This document is Appendix A (Local Permits), Appendix B (Davis-Bacon Labor Wage Rates), and Appendix C (Hazardous Building Materials Survey) from the bid package for the Town of East Hartford, Connecticut's Veteran's Memorial Clubhouse Interior and Exterior Renovations project. The project involves comprehensive renovation of the Tudor-style clubhouse located at 100 Sunset Ridge Drive, originally constructed circa 1930, comprising approximately 11,400 square feet. The scope includes selective demolition, window and door replacement, kitchen reconfiguration, HVAC system replacement, electrical upgrades, exterior siding installation, plumbing work, painting, flooring, ceiling work, and asbestos abatement. The project must be completed within 270 calendar days from the Notice to Proceed, with liquidated damages of $500 per calendar day for delays. Sealed bids are due by 11:00 AM on May 21, 2026, at the Town Hall Purchasing Department. A non-mandatory pre-bid meeting is scheduled for May 4, 2026, at 2:00 PM at the project site, and plan holders must register by May 14, 2026. Bid security of 5% is required in the form of a bid bond payable to the Town of East Hartford.
The Davis-Bacon Wage Rates for Hartford County, Connecticut building construction establish trade-specific hourly rates ranging from $35.70 for general laborers to $66.72 for elevator mechanics, plus applicable fringe benefits. Contractors must comply with Executive Order 13706 requiring one hour of paid sick leave for every 30 hours worked (up to 56 hours annually) and Executive Order 13658 establishing a minimum wage of $13.30 per hour for covered workers. The Hazardous Materials Assessment, conducted in December 2019 by Payne Environmental, LLC, identified asbestos-containing materials (ACM) throughout the building, including 5% chrysotile in basement boiler room flue cement (3 SF), 3% chrysotile in basement foyer/corridor black mastic associated with floor tiles (280 SF), 6% chrysotile in a basement kitchen sink condensate barrier (1 unit), and 2% chrysotile in first-floor meeting room floor tiles with associated mastics (830 SF), totaling approximately 1,114 square feet of ACM that must be properly removed and disposed of prior to any disturbance activities in compliance with federal and state regulations. The awarded bidder must provide 100% Performance and Labor and Materials bonds and maintain comprehensive insurance coverage including $1,000,000 per occurrence/$2,000,000 aggregate Commercial General Liability, Workers' Compensation, $1,000,000 combined single limit Commercial Automobile Liability, $10,000,000 Umbrella Liability, and $1,000,000 per claim/$2,000,000 aggregate Pollution Liability. The contract is subject to Connecticut state compliance requirements including a minimum 25% spending allocation goal for Small Business Enterprises (SBE) subcontractors and a minimum 6.25% allocation for Minority-, Women-, and/or Disabled-owned business (M/W/DisBE) subcontractors certified by the Connecticut Department of Administrative Services.
Text of this file
APPENDIX A
LOCAL PERMITS
Sample
10/05/2015 2:24:34 PM
APPENDIX B
DAVIS-BACON LABOR WAGE RATES
"General Decision Number: CT20260021 01/23/2026
Superseded General Decision Number: CT20250021
State: Connecticut
Construction Type: Building
County: Hartford County in Connecticut.
BUILDING CONSTRUCTION PROJECTS (does not include single family homes or apartments up to and including 4 stories).
Modification Number Publication Date
0 01/02/2026
1 01/23/2026
ASBE0033-002 06/01/2025
Rates Fringes
HEAT & FROST INSULATOR
(Includes Duct, Pipe and
Mechanical Systems)..............$ 48.81 33.65
* BRCT0001-001 01/05/2026
BRICKLAYER.......................$ 45.56 36.94
* BRCT0001-002 01/05/2026
BRICK POINTER/CAULKER/CLEANER....$ 45.56 36.94
* BRCT0001-005 01/05/2026
CEMENT MASON/CONCRETE FINISHER...$ 45.56 36.94
CARP0326-024 05/05/2025
FLOOR LAYER: Carpet Only.........$ 42.03 29.19
CARP0326-025 05/05/2025
FLOOR LAYER: Hardwood Floors
Only.............................$ 42.03 29.19
CARP0326-027 05/05/2025
CARPENTER (Scaffold Builder).....$ 42.03 29.19
CARP0326-028 05/05/2025
CARPENTER (Includes
Acoustical Ceiling
Installation, Drywall
Hanging, Form Work, and Metal
Stud Installation)...............$ 42.03 29.19
* ELEC0035-014 06/01/2025
ELECTRICIAN (Including Low
Voltage Wiring)..................$ 48.25 3%+35.22
ELEV0091-002 01/01/2025
ELEVATOR MECHANIC................$ 66.72 38.435+a+b
FOOTNOTE:
a.Vacation: 6%/under 5 years based on regular hourly rate for all hours worked. 8%/over 5 years based on regular hourly rate for all hours worked.
b. PAID HOLIDAYS: New Year's Day; Memorial Day; Independence
Day; Labor Day; Veterans' Day; Thanksgiving Day; the Friday after Thanksgiving Day; and Christmas Day.
ENGI0478-004 04/06/2025
POWER EQUIPMENT OPERATOR
(Backhoe/Excavator/Trackhoe).....$ 51.92 29.80
PAID HOLIDAYS: New Year's Day, Good Friday, Memorial Day, Independence Day, Labor Day, Thanksgiving Day and Christmas
Day, provided the employee works 3 days during the week in which the holiday falls, if scheduled, and if scheduled, the working day before and the working day after the holiday.
ENGI0478-005 04/06/2025
(Bulldozer)
Finegrade (Slopes, Shaping, laser or GPS, etc.).......................$ 51.92 29.80
Rough Grade Dozer...........$ 50.22 29.80
Day, provided the employee works 3 days during the week in which the holiday falls, if scheduled, and if scheduled, ENGI0478-012 04/06/2025
(Crane under 100 ton rated capacity)).......................$ 56.79 29.80
Day, provided the employee works 3 days during the week in which the holiday falls, if scheduled, and if scheduled, ENGI0478-016 04/06/2025
(Loader - 7 cubic yards or over)............................$ 53.33 29.80
Day, provided the employee works 3 days during the week in which the holiday falls, if scheduled, and if scheduled, IRON0015-010 06/02/2025
IRONWORKER (Reinforcing, Structural, Ornamental)..........$ 45.25 43.62
LABO0230-001 04/06/2025
LABORER
Common or General...........$ 35.70 28.85
Mason Tender-
Cement/Concrete.............$ 35.70 28.85
PAIN0011-014 06/01/2025
GLAZIER..........................$ 43.13 26.75
PAIN0011-021 06/01/2025
PAINTER (Brush and Roller).......$ 39.57 26.75
PAIN0011-023 06/01/2025
DRYWALL FINISHER/TAPER...........$ 40.32 26.75
PLUM0777-001 06/01/2025
PLUMBER..........................$ 50.58 35.85
PLUM0777-003 06/01/2025
PIPEFITTER.......................$ 50.58 35.85
PLUM0777-004 06/01/2025
PLUMBER (HVAC Pipe
Installation)....................$ 50.58 35.85
* ROOF0009-001 01/01/2026
ROOFER
Composition.................$ 45.15 23.53
Slate and Tile..............$ 45.65 23.53
SFCT0669-002 04/01/2025
SPRINKLER FITTER.................$ 53.76 33.44
SHEE0040-001 07/01/2025
SHEET METAL WORKER (Including
HVAC Unit Installation)..........$ 44.70 44.50
SHEE0040-002 07/01/2025
SHEET METAL WORKER (Metal
Flashing and HVAC Duct
Installation Only)...............$ 44.70 44.50
SHEE0040-008 07/01/2025
SHEET METAL WORKER (Metal
Roofs Installation)..............$ 44.70 44.50
TEAM0191-001 04/06/2025
TRUCK DRIVER (Dump Truck)........$ 36.39 32.68
WELDERS - Receive rate prescribed for craft performing operation to which welding is incidental.
