250003_ATT11_DRWGS.pdf

PDF 3 MB Posted

Attached to
TINKER AFB MAC BOA WWYK250003 - Relocate Fire Alarm Circuit O106-062, B3001
Solicitation number
FA813726R0013
Issued by

About this file

This is a set of construction design drawings for a federal contract at Tinker Air Force Base, Oklahoma, specifically for relocating fire alarm circuits in Building B3001 along the O-P aisle. The project is designated WWYK250003 and is at 35% design completion as of October 15, 2025. The Air Force Materiel Command's 72nd Air Base Wing Civil Engineer Directorate is overseeing the work through the TEPA-CSAG design group.

The primary scope involves removing fire alarm and mass notification devices from an existing conveyor structure and fire sprinkler piping supported by that conveyor, then installing new code-compliant alarm and sprinkler equipment within the work area. New exit signs will be provided and mounted per NFPA 101 requirements but will not be connected to primary power circuits under this project. The work encompasses 16 conveyor sections listed in order of priority, with sections 15 and 9 as the highest priorities. The construction documents include general notes, vicinity maps, fire alarm and sprinkler composite plans, and detailed area plans showing the project location relative to the broader Tinker AFB facility. Key requirements include coordination with existing fire protection systems, hot work procedures per NFPA 51B, shop drawing submissions with NICET Level III technician design and Qualified Fire Protection Engineer review, and simultaneous commissioning and testing of fire suppression and fire alarm systems in accordance with UFC and NFPA standards. The contractor is responsible for final installation design, sizing confirmation, and ensuring all materials bear third-party testing and approval labels suitable for fire protection applications.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REVIEWED BY:

REVIEWED BY:

USING AGENCY:

ASBESTOS EVALUATION:

SAFETY:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

DATE:

INDUSTRIAL HYGIENE:

DATE:

PROJECT DRAWING INDEX SIGNATURES

CORROSION ENGINEER: (CECE)

CE OPERATIONS: (CECO)

COMMUNICATIONS: (COMM)

CHIEF ENGINEER DIR: (CECE)

CHIEF DESIGN BRANCH: (CECE)

DESIGN MANAGER: (CECE)

ZONE MANAGER:

CONSTRUCTION MANAGEMENT: (CECE)

ENVIRONMENTAL:

BASE CIVIL ENGINEER: (CE)

FIRE DEPARTMENT

GENERAL1. BRAND NAMES: REFERENCE TO SPECIFIC BRAND NAMES

OR COMPANIES IS FOR THE PURPOSE OF ESTABLISHING

MINIMUM QUALITY STANDARDS, IDENTIFICATION AND

GUIDANCE AND IS NOT INTENDED TO LIMIT SELECTION OF

OTHER MANUFACTURERS THAT ARE EQUAL OR EXCEED

THE SPECIFIED ITEMS IN TERMS OF PHYSICAL

PROPERTIES, INCLUDING, COLOR RANGE, FINISH,

DURABILITY, APPEARANCE, PERFORMANCE

CHARACTERISTICS, AND OTHER FACTORS. OTHER

PRODUCTS, MATERIALS, COLORS AND SYSTEMS, MAY BE

SUBMITTED FOR EVALUATION AND

APPROVAL/DISAPPROVAL BY THE CONTRACTING OFFICER.

2. THIS SET OF CONSTRUCTION DOCUMENTS SHALL BE

CONSIDERED AS A WHOLE IN THAT THE GENERAL

CONTRACTOR AND ALL THE SUB-CONTRACTORS ARE

RESPONSIBLE FOR THE INFORMATION PRESENTED ON ALL

SHEETS ON THE SET OF DRAWINGS AND ALL SECTIONS OF

THE SPECIFICATIONS.

3. THE CONTRACTOR IS RESPONSIBLE FOR ERECTING ALL

CONSTRUCTION FENCING AND BARRICADES AS REQUIRED

TO PROTECT CONSTRUCTION MATERIAL AND TO PREVENT

ANY UNAUTHORIZED PERSONNEL FROM ENTERING THE

CONSTRUCTION SITE.

4. ANY DAMAGE TO THE EXISTING GROUNDS OR FACILITIES

CAUSED BY CONSTRUCTION TRAFFIC OR ANY

CONSTRUCTION OPERATION SHALL BE REPAIRED OR

REPLACED BY THE CONTRACTOR TO MATCH OR EXCEED

EXISTING CONDITIONS AT NO ADDITIONAL COST TO THE

GOVERNMENT.

5. ALL WORK NOTED & LOCATED IN THESE DOCS SHALL BE

UNDERSTOOD BY THE CONTRACTOR TO REQUIRE ALL NEW

LABOR & MATERIALS UNLESS SPECIFICALLY NOTED TO BE

"EXISTING" OR "BY OTHERS".

6. THE PURPOSE OF THIS PROJECT IS TO REMOVE THE FIRE

ALARM AND MASS NOTIFICATION DEVICES FROM THE

CONVEYOR AS WELL AS REMOVING THE FIRE SPRINKLER

PIPING SUPPORTED BY THE CONVEYOR STRUCTURE. THE

CONTRACTOR WILL INSTALL NEW ALARM AND SPRINKLER

EQUIPMENT FOR CODE COMPLIANT COVERAGE WITHIN

THE SCOPE OF WORK AREA. NEW EXIT SIGNS WILL ALSO

BE PROVIDED AND INSTALLED AS REQUIRED IN NFPA 101 IN

THE SCOPE OF WORK AREA. THE EXIT SIGNS WILL NOT BE

CONNECTED TO THE PRIMARY POWER CIRCUITS UNDER

THE SCOPE OF THIS PROJECT, ONLY PROVIDED AND

MOUNTED IN THE APPROPRIATE LOCATIONS.

WWYK250003

RELOCATE FIRE ALARM

CIRCUIT, B3001, O-P AISLE

KEY PLAN:

GENERAL NOTES:

PROJECT

LOCATION 1 G-101 GENERAL NOTES & VICINITY MAP

SHT.SEQ. SHEET TITLE

OF

TI

N

KE

R

A

IR

F O

R C

E

BA

SE

, O

KL

AH

O M

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

35%

DESIGN

W W

YK

RE

LO

CA

TE

F

IR

E

AL

AR

M

CI

RC

UI

T, B

, O

-P A

IS

LE

/1

5/

TE

PA

-C

SA

G

A M cP H

ER

SO

N

G-101

S

ST

AR

R

B

JI

M O

H

En gr

\D es ig n\

\2

5\

\S up po rt\ D ra w in gs

\M od el

GE

NE

RA

L N

OT

ES

AN

D

VI

CI

NI

TY

M

AP

01 06

F-101 FIRE ALARM AND SPRINKLER COMPOSITE PLAN

F-102 F-103

6 F-104

FIRE ALARM AND SPRINKLER COMPOSITE PLAN

FIRE ALARM AND SPRINKLER PLAN AREA "A"

FIRE ALARM AND SPRINKLER PLAN AREA "B"

DISCIPLINE

2 F-100 NOTES

A

/08 /26

RE

MO

VE

D

EX

IT

S

IG

NS

F

RO

M

TH

E

SC

OP

E

OF

W

OR

K

B

/14 /26

AD

DE

D

MO

DI

FI

ED

E

XI

T

SI

GN

S

CO

PE

TAXIWAY A

TAXIWAY J

TA

XI

W

AY

G

TAXIWAY A

TAXIWAY C

Soldier Creek

So ld ie r C re ek

Soldier C reek

Soldier C reek

3220 3707

62540

62509 62528

62523

62501X

43774

62512

62516

62525

99999

62543

33001

62501

43609

62517

62515

62526

62527

62503

62513

62542

62501OK

62501

62502

62501

62514

62501

43120

43610

62522

St af f D r.

W ar eh ou se R d.

Turbine Dr.

Ea st

D r.

W es t D r.

Bradley Dr.

Entrance Road "C"

Entrance Road "A"

Turbine Dr.

R U

N W

AY

8/

RUNWAY 13/31

TA

XI

W

AY

G

TAXIW

AY H

TAXIWAY B

TAXIWAY C

TAXIWAY M

TA

XI

W

AY

K

TAXIWAY E

TAXIWAY A

TA

XIW

AY E

E

TAXIWAY F

TAXIWAY D

TAXIWAY E

TAXIWAY J

TA

XI

W

AY

G

TAXIWAY A

TAXIW

AY H

TAXIWAY C

TAXIWAY D

TAXIWAY EE

TAXIWAY F

Elm C reek

Crutcho Creek

Kuhlman Creek

Soldier Creek

Kuhlman Creek

Elm C reek

East Crutcho Creek

Elm Creek

El m

C re ek

Elm Creek

Elm C reek

Elm CreekElm C reek

Ku hlm an C re ek

Ea st

C ru tc ho

C re ek

Elm C ree k

West Crutcho Creek

W es t C ru tc ho

C re ek

Elm Creek

Soldier Creek

Elm C reek

Soldier CreekSoldier Creek

Ea st

C ru tc ho

C re ek

Elm Creek

Ea st

C ru tc ho

C re ek

East C rutcho C reek

Soldier Creek

So ld ie r C re ek

East C rutch o Creek

Soldier C reek

Soldier C reek

So ld ie r C re ek

East Crutcho Creek

416506

21222121

59475946

11401128

62540

61089

838837

62509

62528

62523

62501X

43774

62512

62516

62525

3592135916

99999

62543

32101

71086

53902

50414

55300

56601

930G

948-E

911-E

948-W

61019

911-W

33001

35913

62501

65672

930S

45134

43609

42116

62517

62515

62526

62527

62503

62513

61289

62542

62501OK

11289

62501

15930

15908

15904

15904

15908

15908

15904

15904

15908

62502

41046

62501

62514

62501

61018

71089

45134

96022

43120

41157

44045

45815

40592

43610

62522

41163

15930

15930

11824

SE 74th St

SE 59th St.

Ai r D ep ot

St af f D r.

"A " A ve

M un iti on s R d.

W ar eh ou se R d.

"B " A ve

"H " A ve

M cN ar ne y Av e.

Al er t R d.

"E "A ve

Sentry Rd.

5th Ave.

Jo ne s

To w er R d.

Vanaman Rd.

So ut h St

Ai r D ep ot

Ai r D ep ot

Rapcon Rd.

Reserve Rd

Mercury Rd.

O ld

A ir

De po t

Airey Dr.

General Motors Dr

Vandenberg Dr.

Hi llt op R d.

Dormitory Rd.

Chennault Dr.

M itc he ll A ve

Spaatz Dr.

3rd Ave.

Ai r D ep ot

B lv d

Turbine Dr.

Central Plant Dr.

6th St.6th St.

Blackb ird

Dr.

Thunderbolt D r.

Munitions Rd. Ext.

Codding Rd.

Starlifter Dr.

Co rs ai r D r.

Ra pt or Ct

N ig ht H aw k

Ct

Fr an kl in

Po w er ho us e

Dr

Sk ym as te r D r.

Spaatz Ct.

M un de ll

Nabors Dr.

M cN ickle

Ta il

Fe at he r D r.

Holden Dr.

Smith Ct.

Air Dep ot

1st St.

TAXIWAY F

Mercury Rd.

Ra ily ar d

Rd

He rc ul es

R d.

"F " A ve

96021

Arnold St.

Ea st

D r.

Patrol Rd.

Reserve Rd.

5th Ave

7th St.

Mitchell Ave

Co ok

A ve

W es t D r.

Extender Dr.

34th St.

Twining Dr.

Globemaster Dr.

In du st ria l B lv d.

1st St.

Do ol itt le

A ve

Pi cn ic R d.

Ja m es D r.

W ol fe D r.

"D " A ve

Perimeter Rd.

"L " A ve

1st St.

Br ow n Dr

Po nd

R d.

Bradley Dr.

Entrance Road "C"

Entrance Road "A"

"C " A ve

"C " A ve

Do rm ito ry

R d.

"M " A ve

Co m m od ity D r.

Doolittle Ave

W hi te D r.

"D " D riv e

Ba ll

Pa rk

R d.

Joint STARS Dr.

Turbine Dr.

Falco n Dr.

W ey la nd

L oo p

Pegasus Dr.

Chidlaw Ct.

Ph an to m

D r.

La w re nc e

In tr ud er

D r.

M cN ic kl e

M ill er D r.

Ai re y C ir.

