NM DPS Albuquerque Metropolitan Complex - Project Manual Summary
This is a Project Manual Volume 3 (Divisions 20-33) for the New Mexico Department of Public Safety (DPS) Albuquerque Metropolitan Complex, prepared by the State of New Mexico Facilities Management Division in coordination with Design Group Project 4729. The project encompasses the construction of two new buildings in Albuquerque to consolidate scattered DPS personnel currently housed across multiple locations and the District Five complex. The manual provides comprehensive specifications for divisions including fire suppression systems (Division 21), plumbing (Division 22), HVAC (Division 23), electrical (Division 26), communications (Division 27), electronic safety and security (Division 28), earthwork (Division 31), exterior improvements (Division 32), and utilities (Division 33). Specific fire suppression requirements mandate automatic wet-pipe sprinkler systems designed per NFPA 13 standards with UL-listed and FM-approved components, including ductile iron underground piping, black steel interior piping, pressure relief valves, tamper switches, water flow switches, and fire department connections. All materials must be lead-free (maximum 8.0% lead content), and equipment must be rated for operation at the project's 5,300-foot elevation. The contractor is responsible for complete system design, hydraulic calculations, installation, testing, and commissioning, with submittals required within 45 days of contract award and coordination drawings required prior to work commencement.
The specifications establish stringent quality assurance requirements, including ASME-certified welders, coordination with fire marshals and insurance underwriters, and compliance with the 2021 International Building Code and Fire Code. The contractor must provide seismic restraints capable of resisting 100% of equipment weight for life-safety equipment and 50% for other equipment, with calculations sealed by a New Mexico-licensed structural engineer. Record drawings in mylar and AutoCAD 2008 format must be submitted prior to final payment requests. Environmental and hazardous material protocols prohibit asbestos, mercury, and PCBs. The project includes mandatory coordination with Division 26 (electrical), Division 28 (fire alarm), and other trades to ensure proper clearances, equipment operation, and maintenance access. A one-year mechanical defect warranty is required, commencing upon substantial completion. The contractor must provide operation and maintenance instruction manuals, spare parts lists, and equipment training to the Owner prior to project closeout.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
New Mexico Department of Public Safety
Albuquerque Metropolitan Complex Albuquerque, New Mexico
Volume 3 of 3 Divisions 20 through 33
PROJECT MANUAL
May 29, 2026
Design Group Project 4729
STATE OF NEW MEXICO - FACILITIES MANAGEMENT DIVISION MAY 29, 2026
NM DPS ALBUQUERQUE METRO COMPLEX
ALBUQUERQUE, NEW MEXICO
00 01 10 – TABLE OF CONTENTS - 1
TABLE OF CONTENTS
Volume 1 of 3
Number SECTION TITLE
DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS
REQUEST FOR PROPOSAL (RFP) #60-35000-26-08799
APPENDIX H - DRAFT CONSTRUCTION CONTRACT
00 01 10 – TABLE OF CONTENTS - 2
TABLE OF CONTENTS
Volume 2 of 2
Number SECTION TITLE
DIVISION 01 - GENERAL REQUIREMENTS
01 10 00 SUMMARY
01 21 00 ALLOWANCES information needed
01 23 00 ALTERNATES information needed
01 25 00 SUBSTITUTION PROCEDURES
01 25 01 SUBSTITUTION REQUEST FORM
01 26 00 CONTRACT MODIFICATION PROCEDURES
01 29 00 PAYMENT PROCEDURES
01 31 00 PROJECT MANAGEMENT AND COORDINATION
01 32 00 CONSTRUCTION PROGRESS DOCUMENTATION
01 33 00 SUBMITTAL PROCEDURES
01 40 00 QUALITY REQUIREMENTS
01 42 00 REFERENCES
01 50 00 TEMPORARY FACILITIES AND CONTROLS
01 60 00 PRODUCT REQUIREMENTS
01 73 00 EXECUTION
01 77 00 CLOSEOUT PROCEDURES
01 78 23 OPERATION AND MAINTENANCE DATA
01 78 39 PROJECT RECORD DOCUMENTS
01 79 00 DEMONSTRATION AND TRAINING
01 91 13 GENERAL COMMISSIONING REQUIREMENTS
DIVISION 02 – EXISTING CONDITIONS
02 41 16 STRUCTURE DEMOLITION
00 01 10 – TABLE OF CONTENTS - 3
DIVISION 03 – CONCRETE
03 10 00 CONCRETE FORMING AND ACCESSORIES
03 20 00 CONCRETE REINFORCING
03 30 00 CAST-IN-PLACE CONCRETE
03 35 43 POLISHED CONCRETE FINISHING
DIVISION 04 – MASONRY
04 20 00 UNIT MASONRY
04 26 13 MASONRY VENEER
DIVISION 05 – METALS
05 12 00 STRUCTURAL STEEL
05 21 00 STEEL JOISTS
05 31 23 METAL ROOF DECK
05 40 00 COLD-FORMED METAL FRAMING
05 50 00 METAL FABRICATIONS
05 52 13 PIPE AND TUBE RAILINGS
DIVISION 06 – WOOD, PLASTICS, AND COMPOSITES
06 10 00 ROUGH CARPENTRY
06 16 00 SHEATHING
06 41 16 PLASTIC-LAMINATE-FACED ARCHITECTURAL CABINETS
06 64 00 PLASTIC PANELING