Note: Executive Order (EO) 13706, Establishing Paid Sick Leave for Federal Contractors applies to all contracts subject to the
Davis-Bacon Act for which the contract is awarded (and any solicitation was issued) on or after January 1, 2017. If this contract is covered by the EO, the contractor must provide employees with 1 hour of paid sick leave for every 30 hours they work, up to 56 hours of paid sick leave each year.
Employees must be permitted to use paid sick leave for their own illness, injury or other health-related needs, including preventive care; to assist a family member (or person who is like family to the employee) who is ill, injured, or has other health-related needs, including preventive care; or for reasons resulting from, or to assist a family member (or person who is like family to the employee) who is a victim of, domestic violence, sexual assault, or stalking. Additional information on contractor requirements and worker protections under the EO is available at https://www.dol.gov/agencies/whd/government-contracts.
Note: Executive Order 13658 generally applies to contracts subject to the Davis-Bacon Act that were awarded on or between
January 1, 2015 and January 29, 2022, and that have not been renewed or extended on or after January 30, 2022. Executive
Order 13658 does not apply to contracts subject only to the
Davis-Bacon Related Acts regardless of when they were awarded.
If a contract is subject to Executive Order 13658, the contractor must pay all covered workers at least $13.30 per hour (or the applicable wage rate listed on this wage determination, if it is higher) for all hours spent performing on the contract in 2025. The applicable Executive Order minimum wage rate will be adjusted annually. Additional information on contractor requirements and worker protections under Executive Order 13658 is available at www.dol.gov/whd/govcontracts.
Unlisted classifications needed for work not included within the scope of the classifications listed may be added after award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (iii)).
The body of each wage determination lists the classifications and wage rates that have been found to be prevailing for the type(s) of construction and geographic area covered by the wage determination. The classifications are listed in alphabetical order under rate identifiers indicating whether the particular rate is a union rate (current union negotiated rate), a survey rate, a weighted union average rate, a state adopted rate, or a supplemental classification rate.
Union Rate Identifiers
A four-letter identifier beginning with characters other than
""SU"", ""UAVG"", ?SA?, or ?SC? denotes that a union rate was prevailing for that classification in the survey. Example:
PLUM0198-005 07/01/2024. PLUM is an identifier of the union whose collectively bargained rate prevailed in the survey for this classification, which in this example would be Plumbers.
0198 indicates the local union number or district council number where applicable, i.e., Plumbers Local 0198. The next number, 005 in the example, is an internal number used in processing the wage determination. The date, 07/01/2024 in the example, is the effective date of the most current negotiated rate.
Union prevailing wage rates are updated to reflect all changes over time that are reported to WHD in the rates in the collective bargaining agreement (CBA) governing the classification.
Union Average Rate Identifiers
The UAVG identifier indicates that no single rate prevailed for those classifications, but that 100% of the data reported for the classifications reflected union rates. EXAMPLE:
UAVG-OH-0010 01/01/2024. UAVG indicates that the rate is a weighted union average rate. OH indicates the State of Ohio.
The next number, 0010 in the example, is an internal number used in producing the wage determination. The date, 01/01/2024 in the example, indicates the date the wage determination was updated to reflect the most current union average rate.
A UAVG rate will be updated once a year, usually in January, to reflect a weighted average of the current rates in the collective bargaining agreements on which the rate is based.
Survey Rate Identifiers
The ""SU"" identifier indicates that either a single non-union rate prevailed (as defined in 29 CFR 1.2) for this classification in the survey or that the rate was derived by computing a weighted average rate based on all the rates reported in the survey for that classification. As a weighted average rate includes all rates reported in the survey, it may include both union and non-union rates. Example: SUFL2022-007
6/27/2024. SU indicates the rate is a single non-union prevailing rate or a weighted average of survey data for that classification. FL indicates the State of Florida. 2022 is the year of the survey on which these classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination. The date, 6/27/2024 in the example, indicates the survey completion date for the classifications and rates under that identifier.
?SU? wage rates typically remain in effect until a new survey is conducted. However, the Wage and Hour Division (WHD) has the discretion to update such rates under 29 CFR 1.6(c)(1).
State Adopted Rate Identifiers
The ""SA"" identifier indicates that the classifications and prevailing wage rates set by a state (or local) government were adopted under 29 C.F.R 1.3(g)-(h). Example: SAME2023-007
01/03/2024. SA reflects that the rates are state adopted. ME refers to the State of Maine. 2023 is the year during which the state completed the survey on which the listed classifications and rates are based. The next number, 007 in the example, is an internal number used in producing the wage determination.
The date, 01/03/2024 in the example, reflects the date on which the classifications and rates under the ?SA? identifier took effect under state law in the state from which the rates were adopted.
WAGE DETERMINATION APPEALS PROCESS
1) Has there been an initial decision in the matter? This can be:
a) a survey underlying a wage determination
b) an existing published wage determination
c) an initial WHD letter setting forth a position on a wage determination matter
d) an initial conformance (additional classification and rate) determination
On survey related matters, initial contact, including requests for summaries of surveys, should be directed to the WHD Branch of Wage Surveys. Requests can be submitted via email to davisbaconinfo@dol.gov or by mail to:
Branch of Wage Surveys
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210
Regarding any other wage determination matter such as conformance decisions, requests for initial decisions should be directed to the WHD Branch of Construction Wage Determinations.
Requests can be submitted via email to BCWD-Office@dol.gov or by mail to:
Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
2) If an initial decision has been issued, then any interested party (those affected by the action) that disagrees with the decision can request review and reconsideration from the Wage and Hour Administrator (See 29 CFR Part 1.8 and 29 CFR Part 7).
Requests for review and reconsideration can be submitted via email to dba.reconsideration@dol.gov or by mail to:
Wage and Hour Administrator
The request should be accompanied by a full statement of the interested party's position and any information (wage payment data, project description, area practice material, etc.) that the requestor considers relevant to the issue.
3) If the decision of the Administrator is not favorable, an interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:
Administrative Review Board
Washington, DC 20210.
END OF GENERAL DECISION"
�'()�*+,-�)'..-�/012(3.)�4.5.0+6�(5*107+-(15�,15,.05(54�����8
�����0.9:(0.)�/+;7.5-�1*�/0.2+(6(54�<+4.)�15�*.3.0+66;�*:53.3�10�+))()-.3�,15)-0:,-(15�/01=.,-)8
�'.��+2()>�+,15��,-�+//6(.)�-1�.+,'�*.3.0+6�412.057.5-�10��()-0(,-�1*�?16:7@(+�,15-0+,-�(5�.A,.))�1*
BCDEEE�*10�-'.�,15)-0:,-(15D�+6-.0+-(15D�10�0./+(0�F(5,6:3(54�/+(5-(54�+53�3.,10+-(54G�1*�/:@6(,�@:(63(54)�10
/:@6(,�<10H)8��+5;�*.3.0+6�6+<)�-'+-�+:-'10(I.�*.3.0+6�+))()-+5,.�*10�,15)-0:,-(15�-'01:4'�40+5-)D�61+5)D
61+5�4:+0+5-..)D�(5):0+5,.D�+53�1-'.0�7.-'13)�+0.��+2()>�+,15�J�.6+-.3��,-)8K��'.�J�.6+-.3��,-)K
(5,6:3.�/012()(15)�-'+-�+//6;��+2()>�+,15�6+@10�)-+53+03)�-1�71)-�*.3.0+66;�+))()-.3�,15)-0:,-(158
�A+7/6.)�1*�J�.6+-.3��,-)K�(5,6:3.�-'.��.3.0+6>�(3�L(4'<+;��,-)D�-'.�L1:)(54�+53�?177:5(-;
�.2.61/7.5-��,-�1*�MNOPD�+53�-'.��.3.0+6�Q+-.0��166:-(15�?15-016��,-8
?15-0+,-10)�7:)-�/+;�6+@10.0)�+53�7.,'+5(,)�<10H(54�15�-'.�)(-.�1*�-'.�<10H�+-�6.+)-�-'.�61,+66;
/0.2+(6(54�<+4.)�F(5,6:3(54�*0(54.�@.5.*(-)GD�6()-.3�(5�-'.��+2()>�+,15�<+4.�3.-.07(5+-(15�+//6(,+@6.�-1
-'.�,15-0+,-D�*10�-'.�<10H�/.0*107.38��+2()>�+,15�6+@10�)-+53+03)�,6+:).)�7:)-�@.�(5,6:3.3�(5�,12.0.3
,15-0+,-)8
�'.��+2()>�+,15�R/0.2+(6(54�<+4.R�()�-'.�,17@(5+-(15�1*�-'.�@+)(,�'1:06;�0+-.�+53�+5;�*0(54.�@.5.*(-)
6()-.3�(5�+��+2()>�+,15�<+4.�3.-.07(5+-(158��'.�,15-0+,-10S)�1@6(4+-(15�-1�/+;�+-�6.+)-�-'.�/0.2+(6(54
<+4.�6()-.3�(5�-'.�+//6(,+@6.�<+4.�3.-.07(5+-(15�,+5�@.�7.-�@;�/+;(54�.+,'�6+@10.0�+53�7.,'+5(,�-'.