Ra ve n Ct

. Ai r D ep ot

Vanaman Rd.

1st St.

Ra w li ng s A ve

Mitc he ll A ve

Pr op ul sio n Dr

Stratofortress Dr.

Arnold St.

TINKER AFB, OK

VICINITY MAP

CONTRACTING

B3

GOTT

GATE

TINKER GATE

PASS & ID B6611

EAKER GATE

FIRE DEPARTMENT

B117

VANCE

GATE

LIBERATOR GATE

HOPE

GATE

LEGEND

CONTRACTOR

HAUL ROUTE

LANCER GATE

TRUCK GATE

PIAZZA GATE

BASE CIVIL

ENGINEER

B400

PROJECT LOCATION

BASE OPERATIONS

B240

HRUSKOCY GATE

OF

TI

N

KE

R

A

IR

F O

R C

E

BA

SE

, O

KL

AH

O M

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

35%

DESIGN

W W

YK

RE

LO

CA

TE

F

IR

E

AL

AR

M

CI

RC

UI

T, B

, O

-P A

IS

LE

/1

5/

TE

PA

-C

SA

G

A M cP H

ER

SO

N

F-100

S

ST

AR

R

B

JI

M O

H

En gr

\D es ig n\

\2

5\

\S up po rt\ D ra w in gs

\M od el

FI

RE

A

LA

RM

A

ND

SP

RI

NK

LE

R

NO

TE

S

02 06

SPRINKLER SYSTEM DEMOLITION NOTES:

1.

2.

3.

4.

5.

CONTRACT DOCUMENTS WERE PREPARED FROM FIELD SURVEYS.

THEY ARE NOT INTENDED TO DEPICT UNFORESEEN CONDITIONS

THAT MAY ADVERSELY AFFECT THE ARCHITECTURAL, ELECTRICAL,

AND MECHANICAL SYSTEM DEMOLITION OR INSTALLATION.

CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS PRIOR TO

STARTING ANY WORK.

THE EXISTING BUILDING SPRINKLER SYSTEM LOCATED OUTSIDE OF

THE WORK AREA SHALL REMAIN OPERATIONAL AT ALL TIMES. THE

FIRE ALARM SYSTEM SHALL MONITOR THE SPRINKLER SYSTEM

WATER FLOW AND VALVE TAMPER DEVICES AT ALL TIMES.

SUPERVISE ALL FIRE PROTECTION IMPAIRMENTS IN ACCORDANCE

WITH UFC 3-601-02. NO SPRINKLER HEADS SHALL BE DEMOLISHED

UNTIL THE BUILDING OCCUPANTS HAVE BEEN REMOVED FROM THE

AFFECTED PORTION OF THE BUILDING.

PERFORM DEMOLITION AND INSTALLATION IN A MANNER THAT SHALL

HAVE LEAST ADVERSE EFFECT ON NORMAL BUILDING OPERATION.

CONTRACTOR SHALL COORDINATE DEMOLITION AND INSTALLATION

WITH THE BUILDING USER AND THE GOVERNMENT.

HOT WORK ASSOCIATED WITH DEMOLITION AND CONSTRUCTION

SHALL BE PERFORMED IN ACCORDANCE WITH NFPA 51B.

SAFEGUARDS FOR HOT WORK OPERATIONS INCLUDE, BUT ARE NOT

LIMITED TO THE RELOCATION OF COMBUSTIBLE STORAGE, THE USE

OF FIRE RESISTIVE BARRIERS TO PROTECT COMBUSTIBLES THAT

CANNOT BE RELOCATED, THE ESTABLISHMENT OF FIRE WATCH AND

THE TERMINATION OF HOT WORK OPERATIONS WHEN FIRE

PROTECTION SYSTEMS ARE OUT OF SERVICE. ADDITIONALLY, HOT

WORK SHOULD NOT BE PERFORMED WHEN ALTERNATIVE METHODS

CAN BE EMPLOYED TO DISMANTLE EXISTING OR ASSEMBLE NEW

SYSTEMS.

THE CONTRACTOR SHALL PROVIDE PORTABLE FIRE EXTINGUISHERS

SUITABLE FOR THE COMBUSTIBLES PRESENT DURING

CONSTRUCTION. WHERE EXISTING BUILDING EXTINGUISHERS AREA

BLOCKED, REMOVED OR GENERALLY MADE INACCESSIBLE TO THE

BUILDING OCCUPANTS, SUPPLEMENTAL EXTINGUISHERS SHALL BE

PROVIDED SUCH THAT A PORTABLE FIRE EXTINGUISHER IS LOCATED

WITHIN 75 FT OF ALL AREAS OF THE BUILDING. THE CONTRACTOR

SHALL REGULARLY INSPECT (AT LEAST WEEKLY) PORTABLE

EXTINGUISHERS LOCATED WITHIN THE WORK AREA TO ENSURE THAT

THEY ARE CHARGED, FREE FROM DAMAGE AND ACCESSIBLE.

SPRINKLER SYSTEM GENERAL NOTES:

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

CONTRACTOR IS RESPONSIBLE FOR FINAL INSTALLATION DESIGN

AND COORDINATION. SIZING OF FIRE SUPPRESSION COMPONENTS

WILL BE CONFIRMED BY CONTRACTOR. DESIGNER WILL BE A

MINIMUM NICET LEVEL III TECHNICIAN.

THESE DRAWINGS ARE CONCEPTUAL IN NATURE AND DEVICE

PLACEMENTS ARE REPRESENTATIVE. CONTRACTOR TO VERIFY AND

PROVIDE FULL DESIGN IN ACCORDANCE WITH APPLICABLE CODES

(UFC, ICC, NFPA, ETC.).

THE FIRE SPRINKLER CONTRACTOR WILL COORDINATE WITH THE

FIRE ALARM CONTRACTOR AND OTHER TRADES FOR PROVISION OF

CONNECTIONS BETWEEN THEIR RESPECTIVE SYSTEMS.

ALL MATERIALS ARE TO BE UL LISTED OR FM APPROVED FOR USE IN

FIRE PROTECTION SYSTEMS.

COMMISSIONING AND PRELIMINARY AND FINAL ACCEPTANCE

TESTING WILL BE IN ACCORDANCE WITH SPECIFICATION SECTIONS

21 13 13 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION.

COORDINATE TESTING WITH OTHER TRADES AND BASE PERSONNEL

PRIOR TO OPERATION. ALL FIRE SUPPRESSION AND FIRE ALARM

TESTING WILL OCCUR SIMULTANEOUSLY TO EXPEDITE

COMMISSIONING.

THE BUILDING FIRE PROTECTION WATER SUPPLY IS SERVED BY

EXISTING FIRE PUMPS.

WHERE PIPES PASS THROUGH FIRE WALLS, FIRE BARRIERS, FIRE

PARTITION, OR FLOORS, A FIRE SEAL WILL BE PLACED BETWEEN THE

PIPE AND SLEEVE IN ACCORDANCE WITH SECTION 07 84 00

FIRESTOPPING.

SLEEVES PENETRATING CONCRETE, MASONRY WALLS OR CONCRETE

FLOORS WILL BE CUT FLUSH WITH EACH SURFACE. SLEEVE SIZES

AND CLEARANCE BETWEEN PIPE AND SLEEVE WILL BE IN

ACCORDANCE WITH NFPA 13.

SPRINKLERS WILL BE SPACED IN ACCORDANCE WITH NFPA 13

OBSTRUCTION REQUIREMENTS. PROVIDE SPRINKLERS UNDER

STAIRS, CATWALKS, PLATFORMS, SHED STRUCTURES, ETC. AS

REQUIRED PER NFPA 13.

PROVIDE HEAD GUARDS IN AREAS SUBJECT TO DAMAGE OR HEADS

INSTALLED LOWER THAN SEVEN FEET ABOVE FLOOR.

PROVIDE HEAD GUARDS WITH WATER SHIELDS FOR ALL HEADS

INSTALLED BENEATH OPEN GRATED PLATFORMS.

VALVES LOCATED MORE THAN 8 FOOT ABOVE FINISHED FLOOR AND

NOT READILY ACCESSIBLE FROM MEZZANINE WILL BE PROVIDED

WITH CHAIN OPERATORS.

PROVIDE ACCESS DOORS AND SIGNAGE WHERE ACCESS IS

REQUIRED TO CONCEALED SPRINKLER EQUIPMENT, VALVES, AND

CONTROLS. LOCATIONS TO BE APPROVED BY CONTRACTING

OFFICER.

PROVIDE PERMANENT LABELS ON WET-PIPE RISERS TO INDICATE

WHICH ZONE EACH ONE SERVES.

PROVIDE PERMANENT LABELS INDICATING NORMAL OPERATING

POSITION ON ALL VALVES INCLUDING, BUT NOT LIMITED TO,

SECTIONAL VALVES, INSPECTOR'S TEST VALVES, AND DRAIN VALVES.

MODIFIED SYSTEM, CONSTRUCTION (SHOP) DRAWINGS AND

CALCULATIONS MUST PREPARED BY AN INDIVIDUAL THAT HAS

OBTAINED NATIONAL INSTITUTE FOR CERTIFICATION IN ENGINEERING

TECHNOLOGIES, FIRE ALARM SYSTEMS, LEVEL III CERTIFICATION, AT

A MINIMUM. THE QFPE MUST REVIEW THE SHOP DRAWINGS,

CALCULATION AND MATERIALS SUBMITTALS. THE SHOP DRAWINGS

MUST BEAR THE REVIEW STAMP OF THE QFPE PRIOR TO SUBMITTING

THE FIRE SPRINKLER SHOP DRAWINGS TO THE GOVERNMENT.

SUBMIT SHOP DRAWINGS AND CALCULATIONS TO THE GOVERNMENT

FOR REVIEW, IN A MANNER AS REQUIRED PER NFPA 13 AND UFC

3-600-01. SUBMIT EQUIPMENT DATA SHEETS FOR A COMPLETE

INSTALLATION OF THE FIRE SPRINKLER SYSTEM.

APPROVED SHOP DRAWINGS, TESTING PLANS,

DATA SHEETS, AND CALCULATIONS ARE REQUIRED PRIOR TO

COMMENCEMENT OF WORK. THE FIRE SPRINKLER SYSTEM SUBMITTAL

SHALL BE A COMPLETE PACKAGE, PARTIAL SUBMITTAL WILL NOT BE

ACCEPTED.

FIRE ALARM AND MASS

NOTIFICATION DEMOLITION NOTES:

1.

2.

3.

4.

5.

6.

CONTRACT DOCUMENTS WERE PREPARED FROM FIELD SURVEYS.

THEY ARE NOT INTENDED TO DEPICT UNFORESEEN CONDITIONS

THAT MAY ADVERSELY AFFECT DEMOLITION OR INSTALLATION.

CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS PRIOR TO

STARTING ANY WORK.

THE BUILDING FIRE ALARM SYSTEM OUTSIDE THE PROJECT AREA

SHALL REMAIN OPERATIONAL AT ALL TIMES. SUPERVISE FIRE

PROTECTION IMPAIRMENTS IN ACCORDANCE WITH UFC 3-601-02. NO

FIRE ALARM DEVICES SHALL BE DEMOLISHED UNTIL THE BUILDING

OCCUPANTS HAVE BEEN REMOVED FROM THAT PORTION OF THE

BUILDING OR FIRE WATCH IN PLACE.

PROVIDE PROTECTION AS REQUIRED TO PREVENT DAMAGE

TO EXISTING EQUIPMENT.

COORDINATE DEMOLITION WITH NEW WORK. IF UNDOCUMENTED

CONDITIONS EXIST, CONTACT THE CONTRACTING OFFICER BEFORE

PROCEEDING.

PROTECT EXISTING CONDITIONS INCLUDING BUT NOT LIMITED TO:

STRUCTURES, CEILING, WALLS, EQUIPMENT, UTILITIES, ETC. DAMAGE

TO EXISTING CONDITIONS SHALL BE REPAIRED AT NO ADDITIONAL

COST TO THE GOVERNMENT.

THE BUILDING WILL BE OCCUPIED DURING CONSTRUCTION.

COORDINATE WORK WITH GOVERNMENT PRIOR TO COMMENCING

WORK. CONTRACTOR SHALL BE RESPONSIBLE FOR WORKING

AROUND OCCUPANT SCHEDULE AS DETERMINED BY THE

GOVERNMENT AND MAINTAIN MINIMUM IMPACT DUE TO

CONSTRUCTION.

