Summary
This is a construction drawing document for the Hollins High School Lift Station Replacement project in St. Petersburg, Florida, prepared by BCER Engineering for the Pinellas County School District. The project involves the complete replacement of an existing wastewater lift station with a new 8-foot diameter precast concrete wet well facility designed to accommodate submersible pumps with a capacity of 255 gallons per minute at 51.45 feet of total dynamic head. The work includes demolition of the existing lift station structure, installation of new gravity and force mains, water distribution lines, and fire mains; replacement of associated appurtenances such as gate valves, check valves, and air release valves; construction of a concrete slab and control panel foundation; installation of brick pavers and fencing; and site restoration with sodding. The project location is at 4940 62nd Street North, St. Petersburg, Florida 33709. The drawing sheets, dated July 10, 2026, provide detailed specifications for materials, construction methods, testing and inspection requirements, utility clearance standards, and site restoration procedures in accordance with Pinellas County standards, the Florida Department of Transportation specifications, and AWWA standards. The sealed bid deadline for the project is August 31, 2026, at 4:00 pm, with submission through the Pinellas County School District e-Procurement Portal.
The technical specifications require all gravity sewer piping to conform to ASTM D-3034 PVC standards with appropriate depths and ductile iron pipe for depths below 18 feet; water and fire mains to meet AWWA C-900 and C-905 specifications with Class 50 ductile iron components; and all pressure testing to comply with AWWA C600 and C605 standards. Dewatering activities must be contained within the project area with silt barriers and settling areas, with discharge directed away from wetlands, lakes, or rivers. The contractor is responsible for obtaining all necessary permits, coordinating with utility companies for location verification 48 hours before work begins, protecting trees marked to remain, managing erosion control measures through completion, and providing certified record drawings signed by a professional surveyor. All disturbed areas must be sodded to FDOT standards, and the contractor must maintain the project until final acceptance by regulatory agencies and the owner. Funding sources and specific contract values are not detailed in the construction documents provided.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C1.0
GENERAL NOTES
WATER SYSTEM NOTESGENERAL UTILITY NOTES
WATER/SEWER CLEARANCE REQUIREMENTS:
WATER SYSTEM TESTING AND INSPECTION REQUIREMENTS
TECHNICAL SPECIFICATIONS
PINELLAS COUNTY PINELLAS COUNTY UTILITY DEPARTMENT
SPECIFICALLY
APPROVED BY THE OWNER AND / OR THE ENGINEER OF RECORD.
1. PINELLAS COUNTY ENGINEERING SERVICES DEPARTMENT
2. PINELLAS COUNTY UTILITY DEPARTMENT
FY-2026-27
FY-2026-27
11TH EDITION, DATED DECEMBER, 2023.
GENERAL CONSTRUCTION NOTES
GEORGE F. YOUNG, INC.
SUNSHINE STATE ONE CALL -------- 1-800-432-4770
PAVING, GRADING & DRAINAGE TESTING & INSPECTION
REQUIREMENTS
CLEARING AND GRUBBING NOTES
2024-25
EROSION CONTROL NOTES
PAVING, GRADING & DRAINAGE NOTES
REUSE SYSTEM TESTING AND INSPECTION REQUIREMENTS
REUSE SYSTEM NOTES
MINIMUM REQUIRED UTILITY AS-BUILTS
GENERAL
REUSE
WATER
SEWER
PUMP STATION
SANITARY SEWER NOTES
SANITARY SEWER TESTING & INSPECTION REQUIREMENTS
DEWATERING PLAN / NOTES
1. DEWATERING ACTIVITIES SHALL BE CONTAINED WITHIN THE PROJECT AREA AND SHALL BE IN
CONFORMANCE WITH THE LATEST NPDES CRITERIA..
2. THE PROPOSED DRAINAGE RETENTION AREAS CAN BE USED AS TEMPORARY SETTLING AREAS FOR DEWATERING ACTIVITIES. THE PROPOSED DRAINAGE RETENTION AREA(S) SHALL BE CONSTRUCTED TO A SUFFICIENT SIZE AND DEPTH TO RECEIVE WATER FROM DEWATERING ACTIVITIES. IF AT ANY TIME STAGING OF WATER WITHIN THE RETENTION AREA APPROACHES 6-INCHES OF THE PROPOSED POND TOP-OF-BANK, DEWATERING ACTIVITIES SHALL STOP UNTIL THE RETENTION VOLUME HAS RECOVERED.
3. SHEET PILE WALLS, SLURRY WALLS, OR OTHER MEANS OF LIMITING THE EXTENT OF THE WATER TABLE
DRAWDOWN, BEYOND THE PROJECT AREA, SHALL BE IMPLEMENTED.
4. WATER DISCHARGE FROM SETTLING AREAS SHALL BE CLEAN AND FREE OF ANY SILT. SILT BARRIERS (I.E. SILT FENCE, HAY BALES, ROCK BAGS OR ANY COMBINATION NECESSARY TO REMOVE SEDIMENTS PRIOR TO DISCHARGE) SHALL BE INSTALLED AND MAINTAINED UNTIL ALL DEWATERING ACTIVITIES ARE COMPLETE.
5. AT NO TIME SHALL DISCHARGE FROM THE DEWATERING ACTIVITIES BE DIRECTED IN A MANNER THAT WOULD
IMPACT AN EXISTING WETLAND, LAKE OR RIVER.
6. DEWATERING ACTIVITIES SHALL BE LIMITED TO TIME PERIODS THAT CONSTRUCTION ACTIVITIES REQUIRED DEWATERING. ALL IMPLEMENTED DEWATERING INFRASTRUCTURE, EQUIPMENT, ETC. SHALL BE REMOVED
UPON COMPLETION OF CONSTRUCTION.
7. CONTRACTOR SHALL PROVIDE WATERING PLAN, IF APPLICABLE, TO PINELLAS COUNTY ENGINEERING INSPECTIONS DEPARTMENT @ 727-834-3670 FOR REVIEW PRIOR TO THE EROSION CONTROL MEASURE
PRE-INSPECTION MEETING.
Issue Record:
Sheet Title:
Sheet no:
Drawn by:
Checked by:
Scale:
Date:
No: Date:Description:
JULY 10, 2026
AS NOTED
BCER PROJECT
6555 N. WICKHAM ROAD, SUITE 104
MELBOURNE, FL 32940 | 321.241.4124
CA# 9303
© Copyright BCER Engineering
ALL DRAWINGS, SPECIFICATIONS, AND OTHER WORK PRODUCT PREPARED BY BCER
ENGINEERING FOR THIS PROJECT ARE INSTRUMENTS OF SERVICE AND SHALL REMAIN THE
PROPERTY OF BCER ENGINEERING. BCER ENGINEERING SHALL RETAIN ALL COMMON LAW,
STATUTORY AND OTHER RESERVED RIGHTS, INCLUDING THE COPYRIGHT THERETO.
H O
LL
IN
S H
S
LI
FT
ST
AT
IO
N R
EP
LA
C
EM
EN
T
2n d St
N St
. P et er sb ur g, F L
PLANNING ENGINEERING CONSTRUCTION ADMINISTRATION
7026 LITTLE ROAD NEW PORT RICHEY, FLORIDA 34654
727-849-8010 Fax 727-849-8020
CA# 00009572
Pl ot-
T:
CD
C\
Pr oje cts \25
2 H oll ins
H S
Lif t S tat ion
\D ra wi ng s\C on str uc tio n\2
_C 1.0
G en er al
No tes
.dw g -
Ju l 0
9, :12 am
JT
rip p
JLT
PAM
AutoCAD SHX Text
1. ALL WATER MAINS SHALL HAVE A MINIMUM OF 36 INCHES OF COVER BASED ON FINAL GRADING. ALL WATER MAINS SHALL HAVE A MINIMUM OF 36 INCHES OF COVER BASED ON FINAL GRADING. 2. ALL WATER SYSTEM WORK SHALL CONFORM WITH LOCAL REGULATORY STANDARDS AND SPECIFICATIONS. ALL WATER SYSTEM WORK SHALL CONFORM WITH LOCAL REGULATORY STANDARDS AND SPECIFICATIONS. 3. ALL DUCTILE IRON PIPE SHALL BE CLASS 50 IN ACCORDANCE WITH ANSI/AWWA C150/A21.50 AND PIPE SHALL ALL DUCTILE IRON PIPE SHALL BE CLASS 50 IN ACCORDANCE WITH ANSI/AWWA C150/A21.50 AND PIPE SHALL RECEIVE EXTERIOR BITUMINOUS COATING AND SHALL BE CEMENT MORTAR LINED, STANDARD THICKNESS, IN ACCORDANCE WITH ANSI/AWWA C104/A21.4. 4. ALL FITTINGS LARGER THAN 3" SHALL BE DUCTILE IRON IN ACCORDANCE WITH A.W.W.A. C-110 WITH A PRESSURE ALL FITTINGS LARGER THAN 3" SHALL BE DUCTILE IRON IN ACCORDANCE WITH A.W.W.A. C-110 WITH A PRESSURE RATING OF 350 P.S.I. JOINTS SHALL BE MECHANICAL JOINTS IN ACCORDANCE WITH AWWA C-111. FITTINGS SHALL BE CEMENT MORTAR LINED AND COATED IN ACCORDANCE WITH AWWA C-104. 5. ALL PVC POTABLE WATER MAINS 4" THROUGH 12" SHALL BE AWWA C-900 (CLASS 150), DR 18 PVC, AND 14" ALL PVC POTABLE WATER MAINS 4" THROUGH 12" SHALL BE AWWA C-900 (CLASS 150), DR 18 PVC, AND 14" THROUGH 24" AWWA C-905 (CLASS 165), DR-25 PVC; WITH AWWA APPROVED DUCTILE IRON MECHANICAL JOINT FITTINGS. THE PIPE SHALL BE SOLID BLUE WITH WHITE OR BLACK LETTERING. 6. ALL PVC FIRE MAINS 4" THROUGH 12" SHALL BE AWWA C-900 (CLASS 200), DR 14 PVC WITH AWWA APPROVED ALL PVC FIRE MAINS 4" THROUGH 12" SHALL BE AWWA C-900 (CLASS 200), DR 14 PVC WITH AWWA APPROVED DUCTILE IRON MECHANICAL JOINT FITTINGS. THE PIPE SHALL BE SOLID BLUE WITH WHITE OR BLACK LETTERING. 7. ALL PVC PIPE AND FITTINGS 3" AND SMALLER SHALL BE SCHEDULE 40 P.V.C .WITH SOLVENT WELDED SLEEVE TYPE ALL PVC PIPE AND FITTINGS 3" AND SMALLER SHALL BE SCHEDULE 40 P.V.C .WITH SOLVENT WELDED SLEEVE TYPE JOINTS. 8. ALL GATE VALVES 3" OR LARGER SHALL BE RESILIENT SEAT OR RESILIENT WEDGE MEETING THE REQUIREMENTS OF ALL GATE VALVES 3" OR LARGER SHALL BE RESILIENT SEAT OR RESILIENT WEDGE MEETING THE REQUIREMENTS OF AWWA C509 9. ALL FIRE HYDRANTS SHALL MEET THE REQUIREMENTS OF AWWA C502 AND SHALL BE APPROVED BY THE LOCAL ALL FIRE HYDRANTS SHALL MEET THE REQUIREMENTS OF AWWA C502 AND SHALL BE APPROVED BY THE LOCAL UTILITY AND FIRE MARSHAL. 10. THE CONTRACTOR IS TO INSTALL TEMPORARY BLOW-OFFS AT THE END OF WATER SERVICE LATERALS TO ASSURE THE CONTRACTOR IS TO INSTALL TEMPORARY BLOW-OFFS AT THE END OF WATER SERVICE LATERALS TO ASSURE ADEQUATE FLUSHING AND DISINFECTION. 11. MATERIALS AND CONSTRUCTION METHODS FOR WATER DISTRIBUTION SYSTEM SHALL BE IN ACCORDANCE WITH THE MATERIALS AND CONSTRUCTION METHODS FOR WATER DISTRIBUTION SYSTEM SHALL BE IN ACCORDANCE WITH THE LOCAL REGULATORY AGENCY CODES, PLANS, AND SPECIFICATIONS FOR CONSTRUCTION, LATEST REVISION THEREOF, AND SUPPLEMENTAL SPECIFICATIONS THERETO. APPROVAL AND CONSTRUCTION OF ALL POTABLE WATER SERVICE MAIN EXTENSIONS AND CONNECTIONS MUST BE COORDINATED THROUGH THE LOCAL REGULATORY AGENCY.