+//6(,+@6.�/0.2+(6(54�<+4.�.5-(0.6;�+)�,+)'�<+4.)�10�@;�+�,17@(5+-(15�1*�,+)'�<+4.)�+53�.7/61;.0>
/012(3.3�@15+�*(3.�*0(54.�@.5.*(-)8��0.2+(6(54�<+4.)D�(5,6:3(54�*0(54.�@.5.*(-)D�7:)-�@.�/+(3�*10�+66�'1:0)
<10H.3�15�-'.�)(-.�1*�-'.�<10H8
�//0.5-(,.)�7+;�@.�/+(3�6.))�-'+5�-'.�0+-.)�6()-.3�(5�-'.�+//6(,+@6.�<+4.�3.-.07(5+-(15�156;�<'.5�-'.;
+0.�(53(2(3:+66;�0.4()-.0.3�(5�+5�+//0.5-(,.)'(/�/0140+7�0.4()-.0.3�<(-'�-'.��./+0-7.5-�1*��+@10�10�<(-'
+�)-+-.�+//0.5-(,.)'(/�+4.5,;�0.,145(I.3�@;�-'.��./+0-7.5-D�+53�-'.�-.07)�1*�-'.�+//0.5-(,.)'(/
/0140+7�+0.�7.-8
?15-0+,-10)�+0.�0.9:(0.3�-1�/+;�,12.0.3�<10H.0)�<..H6;�+53�):@7(-�<..H6;�,.0-(*(.3�/+;0166�0.,103)�-1
-'.�,15-0+,-(54�+4.5,;8��'.;�+0.�+6)1�0.9:(0.3�-1�/1)-�-'.�+//6(,+@6.��+2()>�+,15�<+4.�3.-.07(5+-(15
+53�-'.��+2()>�+,15�/1)-.0�FQL>MTCMG�15�-'.�<10H�)(-.�(5�+�/017(5.5-�+53�+,,.))(@6.�/6+,.�<'.0.�-'.;
UVWXYZ[\]YẐ_̀ Ỳ
abcbdefghijkfljdmndohpmi qrsturvwuxyz{u|}~}�}yv
��./�0��
�0���1��� �������0���������
�0�� ����0��
�20���� �����+�0�����
��2��
| ��� | ��� |
| ���� | ������ |
�����������2�����
����1���� ���3
��3./������4������
| �� | |
| ���� | ������ |
�5����
����6���7�������67���4� ������ ���������67�������
5��������� ������+����8������+��������
����1��� ���������9
8�������
4��
8�������
8�������
| �������� | � |
| ��������� | �� |
8�������
| ������ | �� � | ����� | � ��� | ��� | ��� |
| ������� | ���� |
-./012.34/56786./782/9:;:
<2=0>7?2.7/@A/B0C@>
DEE/F@.G767H76@./-I2/JK
K0G86.17@.L/<F/DEDME
NOPQQOROSTOUVWX
NOPQQORPYOZ[R\
]]]̂_̀âb̀c defeghijklmegnoenp qrstuvẁxyu zsy{ytu|v}u~̀cu|�v�yysyt{�~u zsy{ytu|�yysyt{�~ûb̀c
���̂b̀c
�̀v�u{|v�~tvz{t{
�̂�̂v��s~uv̀�v��u~s{av�̀x�yua ih�lgjfe�hgpoenp
��̀xtvz��
�xs_{�~uv�u{|~r
�y�{�̀a
��s~uv̀�v��y�u~t̀|v�u�u|{a
�vt̀v�v��_u�
��fj�lgphi�
�̀xtr}xauy� q{buvzutu|�s�{ts̀�y
�~~uyys�sast�v�t{tu�u�t
����� ¡¢ £¤¥¦§̈ ¥£©� ̈ª¥§ «�̈¬¡ª£®£̄¥ª°�̈ £̄ ¡ ¥�¥¢
F@..237/K678/<±B
²ruv~̀�tu�tyv̀�vtrsyv_̀~x�u�tv_̀v�̀tvr{cuvtruv�̀|~uv{�_vu�u~tv̀�va{]v{�_v{|uv�̀tv�u{�tvt̀v�s�_vtruv�x�as~vs�v{��v]{�̂v²rsy
_̀~x�u�tvsyvs�tu�_u_v̀�a�vt̀v�|̀cs_uv~a{|st�vt̀vtruv�x�as~v|ub{|_s�bvu�syts�bv|u³xs|u�u�tyvx�_u|vtruva{]v̀|v{bu�~�v�̀as~suŷ
²ruv�̀�ua{�_v́��tsµ¶s~·�{~·́v�~tv�|̀rs�styv~̀�t|{~t̀|yv�|̀�vs�v{��v]{�vs�_x~s�bv{�vu��à�uuvt̀vbscuvx�
{��v�{|tv̀�vtruv~̀��u�y{ts̀�vt̀v]rs~rvtru�v{|uvu�tstau_v{�_v|u³xs|uyv~̀�t|{~t̀|yvt̀vyx��stv{v]uu·a� yt{tu�u�tv̀�vtruv]{buyv�{s_vt̀vu{~rv]̀|·u|v�u|�̀|�s�bvz̧}�µ~̀cu|u_v]̀|·̂
�̀�t|{~t̀|yv̀�v�|̀¹u~tyvyx�¹u~tvt̀vz̧}�va{�̀|vyt{�_{|_yv�{�v{aỳv�uvyx�¹u~tvt̀v{__sts̀�{av�|uc{sas�b
]{buv{�_v̀cu|ts�uv�{�v|u³xs|u�u�tyvx�_u|v�t{tuvº{�_và~{a»va{]ŷv�aỳ¼v̀cu|ts�uv�{�v|u³xs|u�u�ty x�_u|v�qw���v{�_vtruv�{s|v�{�̀|v�t{�_{|_yv�~tv�{�v{��a�̂
��_u|v}ù|b{�s½{ts̀�v¾a{�v�̀ v̂¿Àv̀�v¿ÁÂüvºÂv�̂�̂�̂v���u�_s�v¿»¼vtruv�u_u|{av~̀�t|{~ts�bv̀|v{yysyt{�~uµ
{_�s�sytu|s�bv{bu�~suyvr{cuv_{�µt̀µ_{�v|uy�̀�ys�sast�v�̀|v{_�s�syt|{ts̀�v{�_vu��̀|~u�u�tv̀�vtruvz{csyµ
{̧~̀�va{�̀|vyt{�_{|_yv�|̀csys̀�yv{�_¼vs�v̀|_u|vt̀v�|̀�̀ tuv~̀�ysytu�tv{�_vu�u~tscuvu��̀|~u�u�t¼vtru zu�{|t�u�tv̀�v�{�̀|vr{yv|ubxa{t̀|�v{�_v̀cu|ysbrtv{xtr̀|st�¼vs�~ax_s�bvtruv{xtr̀|st�vt̀vs�cuytsb{tu
~̀��as{�~û
�Ä!(!"Å&"ÆÇÅ�*#"È$$*Å*&#�É"Ê#Ë&(Ì�Å*&#
Í&("�$$*Å*&#�É"*#Ë&(Ì�Å*&#Î"+*,*Å"&'("�� !"�#$"%&'(")*+*,*&#"�!Ç,*Å!Ï
���ÐÑÑ���Ò���Ò���Ñ�� ��� �Ñ�
�"�#$Ó&("Ô�ÉÉ"&'("Å&ÉÉÕË(!!"*#Ë&(Ì�Å*&#"�#$"Ä!ÉÖÉ*#!Î
�+�*É�ÇÉ!"×"�ØÌØ"Å&"Ù"ÖØÌØ"*#"Ú&'("Å*Ì!"Û&#!Î"ÜÕ×ÝÝÕÞßà�Èáâ"ãÜÕ×ÝÝÕÞ×äÕåæÞçèØ é86G/=HCê63076@./6G/A@>/12.2>0ê/6.A@>?076@./0.ë/6G/.@7/7@/C2/3@.G6ë2>2ë/6./782/G0?2/ê6187/0G/@ì6360ê
G7072?2.7G/@A/=@G676@./3@.706.2ë/6./782/>21Hê076@.G:
APPENDIX C
HAZARDOUS BUILDING MATERIALS SURVEY
Consulting Engineers and Scientists
HAZARDOUS MATERIALS ASSESSMENT
VETERANS MEMORIAL CLUBHOUSE
100 SUNSET RIDGE DRIVE
EAST HARTFORD, CT
December 2019
PROJECT NUMBER: 19.137/001
Prepared For:
Antinozzi Associates PC
271 Fairfield Avenue Bridgeport, Connecticut 06604
Prepared By:
Payne Environmental, LLC 85 Willow Street
New Haven, Connecticut 06511 Phone 203.865.1285
Facsimile 203.865.1286
PAYNE Environmental, LLC -2- Proj. No. 19.137/001 HMA Report Veterans Memorial Clubhouse, East Hartford, CT
12/9/2019
12/9/2019
HAZARDOUS MATERIALS ASSESSMENT
VETERANS MEMORIAL CLUBHOUSE
100 SUNSET RIDGE DRIVE
EAST HARTFORD, CT
Quality Assurance/Quality Control
The following personnel have reviewed this report for accuracy, content and quality of presentation:
Neil G. Payne, PhD, CHMM, LEP Date Project Director
Gail R. Simon Date
PAYNE Environmental, LLC -3- Proj. No. 19.137/001
CONTENTS
1.0 INTRODUCTION
2.0 SITE DESCRIPTION
3.0 DETERMINATION OF POTENTIAL CONTAMINATION
3.1 Objective
3.2 Asbestos-Containing Materials
4.0 RESULTS OF TESTING
4.1 Asbestos-Containing Materials
4.2 Inaccessible or Untested Building Materials
5.0 SUMMARY AND CONCLUSIONS
6.0 LIMITATIONS
LIST OF ATTACHMENTS
Attachment Title
Attachment A: Laboratory Analytical Results – Asbestos
Attachment B: Sample Location Plans
Attachment C: PAYNE Certifications
PAYNE Environmental, LLC -4- Proj. No. 19.137/001