FIRE ALARM AND MASS

NOTIFICATION GENERAL NOTES:

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

MODIFY THE EXISTING FIRE ALARM AND MASS NOTIFICATION

SYSTEM AS INDICATED ON THE CONTRACT DOCUMENTS, AS

EVIDENTLY INTENDED AND IN ACCORDANCE WITH NFPA 70 2023 EDITION,

NFPA 72 2025 EDITION, UFC 3-600-01 WITH CHANGE 6, 05/06/2021, AND

TINKER AFB FIRE PROTECTION STANDARDS, 2023. THE DRAWINGS

ARE DIAGRAMMATIC IN NATURE AND INDICATE GENERAL

ARRANGEMENTS OF SYSTEMS AND WORK, BUT DO NOT INCLUDE ALL

INTERCONNECTIONS BETWEEN OTHER SYSTEMS. PROVIDE CONDUIT,

BACK BOXES, RACEWAY AND WIRING AS REQUIRED TO ACCOMPLISH

THE FUNCTIONS INTENDED AND REQUIRED BY CODE.

COORDINATE WORK WITH THAT OF OTHER TRADES SO AS TO AVOID

CONFLICTS. RESOLVE CONFLICTS THROUGH THE A/E PRIOR TO

ROUGH-IN. FAILURE TO PROVIDE SUCH COORDINATION PRIOR TO

WORK BEING INSTALLED SHALL NOT BE CAUSE FOR ADDITIONAL

COMPENSATION TO THE CONTRACTOR, AND MAY RESULT IN

REJECTION OF THE WORK.

COMMISSIONING AND PRELIMINARY AND FINAL ACCEPTANCE

TESTING WILL BE IN ACCORDANCE WITH SPECIFICATION SECTIONS

28 31 76 FIRE ALARM AND MASS NOTIFICATION SYSTEM, FIRE

PROTECTION. COORDINATE TESTING WITH OTHER TRADES AND BASE

PERSONNEL PRIOR TO OPERATION. ALL FIRE SUPPRESSION AND

FIRE ALARM TESTING WILL OCCUR SIMULTANEOUSLY TO EXPEDITE

COMMISSIONING.

THE BUILDING FIRE ALARM AND MASS NOTIFICATION SYSTEM SHALL

REMAIN OPERATIONAL AT ALL TIMES. SUPERVISE ALL FIRE

PROTECTION IMPAIRMENTS IN ACCORDANCE WITH UFC 3-601-02. NO

PORTION OF THE BUILDING SHALL BE OCCUPIED UNTIL THE FIRE

ALARM DEVICES HAVE BEEN INSTALLED OR FIRE WATCH IN PLACE.

PROVIDE NEW MATERIALS, BEARING LABELS OR MARKING

INDICATING THIRD PARTY TESTING AND APPROVAL, SUITABLE FOR

THE APPLICATION INTENDED.

INSTALL FIRE ALARM CABLE IN METAL RACEWAY. FREE-RUN CABLE IS

NOT PERMITTED. RACEWAY SHALL BE CONCEALED IN FINISHED

SPACES, AND MAY BE INSTALLED EXPOSED IN UNFINISHED SPACES

SUCH AS MECHANICAL AND ELECTRICAL ROOMS. INSTALL RACEWAY

PERPENDICULAR OR PARALLEL TO THE BUILDING'S STRUCTURAL

COMPONENTS. RACEWAY SHOULD BE 3/4 INCH RED EMT.

PROVIDE PULL AND JUNCTION BOXES AS REQUIRED TO MEET CODE

AND INSTALLATION REQUIREMENTS. PULL AND JUNCTION BOXES

SHALL BE CONCEALED IN FINISHED SPACES. COORDINATE WITH

OTHER TRADES SO AS TO AVOID CONFLICTS. BOXES TO BE RED.

SUPPORT CONDUIT AND BACK BOXES BY MEANS OF ANCHORS,

RODS, HANGERS, ETC., TO MAINTAIN ALIGNMENT AND PREVENT

MOVEMENT. SUPPORT CEILING MOUNTED BACK BOXES WITH "T"

HANGERS OR EQUAL METHOD OF SUPPORT. BACK BOXES SHALL NOT

BE SUPPORTED SOLELY BY CONDUIT.

IDENTIFY CONDUCTORS AT EACH JUNCTION BOX, OUTLET BOX,

CABINET, PULL BOX, ETC., WITH VINYL HEAT SHRINK TAGS

INDICATING PANEL AND CIRCUIT NUMBER, CONTROL WIRE

IDENTIFICATION NUMBER, OR OTHER APPROPRIATE INFORMATION.

WHERE CONDUIT PASS THROUGH FIRE WALLS, FIRE BARRIERS, FIRE

PARTITION, OR FLOORS, A FIRE SEAL WILL BE PLACED BETWEEN THE

PIPE AND SLEEVE IN ACCORDANCE WITH REQUIRED

FIRESTOPPING.

SEAL PENETRATIONS AT FIRE OR SMOKE RATED CONSTRUCTION

WITH FIRESTOPPING MATERIALS APPROVED AND LISTED FOR THE

RATING OF THE CONSTRUCTION TO BE PENETRATED. PROVIDE

DOCUMENTATION FOR EACH PENETRATION SEALING SYSTEMS FOR

VERIFICATION OF PROPER INSTALLATION.

PERFORM WORK ON DE-ENERGIZED SYSTEMS ONLY TO PREVENT

PERSONNEL INJURY AND POTENTIAL SYSTEM FAILURE. WHERE

WORK ON EXISTING SYSTEMS SHALL REQUIRE INTERRUPTION OF

ELECTRICAL SERVICE, TEMPORARY PROVISIONS ACCEPTABLE TO

THE OWNER SHALL BE REQUIRED.

MODIFIED SYSTEM, CONSTRUCTION (SHOP) DRAWINGS AND

CALCULATIONS MUST PREPARED BY AN INDIVIDUAL THAT HAS

OBTAINED NATIONAL INSTITUTE FOR CERTIFICATION IN ENGINEERING

TECHNOLOGIES, FIRE ALARM SYSTEMS, LEVEL III CERTIFICATION, AT

A MINIMUM. THE QFPE MUST REVIEW THE SHOP DRAWINGS,

CALCULATIONS AND MATERIAL SUBMITTALS. THE SHOP DRAWINGS

MUST BEAR THE REVIEW STAMP OF THE QFPE PRIOR TO SUBMITTING

THE FIRE ALARM AND MASS NOTIFICATION SYSTEM SHOP DRAWINGS

TO THE GOVERNMENT.

SUBMIT SHOP DRAWINGS AND CALCULATIONS TO THE GOVERNMENT

FORE REVIEW, IN A MANNER AS REQUIRED PER NFPA 72 AND UFC

3-600-01. SUBMIT EQUIPMENT DATA SHEETS FOR A COMPLETE

INSTALLATION OF THE FIRE ALARM AND MASS NOTIFICATION

SYSTEM. APPROVED SHOP DRAWINGS, TESTING PLANS,

DATA SHEETS, AND CALCULATIONS ARE REQUIRED PRIOR TO

COMMENCEMENT OF WORK. THE FIRE ALARM AND MASS

NOTIFICATION SYSTEM SUBMITTAL

SHALL BE A COMPLETE PACKAGE, PARTIAL SUBMITTAL WILL NOT BE

ACCEPTABLE.

EXISTING BUILDING SCOPE EXTENTS:

1.

2.

UFC 3-600-01, SECTION 34-1.1, EXISTING FACILITIES, MINIMUM REQUIREMENTS:

FACILITIES AS THEY EXIST, MUST MEET THE REQUIREMENTS OF NFPA 101,

FOR EXISTING OCCUPANCIES. FACILITIES THAT DO NOT MEET THE

REQUIREMENTS OF NFPA 101 FOR EXISTING OCCUPANCIES MUST CONFORM

TO ONE OF THE FOLLOWING:

A. UPGRADE THE DEFICIENCY TO MEET THE EXISTING OCCUPANCY

REQUIREMENTS, OR

B. ESTABLISH MANAGEMENT PROTOCOLS TO PROVIDE A LEVEL OF LIFE

SAFETY EQUIVALENT TO THAT REQUIRED BY NFPA 101 FOR

EXISTING OCCUPANCIES, UNTIL AN UPGRADE PROJECT CAN BE

COMPLETED. MANAGEMENT PROTOCOLS MUST BE IN WRITING

AND APPROVED BY THE COMPONENT FIRE PROTECTION

ENGINEER.

UFC 3-600-01, 34-1.2.1, WORK IN EXISTING FACILITIES:

CONFORM TO THE REQUIREMENTS OF THE BUILDING REHABILITATION

CHAPTER OF NFPA 101 FOR DESIGN AND CONSTRUCTION PROJECTS IN

EXISTING BUILDINGS EXCEPT AS SPECIFIED IN UFC 3-600-01.

A. THE ENTIRE FACILITY, AT A MINIMUM, MUST COMPLY WITH THE

APPLICABLE EXISTING OCCUPANCY CHAPTER OF NFPA 101

BEFORE BEGINNING THE PROJECT FOR WORK IN EXISTING

FACILITIES. THE PROJECT MAY INCLUDE BRINGING THE FACILITY

INTO COMPLIANCE WITH THE APPLICABLE OCCUPANCY CHAPTER

OF NFPA 101.

B. THE AREAS OF THE FACILITY WHERE NO WORK IS BEING PERFORMED

MUST MEET THE APPLICABLE EXISTING OCCUPANCY CHAPTER OF

NFPA 101, BEFORE BEGINNING THE PROJECT OR BE INCLUDED AS

PART OF THE PROJECT.

NFPA 101, 43.2.2.1.3, MODIFICATION:

THE RECONFIGURATION OF ANY SPACE; THE ADDITION, RELOCATION, OR

ELIMINATION OF ANY DOOR OR WINDOW; THE ADDITION OR ELIMINATION OF

LOAD BEARING ELEMENTS; THE RECONFIGURATION OR EXTENSION OF ANY

SYSTEM; OR THE INSTALLATION OF ANY ADDITIONAL EQUIPMENT.

NFPA 101, 43.5.1.3, GENERAL REQUIREMENTS:

NEWLY CONSTRUCTED ELEMENTS, COMPONENTS, AND SYSTEMS SHALL

COMPLY WITH THE REQUIREMENTS OF OTHER SECTIONS OF THIS CODE [NFPA

101] APPLICABLE TO NEW CONSTRUCTION.

3.

4.

A

/08 /26

RE

MO

VE

D

EX

IT

S

IG

NS

F

RO

M

TH

E

SC

OP

E

OF

W

OR

K

EXIT SIGNS:

1.

2.

LOCATE AND PROVIDE NEW EXIT SIGNS IN THE SCOPE OF WORK AREA WITHIN

THE PATHWAY OF THE EXISTING CONVEYOR. EXIT SIGNS SHALL BE PROVIDED

AS REQUIRED PER NFPA 101 IN THE SCOPE OF WORK AREA FOR THE PRIMARY

EGRESS PATHWAYS ALONG THE EXISTING CONVEYOR. EXIT SIGNS SHALL BE

PROVIDED WITH BATTERY BACKUP. THE NEW EXIT SIGNS WILL NOT BE

CONNECTED TO POWER CIRCUITS TO ENERGIZE THE UNITS. THE

GOVERNMENT WILL BE PROVIDING THE MATERIALS AND LABOR TO ENERGIZE

THE EXIT SIGNS AT A LATER DATE. THE GOVERNMENT WILL PROVIDE THE

EMT AND POWER CIRCUITS TO THE NEW EXIT SIGNS THAT THE CONTRACTOR

PROVIDES AND INSTALLS. THE GOVERNMENT WILL BE WIRING AND

ENERGIZING AND TESTING THE EXIT SIGNS OUTSIDE THE SCOPE OF THIS

PROJECT AT A LATER DATE.

PROVIDE A FLOOR PLAN THAT IDENTIFIES THE PROPOSED EXIT SIGN

LOCATIONS FOR GOVERNMENT REVIEW. THE LAYOUT WILL BE REVIEWED

FOR APPROVAL BY THE GOVERNMENT PRIOR TO INSTALLATION.

