This is Addendum Number 3 to the bidding documents for the Hollins High School Lift Station Replacement project issued by Pinellas County Schools, dated August 27, 2026, and modifying the original bidding documents from July 10, 2026. The addendum addresses clarifications and questions submitted by bidders regarding project specifications and drawings through a questions-and-answers format. Key clarifications include confirmation that the existing control cabinet will be reused rather than replaced; that electrical specifications require three #6 AWG hot conductors, one #6 AWG neutral conductor, and one #10 AWG ground conductor (correcting previous documentation); that junction boxes must comply with manufacturer recommendations or the National Electrical Code; that floats meeting design criteria are acceptable with four floats required per Sheet C4.0; that a junction box is required between the wet well and control cabinet; that an electrical permit is required; and that the RPZ (reduced pressure zone backflow preventer) is 1 inch in size. The addendum also directs bidders to Sheet C4.0 for details regarding air release valves, pressure gauges, PVC vent piping, and drop bowl assemblies, and notes that the lift station's rail system is proprietary and must be compatible with the selected pump.

No changes to drawings or specifications are noted in this addendum, and no attachments are included. The addendum consists of two pages and requires bidders to acknowledge receipt on the bid form, with failure to do so potentially resulting in disqualification from consideration.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ADDENDUM NUMBER: 3

Project: Hollins High School Lift Station PCS Project No.:

BCER Project #:

245719 132325003

Date: August 27, 2026

This Addendum forms a part of the Contract Documents and modifies the original Bidding Documents dated July 10, 2026, as noted below. Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may subject Bidder to disqualification.

This Addendum consists of 2 pages.

CHANGES TO DRAWINGS:

NONE

CHANGES TO SPECIFICATIONS:

NONE

QUESTIONS:

1. The specs attached is just the standard no spec above the control cabinet.

a. We're reusing the existing control cabinet. See updated plans.

2. If you want to use your own new control cabinet back plate and install in a NEMA 4X stainless steel/aluminum, we need a layout of the interior door that has the breaker cut out and the lights.

a. We're reusing the existing control cabinet. See updated plans.

3. What size, type of junction box for pump leads, and float needed to lay out?

a. Size per manufacturer's recommendations or NEC. See updated plans.

4. The existing disconnect in the building that feeds the lift station, what is the type to ensure we grab the correct fuses that will fit?

a. See updated plans.

5. What pump manufacture/type would you want quoted?

a. See previous question responses.

6. What type of floats, how many, and what brands you prefer for us to have?

a. Pinellas County Schools does not have a float standard. Floats that meet the design criteria identified in the specifications are acceptable. Number of floats is specified on Sheet C4.0 (four).

7. After reviewing the documents, this is what our team picked up on. On the Eliol sheet; Its shown

(3) #6, (1) #10 ground. But it should instead say, 3 #6 Hots, 1 #6 Neutral, 1 #10 ground.

a. See updated plans.

Addendum Hollins High School Lift Station August 27, 2026

8. We do not see a j-box between the wet well and the control cabinet, do we need to supply/ install one?

a. Yes, see updated plans.

9. Is an electrical permit needed?

a. YES.

10. Please confirm whether any piping supports are required within the pump station wet well. We were unable to locate any support details on the plans or specifications. If required, please provide the applicable detail.

a. The lift station’s rail system is proprietary and must be compatible with the pump selection.

11. Please provide the applicable details for the following lift station components, as we were unable to locate them on the plans or in the specifications: Air Release Valve Pressure Gauge PVC Vent Piping Drop Bowl Assembly

a. The details listed can be found in the Section View and Plan View on sheet C4.0

12. Could you confirm the size of the RPZ on Plan sheet C2.0? Is it 1 inch?”

a. The RPZ is ¾ inch.

ATTACHMENTS:

NONE

END OF ADDENDUM