1.0 INTRODUCTION
Payne Environmental, LLC (PAYNE) was retained by Antinozzi Associates PC to perform a Hazardous Materials Assessment (HMA) of the property known as Veterans
Memorial Clubhouse, 100 Sunset Ridge Drive, East Hartford, Connecticut. The purpose of this
HMA was to assess for the presence of hazardous and regulated materials located within interior and exterior areas that may be disturbed during planned renovations and/or major alteration activities and that may impact costs associated with such activities.
The inspection included a survey for asbestos-containing materials (ACM). All testing was performed by PAYNE personnel trained, certified and licensed in hazardous materials testing.
Qualifications of field personnel involved in this investigation are provided in Attachment C.
This document provides a brief description of the subject site (Section 2.0); the field investigation methods and results (Sections 3.0 and 4.0); and the summary and conclusions (Section 5.0).
PAYNE Environmental, LLC -5- Proj. No. 19.137/001
2.0 SITE DESCRIPTION
The ±1.64-acre site is located on east and south of Sunset Ridge Drive, and bounded to the east and south by open space and residential properties. within the site boundary. The site is improved with a three-story clubhouse structure (built circa 1930), bituminous parking lots and driveway, patio areas and extensive landscaped areas.
The exterior is constructed of wood siding, brick and stucco , and heated via forced-air oil-fired furnaces. Building materials observed and inspected included: sheetrock & plaster ceiling/walls, floor tiles/mastic, ceramic tile/mortar/grout, sheet flooring, textured ceiling paint, ceiling tiles, various interior and exterior caulking, exterior and interior stucco, vinyl base cove moldings/adhesives, kitchen sink condensate barriers, paper-backed insulation, vapor barriers
(black paper behind wood-siding) and asphalt roofing shingles.
PAYNE Environmental, LLC -6- Proj. No. 19.137/001
3.0 DETERMINATION OF POTENTIAL CONTAMINATION
3.1 Objective
The purpose of this investigation was to screen for the presence of asbestos-containing materials
(ACMs) associated with the building that may be affected by future activities so that a plan could be developed for their appropriate handling and disposal.
3.2 Asbestos-Containing Materials
The standard methodology for surveying and evaluating buildings to determine the presence of asbestos-containing material (ACM) involves a series of activities which provide information concerning the presence, type, location, and quantity of noted ACM and is conducted in accordance with current United States Environmental Protection Agency (USEPA) Asbestos
Hazard Emergency Response Act (AHERA; 40 CFR Part 763 Subpart E), USEPA National
Emission Standards for Hazardous Air Pollutants (NESHAPS, 40 CFR Part 61), and OSHA
Asbestos Standard (29 CFR 1926.1101) guidelines.
During the site visit conducted during on November 26, 2019, licensed asbestos inspectors performed a hazard assessment within interior and exteriors areas of the site structures. Limited destructive testing was undertaken.
During inspections, suspect asbestos-containing material (ACM) is separated into three USEPA categories. These categories are thermal insulation (TSI), surfacing ACM, and miscellaneous
ACM. TSI includes all materials used to prevent heat loss or gain or water condensation on mechanical systems. Examples of TSI are pipe insulation, boiler insulation, duct insulation, and mudded insulation on pipe fittings. Surfacing ACM includes all ACM that is sprayed, trowel led, or otherwise applied to an existing surface. Surfacing ACM is commonly used for fireproofing, decorative, and acoustical applications. Miscellaneous materials include ACM not listed in thermal or surfacing, such as linoleum, vinyl asbestos flooring, and ceiling tiles.
Representative bulk samples of suspect homogeneous materials were collected within the defined sampling areas in accordance with AHERA protocols. Materials that were sampled were
PAYNE Environmental, LLC -7- Proj. No. 19.137/001 transported following proper chain-of-custody procedures and analyzed by Polarized Light
Microscopy (PLM) at a state-certified and AIHA-accredited laboratory. All ACM was quantified in linear and square footage, depending on the nature of the material. Materials identified are based on the information acquired during this limited survey and by no means infer that all materials have been wholly identified.
The EPA recommends further analysis of non-friable organically bound (NOB) materials by
Transmission Electron Microscopy (TEM) to avoid false negatives by Polarized Light Microscopy
(PLM). NOB materials include floor tiles, mastics, asphalt shingles, roofing materials, caulking, and glazing. Further TEM analysis was not conducted as part of this assessment.