THE CONTRACTOR IS NOT RESPONSIBLE FOR THE DEMOLITION OF THE

EXISTING EXIT SIGNS. THE GOVERNMENT WILL DEMOLISH THE EXISTING EXIT

SIGNS AFTER THE DEMOLITION OF THE CONVEYOR AT A LATER DATE,

OUTSIDE THE SCOPE OF THIS PROJECT.

3.

B

/14 /26

AD

DE

D

MO

DI

FI

ED

E

XI

T

SI

GN

S

CO

PE

F-101

FIRE ALARM AND SPRINKLER COMPOSITE PLAN

NTS

PROJECT LOCATIONB3001 KEY PLAN

OF

TI

N

KE

R

A

IR

F O

R C

E

BA

SE

, O

KL

AH

O M

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

35%

DESIGN

W W

YK

RE

LO

CA

TE

F

IR

E

AL

AR

M

CI

RC

UI

T, B

, O

-P A

IS

LE

/1

5/

TE

PA

-C

SA

G

A M cP H

ER

SO

N

F-101

S

ST

AR

R

B

JI

M O

H

En gr

\D es ig n\

\2

5\

\S up po rt\ D ra w in gs

\M od el

FI

RE

A

LA

RM

A

ND

SP

RI

NK

LE

R

CO

MP

OS

IT

E

PL

AN

03 06

AREA OF WORK

A R

EA

O

F W

O R

K

A R

EA

O

F W

O R

K A

R

EA

O F

W O

R K

AREA OF WORKAREA OF WORK

A R

EA

O

F W

O R

K

AREA OF WORK

CONVEYOR SECTIONS

1. H87 - 087 (PHASE 1, 23E092)

2. G82 - G87 (PHASE 2, 23E094)

3. C87 - G87 (PHASE 3, 23E095)

4. K77 - K81 (PHASE 4, 23E096)

5. J81 - 081 (PHASE 5, 23E103)

6. D81 - J81 (PHASE 6, 23E104)

7. D87 - D92 (PHASE 7, 23E105)

8. I95 - 095 (PHASE 8, 23E106)

9. 099 - 0105 (O-P 1 OF 6, 24E026)

10. 095 - 099 (O-P 2 OF 6, 24E027)

11. 091 - 095 (O-P 3 OF 6, 24E028)

12. 087 - 091 (O-P 4 OF 6, 24E029)

13. 081 - 087 (O-P 5 OF 6, 24E030)

14. 071 - 081 (O-P 6 0F 6, 24E031)

15. TO BE DETERMINED

16. TO BE DETERMINED

SECTIONS LISTED IN

ORDER OF PRIORITY

1. SECTION 15

2. SECTION 9

3. SECTION 10

4. SECTION 11

5. SECTION 12

6. SECTION 13

7. SECTION 14

8. SECTION 8

9. SECTION 7

10. SECTION 3

11. SECTION 2

12. SECTION 1

13. SECTION 5

14. SECTION 6

15. SECTION 16

16. SECTION 4

FIRE/MASS NOTIFICATION CONTROL

PANEL SCHEDULE

A. EXISTING FCI-72 TO BE

DEMOLISHED AND CIRCUITS

PICKED UP WITH ADDRESSABLE

MODULES FROM NEW FCI-E3

PANEL "B"

B. NEW FCI-E3 FIBER OPTIC

NETWORK NODE TO BE

INSTALLED IN THIS PROJECT

C. EXISTING FCI 7100 TO BE

DEMOLISHED AND ADDRESSABLE

CIRCUITS EXTENDED TO THE

NEW FCI-E3 NETWORK NODE

(PANEL "B" ABOVE)

D. EXISTING FCI E-3 (INSTALLED ON

FIBER NETWORK)(PANEL HAS

CAPACITY FOR EXPANSION IF

NEEDED)

E. EXISTING SIEMENS MXL TO BE

DEMOLISHED AND COVERAGE

ADDED TO PANEL "G"

F. EXISTING FCI E-3 TO REMAIN

(NOT ON NETWORK)

G. EXISTING FCI E-3 TO REMAIN

(NOT ON NETWORK)

H. EXISTING SIMPLEX 4004 PANEL IS

TO BE SUPERVISED BY PANEL "B"

AND CROSS TRIP

I. NEW FIBER OPTIC PATCH PANEL

FOR FIRE AND MASS

NOTIFICATION NETWORK.

CONTRACTOR TO PROVIDE THE

PATCH PANEL AND TERMINATE

THE FIBER INTO AND OUT FROM

THE PATCH PANEL TO MAINTAIN

THE CONTINUITY OF THE FIBER

OPTIC NETWORK. TERMINATING

AND PROGRAMMING THESE

PANELS TO THE NETWORK WILL

BE UNDER A SEPARATE

CONTRACT.

J. EXISTING FCI 24 TO BE

DEMOLISHED AND COVERAGE

ADDED TO PANEL "B" OR "D"

K. EXISTING SIMPLEX 4004 TO BE

DEMOLISHED AND COVERAGE

ADDED TO EITHER PANEL "B" OR

"D"

L. EXISTING FCI TO REMAIN (NOT

ON NETWORK)

M. EXISTING FCI 24 TO BE

DEMOLISHED AND COVERAGE

ADDED TO PANEL "G"

N. EXISTING FCPS-24FS8

O. EXISTING HPF-24S8

P. EXISTING HPF-24S8

Q. EXISTING HPF-24S8

R. EXISTING HPF-24S8

S. EXISTING FCPS-24FS6

T. EXISTING SIMPLEX 4100U TO

REMAIN IN SERVICE.

A

/08 /26

RE

MO

VE

D

EX

IT

S

IG

NS

F

RO

M

TH

E

SC

OP

E

OF

W

OR

K

1 1 1 1

2 2 2 2

3 3 3 3

4 4 4 4

5 5 5 5

6 6 6 6

7 7 7 7

8 8 8 8

9 9 9 9

J J J J J J J J J J J J

K K K K K K K K K K K K

L L L L L L L L L L L L

E

E

E

E

E

E

E

E

E

D

D

D

D

D

D

D

D

D

C

C

C

C

C

C

C

C

C

B

B

B

B

B

B

B

B

B

A

A

A

A

A

A

A

A

A

L

K

J

12 11

11 10

10 9 8 7 6 5 4 3 2 1

9 8 7 6 5 4 3 2 1

9 8 7 6 5 4 3 2 1

Q

P

O

N

M

Q

P

O

N

M

Q

P

O

N

M

Q

P

O

N

M

Q

P

O

N

M

Q

P

O

N

M

Q

P

O

N

M

L

K

J

I

H

G

L

K

J

I

H

G

L

K

J

I

H

G

L

K

J

I

H

G

L

K

J

I

H

G

L

K

J

I

H

G

L

K

J

I

H

G

G

G

G

77 79

77 79

77 79

77 79

77 79

77 79

77 79

77 79

77 79

77 79

77 79

G

G

F

E

D

C

B

A A

Q

P

O

N

M

L

K

J

I

H

G

F

E

D

C

B

A

Q

P

O

N

M

L

K

J

I

H

G

F

E

D

C

B

A

Q

P

O

N

M

L

K

J

I

H

G

F

E

D

C

B

A

Q

P

O

N

M

L

K

J

I

H

G

F

E

D

C

B

A

Q

P

O

N

M

L

K

J

I

H

G

F

E

D

C

B

A

A

A

A

A

89 91

89 91

89 91

89 91

89 91

89 91

89 91

89 91

89 91

89 91

89 91

89 91

89 91

89 91

89 91

89 91

89 91

A

Q

P

O

N

M

L

K

J

I

H

G

F

E

D

C

B

A

Q

P

O

N

M

L

K

J

I

H

G

F

E

D

C

B

A

Q

P

O

N

M

L

K

J

I

H

G

F

E

D

C

B

A

Q

P

O

N

M

L

K

J

I

H

G

F

E

D

C

B

A

Q

P

O

N

M

L

K

J

I

H

G

F

E

D

C

B

A

A

A

A

99 101

99 101

99 101

99 101

99 101

99 101

99 101

99 101

99 101

99 101

99 101

99 101

99 101

99 101

99 101

99 101

99 101

A

A

Q

P

O

N

M

L

K

J

I

H

G

F

E

D

C

B

A

Q

P

O

N

M

L

K

J

I

H

G

F

E

D

C

B

A

Q

P

O

N

M

L

K

J

I

H

G

F

E

D

C

B

A

Q

P

O

N

M

L

K

J

I

H

G

F

E

D

C

B

A

Q

P

O

N

M

L

K

J

I

H

G

F

E

D

C

B

A

103 105

103 105

103 105

103 105

103 105

103 105

103 105

103 105

103 105

103 105

103 105

103 105

103 105

103 105

103 105

103 105

103 105

A

A

A

A

107 109 111

107 109 111

107 109 111

107 109 111

107 109 111

107 109 111

107 109 111

107 109 111

107 109 111

107 109 111

107 109 111

107 109 111

107 109 111

107 109 111

107 109 111

107 109 111

107 109 111

G

AISLE AISLE AISLE

AI

SL

E

AI

SL

E

AISLE

AISLE

AISLE

AI

SL

E

OFFICE STORAGE

LABORATORY

SOUTH LABORATORY

NORTH VAULT V6

MEN

LA

DD

ER

CMM

DISASSEMBLY AREA

OFFICE

OFFICE

OFFICE

TOOL CRIB

HEAT TREAT CAGE

WOMEN

BLOCK HOUSE

AI

SL

E

AISLE

AI

SL

E

AI

SL

E

AI

SL

E

AI

SL

E

AI

SL

E

AI

SL

E

AI

SL

E

FPI

BOOTH

MEN WOMEN

UP

CA

TW

AL

K

LA

DD

ER

OFFICE

AISLE AISLE

AI

SL

E

CAGE

CAGE

AISLE

AI

SL

E

AI

SL

E

AI

SL

E

AI

SL

E

AI

SL

E

AI

SL

E

AI

SL

E

AISLEAISLE

AISLE

AISLE

AI

SL

E

AISLEAISLE

AI

SL

E

AI

SL

E

AISLE

AI

SL

E

AI

SL

E

AI

SL

E

AISLE

AISLE

AISLE

AI

SL

E

AISLE

AISLE

AISLE

AI

SL

E

AI

SL

E

AISLEAISLE

AISLE

AISLE

AISLE

AISLE

AISLE

AI

SL

E

AISLE

AI

SL

E

AISLE

AISLE

AI

SL

E

AI

SL

E

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

AI

SL

E

AI

SL

E

AI

SL

E

AISLE

AISLE

AISLE

AISLE

AI

SL

E

AI

SL

E

AISLE

AISLEAISLE AISLE AISLE AISLE AISLE

AI

SL

E

AISLE

AISLE

AISLE

AI

SL

E

AI

SL

E

AISLE

AISLE

AISLE

AI

SL

E

AISLEAISLE AISLE

BREAK ROOM

BREAK ROOM

BREAK ROOM

SL

OP

E

DN

LADDER

UP

9'-0"

DEEP PIT

1'-0"

TRENCH

1'-0"

TRENCH

PLASMA SPRAY

NORTH ANNEX

UP

UP

UP

UP

UP

UP

OFFICE

WOMEN

UP

UP

UP

UP

UP

OFFICE

STORAGE

CLOSET

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE BREAK

ROOM

OFFICE

TOOL

CRIB TOOL

CRIB

AI

SL

E

OFFICE

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

OFFICE OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

BREAK

ROOM

OFFICE

LADDER

AISLE

UP

UP

GUN

ROOM

ACTIVATED DIFFUSION

HEALING ROOM

UP

UP

OFFICE

TANKS

TA

NK

S

TA

NK

S

WELDING

CENTER

MILLING

CENTER

TURNING

CENTER

GRINDING

CENTER

CAGE

BLACK

LIGHT

BOOTH

TOOL CRIB

MEN

UP

OFFICE

OFFICEOFFICE

CAGE

BOOTH

BOOTH

TOOL

CRIB

TOOL CRIB

WOMEN

TOOL

CRIB

CLOSET

CLOSET

TE

LE

PH

ON

E

WOMEN

OFFICE

IFM

RUBBER ROOM

LA

SE

R

HO

LO

GR

AP

HY

BO

OT

H

DARK ROOM CONTROL ROOM X-RAY ROOM

SOUND PROOF

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

OFFICE

BREAK ROOM

AISLE

SPINDLE

FINISH

VIBRATORY

BP-7

CO2 BLAST

BLAST &

CLEAN CELL

MATERIAL

REVIEW STATION

GLASS BEAD

BP-2 DRY

GLASS BEAD

BP-3 DRY

AL-OXIDE BP-5 WET

GLASS BEAD

BP-4 WET

AL-OXIDE

BP-8 DRY

PLASTIC BLAST

OFFICE

FIXTURE

STORAGE

WELDING

BOOTH

TOOL

CAGETOOL

CAGE

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

STORAGEHEAT TREAT &

PLASMA SPRAY

PLASMA SPRAY &

BLAST

CONTROLLED GRINDING

F-SERIES

STATORS

STATORS

F-SERIES

ROTORS

CH

EM

IC

AL

CL

EA

NI

NG

QEC

GENERAL

SHOP

PLS

GEN WELDING TF33

ROTOR

CASE

NDI

INDUCTION

WELDING

INDUCTION

WELDING

AUTOMATED

WELDING

RESISTANCE

WELDING

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH STORAGE WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

