This is a set of electrical engineering drawings prepared by BCER Engineering for the Dixie Hollins High School Lift Station Replacement project in St. Petersburg, Florida, under Pinellas County School District's authority. The project involves the removal and replacement of an existing sanitary lift station with electrical infrastructure upgrades, including disconnection of existing power feeders and wiring, demolition of current systems, and installation of new electrical components. The scope includes providing a new 208-volt, three-phase feeder with three #3 AWG conductors plus one #8 ground conductor from the disconnect in the electrical room to the new lift station location, replacement of existing fuses with 100-ampere fuses in the existing fused disconnect, installation of a new surge protection device, and reconnection of the relocated VC Systems & Controls VC25-9622 controller and associated pump and float switch wiring. The mandatory pre-bid conference is scheduled for August 12, 2026 at 9:00 a.m. at the school site, with sealed bids due by 4:00 p.m. on August 31, 2026. The contract period is 60 calendar days from Notice to Proceed, with bid evaluation and contractor selection scheduled for September 2-8, 2026, Notice of Intent to Award by October 6, 2026, and School Board approval anticipated by October 13, 2026.

The estimated project contract value is approximately $485,000, including a 10 percent contingency. Prime contractors must hold a current Florida License as a Utility Contractor and demonstrate five years of continuous business operation as the same legal entity plus documented experience performing five comparable utilities and lift station replacement projects within the past five years. All work must comply with the 2023 Florida Building Code, 2023 Florida Existing Building Code, NFPA 70-2020 National Electrical Code, and applicable ASTM and AWWA standards. General Liability Insurance minimum limits are $1,000,000 per occurrence and $2,000,000 general aggregate. Liquidated damages are $150 per calendar day for failure to meet the 60-day deadline. The contractor must provide permits, inspections, submittals, and as-built documents within 90 days of certificate of occupancy. Bid and performance security, proof of E-Verify registration, background screening clearance under the Jessica Lunsford Act, and executed affidavits regarding labor coercion and public entity crimes are required. The District will consider pricing from Florida Department of Management Services contracts during evaluation.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

M

E2 E1

Issue Record:

Sheet Title:

Sheet no:

Drawn by:

Checked by:

Scale:

Date:

No: Date:Description:

8/14/2026

AS NOTED

BCER PROJECT

6555 N. WICKHAM ROAD, SUITE 104

MELBOURNE, FL 32940 | 321.241.4124

CA# 9303

132325003

© Copyright BCER Engineering

ALL DRAWINGS, SPECIFICATIONS, AND OTHER WORK PRODUCT PREPARED BY BCER

ENGINEERING FOR THIS PROJECT ARE INSTRUMENTS OF SERVICE AND SHALL REMAIN THE

PROPERTY OF BCER ENGINEERING. BCER ENGINEERING SHALL RETAIN ALL COMMON LAW,

STATUTORY AND OTHER RESERVED RIGHTS, INCLUDING THE COPYRIGHT THERETO.

D

IX

IE

H

O

LL

IN

S

H S

LI

FT

ST

AT

IO

N

R

EP

LA

C

EM

EN

T

2n d

St N

St . P et er sb ur g, F

L

JRB

MC

ELECTRICAL SITE

DEMOLITION PLAN

ED1.01

GENERAL NOTES

**REFER TO ELECTRICAL PROJECT NOTES SHEET FOR ADDITIONAL REQUIREMENTS**

DISCONNECT EXISTING LIFT STATION POWER FEEDER AND ALL WIRING BETWEEN

DISCONNECT AND ORIGINAL LIFT STATION PANEL. REMOVE FEEDER BACK TO LIFT

STATION DISCONNECT SWITCH LOCATED IN ELECTRICAL ROOM. MAINTAIN CONDUIT TO

BE REUSED.

DISCONNECT ALL ELECTRICAL CONNECTIONS, INCLUDING FLOAT SWITCHES AND PUMPS,

TO EXISTING VC SYSTEMS & CONTROLS PUMP CONTROL PANEL. SAVE FLOAT SWITCHES

AND CONTROL PANEL FOR REUSE.

E1

WORK NOTES

N

ELECTRICAL SITE DEMOLITION PLAN

1" = 10'-0"

05' 5' 10' 20'

E2

This item has been electronically signed and sealed by Robert M. Cordero on the date adjacent to the seal using a SHA authentication code.

Printed copies of this document are not considered signed and the SHA authentication code must be verified on any electronic copies.

