26_009_LH Attachment B _Project Quantity She.xlsx
XLSX spreadsheet 14 KB Posted
- Attached to
- 26-009-LH Paving the Way Project 1 (10/2/25)
- Solicitation number
- PE-61100-NONST-2026-000000086
- Issued by
- Bibb County, Georgia
About this file
This is a Project Quantity Sheet for Package 1 Road work, detailing road resurfacing and infrastructure improvements across six road segments. The project encompasses pavement restoration, utility work, and road marking services across approximately 9.53 miles of roadway. Major work items include milling (10,146.7 tons), bituminous tack application (7,379.39 gallons), roadway patching (12,298.98 square yards), and 12.5 mm Superpave asphalt placement (10,146.7 tons). Additional scope includes installation of 11 sewer/storm manholes, 12 water valve risers, manhole and water valve adjustments, and extensive striping work totaling 201,256 linear feet. Supplemental items comprise 56 linear feet of painted stop bars, 340 linear feet of painted hatching, 3 painted arrows, 9.53 miles of rumble profile markers, and 19.06 miles of clipping grassed shoulders.
The sheet provides estimated quantities, actual quantities, unit prices, contract amounts, and actual amounts with variance columns for each line item across the identified road segments, including Fulton Mill Road, Dixon Road, and Rogers Road. The spreadsheet tracks both estimated versus actual work performed, enabling cost reconciliation between contracted amounts and actual project execution. No specific pricing, contract award date, or term information is provided within this quantity documentation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Project Quantity for Package 1 Road List | |||||||||||||||||||||||||||||||||||||||||||||||||
| Road Name | From | To | Miles | Rating | Length | Miles | Width (Ft) | Square Yards | Patchwork,SY, E | Patchwork,SY,A | Price | Cont Amt | Actual Amt | Difference | Deep Patch SY, E | Deep Patch SY, A | Price | Cont Amt | Actual Amt | Difference | Asphalt, Tons 12.5 mm, E | Asphalt,Tons 12.5 mm, A | Price | Cont Amt | Actual Amt | Difference | Asphalt, Tons 9.5 mm, E | Asphalt,Tons 9.5 mm, A | Price | Cont Amt | Actual Amt | Difference | Tack,Gal, E | Tack,Gal, A | Price | Cont Amt | Actual Amt | Difference | Milling,Tons, E | Milling, Tons, A | Price | Cont Amt | Actual Amt | Difference | M.H. (EA), E | M.H. (EA), A | Price | Cont Amt | Actual Amt |
| Fulton Mill Rd | Jane Ann Dr | US 80 | 0.38 | 61 | 2027 | 0.38 | 22 | 4954.89 | 495.49 | 0 | 0 | 0 | 0 | 0 | 408.8 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 297.29 | 0 | 0 | 0 | 0 | 0 | 408.8 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | 0 | ||||||
| Fulton Mill Rd | US 80 | Hunnicutt Rd | 1.71 | 61 | 9026 | 1.71 | 22 | 22063.56 | 2206.36 | 1820.2 | 1323.81 | 1820.2 | 0 | ||||||||||||||||||||||||||||||||||||
| Fulton Mill Rd | Western Cir | Bethel Church Rd | 1.05 | 58 | 5534 | 1.05 | 22 | 13527.56 | 1352.76 | 1116.0 | 811.65 | 1116.0 | 11 | ||||||||||||||||||||||||||||||||||||
| Fulton Mill Rd | Michael Dr | Skyhawk Cir | 0.22 | 66 | 1137 | 0.22 | 22 | 2779.33 | 277.93 | 229.3 | 166.76 | 229.3 | 0 | ||||||||||||||||||||||||||||||||||||
| Dixon Rd | Bethel Church Rd | Rogers Rd | 1.42 | 60 | 7478 | 1.42 | 22 | 18279.56 | 1827.96 | 1508.1 | 1096.77 | 1508.1 | 0 | ||||||||||||||||||||||||||||||||||||
| Dixon Rd | Fulton Mill | Pine Bloom Pl | 1.23 | 50 | 6474 | 1.23 | 22 | 15825.33 | 1582.53 | 1305.6 | 949.52 | 1305.6 | 0 | ||||||||||||||||||||||||||||||||||||
| Rogers Rd | Dixon Rd | Fulton Mill | 3.53 | 59 | 18638 | 3.53 | 22 | 45559.56 | 4555.96 | 3758.7 | 2733.57 | 3758.7 | 0 |
| Total | 9.53 | 9.53 | 12298.98 | 10146.7 | 7379.39 | 10146.7 | 11 | 11 | 12 | 201256 | 3 | 56 | 340 | 9.53 | 19.06 | |||
| Item | Unit | Quantity | Unit Price | Total |
| Milling | TONS | 10146.7 |
| Bituminous Tack | GAL | 7379.39 |
| Roadway Patching | SY | 12298.98 |
| 12.5 mm Superpave Asphalt | TONS | 10146.7 |
| 9.5 mm Superpave Asphalt | TONS | 0 |
| Install Furnished Sewer Manhole, Storm Manholes, | EA | 11 |
| Install Furnished Water Valve Riser | 12 | |
| Manhole (Adjustment) | EA | 11 |
| Water Valve (Adjustment) | EA | 12 |
| Traffic Signal Loop Install | EA | 0 |
| Striping (Center Lines, Edge Lines, Lane Lines) | LF | 201256 |
| Painted Arrows | EA | 3 |
| Bike Symbols | EA | 0 |
| Painted Messages | EA | 0 |
| Painted Crosswalks | LF | 0 |
| Painted Stop Bars | LF | 56 |
| Painted RR Symbols | EA | 0 |
| Painted Hatching | LF | 340 |
| Rumble Stripe | SET | 0 |
| RPMs | MILE | 9.53 |
| Clipping Grassed Shoulders | MILE | 19.06 |