20260817HollinsHSLiftStationReplacementAddendum1.pdf
PDF 543 KB Posted
- Attached to
- Lift Station Replacement
- Solicitation number
- 26-CD-033
- Issued by
- Pinellas County, Florida
About this file
This is Addendum Number 1 to the bidding documents for the Hollins High School Lift Station Replacement project issued by Pinellas County School District in Florida. The addendum, dated August 17, 2026, modifies the original bidding documents dated July 10, 2026, and consists of six pages containing changes to five drawing sheets: ED1.01 (Electrical Site Demolition Plan), E1.01 (Electrical Site Plan), C2.0 (Demolition, Utility, and Site and Grading Plan), C3.0 (Site Details), and C4.0 (Lift Station Details). No changes to specifications are included in this addendum. Sealed electronic bids are due by 4:00 p.m. on August 31, 2026, with a mandatory pre-bid conference scheduled for August 12, 2026, at 9:00 a.m. at the Dixie Hollins High School site in St. Petersburg, Florida. Bid evaluation and contractor selection are scheduled for September 2-8, 2026, with Notice of Intent to Award by October 6, 2026, and School Board approval anticipated by October 13, 2026. The contract period is 60 calendar days from Notice to Proceed with liquidated damages of $150 per calendar day for failure to meet the deadline.
Prime contractors must hold a current Florida Utility Contractor License and demonstrate five years of continuous business operation as the same legal entity with documented experience performing five comparable utilities and lift station replacement projects within the past five years. The estimated contract value is approximately $485,000, including a 10% contingency. General Liability Insurance minimum limits are $1,000,000 per occurrence and $2,000,000 general aggregate. Required documentation includes bid and performance security, proof of E-Verify registration, background screening clearance under the Jessica Lunsford Act, and executed affidavits regarding labor coercion and public entity crimes. All materials and equipment must comply with 2023 Florida Building Code, 2023 Florida Existing Building Code, NFPA 70-2020 National Electrical Code, and applicable ASTM and AWWA standards. The District will consider pricing from Florida Department of Management Services contracts during evaluation. Bidders must acknowledge receipt of this addendum on the Bid Form or face potential disqualification.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM NUMBER: 1
Project: Hollins High School Lift Station PCS Project No.:
BCER Project #:
245719 132325003
Date: August 17, 2026
This Addendum forms a part of the Contract Documents and modifies the original Bidding Documents dated July 10, 2026, as noted below. Acknowledge receipt of this Addendum in the space provided on the Bid Form. Failure to do so may subject Bidder to disqualification.
This Addendum consists of 6 pages.
CHANGES TO DRAWINGS:
ED1.01 – Electrical Site Demolition Plan E1.01 – Electrical Site Plan C2.0 – Demolition, Utility, and Site and Grading Plan C3.0 – Site Details C4.0 – Lift Station Details
CHANGES TO SPECIFICATIONS:
NONE
ATTACHMENTS:
Drawing Sheets listed above
END OF ADDENDUM
File details come from the government source that posted it. Updated .