove existing joint filler material from cracks or joints to a depth of 1/4 inch.
1. Clean cracks and joints in existing hot-mix asphalt pavement.
2. Use emulsified-asphalt slurry to seal cracks and joints less than 1/4 inch wide. Fill flush with surface of existing pavement and remove excess.
3. Use hot-applied joint sealant to seal cracks and joints more than 1/4 inch wide. Fill flush with surface of existing pavement and remove excess.
3.4 SURFACE PREPARATION
A. General: Immediately before placing asphalt materials, remove loose and deleterious material from substrate surfaces. Ensure that prepared subgrade is ready to receive paving.
B. Herbicide Treatment: Not used.
C. Prime Coat: Do not use if paving takes place not more than 48 hours after final compaction and grading of road bases. If paving must be delayed significantly, re-grade and re-compact road base or apply Prime Coat. Apply uniformly over surface of compacted unbound-aggregate base course at a rate of 0.15 to 0.50 gal./sq. yd. Apply enough material to penetrate and seal but not flood surface. Allow prime coat to cure.
1. If prime coat is not entirely absorbed within 24 hours after application, spread sand over surface to blot excess asphalt. Use enough sand to prevent pickup under traffic.
Remove loose sand by sweeping before pavement is placed and after volatiles have evaporated.
2. Protect primed substrate from damage until ready to receive paving.
D. Tack Coat: Apply uniformly to surfaces of existing pavement at a rate of 0.05 to 0.15 gal./sq.
yd.
1. Allow tack coat to cure undisturbed before applying hot-mix asphalt paving.
2. Avoid smearing or staining adjoining surfaces, appurtenances, and surroundings.
3. Remove and replace items damaged by overspray or clean affected surfaces as directed by architect at no additional cost to owner.
3.5 HOT-MIX ASPHALT PLACING
A. Machine place hot-mix asphalt on prepared surface, spread uniformly, and strike off. Place asphalt mix by hand to areas inaccessible to equipment in a manner that prevents segregation of mix. Place each course to required grade, cross section, and thickness when compacted.
1. Place hot-mix asphalt surface course in single lift if design thickness is less than 3-inches. If design thickness is more than 3-inches, place in multiple lifts with a minimum thickness of 1.5-inches and a maximum thickness of 3-inches.
2. Spread mix at minimum temperature of 250 deg F.
3. Begin applying mix along centerline of crown for crowned sections and on high side of one-way slopes unless otherwise indicated.
4. Regulate paver machine speed to obtain smooth, continuous surface free of pulls and tears in asphalt-paving mat.
321216 - 8 Asphalt Paving
B. Place paving in consecutive strips not less than 10 feet wide unless infill edge strips of a lesser width are required.
1. After first strip has been placed and rolled, place succeeding strips and extend rolling to overlap previous strips. Complete a section of asphalt base course before placing asphalt surface course.
C. Promptly correct surface irregularities in paving course behind paver. Use suitable hand tools to remove excess material forming high spots. Fill depressions with hot-mix asphalt to prevent segregation of mix; use suitable hand tools to smooth surface.
3.6 JOINTS
A. Construct joints to ensure a continuous bond between adjoining paving sections. Construct joints free of depressions, with same texture and smoothness as other sections of hot-mix asphalt course.
1. Clean contact surfaces and apply tack coat to joints.
2. Offset longitudinal joints, in successive courses, a minimum of 6 inches.
3. Offset transverse joints, in successive courses, a minimum of 24 inches.
4. Construct transverse joints at each point where paver ends a day's work and resumes work at a subsequent time. Construct these joints using either "bulkhead" or "papered" method according to AI MS-22, for both "Ending a Lane" and "Resumption of Paving Operations.".
5. Compact joints as soon as hot-mix asphalt will bear roller weight without excessive displacement.
6. Compact asphalt at joints to a density within 2 percent of specified course density.
3.7 COMPACTION
A. General: Begin compaction as soon as placed hot-mix paving will bear roller weight without excessive displacement. Compact hot-mix paving with hot, hand tampers or with vibratory-plate compactors in areas inaccessible to rollers.