OFFICE

OFFICE

OFFICE

OFFICE

CMM

ROOM

OFFICE

OFFICE

OFFICE

STORAGE

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

TOOL

CRIB

STORAGE

WELDING

BOOTH

MENS

ACID ETCH ROOM

UP

UP

UP

UP

U P

BLACK LIGHT

INSPECTION

TOOL CRIB

WELDING

SHOP

MAINTENANCE PLATFORM

BREAK ROOM

OFFICE OFFICE

OFFICE

MAINTENANCE PLATFORM

96" AFF

CASE

QEC

WCD

TOOL

SHOP

TURN IN

RECEIVING

KIT

STAGING

REPAIR

AREA

AUGMENTOR

ASSEMBLY/

DISASSEMBLY

WELDING

BOOTH

FPI

BOOTH

POWER WASH

REPAIR AREA

CN

C

GR

IN

DE

R

CO

M

PR

ES

SO

R

TU

RB

IN

E

SS ENGINE

SUPPLY

CE

NT

RA

L

LO

G

IS

TI

CS

ENGINE

SUPPORT

(CLUSTER)

ENGINE

ASSY/DIS

HPT

CYCLE

T/C ROTOR

RELOCATION SS

EDDY

CURRENT

BLAST

CLEAN

COMPRESSOR

DISKS

& SEALS

DI

FF

US

ER

S INTERMEDIATE

CASE CYCLE

1,2,&3

CORE

SUPPORT

CH

EM

IC

AL

AR

EA

M

XR

TO

O

L

CR

IB

UP UP

ASSEMBLY/

DISASSEMBLY

OVEN

LOCAL FPI

DETAIL

INSPECTION

TIG/BAG WELD

KIT STAGING AREA

UNIVERSAL

MILL

VTL VERTICAL

BORING

MILL

LATHE

SH

O

T

PE

EN

POWER

WASH

LOCAL

FPI

EDDY

CURRENT

U

LT

R

AS

O N

IC

IN

SP

EC

TI

O

N

C M

M

F100-229

ASSEMBLY/

DISASSEMBLY

MENS

MEETING

ROOM #1

RECORDS

STORAGE

CORE SUPPORT

MECHANICAL

ROOM

TOOL MAINTENANCE

CENTER

OFFICE OFFICE

UP

UP

72 COMMUNICATION

UP

4 1/2"

OFFICE

PR

ED

IC

TI

VE

MA

IN

TE

NA

NC

E

TE

AM

MICROSCOPE ROOM

MECHANICAL

ROOM

QUALITY VERIFICATION

CENTER

X-

RA

Y

CO

NT

RO

L R

OO

M

STAGING AREA

32"

CO

PI

ER

HE

AT

T

RE

AT

AN

NE

X

PDQR

CAGE

CONTINUOUS

IMPROVEMENT

FIRE CLOSETFIRE CLOSET

STORAGESTORAGE

UP

UP

DF DF

MEN

DF

UP

FI

RE

D

OO

R

FI

RE

D

OO

R

FI

RE

D

OO

R

FIRE DOORFIRE DOOR

FIRE DOOR

FIRE DOORFIRE DOORFIRE DOOR

FIRE DOOR

FI

RE

D

OO

R

JA

N

ME

N

UP

UP

2ND FLR

LANDING

AI

SL

E

AISLEAISLE

LA

DD

ER

UP

DN 548th PMXS O-95

INCOMING

548th PMXS 44th

LADDER

PRESSURE WASHER

BOOTH

CONTROL

ROOM

UP

LADDER

ELEC

ELECTRIC

5"UNSERVICEABLE MODULES STAGINGSERVICEABLE CANS STAGINGSTAGING

ST

EP

ST

EP

ST

EP

BREAK

TABLE

BR

EA

K

TA

BL

E

BREAK

TABLE

BR

EA

K

TA

BL

E

BR

EA

K

TA

BL

E

BR

EA

K

TA

BL

E

BR

EA

K

TA

BL

E

AI

SL

E

10"10"10"

10"10.5" 10.5"

ELECTRIC

ELECTRIC

11"

4" 10"

ELECTRIC

10" SUB STATION10" SUB STATION

BOTTLE

RACKS

BOTTLE

RACKS

BOTTLE

RACKS

BOTTLE

RACKS

OXYGEN ACETYLENE

6"

SL

OP

E

16"19.5"

4"4"

19.5" 6"CONCRETE UTILITY

EQUIPMENT PAD

HW

WF

LT #5

LT #6

SUPERFORTRESS

CAFETERIA

LUNCH BOWL

UP

JANITOR

CLOSET

5-4OC109

FENTON SYSTEM IN

C.

CONTROLR

4-

OC

FE

NT

ON

S

YS

TE

M

IN

C.

CO

NT

RO

L

R

4-

OC

FE

NT

ON

S

YS

TE

M

IN

C.

CO

NT

RO

L

R

4-6

OC10906

FENTON SYSTEM INC.

CONTROL

R

4-

OC

FE

NT

ON

S

YS

TE

M

IN

C.

CO

NT

RO

L

P

4-2

OC10903

FENTON SYSTEM INC.

CONTROL

R

5-1

OC10909

FENTON SYSTEM INC.

CONTROL

P

3-2

OC10899

FENTON SYSTEM INC.

CONTROL

R

2-4

OC10898

FENTON SYSTEM INC.

CONTROL

R

1-4

OC10893

FENTON SYSTEM INC.

CONTROL

R

1-

OC

FE

NT

ON

S

YS

TE

M

IN

C.

CO

NT

RO

L

P

2-23

OC10896

FENTON SYSTEM INC.

CONTROL

R

2-

OC

FE

NT

ON

S

YS

TE

M

IN

C.

CO

NV

C

ON

TR

OL

P

PLATFORM

PLATFORM

DR

OP

S

TA

. 5

OC

NO

S

ER

IA

L N

UM

BE

R

N/ A

2 3

13 12

11 10 9 15

ABC

D

E

G

F

I

I

H

I

J

K

L

M

N

O

P

Q

S T

R

69 70 72 73 74 75 76 77 78 79 80 82 83 84 85 86 87 88 89 90 92 93 94 95 96 97 98 99 100 102 103 104 105 106 107 108 109 110 11171 71 81 81 91 91 101 101

A

B

C

D

E

F

G

H

I

J

K

L

M

N

O

P

Q

M

RA

MP

U P

AutoCAD SHX Text

WH

F-102

FIRE ALARM AND SPRINKLER COMPOSITE PLAN

NTS

PROJECT LOCATIONB3001 KEY PLAN

OF

TI

N

KE

R

A

IR

F O

R C

E

BA

SE

, O

KL

AH

O M

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

35%

DESIGN

W W

YK

RE

LO

CA

TE

F

IR

E

AL

AR

M

CI

RC

UI

T, B

, O

-P A

IS

LE

/1

5/

TE

PA

-C

SA

G

A M cP H

ER

SO

N

F-102

S

ST

AR

R

B

JI

M O

H

En gr

\D es ig n\

\2

5\

\S up po rt\ D ra w in gs

\M od el

FI

RE

A

LA

RM

AN

D

SP

RI

NK

LE

R

CO

MP

OS

IT

E

PL

AN

04 06

AREA OF WORK

A R

EA

O

F W

O R

K

A R

EA

O

F W

O R

K A

R

EA

O F

W O

R K

AREA OF WORKAREA OF WORK

A R

EA

O

F W

O R

K

AREA OF WORK

GENERAL NOTES GENERAL NOTES

8. EXISTING FCI-E3 NETWORK FIRE ALARM

LOCATED ON THE SECOND LEVEL NEXT TO O-P AISLE.

THE SECOND LEVEL IS OPEN TO THE AISLE. LOCATED AT

COLUMN O-94/95 ON THE SECOND LEVEL.

10. NOT USED.

11. EXISTING CLASS A CIRCUITS MAY BE CONVERTED TO

CLASS B PER THE EQUIPMENT MANUFACTURER'S

INSTRUCTIONS IN ACCORDANCE WITH NFPA 72. DO NOT

ABANDON ANY FIRE ALARM, MASS NOTIFICATION CIRCUITS

OR RACEWAY.

12. PERFORM A PRE-TEST OF THE ALARM SYSTEMS IMPACTED

BY THE RELOCATION OF CIRCUITS PRIOR TO BEGINNING

WORK. DEFICIENCIES IDENTIFIED DURING THE PRE-TEST

WILL NOT BE THE RESPONSIBILITY OF THE CONTRACTOR

TO CORRECT IF ISSUE REMAINS DURING THE FINAL

ACCEPTANCE TEST.

13. PERFORM AN ACCEPTANCE TEST FOR ALL AFFECTED

ALARM SYSTEMS IN ACCORDANCE WITH NFPA 72, UPON

THE COMPLETION OF ALARM WORK. CONTRACTOR WILL

CORRECT DEFICIENCIES NOT IDENTIFIED ON THE

PRE-TEST.

1. THIS SHEET IDENTIFIES THE CONVEYOR LOCATION REQUIRING

RE-ROUTING OF THE FIRE ALARM CIRCUITS CURRENTLY

INSTALLED ON THE CONVEYOR PLATFORM. ALL EXIT SIGNS,

FIRE ALARM, MASS NOTIFICATION, AND FIRE SPRINKLER

SYSTEMS ARE TO BE UNINSTALLED FROM THE CONVEYOR AND

REINSTALLED WITH SUPPORTS CONNECTING TO THE ROOF

DECK STEEL.

2. BEFORE REMOVING ANY ELECTRICAL CONDUIT, CONDUCTORS,

OR DEVICES, ENSURE AND VERIFY THAT THE CIRCUIT IS

PROPERLY DE-ENERGIZED.

3. THE INTENT IS TO DISCONNECT THE FIRE ALARM CIRCUITS AND

FIRE SPRINKLER DROPS TO DEMOLISH THE OVERHEAD

CONVEYOR. RE-ROUTE SYSTEMS CABLING AND DROPS TO THE

BOTTOM OF ROOF STEEL ABOVE THE CONVEYOR PLATFORM

THAT IS TO BE DEMOLISHED.

4. PROVIDE RED EMT OF 3/4 INCH MINIMUM WITH COMPRESSION

FITTINGS FOR ALL NEW FIRE ALARM RACEWAY. ALL FIRE

ALARM CIRCUITS MAY BE INSTALLED CLASS B. EXISTING RED

EMT MAY BE REUSED IF IT IS LIKE NEW CONDITION.

5. NEW CIRCUIT AND PIPING ROUTE SHALL BE ALONG THE LOWER

ROOF DECK STEEL SUPPORTS ABOVE THE CURRENT

CONVEYOR PLATFORM.

6. FIRE SPRINKLER BRANCH LINES AND SUPPORTING HANGERS

MAY BE UNINSTALLED AND REINSTALLED AFTER CONVEYOR

DEMOLITION, OR DEMOLISHED IF NO LONGER NECESSARY.

GENERAL NOTES

14. NOT USED.

15. SUBMITTALS ARE REQUIRED. ACCURATE RECORD

DRAWINGS (AS-BUILTS) ARE REQUIRED TO BE PROVIDED

BY THE CONTRACTOR AS A CLOSE-OUT SUBMITTAL.

16. PROVIDE CODE COMPLIANT FIRE ALARM AND MASS

NOTIFICATION WITHIN THE SCOPE OF WORK AREA WEST

OF THE O-P AISLE, NORTH OF COLUMN LINE "G" AND

SOUTH OF COLUMN LINE 111.

A

/08 /26

RE

MO

VE

D

EX

IT

S

IG

NS

F

RO

M

TH

E

SC

OP

E

OF

W

OR

K

AISLE AISLE AISLE

AI

SL

E

AI

SL

E

AISLE

AISLE

AISLE

AI

SL

E

OFFICE STORAGE

LABORATORY

SOUTH LABORATORY

NORTH VAULT V6

MEN

LA

DD

ER

CMM

DISASSEMBLY AREA

OFFICE

OFFICE

OFFICE

TOOL CRIB

HEAT TREAT CAGE

WOMEN

BLOCK HOUSE

AI

SL

E

AISLE

AI

SL

E

AI

SL

E

AI

SL

E

AI

SL

E

AI

SL

E

AI

SL

E

AI

SL

E

AI

SL

E

FPI

BOOTH

MEN WOMEN

UP

AISLE

CA

TW

AL

K

LA

DD

ER

OFFICE

AISLE AISLE

AI

SL

E

CAGE

CAGE

AISLE

AI

SL

E

AI

SL

E

AI

SL

E

AI

SL

E

AI

SL

E

AI

SL

E

AI

SL

E

AISLEAISLE

AISLE

AISLE

AI

SL

E

AISLEAISLE

AI

SL

E

AI

SL

E

AISLE

AI

SL

E

AI

SL

E

AI

SL

E

AISLE

AISLE

AISLE

AI

SL

E

AISLE

AISLE

AISLE

AI

SL

E

AI

SL

E

AISLEAISLE

AISLE

AISLE

AISLE

AISLE

AISLE

AI

SL

E

AISLE

AI

SL

E

AISLE

AISLE

AI

SL

E

AI

SL

E

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

AI

SL

E

AI

SL

E

AI

SL

E

AISLE

AISLE

AISLE

AISLE

AI

SL

E

AI

SL

E

AISLE

AISLEAISLE AISLE AISLE AISLE AISLE

AI

SL

E

AISLE

AISLE

AISLE

AI

SL

E

AI

SL

E

AISLE

AISLE

AISLE

AI

SL

E

AISLEAISLE AISLE

BREAK ROOM

BREAK ROOM

BREAK ROOM

SL

OP

E

DN

LADDER

UP

9'-0"

DEEP PIT

1'-0"

TRENCH

1'-0"

TRENCH

PLASMA SPRAY

NORTH ANNEX

UP

UP

UP

UP

UP

UP

OFFICE

WOMEN

UP

UP

UP

UP

UP

OFFICE

STORAGE

CLOSET

OFFICE

OFFICE

OFFICE

OFFICE

OFFICE BREAK

ROOM

OFFICE

TOOL

CRIB TOOL

CRIB

AI

SL

E

OFFICE

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

OFFICE OFFICE

OFFICE

OFFICE

OFFICE

OFFICE

BREAK

ROOM

OFFICE

LADDER

AISLE

UP

UP

GUN

ROOM

ACTIVATED DIFFUSION

HEALING ROOM

UP

UP

OFFICE

TANKS

TA

NK

S

TA

NK

S

WELDING

CENTER

MILLING

CENTER

TURNING

CENTER

GRINDING

CENTER

CAGE

BLACK

LIGHT

BOOTH

TOOL CRIB

MEN

UP

OFFICE

OFFICEOFFICE

CAGE

BOOTH

BOOTH

TOOL

CRIB

TOOL CRIB

WOMEN

TOOL

CRIB

CLOSET

CLOSET

TE

LE

PH

ON

E

WOMEN

OFFICE

IFM

RUBBER ROOM

LA

SE

R

HO

LO

GR

AP

HY

BO

OT

H

DARK ROOM CONTROL ROOM X-RAY ROOM

SOUND PROOF

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

OFFICE

BREAK ROOM

AISLE

SPINDLE

FINISH

VIBRATORY

BP-7

CO2 BLAST

BLAST &

CLEAN CELL

MATERIAL

REVIEW STATION

GLASS BEAD

BP-2 DRY

GLASS BEAD

BP-3 DRY

AL-OXIDE BP-5 WET

GLASS BEAD

BP-4 WET

AL-OXIDE

BP-8 DRY

PLASTIC BLAST

OFFICE

FIXTURE

STORAGE

WELDING

BOOTH

TOOL

CAGETOOL

CAGE

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

STORAGEHEAT TREAT &

PLASMA SPRAY

PLASMA SPRAY &

BLAST

CONTROLLED GRINDING

F-SERIES

STATORS

STATORS

F-SERIES

ROTORS

CH

EM

IC

AL

CL

EA

NI

NG

QEC

GENERAL

SHOP

PLS

GEN WELDING TF33

ROTOR

CASE

NDI

INDUCTION

WELDING

INDUCTION

WELDING

AUTOMATED

WELDING

RESISTANCE

WELDING

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH STORAGE WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

OFFICE

OFFICE

OFFICE

OFFICE

CMM

ROOM

OFFICE

OFFICE

OFFICE

STORAGE

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

TOOL

CRIB

STORAGE

WELDING

BOOTH

MENS

ACID ETCH ROOM

UP

UP

UP

UP

U P

BLACK LIGHT

INSPECTION

TOOL CRIB

WELDING

SHOP

MAINTENANCE PLATFORM

BREAK ROOM

OFFICE OFFICE

OFFICE

MAINTENANCE PLATFORM

96" AFF

CASE

QEC

WCD

TOOL

SHOP

TURN IN

RECEIVING

CAN

UNCAN

CO

NT

IN

UO

US

IM

PR

OV

EM

EN

T

DE

TA

IL

IN

SP

EC

TI

ON

ME

TA

L R

EV

IE

W

ST

AT

IO

N

GA

TE

W

AY

DR

OP

S

TA

TI

ON

HORIZONTAL

ASSEMBLY/

DISASSEMBLY

VERTICAL

ASSEMBLY/

DISASSEMBLY

KIT

STAGING

REPAIR

AREA

AUGMENTOR

ASSEMBLY/

DISASSEMBLY

WELDING

BOOTH

FPI

BOOTH

POWER WASH

REPAIR AREA

CN

C

GR

IN

DE

R

AS

SE

MB

LY

CELL

MANAGEMENT

TEAM

CONTINUOUS

DYNAMIC

BALANCER

DISASSEMBLY

CMMI EDDY

CURRENT

ROOM

CO

M

PR

ES

SO

R

TU

RB

IN

E

SS ENGINE

SUPPLY

EN

G

IN

E

SU

PP

O

RT

CE

NT

RA

L

LO

G

IS

TI

CS

ENGINE

SUPPORT

(CLUSTER)

ENGINE

ASSY/DIS

HPT

CYCLE

1,2,&3

T/C ROTOR

RELOCATION SS

EDDY

CURRENT

BLAST

CLEAN

COMPRESSOR

DISKS

& SEALS

DI

FF

US

ER

S INTERMEDIATE

CASE CYCLE

1,2,&3

CORE

SUPPORT

CH

EM

IC

AL

AR

EA

M

XR

TO

O

L

CR

IB

UP UP

CORE FORWARD

TOOLING UNIT (FTU)

GATEWAY

DROP STATION: S80W

RCC: MEKBJA

ASSEMBLY/

DISASSEMBLY

OVEN

LOCAL FPI

DETAIL

INSPECTION

KIT STAGING AREA

C O

N

TI

N U

O U

S

IM

PR

O

VE

M

EN

T

DIFFUSER CELL

CELL MANAGEMENT TEAM

CELL MANAGEMENT TEAM

INTERMEDIATE

CASE CELL

TIG/BAG WELD

KIT STAGING AREA

DISASSEMBLY BENCH AS

SE

M

BL

Y

BE

N C

H

LOCAL

STRESS

RELIEF

GATEWAY

DROP STATION: S83W

RCC: MEKBI

ELECTRO

ETCH

REPAIR

BENCH

UNIVERSAL

MILL

VTL VERTICAL

BORING

MILL

LATHE

R

IV

ET

ER

H

YD

R O

TR

O

N

DETAIL

INSPECTION

OVEN

PAINT

SH

O

T

PE

EN

POWER

WASH

LOCAL

FPI

EDDY

CURRENT

U

LT

R

AS

O N

IC

IN

SP

EC

TI

O

N

C M

M

DETAIL

INSPECTION

REPAIR

AREA

ELECTRO

ETCH

KIT STAGING AREA

M

AT

ER

IA

L R

EV

IE

W S

TA

TI

O N

GATEWAY

DROP STATION: S87W

RCC: MEKBEA

CONTINUOUS

IMPROVEMENT

COMPRESSOR

DISKS &

AIRSEALS CELL

C

EL

L M

AN

AG

EM

EN

T

TE

AM

C O

M

PR

ES

SO

R

D

IS

AS

SE

M

BL

Y C

EL

L

D

IS

AS

SE

M

BL

Y

CONTINUOUS

IMPROVEMENT

SUB

DISASSEMBLY

KIT STAGING

AREA

F100-229

ASSEMBLY/

DISASSEMBLY

MENS

BREAK ROOM

KITCHENETTE

MULTI-PURPOSE

ROOM

MEETING

ROOM #1

RECORDS

STORAGE

CORE SUPPORT

MECHANICAL

ROOM

MEETING

ROOM #2

TOOL MAINTENANCE

CENTER

OFFICE OFFICE

STORAGE

STORAGE

UP

UP

72 COMMUNICATION

UP

4 1/2"

OFFICE

PR

ED

IC

TI

VE

MA

IN

TE

NA

NC

E

TE

AM

MICROSCOPE ROOM

MECHANICAL

ROOM

QUALITY VERIFICATION

CENTER

X-

RA

Y

CO

NT

RO

L R

OO

M

STAGING AREA

32"

CO

PI

ER

HE

AT

T

RE

AT

AN

NE

X

PDQR

CAGE

CONTINUOUS

IMPROVEMENT

FIRE CLOSETFIRE CLOSET

STORAGESTORAGE

UP

UP

DF DF

MEN

DF

MEN

WOMEN

UP

FI

RE

D

OO

R

FI

RE

D

OO

R

FI

RE

D

OO

R

FIRE DOORFIRE DOOR

FIRE DOOR

FIRE DOORFIRE DOORFIRE DOOR

FIRE DOOR

FI

RE

D

OO

R

JA

N

ME

N

UP

UP

2ND FLR

LANDING

AI

SL

E

AISLEAISLE

AI

SL

E

AI

SL

E

LA

DD

ER

UP

DN

STAGING AREA

ST

AG

IN

G

AR

EA

548th PMXS O-95

INCOMING

548th PMXS 44th

INCOMING

LADDER

PRESSURE WASHER

BOOTH

CONTROL

ROOM

UP

LADDER

ELEC

ELECTRIC

5"UNSERVICEABLE MODULES STAGINGSERVICEABLE CANS STAGINGSTAGING

ST

EP

ST

EP

ST

EP

BREAK

TABLE

BR

EA

K

TA

BL

E

BREAK

TABLE

BR

EA

K

TA

BL

E

BR

EA

K

TA

BL

E

BR

EA

K

TA

BL

E

BR

EA

K

TA

BL

E

AI

SL

E

10"10"10"

10"10.5" 10.5"

ELECTRIC

ELECTRIC

11"

4" 10"

ELECTRIC

10" SUB STATION10" SUB STATION

BOTTLE

RACKS

BOTTLE

RACKS

BOTTLE

RACKS

BOTTLE

RACKS

OXYGEN ACETYLENE

6"

SL

OP

E

16"19.5"

4"4"

19.5" 6"CONCRETE UTILITY

EQUIPMENT PAD

HW

WF

LT #5

LT #6

SUPERFORTRESS

CAFETERIA

LUNCH BOWL

CONTRACTING

OFFICE

CONTRACTING

OFFICE

NV

NV

NV

NV

ELEV

UP

JANITOR

CLOSET

5-4OC109

FENTON SYSTEM IN

C.

CONTROLR

4-

OC

FE

NT

ON

S

YS

TE

M

IN

C.

CO

NT

RO

L

R

4-

OC

FE

NT

ON

S

YS

TE

M

IN

C.

CO

NT

RO

L

R

4-6

OC10906

FENTON SYSTEM INC.

CONTROL

R

4-

OC

FE

NT

ON

S

YS

TE

M

IN

C.

CO

NT

RO

L

P

4-2

OC10903

FENTON SYSTEM INC.

CONTROL

R

5-1

OC10909

FENTON SYSTEM INC.

CONTROL

P

3-2

OC10899

FENTON SYSTEM INC.

CONTROL

R

2-4

OC10898

FENTON SYSTEM INC.

CONTROL

R

1-4

OC10893

FENTON SYSTEM INC.

CONTROL

R

1-

OC

FE

NT

ON

S

YS

TE

M

IN

C.

CO

NT

RO

L

P

2-23

OC10896

FENTON SYSTEM INC.

CONTROL

R

2-

OC

FE

NT

ON

S

YS

TE

M

IN

C.

CO

NV

C

ON

TR

OL

P

PLATFORM

PLATFORM

DR

OP

S

TA

. 5

OC

NO

S

ER

IA

L N

UM

BE

R

N/ A

S

R

Q

P

O

N

M

S

R

Q

P

O

N

M

S

R

Q

P

O

N

M

S

R

Q

P

O

N

M

S

R

Q

P

O

N

M

S

R

Q

P

O

N

M

S

R

Q

P

O

N

M

L

K

J

I

H

G

L

K

J

I

H

G

L

K

J

I

H

G

L

K

J

I

H

G

L

K

J

I

H

G

L

K

J

I

H

G

L

K

J

I

H

G

G

G

G

77 79

77 79

77 79

77 79

77 79

77 79

77 79

77 79

77 79

77 79

77 79

77 79

77 79

G

G

F

E

D

C

B

A A

S

R

Q

P

O

N

M

L

K

J

I

H

G

F

E

D

C

B

A

S

R

Q

P

O

N

M

L

K

J

I

H

G

F

E

D

C

B

A

S

R

Q

P

O

N

M

L

K

J

I

H

G

F

E

D

C

B

A

S

R

Q

P

O

N

M

L

K

J

I

H

G

F

E

D

C

B

A

S

R

Q

P

O

N

M

L

K

J

I

H

G

F

E

D

C

B

A

A

A

A

A

89 91

89 91

89 91

89 91

89 91

89 91

89 91

89 91

89 91

89 91

89 91

89 91

89 91

89 91

89 91

89 91

89 91

89 91

89 91

A

S

R

Q

P

O

N

M

L

K

J

I

H

G

F

E

D

C

B

A

S

R

Q

P

O

N

M

L

K

J

I

H

G

F

E

D

C

B

A

S

R

Q

P

O

N

M

L

K

J

I

H

G

F

E

D

C

B

A

S

R

Q

P

O

N

M

L

K

J

I

H

G

F

E

D

C

B

A

S

R

Q

P

O

N

M

L

K

J

I

H

G

F

E

D

C

B

A

A

A

A

99 101

99 101

99 101

99 101

99 101

99 101

99 101

99 101

99 101

99 101

99 101

99 101

99 101

99 101

99 101

99 101

99 101

99 101

99 101

A

A

S

R

Q

P

O

N

M

L

K

J

I

H

G

F

E

D

C

B

A

S

R

Q

P

O

N

M

L

K

J

I

H

G

F

E

D

C

B

A

S

R

Q

P

O

N

M

L

K

J

I

H

G

F

E

D

C

B

A

S

R

Q

P

O

N

M

L

K

J

I

H

G

F

E

D

C

B

A

S

R

Q

P

O

N

M

L

K

J

I

H

G

F

E

D

C

B

A

103 105

103 105

103 105

103 105

103 105

103 105

103 105

103 105

103 105

103 105

103 105

103 105

103 105

103 105

103 105

103 105

103 105

103 105

103 105

A

A

A

A

107 109 111

107 109 111

107 109 111

107 109 111

107 109 111

107 109 111

107 109 111

107 109 111

107 109 111

107 109 111

107 109 111

107 109 111

107 109 111

107 109 111

107 109 111

107 109 111

107 109 111

107 109 111

107 109 111

G

13 12 11 10 9 8 7 6 5 4 3 2 1

J

K

L

ABCDE

1 1 1 1

2 2 2 2

3 3 3 3

4 4 4 4

5 5 5 5

6 6 6 6

7 7 7 7

8 8 8 8

9 9 9 9

J J J J J J J J J J J J

K K K K K K K K K K K K

L L L L L L L L L L L L

E

E

E

E

E

E

E

E

E

D

D

D

D

D

D

D

D

D

C

C

C

C

C

C

C

C

C

B

B

B

B

B

B

B

B

B

A

A

A

A

A

A

A

A

A

L

K

J

12 11

11 10

10 9 8 7 6 5 4 3 2 1

9 8 7 6 5 4 3 2 1

9 8 7 6 5 4 3 2 1

2 3

13 12

11 10 9 15

ABC

D

E

G

F

I

I

H

I

J

K

L

M

N

O

P

Q

S T

R

69 70 72 73 74 75 76 77 78 79 80 82 83 84 85 86 87 88 89 90 92 93 94 95 96 97 98 99 100 102 103 104 105 106 107 108 109 110 11171

2'-0" EXPANSION JOINT

71 81

2'-0" EXPANSION JOINT

81 91

2'-0" EXPANSION JOINT

91 101

2'-0" EXPANSION JOINT

RA

MP

U P

A

B

C

D

E

F

G

H

I

J

K

L

M

N

O

P

Q

M

F-103

FIRE ALARM AND SPRINKLER PLAN - AREA "A"

NTS

PROJECT LOCATIONB3001 KEY PLAN

OF

TI

N

KE

R

A

IR

F O

R C

E

BA

SE

, O

KL

AH

O M

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

35%

DESIGN

W W

YK

RE

LO

CA

TE

F

IR

E

AL

AR

M

CI

RC

UI

T, B

, O

-P A

IS

LE

/1

5/

TE

PA

-C

SA

G

A M cP H

ER

SO

N

F-103

S

ST

AR

R

B

JI

M O

H

En gr

\D es ig n\

\2

5\

\S up po rt\ D ra w in gs

\M od el

FI

RE

A

LA

RM

A

ND

SP

RI

NK

LE

R

PL

AN

A

RE

A "A

05 06

SHEET NOTES

AREA OF WORK

AREA OF WORK

A R

EA

O

F W

O R

K

A R

EA

O

F W

O R

K

AREA OF WORK

AREA OF WORK

CONVEYOR SECTIONS SHOWN IN PLAN

1. DEMO COMPLETE.

2. DEMO: FIRE SPRINKLER BRANCH LINES TO BOOTHS AND DOCK

BOX OFFICE.

3. NO LIFE SAFETY SYSTEMS ON THIS CONVEYOR SECTION.

4. NO LIFE SAFETY SYSTEMS ON THIS CONVEYOR SECTION.

5. DEMO FIRE ALARM CIRCUIT AND INSTALL NEW AT ROOF STEEL.

6. A) DEMO FIRE ALARM CIRCUIT AND INSTALL NEW AT ROOF

STEEL.

B) DEMO FIRE SPRINKLER CROSS MAIN FROM CONVEYOR AND

INSTALL NEW WITH SUPPORTING HANGERS ATTACHED TO

ROOF STEEL.

C) DEMO SPRINKLER DROP TO DOCK BOX OFFICE AND INSTALL

NEW TO DOCK BOX OFFICE WITH SUPPORT HANGERS

ATTACHED AT ROOF STEEL.

7. A) DEMO AND CAP 5 SPRINKLER BRANCH LINES.

B) INSTALL SPRINKLER AND DROP AT COLUMN C-93. HANGERS

SHOULD BE ANCHORED AT ROOF STEEL.

8. A) UNINSTALL THE FIRE ALARM AUDIO-VISUAL CIRCUIT SERVING

THE DOCK BOX OFFICE. REINSTALL AFTER CONVEYOR DEMO.

B) NOT USED.

C) DEMOLISH FIRE SPRINKLER BRANCH LINE AND CAP AT THE

ISOLATION VALVE LOCATED AT THE WHITE HOUSE.

9. DEMO FIRE ALARM CIRCUIT AND INSTALL NEW AT ROOF STEEL.

10. A) NOT USED.

B) DEMO FIRE ALARM CIRCUIT AND INSTALL NEW AT ROOF

STEEL.

11. DEMO FIRE ALARM CIRCUIT AND INSTALL NEW AT ROOF STEEL.

12. A) DEMO FIRE ALARM CIRCUIT AND INSTALL NEW AT ROOF

STEEL.

B) NOT USED.

13. A) NOT USED.

B) DEMO FIRE ALARM CIRCUIT AND INSTALL NEW AT ROOF

STEEL.

14. A) NOT USED.

B) DEMO FIRE ALARM CIRCUITS AND INSTALL NEW AT ROOF

STEEL.

15. A) DEMO FIRE SYSTEM BRANCH LINES AT SPRINKLERS FROM

BELOW CONVEYOR MEZZANINE AND CAP CROSS MAIN.

B) DEMO FIRE ALARM CIRCUIT TO DOCK BOX OFFICE AND

INSTALL NEW WITH SUPPORTS FROM ROOF STEEL.

C) NOT USED.

16. NO LIFE SAFETY SYSTEMS IN THIS CONVEYOR SECTION.

A

/08 /26

RE

MO

VE

D

EX

IT

S

IG

NS

F

RO

M

TH

E

SC

OP

E

OF

W

OR

K

K K K K K K K K K K K K

L L L L L L L L L L L L

A

A

A

A

A

A

L

K

12 11

11 10

10 9 8 7 6 5 4 3 2 1

9 8 7 6 5 4 3 2 1

P

O

N

M

P

O

N

M

P

O

N

M

P

O

N

M

P

O

N

M

L

K

J

I

H

G

L

K

J

I

H

G

L

K

J

I

H

G

L

K

J

I

H

G

L

K

J

I

H

G

G

G

77 79

77 79

77 79

77 79

77 79

77 79

77 79

77 79

77 79

77 79

G

G

F

E

D

C

P

O

N

M

L

K

J

I

H

G

F

E

D

C

P

O

N

M

L

K

J

I

H

G

F

E

D

C

P

O

N

M

L

K

J

I

H

G

F

E

D

C

P

O

N

M

L

K

J

I

H

G

F

E

D

C

AISLE

AI

SL

E

OFFICE STORAGE

LABORATORY

SOUTH LABORATORY

NORTH VAULT V6

LA

DD

ER

OFFICE

BLOCK HOUSE

AI

SL

E

AI

SL

E

AI

SL

E

FPI

BOOTH

MEN WOMEN

CA

TW

AL

K

LA

DD

ER

AI

SL

E

AI

SL

E

AI

SL

E

AISLEAISLE

AISLE

AISLE

AISLE

AI

SL

E

AISLE

AI

SL

E

AI

SL

E

AI

SL

E

AI

SL

E

AI

SL

E

AISLE

AISLE

AISLE

AISLE

AI

SL

E

AI

SL

E

AISLE

AISLEAISLE AISLE AISLE

AI

SL

E

AISLE

AISLE

AISLE

AISLE

AISLE

AI

SL

E

AISLE

BREAK ROOM

BREAK ROOM

UP

PLASMA SPRAY

NORTH ANNEX

UP

UPCLOSET

OFFICE

OFFICE

OFFICE

OFFICE BREAK

ROOM

OFFICE

TOOL

CRIB TOOL

CRIB

AI

SL

E

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

OFFICE OFFICE

OFFICE

OFFICE

OFFICE

BREAK

ROOM

OFFICE

LADDER

AISLE

UP

UP

GUN

ROOM

ACTIVATED DIFFUSION

HEALING ROOM

UP

UP

OFFICE

TANKS

TA

NK

S

TA

NK

S

WELDING

CENTER

MILLING

CENTER

TURNING

CENTER

GRINDING

CENTER

CAGE

BLACK

LIGHT

BOOTH

OFFICE

OFFICEOFFICE

CAGE

BOOTH

BOOTH

STORAGEHEAT TREAT &

PLASMA SPRAY

PLASMA SPRAY & CONTROLLED GRINDING

QEC

GENERAL

SHOP

INDUCTION

WELDING

INDUCTION

WELDING

AUTOMATED

WELDING

RESISTANCE

WELDING

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH STORAGE WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

OFFICE

OFFICE

OFFICE

OFFICE

CMM

ROOM

OFFICE

OFFICE

OFFICE

STORAGE

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

TOOL

CRIB

STORAGE

WELDING

BOOTH

MENS

CASE

CO

M

PR

ES

SO

R

TU

RB

IN

E

SS

T/C ROTOR

RELOCATION SS

UP UP

OVEN

VTL VERTICAL

BORING

MILL

F100-229

ASSEMBLY/

DISASSEMBLY

MENS

RECORDS

STORAGE

UP

DF

UP

FI

RE

D

OO

R

FIRE DOORFIRE DOOR

FIRE DOOR

FIRE DOORFIRE DOORFIRE DOOR

FIRE DOOR

LT #6

5-4OC109

FENTON SYSTEM IN

C.