DIVISION 07 – THERMAL AND MOISTURE PROTECTION
07 11 13 BITUMINOUS DAMPPROOFING
07 21 00 THERMAL INSULATION
07 24 13 POLYMER-BASED EXTERIOR INSULATION AND FINISH SYSTEM (EIFS)
07 27 26 FLUID-APPLIED MEMBRANE AIR BARRIERS
00 01 10 – TABLE OF CONTENTS - 4
07 54 19 72 MIL INDUCTION WELDED PVC SYSTEM
07 62 00 SHEET METAL FLASHING AND TRIM
07 71 00 ROOF SPECIALTIES
07 84 13 PENETRATION FIRESTOPPING
07 84 43 JOINT FIRESTOPPING
07 92 00 JOINT SEALANTS
DIVISION 08 – OPENINGS
08 11 13 HOLLOW METAL DOORS AND FRAMES
08 14 16 FLUSH WOOD DOORS
08 31 13.53 SECURITY ACCESS DOORS AND FRAMES
08 31 13 ACCESS DOORS AND FRAMES
08 33 23 OVERHEAD COILING DOORS
08 34 63 DETENTION DOORS AND FRAMES
08 41 13 ALUMINUM-FRAMED ENTRANCES AND STOREFRONTS
08 44 13 GLAZED ALUMINUM CURTAIN WALLS
08 56 53 SECURITY WINDOWS
08 71 00 DOOR HARDWARE
08 71 63 DETENTION DOOR HARDWARE
08 79 13 KEY STORAGE EQUIPMENT (KNOX BOX)
08 80 00 GLAZING
08 87 00 GLAZING SURFACE FILMS
08 88 50 VISION CONTROL GLASS
08 88 53 SECURITY GLAZING
DIVISION 09 – FINISHES
09 22 16 NON-STRUCTURAL METAL FRAMING
09 29 00 GYPSUM BOARD
09 29 05 BULLET RESISTANT FIBERGLASS ARMOR
00 01 10 – TABLE OF CONTENTS - 5
09 30 13 CERAMIC TILING
09 51 13 ACOUSTICAL PANEL CEILINGS
09 65 13 RESILIENT BASE AND ACCESSORIES
09 65 36 STATIC-CONTROL RESILIENT FLOORING
09 67 23 RESINOUS FLOORING
09 68 13 TILE CARPETING
09 84 36 SOUND-ABSORBING CEILING UNITS
09 91 13 EXTERIOR PAINTING
09 91 23 INTERIOR PAINTING
09 96 00 HIGH-PERFORMANCE COATINGS
DIVISION 10 – SPECIALTIES
10 11 00 VISUAL DISPLAY UNITS
10 14 16 PLAQUES
10 14 19 DIMENSIONAL LETTER SIGNAGE
10 14 23 PANEL SIGNAGE
10 21 13.14 STAINLESS-STEEL TOILET COMPARTMENTS
10 26 00 WALL AND DOOR PROTECTION
10 28 00 TOILET, BATH, AND LAUNDRY ACCESSORIES
10 28 13.63 DETENTION TOILET ACCESSORIES
10 44 13 FIRE PROTECTION CABINETS
10 44 16 FIRE EXTINGUISHERS
10 51 14 EVIDENCE LOCKERS
10 51 44 HANDGUN STORAGE LOCKERS
10 51 51 FLAMMABLE STORAGE LOCKERS
10 56 13 METAL STORAGE SHELVING
10 75 16 GROUND-SET FLAGPOLES
10 82 00 WOVEN WIRE MESH GRILLS AND PARTITIONS
00 01 10 – TABLE OF CONTENTS - 6
10 82 13 EXTERIOR GRILLS AND SCREENS
DIVISION 11 - EQUIPMENT
11 11 00 VEHICLE SERVICE EQUIPMENT
11 31 00 RESIDENTIAL APPLIANCES
11 32 00 CHARGING STATION
DIVISION 12 – FURNISHINGS
12 24 13 ROLLER WINDOW SHADES
12 36 61.16 SOLID SURFACING COUNTERTOPS
12 48 13 ENTRANCE FLOOR MATS AND FRAMES
12 48 16 ENTRANCE FLOOR GRILLES
12 55 00 DETENTION FURNITURE
12 93 00 SITE FURNISHINGS x
DIVISIONS 13 - SPECIAL CONSTRUCTION
NOT USED
DIVISIONS 14 – CONVEYING EQUIPMENT
00 01 10 – TABLE OF CONTENTS - 7
TABLE OF CONTENTS
Volume 3 of 3
Number SECTION TITLE
DIVISION 20 – MECHANICAL REQUIREMENTS
DIVISION 21 - FIRE SUPPRESSION
21 05 00 COMMON WORK REQUIREMENTS FOR FIRE SUPPRESSION
21 05 03 TRENCHING AND BACKFILLING FOR FIRE SUPPRESSION
21 05 04 PIPE AND PIPE FITTINGS FOR FIRE SUPPRESSION
21 05 05 PIPING SPECIALTIES FOR FIRE SUPPRESSION
21 05 23 VALVES FOR FIRE SUPPRESSION
21 05 48 VIBRATION AND SEISMIC CONTROLS FOR FIRE PROTECTION
21 05 49 FIRE SUPPRESSION AND ELECTRICAL INSTALLATION COORDINATION
21 13 13 FIRE PROTECTION SYSTEM, AUTOMATIC WET-PIPE SPRINKLER
DIVISION 22 - PLUMBING
22 05 00 COMMON WORK RESULTS FOR PLUMBING
22 05 03 TRENCHING AND BACKFILLING FOR PLUMBING
22 05 04 PIPE AND PIPE FITTING FOR PLUMBING
22 05 05 PIPING SPECIALTIES FOR PLUMBING
22 05 23 VALVES FOR PLUMBING
22 05 48 VIBRATION AND SEISMIC CONTROLS FOR PLUMBING
22 05 49 PLUMBING & ELECTRICAL INSTALLATION COORDINATION
22 07 00 PLUMBING INSULATION
22 11 00 DOMESTIC WATER PIPING
22 11 23 FACILITY NATURAL GAS SYSTEM
22 13 16 SANITARY WASTE AND VENT PIPING
00 01 10 – TABLE OF CONTENTS - 8
22 14 00 FACILITY ROOF AND AREA DRAINAGE
22 15 00 COMPRESSED AIR SYSTEMS
22 40 00 PLUMBING FIXTURES AND TRIM
22 68 01 OUTSIDE UTILITIES
DIVISION 23 - HEATING, VENTILATING, AND AIR CONDITIONING (HVAC)
23 05 00 COMMON WORK REQUIREMENTS FOR HVAC
23 05 03 TRENCHING AND BACKFILLING FOR HVAC
23 05 04 PIPE AND PIPE FITTINGS
23 05 23 VALVES
23 05 48 VIBRATION ISOLATION, SEISMIC & WIND RESTRAINTS FOR MEP
SYSTEMS & EQUIPMENT
23 05 49 HVAC AND ELECTRICAL INSTALLATION COORDINATION
23 05 93 TESTING, ADJUSTING, AND BALANCING OF MECHANICAL SYSTEMS
23 07 00 MECHANICAL SYSTEMS INSULATION
23 09 00 FACILITY MANAGEMENT SYSTEM
23 23 13 REFRIGERANT PIPING SYSTEM AND EQUIPMENT
23 30 00 AIR TEMPERING SYSTEM AND EQUIPMENT
23 74 13 PACKAGED OUTDOOR CENTRAL STATION AIR HANDLING UNITS
23 74 33 PACKAGED DEDICATED OUTDOOR-AIR UNITS WITH ENERGY RECOVERY
DIVISION 26 – ELECTRICAL
26 00 50 BASIC ELECTRICAL MATERIALS AND METHODS
26 05 19 LOW VOLTAGE ELECTRICAL POWER CONDUCTORS AND CABLES
26 05 26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS
26 05 29 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS
26 05 33 RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS
26 05 43 UNDERGROUND DUCTS AND RACEWAYS FOR ELECTRICAL SYSTEMS
26 05 44 SLEEVES AND SLEEVE SEALS FOR ELECTRICAL RACEWAYS AND
CABLING
00 01 10 – TABLE OF CONTENTS - 9
26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEMS
26 05 73 OVERCURRENT PROTECTIVE DEVICE COORDINATION STUDY
26 05 74 OVERCURRENT PROTECTIVE DEVICE ARC-FLASH STUDY
26 09 23 LIGHTING CONTROL DEVICES
26 22 00 LOW-VOLTAGE TRANSFORMERS
26 24 13 SWITCHBOARDS
26 24 16 PANELBOARDS
26 27 26 WIRING DEVICES
26 28 16 ENCLOSED SWITCHES AND CIRCUIT BREAKERS
26 36 00 TRANSFER SWITCHES
26 43 13 SURGE PROTECTION FOR LOW-VOLTAGE ELECTRICAL POWER CIRCUITS
26 51 00 INTERIOR LIGHTING
26 52 19 EMERGENCY AND EXIT LIGHTING
26 56 00 EXTERIOR LIGHTING
DIVISION 27 – COMMUNICATIONS
27 05 00 COMMON WORK REQUIREMENTS FOR COMMUNICATIONS
27 05 26 GROUNDING AND BONDING FOR COMMUNICATIONS SYSTEMS
27 05 28 PATHWAYS FOR COMMUNICATIONS SYSTEMS
27 05 36 CABLE TRAYS FOR COMMUNICATIONS SYSTEMS
27 05 44 SLEEVES & SLEEVE SEALS FOR COMMUNICATIONS PATHWAYS &
CABLING
27 11 00 COMMUNICATIONS EQUIPMENT ROOM FITTINGS
27 13 00 COMMUNICATIONS BACKBONE CABLING
27 15 00 COMMUNICATIONS HORIZONTAL CABLING
27 16 22 CABLING FOR AUDIO-VISUAL SYSTEMS
27 41 00 AUDIO-VISUAL SYSTEMS
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 05 26 GROUNDING AND BONDING FOR ELECTRONIC SAFETY AND SECURITY
00 01 10 – TABLE OF CONTENTS - 10
28 05 28 PATHWAYS FOR ELECTRONIC SAFETY AND SECURITY
28 05 44 SLEEVES AND SLEEVE SEALS FOR ELECTRONIC SAFETY AND SECURITY
PATHWAYS AND CABLING
28 13 00 ACCESS CONTROL
28 20 00 VIDEO SURVEILLANCE
28 46 21.11 ADDRESSABLE FIRE-ALARM SYSTEMS
DIVISION 31 – EARTHWORK
31 00 00 EARTHWORK
31 23 03 BUILDING PAD PREPARATION
DIVISION 32 – EXTERIOR IMPROVEMENTS
32 12 00 FLEXIBLE PAVING
32 13 00 CONCRETE PAVEMENT, CURB AND SIDEWALK
32 31 19.53 DECORATIVE METAL SECURITY FENCES AND GATES
32 84 00 LANDSCAPE IRRIGATION SYSTEM
32 93 00 PLANTS
DIVISION 33 – UTILITIES
33 10 00 WATER UTILITIES
33 30 00 SANITARY SEWER UTILITIES
33 40 00 STORM DRAIN UTILITIES
END OF TABLE OF CONTENTS
21 05 00 - COMMON WORK REQUIREMENTS FOR FIRE SUPPRESSION - 1
SECTION 21 05 00
COMMON WORK REQUIREMENTS FOR FIRE SUPPRESSION
GENERAL
SCOPE OF WORK
See General Conditions and Supplemental General Conditions.
The requirements listed under General Conditions and Supplemental General Conditions and the General Requirements are applicable to this section and all subsequent sections of Division
21 and form a part of the contract.
Division 22 for Plumbing Systems.
Division 23 for Heating, Ventilating and Air Conditioning (HVAC) Systems.
Division 26 for Electrical Systems.
Division 28 for Fire Alarm Systems.
Division 33 for requirements of site utility systems, including sanitary sewer, storm sewer, domestic water distribution system, fire main water distribution system, and natural gas service.
All electrical work, regardless of voltage which is provided under Division 21 shall comply with the requirements of the National Electric Code (NEC) and Division 26.
FIRE SUPPRESSION DIVISION INDEX
Section 21 0500 Common Work Requirements for Fire Suppression
Section 21 0503 Trenching and Backfilling for Fire Suppression
Section 21 0504 Pipe and Pipe Fittings for Fire Suppression
Section 21 0505 Piping Specialties for Fire Suppression
Section 21 0523 Valves for Fire Suppression
Section 21 0548 Vibration and Seismic Control for Fire Suppression
Section 21 0549 Fire Suppression and Electrical Installation Coordination
Section 21 1313 Fire Protection System, Automatic Wet Pipe Sprinkler
21 05 00 - COMMON WORK REQUIREMENTS FOR FIRE SUPPRESSION - 2
CODES AND PERMITS
The fire suppression shall be performed in strict accordance with the applicable provisions of the International Building Code, 2021 Edition; the Uniform Plumbing Code, 2021 Edition; the
Uniform Mechanical Code, 2021 Edition and the International Fire Code, 2021 Edition as adopted and interpreted by the State of New Mexico, City of Albuquerque, and the National
Fire Protection Association (NFPA Regulations), current adopted edition, regarding fire protection, heating and ventilating and air conditioning systems and electrical systems. All materials and labor necessary to comply with rules, regulations and ordinances shall be provided. Where the drawings and/or specifications indicate materials or construction in excess of code requirements, the drawings and/or specifications shall govern. The Contractor shall hold and save the Architect free and harmless from liability of any nature or kind arising from his failure to comply with codes and ordinances.
Permits necessary for performance of the work shall be secured and paid for by the Contractor.