Bulk samples were submitted to EMSL Analytical, Inc. (Wallingford, CT) for PLM bulk analysis
(EPA Method 600/R-93/116).
PAYNE Environmental, LLC -8- Proj. No. 19.137/001
4.0 RESULTS OF TESTING
4.1 Asbestos-Containing Materials
Using the USEPA protocol and criteria, the following materials listed in Table 1 were determined to be ACM by PLM Bulk Analysis (both >1% and trace). Typical materials testing positive for asbestos included interior and exterior caulk (window and door); floor tile/mastic; thermal pipe insultation;
textured ceiling paint; roofing materials (assumed) and kitchen sink condensate barrier.
TABLE 1
ASBESTOS SAMPLING
LABORATORY ANALYTICAL RESULTS SUMMARY – ACM
SAMPLE ID
SAMPLE LOCATION
MATERIAL DESCRIPTION
QUANTITY
% ASBESTOS
CH-05 Basement Boiler Room Flue cement ±3 SF 5% Chrysotile
N/A Basement Boiler Room Insulation associated with boiler room fire door 1 Unit Assume
CH-08ABC
Basement
Foyer/Corridors
Black mastic associated with
12” tan floor tiles ±280 SF 3% Chrysotile
CH-22 Basement Kitchen Black condensate barrier associated with kitchen sink 1 Unit 6% Chrysotile
CH-43ABC 1st Floor Meeting Room 12” tan floor tile associated with multiple layers of tile/mastics
±830 SF 2% Chrysotile
Using the USEPA protocol and criteria, the following materials listed in Table 2 were determined to be non-ACM by PLM Bulk Analysis. Typical non-ACM materials included sheetrock & plaster ceiling/walls, some floor tiles/mastic, ceramic tile/mortar/grout, sheet flooring, textured ceiling paint, ceiling tiles, various interior and exterior caulking, exterior and interior stucco, vinyl base cove moldings/adhesives, 1st & 2nd floor kitchen sink condensate barriers, paper-backed insulation, vapor barriers (black paper behind wood-siding) and asphalt roofing shingles.
PAYNE Environmental, LLC -9- Proj. No. 19.137/001
TABLE 2
ASBESTOS SAMPLING
LABORATORY ANALYTICAL RESULTS SUMMARY – NON-ACM
SAMPLE ID
SAMPLE LOCATION
MATERIAL DESCRIPTION
CH-01AB Basement - Kitchen Ceiling tile – 2’ x 4’
CH-02AB Basement - Kitchen Sheetrock - wall
CH-03AB Basement - Kitchen Sheetrock joint compound - wall
CH-04AB Basement - Kitchen 12” tan ceramic floor tile/adhesive
CH-06AB Basement – Boiler Room Sheetrock - ceiling
CH-07AB Basement - Kitchen 6” tan ceramic cove base
CH-08ABC Basement – Foyer/Corridor 12” tan vinyl floor tile
CH-09ABC Basement – Foyer/Corridor Brown cove base/yellow adhesive
CH-10AB Basement – Storage/Radio Room Window glazing compound
CH-11AB Basement – Storage/Radio Room 4” blue ceramic tile
CH-12ABC Basement – Storage/Radio Room Wall plaster (skim & base coats)
CH-13ABC Basement – Storage/Radio Room Ceiling plaster (skim & base coats)
CH-14AB Basement – Storage/Radio Room 1” tan/blue ceramic floor tile
CH-15AB Basement – Men’s Room 2’x2’ ceiling tile
CH-16AB Basement – Meeting Room 4” ceramic cove base/adhesive
CH-17AB Men’s Bathroom Gray grout with #16
CH-18AB Basement – Meeting Room 12” tan ceramic floor tile/yellow mortar
CH-19AB Basement – Meeting Room Gray grout with #18
CH-20 Basement – Meeting Room Chimney cement coating (storage area)
CH-21AB Basement – Meeting Room Plaster ceiling
CH-23AB 1st Floor - Kitchen Plaster ceiling
CH-24AB 1st Floor - Kitchen Plaster wall
CH-25AB 1st Floor - Kitchen Skim coat on #24
CH-26ABC 1st Floor - Kitchen 12” pink ceramic floor tile/white mortar
CH-27ABC 1st Floor - Kitchen Gray grout with #26
CH-28 1st Floor - Kitchen White sink condensate barrier
CH-29ABC 1st Floor – Bar Area 8” gray ceramic floor tile/yellow mortar
CH-30ABC 1st Floor – Bar Area Gray grout with #29
PAYNE Environmental, LLC -10- Proj. No. 19.137/001
CH-31AB 1st Floor – Handicap Bathroom 2’x4’ ceiling tile
CH-32ABC 1st Floor – Handicap Bathroom Ceiling plaster above #31
CH-33ABC 1st Floor – Handicap Bathroom Plaster wall
CH-34ABC 1st Floor – Hallway 12” blue/gray ceramic floor tile/gray mortar
CH-35ABC 1st Floor – Hallway Gray grout with #34
CH-36AB 1st Floor – Front Lobby Plaster wall
CH-37ABC 1st Floor – Ballroom Black paper under hardwood floor
CH-38ABC 1st Floor – Ballroom White decorative wall stucco
CH-39AB 1st Floor – Meeting Room 2’x4’ ceiling tile
CH-40AB 1st Floor – Meeting Room 12” ceiling tile above #39
CH-41AB 1st Floor – Meeting Room SR/SRJC - wall
CH-42AB 1st Floor – Meeting Room Plaster ceiling above ceiling tile
CH-43ABC 1st Floor – Meeting Room Black mastic associated with floor tile
CH-44AB 1st Floor – Meeting Room Black paper under #43
CH-45AB 1st Floor – Storage Room Sheetrock - wall
CH-46AB 1st Floor – Rear Foyer (kitchen) 12” blue vinyl floor tile with tan mastic
CH-47AB 1st Floor – Janitor Closet 1” ceramic floor tile
CH-48AB 1st Floor – Janitor Closet Cement mortar under #47
CH-49ABC 2nd Floor - Roof Brown asphalt roof shingle
CH-50 2nd Floor - Kitchen Black sink condensate barrier
CH-51ABC 2nd Floor - Kitchen Sheetrock – ceiling with textured paint
CH-52ABC 2nd Floor - Kitchen Sheetrock - wall
CH-53ABC 2nd Floor - Kitchen Sheetrock joint compound - wall
CH-54ABC 2nd Floor - Kitchen Pink/tan sheet flooring
CH-55AB 2nd Floor - Kitchen Brown cove base/adhesive
CH-56ABC 2nd Floor – Bedroom over Lobby Plaster ceiling
CH-57ABC 2nd Floor – Bedroom over Lobby Plaster wall
CH-58AB 2nd Floor – Bedroom #2 Sheetrock - wall
CH-59AB 2nd Floor – Bedroom #2 Sheetrock joint compound - wall
CH-60AB 2nd Floor – Bathroom 6” blue ceramic floor tile/mortar
CH-61AB 2nd Floor – Bathroom Gray grout with #60
CH-62ABC Exterior - Roof Black paper under brown asphalt shingle
CH-63AB Exterior Gray rubbery door caulk
PAYNE Environmental, LLC -11- Proj. No. 19.137/001
CH-64AB Exterior White window glazing compound
CH-65AB Exterior Gray brittle window caulk at sill
CH-66AB Exterior Gray rubbery window caulk at sill
CH-67AB Exterior Gray brittle window caulk at brick molding
CH-68ABC Exterior Yellow/white stucco on building face
CH-69AB Exterior Black paper behind yellow wood siding
Any suspect materials encountered during renovation/demolition activities that is not identified in this report as being non-ACM should be assumed to be ACM unless sample results prove otherwise and additional samples collected to properly identify suspect materials. Destructive testing was limited since the building is currently in use.
Copies of laboratory analytical data are provided in Attachment A.