1. Complete compaction before mix temperature cools to 185 deg F.
B. Breakdown Rolling: Complete breakdown or initial rolling immediately after rolling joints and outside edge. Examine surface immediately after breakdown rolling for indicated crown, grade, and smoothness. Correct laydown and rolling operations to comply with requirements.
C. Intermediate Rolling: Begin intermediate rolling immediately after breakdown rolling while hot-mix asphalt is still hot enough to achieve specified density. Continue rolling until hot-mix asphalt course has been uniformly compacted to the following density:
1. Average Density: 96 percent of reference laboratory density according to ASTM D 6927 or AASHTO T 245, but not less than 94 percent nor greater than 100 percent.
D. Finish Rolling: Finish roll paved surfaces to remove roller marks while hot-mix asphalt is still warm.
321216 - 9 Asphalt Paving
E. Edge Shaping: While surface is being compacted and finished, trim edges of pavement to proper alignment. Bevel edges while asphalt is still hot; compact thoroughly.
F. Place asphalt so that final compacted asphalt is even with lip of gutter on curbs that drain away from the curb and gutter (open face or depressed curb and gutter). Place asphalt so that final compacted asphalt is 1/4-inch above lip of gutter on curbs that carry water (slope of parking lot is towards the curb). In transition areas, use extra care to make sure that no ponds, bird baths, or depressions are left after paving.
G. Repairs: Remove paved areas that are defective or contaminated with foreign materials and replace with fresh, hot-mix asphalt. Compact by rolling to specified density and surface smoothness.
H. Protection: After final rolling, do not permit vehicular traffic on pavement until it has cooled and hardened.
I. Erect barricades to protect paving from traffic until mixture has cooled enough not to become marked.
3.8 INSTALLATION TOLERANCES
A. Pavement Thickness: Compact each course to produce the thickness indicated within the following tolerances:
1. Surface Course: Plus 1/4 inch, no minus.
B. Pavement Surface Smoothness: Compact each course to produce a surface smoothness within the following tolerances as determined by using a 10-foot straightedge applied transversely or longitudinally to paved areas:
1. Surface Course: 1/8 inch.
2. Crowned Surfaces: Test with crowned template centered and at right angle to crown.
Maximum allowable variance from template is 1/4 inch.
C. After paving is complete, pour water on paved areas and identify ponds, bird baths, and depressions. Identify the same at open face and transition sections of curb and gutter.
Remove and replace asphalt, curb and gutter, road base, and or sub-base as necessary to fix ponds, bird baths, or depressions at no additional cost to owner.
3.9 PAVEMENT MARKING
A. Do not apply pavement-marking paint until layout, colors, and placement have been verified with Architect and approved by the local jurisdictional fire marshal.
B. Allow paving to age for 7 days minimum days before starting pavement marking.
C. Sweep and clean surface to eliminate loose material and dust.
D. Apply paint with mechanical equipment to produce pavement markings, of dimensions indicated, with uniform, straight edges. Apply at manufacturer's recommended rates to provide a minimum wet film thickness of 15 mils.
1. Broadcast glass beads uniformly into wet pavement markings at a rate of 6 lb/gal.
321216 - 10 Asphalt Paving
E. Color
1. Yellow: Parking stalls and pedestrian crossings.
2. Blue: Handicap insignia at appropriate stalls.
3. Red: Fire lanes and no parking areas.
4. White: Directional arrows.
3.10 FIELD QUALITY CONTROL
A. Testing Agency: Owner will engage a qualified testing agency to perform tests and inspections.
B. Thickness: In-place compacted thickness of hot-mix asphalt courses will be determined according to ASTM D 3549.
C. Surface Smoothness: Finished surface of each hot-mix asphalt course will be tested for compliance with smoothness tolerances.