See Division 33 for all requirements associated with utility permits and fees, connections and extensions.
The following lists some applicable codes and standards that shall be followed.
Applicable county and state mechanical, electrical, gas, plumbing, health and sanitary codes, laws and ordinances
National Electrical Manufacturer's Association Standards
National Electrical Code
Underwriters Laboratories, Inc. Standards
American National Standards Institute
American Society for Testing Materials Standards
Standards and requirements of local utility companies
National Fire Protection Association Standards
American Society of Mechanical Engineers Boiler and Pressure Vessel Codes
Occupational Safety and Health Act
The American Society of Sanitary Engineering
RECORD DRAWINGS
See Division 1, for requirements associated with Project Record Drawings.
The Contractor shall be responsible to maintain a complete and accurate set of marked up reproducible sepias showing information on the installed location and arrangement of all mechanical work, and in particular, where changes were made during construction. The
Contractor shall be responsible for keeping record drawings accurate and up-to-date throughout the construction period. Record drawings may be reviewed and checked by the Architect during the construction and in conjunction with review and approval of monthly pay requests.
The Contractor shall include copies of all addenda, RFI's, bulletins, and change orders neatly taped or attached to record drawing set.
After installation and acceptance of direct buried underground piping and service lines in trenches, the Contractor shall take 'as-built' measurements, including all depths, prior to commencement of backfilling operations. It will not be sufficient to check off line locations.
21 05 00 - COMMON WORK REQUIREMENTS FOR FIRE SUPPRESSION - 3
Definite measurements shall be taken for each service line. The location of buried piping and trench service lines shall be shown on the drawings and dimensioned from fixed points.
QUALIFICATIONS
All mechanics shall be skilled in their respective trade.
All welders shall be certified in accordance with the ASME Boiler Test Code, Section IX, latest issue.
QUALIFICATION PROCEDURES
The storage, handling, and transportation of all refrigerants, oils, lubricants, etc. shall be accomplished in strict compliance with all State, local, and Federal Regulations including all requirements set forth by the Environmental Protection Agency (EPA) for the safe handling of regulated refrigerants and materials. The Contractor shall utilize qualified and/or certified personnel and equipment as prescribed by these requirements.
HAZARDOUS CONDITIONS
Protruding metal (bolts, steel angles, etc.) potentially hazardous to maintenance and operation personnel, shall be cut back and/or protected to reduce the risk of injury.
HAZARD SIGNS
Equipment rooms, fan plenums, and similar areas containing moving or rotating parts, or other potentially hazardous environments shall include signs on all doors entering such spaces that shall read similar to the following: "Hazardous Area - Authorized Personnel Only."
Confined Spaces: Areas designated by OSHA Standard 1910.146 as a confined space shall be marked with a sign that reads "Confined Space - Entry by authorized personnel only, by permit."
"Confined Space" means a space that:
Is large enough and so configured that an employee can bodily enter and perform assigned work; and
Has limited or restricted means for entry or exit (for example, tanks, vessels, storage bins, hoppers, vaults, and pits are spaces that may have limited means of entry); and
Is not designed for continuous employee occupancy.
The Contractor shall survey the final premises to determine where any such potentially hazardous areas exist. If the Contractor feels that hazards exist which cannot be suitably provided for through the above typical methods, he shall forward in writing his concerns, and
21 05 00 - COMMON WORK REQUIREMENTS FOR FIRE SUPPRESSION - 4
request for a decision concerning the referenced hazard, prior to the final inspection of the facilities.
SUBMITTALS
The Contractor shall submit submittal brochures of all equipment, fixtures and materials to be furnished under Division 21, including but not limited to the following:
Piping materials, valves, equipment and installation methods, vibration isolation devices, pipe penetration installation methods and products for fire rated assemblies, and all equipment listed on equipment schedules, and in related construction documents.
Materials, certification, shop drawings, and other information as specified in the individual Division 21 Specification Sections within this Specification.
Unauthorized Substitutions: If substitute materials, equipment or systems are installed without prior review or are installed in a manner which is not in conformance with the requirement of this Specification and for which the Contractor has not received a written review, removal of all the unauthorized materials and installation of those indicated or specified shall be provided at no change in contract amount.
All equipment shall be installed in accordance with the manufacturer's recommendations.
Provide all accessories and components for optimum operation as recommended by the manufacturer.
Expense: All costs for the preparation, correction, delivery, and return of the submittals shall be borne by the Contractor.
Submittals and one resubmittal will be reviewed by the Architect/Engineer. If the Contractor fails to provide the required data with his second submittal, he will be charged for the third and subsequent reviews.
See Division 1 for additional submission requirements.
The Contractor shall submit a maximum of seven (7) copies of submittal brochures for review.
Brochures shall be submitted within thirty (30) days after contract award. One (1) copy of all submittals will be retained by the Engineer. The remaining copies will be returned to the
Architect. Additional sets of submittals, if required by the Contractor, shall be reproduced by the Contractor from the reviewed and marked sets returned to the Contractor.
Complete data must be furnished showing performance, quality and dimensions. No equipment or materials shall be purchased prior to receiving written notification that submittals have been reviewed and marked either "NO EXCEPTIONS TAKEN" or "EXCEPTIONS AS NOTED."
Submittals returned marked "EXCEPTIONS AS NOTED" do not require resubmittal provided that the Contractor agrees to comply with all exceptions noted in the submittal, and so states in a letter.
Review of Submittals: Submittals will be reviewed with reasonable promptness, but only for conformance with the design concept of the Project and for conformance with the information indicated on the Drawings and stated in the Specifications. Review of a separate item as such
21 05 00 - COMMON WORK REQUIREMENTS FOR FIRE SUPPRESSION - 5
will not indicate review of the assembly in which the item functions. Review of submittals shall not relieve the Contractor of responsibility for any deviation from the requirements of the
Contract Documents, nor for errors or omissions in the submittals; or for the accuracy of dimensions and quantities, the adequacy of connections, and the proper and acceptable fitting, execution, functioning and completion of the work. Review shall not relieve the Contractor of responsibility for the equipment fitting within the allotted space shown on the drawings with all clearances required for equipment operation, service and maintenance including minimum clearances required by applicable codes, manufacturer's installation instructions and as necessary for proper clearance in front of all electrical panels as defined by the National Electric
Code (NEC). Any relocation of mechanical and/or electrical equipment, materials and systems required to comply with minimum clearances shall be provided by the Contractor without additional cost under the Contract.
