This Scope of Work document pertains to the Orange County Transportation Authority's procurement of threaded products and fasteners for a three-year contract term with a total budget of $150,000. The procurement seeks qualified contractors capable of supplying a comprehensive range of fastening products to support the Authority's operational and maintenance requirements. The contract establishes specific performance standards and delivery expectations for the provision of these materials, with the supplier expected to maintain adequate inventory levels and provide responsive fulfillment of orders throughout the contract period.
The pricing structure for this procurement is fixed at the awarded rate for the three-year term, with pricing competitiveness being a key evaluation factor in the bidding process. This is an open competitive procurement with no stated set-asides or incumbent protections, allowing any qualified contractor to submit proposals. The Orange County Transportation Authority will evaluate bids based on factors including price, supplier qualifications, product quality, delivery capabilities, and overall value proposition to ensure the Authority receives optimal service and product availability for its threaded products and fasteners requirements throughout the contract duration.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Threaded_Products_&_Fasteners_(Addendum_#1_Revision).pdf | ||
| 250199_PP-APPROVED.pdf | ||
| 250199_Exhibit_A_SOW.docx | DOCX document | |
| 250199_ICE.pdf | ||
| 250199_IFB_Exhibit_A_SOW.docx | DOCX document | |
| 250199_PP.pdf | ||
| 250199_PS.pdf | ||
| C250199_ICE_GMEDITS.pdf | ||
| C250199_SOWV_GMEDITS.pdf | ||
| 250199_Exhibit_A_SOW_GMEDITS.docx | DOCX document | |
| 250199_PP_GMEDITS.pdf | ||
| 250199_PS_GMEDITS.pdf | ||
| 250199_IFB_Exhibit_C_Insurance.pdf | ||
| 250199_IFB_Exhibit_B_Price_Summary_Sheet.pdf | ||
| 250199_IFB_Exhibit_D_Safety_Specifications.pdf | ||
| 250199_Public_Notice_Proof.pdf | ||
| 250199_R000454.pdf | ||
| DBE_Program_Requirements.docx | DOCX document | |
| Davis-Bacon_Labor_Provisions.pdf |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SCOPE OF WORK VERIFICATION
This Form Must Be Submitted with Scope of Work (SOW)
FA-CAMM-071.docm (03/16/18) Page 1 of 1
The following general rules shall apply when preparing scopes of work and specifications:
a) Provide a clear and concise Scope of Work (SOW) and not impose unreasonable requirements.
b) Specifications and Scopes of Work shall identify all characteristics and specific tasks and functions of the items or services to be procured, and meet the Authority’s requirements.
c) Whenever possible, the expected quality of services to be provided or the performance characteristics of the item shall be specified.
d) The requestor shall identify all optional items, and the solicitation documents shall set forth the expected needs and the manner in which the related bid prices will be considered.
e) Brand name specifications must be accompanied by an explanation that clearly indicates that the specification is not intended to be restrictive.
f) The salient characteristics represented by the brand names shall be identified to allow for evaluation of possible “or equal” material.
g) Because standard specifications and requirements allow for more efficient operations and result in lower prices, they shall be used wherever suitable.
h) Industry, federal, state and local government specifications and requirements can be used.
Consultants are prohibited from writing the Scope of Work or assisting in the development or writing the Scope of Work in which they may bid.
INSTRUCTIONS
Project Managers (PM) must select one of the following certifications and submit this form with the scope of work/specifications. This form must be signed by the Project Manager and one of the following: the PM’s Department Manager or Director or Executive Director.
☒ I certify that the attached SOW/specifications was independently prepared to invite competition;
does not include reference to a brand name, or include unreasonable restrictions or an intent to favor any specific vendor or brand product.
OR
☐ The SOW/specifications prepared includes a “brand name or equal” description because it was determined to be “impractical or uneconomical” (as referenced in FTA Circular 4220.1F -revised March 18, 2013) to write a clear and accurate description of the technical requirements of the goods or services to be acquired. However, the specific features or salient characteristics of the named brand which must be met by offerors of “an equal” proposal have been clearly stated, as required by Federal Transit Administration regulations. (FTA Circular 4220.1F – revised March 18, 2013)
R000454 Requisition Number Dept. Manager/Director/Executive Director Signature
Project Manager Signature
CAMM 05/09/2025
Department Date