D. In-Place Density: Testing agency will take samples of uncompacted paving mixtures and compacted pavement according to ASTM D 979 or AASHTO T 168.
1. Reference maximum theoretical density will be determined by averaging results from four samples of hot-mix asphalt-paving mixture delivered daily to site, prepared according to ASTM D 2041, and compacted according to job-mix specifications.
2. In-place density of compacted pavement will be determined by testing core samples according to ASTM D 1188 or ASTM D 2726. Cores will also be measured for compacted thickness. The owner and architect may also direct additional cores to be taken at locations of their choosing to verify final pavement thickness.
a. One core sample will be taken for every 1000 sq. yd. or less of installed pavement, with no fewer than 3 cores taken.
b. Field density of in-place compacted pavement may also be determined by nuclear method according to ASTM D 2950 and correlated with ASTM D 1188 or
ASTM D 2726.
c. Coordinate the time and locations of all holes so that cores may be filled.
E. The contractor will replace and compact hot-mix asphalt where core tests were taken.
F. Remove and replace or install additional hot-mix asphalt where test results or measurements indicate that it does not comply with specified requirements.
3.11 DISPOSAL
A. Except for material indicated to be recycled, remove excavated materials from Project site and legally dispose of them in an EPA-approved landfill.
1. Do not allow milled materials to accumulate on-site.
END OF SECTION 321216
321216 - 11 Asphalt Paving
| PART 1 - GENERAL |
| 1.1 RELATED DOCUMENTS |
| A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section. |
| 1.2 SUMMARY |
| A. Section Includes: |
| 1. Cold milling of existing hot-mix asphalt pavement. |
| 2. Hot-mix asphalt patching. |
| 3. Hot-mix asphalt paving. |
| 4. Hot-mix asphalt paving overlay. |
| 5. Asphalt surface treatments. |
| 6. Pavement-marking paint. |
| 7. Traffic-calming devices. |
| B. Related Sections: |
| 1. Division 02 Section "Structure Demolition" for demolition, removal, and recycling of existing asphalt pavements, and for geotextiles that are not embedded within courses of asphalt paving. |
| 2. Division 31 Section "Earth Moving" for aggregate subbase and base courses and for aggregate pavement shoulders. |
| 3. Division 32 Sections for other paving installed as part of crosswalks in asphalt pavement areas. |
| 4. Division 32 Section "Concrete Paving Joint Sealants" for joint sealants and fillers at paving terminations. |
| 5. Division 32 Section "Unit Paving" for bituminous setting bed for pavers. |
| 1.3 UNIT PRICES |
| A. Work of this Section is affected by unit prices and as defined in Division 1. |
| 1.4 DEFINITION |
| A. Hot-Mix Asphalt Paving Terminology: Refer to ASTM D 8 for definitions of terms. |
| 1.5 SUBMITTALS |
| A. Product Data: For each type of product indicated. Include technical data and tested physical and performance properties. |
| 1. Job-Mix Designs: Certification, by authorities having jurisdiction, of approval of each job mix proposed for the Work. |
| 2. Job-Mix Designs: For each job mix proposed for the Work. |
| B. Shop Drawings: Indicate pavement markings, lane separations, and defined parking spaces. Indicate, with international symbol of accessibility, spaces allocated for people with disabilities. |
| C. Samples: For each paving fabric, 12 by 12 inches minimum if used. |
| D. Samples for Verification: For the following products, in manufacturer's standard sizes unless otherwise indicated: |
| 1. Each paving fabric, 12 by 12 inches minimum. |
| 2. Each type and color of preformed traffic-calming device. |