Shop drawings will be returned unchecked unless the following information is included: cover sheet shall be provided for each submittal of equipment, products and material proposed for use on the project. A common cover sheet for similar equipment (example: all air handling units or all fire protection products) is acceptable. The cover sheet shall list equipment by symbol number; reference all pertinent data in the Specifications or on the drawings; provide size and characteristics of the equipment, name of the project and a space large enough to accept a review stamp. The data submitted shall reflect the actual equipment performance under the specified conditions and shall not be a copy of the scheduled data on the drawings. Cover sheet shall clearly identify any deviations from the specifications for submitted equipment, products, and materials.
Use of substitutions reviewed and checked by the Engineer does not relieve the Contractor from compliance with the Contract Documents. Contractor shall bear all extra expense resulting from the use of any substitutions where substitutions affect adjoining or related work required in this Division or other Divisions of this Specification.
If Contractor substitutes equipment for that drawn to scale on the drawings, he shall prepare a
1/4" = 1'-0" installation drawing for each equipment room where a substitution is made, using dimensions of substituted equipment, and including piping, and electrical equipment requirements, to verify that equipment will fit space with adequate clearances for maintenance.
This 1/4" = 1'-0" fabrication drawing shall be submitted for review with the shop drawing submittals of the substitution. Failure to comply with this requirement will result in the shop drawings being returned unchecked.
COORDINATION DRAWINGS
The Contractor shall, in advance of the work, prepare coordination drawings for:
Mechanical equipment rooms.
Piping and piping chases.
Complete fire suppression system piping and sprinkler head layout.
Layout of all fire suppression equipment.
Show the location of piping openings through the building floors, walls and roofs coordinated with Architectural and Structural, as well as the location and elevations of building fire suppression equipment and systems and piping, coordinated with plumbing, HVAC and
21 05 00 - COMMON WORK REQUIREMENTS FOR FIRE SUPPRESSION - 6
electrical systems. Coordination drawings, including plans, elevations and sections, as appropriate, shall clearly show the manner in which the fire suppression systems fit into the available space and coordinates with HVAC and plumbing equipment, ductwork, piping, and electrical equipment, including conduits, light fixtures, motor control centers, transformers, panels, variable frequency drives, etc. Drawings shall demonstrate required code clearances for mechanical and electrical equipment, control panels, etc., and proper operation, maintenance and replacement of fire suppression devices and equipment. Coordination drawings shall be of appropriate scale to satisfy the previously stated purposes, but not smaller than 1/8 inch scale for floor plans and 1/4 scale of equipment rooms and chase areas. Drawings may be composite or may be separate but fully coordinated drawings of the same scale. Every subcontractor must sign-off on coordination drawings prepared by each craft. Failure to sign-off will indicate that subcontractor is proceeding at his own risk. Any cost required to relocate systems to comply with required clearance and equipment installation requirements shall be provided by the
Contractor without additional cost under the contract.
Seven (7) complete sets of coordination drawings shall be submitted prior to the scheduled start of the work in the area illustrated by the drawings, for the purpose of showing the Contractor's planned method of installation. The objectives of such drawings are to promote carefully planned work sequence and proper coordination, in order to assure the expeditious solutions of problems, and the installation of lines and equipment as contemplated by the contract documents while avoiding or minimizing additional costs to the Contractor and to the Owner.
In the event the Contractor, in coordinating the various installations and in planning the method of installation, finds a conflict in location or elevation of any of the mechanical systems, with the structural items or with other construction items, such conflicts shall immediately be documented and submitted for clarification. In doing so, the Contractor shall explain the proposed method of solving the problem, or shall request instructions as to how to proceed if adjustments beyond those of usual trades coordination are necessary.
Installation of fire suppression work shall not proceed prior to the submission and completion of the review of the coordination drawings, and any conflicts which are disclosed by the coordination drawings. It is the responsibility of the Contractor to submit the required drawings in a timely manner consistent with the requirements for completing the work covered by this contract within the prescribed contract time.
USE OF CADD FILES
Under certain conditions, the Contractor will be permitted the use of the Engineer's CADD files for documentation of as-builts, submittals, or coordination drawings.
The Engineer shall be compensated for the time necessary to format the CADD files delivery to the Contractor. Such work will include removal of title blocks, professional for seals, calculations, proprietary information, etc.
The Contractor shall complete the enclosed License, Indemnity and Warranty Agreement, complete with contractor's name, address, and Contractor's Representative signature prior to request for CADD file usage.
21 05 00 - COMMON WORK REQUIREMENTS FOR FIRE SUPPRESSION - 7
PRIOR APPROVAL
Prior approval (approval prior to bid) of alternate mechanical equipment suppliers and service providers is not required. Please do not request prior approval. Alternate manufacturers and service providers may be submitted after bid in accordance with the submittal process provided they meet or exceed the specifications and the indicated design intent.
Equipment manufacturers and service providers are listed within the specifications for the work specified in this division. For the items listed below, the specified manufacturers and providers are the only ones presently approved, and may be the only ones allowed:
Fire Pump
Plumbing Fixtures and Trim
Water Treatment Equipment
Manufacturers and service providers who are not listed in these specs, and who offer equivalent or superior products or services, are invited to submit for approval prior to bid (prior approval).
Submit two copies. Requests for prior approval must:
Include the substitution request form at the end of this spec section.
Include technical data sufficient for the Engineer to generally assess appropriateness for this project.
Be submitted minimum ten days prior to the bid date in effect at the time of submission.
Comply with any additional requirements per specification Division 1.
Any additional prior approved alternate manufacturers and service providers will be published in an addendum prior to bid. Prior approval indicates that based on the information submitted it appears to the Engineer that the alternate might be capable of meeting the specifications and the design intent, and might be appropriate for the project. But prior approval does not guarantee this. Prior approved products and service providers must still go through the submittal process after award, and must still comply with the design intent and all specification requirements.
Please do not request prior approval for products and service providers that are not listed above.
Instead, for those items alternate manufacturers and alternate service providers may be submitted after bid in accordance with the submittal process, provided they meet or exceed the specifications and the indicated design intent.
GUARANTEE-WARRANTY
See Division 1 for warranties.
