(26-0009-REQ)_CPM_HVAC_Systems_New_Contract_Fiscal_Review.docx
DOCX document 76 KB Posted
- Attached to
- HVAC-Systems and Related Services
- Solicitation number
- 26-0009-RFP
- Issued by
- Pinellas County, Florida
About this file
This is a fiscal review document for a new contract issued by Pinellas County, Florida for HVAC Systems and Related Services. The procurement establishes a comprehensive preventive maintenance and condition assessment program for water-cooled chillers, air-cooled chillers, pumps, and cooling towers across approximately 4.5 million square feet of facilities spanning more than 150 county locations. The scope encompasses 122 line items requiring three annual preventive maintenance services per unit, with deliverables including structured preventive maintenance performed during regular business hours (Monday-Friday, 7:00 AM-5:00 PM), a mandatory three-hour emergency response time, comprehensive documentation submitted within 30 days of service completion, an Annual Reporting Package with formal Condition Assessments and Remaining Useful Life projections, and Eddy Current testing and tube cleaning for water-cooled chillers. The initial contract term is 36 months from the award date with two optional 12-month renewal periods. Proposals were due April 9, 2026, at 3:00 PM EST, with a question submission deadline of March 30, 2026, at 2:00 PM EST. The anticipated award date is August 12, 2026.
The total contract amount is $375,079.00 for the three-year initial term with an annual estimated expenditure of $125,026.33. The pricing schedule establishes a Not-To-Exceed budget of $220,000 for the three-year contract period, comprised of $200,000 for standard preventive maintenance and repairs and $20,000 for unspecified services requiring prior written county authorization, with estimated labor costs of 3,200 standard repair hours and 400 overtime/emergency hours, and parts billed at cost plus percentage markup. Johnson Controls, Inc. (Contract Number 23-0751-PB) is identified as the anticipated contractor. The contract is currently budgeted in the CPM Department Operating Budget for FY26 at $526,873.89 across multiple budget line items. As of November 17, 2025, no costs had been expended under this vendor for HVAC systems and related services; however, FY25 final costs associated with this vendor totaled $507,782.29. Contractors must maintain comprehensive insurance coverage including Workers' Compensation, Commercial General Liability of $1,000,000 per occurrence and $2,000,000 aggregate, Business Automobile Liability of $1,000,000 combined single limit, Excess/Umbrella Liability of $5,000,000, and Professional Liability Insurance of $1,000,000, with all policies issued by companies holding an AM Best rating of A-VIII or better.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| HVAC-Systems_and_Related_Services.pdf | ||
| 26-0009_-_Insurance_Requirements_-_HVAC_Systems_and_Related_Services.docx | DOCX document | |
| Notice_of_Intent_to_Sole_Source_07-25-2023.pdf | ||
| Human_Trafficking_Affidavit_11.20.25.pdf | ||
| Common_Carrier_Attestation_02.05.2025.pdf | ||
| (26-0009-REQ)_CPM_HVAC_Systems_New_Contract_Fiscal_Review.docx | DOCX document | |
| Foreign_Countries_of_Concern_Affidavit_12.11.2025.pdf | ||
| Eddy_Current_Checklist_&_Condition_Assesment.docx | DOCX document | |
| HVAC_Pricing.xlsx | XLSX spreadsheet | |
| HVAC_Systems_and_Related_Services_Scope.docx | DOCX document | |
| Cooling_Towers_Checklist_&_Condition_Assesment.docx | DOCX document | |
| Non-Competitive_Oversight_Committee_Justification_Form.docx | DOCX document | |
| Pumps_Checklist_&_Condition_Assesment.docx | DOCX document | |
| Air_Cooled_Chillers_Checklist_&_Condition_Assesment.docx | DOCX document | |
| Water_Cooled_Chillers_Checklist_&_Condition_Assesment.docx | DOCX document |
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CPM OpenGov Procurement Contracts Fiscal Review New Contract
| 1. Contract Title: | HVAC Systems and Related Services | |||
| 2. Vendor Name: | Johnson Controls, Inc. | |||
| 3. Contract Number: | 23-0751-PB | |||
| 4. Granicus ID (if applicable): | N/A | |||
| 5. BPA number (if applicable): | N/A | |||
| 6. Term: | 3 YRS (?) | |||
| 7. Contract Amount: | +$375,079.00 |
8. Currently budgeted? (Y/N) Y (CPM Department Operating Budget)
a. Amount Budgeted: FY26 $526,873.89
i. $0 (534-Other Contractual Serv)
ii. $163,410 (546-Routine/Preventative R&M)
iii. $0 (546-Planned Projects (PP))
iv. $339,826.17 (546-Projected/As-needed R&M)
v. $23,637.72 (552-Operating Supplies)
FY25: 0
i. $0 (534-Other Contractual Serv)
ii. $0 (546-Routine/Preventative R&M)
iii. $0 (546-Planned Projects (PP))
iv. $0 (546-Projected/As-needed R&M)
v. $0 (552-Operating Supplies)
b. Account String(s): 0001.361310.1391.000000.5340001 – 0 | 0
0001.361410.1391.000000.5340001 – 0 | 0 0001.361501.1903.000000.546/5520001 – $48,200 / $75,591.82 0001.361525.1903.000000.546/5520001 – $10,220 / $35,880.07 / $10,099.55 0001.361530.1903.000000.546/5520001 – $51,260 / $155,713.09 / $13,538.17 0001.361540.1882.000000.546/5520001 – $53,730 / $72,641.19
9. Analysis (annual impact based on contract modification date)
· The fiscal impact of this new contract is an overall cost of $375,079.00 and a YoY cost of $125,026.33 (based on a 3 YR term). Due to the timing of this modification (which will affect FY26 based on the anticipated award date of 8/12/26) this item IS consistent with the FY26 Adopted Budget and WILL BE PROGRAMMED into CPM’s FY27 Budget, once submitted in March 2026. As of 11/17/25, the costs associated with this vendor for HVAC systems and related services totaled $0. In FY25, the final costs associated with this vendor totaled $507,782.29. Any overages would be absorbed by the department or addressed via a budget amendment.
10. Overall Fiscal Impact
a. Contract Amount: $0
i. Annual Estimated Expenditure: $0
b. Contract Modification Amount: $0
i. Annual Estimated Expenditure: $0
c. New Contract Amount: $375,079.00
i. Annual Estimated Expenditure: $125,026.33
11. Amount Expended in FY25 (as of 11/17/25): $0
12. Amount Expended in FY25: $507,782.29 image1.png
File details come from the government source that posted it. Updated .