| 3. Each pattern and color of imprinted asphalt and precut marking material. |
| E. Qualification Data: For qualified manufacturer and Installer. |
| F. Material Certificates: For each paving material, from manufacturer. |
| G. Material Test Reports: For each paving material. |
| H. Fire Marshal Approval: For the striping plan as it relates to fire lanes and the marking therof. |
| 1.6 QUALITY ASSURANCE |
| A. Manufacturer Qualifications: Provide copy of manufactures experience for verification of qualifications. |
| B. Installer Qualifications: Imprinted-asphalt manufacturer's authorized installer who is trained and approved for installation of imprinted asphalt required for this Project. |
| C. Testing Agency Qualifications: Qualified according to ASTM D 3666 for testing indicated. |
| D. Regulatory Requirements: Comply with materials, workmanship, and other applicable requirements of city and DOT for asphalt paving work. |
| 1. Measurement and payment provisions and safety program submittals included in standard specifications do not apply to this Section. |
| E. Preinstallation Conference: Conduct conference at Project site |
| 1. Review methods and procedures related to hot-mix asphalt paving including, but not limited to, the following: |
| a. Review proposed sources of paving materials, including capabilities and location of plant that will manufacture hot-mix asphalt. |
| b. Review condition of subgrade and preparatory work. |
| c. Review requirements for protecting paving work, including restriction of traffic during installation period and for remainder of construction period. |
| d. Review and finalize construction schedule and verify availability of materials, Installer's personnel, equipment, and facilities needed to make progress and avoid delays. |
| 1.7 DELIVERY, STORAGE, AND HANDLING |
| A. Deliver pavement-marking materials to Project site in original packages with seals unbroken and bearing manufacturer's labels containing brand name and type of material, date of manufacture, and directions for storage. |
| B. Store pavement-marking materials in a clean, dry, protected location within temperature range required by manufacturer. Protect stored materials from direct sunlight. |
| 1.8 PROJECT CONDITIONS |
| A. Environmental Limitations: Do not apply asphalt materials if subgrade is wet or excessively damp, if rain is imminent or expected before time required for adequate cure, or if the following conditions are not met: |
| 1. Prime Coat: Minimum surface temperature of 60 deg F. Not used if paving takes place within 48 hours of final grading and final compaction of road base. |
| 2. Tack Coat: Minimum surface temperature of 60 deg F. |
| 3. Slurry Coat: Comply with weather limitations in ASTM D 3910. |
| 4. Asphalt Base Course: Minimum surface temperature of 40 deg F and rising at time of placement. |
| 5. Asphalt Surface Course: Minimum surface temperature of 60 deg F at time of placement. |
B. Pavement-Marking Paint: Proceed with pavement marking only on clean, dry surfaces and at a minimum ambient or surface temperature of 40 deg F for oil-based materials 55 deg F for water-based materials, and not exceeding 95 deg F.
| PART 2 - PRODUCTS |
| 2.1 AGGREGATES |
| A. General: Use materials and gradations that have performed satisfactorily in previous installations. |
| B. Coarse Aggregate: ASTM D 692, sound; angular crushed stone, crushed gravel, or cured, crushed blast-furnace slag. |
| C. Fine Aggregate: ASTM D 1073 or AASHTO M 29, sharp-edged natural sand or sand prepared from stone, gravel, cured blast-furnace slag, or combinations thereof. |
| 1. For hot-mix asphalt, limit natural sand to a maximum of 20 percent by weight of the total aggregate mass. |