The following guarantee is a part of the specifications and shall be binding on the Contractor:
"The Contractor guarantees that this installation is free from mechanical defects. He agrees to replace or repair any part of the installation which may fail within a period of one year after date established below, provided that such failure is due to defects in the materials or workmanship or to failure to follow the specifications and drawings. Warranty of the Contractor-furnished equipment or systems shall begin on the date the system or equipment is placed in operation for beneficial use of the Owner or occupancy by the Owner, whichever occurs first; such date will
21 05 00 - COMMON WORK REQUIREMENTS FOR FIRE SUPPRESSION - 8
be determined in writing, by means of issuing a 'Certificate of Substantial Completion', AIA
Form G704," or equivalent.
The extent of guarantees or warranties by Equipment and/or Materials Manufacturers shall not diminish the requirements of the Contractor's guarantee-warranty to the Owner.
PRODUCTS
QUALITY OF MATERIALS
All equipment and materials shall be new, and shall be the standard product of manufacturers regularly engaged in the production of fire suppression equipment and shall be the manufacturer's latest design. Specific equipment, shown in schedules on drawings and specified herein, is to set forth a standard of quality and operation.
Hazardous or Environmentally Damaging Materials: Products shall not contain asbestos, mercury, PCBs, or other materials harmful to people or the environment.
ALTITUDE RATINGS
Unless otherwise noted, all specified equipment capacities are for an altitude of 5,300 feet above sea level and adjustments to manufacturer's ratings must be made accordingly.
ELECTRICAL SERVICES – MOTORS
Each motor, unless otherwise specified of 3/4 HP and greater, shall be designed for operation with 3 phase, 60 Hz, 460 volt electrical service. Unless otherwise specified, motors of 1/2 hp and less shall be designed for operation with single phase, 60 Hz, 120 volt electrical service.
Motors shall be 1750 RPM, squirrel cage, normal starting torque and normal starting current, in accordance with NEMA standards unless otherwise specified.
NEMA EFFICIENCY
Motor Horsepower Efficiency, Minimum
5 90.2
7-1/2 91.0
10 91.7
15 92.4
20 93.0
25 92.4
30 93.0
40 93.6
50 93.6
60 93.6
75 95.0
21 05 00 - COMMON WORK REQUIREMENTS FOR FIRE SUPPRESSION - 9
All T-frame, ODP motors 5 HP and above shall be premium efficiency motors with a minimum power factor of 0.85 on 1800 RPM motors and a minimum efficiency rating in accordance with
IEEE Standard 112, Test Method 'B' as scheduled below. In addition, all motors used in conjunction with variable frequency drives shall be premium efficiency.
Motors, including premium efficiency motors shall be manufactured by General Electric
Baldor, Louis Allis (Spartan), Marathon, Reliance Electric, Westinghouse, or equivalent having equal efficiencies.
Special motors as may be necessary by the application and as specified herein and on the drawings include C-FACE, totally enclosed fan cooled (TEFC), explosion-proof, etc., shall be provided as required and shall be furnished manufacturer's premium efficiency rating for 5 HP and larger.
Each motor shall be of the horsepower as specified and suitable for use at an altitude of 5,300 feet. All motors shall have grease lubricated sealed ball bearings. Motors larger than 1 HP shall have a standard grease fitting "Zerk" and a separate grease relief tapping. Motors shall be factory lubricated. Motors shall be commercially dynamically balanced and tested at the factory before shipment and shall be selected for quiet operation. The Contractor shall line up motors and drives and place motors and equipment on foundations ready for operation.
Unless indicated otherwise, motors shall be NEMA design B with a service factor of 1.15 with
40oC rise and total temperature rise of 65oC ambient and when powered from the system voltage feeding the motor. TEFC motors shall have a service factor of 1.00 with total temperature rise of 65oC in the above conditions. Motors located in areas exceeding 40oC in the ambient shall be factory rated for the ambient temperature of the motor environment. Single phase motors shall generally be NEMA Type N split phase induction motors with built-in thermal protectors. Unless otherwise specified for a particular application use electric motors with the following requirements.
Single-phase Motors: Capacitor-start type for hard starting applications. Motors for centrifugal fans and pumps may be split phase or permanent split capacitor (PSC).
Polyphase Motors: NEMA Design B, Squirrel cage, induction type. Each two speed motor shall have two separate windings.
Rating: Continuous duty at 100% capacity in an ambient temperature of 40oC.
If the Division 21 Contractor proposes to furnish motors varying in horsepower and/or characteristics from those specified, he shall first submit his request for the change and shall then coordinate the change with Division 26, Electrical and shall pay all additional charges in connection with the change.
ELECTRICAL WIRING AND CONTROL EQUIPMENT
All wiring and conduit shall be furnished and installed as scheduled in Section 21 0549, Fire
Suppression and Electrical Installation Coordination, unless otherwise noted or directed.
The Contractor shall coordinate completely with all trades and Sub-Contractors as required to ensure that all necessary components of control work are included and fully understood. No additional cost shall accrue to the Owner as a result of lack of such coordination.
21 05 00 - COMMON WORK REQUIREMENTS FOR FIRE SUPPRESSION - 10
The fire suppression piping system may be bonded to the electrical ground bus at the electrical service equipment, but shall not under any circumstances be used as the main grounding electrode for the electrical service.
PAINTING
All finish painting of fire suppression systems and equipment will be under "Painting," unless equipment is hereinafter specified to be provided with factory applied finish coats.
All equipment shall be provided with factory applied prime finish, unless otherwise specified.
Touch-Up: If the factory finish on any equipment is damaged in shipment or during construction of the building, the equipment shall be refinished.
COUPLING GUARDS
All flexibly connected pumps shall be provided with protective steel coupling guards.
IDENTIFICATION OF VALVES
Each valve shall be provided with a stamped metal tag secured to the valve. Tag shall indicate the valve number, the service and function of each valve. The Contractor shall furnish two sets of prints of drawings showing floor plan for each floor with all valves accurately located and labeled. Submitted drawings shall be neat and easily readable. In addition, the Contractor shall provide a valve chart, typed neatly on 8-1/2" x 11" sheets, listing the number, size, location, function, normal operating position, on each valve installed under Division 21. Tags shall be stamped brass 1-1/2" diameter, and secured to valves by heavy copper figure eight hooks, braided stainless steel wire anchor, or other approved means.
Division 21 valve tags shall be coordinated with Division 22 and Division 23 valve tags for coordinated format between each division.
PIPING SYSTEM IDENTIFICATION
Means of Identification: All piping shall be identified by each of the means described below.