AutoCAD SHX Text
1. NO CONNECTION TO THE EXISTING UTILITY LINES SHALL BE MADE WITHOUT PRIOR APPROVAL OF THE LOCAL GOVERNING UTILITY NO CONNECTION TO THE EXISTING UTILITY LINES SHALL BE MADE WITHOUT PRIOR APPROVAL OF THE LOCAL GOVERNING UTILITY DEPARTMENT. 2. ALL AREAS DISTURBED BY THIS CONSTRUCTION SHALL BE SODDED WITH BAHIA AND / OR MATCH EXISTING GRASS TYPE. ALL AREAS DISTURBED BY THIS CONSTRUCTION SHALL BE SODDED WITH BAHIA AND / OR MATCH EXISTING GRASS TYPE. BAHIA AND / OR MATCH EXISTING GRASS TYPE. ALL UTILITY LINES SHALL HAVE AN "EARLY WARNING" PROTECTION TAPE INSTALLED CONTINUOUSLY ALONG THE PIPE ALIGNMENT. IN THE CASE OF GRAVITY SEWERS, THE TAPE SHALL BE SECURED TO EACH MANHOLE. THE PROTECTION TAPE SHALL BE INSTALLED DURING BACK FILLING 12" BELOW FINAL GRADE DIRECTLY OVER THE PIPE. THE TAPE SHALL HAVE A METALLIC DETECTABLE STRIP SANDWICHED BETWEEN 2 LAYERS OF POLYETHYLENE, 2" WIDE STRIPPING WITH A THICKNESS OF 5.5 MILS. (BLUE TAPE) FOR WATER LINES, THE TAPE SHALL BE CONTINUOUSLY MARKED "CAUTION WATER LINE BELOW". , (GREEN TAPE) FOR FORCE MAINS, THE TAPE SHALL BE CONTINUOUSLY MARKED "CAUTION, SEWAGE FORCE MAIN BELOW". (GREEN TAPE) FOR SANITARY SEWER LINES, THE TAPE SHALL BE CONTINUOUSLY MARKED "CAUTION, SEWER MAIN BELOW". (PURPLE TAPE) FOR RECLAIMED WATER LINES, THE TAPE SHALL BE CONTINUOUSLY MARKED "CAUTION RECLAIMED WATER LINE BELOW" 3. THE CONTRACTOR IS CAUTIONED THAT THE LOCATION OF EXISTING UTILITIES, WHEN SHOWN, ARE APPROXIMATE. IT SHALL BE THE THE CONTRACTOR IS CAUTIONED THAT THE LOCATION OF EXISTING UTILITIES, WHEN SHOWN, ARE APPROXIMATE. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN ACTUAL FIELD LOCATIONS FROM THE RESPECTIVE UTILITY COMPANY 48 HOURS BEFORE BEGINNING ANY WORK. SUNSHINE STATE CALL - 1-800-432-4770 4. ALL UTILITY CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE DOCUMENTS REFERENCED HEREIN. ANY METHODS, PROCEDURE, ALL UTILITY CONSTRUCTION SHALL BE IN ACCORDANCE WITH THE DOCUMENTS REFERENCED HEREIN. ANY METHODS, PROCEDURE, STANDARDS, EQUIPMENT, OR MATERIALS WHICH ARE NOT COVERED OR SPECIFIED BY THE APPLICABLE PROVISIONS OF THE GOVERNING MUNICIPALITY WATER/SEWER STANDARDS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE F.D.O.T. STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION AND F.D.O.T. UTILITIES SPECIFICATIONS, THE MOST STRINGENT SHALL APPLY. 5. ALL UTILITIES WILL BE INSTALLED UNDERGROUND. ALL UTILITIES WILL BE INSTALLED UNDERGROUND. 6. UNLESS OTHERWISE NOTED, ALL ONSITE WELLS ARE TO BE ABANDONED BY A LICENSED WELL CONTRACTOR IN ACCORDANCE WITH UNLESS OTHERWISE NOTED, ALL ONSITE WELLS ARE TO BE ABANDONED BY A LICENSED WELL CONTRACTOR IN ACCORDANCE WITH LOCAL, STATE AND FEDERAL REGULATIONS. VERTICAL CLEARANCE AT CROSSINGS: SANITARY SEWERS, STORM SEWERS AND STRUCTURES, RECLAIMED WATER MAINS, OR FORCE MAINS CROSSING WATER MAINS SHALL BE LAID TO PROVIDE A MINIMUM VERTICAL DISTANCE OF 12 INCHES BETWEEN THE INVERT OF THE UPPER PIPE AND THE CROWN OF THE LOWER PIPE. THE CROSSING SHALL BE ARRANGED SO THAT THE SEWER JOINTS AND WATER JOINTS WILL BE EQUIDISTANT FROM THE POINT OF CROSSING WITH NO LESS THAN 10 FEET BETWEEN ANY TWO JOINTS. WHERE THE MINIMUM 12 INCH SEPARATION CANNOT BE MAINTAINED, ONE OF THE FOLLOWING METHODS OF PROTECTION SHALL BE UTILIZED: I. THE PROPOSED PIPE SHALL BE CONSTRUCTED OF PRESSURE RATED PVC PIPE, (MEETING THE AWWA C-900 OR C-905 SPECIFICATION) AND SHALL BE PRESSURE TESTED AT 150 PSI TO ASSURE TIGHTNESS PRIOR TO BACKFILLING. II. EITHER THE WATER MAIN OR THE OTHER PIPE SHALL BE ENCASED IN A WATERTIGHT CARRIER PIPE. THE CARRIER PIPE SHALL BE OF MATERIALS APPROVED BY THE F.D.E.P. FOR USE IN WATER MAIN CONSTRUCTION. III. USE WELDED, FUSED OR OTHERWISE RESTRAINED JOINTS FOR EITHER THE WATER MAIN OR OTHER PIPELINE. IV. USE OF PIPE OR CASING PIPE, HAVING HIGH IMPACT STRENGTH (I.E. HAVING AN IMPACT STRENGTH AT LEAST EQUAL TO THAT OF 0.25-INCH-THICK DUCTILE IRON PIPE) V. UNDERGROUND WATER MAINS SHALL BE A HORIZONTAL DISTANCE OF AT LEAST THREE (3) FEET, AND PREFERABLY TEN (10) FEET, BETWEEN THE OUTSIDE OF THE WATER MAIN AND THE OUTSIDE OF ANY EXISTING OR PROPOSED VACUUM-TYPE SANITARY SEWER. VI. UNDERGROUND WATER MAINS SHALL BE A HORIZONTAL DISTANCE OF AT LEAST SIX (6) FEET, AND PREFERABLY TEN (10) FEET, BETWEEN THE OUTSIDE OF THE WATER MAIN AND THE OUTSIDE OF ANY EXISTING OR PROPOSED GRAVITY OR PRESSURE-TYPE SANITARY SEWER, WASTEWATER FORCE MAIN, OR PIPELINE CONVEYING RECLAIMED WATER NOT REGULATED UNDER PART III OF CHAPTER 62-610, F.A.C. THE MINIMUM HORIZONTAL SEPARATION DISTANCE BETWEEN WATER MAINS AND GRAVITY-TYPE SANITARY SEWERS SHALL BE REDUCED TO THREE FEET WHERE THE BOTTOM OF THE WATER MAIN IS LAID AT LEAST SIX INCHES ABOVE THE TOP OF THE SEWER. VII. UNDERGROUND WATER MAINS SHALL BE A HORIZONTAL DISTANCE OF AT LEAST TEN (10) FEET BETWEEN THE OUTSIDE OF THE WATER MAIN AND ALL PARTS OF ANY EXISTING OR PROPOSED "ON-SITE SEWAGE TREATMENT AND DISPOSAL SYSTEM" AS DEFINED IN SECTION 381.0065(2), F.S., AND RULE 64E-6.002, F.A.C. VERTICAL SEPARATION BETWEEN UNDERGROUND WATER MAINS AND SANITARY OR STORM SEWERS, WASTEWATER OR STORMWATER FORCE MAINS AND RECLAIMED WATER PIPELINES. I. UNDERGROUND WATER MAINS CROSSING ANY EXISTING OR PROPOSED GRAVITY OR VACUUM-TYPE SANITARY SEWER OR STORM SEWER SHALL BE LAID SO THE OUTSIDE OF THE WATER MAIN IS AT LEAST SIX (6) INCHES, AND PREFERABLY TWELVE (12) INCHES, ABOVE OR AT LEAST TWELVE (12) INCHES BELOW THE OUTSIDE OF THE OTHER PIPELINE. HOWEVER, IT IS PREFERABLE TO LAY THE WATER MAIN ABOVE THE OTHER PIPELINE. II. UNDERGROUND WATER MAINS CROSSING ANY EXISTING OR PROPOSED PRESSURE-TYPE SANITARY SEWER, WASTEWATER OR STORMWATER FORCE MAIN, OR PIPELINE CONVEYING RECLAIMED WATER SHALL BE LAID SO THE OUTSIDE OF THE WATER MAIN IS AT LEAST TWELVE (12) INCHES ABOVE OR BELOW THE OUTSIDE OF THE OTHER PIPELINE. HOWEVER, IT IS PREFERABLE TO LAY THE WATER MAIN ABOVE THE OTHER PIPELINE. III. AT THE UTILITY CROSSINGS DESCRIBED IN PARAGRAPHS (A) AND (B) ABOVE, ONE FULL LENGTH OF WATER MAIN PIPE SHALL BE CENTERED ABOVE OR BELOW THE OTHER PIPELINE SO THE WATER MAIN JOINTS WILL BE AS FAR AS POSSIBLE FROM THE OTHER PIPELINE. ALTERNATIVELY, AT SUCH CROSSINGS, THE PIPES SHALL BE ARRANGED SO THAT ALL WATER MAIN JOINTS ARE AT LEAST THREE FEET FROM ALL JOINTS IN VACUUM-TYPE SANITARY SEWERS, STORM SEWERS, STORMWATER FORCE MAINS, OR PIPELINES CONVEYING RECLAIMED WATER REGULATED UNDER PART III OF CHAPTER 62-610, F.A.C., AND AT LEAST SIX (6) FEET FROM ALL JOINTS IN GRAVITY OR PRESSURE-TYPE SANITARY SEWERS, WASTEWATER FORCE MAINS, OR PIPELINES CONVEYING RECLAIMED WATER NOT REGULATED UNDER PART III OF CHAPTER 62-610, F.A.C. HORIZONTAL SEPARATION BETWEEN PARALLEL LINES: SANITARY SEWERS, STORM SEWERS AND STRUCTURES, RECLAIMED WATER MAINS, OR FORCE MAINS SHALL BE INSTALLED AT LEAST 6 FEET FROM ANY EXISTING OR PROPOSED WATER MAIN. THE DISTANCE SHALL BE MEASURED EDGE TO EDGE. IN CASES WHERE IT IS NOT PRACTICAL TO MAINTAIN A 6 FT. SEPARATION. THE FOLLOWING METHODS OF PROTECTION SHALL BE UTILIZED: I. THE PROPOSED PIPE SHALL BE CONSTRUCTED OF PRESSURE RATED PVC PIPE ,(MEETING THE AWWA C-900 OR C-905 SPECIFICATION) AND SHALL BE PRESSURE TESTED AT 150 PSI TO ASSURE TIGHTNESS PRIOR TO BACK FILLING. II. EITHER THE WATER MAIN OR THE OTHER PIPE SHALL BE ENCASED IN A WATERTIGHT CARRIER PIPE. THE CARRIER PIPE SHALL BE OF MATERIALS APPROVED BY THE F.D.E.P. FOR USE IN WATER MAIN CONSTRUCTION. III. USE WELDED, FUSED, OR OTHERWISE RESTRAINED JOINTS FOR EITHER THE WATER MAIN OR OTHER PIPELINE. IV. USE OF PIPE, OR CASING PIPE, HAVING HIGH IMPACT STRENGTH (I.E. HAVING AN IMPACT STRENGTH AT LEAST EQUAL TO THAT OF 0.25-INCH-THICK DUCTILE IRON PIPE) C. SEPARATION BETWEEN WATER MAINS AND SANITARY OR STORM SEWER MAINS: NO WATER MAIN SHALL PASS THROUGH, OR COME INTO CONTACT WITH, ANY PART OF A SANITARY SEWER MANHOLE. A. WATER MAIN SHALL NOT BE CONSTRUCTED OR ALTERED TO PASS THROUGH, OR COME INTO CONTACT WITH, ANY PART OF A STORM SEWER MANHOLE OR INLET STRUCTURE. WHERE IT IS NOT TECHNICALLY FEASIBLE OR ECONOMICALLY SENSIBLE TO COMPLY WITH THIS REQUIREMENT THE WATER MAIN SHALL BE CONSTRUCTED WITH A CONFLICT MANHOLE AS FOLLOWS: I. EACH WATER MAIN PASSING THROUGH A CONFLICT MANHOLE SHALL HAVE A FLEXIBLE, WATERTIGHT JOINT ON EACH SIDE OF THE MANHOLE TO ACCOMMODATE DIFFERENTIAL SETTLING BETWEEN THE MAIN AND THE MANHOLE. II. WITHIN EACH CONFLICT MANHOLE, THE WATER MAIN PASSING THROUGH THE MANHOLE SHALL BE INSTALLED IN A WATERTIGHT CASING PIPE HAVING HIGH IMPACT STRENGTH (I.E., HAVING IMPACT STRENGTH AT LEAST EQUAL TO THAT OF 0.25-INCH-THICK DUCTILE IRON PIPE). III. EACH CONFLICT MANHOLE SHALL HAVE AN ACCESS OPENING, AND SHALL BE SIZED, TO ALLOW FOR EASY CLEANING OF THE MANHOLE. IV. GRATINGS SHALL BE INSTALLED AT ALL STORM SEWER INLETS UPSTREAM OF EACH CONFLICT MANHOLE TO PREVENT LARGE OBJECTS FROM ENTERING THE MANHOLE. NOTE: WHEN IT IS IMPOSSIBLE TO OBTAIN PROPER HORIZONTAL AND VERTICAL SEPARATIONS AS STIPULATED ABOVE, THE F.D.E.P. MAY ALLOW DEVIATION ON A CASE-BY-CASE BASIS IF SUPPORTED BY DATA FROM THE DESIGN ENGINEER. APPROVAL FOR THE DEVIATION MUST BE OBTAINED FROM THE PROJECT ENGINEER AND THE F.D.E.P. PRIOR TO CONSTRUCTION.
AutoCAD SHX Text
1. ALL COMPONENTS OF THE WATER SYSTEM, INCLUDING FITTINGS, HYDRANTS, CONNECTIONS, AND ALL COMPONENTS OF THE WATER SYSTEM, INCLUDING FITTINGS, HYDRANTS, CONNECTIONS, AND VALVES SHALL REMAIN UNCOVERED UNTIL PROPERLY PRESSURE TESTED AND ACCEPTED BY THE OWNER'S ENGINEER. PRESSURE TESTS TO BE IN ACCORDANCE WITH WATER DEPARTMENT SPECIFICATIONS. CONTRACTOR TO NOTIFY OWNER'S ENGINEER AND WATER DEPARTMENT INSPECTORS 48 HOURS IN ADVANCE OF PERFORMING TESTS. 2. CONTRACTOR TO PERFORM CHLORINATION. BACTERIOLOGICAL SAMPLING SHALL BE BY THE CONTRACTOR TO PERFORM CHLORINATION. BACTERIOLOGICAL SAMPLING SHALL BE BY THE LOCAL PUBLIC HEALTH UNIT AND/OR LOCAL UTILITY. CONTRACTOR SHALL OBTAIN CLEARANCE OF DOMESTIC WATER SYSTEM. COPIES OF ALL BACTERIOLOGICAL TESTS TO BE SUBMITTED TO OWNER'S ENGINEER. 3. A HYDROSTATIC TEST CONSISTING OF PRESSURE TEST AND LEAKAGE TEST SHALL BE A HYDROSTATIC TEST CONSISTING OF PRESSURE TEST AND LEAKAGE TEST SHALL BE CONDUCTED ON ALL NEWLY-INSTALLED WATER DISTRIBUTION SYSTEM PRESSURE PIPES AND APPURTENANCES. THESE TESTS SHALL BE IN ACCORDANCE WITH THE PROVISIONS OF A.W.W.A. C600 FOR DUCTILE IRON PIPES AND C605 FOR PVC PIPES. 4. ALL SAMPLING IS TO BE PERFORMED BY THE CONTRACTOR AND SUBMITTED TO A DHS ALL SAMPLING IS TO BE PERFORMED BY THE CONTRACTOR AND SUBMITTED TO A DHS CERTIFIED LAB FOR TESTING. 5. ALL NEWLY-INSTALLED WATER DISTRIBUTION SYSTEMS SHALL BE DISINFECTED IN ACCORDANCE ALL NEWLY-INSTALLED WATER DISTRIBUTION SYSTEMS SHALL BE DISINFECTED IN ACCORDANCE WITH AWWA C651 - DISINFECTING WATER MAINS.