D. Mineral Filler: ASTM D 242 or AASHTO M 17, rock or slag dust, hydraulic cement, or other inert material.
| 2.2 ASPHALT MATERIALS |
| A. Asphalt Cement: AC 20 per ASTM D 3381 for viscosity-graded material except use ductility at 39.2 deg. F., >5 for AC 20 and delete the loss on heating requirement on residue from “Thin-Film Oven Test”. |
| B. Prime Coat: Not required if paving is done within 48 hours of final compaction. |
| C. Tack Coat: ASTM D 977 or AASHTO M 140 emulsified asphalt, or ASTM D 2397 or AASHTO M 208 cationic emulsified asphalt, slow setting, diluted in water, of suitable grade and consistency for application. |
| D. Fog Seal: ASTM D 977 or AASHTO M 140 emulsified asphalt, or ASTM D 2397 or AASHTO M 208 cationic emulsified asphalt, slow setting, factory diluted in water, of suitable grade and consistency for application. |
| E. Water: Potable. |
| F. Undersealing Asphalt: ASTM D 3141, pumping consistency. |
| 2.3 AUXILIARY MATERIALS |
| A. Herbicide: Commercial chemical for weed control, registered by the EPA. Provide in granular, liquid, or wettable powder form. |
| B. Sand: ASTM D 1073 or AASHTO M 29, Grade Nos. 2 or 3. |
| C. Paving Geotextile: AASHTO M 288, nonwoven polypropylene; resistant to chemical attack, rot, and mildew; and specifically designed for paving applications. |
| D. Joint Sealant: ASTM D 6690 or AASHTO M 324, Type I Type II or III Type IV, hot-applied, single-component, polymer-modified bituminous sealant. |
| E. Pavement-Marking Paint: Alkyd-resin type, lead and chromate free, ready mixed, complying with AASHTO M 248, Type N, Type F, and Type S; colors complying with FS TT-P-1952. |
| 1. Color: White, Yellow, Blue, and As indicated. |
| F. Pavement-Marking Paint: MPI #32 Alkyd Traffic Marking Paint. |
| 1. Color: White, Yellow, Blue, and As indicated. |
| G. Pavement-Marking Paint: Latex, waterborne emulsion, lead and chromate free, ready mixed, complying with FS TT-P-1952, Type II, with drying time of less than 45 minutes. |
| 1. Color: White, Yellow, Blue, and As indicated. |
| H. Pavement-Marking Paint: MPI #97 Latex Traffic Marking Paint. |
| 1. Color: White, Yellow, Blue, and As indicated. |
| I. Glass Beads: AASHTO M 247, Type 1. |
| J. Wheel Stops: Precast, air-entrained concrete, 2500-psi minimum compressive strength, 4-1/2 inches high by 9 inches wide by 72 inches. Provide chamfered corners, drainage slots on underside, and holes for anchoring to substrate. |
| 1. Dowels: Galvanized steel, 3/4-inch diameter, 20-inch minimum length. |
| 2.4 MIXES |
| A. Hot-Mix Asphalt: Dense, hot-laid, hot-mix asphalt plant mixes approved by authorities having jurisdiction; designed according to procedures in AI MS-2, "Mix Design Methods for Asphalt Concrete and Other Hot-Mix Types"; and complying with the foll... |
| 1. Provide mixes with a history of satisfactory performance in geographical area where Project is located. Provide mix with the following characteristics: |
| a. Number of compaction blows each end of specimen: 50. |
| b. Stability based on ASTM D5581: 1200 minimum. |
| c. Flow in 0.01-inch units per ASTM D5581: 10-18. |
| d. Voids in mineral aggregate VMA: 14. |
| e. The percentage of bituminous material by weight added to aggregate will be between 4% and 7% of the weight of the bituminous mixture. |
| 2. Surface Course: 3-inch minimum compacted thickness and as indicated on the drawings with aggregate meeting the following gradation table |