4.2 Inaccessible or Untested Building Materials
Building areas, systems, structural components, or surfaces which could not be observed because a space was considered unsafe or impractical to demolish, disassemble, or remove systems or coverings, or because a person could not physically enter or observe the area or component is considered an inaccessible building area.
General limitations to our building materials portion of the Site survey for this project include the following areas/materials specifically not assessed:
• Underground asbestos-cement water/sewer lines (if they exist) for asbestos testing;
• Other building roof materials, including flashing tars;
• Inaccessible building materials suspect for asbestos;
• Electrical equipment (operational, thus inaccessible for testing at the time of the inspection);
• Below-grade damp-proofing on concrete foundations for asbestos; and
• Any suspect material not identified in the preceding tables.
Although PAYNE’s intent was to conduct a thorough survey of the facility, it is important to note that we cannot guarantee that all ACMs, or potentially hazardous materials within the surveyed areas
PAYNE Environmental, LLC -12- Proj. No. 19.137/001 have been identified. Building areas, systems, structural components, or surfaces which could not be observed because a space was considered unsafe or impractical to demolish, disassemble, or remove systems or coverings, or because a person could not physically enter or observe the area or component were not surveyed as part of our effort. It is important to note that these materials have frequently been used in areas where detection is difficult until renovation, demolition, and/or asbestos abatement work begins and allows access to these remote areas. Where access to portions of the site was unavailable or limited, PAYNE has provided no opinions as to the likely presence of these materials consistent with the information available.
PAYNE Environmental, LLC -13- Proj. No. 19.137/001
5.0 SUMMARY AND CONCLUSIONS
Payne Environmental, LLC (PAYNE) was retained by Antinozzi Associates PC to perform a Hazardous Materials Assessment (HMA) of the property known as Veterans Memorial
Clubhouse, 100 Sunset Ridge Drive, East Hartford, Connecticut. The purpose of this HMA was to assess for the presence of hazardous and regulated materials located within interior and exterior areas that may be disturbed during planned renovations and/or major alteration activities and that may impact costs associated with such activities.
PAYNE recommends:
• Identified asbestos-containing materials should be properly removed and disposed of in accordance with federal and state regulations prior to any disturbance activities.
• Workers should don proper personal protective equipment (PPE) in compliance with OSHA to prevent the potential of worker exposure to airborne materials during disturbance activities (lead, particulates etc).
• Universal wastes identified as part of this study may require proper disposal (i.e. potential mercury-containing thermostats).
Quantities of regulated materials and associated cost estimates for abatement will be provided under separate cover.
PAYNE Environmental, LLC -14- Proj. No. 19.137/001
6.0 LIMITATIONS
The standard methodology for surveying and evaluating buildings to determine the presence of asbestos-containing material (ACM) involves a series of activities which provide information concerning the presence, type, location, and quantity of noted ACM and is conducted in general accordance with current United States Environmental Protection Agency (USEPA), Asbestos
Hazard Emergency Response Act (AHERA; 40 CFR Part 763 Subpart E), USEPA National
Emission Standards for Hazardous Air Pollutants (NESHAPS, 40 CFR Part 61), and OSHA
Asbestos Standard (29 CFR 1926.1101) guidelines.
This evaluation has been prepared on behalf of and for the exclusive use of Antinozzi Associates
PC use in an environmental and hazardous materials investigation of the Site. The conclusions provided by Payne Environmental, LLC are based solely on the scope of the work conducted and the sources of information referenced in this report.
This evaluation does not represent final conclusions regarding hazardous or regulated materials or any other environmental compliance. This evaluation was limited due to Client request for limited testing, Site occupancy, active mechanical and plumbing systems, limitation for destructive testing was limited etc. All building materials have not been assessed at the Site. It is assumed additional testing will need to be performed prior to disturbance. No attempt has been made to audit the facility or operations conducted at the Site with respect to regulatory compliance.
This evaluation is not meant to be utilized as a project design or bidding document. This assessment is not meant to identify all locations, quantities, and conditions of materials associated with the Site or to supply means and methods regarding abatement/removal activities.
This work has been undertaken in accordance with generally accepted consulting practices. No other warranty, express or implied, is made. This evaluation has been prepared in connection with anticipated future renovation activities. The contents of this report may not be copied, provided or otherwise communicated to any other party for any other purpose, in whole or in part, without the prior written consent of Payne Environmental, LLC.
ATTACHMENT A
LABORATORY ANALYTICAL RESULTS - ASBESTOS
EMSL Analytical, Inc.
29 North Plains Highway, Unit # 4 Wallingford, CT 06492
Tel/Fax: (203) 284-5948 / (203) 284-5978 http://www.EMSL.com / wallingfordlab@emsl.com
241907155EMSL Order:
Customer ID: PAYNE50
Customer PO: 19.137/001
Project ID:
Attention: Phone:Neil G. Payne (203) 421-2288
Fax:Payne Environmental, LLC (203) 865-1286
Received Date:PO Box 1190 11/27/2019 9:05 AM
Analysis Date:Madison, CT 06443 12/03/2019 - 12/05/2019
Collected Date: 11/26/2019
Project: 19.137/001
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized
Light Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
CH-01A
241907155-0001
None DetectedNon-fibrous (Other)15%Cellulose
Min. Wool
60%
25%
Tan
Fibrous
Homogeneous
Basement-kitchen -ceiling tile-2'x4'
CH-01B
241907155-0002
None DetectedNon-fibrous (Other)15%Cellulose
Min. Wool
45%
40%
Tan/White
Fibrous
Homogeneous
Basement-kitchen -ceiling tile-2'x4'
CH-02A
241907155-0003
None DetectedNon-fibrous (Other)95%Cellulose5%Gray
Non-Fibrous
Homogeneous
Basement-kitchen -sheetrock-wall
CH-02B
241907155-0004
None DetectedNon-fibrous (Other)95%Cellulose5%Gray
Non-Fibrous
Homogeneous
Basement-kitchen -sheetrock-wall
CH-03A
241907155-0005
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Basement-kitchen -sheetrock joint compound-wall
CH-03B
241907155-0006
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Basement-kitchen -sheetrock joint compound-wall
CH-04A-Ceramic Tile
241907155-0007
None DetectedNon-fibrous (Other)100%Gray/Tan
Non-Fibrous
Homogeneous
Basement-kitchen -