AutoCAD SHX Text ALL SITE AND UTILITY WORK PERFORMED ON THIS PROJECT SHALL BE GOVERNED BY APPLICABLE PROVISIONS OF PINELLAS COUNTY AND THE PINELLAS COUNTY UTILITY DEPARTMENT. THE AND THE PINELLAS COUNTY UTILITY DEPARTMENT. THE . THE PROJECT SHALL BE CONSTRUCTED IN SUBSTANTIAL CONFORMANCE WITH THE APPROVED CONSTRUCTION DRAWINGS & SPECIFICATIONS DESCRIBED HEREIN. AND WITH THE MANUAL OF UNIFORM MINIMUM STANDARDS FOR DESIGN, CONSTRUCTION, AND MAINTENANCE OF STREETS AND HIGHWAYS, STATE OF FLORIDA. IN THE EVENT THAT ANY ITEM IS NOT ADDRESSED IN THESE PLANS OR THE SPECIFICATIONS, THEN THE APPLICABLE PROVISIONS OF THE "FLORIDA DEPARTMENT OF TRANSPORTATION STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION", CURRENT EDITION AND SUPPLEMENTS THERETO SHALL APPLY, EXCEPT AS OTHERWISE SPECIFICALLY THE FOLLOWING ARE INCORPORATED HEREIN BY REFERENCE: "TESTING SPECIFICATIONS FOR CONSTRUCTION OF ROADS, STORM DRAINAGE AND UTILITIES" 2006 "TECHNICAL MANUAL FOR DESIGN AND CONSTRUCTION OF WATER, WASTEWATER, AND RECLAIMED WATER FACILITIES". 2021 3. FLORIDA DEPARTMENT OF TRANSPORTATION "MANUAL OF UNIFORM MINIMUM STANDARDS FOR DESIGN, FLORIDA DEPARTMENT OF TRANSPORTATION "MANUAL OF UNIFORM MINIMUM STANDARDS FOR DESIGN, CONSTRUCTION AND MAINTENANCE FOR STREETS AND HIGHWAYS (FLORIDA GREENBOOK)" 2023 4. FLORIDA DEPARTMENT OF TRANSPORTATION "STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE FLORIDA DEPARTMENT OF TRANSPORTATION "STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION" FY-2026-27 5. FLORIDA DEPARTMENT OF TRANSPORTATION "STANDARD PLANS" FY-2026-27 FLORIDA DEPARTMENT OF TRANSPORTATION "STANDARD PLANS" FY-2026-27 6. FEDERAL HIGHWAY ADMINISTRATION "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD)" FEDERAL HIGHWAY ADMINISTRATION "MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES (MUTCD)" 7. ELEVATIONS ARE REFERENCED TO THE NORTH AMERICAN DATUM OF 1988 (NAVD88), AND BASED ON ELEVATIONS ARE REFERENCED TO THE NORTH AMERICAN DATUM OF 1988 (NAVD88), AND BASED ON DESIGNATION 322 (PID AGO179), LOICATED ON TOP OF A CONCRETE HEADWALL, HAVING A PUBLISHED ELEVATION OF 12.18 FT. ALL SURVEY DATA WAS PROVIDED BY GEORGE F. YOUNG, INC.. . 8. LOCATIONS, ELEVATIONS AND DIMENSIONS OF EXISTING UTILITIES, STRUCTURES AND OTHER FEATURES LOCATIONS, ELEVATIONS AND DIMENSIONS OF EXISTING UTILITIES, STRUCTURES AND OTHER FEATURES ARE SHOWN ACCORDING TO THE BEST INFORMATION AVAILABLE AT THE TIME OF PREPARATION OF THESE PLANS. THE CONTRACTOR SHALL VERIFY THE LOCATIONS, ELEVATIONS AND DIMENSIONS OF ALL EXISTING UTILITIES, STRUCTURES AND OTHER FEATURES AFFECTING THIS WORK, PRIOR TO CONSTRUCTION. 9. THE CONTRACTOR SHALL CHECK THE PLANS FOR CONFLICTS AND DISCREPANCIES PRIOR TO THE CONTRACTOR SHALL CHECK THE PLANS FOR CONFLICTS AND DISCREPANCIES PRIOR TO CONSTRUCTION. THE CONTRACTOR SHALL NOTIFY THE OWNER'S ENGINEER OF ANY CONFLICTS OR DISCREPANCIES BEFORE PERFORMING ANY WORK IN THE AFFECTED AREA. 10. THE CONTRACTOR IS CAUTIONED THAT THE LOCATION OF EXISTING UTILITIES, WHETHER OR NOT THE CONTRACTOR IS CAUTIONED THAT THE LOCATION OF EXISTING UTILITIES, WHETHER OR NOT SHOWN, ARE APPROXIMATE. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN ACTUAL FIELD LOCATIONS FROM THE RESPECTIVE UTILITY COMPANY 48 HOURS BEFORE BEGINNING WORK. 11. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY DAMAGE TO EXISTING FACILITIES, ABOVE OR THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY DAMAGE TO EXISTING FACILITIES, ABOVE OR BELOW GROUND THAT MAY OCCUR AS A RESULT OF THE WORK PERFORMED BY THE CONTRACTOR. 12. IT IS THE CONTRACTOR'S RESPONSIBILITY TO BECOME FAMILIAR WITH THE PERMIT AND INSPECTION IT IS THE CONTRACTOR'S RESPONSIBILITY TO BECOME FAMILIAR WITH THE PERMIT AND INSPECTION REQUIREMENTS OF THE VARIOUS GOVERNMENTAL AGENCIES. THE CONTRACTOR SHALL OBTAIN ALL NECESSARY PERMITS PRIOR TO CONSTRUCTION AND SCHEDULE INSPECTIONS ACCORDING TO AGENCY INSTRUCTION. 13. EARTHWORK CONSTRUCTION: EARTHWORK CONSTRUCTION: A. ALL EARTHWORK CONSTRUCTION SHALL BE PAID FOR BY PLAN QUANTITIES. ALL EARTHWORK CONSTRUCTION SHALL BE PAID FOR BY PLAN QUANTITIES. B. ALL FILL SUITABLE FOR CONSTRUCTION EITHER REQUIRED OR IN EXCESS TO THE PROJECT ALL FILL SUITABLE FOR CONSTRUCTION EITHER REQUIRED OR IN EXCESS TO THE PROJECT IS THE PROPERTY OF THE OWNER AND SHALL BE UTILIZED FOR THE PROJECT OR STOCKPILED OWNER AND SHALL BE UTILIZED FOR THE PROJECT OR STOCKPILED AND SHALL BE UTILIZED FOR THE PROJECT OR STOCKPILED AND SHALL BE UTILIZED FOR THE PROJECT OR STOCKPILED SHALL BE UTILIZED FOR THE PROJECT OR STOCKPILED SHALL BE UTILIZED FOR THE PROJECT OR STOCKPILED ON-SITE AS DIRECTED BY THE OWNER AND / OR ENGINEER OF RECORD. . 14. THE CONTRACTOR SHALL SUBMIT FOR APPROVAL TO THE OWNER'S ENGINEER, SHOP DRAWINGS ON THE CONTRACTOR SHALL SUBMIT FOR APPROVAL TO THE OWNER'S ENGINEER, SHOP DRAWINGS ON ALL PRECAST AND MANUFACTURED ITEMS WHICH ARE FOR THIS SITE. FAILURE TO OBTAIN APPROVAL BEFORE INSTALLATION MAY RESULT IN REMOVAL AND REPLACEMENT AT THE CONTRACTOR'S EXPENSE. ALL SHOP DRAWINGS ARE TO BE REVIEWED AND APPROVED BY THE CONTRACTOR PRIOR TO SUBMITTAL TO THE OWNER'S ENGINEER. 15. AT LEAST FIVE (5) WORKING DAYS PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY THE AT LEAST FIVE (5) WORKING DAYS PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL NOTIFY THE ENGINEER AND APPROPRIATE AGENCIES AND SUPPLY THEM WITH ALL REQUIRED SHOP DRAWINGS, THE CONTRACTOR'S NAME, STARTING DATE, PROJECTED SCHEDULE AND OTHER INFORMATION AS REQUIRED. ANY WORK PERFORMED PRIOR TO NOTIFYING THE ENGINEER, OR WITHOUT AGENCY INSPECTOR PRESENT MAY BE SUBJECT TO REMOVAL AND REPLACEMENT AT THE CONTRACTOR'S EXPENSE. 16. BACKFILL MATERIAL SHALL BE SOLIDLY TAMPED AROUND PIPES IN 6" LAYERS UP TO A LEVEL OF AT BACKFILL MATERIAL SHALL BE SOLIDLY TAMPED AROUND PIPES IN 6" LAYERS UP TO A LEVEL OF AT LEAST ONE FOOT ABOVE THE TOP OF THE PIPE. IN AREAS TO BE PAVED, BACKFILL SHALL BE COMPACTED TO 100% MAXIMUM DENSITY AS DETERMINED BY A.A.S.H.T.O. T-99. 17. SITE WORK CONCRETE SHALL HAVE A COMPRESSIVE STRENGTH OF AT LEAST 3,000 P.S.I. IN 28 SITE WORK CONCRETE SHALL HAVE A COMPRESSIVE STRENGTH OF AT LEAST 3,000 P.S.I. IN 28 DAYS, UNLESS OTHERWISE NOTED. 18. ALL PRIVATE AND PUBLIC PROPERTY AFFECTED BY THIS WORK SHALL BE RESTORED TO A CONDITION ALL PRIVATE AND PUBLIC PROPERTY AFFECTED BY THIS WORK SHALL BE RESTORED TO A CONDITION EQUAL TO OR BETTER THAN EXISTING CONDITIONS UNLESS SPECIFICALLY EXEMPTED BY THE PLANS. ADDITIONAL COSTS ARE INCIDENTAL TO OTHER CONSTRUCTION AND NO EXTRA COMPENSATION IS TO BE ALLOWED. 19. ALL DISTURBED AREAS ARE TO BE SODDED TO FDOT STANDARDS UNLESS OTHERWISE NOTED. AREAS ALL DISTURBED AREAS ARE TO BE SODDED TO FDOT STANDARDS UNLESS OTHERWISE NOTED. AREAS CALLED OUT IN THE PLANS TO BE SEEDED AND MULCHED, THE FOLLOWING SHALL APPLY: A. ALL AREAS WITH SLOPES EQUAL TO OR GREATER THAN 4:1 OR WITHIN 2' OF ANY PAVEMENT OR CURB SHALL BE SODDED. ALL SODDED SLOPES STEEPER THAN 4:1 SHALL BE INSTALLED WITH SOD PEGS. B. ALL AREAS WITHIN 5' OF ANY DRAINAGE STRUCTURE OR WITHIN CITY, COUNTY AND/OR FDOT R.O.W. SHALL BE SODDED. ALL SODDED AND SEEDED / MULCHED AREAS SHALL BE MAINTAINED UNTIL A SATISFACTORY STAND OF GRASS, ACCEPTABLE TO THE REGULATORY AGENCY AND ENGINEER OF RECORD. OF GRASS, ACCEPTABLE TO THE REGULATORY AGENCY AND ENGINEER OF RECORD. ANY WASHOUTS, REGRADING, RESEEDING AND GRASSING WORK, AND OTHER EROSION WORK REGRADING, RESEEDING AND GRASSING WORK, AND OTHER EROSION WORK REQUIRED, WILL BE PERFORMED BY THE CONTRACTOR, UNTIL THE SYSTEM IS ACCEPTED FOR PERFORMED BY THE CONTRACTOR, UNTIL THE SYSTEM IS ACCEPTED FOR MAINTENANCE BY THE REGULATORY AGENCY AND ENGINEER OF RECORD. REGULATORY AGENCY AND ENGINEER OF RECORD. 20. ALL SODDING, SEEDING AND MULCHING SHALL INCLUDE WATERING AND FERTILIZATION. THE ALL SODDING, SEEDING AND MULCHING SHALL INCLUDE WATERING AND FERTILIZATION. THE CONTRACTOR SHALL BE RESPONSIBLE FOR MAINTAINING THESE AREAS UNTIL THE PROJECT IS COMPLETED AND ACCEPTED BY REGULATORY AGENCIES, THE ENGINEER OF RECORD, AND THE OWNER. 