| ¾ inch 100 |
| ½ inch 74-99 |
| 3/8 inch 69-91 |
| No. 4 49-65 |
| No. 8 33-47 |
| No. 16 21-35 |
| No. 50 6-18 |
| No. 200 2-6 |
B. Emulsified-Asphalt Slurry: ASTM D 3910, Type 1.
| PART 3 - EXECUTION |
| 3.1 EXAMINATION |
| A. Verify that subgrade is dry and in suitable condition to begin paving. |
| B. Verify that the road base has been properly compacted and is at the correct line, grade, and slope. |
| C. Verify that the road base thickness is as indicated on the project plans. |
| D. Verify that sufficient depth at curbs, walks, lips and other vertical edges is available to place the required thickness of compacted asphalt. |
| E. Proof-roll subgrade below pavements with heavy pneumatic-tired equipment to identify soft pockets and areas of excess yielding. Do not proof-roll wet or saturated subgrades. |
| 1. Completely proof-roll subgrade in one direction. Limit vehicle speed to 3 mph. |
| 2. Proof roll with a loaded 10-wheel, tandem-axle dump truck weighing not less than 15 tons or other vehicle with similar axel weight. |
| 3. Excavate soft spots, unsatisfactory soils, and areas of excessive pumping or rutting, as determined by Architect, and replace with compacted backfill or fill as directed. |
| F. Proceed with paving only after unsatisfactory conditions have been corrected. |
| G. Verify that utilities, traffic loop detectors, and other items requiring a cut and installation beneath the asphalt surface have been completed and that asphalt surface has been repaired flush with adjacent asphalt prior to beginning installation o... |
| 3.2 PATCHING |
| A. Hot-Mix Asphalt Pavement: Saw cut perimeter of patch and excavate existing pavement section to sound base. Excavate rectangular or trapezoidal patches, extending 12 inches into adjacent sound pavement, unless otherwise indicated. Cut excavation ... |
| B. Portland Cement Concrete Pavement: Break cracked slabs and roll as required to reseat concrete pieces firmly. |
| 1. Pump hot undersealing asphalt under rocking slab until slab is stabilized or, if necessary, crack slab into pieces and roll to reseat pieces firmly. |
| 2. Remove disintegrated or badly cracked pavement. Excavate rectangular or trapezoidal patches, extending into adjacent sound pavement, unless otherwise indicated. Cut excavation faces vertically. Recompact existing unbound-aggregate base course to... |
| C. Tack Coat: Apply uniformly to vertical surfaces abutting or projecting into new, hot-mix asphalt paving at a rate of 0.05 to 0.15 gal./sq. yd. |
| 1. Allow tack coat to cure undisturbed before applying hot-mix asphalt paving. |
| 2. Avoid smearing or staining adjoining surfaces, appurtenances, and surroundings. Remove spillages and clean affected surfaces. |
| D. Patching: Fill excavated pavements with hot-mix asphalt base mix for full thickness of patch and, while still hot, compact flush plus 1/8” with adjacent surface. |
| E. Patching: Partially fill excavated pavements with hot-mix asphalt base mix and, while still hot, compact. Cover asphalt base course with compacted, hot-mix surface layer finished flush with adjacent surfaces. |
| 3.3 REPAIRS |
| A. Leveling Course: Install and compact leveling course consisting of hot-mix asphalt surface course to level sags and fill depressions deeper than 1 inch in existing pavements. |
| 1. Install leveling wedges in compacted lifts not exceeding 3 inches thick. |
| B. Crack and Joint Filling: Remove existing joint filler material from cracks or joints to a depth of 1/4 inch. |
| 1. Clean cracks and joints in existing hot-mix asphalt pavement. |
| 2. Use emulsified-asphalt slurry to seal cracks and joints less than 1/4 inch wide. Fill flush with surface of existing pavement and remove excess. |
| 3. Use hot-applied joint sealant to seal cracks and joints more than 1/4 inch wide. Fill flush with surface of existing pavement and remove excess. |
| 3.4 SURFACE PREPARATION |
| A. General: Immediately before placing asphalt materials, remove loose and deleterious material from substrate surfaces. Ensure that prepared subgrade is ready to receive paving. |
| B. Herbicide Treatment: Not used. |
| C. Prime Coat: Do not use if paving takes place not more than 48 hours after final compaction and grading of road bases. If paving must be delayed significantly, re-grade and re-compact road base or apply Prime Coat. Apply uniformly over surface of ... |
