26_009_LH Attachment B _Project Quantity She.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
26-009-LH Paving the Way Project 1 (10/2/25)
Solicitation number
PE-61100-NONST-2026-000000086
Issued by
Bibb County, Georgia

About this file

This is a Project Quantity Sheet for Package 1 Road work, detailing road resurfacing and infrastructure improvements across six road segments. The project encompasses pavement restoration, utility work, and road marking services across approximately 9.53 miles of roadway. Major work items include milling (10,146.7 tons), bituminous tack application (7,379.39 gallons), roadway patching (12,298.98 square yards), and 12.5 mm Superpave asphalt placement (10,146.7 tons). Additional scope includes installation of 11 sewer/storm manholes, 12 water valve risers, manhole and water valve adjustments, and extensive striping work totaling 201,256 linear feet. Supplemental items comprise 56 linear feet of painted stop bars, 340 linear feet of painted hatching, 3 painted arrows, 9.53 miles of rumble profile markers, and 19.06 miles of clipping grassed shoulders.

The sheet provides estimated quantities, actual quantities, unit prices, contract amounts, and actual amounts with variance columns for each line item across the identified road segments, including Fulton Mill Road, Dixon Road, and Rogers Road. The spreadsheet tracks both estimated versus actual work performed, enabling cost reconciliation between contracted amounts and actual project execution. No specific pricing, contract award date, or term information is provided within this quantity documentation.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Project Quantity for Package 1 Road List
Road NameFromToMilesRatingLengthMilesWidth (Ft)Square YardsPatchwork,SY, EPatchwork,SY,APriceCont AmtActual AmtDifferenceDeep Patch SY, EDeep Patch SY, APriceCont AmtActual AmtDifferenceAsphalt, Tons 12.5 mm, EAsphalt,Tons 12.5 mm, APriceCont AmtActual AmtDifferenceAsphalt, Tons 9.5 mm, EAsphalt,Tons 9.5 mm, APriceCont AmtActual AmtDifferenceTack,Gal, ETack,Gal, APriceCont AmtActual AmtDifferenceMilling,Tons, EMilling, Tons, APriceCont AmtActual AmtDifferenceM.H. (EA), EM.H. (EA), APriceCont AmtActual Amt
Fulton Mill RdJane Ann DrUS 800.386120270.38224954.89495.4900000408.800000000000297.2900000408.80000000000
Fulton Mill RdUS 80Hunnicutt Rd1.716190261.712222063.562206.361820.21323.811820.20
Fulton Mill RdWestern CirBethel Church Rd1.055855341.052213527.561352.761116.0811.651116.011
Fulton Mill RdMichael DrSkyhawk Cir0.226611370.22222779.33277.93229.3166.76229.30
Dixon RdBethel Church RdRogers Rd1.426074781.422218279.561827.961508.11096.771508.10
Dixon RdFulton MillPine Bloom Pl1.235064741.232215825.331582.531305.6949.521305.60
Rogers RdDixon RdFulton Mill3.5359186383.532245559.564555.963758.72733.573758.70
Total9.539.5312298.9810146.77379.3910146.71111122012563563409.5319.06
ItemUnitQuantityUnit PriceTotal
MillingTONS10146.7
Bituminous TackGAL7379.39
Roadway PatchingSY12298.98
12.5 mm Superpave AsphaltTONS10146.7
9.5 mm Superpave AsphaltTONS0
Install Furnished Sewer Manhole, Storm Manholes,EA11
Install Furnished Water Valve Riser12
Manhole (Adjustment)EA11
Water Valve (Adjustment)EA12
Traffic Signal Loop InstallEA0
Striping (Center Lines, Edge Lines, Lane Lines)LF201256
Painted ArrowsEA3
Bike SymbolsEA0
Painted MessagesEA0
Painted CrosswalksLF0
Painted Stop BarsLF56
Painted RR SymbolsEA0
Painted HatchingLF340
Rumble StripeSET0
RPMsMILE9.53
Clipping Grassed ShouldersMILE19.06