The Contractor shall provide shop drawing submittal data for proposed labeling system materials and manufacturer's recommended installation procedures.
Piping Systems shall be identified by means of an identifying legend on color coded background appropriately worded to indicate the "service" name of the pipe as shown on the drawings. Color coded banding shall also be provided. Additionally, an arrow shall be included to indicate the direction of flow through the pipe.
Locations of Piping System Identification: The identifying legends and directional arrows described in the paragraphs preceding shall be located at the following points on each piping system:
21 05 00 - COMMON WORK REQUIREMENTS FOR FIRE SUPPRESSION - 11
Adjacent to each valve in piping system.
At every point of entry and exit where piping passes through a wall.
On each pipe riser and junction.
At a maximum interval of 20 feet on pipe lines exposed and concealed above accessible ceilings.
Adjacent to all special fittings (regulating valves, etc.) in piping systems.
At every access door.
Piping identification shall meet the standards of the Federal Occupational Safety Health Act
(OSHA) which refers to the ANSI Standard A13.1. The following standardized color code scheme shall be used:
Yellow Hazardous Materials
Green Liquid Materials of Inherently Low Hazard
Blue Gaseous Materials of Inherently Low Hazard
Red Fire Protection Materials
The size of letter and length of color field shall conform to the ANSI standard and shall be as follows:
Outside Diameter of Pipe or Covering Length of Color Field Size of Letters
To 1-1/4” 8” ½”
1-1/2” to 2” 8” ¾”
2-1/2” to 6” 12” 1-1/4”
8” to 10” 24” 2-1/2”
Over 10” 32” 3-1/2”
All pipe labels exposed within mechanical equipment spaces shall be semi-rigid plastic identification markers. Each label shall have appropriately color-coded background with printed legend. Directional flow arrows shall be included on label. Labels shall "snap-on" around pipe without the requirement for adhesive or bonding of piping sizes 3/4" through 5".
Labels for piping 6" and larger shall be furnished with spring attachment at each end of label.
Labels shall be "SETMARK" Type SNA, 3/4" through 5" size and Type STR, 6" and larger, as manufactured by Seton Name Plate Corporation, Brady, or equivalent.
All pipe labels except pipe labels located exposed within the mechanical equipment spaces shall be vinyl material with permanent adhesive for application to clear dry pipe and/or insulation jacketing. Each label shall have appropriate color-coded background with printed legend.
Direction arrows shall be placed next to label to indicate flow direction. Color and size of arrows shall correspond to that of label. Pressure sensitive pipe tape matching the background color of the label shall be placed over each end of the label and completely around the pipe.
Attach pipe markers to lower quarter of the pipe on horizontal runs and on the centerline of vertical piping where view is not obstructed. Flow indicator arrow shall point away from pipe marker.
Provide the following labels, with ANSI/OSHA color for all piping systems as shown on the drawings and as listed below:
21 05 00 - COMMON WORK REQUIREMENTS FOR FIRE SUPPRESSION - 12
Service/Legend Letter Color Background Color
Fire Protection Water White Red
Fire Auto Sprinkler White Red
Fire Dry Standpipe White Red
Fire Wet Standpipe White Red
Fire Combination Standpipe White Red
IDENTIFICATION OF CONTROL SYSTEM DEVICES
All automatic controls, control panels, pressure electric, electric pressure switches, relays and starters shall be clearly tagged and identified.
UNDERGROUND PIPING SYSTEM IDENTIFICATION
Bury a continuous, preprinted, bright colored, plastic ribbon cable marker with each underground pipe regardless of whether encased. Locate directly over buried pipe, 6" to 8" below finished grade. Marker tape used in conjunction with buried plastic piping systems shall be special detector type. Marker tape used in conjunction with buried plastic piping systems shall be special detection type.
ACCESS DOORS
Provide all access doors required for access to valves, controls, or other items for which access is required for either operation or servicing. All costs incurred through failure to perform this function as the proper sequence of this work ¬shall be borne by the Contractor. The type of access door shall be as required by the room finish schedule. Acoustical tile access doors shall be equal to Krueger Style B, Style A for acoustical plaster, Style C-CE for sidewall drywall or plaster construction.
Access doors shall be not less than 24" x 24" in size except that larger panels shall be furnished where required, and panels in tile or other similar patterned ceilings shall have dimensions corresponding to the tile or pattern module.
Where access doors are installed in walls required to have a specific fire rating, the access door installed shall be a fire rated access door with UL label, as manufactured by Milcor or equivalent. Access door in 1-hour construction shall be Class C and access doors in 2-hour construction shall be Class B.
EXECUTION
COOPERATION WITH OTHER TRADES
The Contractor shall refer to other parts of these specifications covering the work of other trades which must be carried on in conjunction with the mechanical work so that the construction
21 05 00 - COMMON WORK REQUIREMENTS FOR FIRE SUPPRESSION - 13
operations can proceed without harm to the Owner from interference, delay, or absence of coordination. The Contractor shall be responsible for the size and accuracy of all openings.
DRAWINGS
The complete design for the project fire suppression system including drawings, hydraulic calculations, piping sizing and arrangement, head layouts, equipment selection, etc., shall be the responsibility of Division 21 Contractor. Preparation of the fire suppression system design shall be in accordance with all Division 21 specification requirements, NFPA requirements and
Authorities Having Jurisdiction.
Should any doubt or question arise in respect to the true meaning of the drawings or specifications, the question shall be submitted in writing.
Installation of all fire suppression equipment and piping systems shall be arranged to provide all clearances required for equipment operation, service, and maintenance, including minimum clearances required by applicable codes, manufacturer's installation instructions and as necessary for proper clearance in front of all electrical panels as defined by the National Electric
Code (NEC). Piping systems shall not be routed through or above electrical equipment room or electrical equipment space designed within mechanical equipment rooms.
The Contractor's attention is directed to the unique architectural design features and consideration associated with this facility which will require significantly greater levels of coordination and cooperation for the work furnished and installed under Division 21 with the associated architectural, structural, and electrical work than is normally necessary for a more typical facility.
The installation of all concealed fire suppression systems shall be carefully arranged to fit within the available space without interference with adjacent mechanical, plumbing, structural and electrical systems. The Contractor shall make all necessary provisions for penetrations of piping, including sleeves and blockouts in structural systems. The exact location of all exposed fire suppression systems, including access doors; sprinkler piping exposed within finished areas;
and other equipment and devices as applicable, shall be coordinated with the Architect, who shall have final authority for the acceptance of the work as it specifically relates to the architectural aesthetic design requirements for the facility.