| 1. If prime coat is not entirely absorbed within 24 hours after application, spread sand over surface to blot excess asphalt. Use enough sand to prevent pickup under traffic. Remove loose sand by sweeping before pavement is placed and after volatile... |
| 2. Protect primed substrate from damage until ready to receive paving. |
| D. Tack Coat: Apply uniformly to surfaces of existing pavement at a rate of 0.05 to 0.15 gal./sq. yd. |
| 1. Allow tack coat to cure undisturbed before applying hot-mix asphalt paving. |
| 2. Avoid smearing or staining adjoining surfaces, appurtenances, and surroundings. |
| 3. Remove and replace items damaged by overspray or clean affected surfaces as directed by architect at no additional cost to owner. |
| 3.5 HOT-MIX ASPHALT PLACING |
| A. Machine place hot-mix asphalt on prepared surface, spread uniformly, and strike off. Place asphalt mix by hand to areas inaccessible to equipment in a manner that prevents segregation of mix. Place each course to required grade, cross section, an... |
| 1. Place hot-mix asphalt surface course in single lift if design thickness is less than 3-inches. If design thickness is more than 3-inches, place in multiple lifts with a minimum thickness of 1.5-inches and a maximum thickness of 3-inches. |
| 2. Spread mix at minimum temperature of 250 deg F. |
| 3. Begin applying mix along centerline of crown for crowned sections and on high side of one-way slopes unless otherwise indicated. |
| 4. Regulate paver machine speed to obtain smooth, continuous surface free of pulls and tears in asphalt-paving mat. |
| B. Place paving in consecutive strips not less than 10 feet wide unless infill edge strips of a lesser width are required. |
| 1. After first strip has been placed and rolled, place succeeding strips and extend rolling to overlap previous strips. Complete a section of asphalt base course before placing asphalt surface course. |
C. Promptly correct surface irregularities in paving course behind paver. Use suitable hand tools to remove excess material forming high spots. Fill depressions with hot-mix asphalt to prevent segregation of mix; use suitable hand tools to smooth su...
| 3.6 JOINTS |
| A. Construct joints to ensure a continuous bond between adjoining paving sections. Construct joints free of depressions, with same texture and smoothness as other sections of hot-mix asphalt course. |
| 1. Clean contact surfaces and apply tack coat to joints. |
| 2. Offset longitudinal joints, in successive courses, a minimum of 6 inches. |
| 3. Offset transverse joints, in successive courses, a minimum of 24 inches. |
| 4. Construct transverse joints at each point where paver ends a day's work and resumes work at a subsequent time. Construct these joints using either "bulkhead" or "papered" method according to AI MS-22, for both "Ending a Lane" and "Resumption of Pa... |
| 5. Compact joints as soon as hot-mix asphalt will bear roller weight without excessive displacement. |
| 6. Compact asphalt at joints to a density within 2 percent of specified course density. |
| 3.7 COMPACTION |
| A. General: Begin compaction as soon as placed hot-mix paving will bear roller weight without excessive displacement. Compact hot-mix paving with hot, hand tampers or with vibratory-plate compactors in areas inaccessible to rollers. |
| 1. Complete compaction before mix temperature cools to 185 deg F. |
| B. Breakdown Rolling: Complete breakdown or initial rolling immediately after rolling joints and outside edge. Examine surface immediately after breakdown rolling for indicated crown, grade, and smoothness. Correct laydown and rolling operations to... |
| C. Intermediate Rolling: Begin intermediate rolling immediately after breakdown rolling while hot-mix asphalt is still hot enough to achieve specified density. Continue rolling until hot-mix asphalt course has been uniformly compacted to the followi... |
| 1. Average Density: 96 percent of reference laboratory density according to ASTM D 6927 or AASHTO T 245, but not less than 94 percent nor greater than 100 percent. |
| D. Finish Rolling: Finish roll paved surfaces to remove roller marks while hot-mix asphalt is still warm. |
| E. Edge Shaping: While surface is being compacted and finished, trim edges of pavement to proper alignment. Bevel edges while asphalt is still hot; compact thoroughly. |