M E1ME4

E3

E2

JRB

MC

ELECTRICAL SITE

PLAN

E1.01

NEW LIFT STATION AND PUMP CONTROL PANEL LOCATION. COORDINATE MOUNTING OF

RELOCATED VC SYSTEMS & CONTROLS VC25-9622 CONTROLLER ON NEW SUPPORT

POSTS WITH OTHER TRADES. REFER TO CIVIL DRAWINGS FOR ALL INSTALLATION

DETAILS.

REPLACE EXISTING FUSES WITH 100A FUSES IN EXISTING FUSED DISCONNECT. PROVIDE

FUSE REDUCERS SUCH THAT NEW FUSES WILL FIT IN 200A DISCONNECT. CONTRACTOR

SHALL CONFIRM TYPE OF FUSES BEFORE PROCURING. THE LIFT STATION IS A

ONE-FOR-ONE REPLACEMENT. NO ADDED LOAD.

PROVIDE NEW FEEDER WITH (3) #3AWG + (1) #8G FROM DISCONNECT IN ELECTRICAL

ROOM TO NEW LOCATION AND CONNECT. PROVIDE NEW SURGE PROTECTION DEVICE.

REUSE EXISTING CONDUIT WHERE PRACTICABLE AND EXTEND TO NEW LOCATION.

FEEDER SHALL NOT INCLUDE ANY SPLICES.

INSTALL CONDUIT AND WIRING BETWEEN CONTROLLER, PUMPS, AND FLOAT SWITCHES

PER MANUFACTURER INSTALLATION INSTRUCTIONS. ALL PANEL PENETRATIONS SHALL

BE ON THE BOTTOM. USE CONDUIT FITTINGS TO MAINTAIN NEMA 4 RATING. SEAL ANY

UNUSED OPENINGS.

E1

WORK NOTES

N

ELECTRICAL SITE PLAN

1" = 10'-0"

05' 5' 10' 20'

EQUIPMENT SCHEDULE

PLAN CODE

LS-1

GENERAL NOTES

A.

NOTES

1.

2.

3.

DESCRIPTION

LIFT STATION

COORDINATE AND VERIFY ALL EQUIPMENT REQUIREMENTS WITH SUPPLIER AND CIVIL DRAWINGS PRIOR TO SUBMITTALS INCLUDING, BUT NOT LIMITED TO, VOLTAGE, OVERCURRENT PROTECTION, CONTROL, DICONNECTING MEANS, ETC.

SINGLE POINT ELECTRICAL CONNECTION. DISCONNECT INTERGRAL TO CONTROLLER.

CONNNECTED BY DIVISION 26.

PROVIDE SPD ON EXISTING CIRCUIT IF ONE IS NOT INSTALLED. (PQ PROTECTION PQM200)

VOLTAGE

PH

HP

FLA

72.3

MCA

81.3

MOCP

EX

KVA

20.8

SIZE

FUSE SIZE

N/A

NEMA RATING

DISCO

EX

CIRCUIT

N/A

FUSE

FEEDER SIZE

(3) #3AWG + (1) #8G

NOTES

1, 2, 3

GENERAL NOTES

**REFER TO ELECTRICAL PROJECT NOTES SHEET FOR ADDITIONAL REQUIREMENTS**

E2

E3

E4

Issue Record:

Sheet Title:

Sheet no:

Drawn by:

Checked by:

Scale:

Date:

No: Date:Description:

8/14/2026

AS NOTED

© Copyright BCER Engineering

ALL DRAWINGS, SPECIFICATIONS, AND OTHER WORK PRODUCT PREPARED BY BCER

ENGINEERING FOR THIS PROJECT ARE INSTRUMENTS OF SERVICE AND SHALL REMAIN THE

PROPERTY OF BCER ENGINEERING. BCER ENGINEERING SHALL RETAIN ALL COMMON LAW,

STATUTORY AND OTHER RESERVED RIGHTS, INCLUDING THE COPYRIGHT THERETO.

D

IX

IE

H

O

LL

IN

S

H S

LI

FT

ST

AT

IO

N

R

EP

LA

C

EM

EN

T

2n d

St N

St . P et er sb ur g, F

L

Sheets and Views
CS COVER SHEET
C1.0 GENERAL NOTES
C2.0 DEMOLITION, UTILITY AND SITE, AND GRADING PLAN
C3.0 SITE DETAILS
C4.0 LIFT STATION DETAILS
E0.01 ELECTRICAL GENERAL INFORMATION
E0.02 ELECTRICAL PROJECT NOTES
ED1.01 ELECTRICAL SITE DEMOLITION PLAN
E1.01 ELECTRICAL SITE PLAN
E5.01 ELECTRICAL ONE-LINE DIAGRAM
mcordero@bcer.com
2026-08-17T17:40:59-0600
St. Petersburg, FL
ROBERT M CORDERO
I have reviewed this document

File details come from the government source that posted it. Updated .