FIELD MEASUREMENTS
The Contractor shall verify the dimensions and conditions governing his work at the building.
No extra compensation shall be claimed or allowed on account of differences between actual dimensions, including dimensions of equipment, fixtures and materials furnished, and those indicated on the drawings. Contractor shall examine adjoining work, on which his work is dependent for perfect efficiency, and shall report any work which must be corrected.
Coordination of all fire suppression work within the building will be the direct responsibility of the Contractor. Review of submittal data in accordance with paragraph "Submittals" shall in no manner relieve the Contractor of responsibility for the proper installation of the fire suppression work within the available space. Installation of equipment and systems within the building space shall be carefully coordinated by the Division 21 Contractor with all building trades.
21 05 00 - COMMON WORK REQUIREMENTS FOR FIRE SUPPRESSION - 14
Each contractor shall so harmonize his work with that of the several other trades that it may be installed in the most direct and workmanlike manner without hindering or handicapping the other trades. Piping interferences shall be handled by giving precedence to pipe lines which require a stated grade for proper operation. Sewer lines shall take precedence over water lines in determination of elevations. In all cases, lines requiring a stated grade for their proper operation shall have precedence over electrical conduit and ductwork. Installation of fire suppression, plumbing and HVAC systems within the ceiling cavity shall be in the following order of priority: plumbing waste lines; roof drains; supply, return, outside air, makeup, and exhaust ductwork; condensate piping; fire sprinkler mains; fire sprinkler branch piping and sprinkler runouts; domestic hot and cold water; control piping, wiring and conduit;
miscellaneous special piping systems.
EQUIPMENT SUPPORT
Contractor shall provide support for equipment to the building structure. Contractor shall furnish all necessary structures, inserts, sleeves, and hanging devices for installation of mechanical and plumbing equipment, ductwork and piping, etc. Contractor shall completely coordinate installation of such devices with all trades and Sub-Contractors. Contractor must further verify that the devices and supports are adequate as intended and do not overload the building's structural components in any way.
SEISMIC SUPPORTS
The Contractor shall be responsible for all anchors and connections for the mechanical work to the building structure to prevent damage of equipment and systems due to earthquakes. The complete fire protection systems shall be supported as required to resist stresses produced by lateral forces as required by NFPA No. 13. Where fire suppression equipment and piping is connected to the building structure, exact method and means of attachment to the structural system shall be approved by the Architect.
See Section 21 0548 for additional requirements for seismic supporting of fire suppression equipment and systems.
PROTECTION OF MATERIALS AND EQUIPMENT
The Contractor shall be responsible for the protection of all work, materials and equipment furnished and installed under this section of the specifications, whether incorporated in the building or not.
All items of fire suppression equipment and materials, including piping, valves and fittings, etc., shall be protected from damage and contamination. Equipment and materials shall not be stored outside and exposed to weather and ambient conditions without appropriate protection measures and without the approval of the Architect. Equipment shall be delivered to the jobsite and maintained while on the jobsite with all openings, controls and control panels covered with heavy duty polyethylene wrap or other proper means. Equipment and materials where stored within the building shall be protected at all times from construction damage and contamination from dust, dirt, debris, and especially during fireproofing, painting and gyp board sanding and
21 05 00 - COMMON WORK REQUIREMENTS FOR FIRE SUPPRESSION - 15
finishing. Unprotected equipment and piping will require special field cleaning by the
Contractor prior to acceptance by the Architect.
The Contractor shall provide protection for all work where necessary and shall be responsible for all damage done to property, equipment and materials. Storage of materials within the building shall be approved by the Architect prior to such storage.
Pipe openings shall be closed with caps or plugs, or covered to prevent lodgment of dirt or trash during the course of installation. At the completion of the work, fire suppression equipment and materials shall be cleaned thoroughly and delivered in a condition satisfactory to the Architect.
TRENCHING AND BACKFILLING
All excavation, trenching and backfilling required for the fire suppression installation shall be provided by this Contractor.
MANUFACTURER'S INSTRUCTIONS
All equipment shall be installed in strict accordance with recommendations of the manufacturer.
If such recommendations conflict with plans and specifications, the Contractor shall report such conflicts to the Architect, who shall make such compromises as he deems necessary and desirable.
CONCRETE BASES AND HOUSEKEEPING PADS
Concrete bases and housekeeping pads shall be installed under all pieces of fire suppression equipment unless specifically deleted by the specifications or drawings.
Contractor shall be responsible for the accurate dimensions of all pads and bases and shall furnish and install all vibration isolators, anchor bolts, etc.
Contractor shall provide concrete housekeeping pad foundations for all floor mounted equipment installed under this section unless otherwise shown on the drawings. All concrete bases and housekeeping pads shall conform to the requirements specified under Division 3, Concrete, portions of these specifications. Pad foundations shall be 4" high minimum, unless otherwise indicated on the drawings. Chamfer edges shall be 1". Faces shall be free of voids and rubbed smooth with carborundum block after stripping forms. Tops shall be level. Provide dowel rods in floor for lateral stability and anchorage.
Equipment anchor bolts shall be set in a galvanized pipe or sheet metal sleeves 1" larger than bolt diameter. Anchor bolts shall be high strength steel J shape. Anchor bolt design shall be arranged and paid for by the Contractor.
Machinery bases, bed plates, sole plates, or vibration isolation units shall be carefully aligned, shimmed, leveled, then grouted in place with commercial non-shrink grout. When a flexible coupling is employed as a part of the drive train, the coupling shall be aligned before the machinery base is grouted.
21 05 00 - COMMON WORK REQUIREMENTS FOR FIRE SUPPRESSION - 16
ALIGNMENT OF FLEXIBLE COUPLINGS
Flexible couplings between motors and driven equipment shall be aligned by the qualified service technician after the equipment is installed and ready for operation. Proper aligning shall be provided within manufacturer's maximum alignment tolerance at equipment operating conditions and temperature. Alignment shall follow unit manufacturer's written procedures using approved dial indication methods for parallel and angular alignment. The Contractor shall provide written certification that each device has been so aligned.
LUBRICATION
The Contractor shall provide all oil for the operation of all equipment until acceptance. The
Contractor shall be held responsible for all damage to bearings while the equipment is being operated by him up to the date…
This is the start of the file's text. The full file is on GovTribe.