| F. Place asphalt so that final compacted asphalt is even with lip of gutter on curbs that drain away from the curb and gutter (open face or depressed curb and gutter). Place asphalt so that final compacted asphalt is 1/4-inch above lip of gutter on c... |
| G. Repairs: Remove paved areas that are defective or contaminated with foreign materials and replace with fresh, hot-mix asphalt. Compact by rolling to specified density and surface smoothness. |
| H. Protection: After final rolling, do not permit vehicular traffic on pavement until it has cooled and hardened. |
| I. Erect barricades to protect paving from traffic until mixture has cooled enough not to become marked. |
| 3.8 INSTALLATION TOLERANCES |
| A. Pavement Thickness: Compact each course to produce the thickness indicated within the following tolerances: |
| 1. Surface Course: Plus 1/4 inch, no minus. |
| B. Pavement Surface Smoothness: Compact each course to produce a surface smoothness within the following tolerances as determined by using a 10-foot straightedge applied transversely or longitudinally to paved areas: |
| 1. Surface Course: 1/8 inch. |
| 2. Crowned Surfaces: Test with crowned template centered and at right angle to crown. Maximum allowable variance from template is 1/4 inch. |
C. After paving is complete, pour water on paved areas and identify ponds, bird baths, and depressions. Identify the same at open face and transition sections of curb and gutter. Remove and replace asphalt, curb and gutter, road base, and or sub-bas...
| 3.9 PAVEMENT MARKING |
| A. Do not apply pavement-marking paint until layout, colors, and placement have been verified with Architect and approved by the local jurisdictional fire marshal. |
| B. Allow paving to age for 7 days minimum days before starting pavement marking. |
| C. Sweep and clean surface to eliminate loose material and dust. |
| D. Apply paint with mechanical equipment to produce pavement markings, of dimensions indicated, with uniform, straight edges. Apply at manufacturer's recommended rates to provide a minimum wet film thickness of 15 mils. |
| 1. Broadcast glass beads uniformly into wet pavement markings at a rate of 6 lb/gal. |
| E. Color |
| 1. Yellow: Parking stalls and pedestrian crossings. |
| 2. Blue: Handicap insignia at appropriate stalls. |
| 3. Red: Fire lanes and no parking areas. |
| 4. White: Directional arrows. |
| 3.10 FIELD QUALITY CONTROL |
| A. Testing Agency: Owner will engage a qualified testing agency to perform tests and inspections. |
| B. Thickness: In-place compacted thickness of hot-mix asphalt courses will be determined according to ASTM D 3549. |
| C. Surface Smoothness: Finished surface of each hot-mix asphalt course will be tested for compliance with smoothness tolerances. |
| D. In-Place Density: Testing agency will take samples of uncompacted paving mixtures and compacted pavement according to ASTM D 979 or AASHTO T 168. |
| 1. Reference maximum theoretical density will be determined by averaging results from four samples of hot-mix asphalt-paving mixture delivered daily to site, prepared according to ASTM D 2041, and compacted according to job-mix specifications. |
| 2. In-place density of compacted pavement will be determined by testing core samples according to ASTM D 1188 or ASTM D 2726. Cores will also be measured for compacted thickness. The owner and architect may also direct additional cores to be taken a... |
| a. One core sample will be taken for every 1000 sq. yd. or less of installed pavement, with no fewer than 3 cores taken. |
| b. Field density of in-place compacted pavement may also be determined by nuclear method according to ASTM D 2950 and correlated with ASTM D 1188 or ASTM D 2726. |
| c. Coordinate the time and locations of all holes so that cores may be filled. |
| E. The contractor will replace and compact hot-mix asphalt where core tests were taken. |
| F. Remove and replace or install additional hot-mix asphalt where test results or measurements indicate that it does not comply with specified requirements. |
| 3.11 DISPOSAL |
| A. Except for material indicated to be recycled, remove excavated materials from Project site and legally dispose of them in an EPA-approved landfill. |
| 1. Do not allow milled materials to accumulate on-site. |