4-

OC

FE

NT

ON

S

YS

TE

M

IN

C.

CO

NT

RO

L

R

4-

OC

FE

NT

ON

S

YS

TE

M

IN

C.

CO

NT

RO

L

R

4-6

OC10906

FENTON SYSTEM INC.

CONTROL

R

4-

OC

FE

NT

ON

S

YS

TE

M

IN

C.

CO

NT

RO

L

P

4-2

OC10903

FENTON SYSTEM INC.

CONTROL

R

5-1

OC10909

FENTON SYSTEM INC.

CONTROL

P

2 3

13 12

73 74 75 76 77 78 79 80 82 83 84 85 86 87 88 89 9081

C

D

E

F

G

H

I

J

K

L

N

O

P

M

RA

MP

U P

F-104

FIRE ALARM AND SPRINKLER PLAN - AREA "B"

NTS

PROJECT LOCATIONB3001 KEY PLAN

OF

TI

N

KE

R

A

IR

F O

R C

E

BA

SE

, O

KL

AH

O M

A

PR

O

JE

C

T

IN

FO

R

M

AT

IO

N

D

ES

IG

N

F

IL

E

LO

C

AT

IO

N

R

EV

IS

IO

N S

M

AR

K

D

ES

IG

N

G R

O U

P:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

D

ES

IG

N

ED

B

Y:

D

AT

E D

ES

C

R

IP

TI

O

N

1 2 3 4 5

E

D

C

B

A

M

AN

AG

EM

EN

T

IN

FO

R M

AT

IO

N

1 2 3 4 5

E

D

C

B

A

IS

SU

E D

AT

E:

SHEET

SHEET NUMBER

SH

EE

T

TI

TL

E

AIR FORCE MATERIEL COMMAND

72 ABW CIVIL ENGINEER DIRECTORATE

TINKER AFB, OK

35%

DESIGN

W W

YK

RE

LO

CA

TE

F

IR

E

AL

AR

M

CI

RC

UI

T, B

, O

-P A

IS

LE

/1

5/

TE

PA

-C

SA

G

A M cP H

ER

SO

N

F-104

S

ST

AR

R

B

JI

M O

H

En gr

\D es ig n\

\2

5\

\S up po rt\ D ra w in gs

\M od el

FI

RE

A

LA

RM

A

ND

SP

RI

NK

LE

R

P

LA

N

AR

EA

"B

06 06

AREA OF WORK

AREA OF WORK

A R

EA

O

F W

O R

K

A R

EA

O

F W

O R

K

AREA OF WORK

AREA OF WORK

1. DEMO COMPLETE.

2. DEMO: FIRE SPRINKLER BRANCH LINES TO BOOTHS AND DOCK

BOX OFFICE.

3. NO LIFE SAFETY SYSTEMS ON THIS CONVEYOR SECTION.

4. NO LIFE SAFETY SYSTEMS ON THIS CONVEYOR SECTION.

5. DEMO FIRE ALARM CIRCUIT AND INSTALL NEW AT ROOF STEEL.

6. A) DEMO FIRE ALARM CIRCUIT AND INSTALL NEW AT ROOF

STEEL.

B) DEMO FIRE SPRINKLER CROSS MAIN FROM CONVEYOR AND

INSTALL NEW WITH SUPPORTING HANGERS ATTACHED TO

ROOF STEEL.

C) DEMO SPRINKLER DROP TO DOCK BOX OFFICE AND INSTALL

NEW TO DOCK BOX OFFICE WITH SUPPORT HANGERS

ATTACHED AT ROOF STEEL.

7. A) DEMO AND CAP 5 SPRINKLER BRANCH LINES.

B) INSTALL SPRINKLER AND DROP AT COLUMN C-93. HANGERS

SHOULD BE ANCHORED AT ROOF STEEL.

8. A) UNINSTALL THE FIRE ALARM AUDIO-VISUAL CIRCUIT SERVING

THE DOCK BOX OFFICE. REINSTALL AFTER CONVEYOR DEMO.

B) DEMO 2 EXIT SIGNS AND INSTALL NEW AFTER CONVEYOR

DEMO.

C) DEMOLISH FIRE SPRINKLER BRANCH LINE AND CAP AT THE

ISOLATION VALVE LOCATED AT THE WHITE HOUSE.

9. DEMO FIRE ALARM CIRCUIT AND INSTALL NEW AT ROOF STEEL.

10. A) NOT USED.

B) DEMO FIRE ALARM CIRCUIT AND INSTALL NEW AT ROOF

STEEL.

11. DEMO FIRE ALARM CIRCUIT AND INSTALL NEW AT ROOF STEEL.

12. A) DEMO FIRE ALARM CIRCUIT AND INSTALL NEW AT ROOF

STEEL.

B) NOT USED.

13. A) NOT USED.

B) DEMO FIRE ALARM CIRCUIT AND INSTALL NEW AT ROOF

STEEL.

14. A) NOT USED.

B) DEMO FIRE ALARM CIRCUITS AND INSTALL NEW AT ROOF

STEEL.

15. A) DEMO FIRE SYSTEM BRANCH LINES AT SPRINKLERS FROM

BELOW CONVEYOR MEZZANINE AND CAP CROSS MAIN.

B) DEMO FIRE ALARM CIRCUIT TO DOCK BOX OFFICE AND

INSTALL NEW WITH SUPPORTS FROM ROOF STEEL.

C) NOT USED.

16. NO LIFE SAFETY SYSTEMS IN THIS CONVEYOR SECTION.

CONVEYOR SECTIONS SHOWN IN PLAN

A

/08 /26

RE

MO

VE

D

EX

IT

S

IG

NS

F

RO

M

TH

E

SC

OP

E

OF

W

OR

K

P

O

N

M

L

K

J

I

H

G

F

E

D

C

P

O

N

M

L

K

J

I

H

G

F

E

D

C

P

O

N

M

L

K

J

I

H

G

F

E

D

C

89 91

89 91

89 91

89 91

89 91

89 91

89 91

89 91

89 91

89 91

89 91

89 91

89 91

89 91

P

O

N

M

L

K

J

I

H

G

F

E

D

C

P

O

N

M

L

K

J

I

H

G

F

E

D

C

P

O

N

M

L

K

J

I

H

G

F

E

D

C

P

O

N

M

L

K

J

I

H

G

F

E

D

C

P

O

N

M

L

K

J

I

H

G

F

E

D

C

99 101

99 101

99 101

99 101

99 101

99 101

99 101

99 101

99 101

99 101

99 101

99 101

99 101

99 101

P

O

N

M

L

K

J

I

H

G

F

E

D

C

P

O

N

M

L

K

J

I

H

G

F

E

D

C

P

O

N

M

L

K

J

I

H

G

F

E

D

C

P

O

N

M

L

K

J

I

H

G

F

E

D

C

P

O

N

M

L

K

J

I

H

G

F

E

D

C

103 105

103 105

103 105

103 105

103 105

103 105

103 105

103 105

103 105

103 105

103 105

103 105

103 105

103 105

107 109 111

107 109 111

107 109 111

107 109 111

107 109 111

107 109 111

107 109 111

107 109 111

107 109 111

107 109 111

107 109 111

107 109 111

107 109 111

107 109 111

AISLE AISLE AISLE

AI

SL

E

AI

SL

E

MEN

CMM

DISASSEMBLY AREA

OFFICE

TOOL CRIB

BLOCK HOUSE

AI

SL

E

AI

SL

E

AI

SL

E

AI

SL

E

FPI

BOOTH

UP

OFFICE

AI

SL

E

CAGE

CAGE

AISLE

AI

SL

E

AI

SL

E

AI

SL

E

AI

SL

E

AI

SL

E

AI

SL

E

AISLEAISLE

AISLE

AISLE

AI

SL

E

AISLEAISLE

AI

SL

E

AI

SL

E

AISLE

AI

SL

E

AI

SL

E

AI

SL

E

AISLE

AISLE

AISLEAISLE

AI

SL

E

AISLEAISLE

AI

SL

E

AISLE AISLE AISLE

LT

#7

BREAK ROOM

BREAK ROOM

UP

UP

UP

UP

OFFICE

WOMEN

UP

UP

OFFICE

OFFICE

OFFICE

OFFICE

OFFICEOFFICE

CAGE

BOOTH

BOOTH

TE

LE

PH

ON

E

WOMEN

OFFICE

IFM

RUBBER ROOM

LA

SE

R

HO

LO

GR

AP

HY

BO

OT

H

DARK ROOM CONTROL ROOM X-RAY ROOM

SOUND PROOF

BOOTH

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

BREAK ROOM

AISLE

BP-7

CO2 BLAST

BLAST &

CLEAN CELL

MATERIAL

REVIEW STATION

GLASS BEAD

BP-2 DRY

GLASS BEAD

BP-3 DRY

AL-OXIDE BP-5 WET

GLASS BEAD

BP-4 WET

AL-OXIDE

BP-8 DRY

PLASTIC BLAST

OFFICE

FIXTURE

STORAGE

WELDING

BOOTH

TOOL

CAGETOOL

CAGE

WELDING

BOOTH

WELDING

BOOTH

WELDING

BOOTH

STORAGE

STATORS

STATORS

F-SERIES

ROTORS

CH

EM

IC

AL

CL

EA

NI

NG

GENERAL

SHOP

PLS

TF33

ROTOR

CASE

NDI

OFFICE

OFFICE

ACID ETCH ROOM

UP

UP

UP

UP

U P

BLACK LIGHT

INSPECTION

TOOL CRIB

MAINTENANCE PLATFORM

BREAK ROOM

OFFICE OFFICE

OFFICE

MAINTENANCE PLATFORM

96" AFF

CASE

QEC

WCD

RECEIVING

AUGMENTOR

ASSEMBLY/

POWER WASH

CO

M

PR

ES

SO

R

TU

RB

IN

E

SS ENGINE

CE

NT

RA

L

LO

G

IS

TI

CS

EDDY

CURRENT

BLAST

CLEAN

F100-229

ASSEMBLY/

DISASSEMBLY

DR

C

OF

FI

CE

PMXG ENGINEERING

SUPPORT OFFICE

72 COMMUNICATION

SQUADRON

UP

4 1/2"

OFFICE

6"

32"

SLOPE

CO

PI

ER

4"

DF

MEN

DF

FI

RE

D

OO

R

M

EN

G

W

OM

ENJA

N

ME

N

AISLEAISLE

CONTROL

ROOM

LADDER

JANITOR

CLOSET

4-

OC

FE

NT

ON

S

YS

TE

M

IN

C.

CO

NT

RO

L

P

4-2

OC10903

FENTON SYSTEM INC.

CONTROL

R

3-2

OC10899

FENTON SYSTEM INC.

CONTROL

R

1-

OC

FE

NT

ON

S

YS

TE

M

IN

C.

CO

NT

RO

L

P

2-23

OC10896

FENTON SYSTEM INC.

CONTROL

R

2-

OC

FE

NT

ON

S

YS

TE

M

IN

C.

CO

NV

C

ON

TR

OL

P

PLATFORM

PLATFORM

DR

OP

S

TA

. 5

OC

NO

S

ER

IA

L N

UM

BE

R

N/ A

11 10 9 15

87 88 89 90 92 93 94 95 96 97 98 99 100 102 103 104 105 106 107 108 109 110 11191 101

C

D

E

F

G

H

I

J

K

L

N

O

P

M

RA

MP

U P

01-250003-G101
Sheets and Views
G101
02-250003-F100
Sheets and Views
F101
03-250003-F101
Sheets and Views
F101
04-250003-F102
Sheets and Views
F102
05-250003-F103
Sheets and Views
F103
06-250003-F104
Sheets and Views
FD104

File details come from the government source that posted it. Updated .