21. THE CONTRACTOR SHALL MAINTAIN A COPY OF THE APPROVED PLANS AND PERMITS AT THE THE CONTRACTOR SHALL MAINTAIN A COPY OF THE APPROVED PLANS AND PERMITS AT THE CONSTRUCTION SITE. 22. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY AT ALL TIMES TO CONTROL FUGITIVE DUST FROM IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY AT ALL TIMES TO CONTROL FUGITIVE DUST FROM THE CONSTRUCTION SITE. THE CONTRACTOR IS ADVISED THAT THE USE OF A WATER TRUCK OR TRAILER MAY BE REQUIRED FOR THE PURPOSE OF KEEPING THE SOIL MOIST TO CONTROL FUGITIVE DUST. 23. IF DURING CONSTRUCTION ACTIVITIES ANY EVIDENCE OF HISTORIC RESOURCES, INCLUDING BUT NOT IF DURING CONSTRUCTION ACTIVITIES ANY EVIDENCE OF HISTORIC RESOURCES, INCLUDING BUT NOT LIMITED TO ABORIGINAL OR HISTORIC POTTERY, PREHISTORIC STONE TOOLS, BONE OR SHELL TOOLS, HISTORIC TRASH PITS, OR HISTORIC BUILDING FOUNDATIONS, ARE DISCOVERED, WORK SHALL COME TO AN IMMEDIATE STOP AND THE FLORIDA DEPARTMENT OF HISTORICAL RESOURCES (STATE HISTORIC PRESERVATION OFFICER) AND THE LOCAL GOVERNING CITY AND/OR COUNTY DEPARTMENT SHALL BE NOTIFIED WITHIN TWO WORKING DAYS OF THE RESOURCES FOUND ON SITE. 24. DURING THE CONSTRUCTION AND/OR MAINTENANCE OF THIS PROJECT, ALL SAFETY REGULATIONS ARE DURING THE CONSTRUCTION AND/OR MAINTENANCE OF THIS PROJECT, ALL SAFETY REGULATIONS ARE TO BE ENFORCED BY THE CONTRACTOR. THE CONTRACTOR OR HIS REPRESENTATIVE SHALL BE RESPONSIBLE FOR THE CONTROL AND SAFETY OF THE TRAVELING PUBLIC AND THE SAFETY OF HIS PERSONNEL. LABOR SAFETY REGULATIONS SHALL CONFORM TO THE PROVISIONS SET FORTH BY O.S.H.A. IN THE FEDERAL REGISTER OF THE DEPARTMENT OF TRANSPORTATION. 25. IF DURING CONSTRUCTION ACTIVITIES ANY EVIDENCE OF THE PRESENCE OF STATE OR FEDERALLY IF DURING CONSTRUCTION ACTIVITIES ANY EVIDENCE OF THE PRESENCE OF STATE OR FEDERALLY PROTECTED PLANT AND/OR ANIMAL SPECIES IS DISCOVERED, PINELLAS COUNTY NATURAL RESOURCE INSPECTOR AND APPLICABLE AGENCIES SHALL BE NOTIFIED WITHIN TWO WORKING DAYS OF THE PLANT AND/OR ANIMAL SPECIES FOUND ON SITE. ALL WORK IN THE AFFECTED AREA SHALL COME TO AN IMMEDIATE STOP UNTIL ALL PERTINENT PERMITS HAVE BEEN OBTAINED, AGENCY WRITTEN AUTHORIZATION TO COMMENCE ACTIVITIES HAS BEEN GIVEN, OR UNLESS COMPLIANCE WITH STATE AND FEDERAL GUIDELINES CAN BE DEMONSTRATED. 26. ALL REQUIRED TEST REPORTS SHALL BE SUPPLIED BY CONTRACTOR UNLESS OTHERWISE DIRECTED ALL REQUIRED TEST REPORTS SHALL BE SUPPLIED BY CONTRACTOR UNLESS OTHERWISE DIRECTED BY THE OWNER OR ENGINEER OF RECORD. THE TESTING COMPANY SHALL SUPPLY THE ENGINEER WITH A COPY OF ALL COMPACTION TESTS AND ASPHALT TESTING RESULTS. THE TESTING COMPANY SHALL CERTIFY TO THE ENGINEER OF RECORD, IN WRITING THAT ALL TESTING REQUIREMENTS REQUIRED BY THE LOCAL REGULATORY AGENCY AND THE FLORIDA DEPARTMENT OF TRANSPORTATION (F.D.O.T.), FOR THE IMPROVEMENTS AS REQUIRED BY THE ENGINEERING CONSTRUCTION DRAWINGS, HAVE BEEN SATISFIED. 27. PRIOR TO THE START OF CLEARING AND GRUBBING, OR ANY SOIL DISTURBANCE, CONTACT PINELLAS PRIOR TO THE START OF CLEARING AND GRUBBING, OR ANY SOIL DISTURBANCE, CONTACT PINELLAS COUNTY STORMWATER MANAGEMENT AT (727) 834-3611 FOR A SOIL EROSION AND SEDIMENT CONTROL, PRE-INSPECTION MEETING. 28. CONTRACTOR SHALL COMPLY WITH OSHA'S STANDARDS 29 CFR PART 1926, SUBPART CC FOR CONTRACTOR SHALL COMPLY WITH OSHA'S STANDARDS 29 CFR PART 1926, SUBPART CC FOR VERTICAL AND HORIZONTAL CLEARANCES TO THE OVERHEAD DISTRIBUTION AND TRANSMISSION POWER LINES.
AutoCAD SHX Text
1. THE STORM DRAINAGE PIPING AND FILTRATION SYSTEM SHALL BE SUBJECT TO A VISUAL THE STORM DRAINAGE PIPING AND FILTRATION SYSTEM SHALL BE SUBJECT TO A VISUAL INSPECTION BY THE OWNER'S ENGINEER PRIOR TO THE PLACEMENT OF BACKFILL. THE CONTRACTOR IS TO NOTIFY THE ENGINEER 48 HOURS IN ADVANCE TO SCHEDULE AN INSPECTION. 2. THE CONTRACTOR SHALL MAINTAIN THE STORM DRAINAGE SYSTEMS UNTIL FINAL ACCEPTANCE THE CONTRACTOR SHALL MAINTAIN THE STORM DRAINAGE SYSTEMS UNTIL FINAL ACCEPTANCE OF THE PROJECT. 3. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING THE APPLICABLE TESTING WITH THE THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING THE APPLICABLE TESTING WITH THE TESTING COMPANY. UPON COMPLETION OF THE WORK, THE TESTING COMPANY MUST SUBMIT CERTIFICATIONS TO THE OWNER'S ENGINEER STATING THAT TESTING REQUIREMENTS HAVE BEEN MET.
AutoCAD SHX Text
1. CLEARING AND GRUBBING FOR PURPOSES OF THE PROJECT DESCRIBED HEREIN SHALL BE IN ACCORDANCE WITH CLEARING AND GRUBBING FOR PURPOSES OF THE PROJECT DESCRIBED HEREIN SHALL BE IN ACCORDANCE WITH SECTION 110 OF THE "STANDARD SPECIFICATIONS FOR ROAD AND BRIDGE CONSTRUCTION." 2024-25 2. ALL VEGETATION, STRUCTURES, MATERIALS DEBRIS AND FILL UNSUITABLE FOR CONSTRUCTION AND OF NO SALVAGE ALL VEGETATION, STRUCTURES, MATERIALS DEBRIS AND FILL UNSUITABLE FOR CONSTRUCTION AND OF NO SALVAGE VALUE TO THE OWNER SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND SHALL BE DISPOSED OF BY THE CONTRACTOR. 3. EXISTING PAVEMENT SHALL BE REMOVED AND DISPOSED OF BY CONTRACTOR AT THIS EXPENSE. THE CONTRACTOR EXISTING PAVEMENT SHALL BE REMOVED AND DISPOSED OF BY CONTRACTOR AT THIS EXPENSE. THE CONTRACTOR MAY (AT HIS OPTION) USE EXISTING LIMEROCK BASE MATERIAL AS A STABILIZING ADDITIVE TO THE SUBBASE. AT NO TIME WILL EXISTING BASE MATERIAL BE INCORPORATED WITHIN THE NEW BASE. 4. PRIOR TO ANY SITE CLEARING, ALL TREES SHOWN TO REMAIN ON THE CONSTRUCTION PLANS SHALL BE PRIOR TO ANY SITE CLEARING, ALL TREES SHOWN TO REMAIN ON THE CONSTRUCTION PLANS SHALL BE PROTECTED IN ACCORDANCE WITH THE LOCAL REGULATORY AGENCY'S TREE ORDINANCE AND DETAILS CONTAINED IN THESE PLANS. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN THESE TREES IN GOOD CONDITION. NO TREES SHOWN TO REMAIN SHALL BE REMOVED WITHOUT WRITTEN APPROVAL FROM THE OWNER. 5. ALL DELETERIOUS SUBSTANCE MATERIAL, (I.E. MUCK, PEAT, BURIES DEBRIS), IS TO BE EXCAVATED IN ACCORDANCE ALL DELETERIOUS SUBSTANCE MATERIAL, (I.E. MUCK, PEAT, BURIES DEBRIS), IS TO BE EXCAVATED IN ACCORDANCE WITH THESE PLANS, OR AS DIRECTED BY THE OWNER'S ENGINEER OR OWNER'S SOIL TESTING COMPANY. DELETERIOUS MATERIAL IS TO BE REMOVED FROM THE SITE OR AS OTHERWISE DIRECTED BY THE OWNER. EXCAVATED AREAS ARE TO BE BACKFILLED WITH APPROVED MATERIALS AND COMPACTED AS SHOWN ON THESE PLANS. 6. THE CONTRACTOR SHALL CLEAR AND GRUB, ONLY THOSE PORTIONS OF THE SITE, AS NECESSARY FOR THE CONTRACTOR SHALL CLEAR AND GRUB, ONLY THOSE PORTIONS OF THE SITE, AS NECESSARY FOR CONSTRUCTION. DISTURBED AREAS WILL BE SODDED FOLLOWING CONSTRUCTION. 7. THE TOP 4" TO 6" OF GROUND REMOVED DURING CLEARING AND GRUBBING SHALL BE STOCKPILED AT A SITE THE TOP 4" TO 6" OF GROUND REMOVED DURING CLEARING AND GRUBBING SHALL BE STOCKPILED AT A SITE DESIGNATED BY THE OWNER UNLESS OTHERWISE DIRECTED BY THE OWNER. 8. ALL CONSTRUCTION DEBRIS AND OTHER WASTE MATERIAL SHALL BE DISPOSED OF OFF-SITE IN ACCORDANCE WITH ALL CONSTRUCTION DEBRIS AND OTHER WASTE MATERIAL SHALL BE DISPOSED OF OFF-SITE IN ACCORDANCE WITH ACCORDANCE WITH APPLICABLE REGULATIONS. 9. THE CONTRACTOR IS TO OBTAIN ALL NECESSARY PERMITS FOR REMOVING ANY EXISTING STRUCTURES. THE CONTRACTOR IS TO OBTAIN ALL NECESSARY PERMITS FOR REMOVING ANY EXISTING STRUCTURES. 10. THE CONTRACTOR WILL BE RESPONSIBLE FOR MAKING A VISUAL INSPECTION OF THE SITE AND WILL BE THE CONTRACTOR WILL BE RESPONSIBLE FOR MAKING A VISUAL INSPECTION OF THE SITE AND WILL BE RESPONSIBLE FOR THE DEMOLITION AND REMOVAL OF ALL UNDERGROUND AND ABOVE GROUND STRUCTURES THAT WILL NOT BE INCORPORATED WITH THE NEW FACILITIES. SHOULD ANY DISCREPANCIES EXIST WITH THE PLANS, THE CONTRACTOR SHALL BE RESPONSIBLE FOR CALLING THE OWNER AND REQUESTING A CLARIFICATION OF THE PLANS PRIOR TO DEMOLITION. 11. NO ON-SITE BURNING SHALL BE ALLOWED WITHOUT PRIOR APPROVAL FROM THE LOCAL FIRE MARSHALL.NO ON-SITE BURNING SHALL BE ALLOWED WITHOUT PRIOR APPROVAL FROM THE LOCAL FIRE MARSHALL.