12" tan ceramic floor tile/adhesive
CH-04A-Adhesive
241907155-0007A
None DetectedNon-fibrous (Other)100%Tan
Non-Fibrous
Homogeneous
Basement-kitchen -
12" tan ceramic floor tile/adhesive
CH-04B-Ceramic Tile
241907155-0008
None DetectedNon-fibrous (Other)100%Gray/Tan
Non-Fibrous
Homogeneous
Basement-kitchen -
12" tan ceramic floor tile/adhesive
CH-04B-Adhesive
241907155-0008A
None DetectedNon-fibrous (Other)100%Tan
Non-Fibrous
Homogeneous
Basement-kitchen -
12" tan ceramic floor tile/adhesive
CH-05
241907155-0009
5% ChrysotileNon-fibrous (Other)95%Gray
Non-Fibrous
Homogeneous
Basement-boiler room
- flue cement
CH-06A
241907155-0010
None DetectedNon-fibrous (Other)95%Cellulose5%Gray
Non-Fibrous
Homogeneous
Basement-boiler room
- sheetrock-ceiling
CH-06B
241907155-0011
None DetectedNon-fibrous (Other)97%Cellulose3%Gray/White
Non-Fibrous
Homogeneous
Basement-boiler room
- sheetrock-ceiling
CH-07A
241907155-0012
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Basement-kitchen - 6" tan ceramic cove base
CH-07B
241907155-0013
None DetectedNon-fibrous (Other)100%Tan
Non-Fibrous
Homogeneous
Basement-kitchen - 6" tan ceramic cove base
CH-08A-Floor Tile
241907155-0014
None DetectedNon-fibrous (Other)100%Tan
Non-Fibrous
Homogeneous
Basement-foyer/corrid or - 12" tan vinyl floor tile with black mastic
Initial report from: 12/05/2019 16:54:50
Page 1 of 23ASB_PLM_0008_0001 - 1.78 Printed: 12/5/2019 4:54 PM
Tel/Fax: (203) 284-5948 / (203) 284-5978 http://www.EMSL.com / wallingfordlab@emsl.com
241907155EMSL Order:
Customer ID: PAYNE50
Customer PO: 19.137/001
Project ID:
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized
Light Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
CH-08A-Mastic
241907155-0014A
3% ChrysotileNon-fibrous (Other)97%Black
Non-Fibrous
Homogeneous
Basement-foyer/corrid or - 12" tan vinyl floor tile with black mastic
CH-08B-Floor Tile
241907155-0015
None DetectedNon-fibrous (Other)100%Tan
Non-Fibrous
Homogeneous
Basement-foyer/corrid or - 12" tan vinyl floor tile with black mastic
CH-08B-Mastic
241907155-0015A
Positive Stop (Not Analyzed)Basement-foyer/corrid or - 12" tan vinyl floor tile with black mastic
CH-08C-Floor Tile
241907155-0016
None DetectedNon-fibrous (Other)100%Tan
Non-Fibrous
Homogeneous
Basement-foyer/corrid or - 12" tan vinyl floor tile with black mastic
CH-08C-Mastic
241907155-0016A
Positive Stop (Not Analyzed)Basement-foyer/corrid or - 12" tan vinyl floor tile with black mastic
CH-09A-Cove Base
241907155-0017
None DetectedNon-fibrous (Other)100%Brown
Non-Fibrous
Homogeneous
Basement-foyer/corrid or - brown cove base/yellow adhesive
CH-09A-Adhesive
241907155-0017A
None DetectedNon-fibrous (Other)95%Cellulose5%Yellow
Non-Fibrous
Homogeneous
Basement-foyer/corrid or - brown cove base/yellow adhesive
CH-09B-Cove Base
241907155-0018
None DetectedNon-fibrous (Other)100%Brown
Non-Fibrous
Homogeneous
Basement-foyer/corrid or - brown cove base/yellow adhesive
CH-09B-Adhesive
241907155-0018A
None DetectedNon-fibrous (Other)98%Cellulose2%Yellow
Non-Fibrous
Homogeneous
Basement-foyer/corrid or - brown cove base/yellow adhesive
CH-09C-Cove Base
241907155-0019
None DetectedNon-fibrous (Other)100%Brown
Non-Fibrous
Homogeneous
Basement-foyer/corrid or - brown cove base/yellow adhesive
CH-09C-Adhesive
241907155-0019A
None DetectedNon-fibrous (Other)95%Cellulose
Synthetic
3%
2%
Yellow
Non-Fibrous
Homogeneous
Basement-foyer/corrid or - brown cove base/yellow adhesive
CH-10A
241907155-0020
None DetectedNon-fibrous (Other)100%Tan
Non-Fibrous
Homogeneous
Basement-storage/ra dio room - window glazing compound
CH-10B
241907155-0021
None DetectedNon-fibrous (Other)97%Fibrous (Other)3%Gray/White
Non-Fibrous
Homogeneous
Basement-storage/ra dio room - window glazing compound
CH-11A
241907155-0022
None DetectedNon-fibrous (Other)100%White/Blue
Non-Fibrous
Homogeneous
Basement-storage/ra dio room - 4" blue ceramic tile
CH-11B
241907155-0023
None DetectedNon-fibrous (Other)100%White/Blue
Non-Fibrous
Homogeneous
Basement-storage/ra dio room - 4" blue ceramic tile
CH-12A-Skim Coat
241907155-0024
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Basement-storage/ra dio room - wall plaster
(skim & base coats)
CH-12A-Base Coat
241907155-0024A
None DetectedQuartz
Non-fibrous (Other)
10%
90%
Brown/Gray
Non-Fibrous
Homogeneous
Basement-storage/ra dio room - wall plaster
(skim & base coats)
CH-12B-Skim Coat
241907155-0025
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Basement-storage/ra dio room - wall plaster
(skim & base coats)
CH-12B-Base Coat
241907155-0025A
None DetectedQuartz
Non-fibrous (Other)
10%
90%
Brown/Gray
Non-Fibrous
Homogeneous
Basement-storage/ra dio room - wall plaster
(skim & base coats)
Initial report from: 12/05/2019 16:54:50
Page 2 of 23ASB_PLM_0008_0001 - 1.78 Printed: 12/5/2019 4:54 PM
Tel/Fax: (203) 284-5948 / (203) 284-5978 http://www.EMSL.com / wallingfordlab@emsl.com
241907155EMSL Order:
Customer ID: PAYNE50
Customer PO: 19.137/001
Project ID:
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized
Light Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
CH-12C-Skim Coat
241907155-0026
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Basement-storage/ra dio room - wall plaster
(skim & base coats)
CH-12C-Base Coat
241907155-0026A
None DetectedQuartz
Non-fibrous (Other)
10%
90%
Brown
Non-Fibrous
Homogeneous
Basement-storage/ra dio room - wall plaster
(skim & base coats)
CH-13A-Skim Coat
241907155-0027
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Basement-storage/ra dio room - ceiling plaster (skim & base coats)
CH-13A-Base Coat
241907155-0027A
None DetectedQuartz
Non-fibrous (Other)
10%
90%
Tan
Non-Fibrous
Homogeneous
Basement-storage/ra dio room - ceiling plaster (skim & base coats)
CH-13B-Skim Coat
241907155-0028
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Basement-storage/ra dio room - ceiling plaster (skim & base coats)
CH-13B-Base Coat
241907155-0028A
None DetectedQuartz
Non-fibrous (Other)
10%
90%
Tan
Non-Fibrous
Homogeneous
Basement-storage/ra dio room - ceiling plaster (skim & base coats)
CH-13C-Skim Coat
241907155-0029
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Basement-storage/ra dio room - ceiling plaster (skim & base coats)
CH-13C-Base Coat
241907155-0029A
None DetectedQuartz
Non-fibrous (Other)
10%
90%
Gray/Tan
Non-Fibrous
Homogeneous
Basement-storage/ra dio room - ceiling plaster (skim & base coats)
CH-14A
241907155-0030
None DetectedNon-fibrous (Other)100%Gray/Blue
Non-Fibrous
Homogeneous
Basement-storage/ra dio room - 1" tan/blue ceramic floor tile
CH-14B
241907155-0031
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Basement-storage/ra dio room - 1" tan/blue ceramic floor tile
CH-15A
241907155-0032
None DetectedPerlite
Non-fibrous (Other)
10%
15%
Cellulose
Min. Wool
45%
30%
Tan/White
Fibrous
Homogeneous
Basement-men's room - 2'x2' ceiling tile
CH-15B
241907155-0033
None DetectedPerlite
Non-fibrous (Other)
10%
15%
Cellulose
Min. Wool
50%
25%
Tan/White
Non-Fibrous
Homogeneous
Basement-men's room - 2'x2' ceiling tile
CH-16A-Cove Base
241907155-0034
None DetectedNon-fibrous (Other)100%Tan
Non-Fibrous
Homogeneous
Basement-meeting room - 4" ceramic cove base/adhesive
CH-16A-Adhesive
241907155-0034A
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Basement-meeting room - 4" ceramic cove base/adhesive
CH-16B-Cove Base
241907155-0035
None DetectedNon-fibrous (Other)100%Tan
Non-Fibrous
Homogeneous
Basement-meeting room - 4" ceramic cove base/adhesive
CH-16B-Adhesive
241907155-0035A
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Basement-meeting room - 4" ceramic cove base/adhesive
CH-17A
241907155-0036
None DetectedQuartz
Non-fibrous (Other)
5%
95%
Gray
Non-Fibrous
Homogeneous
Men's bathroom -gray grout with #16
Initial report from: 12/05/2019 16:54:50
Page 3 of 23ASB_PLM_0008_0001 - 1.78 Printed: 12/5/2019 4:54 PM
Tel/Fax: (203) 284-5948 / (203) 284-5978 http://www.EMSL.com / wallingfordlab@emsl.com
241907155EMSL Order:
Customer ID: PAYNE50
Customer PO: 19.137/001
Project ID:
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized
Light Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
CH-17B
241907155-0037
None DetectedQuartz
Non-fibrous (Other)
8%
92%
Gray
Non-Fibrous
Homogeneous
Men's bathroom -gray grout with #16
CH-18A-Floor Tile
241907155-0038
None DetectedNon-fibrous (Other)100%Tan
Non-Fibrous
Homogeneous
Basement-meeting room - 12" tan ceramic floor tile/yellow mortar
CH-18A-Mortar
241907155-0038A
None DetectedQuartz
Non-fibrous (Other)
3%
97%
Tan
Non-Fibrous
Homogeneous
Basement-meeting room - 12" tan ceramic floor tile/yellow mortar
CH-18B-Floor Tile
241907155-0039
None DetectedNon-fibrous (Other)100%Tan
Non-Fibrous
Homogeneous
Basement-meeting room - 12" tan ceramic floor tile/yellow mortar
CH-18B-Mortar
241907155-0039A
None DetectedQuartz
Non-fibrous (Other)
3%
97%
Tan
Non-Fibrous
Homogeneous
Basement-meeting room - 12" tan ceramic floor tile/yellow mortar
CH-19A
241907155-0040
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
Basement-meeting room - gray grout with
#18
CH-19B
241907155-0041
None DetectedQuartz
Non-fibrous (Other)
8%
92%
Gray
Non-Fibrous
Homogeneous
Basement-meeting room - gray grout with
#18
CH-20
241907155-0042
None DetectedQuartz
Non-fibrous (Other)
10%
90%
Tan
Non-Fibrous
Homogeneous
Basement-meeting room - chimney cement coating
(storage area)
CH-21A-Skim Coat
241907155-0043
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Basement-meeting room - plaster ceiling
CH-21A-Base Coat
241907155-0043A
None DetectedQuartz
Non-fibrous (Other)
15%
85%
Tan
Non-Fibrous
Homogeneous
Basement-meeting room - plaster ceiling
CH-21B-Skim Coat
241907155-0044
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
Basement-meeting room - plaster ceiling
CH-21B-Base Coat
241907155-0044A
None DetectedQuartz
Non-fibrous (Other)
8%
92%
Tan
Non-Fibrous
Homogeneous
Basement-meeting room - plaster ceiling
CH-22
241907155-0045
6% ChrysotileNon-fibrous (Other)94%Black
Non-Fibrous
Homogeneous
Basement-meeting room - black sink condensate barrier
CH-23A
241907155-0046
None DetectedNon-fibrous (Other)100%Tan
Non-Fibrous
Homogeneous
1st floor-kitchen -plaster ceiling
CH-23B
241907155-0047
None DetectedNon-fibrous (Other)100%Tan
Non-Fibrous
Homogeneous
1st floor-kitchen -plaster ceiling
CH-24A
241907155-0048
None DetectedNon-fibrous (Other)85%Cellulose15%Gray
Non-Fibrous
Homogeneous
1st floor-kitchen -plaster wall
CH-24B
241907155-0049
None DetectedNon-fibrous (Other)93%Cellulose7%Gray
Non-Fibrous
Homogeneous
1st floor-kitchen -plaster wall
Initial report from: 12/05/2019 16:54:50
Page 4 of 23ASB_PLM_0008_0001 - 1.78 Printed: 12/5/2019 4:54 PM
Tel/Fax: (203) 284-5948 / (203) 284-5978 http://www.EMSL.com / wallingfordlab@emsl.com
241907155EMSL Order:
Customer ID: PAYNE50
Customer PO: 19.137/001
Project ID:
Test Report: Asbestos Analysis of Bulk Materials via EPA 600/R-93/116 Method using Polarized
Light Microscopy
Sample Description Appearance % Fibrous % Non-Fibrous
Non-Asbestos Asbestos
% Type
CH-25A-Skim Coat
241907155-0050
None DetectedNon-fibrous (Other)95%Cellulose5%Tan
Non-Fibrous
Homogeneous
1st floor-kitchen -skim coat on #24
CH-25A-Fiberboard
241907155-0050A
None DetectedNon-fibrous (Other)10%Cellulose90%Brown
Fibrous
Homogeneous
1st floor-kitchen -skim coat on #24
CH-25B-Skim Coat
241907155-0051
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
1st floor-kitchen -skim coat on #24
CH-25B-Fiberboard
241907155-0051A
None DetectedNon-fibrous (Other)5%Cellulose95%Brown
Fibrous
Homogeneous
1st floor-kitchen -skim coat on #24
CH-26A-Ceramic Tile
241907155-0052
None DetectedNon-fibrous (Other)100%White/Pink
Non-Fibrous
Homogeneous
1st floor-kitchen - 12" pink ceramic floor tile/white mortar
CH-26A-Mortar
241907155-0052A
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
1st floor-kitchen - 12" pink ceramic floor tile/white mortar
CH-26B-Ceramic Tile
241907155-0053
None DetectedNon-fibrous (Other)100%Pink
Non-Fibrous
Homogeneous
1st floor-kitchen - 12" pink ceramic floor tile/white mortar
CH-26B-Mortar
241907155-0053A
None DetectedNon-fibrous (Other)100%Tan/White
Non-Fibrous
Homogeneous
1st floor-kitchen - 12" pink ceramic floor tile/white mortar
CH-27A
241907155-0054
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
1st floor-kitchen -gray grout with #26
CH-27B
241907155-0055
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
1st floor-kitchen -gray grout with #26
CH-27C
241907155-0056
None DetectedQuartz
Non-fibrous (Other)
5%
95%
Gray
Non-Fibrous
Homogeneous
1st floor-kitchen -gray grout with #26
CH-28
241907155-0057
None DetectedNon-fibrous (Other)85%Cellulose15%White
Non-Fibrous
Homogeneous
1st floor-kitchen -white sink condensate barrier
CH-29A-Ceramic Tile
241907155-0058
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
1st floor-bar area - 8" gray ceramic floor tile/yellow mortar
CH-29A-Mortar
241907155-0058A
None DetectedNon-fibrous (Other)95%Cellulose5%White
Non-Fibrous
Homogeneous
1st floor-bar area - 8" gray ceramic floor tile/yellow mortar
CH-29B-Ceramic Tile
241907155-0059
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
1st floor-bar area - 8" gray ceramic floor tile/yellow mortar
CH-29B-Mortar
241907155-0059A
None DetectedNon-fibrous (Other)100%White
Non-Fibrous
Homogeneous
1st floor-bar area - 8" gray ceramic floor tile/yellow mortar
CH-29C-Ceramic Tile
241907155-0060
None DetectedNon-fibrous (Other)100%Gray
Non-Fibrous
Homogeneous
1st floor-bar area - 8" gray ceramic floor tile/yellow mortar
CH-29C-Mortar
241907155-0060A
None DetectedNon-fibrous (Other)100%Tan/White
Non-Fibrous
Homogeneous
1st floor-bar area - 8" gray ceramic floor tile/yellow mortar
CH-30A
241907155-0061
None DetectedQuartz
Non-fibrous (Other)
15%
85%
Gray
Non-Fibrous
Homogeneous
1st floor-bar area -gray grout with #29
Initial report from: 12/05/2019 16:54:50
Page 5 of 23ASB_PLM_0008_0001 - 1.78 Printed: 12/5/2019 4:54 PM
Tel/Fax: (203) 284-5948 / (203) 284-5978 http://www.
This is the start of the file's text. The full file is on GovTribe.
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .