250003_ATT11_DRWGS.pdf
PDF 3 MB Posted
- Solicitation number
- FA813726R0013
About this file
This is a set of construction design drawings for a federal contract at Tinker Air Force Base, Oklahoma, specifically for relocating fire alarm circuits in Building B3001 along the O-P aisle. The project is designated WWYK250003 and is at 35% design completion as of October 15, 2025. The Air Force Materiel Command's 72nd Air Base Wing Civil Engineer Directorate is overseeing the work through the TEPA-CSAG design group.
The primary scope involves removing fire alarm and mass notification devices from an existing conveyor structure and fire sprinkler piping supported by that conveyor, then installing new code-compliant alarm and sprinkler equipment within the work area. New exit signs will be provided and mounted per NFPA 101 requirements but will not be connected to primary power circuits under this project. The work encompasses 16 conveyor sections listed in order of priority, with sections 15 and 9 as the highest priorities. The construction documents include general notes, vicinity maps, fire alarm and sprinkler composite plans, and detailed area plans showing the project location relative to the broader Tinker AFB facility. Key requirements include coordination with existing fire protection systems, hot work procedures per NFPA 51B, shop drawing submissions with NICET Level III technician design and Qualified Fire Protection Engineer review, and simultaneous commissioning and testing of fire suppression and fire alarm systems in accordance with UFC and NFPA standards. The contractor is responsible for final installation design, sizing confirmation, and ensuring all materials bear third-party testing and approval labels suitable for fire protection applications.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REVIEWED BY:
REVIEWED BY:
USING AGENCY:
ASBESTOS EVALUATION:
SAFETY:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
DATE:
INDUSTRIAL HYGIENE:
DATE:
PROJECT DRAWING INDEX SIGNATURES
CORROSION ENGINEER: (CECE)
CE OPERATIONS: (CECO)
COMMUNICATIONS: (COMM)
CHIEF ENGINEER DIR: (CECE)
CHIEF DESIGN BRANCH: (CECE)
DESIGN MANAGER: (CECE)
ZONE MANAGER:
CONSTRUCTION MANAGEMENT: (CECE)
ENVIRONMENTAL:
BASE CIVIL ENGINEER: (CE)
FIRE DEPARTMENT
GENERAL1. BRAND NAMES: REFERENCE TO SPECIFIC BRAND NAMES
OR COMPANIES IS FOR THE PURPOSE OF ESTABLISHING
MINIMUM QUALITY STANDARDS, IDENTIFICATION AND
GUIDANCE AND IS NOT INTENDED TO LIMIT SELECTION OF
OTHER MANUFACTURERS THAT ARE EQUAL OR EXCEED
THE SPECIFIED ITEMS IN TERMS OF PHYSICAL
PROPERTIES, INCLUDING, COLOR RANGE, FINISH,
DURABILITY, APPEARANCE, PERFORMANCE
CHARACTERISTICS, AND OTHER FACTORS. OTHER
PRODUCTS, MATERIALS, COLORS AND SYSTEMS, MAY BE
SUBMITTED FOR EVALUATION AND
APPROVAL/DISAPPROVAL BY THE CONTRACTING OFFICER.
2. THIS SET OF CONSTRUCTION DOCUMENTS SHALL BE
CONSIDERED AS A WHOLE IN THAT THE GENERAL
CONTRACTOR AND ALL THE SUB-CONTRACTORS ARE
RESPONSIBLE FOR THE INFORMATION PRESENTED ON ALL
SHEETS ON THE SET OF DRAWINGS AND ALL SECTIONS OF
THE SPECIFICATIONS.
3. THE CONTRACTOR IS RESPONSIBLE FOR ERECTING ALL
CONSTRUCTION FENCING AND BARRICADES AS REQUIRED
TO PROTECT CONSTRUCTION MATERIAL AND TO PREVENT
ANY UNAUTHORIZED PERSONNEL FROM ENTERING THE
CONSTRUCTION SITE.
4. ANY DAMAGE TO THE EXISTING GROUNDS OR FACILITIES
CAUSED BY CONSTRUCTION TRAFFIC OR ANY
CONSTRUCTION OPERATION SHALL BE REPAIRED OR
REPLACED BY THE CONTRACTOR TO MATCH OR EXCEED
EXISTING CONDITIONS AT NO ADDITIONAL COST TO THE
GOVERNMENT.
5. ALL WORK NOTED & LOCATED IN THESE DOCS SHALL BE
UNDERSTOOD BY THE CONTRACTOR TO REQUIRE ALL NEW
LABOR & MATERIALS UNLESS SPECIFICALLY NOTED TO BE
"EXISTING" OR "BY OTHERS".
6. THE PURPOSE OF THIS PROJECT IS TO REMOVE THE FIRE
ALARM AND MASS NOTIFICATION DEVICES FROM THE
CONVEYOR AS WELL AS REMOVING THE FIRE SPRINKLER
PIPING SUPPORTED BY THE CONVEYOR STRUCTURE. THE
CONTRACTOR WILL INSTALL NEW ALARM AND SPRINKLER
EQUIPMENT FOR CODE COMPLIANT COVERAGE WITHIN
THE SCOPE OF WORK AREA. NEW EXIT SIGNS WILL ALSO
BE PROVIDED AND INSTALLED AS REQUIRED IN NFPA 101 IN
THE SCOPE OF WORK AREA. THE EXIT SIGNS WILL NOT BE
CONNECTED TO THE PRIMARY POWER CIRCUITS UNDER
THE SCOPE OF THIS PROJECT, ONLY PROVIDED AND
MOUNTED IN THE APPROPRIATE LOCATIONS.
WWYK250003
RELOCATE FIRE ALARM
CIRCUIT, B3001, O-P AISLE
KEY PLAN:
GENERAL NOTES:
PROJECT
LOCATION 1 G-101 GENERAL NOTES & VICINITY MAP
SHT.SEQ. SHEET TITLE
OF
TI
N
KE
R
A
IR
F O
R C
E
BA
SE
, O
KL
AH
O M
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
35%
DESIGN
W W
YK
RE
LO
CA
TE
F
IR
E
AL
AR
M
CI
RC
UI
T, B
, O
-P A
IS
LE
/1
5/
TE
PA
-C
SA
G
A M cP H
ER
SO
N
G-101
S
ST
AR
R
B
JI
M O
H
En gr
\D es ig n\
\2
5\
\S up po rt\ D ra w in gs
\M od el
GE
NE
RA
L N
OT
ES
AN
D
VI
CI
NI
TY
M
AP
01 06
F-101 FIRE ALARM AND SPRINKLER COMPOSITE PLAN
F-102 F-103
6 F-104
FIRE ALARM AND SPRINKLER COMPOSITE PLAN
FIRE ALARM AND SPRINKLER PLAN AREA "A"
FIRE ALARM AND SPRINKLER PLAN AREA "B"
DISCIPLINE
2 F-100 NOTES
A
/08 /26
RE
MO
VE
D
EX
IT
S
IG
NS
F
RO
M
TH
E
SC
OP
E
OF
W
OR
K
B
/14 /26
AD
DE
D
MO
DI
FI
ED
E
XI
T
SI
GN
S
CO
PE
TAXIWAY A
TAXIWAY J
TA
XI
W
AY
G
TAXIWAY A
TAXIWAY C
Soldier Creek
So ld ie r C re ek
Soldier C reek
Soldier C reek
3220 3707
62540
62509 62528
62523
62501X
43774
62512
62516
62525
99999
62543
33001
62501
43609
62517
62515
62526
62527
62503
62513
62542
62501OK
62501
62502
62501
62514
62501
43120
43610
62522
St af f D r.
W ar eh ou se R d.
Turbine Dr.
Ea st
D r.
W es t D r.
Bradley Dr.
Entrance Road "C"
Entrance Road "A"
Turbine Dr.
R U
N W
AY
8/
RUNWAY 13/31
TA
XI
W
AY
G
TAXIW
AY H
TAXIWAY B
TAXIWAY C
TAXIWAY M
TA
XI
W
AY
K
TAXIWAY E
TAXIWAY A
TA
XIW
AY E
E
TAXIWAY F
TAXIWAY D
TAXIWAY E
TAXIWAY J
TA
XI
W
AY
G
TAXIWAY A
TAXIW
AY H
TAXIWAY C
TAXIWAY D
TAXIWAY EE
TAXIWAY F
Elm C reek
Crutcho Creek
Kuhlman Creek
Soldier Creek
Kuhlman Creek
Elm C reek
East Crutcho Creek
Elm Creek
El m
C re ek
Elm Creek
Elm C reek
Elm CreekElm C reek
Ku hlm an C re ek
Ea st
C ru tc ho
C re ek
Elm C ree k
West Crutcho Creek
W es t C ru tc ho
C re ek
Elm Creek
Soldier Creek
Elm C reek
Soldier CreekSoldier Creek
Ea st
C ru tc ho
C re ek
Elm Creek
Ea st
C ru tc ho
C re ek
East C rutcho C reek
Soldier Creek
So ld ie r C re ek
East C rutch o Creek
Soldier C reek
Soldier C reek
So ld ie r C re ek
East Crutcho Creek
416506
21222121
59475946
11401128
62540
61089
838837
62509
62528
62523
62501X
43774
62512
62516
62525
3592135916
99999
62543
32101
71086
53902
50414
55300
56601
930G
948-E
911-E
948-W
61019
911-W
33001
35913
62501
65672
930S
45134
43609
42116
62517
62515
62526
62527
62503
62513
61289
62542
62501OK
11289
62501
15930
15908
15904
15904
15908
15908
15904
15904
15908
62502
41046
62501
62514
62501
61018
71089
45134
96022
43120
41157
44045
45815
40592
43610
62522
41163
15930
15930
11824
SE 74th St
SE 59th St.
Ai r D ep ot
St af f D r.
"A " A ve
M un iti on s R d.
W ar eh ou se R d.
"B " A ve
"H " A ve
M cN ar ne y Av e.
Al er t R d.
"E "A ve
Sentry Rd.
5th Ave.
Jo ne s
To w er R d.
Vanaman Rd.
So ut h St
Ai r D ep ot
Ai r D ep ot
Rapcon Rd.
Reserve Rd
Mercury Rd.
O ld
A ir
De po t
Airey Dr.
General Motors Dr
Vandenberg Dr.
Hi llt op R d.
Dormitory Rd.
Chennault Dr.
M itc he ll A ve
Spaatz Dr.
3rd Ave.
Ai r D ep ot
B lv d
Turbine Dr.
Central Plant Dr.
6th St.6th St.
Blackb ird
Dr.
Thunderbolt D r.
Munitions Rd. Ext.
Codding Rd.
Starlifter Dr.
Co rs ai r D r.
Ra pt or Ct
N ig ht H aw k
Ct
Fr an kl in
Po w er ho us e
Dr
Sk ym as te r D r.
Spaatz Ct.
M un de ll
Nabors Dr.
M cN ickle
Ta il
Fe at he r D r.
Holden Dr.
Smith Ct.
Air Dep ot
1st St.
TAXIWAY F
Mercury Rd.
Ra ily ar d
Rd
He rc ul es
R d.
"F " A ve
96021
Arnold St.
Ea st
D r.
Patrol Rd.
Reserve Rd.
5th Ave
7th St.
Mitchell Ave
Co ok
A ve
W es t D r.
Extender Dr.
34th St.
Twining Dr.
Globemaster Dr.
In du st ria l B lv d.
1st St.
Do ol itt le
A ve
Pi cn ic R d.
Ja m es D r.
W ol fe D r.
"D " A ve
Perimeter Rd.
"L " A ve
1st St.
Br ow n Dr
Po nd
R d.
Bradley Dr.
Entrance Road "C"
Entrance Road "A"
"C " A ve
"C " A ve
Do rm ito ry
R d.
"M " A ve
Co m m od ity D r.
Doolittle Ave
W hi te D r.
"D " D riv e
Ba ll
Pa rk
R d.
Joint STARS Dr.
Turbine Dr.
Falco n Dr.
W ey la nd
L oo p
Pegasus Dr.
Chidlaw Ct.
Ph an to m
D r.
La w re nc e
In tr ud er
D r.
M cN ic kl e
M ill er D r.
Ai re y C ir.
Ra ve n Ct
. Ai r D ep ot
Vanaman Rd.
1st St.
Ra w li ng s A ve
Mitc he ll A ve
Pr op ul sio n Dr
Stratofortress Dr.
Arnold St.
TINKER AFB, OK
VICINITY MAP
CONTRACTING
B3
GOTT
GATE
TINKER GATE
PASS & ID B6611
EAKER GATE
FIRE DEPARTMENT
B117
VANCE
GATE
LIBERATOR GATE
HOPE
GATE
LEGEND
CONTRACTOR
HAUL ROUTE
LANCER GATE
TRUCK GATE
PIAZZA GATE
BASE CIVIL
ENGINEER
B400
PROJECT LOCATION
BASE OPERATIONS
B240
HRUSKOCY GATE
OF
TI
N
KE
R
A
IR
F O
R C
E
BA
SE
, O
KL
AH
O M
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
35%
DESIGN
W W
YK
RE
LO
CA
TE
F
IR
E
AL
AR
M
CI
RC
UI
T, B
, O
-P A
IS
LE
/1
5/
TE
PA
-C
SA
G
A M cP H
ER
SO
N
F-100
S
ST
AR
R
B
JI
M O
H
En gr
\D es ig n\
\2
5\
\S up po rt\ D ra w in gs
\M od el
FI
RE
A
LA
RM
A
ND
SP
RI
NK
LE
R
NO
TE
S
02 06
SPRINKLER SYSTEM DEMOLITION NOTES:
1.
2.
3.
4.
5.
CONTRACT DOCUMENTS WERE PREPARED FROM FIELD SURVEYS.
THEY ARE NOT INTENDED TO DEPICT UNFORESEEN CONDITIONS
THAT MAY ADVERSELY AFFECT THE ARCHITECTURAL, ELECTRICAL,
AND MECHANICAL SYSTEM DEMOLITION OR INSTALLATION.
CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS PRIOR TO
STARTING ANY WORK.
THE EXISTING BUILDING SPRINKLER SYSTEM LOCATED OUTSIDE OF
THE WORK AREA SHALL REMAIN OPERATIONAL AT ALL TIMES. THE
FIRE ALARM SYSTEM SHALL MONITOR THE SPRINKLER SYSTEM
WATER FLOW AND VALVE TAMPER DEVICES AT ALL TIMES.
SUPERVISE ALL FIRE PROTECTION IMPAIRMENTS IN ACCORDANCE
WITH UFC 3-601-02. NO SPRINKLER HEADS SHALL BE DEMOLISHED
UNTIL THE BUILDING OCCUPANTS HAVE BEEN REMOVED FROM THE
AFFECTED PORTION OF THE BUILDING.
PERFORM DEMOLITION AND INSTALLATION IN A MANNER THAT SHALL
HAVE LEAST ADVERSE EFFECT ON NORMAL BUILDING OPERATION.
CONTRACTOR SHALL COORDINATE DEMOLITION AND INSTALLATION
WITH THE BUILDING USER AND THE GOVERNMENT.
HOT WORK ASSOCIATED WITH DEMOLITION AND CONSTRUCTION
SHALL BE PERFORMED IN ACCORDANCE WITH NFPA 51B.
SAFEGUARDS FOR HOT WORK OPERATIONS INCLUDE, BUT ARE NOT
LIMITED TO THE RELOCATION OF COMBUSTIBLE STORAGE, THE USE
OF FIRE RESISTIVE BARRIERS TO PROTECT COMBUSTIBLES THAT
CANNOT BE RELOCATED, THE ESTABLISHMENT OF FIRE WATCH AND
THE TERMINATION OF HOT WORK OPERATIONS WHEN FIRE
PROTECTION SYSTEMS ARE OUT OF SERVICE. ADDITIONALLY, HOT
WORK SHOULD NOT BE PERFORMED WHEN ALTERNATIVE METHODS
CAN BE EMPLOYED TO DISMANTLE EXISTING OR ASSEMBLE NEW
SYSTEMS.
THE CONTRACTOR SHALL PROVIDE PORTABLE FIRE EXTINGUISHERS
SUITABLE FOR THE COMBUSTIBLES PRESENT DURING
CONSTRUCTION. WHERE EXISTING BUILDING EXTINGUISHERS AREA
BLOCKED, REMOVED OR GENERALLY MADE INACCESSIBLE TO THE
BUILDING OCCUPANTS, SUPPLEMENTAL EXTINGUISHERS SHALL BE
PROVIDED SUCH THAT A PORTABLE FIRE EXTINGUISHER IS LOCATED
WITHIN 75 FT OF ALL AREAS OF THE BUILDING. THE CONTRACTOR
SHALL REGULARLY INSPECT (AT LEAST WEEKLY) PORTABLE
EXTINGUISHERS LOCATED WITHIN THE WORK AREA TO ENSURE THAT
THEY ARE CHARGED, FREE FROM DAMAGE AND ACCESSIBLE.
SPRINKLER SYSTEM GENERAL NOTES:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
CONTRACTOR IS RESPONSIBLE FOR FINAL INSTALLATION DESIGN
AND COORDINATION. SIZING OF FIRE SUPPRESSION COMPONENTS
WILL BE CONFIRMED BY CONTRACTOR. DESIGNER WILL BE A
MINIMUM NICET LEVEL III TECHNICIAN.
THESE DRAWINGS ARE CONCEPTUAL IN NATURE AND DEVICE
PLACEMENTS ARE REPRESENTATIVE. CONTRACTOR TO VERIFY AND
PROVIDE FULL DESIGN IN ACCORDANCE WITH APPLICABLE CODES
(UFC, ICC, NFPA, ETC.).
THE FIRE SPRINKLER CONTRACTOR WILL COORDINATE WITH THE
FIRE ALARM CONTRACTOR AND OTHER TRADES FOR PROVISION OF
CONNECTIONS BETWEEN THEIR RESPECTIVE SYSTEMS.
ALL MATERIALS ARE TO BE UL LISTED OR FM APPROVED FOR USE IN
FIRE PROTECTION SYSTEMS.
COMMISSIONING AND PRELIMINARY AND FINAL ACCEPTANCE
TESTING WILL BE IN ACCORDANCE WITH SPECIFICATION SECTIONS
21 13 13 WET PIPE SPRINKLER SYSTEM, FIRE PROTECTION.
COORDINATE TESTING WITH OTHER TRADES AND BASE PERSONNEL
PRIOR TO OPERATION. ALL FIRE SUPPRESSION AND FIRE ALARM
TESTING WILL OCCUR SIMULTANEOUSLY TO EXPEDITE
COMMISSIONING.
THE BUILDING FIRE PROTECTION WATER SUPPLY IS SERVED BY
EXISTING FIRE PUMPS.
WHERE PIPES PASS THROUGH FIRE WALLS, FIRE BARRIERS, FIRE
PARTITION, OR FLOORS, A FIRE SEAL WILL BE PLACED BETWEEN THE
PIPE AND SLEEVE IN ACCORDANCE WITH SECTION 07 84 00
FIRESTOPPING.
SLEEVES PENETRATING CONCRETE, MASONRY WALLS OR CONCRETE
FLOORS WILL BE CUT FLUSH WITH EACH SURFACE. SLEEVE SIZES
AND CLEARANCE BETWEEN PIPE AND SLEEVE WILL BE IN
ACCORDANCE WITH NFPA 13.
SPRINKLERS WILL BE SPACED IN ACCORDANCE WITH NFPA 13
OBSTRUCTION REQUIREMENTS. PROVIDE SPRINKLERS UNDER
STAIRS, CATWALKS, PLATFORMS, SHED STRUCTURES, ETC. AS
REQUIRED PER NFPA 13.
PROVIDE HEAD GUARDS IN AREAS SUBJECT TO DAMAGE OR HEADS
INSTALLED LOWER THAN SEVEN FEET ABOVE FLOOR.
PROVIDE HEAD GUARDS WITH WATER SHIELDS FOR ALL HEADS
INSTALLED BENEATH OPEN GRATED PLATFORMS.
VALVES LOCATED MORE THAN 8 FOOT ABOVE FINISHED FLOOR AND
NOT READILY ACCESSIBLE FROM MEZZANINE WILL BE PROVIDED
WITH CHAIN OPERATORS.
PROVIDE ACCESS DOORS AND SIGNAGE WHERE ACCESS IS
REQUIRED TO CONCEALED SPRINKLER EQUIPMENT, VALVES, AND
CONTROLS. LOCATIONS TO BE APPROVED BY CONTRACTING
OFFICER.
PROVIDE PERMANENT LABELS ON WET-PIPE RISERS TO INDICATE
WHICH ZONE EACH ONE SERVES.
PROVIDE PERMANENT LABELS INDICATING NORMAL OPERATING
POSITION ON ALL VALVES INCLUDING, BUT NOT LIMITED TO,
SECTIONAL VALVES, INSPECTOR'S TEST VALVES, AND DRAIN VALVES.
MODIFIED SYSTEM, CONSTRUCTION (SHOP) DRAWINGS AND
CALCULATIONS MUST PREPARED BY AN INDIVIDUAL THAT HAS
OBTAINED NATIONAL INSTITUTE FOR CERTIFICATION IN ENGINEERING
TECHNOLOGIES, FIRE ALARM SYSTEMS, LEVEL III CERTIFICATION, AT
A MINIMUM. THE QFPE MUST REVIEW THE SHOP DRAWINGS,
CALCULATION AND MATERIALS SUBMITTALS. THE SHOP DRAWINGS
MUST BEAR THE REVIEW STAMP OF THE QFPE PRIOR TO SUBMITTING
THE FIRE SPRINKLER SHOP DRAWINGS TO THE GOVERNMENT.
SUBMIT SHOP DRAWINGS AND CALCULATIONS TO THE GOVERNMENT
FOR REVIEW, IN A MANNER AS REQUIRED PER NFPA 13 AND UFC
3-600-01. SUBMIT EQUIPMENT DATA SHEETS FOR A COMPLETE
INSTALLATION OF THE FIRE SPRINKLER SYSTEM.
APPROVED SHOP DRAWINGS, TESTING PLANS,
DATA SHEETS, AND CALCULATIONS ARE REQUIRED PRIOR TO
COMMENCEMENT OF WORK. THE FIRE SPRINKLER SYSTEM SUBMITTAL
SHALL BE A COMPLETE PACKAGE, PARTIAL SUBMITTAL WILL NOT BE
ACCEPTED.
FIRE ALARM AND MASS
NOTIFICATION DEMOLITION NOTES:
1.
2.
3.
4.
5.
6.
CONTRACT DOCUMENTS WERE PREPARED FROM FIELD SURVEYS.
THEY ARE NOT INTENDED TO DEPICT UNFORESEEN CONDITIONS
THAT MAY ADVERSELY AFFECT DEMOLITION OR INSTALLATION.
CONTRACTOR SHALL FIELD VERIFY EXISTING CONDITIONS PRIOR TO
STARTING ANY WORK.
THE BUILDING FIRE ALARM SYSTEM OUTSIDE THE PROJECT AREA
SHALL REMAIN OPERATIONAL AT ALL TIMES. SUPERVISE FIRE
PROTECTION IMPAIRMENTS IN ACCORDANCE WITH UFC 3-601-02. NO
FIRE ALARM DEVICES SHALL BE DEMOLISHED UNTIL THE BUILDING
OCCUPANTS HAVE BEEN REMOVED FROM THAT PORTION OF THE
BUILDING OR FIRE WATCH IN PLACE.
PROVIDE PROTECTION AS REQUIRED TO PREVENT DAMAGE
TO EXISTING EQUIPMENT.
COORDINATE DEMOLITION WITH NEW WORK. IF UNDOCUMENTED
CONDITIONS EXIST, CONTACT THE CONTRACTING OFFICER BEFORE
PROCEEDING.
PROTECT EXISTING CONDITIONS INCLUDING BUT NOT LIMITED TO:
STRUCTURES, CEILING, WALLS, EQUIPMENT, UTILITIES, ETC. DAMAGE
TO EXISTING CONDITIONS SHALL BE REPAIRED AT NO ADDITIONAL
COST TO THE GOVERNMENT.
THE BUILDING WILL BE OCCUPIED DURING CONSTRUCTION.
COORDINATE WORK WITH GOVERNMENT PRIOR TO COMMENCING
WORK. CONTRACTOR SHALL BE RESPONSIBLE FOR WORKING
AROUND OCCUPANT SCHEDULE AS DETERMINED BY THE
GOVERNMENT AND MAINTAIN MINIMUM IMPACT DUE TO
CONSTRUCTION.
FIRE ALARM AND MASS
NOTIFICATION GENERAL NOTES:
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
MODIFY THE EXISTING FIRE ALARM AND MASS NOTIFICATION
SYSTEM AS INDICATED ON THE CONTRACT DOCUMENTS, AS
EVIDENTLY INTENDED AND IN ACCORDANCE WITH NFPA 70 2023 EDITION,
NFPA 72 2025 EDITION, UFC 3-600-01 WITH CHANGE 6, 05/06/2021, AND
TINKER AFB FIRE PROTECTION STANDARDS, 2023. THE DRAWINGS
ARE DIAGRAMMATIC IN NATURE AND INDICATE GENERAL
ARRANGEMENTS OF SYSTEMS AND WORK, BUT DO NOT INCLUDE ALL
INTERCONNECTIONS BETWEEN OTHER SYSTEMS. PROVIDE CONDUIT,
BACK BOXES, RACEWAY AND WIRING AS REQUIRED TO ACCOMPLISH
THE FUNCTIONS INTENDED AND REQUIRED BY CODE.
COORDINATE WORK WITH THAT OF OTHER TRADES SO AS TO AVOID
CONFLICTS. RESOLVE CONFLICTS THROUGH THE A/E PRIOR TO
ROUGH-IN. FAILURE TO PROVIDE SUCH COORDINATION PRIOR TO
WORK BEING INSTALLED SHALL NOT BE CAUSE FOR ADDITIONAL
COMPENSATION TO THE CONTRACTOR, AND MAY RESULT IN
REJECTION OF THE WORK.
COMMISSIONING AND PRELIMINARY AND FINAL ACCEPTANCE
TESTING WILL BE IN ACCORDANCE WITH SPECIFICATION SECTIONS
28 31 76 FIRE ALARM AND MASS NOTIFICATION SYSTEM, FIRE
PROTECTION. COORDINATE TESTING WITH OTHER TRADES AND BASE
PERSONNEL PRIOR TO OPERATION. ALL FIRE SUPPRESSION AND
FIRE ALARM TESTING WILL OCCUR SIMULTANEOUSLY TO EXPEDITE
COMMISSIONING.
THE BUILDING FIRE ALARM AND MASS NOTIFICATION SYSTEM SHALL
REMAIN OPERATIONAL AT ALL TIMES. SUPERVISE ALL FIRE
PROTECTION IMPAIRMENTS IN ACCORDANCE WITH UFC 3-601-02. NO
PORTION OF THE BUILDING SHALL BE OCCUPIED UNTIL THE FIRE
ALARM DEVICES HAVE BEEN INSTALLED OR FIRE WATCH IN PLACE.
PROVIDE NEW MATERIALS, BEARING LABELS OR MARKING
INDICATING THIRD PARTY TESTING AND APPROVAL, SUITABLE FOR
THE APPLICATION INTENDED.
INSTALL FIRE ALARM CABLE IN METAL RACEWAY. FREE-RUN CABLE IS
NOT PERMITTED. RACEWAY SHALL BE CONCEALED IN FINISHED
SPACES, AND MAY BE INSTALLED EXPOSED IN UNFINISHED SPACES
SUCH AS MECHANICAL AND ELECTRICAL ROOMS. INSTALL RACEWAY
PERPENDICULAR OR PARALLEL TO THE BUILDING'S STRUCTURAL
COMPONENTS. RACEWAY SHOULD BE 3/4 INCH RED EMT.
PROVIDE PULL AND JUNCTION BOXES AS REQUIRED TO MEET CODE
AND INSTALLATION REQUIREMENTS. PULL AND JUNCTION BOXES
SHALL BE CONCEALED IN FINISHED SPACES. COORDINATE WITH
OTHER TRADES SO AS TO AVOID CONFLICTS. BOXES TO BE RED.
SUPPORT CONDUIT AND BACK BOXES BY MEANS OF ANCHORS,
RODS, HANGERS, ETC., TO MAINTAIN ALIGNMENT AND PREVENT
MOVEMENT. SUPPORT CEILING MOUNTED BACK BOXES WITH "T"
HANGERS OR EQUAL METHOD OF SUPPORT. BACK BOXES SHALL NOT
BE SUPPORTED SOLELY BY CONDUIT.
IDENTIFY CONDUCTORS AT EACH JUNCTION BOX, OUTLET BOX,
CABINET, PULL BOX, ETC., WITH VINYL HEAT SHRINK TAGS
INDICATING PANEL AND CIRCUIT NUMBER, CONTROL WIRE
IDENTIFICATION NUMBER, OR OTHER APPROPRIATE INFORMATION.
WHERE CONDUIT PASS THROUGH FIRE WALLS, FIRE BARRIERS, FIRE
PARTITION, OR FLOORS, A FIRE SEAL WILL BE PLACED BETWEEN THE
PIPE AND SLEEVE IN ACCORDANCE WITH REQUIRED
FIRESTOPPING.
SEAL PENETRATIONS AT FIRE OR SMOKE RATED CONSTRUCTION
WITH FIRESTOPPING MATERIALS APPROVED AND LISTED FOR THE
RATING OF THE CONSTRUCTION TO BE PENETRATED. PROVIDE
DOCUMENTATION FOR EACH PENETRATION SEALING SYSTEMS FOR
VERIFICATION OF PROPER INSTALLATION.
PERFORM WORK ON DE-ENERGIZED SYSTEMS ONLY TO PREVENT
PERSONNEL INJURY AND POTENTIAL SYSTEM FAILURE. WHERE
WORK ON EXISTING SYSTEMS SHALL REQUIRE INTERRUPTION OF
ELECTRICAL SERVICE, TEMPORARY PROVISIONS ACCEPTABLE TO
THE OWNER SHALL BE REQUIRED.
MODIFIED SYSTEM, CONSTRUCTION (SHOP) DRAWINGS AND
CALCULATIONS MUST PREPARED BY AN INDIVIDUAL THAT HAS
OBTAINED NATIONAL INSTITUTE FOR CERTIFICATION IN ENGINEERING
TECHNOLOGIES, FIRE ALARM SYSTEMS, LEVEL III CERTIFICATION, AT
A MINIMUM. THE QFPE MUST REVIEW THE SHOP DRAWINGS,
CALCULATIONS AND MATERIAL SUBMITTALS. THE SHOP DRAWINGS
MUST BEAR THE REVIEW STAMP OF THE QFPE PRIOR TO SUBMITTING
THE FIRE ALARM AND MASS NOTIFICATION SYSTEM SHOP DRAWINGS
TO THE GOVERNMENT.
SUBMIT SHOP DRAWINGS AND CALCULATIONS TO THE GOVERNMENT
FORE REVIEW, IN A MANNER AS REQUIRED PER NFPA 72 AND UFC
3-600-01. SUBMIT EQUIPMENT DATA SHEETS FOR A COMPLETE
INSTALLATION OF THE FIRE ALARM AND MASS NOTIFICATION
SYSTEM. APPROVED SHOP DRAWINGS, TESTING PLANS,
DATA SHEETS, AND CALCULATIONS ARE REQUIRED PRIOR TO
COMMENCEMENT OF WORK. THE FIRE ALARM AND MASS
NOTIFICATION SYSTEM SUBMITTAL
SHALL BE A COMPLETE PACKAGE, PARTIAL SUBMITTAL WILL NOT BE
ACCEPTABLE.
EXISTING BUILDING SCOPE EXTENTS:
1.
2.
UFC 3-600-01, SECTION 34-1.1, EXISTING FACILITIES, MINIMUM REQUIREMENTS:
FACILITIES AS THEY EXIST, MUST MEET THE REQUIREMENTS OF NFPA 101,
FOR EXISTING OCCUPANCIES. FACILITIES THAT DO NOT MEET THE
REQUIREMENTS OF NFPA 101 FOR EXISTING OCCUPANCIES MUST CONFORM
TO ONE OF THE FOLLOWING:
A. UPGRADE THE DEFICIENCY TO MEET THE EXISTING OCCUPANCY
REQUIREMENTS, OR
B. ESTABLISH MANAGEMENT PROTOCOLS TO PROVIDE A LEVEL OF LIFE
SAFETY EQUIVALENT TO THAT REQUIRED BY NFPA 101 FOR
EXISTING OCCUPANCIES, UNTIL AN UPGRADE PROJECT CAN BE
COMPLETED. MANAGEMENT PROTOCOLS MUST BE IN WRITING
AND APPROVED BY THE COMPONENT FIRE PROTECTION
ENGINEER.
UFC 3-600-01, 34-1.2.1, WORK IN EXISTING FACILITIES:
CONFORM TO THE REQUIREMENTS OF THE BUILDING REHABILITATION
CHAPTER OF NFPA 101 FOR DESIGN AND CONSTRUCTION PROJECTS IN
EXISTING BUILDINGS EXCEPT AS SPECIFIED IN UFC 3-600-01.
A. THE ENTIRE FACILITY, AT A MINIMUM, MUST COMPLY WITH THE
APPLICABLE EXISTING OCCUPANCY CHAPTER OF NFPA 101
BEFORE BEGINNING THE PROJECT FOR WORK IN EXISTING
FACILITIES. THE PROJECT MAY INCLUDE BRINGING THE FACILITY
INTO COMPLIANCE WITH THE APPLICABLE OCCUPANCY CHAPTER
OF NFPA 101.
B. THE AREAS OF THE FACILITY WHERE NO WORK IS BEING PERFORMED
MUST MEET THE APPLICABLE EXISTING OCCUPANCY CHAPTER OF
NFPA 101, BEFORE BEGINNING THE PROJECT OR BE INCLUDED AS
PART OF THE PROJECT.
NFPA 101, 43.2.2.1.3, MODIFICATION:
THE RECONFIGURATION OF ANY SPACE; THE ADDITION, RELOCATION, OR
ELIMINATION OF ANY DOOR OR WINDOW; THE ADDITION OR ELIMINATION OF
LOAD BEARING ELEMENTS; THE RECONFIGURATION OR EXTENSION OF ANY
SYSTEM; OR THE INSTALLATION OF ANY ADDITIONAL EQUIPMENT.
NFPA 101, 43.5.1.3, GENERAL REQUIREMENTS:
NEWLY CONSTRUCTED ELEMENTS, COMPONENTS, AND SYSTEMS SHALL
COMPLY WITH THE REQUIREMENTS OF OTHER SECTIONS OF THIS CODE [NFPA
101] APPLICABLE TO NEW CONSTRUCTION.
3.
4.
A
/08 /26
RE
MO
VE
D
EX
IT
S
IG
NS
F
RO
M
TH
E
SC
OP
E
OF
W
OR
K
EXIT SIGNS:
1.
2.
LOCATE AND PROVIDE NEW EXIT SIGNS IN THE SCOPE OF WORK AREA WITHIN
THE PATHWAY OF THE EXISTING CONVEYOR. EXIT SIGNS SHALL BE PROVIDED
AS REQUIRED PER NFPA 101 IN THE SCOPE OF WORK AREA FOR THE PRIMARY
EGRESS PATHWAYS ALONG THE EXISTING CONVEYOR. EXIT SIGNS SHALL BE
PROVIDED WITH BATTERY BACKUP. THE NEW EXIT SIGNS WILL NOT BE
CONNECTED TO POWER CIRCUITS TO ENERGIZE THE UNITS. THE
GOVERNMENT WILL BE PROVIDING THE MATERIALS AND LABOR TO ENERGIZE
THE EXIT SIGNS AT A LATER DATE. THE GOVERNMENT WILL PROVIDE THE
EMT AND POWER CIRCUITS TO THE NEW EXIT SIGNS THAT THE CONTRACTOR
PROVIDES AND INSTALLS. THE GOVERNMENT WILL BE WIRING AND
ENERGIZING AND TESTING THE EXIT SIGNS OUTSIDE THE SCOPE OF THIS
PROJECT AT A LATER DATE.
PROVIDE A FLOOR PLAN THAT IDENTIFIES THE PROPOSED EXIT SIGN
LOCATIONS FOR GOVERNMENT REVIEW. THE LAYOUT WILL BE REVIEWED
FOR APPROVAL BY THE GOVERNMENT PRIOR TO INSTALLATION.
THE CONTRACTOR IS NOT RESPONSIBLE FOR THE DEMOLITION OF THE
EXISTING EXIT SIGNS. THE GOVERNMENT WILL DEMOLISH THE EXISTING EXIT
SIGNS AFTER THE DEMOLITION OF THE CONVEYOR AT A LATER DATE,
OUTSIDE THE SCOPE OF THIS PROJECT.
3.
B
/14 /26
AD
DE
D
MO
DI
FI
ED
E
XI
T
SI
GN
S
CO
PE
F-101
FIRE ALARM AND SPRINKLER COMPOSITE PLAN
NTS
PROJECT LOCATIONB3001 KEY PLAN
OF
TI
N
KE
R
A
IR
F O
R C
E
BA
SE
, O
KL
AH
O M
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
35%
DESIGN
W W
YK
RE
LO
CA
TE
F
IR
E
AL
AR
M
CI
RC
UI
T, B
, O
-P A
IS
LE
/1
5/
TE
PA
-C
SA
G
A M cP H
ER
SO
N
F-101
S
ST
AR
R
B
JI
M O
H
En gr
\D es ig n\
\2
5\
\S up po rt\ D ra w in gs
\M od el
FI
RE
A
LA
RM
A
ND
SP
RI
NK
LE
R
CO
MP
OS
IT
E
PL
AN
03 06
AREA OF WORK
A R
EA
O
F W
O R
K
A R
EA
O
F W
O R
K A
R
EA
O F
W O
R K
AREA OF WORKAREA OF WORK
A R
EA
O
F W
O R
K
AREA OF WORK
CONVEYOR SECTIONS
1. H87 - 087 (PHASE 1, 23E092)
2. G82 - G87 (PHASE 2, 23E094)
3. C87 - G87 (PHASE 3, 23E095)
4. K77 - K81 (PHASE 4, 23E096)
5. J81 - 081 (PHASE 5, 23E103)
6. D81 - J81 (PHASE 6, 23E104)
7. D87 - D92 (PHASE 7, 23E105)
8. I95 - 095 (PHASE 8, 23E106)
9. 099 - 0105 (O-P 1 OF 6, 24E026)
10. 095 - 099 (O-P 2 OF 6, 24E027)
11. 091 - 095 (O-P 3 OF 6, 24E028)
12. 087 - 091 (O-P 4 OF 6, 24E029)
13. 081 - 087 (O-P 5 OF 6, 24E030)
14. 071 - 081 (O-P 6 0F 6, 24E031)
15. TO BE DETERMINED
16. TO BE DETERMINED
SECTIONS LISTED IN
ORDER OF PRIORITY
1. SECTION 15
2. SECTION 9
3. SECTION 10
4. SECTION 11
5. SECTION 12
6. SECTION 13
7. SECTION 14
8. SECTION 8
9. SECTION 7
10. SECTION 3
11. SECTION 2
12. SECTION 1
13. SECTION 5
14. SECTION 6
15. SECTION 16
16. SECTION 4
FIRE/MASS NOTIFICATION CONTROL
PANEL SCHEDULE
A. EXISTING FCI-72 TO BE
DEMOLISHED AND CIRCUITS
PICKED UP WITH ADDRESSABLE
MODULES FROM NEW FCI-E3
PANEL "B"
B. NEW FCI-E3 FIBER OPTIC
NETWORK NODE TO BE
INSTALLED IN THIS PROJECT
C. EXISTING FCI 7100 TO BE
DEMOLISHED AND ADDRESSABLE
CIRCUITS EXTENDED TO THE
NEW FCI-E3 NETWORK NODE
(PANEL "B" ABOVE)
D. EXISTING FCI E-3 (INSTALLED ON
FIBER NETWORK)(PANEL HAS
CAPACITY FOR EXPANSION IF
NEEDED)
E. EXISTING SIEMENS MXL TO BE
DEMOLISHED AND COVERAGE
ADDED TO PANEL "G"
F. EXISTING FCI E-3 TO REMAIN
(NOT ON NETWORK)
G. EXISTING FCI E-3 TO REMAIN
(NOT ON NETWORK)
H. EXISTING SIMPLEX 4004 PANEL IS
TO BE SUPERVISED BY PANEL "B"
AND CROSS TRIP
I. NEW FIBER OPTIC PATCH PANEL
FOR FIRE AND MASS
NOTIFICATION NETWORK.
CONTRACTOR TO PROVIDE THE
PATCH PANEL AND TERMINATE
THE FIBER INTO AND OUT FROM
THE PATCH PANEL TO MAINTAIN
THE CONTINUITY OF THE FIBER
OPTIC NETWORK. TERMINATING
AND PROGRAMMING THESE
PANELS TO THE NETWORK WILL
BE UNDER A SEPARATE
CONTRACT.
J. EXISTING FCI 24 TO BE
DEMOLISHED AND COVERAGE
ADDED TO PANEL "B" OR "D"
K. EXISTING SIMPLEX 4004 TO BE
DEMOLISHED AND COVERAGE
ADDED TO EITHER PANEL "B" OR
"D"
L. EXISTING FCI TO REMAIN (NOT
ON NETWORK)
M. EXISTING FCI 24 TO BE
DEMOLISHED AND COVERAGE
ADDED TO PANEL "G"
N. EXISTING FCPS-24FS8
O. EXISTING HPF-24S8
P. EXISTING HPF-24S8
Q. EXISTING HPF-24S8
R. EXISTING HPF-24S8
S. EXISTING FCPS-24FS6
T. EXISTING SIMPLEX 4100U TO
REMAIN IN SERVICE.
A
/08 /26
RE
MO
VE
D
EX
IT
S
IG
NS
F
RO
M
TH
E
SC
OP
E
OF
W
OR
K
1 1 1 1
2 2 2 2
3 3 3 3
4 4 4 4
5 5 5 5
6 6 6 6
7 7 7 7
8 8 8 8
9 9 9 9
J J J J J J J J J J J J
K K K K K K K K K K K K
L L L L L L L L L L L L
E
E
E
E
E
E
E
E
E
D
D
D
D
D
D
D
D
D
C
C
C
C
C
C
C
C
C
B
B
B
B
B
B
B
B
B
A
A
A
A
A
A
A
A
A
L
K
J
12 11
11 10
10 9 8 7 6 5 4 3 2 1
9 8 7 6 5 4 3 2 1
9 8 7 6 5 4 3 2 1
Q
P
O
N
M
Q
P
O
N
M
Q
P
O
N
M
Q
P
O
N
M
Q
P
O
N
M
Q
P
O
N
M
Q
P
O
N
M
L
K
J
I
H
G
L
K
J
I
H
G
L
K
J
I
H
G
L
K
J
I
H
G
L
K
J
I
H
G
L
K
J
I
H
G
L
K
J
I
H
G
G
G
G
77 79
77 79
77 79
77 79
77 79
77 79
77 79
77 79
77 79
77 79
77 79
G
G
F
E
D
C
B
A A
Q
P
O
N
M
L
K
J
I
H
G
F
E
D
C
B
A
Q
P
O
N
M
L
K
J
I
H
G
F
E
D
C
B
A
Q
P
O
N
M
L
K
J
I
H
G
F
E
D
C
B
A
Q
P
O
N
M
L
K
J
I
H
G
F
E
D
C
B
A
Q
P
O
N
M
L
K
J
I
H
G
F
E
D
C
B
A
A
A
A
A
89 91
89 91
89 91
89 91
89 91
89 91
89 91
89 91
89 91
89 91
89 91
89 91
89 91
89 91
89 91
89 91
89 91
A
Q
P
O
N
M
L
K
J
I
H
G
F
E
D
C
B
A
Q
P
O
N
M
L
K
J
I
H
G
F
E
D
C
B
A
Q
P
O
N
M
L
K
J
I
H
G
F
E
D
C
B
A
Q
P
O
N
M
L
K
J
I
H
G
F
E
D
C
B
A
Q
P
O
N
M
L
K
J
I
H
G
F
E
D
C
B
A
A
A
A
99 101
99 101
99 101
99 101
99 101
99 101
99 101
99 101
99 101
99 101
99 101
99 101
99 101
99 101
99 101
99 101
99 101
A
A
Q
P
O
N
M
L
K
J
I
H
G
F
E
D
C
B
A
Q
P
O
N
M
L
K
J
I
H
G
F
E
D
C
B
A
Q
P
O
N
M
L
K
J
I
H
G
F
E
D
C
B
A
Q
P
O
N
M
L
K
J
I
H
G
F
E
D
C
B
A
Q
P
O
N
M
L
K
J
I
H
G
F
E
D
C
B
A
103 105
103 105
103 105
103 105
103 105
103 105
103 105
103 105
103 105
103 105
103 105
103 105
103 105
103 105
103 105
103 105
103 105
A
A
A
A
107 109 111
107 109 111
107 109 111
107 109 111
107 109 111
107 109 111
107 109 111
107 109 111
107 109 111
107 109 111
107 109 111
107 109 111
107 109 111
107 109 111
107 109 111
107 109 111
107 109 111
G
AISLE AISLE AISLE
AI
SL
E
AI
SL
E
AISLE
AISLE
AISLE
AI
SL
E
OFFICE STORAGE
LABORATORY
SOUTH LABORATORY
NORTH VAULT V6
MEN
LA
DD
ER
CMM
DISASSEMBLY AREA
OFFICE
OFFICE
OFFICE
TOOL CRIB
HEAT TREAT CAGE
WOMEN
BLOCK HOUSE
AI
SL
E
AISLE
AI
SL
E
AI
SL
E
AI
SL
E
AI
SL
E
AI
SL
E
AI
SL
E
AI
SL
E
FPI
BOOTH
MEN WOMEN
UP
CA
TW
AL
K
LA
DD
ER
OFFICE
AISLE AISLE
AI
SL
E
CAGE
CAGE
AISLE
AI
SL
E
AI
SL
E
AI
SL
E
AI
SL
E
AI
SL
E
AI
SL
E
AI
SL
E
AISLEAISLE
AISLE
AISLE
AI
SL
E
AISLEAISLE
AI
SL
E
AI
SL
E
AISLE
AI
SL
E
AI
SL
E
AI
SL
E
AISLE
AISLE
AISLE
AI
SL
E
AISLE
AISLE
AISLE
AI
SL
E
AI
SL
E
AISLEAISLE
AISLE
AISLE
AISLE
AISLE
AISLE
AI
SL
E
AISLE
AI
SL
E
AISLE
AISLE
AI
SL
E
AI
SL
E
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
AI
SL
E
AI
SL
E
AI
SL
E
AISLE
AISLE
AISLE
AISLE
AI
SL
E
AI
SL
E
AISLE
AISLEAISLE AISLE AISLE AISLE AISLE
AI
SL
E
AISLE
AISLE
AISLE
AI
SL
E
AI
SL
E
AISLE
AISLE
AISLE
AI
SL
E
AISLEAISLE AISLE
BREAK ROOM
BREAK ROOM
BREAK ROOM
SL
OP
E
DN
LADDER
UP
9'-0"
DEEP PIT
1'-0"
TRENCH
1'-0"
TRENCH
PLASMA SPRAY
NORTH ANNEX
UP
UP
UP
UP
UP
UP
OFFICE
WOMEN
UP
UP
UP
UP
UP
OFFICE
STORAGE
CLOSET
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE BREAK
ROOM
OFFICE
TOOL
CRIB TOOL
CRIB
AI
SL
E
OFFICE
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
OFFICE OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
BREAK
ROOM
OFFICE
LADDER
AISLE
UP
UP
GUN
ROOM
ACTIVATED DIFFUSION
HEALING ROOM
UP
UP
OFFICE
TANKS
TA
NK
S
TA
NK
S
WELDING
CENTER
MILLING
CENTER
TURNING
CENTER
GRINDING
CENTER
CAGE
BLACK
LIGHT
BOOTH
TOOL CRIB
MEN
UP
OFFICE
OFFICEOFFICE
CAGE
BOOTH
BOOTH
TOOL
CRIB
TOOL CRIB
WOMEN
TOOL
CRIB
CLOSET
CLOSET
TE
LE
PH
ON
E
WOMEN
OFFICE
IFM
RUBBER ROOM
LA
SE
R
HO
LO
GR
AP
HY
BO
OT
H
DARK ROOM CONTROL ROOM X-RAY ROOM
SOUND PROOF
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
OFFICE
BREAK ROOM
AISLE
SPINDLE
FINISH
VIBRATORY
BP-7
CO2 BLAST
BLAST &
CLEAN CELL
MATERIAL
REVIEW STATION
GLASS BEAD
BP-2 DRY
GLASS BEAD
BP-3 DRY
AL-OXIDE BP-5 WET
GLASS BEAD
BP-4 WET
AL-OXIDE
BP-8 DRY
PLASTIC BLAST
OFFICE
FIXTURE
STORAGE
WELDING
BOOTH
TOOL
CAGETOOL
CAGE
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
STORAGEHEAT TREAT &
PLASMA SPRAY
PLASMA SPRAY &
BLAST
CONTROLLED GRINDING
F-SERIES
STATORS
STATORS
F-SERIES
ROTORS
CH
EM
IC
AL
CL
EA
NI
NG
QEC
GENERAL
SHOP
PLS
GEN WELDING TF33
ROTOR
CASE
NDI
INDUCTION
WELDING
INDUCTION
WELDING
AUTOMATED
WELDING
RESISTANCE
WELDING
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH STORAGE WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
OFFICE
OFFICE
OFFICE
OFFICE
CMM
ROOM
OFFICE
OFFICE
OFFICE
STORAGE
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
TOOL
CRIB
STORAGE
WELDING
BOOTH
MENS
ACID ETCH ROOM
UP
UP
UP
UP
U P
BLACK LIGHT
INSPECTION
TOOL CRIB
WELDING
SHOP
MAINTENANCE PLATFORM
BREAK ROOM
OFFICE OFFICE
OFFICE
MAINTENANCE PLATFORM
96" AFF
CASE
QEC
WCD
TOOL
SHOP
TURN IN
RECEIVING
KIT
STAGING
REPAIR
AREA
AUGMENTOR
ASSEMBLY/
DISASSEMBLY
WELDING
BOOTH
FPI
BOOTH
POWER WASH
REPAIR AREA
CN
C
GR
IN
DE
R
CO
M
PR
ES
SO
R
TU
RB
IN
E
SS ENGINE
SUPPLY
CE
NT
RA
L
LO
G
IS
TI
CS
ENGINE
SUPPORT
(CLUSTER)
ENGINE
ASSY/DIS
HPT
CYCLE
T/C ROTOR
RELOCATION SS
EDDY
CURRENT
BLAST
CLEAN
COMPRESSOR
DISKS
& SEALS
DI
FF
US
ER
S INTERMEDIATE
CASE CYCLE
1,2,&3
CORE
SUPPORT
CH
EM
IC
AL
AR
EA
M
XR
TO
O
L
CR
IB
UP UP
ASSEMBLY/
DISASSEMBLY
OVEN
LOCAL FPI
DETAIL
INSPECTION
TIG/BAG WELD
KIT STAGING AREA
UNIVERSAL
MILL
VTL VERTICAL
BORING
MILL
LATHE
SH
O
T
PE
EN
POWER
WASH
LOCAL
FPI
EDDY
CURRENT
U
LT
R
AS
O N
IC
IN
SP
EC
TI
O
N
C M
M
F100-229
ASSEMBLY/
DISASSEMBLY
MENS
MEETING
ROOM #1
RECORDS
STORAGE
CORE SUPPORT
MECHANICAL
ROOM
TOOL MAINTENANCE
CENTER
OFFICE OFFICE
UP
UP
72 COMMUNICATION
UP
4 1/2"
OFFICE
PR
ED
IC
TI
VE
MA
IN
TE
NA
NC
E
TE
AM
MICROSCOPE ROOM
MECHANICAL
ROOM
QUALITY VERIFICATION
CENTER
X-
RA
Y
CO
NT
RO
L R
OO
M
STAGING AREA
32"
CO
PI
ER
HE
AT
T
RE
AT
AN
NE
X
PDQR
CAGE
CONTINUOUS
IMPROVEMENT
FIRE CLOSETFIRE CLOSET
STORAGESTORAGE
UP
UP
DF DF
MEN
DF
UP
FI
RE
D
OO
R
FI
RE
D
OO
R
FI
RE
D
OO
R
FIRE DOORFIRE DOOR
FIRE DOOR
FIRE DOORFIRE DOORFIRE DOOR
FIRE DOOR
FI
RE
D
OO
R
JA
N
ME
N
UP
UP
2ND FLR
LANDING
AI
SL
E
AISLEAISLE
LA
DD
ER
UP
DN 548th PMXS O-95
INCOMING
548th PMXS 44th
LADDER
PRESSURE WASHER
BOOTH
CONTROL
ROOM
UP
LADDER
ELEC
ELECTRIC
5"UNSERVICEABLE MODULES STAGINGSERVICEABLE CANS STAGINGSTAGING
ST
EP
ST
EP
ST
EP
BREAK
TABLE
BR
EA
K
TA
BL
E
BREAK
TABLE
BR
EA
K
TA
BL
E
BR
EA
K
TA
BL
E
BR
EA
K
TA
BL
E
BR
EA
K
TA
BL
E
AI
SL
E
10"10"10"
10"10.5" 10.5"
ELECTRIC
ELECTRIC
11"
4" 10"
ELECTRIC
10" SUB STATION10" SUB STATION
BOTTLE
RACKS
BOTTLE
RACKS
BOTTLE
RACKS
BOTTLE
RACKS
OXYGEN ACETYLENE
6"
SL
OP
E
16"19.5"
4"4"
19.5" 6"CONCRETE UTILITY
EQUIPMENT PAD
HW
WF
LT #5
LT #6
SUPERFORTRESS
CAFETERIA
LUNCH BOWL
UP
JANITOR
CLOSET
5-4OC109
FENTON SYSTEM IN
C.
CONTROLR
4-
OC
FE
NT
ON
S
YS
TE
M
IN
C.
CO
NT
RO
L
R
4-
OC
FE
NT
ON
S
YS
TE
M
IN
C.
CO
NT
RO
L
R
4-6
OC10906
FENTON SYSTEM INC.
CONTROL
R
4-
OC
FE
NT
ON
S
YS
TE
M
IN
C.
CO
NT
RO
L
P
4-2
OC10903
FENTON SYSTEM INC.
CONTROL
R
5-1
OC10909
FENTON SYSTEM INC.
CONTROL
P
3-2
OC10899
FENTON SYSTEM INC.
CONTROL
R
2-4
OC10898
FENTON SYSTEM INC.
CONTROL
R
1-4
OC10893
FENTON SYSTEM INC.
CONTROL
R
1-
OC
FE
NT
ON
S
YS
TE
M
IN
C.
CO
NT
RO
L
P
2-23
OC10896
FENTON SYSTEM INC.
CONTROL
R
2-
OC
FE
NT
ON
S
YS
TE
M
IN
C.
CO
NV
C
ON
TR
OL
P
PLATFORM
PLATFORM
DR
OP
S
TA
. 5
OC
NO
S
ER
IA
L N
UM
BE
R
N/ A
2 3
13 12
11 10 9 15
ABC
D
E
G
F
I
I
H
I
J
K
L
M
N
O
P
Q
S T
R
69 70 72 73 74 75 76 77 78 79 80 82 83 84 85 86 87 88 89 90 92 93 94 95 96 97 98 99 100 102 103 104 105 106 107 108 109 110 11171 71 81 81 91 91 101 101
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
M
RA
MP
U P
AutoCAD SHX Text
WH
F-102
FIRE ALARM AND SPRINKLER COMPOSITE PLAN
NTS
PROJECT LOCATIONB3001 KEY PLAN
OF
TI
N
KE
R
A
IR
F O
R C
E
BA
SE
, O
KL
AH
O M
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
35%
DESIGN
W W
YK
RE
LO
CA
TE
F
IR
E
AL
AR
M
CI
RC
UI
T, B
, O
-P A
IS
LE
/1
5/
TE
PA
-C
SA
G
A M cP H
ER
SO
N
F-102
S
ST
AR
R
B
JI
M O
H
En gr
\D es ig n\
\2
5\
\S up po rt\ D ra w in gs
\M od el
FI
RE
A
LA
RM
AN
D
SP
RI
NK
LE
R
CO
MP
OS
IT
E
PL
AN
04 06
AREA OF WORK
A R
EA
O
F W
O R
K
A R
EA
O
F W
O R
K A
R
EA
O F
W O
R K
AREA OF WORKAREA OF WORK
A R
EA
O
F W
O R
K
AREA OF WORK
GENERAL NOTES GENERAL NOTES
8. EXISTING FCI-E3 NETWORK FIRE ALARM
LOCATED ON THE SECOND LEVEL NEXT TO O-P AISLE.
THE SECOND LEVEL IS OPEN TO THE AISLE. LOCATED AT
COLUMN O-94/95 ON THE SECOND LEVEL.
10. NOT USED.
11. EXISTING CLASS A CIRCUITS MAY BE CONVERTED TO
CLASS B PER THE EQUIPMENT MANUFACTURER'S
INSTRUCTIONS IN ACCORDANCE WITH NFPA 72. DO NOT
ABANDON ANY FIRE ALARM, MASS NOTIFICATION CIRCUITS
OR RACEWAY.
12. PERFORM A PRE-TEST OF THE ALARM SYSTEMS IMPACTED
BY THE RELOCATION OF CIRCUITS PRIOR TO BEGINNING
WORK. DEFICIENCIES IDENTIFIED DURING THE PRE-TEST
WILL NOT BE THE RESPONSIBILITY OF THE CONTRACTOR
TO CORRECT IF ISSUE REMAINS DURING THE FINAL
ACCEPTANCE TEST.
13. PERFORM AN ACCEPTANCE TEST FOR ALL AFFECTED
ALARM SYSTEMS IN ACCORDANCE WITH NFPA 72, UPON
THE COMPLETION OF ALARM WORK. CONTRACTOR WILL
CORRECT DEFICIENCIES NOT IDENTIFIED ON THE
PRE-TEST.
1. THIS SHEET IDENTIFIES THE CONVEYOR LOCATION REQUIRING
RE-ROUTING OF THE FIRE ALARM CIRCUITS CURRENTLY
INSTALLED ON THE CONVEYOR PLATFORM. ALL EXIT SIGNS,
FIRE ALARM, MASS NOTIFICATION, AND FIRE SPRINKLER
SYSTEMS ARE TO BE UNINSTALLED FROM THE CONVEYOR AND
REINSTALLED WITH SUPPORTS CONNECTING TO THE ROOF
DECK STEEL.
2. BEFORE REMOVING ANY ELECTRICAL CONDUIT, CONDUCTORS,
OR DEVICES, ENSURE AND VERIFY THAT THE CIRCUIT IS
PROPERLY DE-ENERGIZED.
3. THE INTENT IS TO DISCONNECT THE FIRE ALARM CIRCUITS AND
FIRE SPRINKLER DROPS TO DEMOLISH THE OVERHEAD
CONVEYOR. RE-ROUTE SYSTEMS CABLING AND DROPS TO THE
BOTTOM OF ROOF STEEL ABOVE THE CONVEYOR PLATFORM
THAT IS TO BE DEMOLISHED.
4. PROVIDE RED EMT OF 3/4 INCH MINIMUM WITH COMPRESSION
FITTINGS FOR ALL NEW FIRE ALARM RACEWAY. ALL FIRE
ALARM CIRCUITS MAY BE INSTALLED CLASS B. EXISTING RED
EMT MAY BE REUSED IF IT IS LIKE NEW CONDITION.
5. NEW CIRCUIT AND PIPING ROUTE SHALL BE ALONG THE LOWER
ROOF DECK STEEL SUPPORTS ABOVE THE CURRENT
CONVEYOR PLATFORM.
6. FIRE SPRINKLER BRANCH LINES AND SUPPORTING HANGERS
MAY BE UNINSTALLED AND REINSTALLED AFTER CONVEYOR
DEMOLITION, OR DEMOLISHED IF NO LONGER NECESSARY.
GENERAL NOTES
14. NOT USED.
15. SUBMITTALS ARE REQUIRED. ACCURATE RECORD
DRAWINGS (AS-BUILTS) ARE REQUIRED TO BE PROVIDED
BY THE CONTRACTOR AS A CLOSE-OUT SUBMITTAL.
16. PROVIDE CODE COMPLIANT FIRE ALARM AND MASS
NOTIFICATION WITHIN THE SCOPE OF WORK AREA WEST
OF THE O-P AISLE, NORTH OF COLUMN LINE "G" AND
SOUTH OF COLUMN LINE 111.
A
/08 /26
RE
MO
VE
D
EX
IT
S
IG
NS
F
RO
M
TH
E
SC
OP
E
OF
W
OR
K
AISLE AISLE AISLE
AI
SL
E
AI
SL
E
AISLE
AISLE
AISLE
AI
SL
E
OFFICE STORAGE
LABORATORY
SOUTH LABORATORY
NORTH VAULT V6
MEN
LA
DD
ER
CMM
DISASSEMBLY AREA
OFFICE
OFFICE
OFFICE
TOOL CRIB
HEAT TREAT CAGE
WOMEN
BLOCK HOUSE
AI
SL
E
AISLE
AI
SL
E
AI
SL
E
AI
SL
E
AI
SL
E
AI
SL
E
AI
SL
E
AI
SL
E
AI
SL
E
FPI
BOOTH
MEN WOMEN
UP
AISLE
CA
TW
AL
K
LA
DD
ER
OFFICE
AISLE AISLE
AI
SL
E
CAGE
CAGE
AISLE
AI
SL
E
AI
SL
E
AI
SL
E
AI
SL
E
AI
SL
E
AI
SL
E
AI
SL
E
AISLEAISLE
AISLE
AISLE
AI
SL
E
AISLEAISLE
AI
SL
E
AI
SL
E
AISLE
AI
SL
E
AI
SL
E
AI
SL
E
AISLE
AISLE
AISLE
AI
SL
E
AISLE
AISLE
AISLE
AI
SL
E
AI
SL
E
AISLEAISLE
AISLE
AISLE
AISLE
AISLE
AISLE
AI
SL
E
AISLE
AI
SL
E
AISLE
AISLE
AI
SL
E
AI
SL
E
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
AI
SL
E
AI
SL
E
AI
SL
E
AISLE
AISLE
AISLE
AISLE
AI
SL
E
AI
SL
E
AISLE
AISLEAISLE AISLE AISLE AISLE AISLE
AI
SL
E
AISLE
AISLE
AISLE
AI
SL
E
AI
SL
E
AISLE
AISLE
AISLE
AI
SL
E
AISLEAISLE AISLE
BREAK ROOM
BREAK ROOM
BREAK ROOM
SL
OP
E
DN
LADDER
UP
9'-0"
DEEP PIT
1'-0"
TRENCH
1'-0"
TRENCH
PLASMA SPRAY
NORTH ANNEX
UP
UP
UP
UP
UP
UP
OFFICE
WOMEN
UP
UP
UP
UP
UP
OFFICE
STORAGE
CLOSET
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE BREAK
ROOM
OFFICE
TOOL
CRIB TOOL
CRIB
AI
SL
E
OFFICE
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
OFFICE OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
BREAK
ROOM
OFFICE
LADDER
AISLE
UP
UP
GUN
ROOM
ACTIVATED DIFFUSION
HEALING ROOM
UP
UP
OFFICE
TANKS
TA
NK
S
TA
NK
S
WELDING
CENTER
MILLING
CENTER
TURNING
CENTER
GRINDING
CENTER
CAGE
BLACK
LIGHT
BOOTH
TOOL CRIB
MEN
UP
OFFICE
OFFICEOFFICE
CAGE
BOOTH
BOOTH
TOOL
CRIB
TOOL CRIB
WOMEN
TOOL
CRIB
CLOSET
CLOSET
TE
LE
PH
ON
E
WOMEN
OFFICE
IFM
RUBBER ROOM
LA
SE
R
HO
LO
GR
AP
HY
BO
OT
H
DARK ROOM CONTROL ROOM X-RAY ROOM
SOUND PROOF
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
OFFICE
BREAK ROOM
AISLE
SPINDLE
FINISH
VIBRATORY
BP-7
CO2 BLAST
BLAST &
CLEAN CELL
MATERIAL
REVIEW STATION
GLASS BEAD
BP-2 DRY
GLASS BEAD
BP-3 DRY
AL-OXIDE BP-5 WET
GLASS BEAD
BP-4 WET
AL-OXIDE
BP-8 DRY
PLASTIC BLAST
OFFICE
FIXTURE
STORAGE
WELDING
BOOTH
TOOL
CAGETOOL
CAGE
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
STORAGEHEAT TREAT &
PLASMA SPRAY
PLASMA SPRAY &
BLAST
CONTROLLED GRINDING
F-SERIES
STATORS
STATORS
F-SERIES
ROTORS
CH
EM
IC
AL
CL
EA
NI
NG
QEC
GENERAL
SHOP
PLS
GEN WELDING TF33
ROTOR
CASE
NDI
INDUCTION
WELDING
INDUCTION
WELDING
AUTOMATED
WELDING
RESISTANCE
WELDING
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH STORAGE WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
OFFICE
OFFICE
OFFICE
OFFICE
CMM
ROOM
OFFICE
OFFICE
OFFICE
STORAGE
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
TOOL
CRIB
STORAGE
WELDING
BOOTH
MENS
ACID ETCH ROOM
UP
UP
UP
UP
U P
BLACK LIGHT
INSPECTION
TOOL CRIB
WELDING
SHOP
MAINTENANCE PLATFORM
BREAK ROOM
OFFICE OFFICE
OFFICE
MAINTENANCE PLATFORM
96" AFF
CASE
QEC
WCD
TOOL
SHOP
TURN IN
RECEIVING
CAN
UNCAN
CO
NT
IN
UO
US
IM
PR
OV
EM
EN
T
DE
TA
IL
IN
SP
EC
TI
ON
ME
TA
L R
EV
IE
W
ST
AT
IO
N
GA
TE
W
AY
DR
OP
S
TA
TI
ON
HORIZONTAL
ASSEMBLY/
DISASSEMBLY
VERTICAL
ASSEMBLY/
DISASSEMBLY
KIT
STAGING
REPAIR
AREA
AUGMENTOR
ASSEMBLY/
DISASSEMBLY
WELDING
BOOTH
FPI
BOOTH
POWER WASH
REPAIR AREA
CN
C
GR
IN
DE
R
AS
SE
MB
LY
CELL
MANAGEMENT
TEAM
CONTINUOUS
DYNAMIC
BALANCER
DISASSEMBLY
CMMI EDDY
CURRENT
ROOM
CO
M
PR
ES
SO
R
TU
RB
IN
E
SS ENGINE
SUPPLY
EN
G
IN
E
SU
PP
O
RT
CE
NT
RA
L
LO
G
IS
TI
CS
ENGINE
SUPPORT
(CLUSTER)
ENGINE
ASSY/DIS
HPT
CYCLE
1,2,&3
T/C ROTOR
RELOCATION SS
EDDY
CURRENT
BLAST
CLEAN
COMPRESSOR
DISKS
& SEALS
DI
FF
US
ER
S INTERMEDIATE
CASE CYCLE
1,2,&3
CORE
SUPPORT
CH
EM
IC
AL
AR
EA
M
XR
TO
O
L
CR
IB
UP UP
CORE FORWARD
TOOLING UNIT (FTU)
GATEWAY
DROP STATION: S80W
RCC: MEKBJA
ASSEMBLY/
DISASSEMBLY
OVEN
LOCAL FPI
DETAIL
INSPECTION
KIT STAGING AREA
C O
N
TI
N U
O U
S
IM
PR
O
VE
M
EN
T
DIFFUSER CELL
CELL MANAGEMENT TEAM
CELL MANAGEMENT TEAM
INTERMEDIATE
CASE CELL
TIG/BAG WELD
KIT STAGING AREA
DISASSEMBLY BENCH AS
SE
M
BL
Y
BE
N C
H
LOCAL
STRESS
RELIEF
GATEWAY
DROP STATION: S83W
RCC: MEKBI
ELECTRO
ETCH
REPAIR
BENCH
UNIVERSAL
MILL
VTL VERTICAL
BORING
MILL
LATHE
R
IV
ET
ER
H
YD
R O
TR
O
N
DETAIL
INSPECTION
OVEN
PAINT
SH
O
T
PE
EN
POWER
WASH
LOCAL
FPI
EDDY
CURRENT
U
LT
R
AS
O N
IC
IN
SP
EC
TI
O
N
C M
M
DETAIL
INSPECTION
REPAIR
AREA
ELECTRO
ETCH
KIT STAGING AREA
M
AT
ER
IA
L R
EV
IE
W S
TA
TI
O N
GATEWAY
DROP STATION: S87W
RCC: MEKBEA
CONTINUOUS
IMPROVEMENT
COMPRESSOR
DISKS &
AIRSEALS CELL
C
EL
L M
AN
AG
EM
EN
T
TE
AM
C O
M
PR
ES
SO
R
D
IS
AS
SE
M
BL
Y C
EL
L
D
IS
AS
SE
M
BL
Y
CONTINUOUS
IMPROVEMENT
SUB
DISASSEMBLY
KIT STAGING
AREA
F100-229
ASSEMBLY/
DISASSEMBLY
MENS
BREAK ROOM
KITCHENETTE
MULTI-PURPOSE
ROOM
MEETING
ROOM #1
RECORDS
STORAGE
CORE SUPPORT
MECHANICAL
ROOM
MEETING
ROOM #2
TOOL MAINTENANCE
CENTER
OFFICE OFFICE
STORAGE
STORAGE
UP
UP
72 COMMUNICATION
UP
4 1/2"
OFFICE
PR
ED
IC
TI
VE
MA
IN
TE
NA
NC
E
TE
AM
MICROSCOPE ROOM
MECHANICAL
ROOM
QUALITY VERIFICATION
CENTER
X-
RA
Y
CO
NT
RO
L R
OO
M
STAGING AREA
32"
CO
PI
ER
HE
AT
T
RE
AT
AN
NE
X
PDQR
CAGE
CONTINUOUS
IMPROVEMENT
FIRE CLOSETFIRE CLOSET
STORAGESTORAGE
UP
UP
DF DF
MEN
DF
MEN
WOMEN
UP
FI
RE
D
OO
R
FI
RE
D
OO
R
FI
RE
D
OO
R
FIRE DOORFIRE DOOR
FIRE DOOR
FIRE DOORFIRE DOORFIRE DOOR
FIRE DOOR
FI
RE
D
OO
R
JA
N
ME
N
UP
UP
2ND FLR
LANDING
AI
SL
E
AISLEAISLE
AI
SL
E
AI
SL
E
LA
DD
ER
UP
DN
STAGING AREA
ST
AG
IN
G
AR
EA
548th PMXS O-95
INCOMING
548th PMXS 44th
INCOMING
LADDER
PRESSURE WASHER
BOOTH
CONTROL
ROOM
UP
LADDER
ELEC
ELECTRIC
5"UNSERVICEABLE MODULES STAGINGSERVICEABLE CANS STAGINGSTAGING
ST
EP
ST
EP
ST
EP
BREAK
TABLE
BR
EA
K
TA
BL
E
BREAK
TABLE
BR
EA
K
TA
BL
E
BR
EA
K
TA
BL
E
BR
EA
K
TA
BL
E
BR
EA
K
TA
BL
E
AI
SL
E
10"10"10"
10"10.5" 10.5"
ELECTRIC
ELECTRIC
11"
4" 10"
ELECTRIC
10" SUB STATION10" SUB STATION
BOTTLE
RACKS
BOTTLE
RACKS
BOTTLE
RACKS
BOTTLE
RACKS
OXYGEN ACETYLENE
6"
SL
OP
E
16"19.5"
4"4"
19.5" 6"CONCRETE UTILITY
EQUIPMENT PAD
HW
WF
LT #5
LT #6
SUPERFORTRESS
CAFETERIA
LUNCH BOWL
CONTRACTING
OFFICE
CONTRACTING
OFFICE
NV
NV
NV
NV
ELEV
UP
JANITOR
CLOSET
5-4OC109
FENTON SYSTEM IN
C.
CONTROLR
4-
OC
FE
NT
ON
S
YS
TE
M
IN
C.
CO
NT
RO
L
R
4-
OC
FE
NT
ON
S
YS
TE
M
IN
C.
CO
NT
RO
L
R
4-6
OC10906
FENTON SYSTEM INC.
CONTROL
R
4-
OC
FE
NT
ON
S
YS
TE
M
IN
C.
CO
NT
RO
L
P
4-2
OC10903
FENTON SYSTEM INC.
CONTROL
R
5-1
OC10909
FENTON SYSTEM INC.
CONTROL
P
3-2
OC10899
FENTON SYSTEM INC.
CONTROL
R
2-4
OC10898
FENTON SYSTEM INC.
CONTROL
R
1-4
OC10893
FENTON SYSTEM INC.
CONTROL
R
1-
OC
FE
NT
ON
S
YS
TE
M
IN
C.
CO
NT
RO
L
P
2-23
OC10896
FENTON SYSTEM INC.
CONTROL
R
2-
OC
FE
NT
ON
S
YS
TE
M
IN
C.
CO
NV
C
ON
TR
OL
P
PLATFORM
PLATFORM
DR
OP
S
TA
. 5
OC
NO
S
ER
IA
L N
UM
BE
R
N/ A
S
R
Q
P
O
N
M
S
R
Q
P
O
N
M
S
R
Q
P
O
N
M
S
R
Q
P
O
N
M
S
R
Q
P
O
N
M
S
R
Q
P
O
N
M
S
R
Q
P
O
N
M
L
K
J
I
H
G
L
K
J
I
H
G
L
K
J
I
H
G
L
K
J
I
H
G
L
K
J
I
H
G
L
K
J
I
H
G
L
K
J
I
H
G
G
G
G
77 79
77 79
77 79
77 79
77 79
77 79
77 79
77 79
77 79
77 79
77 79
77 79
77 79
G
G
F
E
D
C
B
A A
S
R
Q
P
O
N
M
L
K
J
I
H
G
F
E
D
C
B
A
S
R
Q
P
O
N
M
L
K
J
I
H
G
F
E
D
C
B
A
S
R
Q
P
O
N
M
L
K
J
I
H
G
F
E
D
C
B
A
S
R
Q
P
O
N
M
L
K
J
I
H
G
F
E
D
C
B
A
S
R
Q
P
O
N
M
L
K
J
I
H
G
F
E
D
C
B
A
A
A
A
A
89 91
89 91
89 91
89 91
89 91
89 91
89 91
89 91
89 91
89 91
89 91
89 91
89 91
89 91
89 91
89 91
89 91
89 91
89 91
A
S
R
Q
P
O
N
M
L
K
J
I
H
G
F
E
D
C
B
A
S
R
Q
P
O
N
M
L
K
J
I
H
G
F
E
D
C
B
A
S
R
Q
P
O
N
M
L
K
J
I
H
G
F
E
D
C
B
A
S
R
Q
P
O
N
M
L
K
J
I
H
G
F
E
D
C
B
A
S
R
Q
P
O
N
M
L
K
J
I
H
G
F
E
D
C
B
A
A
A
A
99 101
99 101
99 101
99 101
99 101
99 101
99 101
99 101
99 101
99 101
99 101
99 101
99 101
99 101
99 101
99 101
99 101
99 101
99 101
A
A
S
R
Q
P
O
N
M
L
K
J
I
H
G
F
E
D
C
B
A
S
R
Q
P
O
N
M
L
K
J
I
H
G
F
E
D
C
B
A
S
R
Q
P
O
N
M
L
K
J
I
H
G
F
E
D
C
B
A
S
R
Q
P
O
N
M
L
K
J
I
H
G
F
E
D
C
B
A
S
R
Q
P
O
N
M
L
K
J
I
H
G
F
E
D
C
B
A
103 105
103 105
103 105
103 105
103 105
103 105
103 105
103 105
103 105
103 105
103 105
103 105
103 105
103 105
103 105
103 105
103 105
103 105
103 105
A
A
A
A
107 109 111
107 109 111
107 109 111
107 109 111
107 109 111
107 109 111
107 109 111
107 109 111
107 109 111
107 109 111
107 109 111
107 109 111
107 109 111
107 109 111
107 109 111
107 109 111
107 109 111
107 109 111
107 109 111
G
13 12 11 10 9 8 7 6 5 4 3 2 1
J
K
L
ABCDE
1 1 1 1
2 2 2 2
3 3 3 3
4 4 4 4
5 5 5 5
6 6 6 6
7 7 7 7
8 8 8 8
9 9 9 9
J J J J J J J J J J J J
K K K K K K K K K K K K
L L L L L L L L L L L L
E
E
E
E
E
E
E
E
E
D
D
D
D
D
D
D
D
D
C
C
C
C
C
C
C
C
C
B
B
B
B
B
B
B
B
B
A
A
A
A
A
A
A
A
A
L
K
J
12 11
11 10
10 9 8 7 6 5 4 3 2 1
9 8 7 6 5 4 3 2 1
9 8 7 6 5 4 3 2 1
2 3
13 12
11 10 9 15
ABC
D
E
G
F
I
I
H
I
J
K
L
M
N
O
P
Q
S T
R
69 70 72 73 74 75 76 77 78 79 80 82 83 84 85 86 87 88 89 90 92 93 94 95 96 97 98 99 100 102 103 104 105 106 107 108 109 110 11171
2'-0" EXPANSION JOINT
71 81
2'-0" EXPANSION JOINT
81 91
2'-0" EXPANSION JOINT
91 101
2'-0" EXPANSION JOINT
RA
MP
U P
A
B
C
D
E
F
G
H
I
J
K
L
M
N
O
P
Q
M
F-103
FIRE ALARM AND SPRINKLER PLAN - AREA "A"
NTS
PROJECT LOCATIONB3001 KEY PLAN
OF
TI
N
KE
R
A
IR
F O
R C
E
BA
SE
, O
KL
AH
O M
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
35%
DESIGN
W W
YK
RE
LO
CA
TE
F
IR
E
AL
AR
M
CI
RC
UI
T, B
, O
-P A
IS
LE
/1
5/
TE
PA
-C
SA
G
A M cP H
ER
SO
N
F-103
S
ST
AR
R
B
JI
M O
H
En gr
\D es ig n\
\2
5\
\S up po rt\ D ra w in gs
\M od el
FI
RE
A
LA
RM
A
ND
SP
RI
NK
LE
R
PL
AN
A
RE
A "A
05 06
SHEET NOTES
AREA OF WORK
AREA OF WORK
A R
EA
O
F W
O R
K
A R
EA
O
F W
O R
K
AREA OF WORK
AREA OF WORK
CONVEYOR SECTIONS SHOWN IN PLAN
1. DEMO COMPLETE.
2. DEMO: FIRE SPRINKLER BRANCH LINES TO BOOTHS AND DOCK
BOX OFFICE.
3. NO LIFE SAFETY SYSTEMS ON THIS CONVEYOR SECTION.
4. NO LIFE SAFETY SYSTEMS ON THIS CONVEYOR SECTION.
5. DEMO FIRE ALARM CIRCUIT AND INSTALL NEW AT ROOF STEEL.
6. A) DEMO FIRE ALARM CIRCUIT AND INSTALL NEW AT ROOF
STEEL.
B) DEMO FIRE SPRINKLER CROSS MAIN FROM CONVEYOR AND
INSTALL NEW WITH SUPPORTING HANGERS ATTACHED TO
ROOF STEEL.
C) DEMO SPRINKLER DROP TO DOCK BOX OFFICE AND INSTALL
NEW TO DOCK BOX OFFICE WITH SUPPORT HANGERS
ATTACHED AT ROOF STEEL.
7. A) DEMO AND CAP 5 SPRINKLER BRANCH LINES.
B) INSTALL SPRINKLER AND DROP AT COLUMN C-93. HANGERS
SHOULD BE ANCHORED AT ROOF STEEL.
8. A) UNINSTALL THE FIRE ALARM AUDIO-VISUAL CIRCUIT SERVING
THE DOCK BOX OFFICE. REINSTALL AFTER CONVEYOR DEMO.
B) NOT USED.
C) DEMOLISH FIRE SPRINKLER BRANCH LINE AND CAP AT THE
ISOLATION VALVE LOCATED AT THE WHITE HOUSE.
9. DEMO FIRE ALARM CIRCUIT AND INSTALL NEW AT ROOF STEEL.
10. A) NOT USED.
B) DEMO FIRE ALARM CIRCUIT AND INSTALL NEW AT ROOF
STEEL.
11. DEMO FIRE ALARM CIRCUIT AND INSTALL NEW AT ROOF STEEL.
12. A) DEMO FIRE ALARM CIRCUIT AND INSTALL NEW AT ROOF
STEEL.
B) NOT USED.
13. A) NOT USED.
B) DEMO FIRE ALARM CIRCUIT AND INSTALL NEW AT ROOF
STEEL.
14. A) NOT USED.
B) DEMO FIRE ALARM CIRCUITS AND INSTALL NEW AT ROOF
STEEL.
15. A) DEMO FIRE SYSTEM BRANCH LINES AT SPRINKLERS FROM
BELOW CONVEYOR MEZZANINE AND CAP CROSS MAIN.
B) DEMO FIRE ALARM CIRCUIT TO DOCK BOX OFFICE AND
INSTALL NEW WITH SUPPORTS FROM ROOF STEEL.
C) NOT USED.
16. NO LIFE SAFETY SYSTEMS IN THIS CONVEYOR SECTION.
A
/08 /26
RE
MO
VE
D
EX
IT
S
IG
NS
F
RO
M
TH
E
SC
OP
E
OF
W
OR
K
K K K K K K K K K K K K
L L L L L L L L L L L L
A
A
A
A
A
A
L
K
12 11
11 10
10 9 8 7 6 5 4 3 2 1
9 8 7 6 5 4 3 2 1
P
O
N
M
P
O
N
M
P
O
N
M
P
O
N
M
P
O
N
M
L
K
J
I
H
G
L
K
J
I
H
G
L
K
J
I
H
G
L
K
J
I
H
G
L
K
J
I
H
G
G
G
77 79
77 79
77 79
77 79
77 79
77 79
77 79
77 79
77 79
77 79
G
G
F
E
D
C
P
O
N
M
L
K
J
I
H
G
F
E
D
C
P
O
N
M
L
K
J
I
H
G
F
E
D
C
P
O
N
M
L
K
J
I
H
G
F
E
D
C
P
O
N
M
L
K
J
I
H
G
F
E
D
C
AISLE
AI
SL
E
OFFICE STORAGE
LABORATORY
SOUTH LABORATORY
NORTH VAULT V6
LA
DD
ER
OFFICE
BLOCK HOUSE
AI
SL
E
AI
SL
E
AI
SL
E
FPI
BOOTH
MEN WOMEN
CA
TW
AL
K
LA
DD
ER
AI
SL
E
AI
SL
E
AI
SL
E
AISLEAISLE
AISLE
AISLE
AISLE
AI
SL
E
AISLE
AI
SL
E
AI
SL
E
AI
SL
E
AI
SL
E
AI
SL
E
AISLE
AISLE
AISLE
AISLE
AI
SL
E
AI
SL
E
AISLE
AISLEAISLE AISLE AISLE
AI
SL
E
AISLE
AISLE
AISLE
AISLE
AISLE
AI
SL
E
AISLE
BREAK ROOM
BREAK ROOM
UP
PLASMA SPRAY
NORTH ANNEX
UP
UPCLOSET
OFFICE
OFFICE
OFFICE
OFFICE BREAK
ROOM
OFFICE
TOOL
CRIB TOOL
CRIB
AI
SL
E
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
OFFICE OFFICE
OFFICE
OFFICE
OFFICE
BREAK
ROOM
OFFICE
LADDER
AISLE
UP
UP
GUN
ROOM
ACTIVATED DIFFUSION
HEALING ROOM
UP
UP
OFFICE
TANKS
TA
NK
S
TA
NK
S
WELDING
CENTER
MILLING
CENTER
TURNING
CENTER
GRINDING
CENTER
CAGE
BLACK
LIGHT
BOOTH
OFFICE
OFFICEOFFICE
CAGE
BOOTH
BOOTH
STORAGEHEAT TREAT &
PLASMA SPRAY
PLASMA SPRAY & CONTROLLED GRINDING
QEC
GENERAL
SHOP
INDUCTION
WELDING
INDUCTION
WELDING
AUTOMATED
WELDING
RESISTANCE
WELDING
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH STORAGE WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
OFFICE
OFFICE
OFFICE
OFFICE
CMM
ROOM
OFFICE
OFFICE
OFFICE
STORAGE
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
TOOL
CRIB
STORAGE
WELDING
BOOTH
MENS
CASE
CO
M
PR
ES
SO
R
TU
RB
IN
E
SS
T/C ROTOR
RELOCATION SS
UP UP
OVEN
VTL VERTICAL
BORING
MILL
F100-229
ASSEMBLY/
DISASSEMBLY
MENS
RECORDS
STORAGE
UP
DF
UP
FI
RE
D
OO
R
FIRE DOORFIRE DOOR
FIRE DOOR
FIRE DOORFIRE DOORFIRE DOOR
FIRE DOOR
LT #6
5-4OC109
FENTON SYSTEM IN
C.
4-
OC
FE
NT
ON
S
YS
TE
M
IN
C.
CO
NT
RO
L
R
4-
OC
FE
NT
ON
S
YS
TE
M
IN
C.
CO
NT
RO
L
R
4-6
OC10906
FENTON SYSTEM INC.
CONTROL
R
4-
OC
FE
NT
ON
S
YS
TE
M
IN
C.
CO
NT
RO
L
P
4-2
OC10903
FENTON SYSTEM INC.
CONTROL
R
5-1
OC10909
FENTON SYSTEM INC.
CONTROL
P
2 3
13 12
73 74 75 76 77 78 79 80 82 83 84 85 86 87 88 89 9081
C
D
E
F
G
H
I
J
K
L
N
O
P
M
RA
MP
U P
F-104
FIRE ALARM AND SPRINKLER PLAN - AREA "B"
NTS
PROJECT LOCATIONB3001 KEY PLAN
OF
TI
N
KE
R
A
IR
F O
R C
E
BA
SE
, O
KL
AH
O M
A
PR
O
JE
C
T
IN
FO
R
M
AT
IO
N
D
ES
IG
N
F
IL
E
LO
C
AT
IO
N
R
EV
IS
IO
N S
M
AR
K
D
ES
IG
N
G R
O U
P:
D R
AW
N
B Y:
C H
EC
KE
D B
Y:
D
ES
IG
N
ED
B
Y:
D
AT
E D
ES
C
R
IP
TI
O
N
1 2 3 4 5
E
D
C
B
A
M
AN
AG
EM
EN
T
IN
FO
R M
AT
IO
N
1 2 3 4 5
E
D
C
B
A
IS
SU
E D
AT
E:
SHEET
SHEET NUMBER
SH
EE
T
TI
TL
E
AIR FORCE MATERIEL COMMAND
72 ABW CIVIL ENGINEER DIRECTORATE
TINKER AFB, OK
35%
DESIGN
W W
YK
RE
LO
CA
TE
F
IR
E
AL
AR
M
CI
RC
UI
T, B
, O
-P A
IS
LE
/1
5/
TE
PA
-C
SA
G
A M cP H
ER
SO
N
F-104
S
ST
AR
R
B
JI
M O
H
En gr
\D es ig n\
\2
5\
\S up po rt\ D ra w in gs
\M od el
FI
RE
A
LA
RM
A
ND
SP
RI
NK
LE
R
P
LA
N
AR
EA
"B
06 06
AREA OF WORK
AREA OF WORK
A R
EA
O
F W
O R
K
A R
EA
O
F W
O R
K
AREA OF WORK
AREA OF WORK
1. DEMO COMPLETE.
2. DEMO: FIRE SPRINKLER BRANCH LINES TO BOOTHS AND DOCK
BOX OFFICE.
3. NO LIFE SAFETY SYSTEMS ON THIS CONVEYOR SECTION.
4. NO LIFE SAFETY SYSTEMS ON THIS CONVEYOR SECTION.
5. DEMO FIRE ALARM CIRCUIT AND INSTALL NEW AT ROOF STEEL.
6. A) DEMO FIRE ALARM CIRCUIT AND INSTALL NEW AT ROOF
STEEL.
B) DEMO FIRE SPRINKLER CROSS MAIN FROM CONVEYOR AND
INSTALL NEW WITH SUPPORTING HANGERS ATTACHED TO
ROOF STEEL.
C) DEMO SPRINKLER DROP TO DOCK BOX OFFICE AND INSTALL
NEW TO DOCK BOX OFFICE WITH SUPPORT HANGERS
ATTACHED AT ROOF STEEL.
7. A) DEMO AND CAP 5 SPRINKLER BRANCH LINES.
B) INSTALL SPRINKLER AND DROP AT COLUMN C-93. HANGERS
SHOULD BE ANCHORED AT ROOF STEEL.
8. A) UNINSTALL THE FIRE ALARM AUDIO-VISUAL CIRCUIT SERVING
THE DOCK BOX OFFICE. REINSTALL AFTER CONVEYOR DEMO.
B) DEMO 2 EXIT SIGNS AND INSTALL NEW AFTER CONVEYOR
DEMO.
C) DEMOLISH FIRE SPRINKLER BRANCH LINE AND CAP AT THE
ISOLATION VALVE LOCATED AT THE WHITE HOUSE.
9. DEMO FIRE ALARM CIRCUIT AND INSTALL NEW AT ROOF STEEL.
10. A) NOT USED.
B) DEMO FIRE ALARM CIRCUIT AND INSTALL NEW AT ROOF
STEEL.
11. DEMO FIRE ALARM CIRCUIT AND INSTALL NEW AT ROOF STEEL.
12. A) DEMO FIRE ALARM CIRCUIT AND INSTALL NEW AT ROOF
STEEL.
B) NOT USED.
13. A) NOT USED.
B) DEMO FIRE ALARM CIRCUIT AND INSTALL NEW AT ROOF
STEEL.
14. A) NOT USED.
B) DEMO FIRE ALARM CIRCUITS AND INSTALL NEW AT ROOF
STEEL.
15. A) DEMO FIRE SYSTEM BRANCH LINES AT SPRINKLERS FROM
BELOW CONVEYOR MEZZANINE AND CAP CROSS MAIN.
B) DEMO FIRE ALARM CIRCUIT TO DOCK BOX OFFICE AND
INSTALL NEW WITH SUPPORTS FROM ROOF STEEL.
C) NOT USED.
16. NO LIFE SAFETY SYSTEMS IN THIS CONVEYOR SECTION.
CONVEYOR SECTIONS SHOWN IN PLAN
A
/08 /26
RE
MO
VE
D
EX
IT
S
IG
NS
F
RO
M
TH
E
SC
OP
E
OF
W
OR
K
P
O
N
M
L
K
J
I
H
G
F
E
D
C
P
O
N
M
L
K
J
I
H
G
F
E
D
C
P
O
N
M
L
K
J
I
H
G
F
E
D
C
89 91
89 91
89 91
89 91
89 91
89 91
89 91
89 91
89 91
89 91
89 91
89 91
89 91
89 91
P
O
N
M
L
K
J
I
H
G
F
E
D
C
P
O
N
M
L
K
J
I
H
G
F
E
D
C
P
O
N
M
L
K
J
I
H
G
F
E
D
C
P
O
N
M
L
K
J
I
H
G
F
E
D
C
P
O
N
M
L
K
J
I
H
G
F
E
D
C
99 101
99 101
99 101
99 101
99 101
99 101
99 101
99 101
99 101
99 101
99 101
99 101
99 101
99 101
P
O
N
M
L
K
J
I
H
G
F
E
D
C
P
O
N
M
L
K
J
I
H
G
F
E
D
C
P
O
N
M
L
K
J
I
H
G
F
E
D
C
P
O
N
M
L
K
J
I
H
G
F
E
D
C
P
O
N
M
L
K
J
I
H
G
F
E
D
C
103 105
103 105
103 105
103 105
103 105
103 105
103 105
103 105
103 105
103 105
103 105
103 105
103 105
103 105
107 109 111
107 109 111
107 109 111
107 109 111
107 109 111
107 109 111
107 109 111
107 109 111
107 109 111
107 109 111
107 109 111
107 109 111
107 109 111
107 109 111
AISLE AISLE AISLE
AI
SL
E
AI
SL
E
MEN
CMM
DISASSEMBLY AREA
OFFICE
TOOL CRIB
BLOCK HOUSE
AI
SL
E
AI
SL
E
AI
SL
E
AI
SL
E
FPI
BOOTH
UP
OFFICE
AI
SL
E
CAGE
CAGE
AISLE
AI
SL
E
AI
SL
E
AI
SL
E
AI
SL
E
AI
SL
E
AI
SL
E
AISLEAISLE
AISLE
AISLE
AI
SL
E
AISLEAISLE
AI
SL
E
AI
SL
E
AISLE
AI
SL
E
AI
SL
E
AI
SL
E
AISLE
AISLE
AISLEAISLE
AI
SL
E
AISLEAISLE
AI
SL
E
AISLE AISLE AISLE
LT
#7
BREAK ROOM
BREAK ROOM
UP
UP
UP
UP
OFFICE
WOMEN
UP
UP
OFFICE
OFFICE
OFFICE
OFFICE
OFFICEOFFICE
CAGE
BOOTH
BOOTH
TE
LE
PH
ON
E
WOMEN
OFFICE
IFM
RUBBER ROOM
LA
SE
R
HO
LO
GR
AP
HY
BO
OT
H
DARK ROOM CONTROL ROOM X-RAY ROOM
SOUND PROOF
BOOTH
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
BREAK ROOM
AISLE
BP-7
CO2 BLAST
BLAST &
CLEAN CELL
MATERIAL
REVIEW STATION
GLASS BEAD
BP-2 DRY
GLASS BEAD
BP-3 DRY
AL-OXIDE BP-5 WET
GLASS BEAD
BP-4 WET
AL-OXIDE
BP-8 DRY
PLASTIC BLAST
OFFICE
FIXTURE
STORAGE
WELDING
BOOTH
TOOL
CAGETOOL
CAGE
WELDING
BOOTH
WELDING
BOOTH
WELDING
BOOTH
STORAGE
STATORS
STATORS
F-SERIES
ROTORS
CH
EM
IC
AL
CL
EA
NI
NG
GENERAL
SHOP
PLS
TF33
ROTOR
CASE
NDI
OFFICE
OFFICE
ACID ETCH ROOM
UP
UP
UP
UP
U P
BLACK LIGHT
INSPECTION
TOOL CRIB
MAINTENANCE PLATFORM
BREAK ROOM
OFFICE OFFICE
OFFICE
MAINTENANCE PLATFORM
96" AFF
CASE
QEC
WCD
RECEIVING
AUGMENTOR
ASSEMBLY/
POWER WASH
CO
M
PR
ES
SO
R
TU
RB
IN
E
SS ENGINE
CE
NT
RA
L
LO
G
IS
TI
CS
EDDY
CURRENT
BLAST
CLEAN
F100-229
ASSEMBLY/
DISASSEMBLY
DR
C
OF
FI
CE
PMXG ENGINEERING
SUPPORT OFFICE
72 COMMUNICATION
SQUADRON
UP
4 1/2"
OFFICE
6"
32"
SLOPE
CO
PI
ER
4"
DF
MEN
DF
FI
RE
D
OO
R
M
EN
G
W
OM
ENJA
N
ME
N
AISLEAISLE
CONTROL
ROOM
LADDER
JANITOR
CLOSET
4-
OC
FE
NT
ON
S
YS
TE
M
IN
C.
CO
NT
RO
L
P
4-2
OC10903
FENTON SYSTEM INC.
CONTROL
R
3-2
OC10899
FENTON SYSTEM INC.
CONTROL
R
1-
OC
FE
NT
ON
S
YS
TE
M
IN
C.
CO
NT
RO
L
P
2-23
OC10896
FENTON SYSTEM INC.
CONTROL
R
2-
OC
FE
NT
ON
S
YS
TE
M
IN
C.
CO
NV
C
ON
TR
OL
P
PLATFORM
PLATFORM
DR
OP
S
TA
. 5
OC
NO
S
ER
IA
L N
UM
BE
R
N/ A
11 10 9 15
87 88 89 90 92 93 94 95 96 97 98 99 100 102 103 104 105 106 107 108 109 110 11191 101
C
D
E
F
G
H
I
J
K
L
N
O
P
M
RA
MP
U P
| 01-250003-G101 |
| Sheets and Views |
| G101 |
| 02-250003-F100 |
| Sheets and Views |
| F101 |
| 03-250003-F101 |
| Sheets and Views |
| F101 |
| 04-250003-F102 |
| Sheets and Views |
| F102 |
| 05-250003-F103 |
| Sheets and Views |
| F103 |
| 06-250003-F104 |
| Sheets and Views |
| FD104 |
File details come from the government source that posted it. Updated .