AutoCAD SHX Text
1. DURING CONSTRUCTION, ALL STORM SEWER INLETS IN THE VICINITY OF THE PROJECT SHALL BE PROTECTED BY DURING CONSTRUCTION, ALL STORM SEWER INLETS IN THE VICINITY OF THE PROJECT SHALL BE PROTECTED BY PROTECTED BY SEDIMENT TRAPS SUCH AS SECURED HAY BALES, SOD, STONE, ETC., WHICH SHALL BE MAINTAINED AND MODIFIED AS REQUIRED BY CONSTRUCTION PROGRESS. 2. ALL EROSION AND SILTATION CONTROL METHODS SHALL BE IMPLEMENTED PRIOR TO THE START OF CONSTRUCTION ALL EROSION AND SILTATION CONTROL METHODS SHALL BE IMPLEMENTED PRIOR TO THE START OF CONSTRUCTION AND MAINTAINED UNTIL CONSTRUCTION IS COMPLETE. 3. CONTRACTOR IS TO PROVIDE EROSION CONTROL/SEDIMENTATION BARRIER (HAY BALES OR SILTATION CURTAIN) TO CONTRACTOR IS TO PROVIDE EROSION CONTROL/SEDIMENTATION BARRIER (HAY BALES OR SILTATION CURTAIN) TO PREVENT SILTATION OF ADJACENT PROPERTY, STREETS, STORM SEWERS, WATERWAYS AND EXISTING WETLANDS. IN ADDITION, THE CONTRACTOR SHALL PLACE STRAW, MULCH OR OTHER SUITABLE MATERIAL ON THE GROUND IN AREAS WHERE CONSTRUCTION RELATED TRAFFIC IS TO ENTER AND EXIT THE SITE. IF, IN THE OPINION OF THE ENGINEER AND/OR LOCAL AUTHORITIES, EXCESSIVE QUANTITIES OF EARTH ARE TRANSPORTED OFF-SITE EITHER BY NATURAL DRAINAGE OR BY VEHICULAR TRAFFIC, THE CONTRACTOR IS TO REMOVE SAID EARTH TO THE SATISFACTION OF THE ENGINEER AND/OR AUTHORITIES.
AutoCAD SHX Text
1. THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING EXCAVATIONS AGAINST COLLAPSE AND WILL PROVIDE THE CONTRACTOR SHALL BE RESPONSIBLE FOR PROTECTING EXCAVATIONS AGAINST COLLAPSE AND WILL PROVIDE BRACING, SHEETING OR SHORING AS NECESSARY. TRENCHES SHALL BE KEPT DRY WHILE PIPE AND APPURTENANCES ARE BEING PLACED. DE-WATERING SHALL BE USED AS REQUIRED. 2. IT MAY BE NECESSARY TO FIELD ADJUST PAVEMENT ELEVATIONS TO PRESERVE THE ROOT SYSTEMS OF TREES IT MAY BE NECESSARY TO FIELD ADJUST PAVEMENT ELEVATIONS TO PRESERVE THE ROOT SYSTEMS OF TREES SHOWN TO BE SAVED. THE CONTRACTOR IS TO COORDINATE WITH OWNER'S ENGINEER PRIOR TO ANY ELEVATION CHANGES. 3. THE CONTRACTOR IS TO PROVIDE A 1/2"" BITUMINOUS EXPANSION JOINT MATERIAL WITH SEALER, AT ABUTMENT THE CONTRACTOR IS TO PROVIDE A 1/2"" BITUMINOUS EXPANSION JOINT MATERIAL WITH SEALER, AT ABUTMENT OF CONCRETE AND ANY STRUCTURE. 4. ALL PAVEMENT MARKINGS SHALL BE MADE WITH THERMOPLASTIC, EXCEPT PARKING STALL DELINEATIONS, WHICH ALL PAVEMENT MARKINGS SHALL BE MADE WITH THERMOPLASTIC, EXCEPT PARKING STALL DELINEATIONS, WHICH MAY BE TRAFFIC RATED PAINT. PARKING STALL DELINEATION SHALL BE 6" MIN. WIDTH. 5. ALL STORM SEWER PIPE SHALL BE REINFORCED CONCRETE CLASS III (A.S.T.M. C-76) UNLESS OTHERWISE ALL STORM SEWER PIPE SHALL BE REINFORCED CONCRETE CLASS III (A.S.T.M. C-76) UNLESS OTHERWISE NOTED ON PLANS. 6. P.V.C. STORM PIPE, 12" AND SMALLER SHALL CONFORM TO A.W.W.A. C-900, CLASS 150 STANDARDS UNLESS P.V.C. STORM PIPE, 12" AND SMALLER SHALL CONFORM TO A.W.W.A. C-900, CLASS 150 STANDARDS UNLESS OTHERWISE NOTED. 7. PIPE LENGTHS SHOWN ARE APPROXIMATE AND TO THE CENTER OF DRAINAGE STRUCTURES. PIPE LENGTHS PIPE LENGTHS SHOWN ARE APPROXIMATE AND TO THE CENTER OF DRAINAGE STRUCTURES. PIPE LENGTHS SHOWN, WHERE MITERED END SECTION OF PIPE, SHALL BE INCLUDED IN THE UNIT COST OF THE MITERED END. 8. ALL DIMENSIONS SHOWN WHERE CURB IS APPLICABLE ARE TO THE EDGE OF PAVEMENT. ALL DIMENSIONS SHOWN WHERE CURB IS APPLICABLE ARE TO THE EDGE OF PAVEMENT. 9. ALL DRAINAGE STRUCTURE GRATES AND COVERS WITHIN TRAFFIC AREAS SHALL BE TRAFFIC RATED FOR H-20 ALL DRAINAGE STRUCTURE GRATES AND COVERS WITHIN TRAFFIC AREAS SHALL BE TRAFFIC RATED FOR H-20 LOADINGS. 10. WHEN CONSTRUCTION IS COMPLETED, THE RETENTION/DETENTION AREAS WILL BE RESHAPED, CLEANED OF SILT, WHEN CONSTRUCTION IS COMPLETED, THE RETENTION/DETENTION AREAS WILL BE RESHAPED, CLEANED OF SILT, MUD AND DEBRIS AND SODDED AND / OR SEED / MULCH IN ACCORDANCE TO THE PLANS. SODDED AND / OR SEED / MULCH IN ACCORDANCE TO THE PLANS. IN ACCORDANCE TO THE PLANS. 11. SOD SHALL BE STAKED AS NECESSARY TO PREVENT DISPLACEMENT. SOD SHALL BE STAKED AS NECESSARY TO PREVENT DISPLACEMENT. 12. THE CONTRACTOR SHALL PROVIDE CERTIFIED RECORD DRAWINGS, SIGNED AND SEALED BY A PROFESSIONAL THE CONTRACTOR SHALL PROVIDE CERTIFIED RECORD DRAWINGS, SIGNED AND SEALED BY A PROFESSIONAL LAND SURVEYOR. THE RECORD DRAWINGS SHALL SHOW FINAL GRADES, INVERTS AND LOCATIONS OF ALL STORMWATER FACILITIES INCLUDING THE STORMWATER POND, DRAINAGE STRUCTURES, BERMS & SWALES. THE CONTRACTOR SHALL PROVIDE TEN COPIES OF THE CERTIFIED RECORD DRAWINGS TO THE ENGINEER FOR THE PURPOSE OF CERTIFYING THE STORMWATER MANAGEMENT SYSTEM. 13. ALL DRAINAGE PIPE SHALL BE CUT FLUSH WITH THE INTERIOR WALLS OF EACH DRAINAGE STRUCTURE AND ALL DRAINAGE PIPE SHALL BE CUT FLUSH WITH THE INTERIOR WALLS OF EACH DRAINAGE STRUCTURE AND GROUTED TO A SMOOTH FINISH.
AutoCAD SHX Text PRESSURE TESTING 1. A HYDROSTATIC TEST CONSISTING OF A PRESSURE TEST AND A LEAKAGE TEST SHALL BE A HYDROSTATIC TEST CONSISTING OF A PRESSURE TEST AND A LEAKAGE TEST SHALL BE CONDUCTED ON ALL NEWLY-INSTALLED REUSE DISTRIBUTION SYSTEM PRESSURE PIPES AND APPURTENANCES. THESE TESTS SHALL BE IN ACCORDANCE WITH THE PROVISIONS OF A.W.W.A. C600 FOR DUCTILE IRON PIPES, C605 FOR PVC PIPES AND SHALL BE PERFORMED IN ACCORDANCE WITH THE GOVERNING WATER DEPARTMENT SPECIFICATIONS. 2. THE CONTRACTOR SHALL NOTIFY AND SCHEDULE THE ATTENDANCE OF THE OWNER'S ENGINEER THE CONTRACTOR SHALL NOTIFY AND SCHEDULE THE ATTENDANCE OF THE OWNER'S ENGINEER AND THE GOVERNING WATER DEPARTMENT'S INSPECTORS DURING THE PRESSURE TESTS. 3. ALL COMPONENTS OF THE REUSE WATER SYSTEM, INCLUDING FITTINGS, CONNECTIONS AND ALL COMPONENTS OF THE REUSE WATER SYSTEM, INCLUDING FITTINGS, CONNECTIONS AND VALVES SHALL REMAIN UNCOVERED UNTIL PROPERLY PRESSURE TESTED AND ACCEPTED BY THE OWNER'S ENGINEER.
AutoCAD SHX Text
1. ALL REUSE MAINS SHALL HAVE A MINIMUM OF 36 INCHES OF COVER BASED ON FINAL GRADING. ALL REUSE MAINS SHALL HAVE A MINIMUM OF 36 INCHES OF COVER BASED ON FINAL GRADING. 2. ALL DUCTILE IRON PIPE SHALL BE CLASS 50 IN ACCORDANCE WITH ANSI/AWWA C150/A21.50 AND PIPE SHALL RECEIVE EXTERIOR ALL DUCTILE IRON PIPE SHALL BE CLASS 50 IN ACCORDANCE WITH ANSI/AWWA C150/A21.50 AND PIPE SHALL RECEIVE EXTERIOR BITUMINOUS COATING AND SHALL BE CEMENT MORTAR LINED, STANDARD THICKNESS, IN ACCORDANCE WITH ANSI/AWWA C104/A21.4. 3. ALL FITTINGS LARGER THAN 3" SHALL BE DUCTILE IRON IN ACCORDANCE WITH AWWA C-110 WITH A PRESSURE RATING OF 350 ALL FITTINGS LARGER THAN 3" SHALL BE DUCTILE IRON IN ACCORDANCE WITH AWWA C-110 WITH A PRESSURE RATING OF 350 P.S.I. JOINTS SHALL BE MECHANICAL JOINTS IN ACCORDANCE WITH AWWA C-111. FITTINGS SHALL BE CEMENT MORTAR LINED AND COATED IN ACCORDANCE WITH AWWA C-104. 4. ALL PVC REUSE MAINS 4" THROUGH 12" SHALL BE AWWA C-900 (CLASS 150), DR 18 PVC, AND 14" THROUGH 24" AWWA ALL PVC REUSE MAINS 4" THROUGH 12" SHALL BE AWWA C-900 (CLASS 150), DR 18 PVC, AND 14" THROUGH 24" AWWA C-905 (CLASS 165), DR-25 PVC; WITH AWWA APPROVED DUCTILE IRON MECHANICAL JOINT FITTINGS. THE PIPE SHALL BE CLASS 150 AND SOLID PURPLE WITH WHITE OR BLACK LETTERING. 5. ALL PVC PIPE AND FITTINGS 3" OR SMALLER SHALL BE SCHEDULE 40 PVC WITH SOLVENT WELDED SLEEVE TYPE JOINTS. ALL PVC PIPE AND FITTINGS 3" OR SMALLER SHALL BE SCHEDULE 40 PVC WITH SOLVENT WELDED SLEEVE TYPE JOINTS. 6. ALL GATE VALVES 3" OR LARGER SHALL BE RESILIENT SEAT OR RESILIENT WEDGE MEETING THE REQUIREMENTS OF AWWA C-509. ALL GATE VALVES 3" OR LARGER SHALL BE RESILIENT SEAT OR RESILIENT WEDGE MEETING THE REQUIREMENTS OF AWWA C-509. 7. MATERIALS AND CONSTRUCTION METHODS FOR REUSE DISTRIBUTION SYSTEM SHALL BE IN ACCORDANCE WITH THE LOCAL MATERIALS AND CONSTRUCTION METHODS FOR REUSE DISTRIBUTION SYSTEM SHALL BE IN ACCORDANCE WITH THE LOCAL REGULATORY AGENCY CODES, PLANS AND SPECIFICATIONS FOR CONSTRUCTION, LATEST REVISION THEREOF, AND SUPPLEMENTAL SPECIFICATIONS THERETO. APPROVAL AND CONSTRUCTION OF ALL REUSE SERVICE MAIN EXTENSIONS AND CONNECTIONS MUST BE COORDINATED THROUGH THE LOCAL REGULATORY AGENCY.
AutoCAD SHX Text
1. ALL DIMENSIONS SHALL BE IN FEET, MEASURED OFF THE CENTERLINE OF ROADS OR OTHER ALL DIMENSIONS SHALL BE IN FEET, MEASURED OFF THE CENTERLINE OF ROADS OR OTHER PERMANENT STRUCTURES. IN ONLY ONE DIMENSION CAN BE TAKEN OFF THE CENTERLINE OF ROAD, THE SECOND SHALL BE OFF A PERMANENT MARKER OR REFERENCE POINT. 2. AS-BUILTS SHALL BE SUBMITTED, SIGNED AND SEALED BY A PROFESSIONAL SURVEYOR AS-BUILTS SHALL BE SUBMITTED, SIGNED AND SEALED BY A PROFESSIONAL SURVEYOR REGISTERED IN THE STATE OF FLORIDA. 1. WATER LINES SHALL BE MEASURED OFF CENTERLINES OF PAVEMENT. WATER LINES SHALL BE MEASURED OFF CENTERLINES OF PAVEMENT. 2. FITTINGS, VALVES, TAPS AND OTHER WATER APPURTENANCES SHALL BE MEASURED USING FITTINGS, VALVES, TAPS AND OTHER WATER APPURTENANCES SHALL BE MEASURED USING DESCRIPTIVE NOTES INDICATING THEIR EXACT LOCATION. 3. INDICATE DEPTH OF COVER AT ALL LOCATIONS WHERE THE WATER MAIN HAS LESS THAN 24" INDICATE DEPTH OF COVER AT ALL LOCATIONS WHERE THE WATER MAIN HAS LESS THAN 24" OF COVER OR MORE THAN 48" OF COVER. 4. INDICATE ALL LOCATIONS WHERE MINIMUM 18" VERTICAL AND 10' HORIZONTAL CLEARANCE OF INDICATE ALL LOCATIONS WHERE MINIMUM 18" VERTICAL AND 10' HORIZONTAL CLEARANCE OF WATER AND SEWER LINE WAS NOT MAINTAINED. DETAIL THE INSTALLATION METHOD. 5. INCLUDE THE SIZE, SDR, CLASS AND TYPE OF MATERIALS IF DIFFERENT FROM PLANS. INCLUDE THE SIZE, SDR, CLASS AND TYPE OF MATERIALS IF DIFFERENT FROM PLANS. 6. MEASURE WATER MAIN STUBS FROM GATE VALVE TO TERMINAL POINT AND FROM CENTERLINE MEASURE WATER MAIN STUBS FROM GATE VALVE TO TERMINAL POINT AND FROM CENTERLINE OF ROAD 1. WATER LINES SHALL BE MEASURED OFF CENTERLINES OF PAVEMENT. WATER LINES SHALL BE MEASURED OFF CENTERLINES OF PAVEMENT. 2. FITTINGS, VALVES, HYDRANTS, TAPS AND OTHER WATER APPURTENANCES SHALL BE MEASURED FITTINGS, VALVES, HYDRANTS, TAPS AND OTHER WATER APPURTENANCES SHALL BE MEASURED USING DESCRIPTIVE NOTES INDICATING THEIR EXACT LOCATION. 3. INDICATE DEPTH OF COVER AT ALL LOCATIONS WHERE THE WATER MAIN HAS LESS THAN 24" INDICATE DEPTH OF COVER AT ALL LOCATIONS WHERE THE WATER MAIN HAS LESS THAN 24" OF COVER OR MORE THAN 48" OF COVER. 4. INDICATE ALL LOCATIONS WHERE MINIMUM 18" VERTICAL AND 10' HORIZONTAL CLEARANCE OF INDICATE ALL LOCATIONS WHERE MINIMUM 18" VERTICAL AND 10' HORIZONTAL CLEARANCE OF WATER AND SEWER LINE WAS NOT MAINTAINED. DETAIL THE INSTALLATION METHOD. 5. INDICATE LOCATIONS AND TYPES OF ALL BACTERIOLOGICAL SAMPLING POINTS. INDICATE LOCATIONS AND TYPES OF ALL BACTERIOLOGICAL SAMPLING POINTS. 6. INCLUDE THE SIZE, SDR, CLASS AND TYPE OF MATERIALS IF DIFFERENT FROM PLANS. INCLUDE THE SIZE, SDR, CLASS AND TYPE OF MATERIALS IF DIFFERENT FROM PLANS. 7. MEASURE WATER MAIN STUBS FROM GATE VALVE TO TERMINAL POINT AND FROM CENTERLINE MEASURE WATER MAIN STUBS FROM GATE VALVE TO TERMINAL POINT AND FROM CENTERLINE OF ROAD. 1. SEWER LINES SHALL BE MEASURED OFF CENTERLINES OF PAVEMENT. SEWER LINES SHALL BE MEASURED OFF CENTERLINES OF PAVEMENT. 2. FITTINGS, VALVES, MANHOLES, SERVICES AND OTHER SEWER APPURTENANCES SHALL BE FITTINGS, VALVES, MANHOLES, SERVICES AND OTHER SEWER APPURTENANCES SHALL BE MEASURED USING DESCRIPTIVE NOTES INDICATING THEIR EXACT LOCATION. 3. INDICATE THE ACTUAL LENGTH OF GRAVITY SEWER AND/OR FORCE MAIN INSTALLED. INDICATE THE ACTUAL LENGTH OF GRAVITY SEWER AND/OR FORCE MAIN INSTALLED. 4. INDICATE ACTUAL INVERT ELEVATION AND REVISE SLOPES BETWEEN MANHOLES IF DIFFERENT INDICATE ACTUAL INVERT ELEVATION AND REVISE SLOPES BETWEEN MANHOLES IF DIFFERENT FROM THE PLANS. 5. INDICATE DEPTH OF COVER AT ALL LOCATIONS WHERE THE SEWER FORCE MAIN HAS LESS INDICATE DEPTH OF COVER AT ALL LOCATIONS WHERE THE SEWER FORCE MAIN HAS LESS THAN 36" OF COVER OR MORE THAN 48" OF COVER. 1. SHOW BOTTOM, INFLUENT INVERT AND TOP ELEVATIONS OF WETWELL. SHOW BOTTOM, INFLUENT INVERT AND TOP ELEVATIONS OF WETWELL. 2. ACTUAL ELEVATIONS OF BOTTOM OF CONTROL PANEL. ACTUAL ELEVATIONS OF BOTTOM OF CONTROL PANEL. 3. ELEVATIONS OF LIQUID LEVEL SENSORS FOR PUMP OFF, FIRST AND SECOND PUMPS ON ELEVATIONS OF LIQUID LEVEL SENSORS FOR PUMP OFF, FIRST AND SECOND PUMPS ON (THIRD IF PROVIDED), AND ALARM ON. 4. SHOW ALL WETWELL AND VALVE VAULT PIPING AND VALVE CHANGES. WEATHERPROOF SHOW ALL WETWELL AND VALVE VAULT PIPING AND VALVE CHANGES. WEATHERPROOF SCHEMATIC WIRING DIAGRAM SHALL BE PERMANENTLY AFFIXED TO THE INTERIOR OF THE CONTROL PANEL ENCLOSURE DOOR.
AutoCAD SHX Text
1. ALL SANITARY SEWER MAINS & LATERAL SHALL HAVE A MINIMUM OF 36" OF COVER BASED ON ALL SANITARY SEWER MAINS & LATERAL SHALL HAVE A MINIMUM OF 36" OF COVER BASED ON FINAL GRADING. 2. PRIOR TO COMMENCING WORK WHICH REQUIRES CONNECTING NEW WORK TO EXISTING LINES PRIOR TO COMMENCING WORK WHICH REQUIRES CONNECTING NEW WORK TO EXISTING LINES OR APPURTENANCES, THE CONTRACTOR SHALL VERIFY LOCATION AND ELEVATION OF EXISTING CONNECTION POINT AND NOTIFY OWNER'S ENGINEER OF ANY CONFLICTS OR DISCREPANCIES. 3. ALL PVC GRAVITY SEWER MAINS AND SERVICE LATERALS SHALL CONFORM TO ASTM-D-3034, ALL PVC GRAVITY SEWER MAINS AND SERVICE LATERALS SHALL CONFORM TO ASTM-D-3034, SDR35; FOR DEPTHS OF 0-12 FEET, SDR26 FOR DEPTHS OF 12-18 FEET AND DUCTILE IRON FOR DEPTHS BELOW 18 FEET. (SEE NOTE 7 BELOW) WITH PVC SLIP JOINT FITTING IN ACCORDANCE WITH ASTM SPECIFICATIONS SECTION D2321 AND SHALL BE SOLID GREEN PIPE WITH WHITE LETTERS. PIPES INSTALLED AT DEPTHS OF LESS THAN 4' SHALL BE AWWA C-900 (CLASS 100), DR-25 PVC OR C-905 (CLASS 165), PVC DR-25. 4. ALL DUCTILE IRON PIPE SHALL BE CLASS 50 IN ACCORDANCE WITH ANSI/AWWA C150/A21.50 ALL DUCTILE IRON PIPE SHALL BE CLASS 50 IN ACCORDANCE WITH ANSI/AWWA C150/A21.50 AND PIPE SHALL RECEIVE EXTERIOR BITUMINOUS COATING AND SHALL BE CEMENT MORTAR LINED, STANDARD THICKNESS, IN ACCORDANCE WITH ANSI/AWWA C104/A21.4. 5. ALL FITTINGS LARGER THAN 3" SHALL BE DUCTILE IRON IN ACCORDANCE WITH AWWA C-110 ALL FITTINGS LARGER THAN 3" SHALL BE DUCTILE IRON IN ACCORDANCE WITH AWWA C-110 WITH A PRESSURE RATING OF 350 P.S.I. JOINTS SHALL BE MECHANICAL JOINTS IN ACCORDANCE WITH AWWA C-111. FITTINGS SHALL BE CEMENT MORTAR LINED AND COATED IN ACCORDANCE WITH AWWA C-104. 6. ALL PVC FORCE MAINS 4" THROUGH 12" SHALL BE AWWA C-900 (CLASS 100), DR-25 PVC ALL PVC FORCE MAINS 4" THROUGH 12" SHALL BE AWWA C-900 (CLASS 100), DR-25 PVC AND 14" THROUGH 24" SHALL BE AWWA C-905 (CLASS 125), DR-25; WITH AWWA APPROVED DUCTILE IRON MECHANICAL JOINT FITTINGS. THE PIPE SHALL BE SOLID GREEN WITH WHITE OR BLACK LETTERING. 7. ALL PVC PIPE AND FITTINGS 3" AND SMALLER SHALL BE SCHEDULE 40 PVC WITH SOLVENT ALL PVC PIPE AND FITTINGS 3" AND SMALLER SHALL BE SCHEDULE 40 PVC WITH SOLVENT WELDED SLEEVE JOINTS. 8. ALL GATE VALVES 3" OR LARGER SHALL BE RESILIENT SEAT OR RESILIENT WEDGE MEETING ALL GATE VALVES 3" OR LARGER SHALL BE RESILIENT SEAT OR RESILIENT WEDGE MEETING THE REQUIREMENTS OF AWWA C509 9. ALL SANITARY SEWER COVERS SHALL BE TRAFFIC RATED FOR H-20 LOADING. ALL SANITARY SEWER COVERS SHALL BE TRAFFIC RATED FOR H-20 LOADING. 10. PIPE LENGTHS SHOWN ARE APPROXIMATE AND SHOWN TO THE EDGE OF THE MANHOLES. PIPE LENGTHS SHOWN ARE APPROXIMATE AND SHOWN TO THE EDGE OF THE MANHOLES. 11. MATERIALS AND CONSTRUCTION METHODS FOR SEWER DISTRIBUTION SYSTEM SHALL BE IN MATERIALS AND CONSTRUCTION METHODS FOR SEWER DISTRIBUTION SYSTEM SHALL BE IN ACCORDANCE WITH THE LOCAL REGULATORY AGENCY CODES, PLANS, AND SPECIFICATIONS FOR CONSTRUCTION, LATEST REVISION THEREOF, AND SUPPLEMENTAL SPECIFICATIONS THERETO. APPROVAL AND CONSTRUCTION OF ALL SANITARY SEWER SERVICE MAIN EXTENSIONS AND CONNECTIONS MUST BE COORDINATED THROUGH THE LOCAL REGULATORY AGENCY. 1. ALL GRAVITY SEWER PIPING SHALL BE SUBJECT TO A VISUAL INSPECTION BY THE OWNER'S ALL GRAVITY SEWER PIPING SHALL BE SUBJECT TO A VISUAL INSPECTION BY THE OWNER'S ENGINEER. CONTRACTOR TO NOTIFY THE ENGINEER 48 HOURS IN ADVANCE TO SCHEDULE INSPECTION. 2. CONTRACTOR SHALL PERFORM AN INFILTRATION/EXFILTRATION TEST ON ALL GRAVITY SEWERS IN CONTRACTOR SHALL PERFORM AN INFILTRATION/EXFILTRATION TEST ON ALL GRAVITY SEWERS IN ACCORDANCE WITH THE REGULATION AGENCY HAVING JURISDICTION. SAID TESTS ARE TO BE CERTIFIED BY THE ENGINEER OF RECORD AND SUBMITTED TO THE REGULATORY AGENCY FOR APPROVAL. COORDINATION AND NOTIFICATION OF ALL PARTIES IS THE CONTRACTOR'S RESPONSIBILITY. 3. ALL FORCE MAINS SHALL BE SUBJECT TO A HYDROSTATIC PRESSURE TEST IN ACCORDANCE ALL FORCE MAINS SHALL BE SUBJECT TO A HYDROSTATIC PRESSURE TEST IN ACCORDANCE WITH THE REGULATORY AGENCY HAVING JURISDICTION. SAID TESTS ARE TO BE CERTIFIED BY THE ENGINEER OF RECORD AND SUBMITTED TO THE REGULATORY AGENCY FOR APPROVAL. COORDINATION AND NOTIFICATION OF ALL PARTIES IS THE CONTRACTOR'S RESPONSIBILITY.
AutoCAD SHX Text THE CONTRACTOR SHALL IMPLEMENT THE FOLLOWING GUIDELINES WHEN CONSTRUCTION ACTIVITIES REQUIRE DEWATERING:
AutoCAD SHX Text THIS ITEM HAS BEEN DIGITALLY SIGNED AND SEALED BY PAUL A. MANUEL, PE ON THE DATE ADJACENT TO THE SEAL. SIGNATURE MUST BE VERIFIED ON ANY ELECTRONIC COPIES.
AutoCAD SHX Text No. 51424. 51424.51424..
AutoCAD SHX Text
STATE OF
Jessica Styron Paul
CONCRETE
TO BE REMOVED
EXISTING 8-FT GATE TO REMAIN CLOSED DURING CONSTRUCTION
SAW CUT
REMOVE ABANDONED MANHOLE
BEGIN TEMPORARY
CONSTRUCTION FENCE
REMOVE AND STOCKPILE THE
BRICK PAVERS ( ± 1,006 SQFT)
EXERCISE CARE WHEN REMOVING
COMMEMORATIVE BRICKS
REMOVE
EXISTING
PALM TREE
END TEMPORARY
CONSTRUCTION
FENCE
X
REMOVE…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .