24-Supplemental Specifications Attachment A rev9.15.2026.pdf
PDF 310 KB Posted
- Solicitation number
- IFB-26-00286
- Issued by
- Hillsborough County, Florida
About this file
This document consists of supplemental specifications and project requirements for a Stormwater CRRP Construction WORCS Contract issued by Hillsborough County Engineering and Operations Department in Florida for culvert repair and replacement work. The contract is structured as a term agreement under which the County will issue work orders on an as-needed basis for stormwater infrastructure projects, primarily located in Hillsborough County north of I-4 and I-275, though work may be assigned throughout the County. The scope of work encompasses storm sewer installation, CIPP lining of existing storm sewers, roadway construction and restoration, retention/detention pond construction, underdrain and trench installation, channel grading, stormwater structure installation, and utility relocations. Standard work hours are established as 8:00 AM to 5:00 PM for low-volume roadways, 9:00 AM to 4:00 PM for high-volume roadways, and 9:00 PM to 6:00 AM for level "F" roadways, with all work performed Monday through Friday excluding County-observed holidays and weekends unless authorized otherwise. The contract requires bar chart scheduling, maintenance of at least one lane of traffic in each direction, site restoration upon completion, pre-construction and post-construction audiovisual surveys, and project surveys including as-built documentation.
The contract is financed in part by CDBG-DR funding with an estimated total contract value of $18,258,390.04. Payment is structured through individual work order lump sum pricing for mobilization and maintenance of traffic items, with other items compensated according to FDOT Standard Specifications for Road and Bridge Construction FY 2026-27 and Hillsborough County Public Works Standard Specifications for Construction October 2023 Edition. The contractor is responsible for all quality control testing through an FDOT-qualified testing laboratory approved by the County, with the County performing quality assurance testing at no cost to the contractor. The contract incorporates FDOT materials, standards, and approved product lists, with specific modifications and clarifications outlined in the supplemental specifications. Non-Priced Items (NPIs) are permitted up to 10 percent of individual work order values and shall be priced using FDOT Construction Cost History data or negotiated rates. The contractor must coordinate with utility companies to resolve conflicts, provide traffic control officer support when approved, and repair any damaged irrigation systems resulting from construction activity without additional compensation.
View the file
Other files
Show all 26
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
May 2025
Supplemental Specifications
Section 1 - Specifications
1.01R Workmanship and Materials:
This project is to be constructed utilizing Hillsborough County Public Works Standard Specifications for Construction October 2023 Edition; FDOT Standard Plans FY 2026-27; FDOT Standard Specifications for Road and Bridge Construction FY 2026-27; with the exception of Division I and Division II Sections 100 through 103 and 105; Hillsborough County Public Utilities Specifications for Construction October 2025 and Technical Manuals; Hillsborough County Stormwater Technical Manual (2023); Utility Accommodation Guide and ROW Use Procedures; Tampa Electric Company Standard Electric Service Requirements, latest edition, available from Tampa Electric Company. Any conflict between the documents shall be resolved in accordance with the requirements of the Hillsborough County General Terms and Conditions.
With the exception of the Specifications contained herein and the Hillsborough County Public Utilities Specifications for Construction October 2025, Hillsborough County Public Works has adopted the Florida Department of Transportation’s Standard Specifications for Roadways and Bridges - FDOT Standard Plans FY 2026-27; FDOT Standard Specifications for Road and Bridge Construction FY 2026-27 for use on Public Works Construction Projects, with the following exceptions/clarifications:
A. FDOT Standard Specifications for Road and Bridge Construction Division I, Sections 1 through 9 and Division II Sections 100 through 103 and 105 are omitted from this contract and replaced in their entirety by Hillsborough County’s General Terms and Conditions and Standard Specifications 01010 through 01700. References contained in Division II and Division III of the FDOT Standard Specifications related to Division I shall be replaced with the appropriate corresponding Article(s) or Technical Specifications referenced above. References to FDOT Division I Specification(s) that do not have a corresponding Article(s) or Technical Specification shall be clarified by the COUNTY’s Project Manager.
B. Paragraph Not Applicable.
C. The following FDOT Standard Specifications for Roadways and Bridges are replaced and/or modified with the corresponding Hillsborough County Standard Specification sections contained herein:
204 Graded Aggregate Base 283 Reclaimed Asphalt Pavement Base 320 Hot Bituminous Mixtures; Plant, Methods and Equipment, 327 Milling of Existing Asphalt Pavement, 330 Hot Bituminous Mixtures General Construction Requirements, 334 Superpave Asphalt Concrete, 336 Asphalt Rubber Binder, 337 Asphalt Concrete Friction Courses, 341 Asphalt Rubber Membrane Interlayer, 600 Traffic Signal Overview 603 General Requirements for Installation and Evaluation of Traffic Control
Equipment and Material 611 Signal Installation Acceptance Procedures 620 Signal Installation Grounding 630 Conduit 632 Signal and Interconnect Cable 634 Span Wire Assembly https://assets.contentstack.io/v3/assets/blteea73b27b731f985/blt2f95697d515cb87c/Standard%20Specifications%20for%20Construction%202023.pdf https://assets.contentstack.io/v3/assets/blteea73b27b731f985/blt2f95697d515cb87c/Standard%20Specifications%20for%20Construction%202023.pdf https://www.fdot.gov/design/standardplans/current/27 https://www.fdot.gov/specifications/default.shtm https://www.fdot.gov/specifications/default.shtm https://hcfl.gov/businesses/land-development/technical-publications/public-utilities-technical-specifications https://hcfl.gov/businesses/land-development/technical-publications/public-utilities-technical-specifications https://hcfl.gov/businesses/land-development/technical-publications/public-utilities-technical-manuals https://assets.contentstack.io/v3/assets/blteea73b27b731f985/bltb859e75c281dd885/Stormwater%20Management%20Technical%20Manual%202023.pdf https://assets.contentstack.io/v3/assets/blteea73b27b731f985/bltb859e75c281dd885/Stormwater%20Management%20Technical%20Manual%202023.pdf https://www.tampaelectric.com/49c963/siteassets/files/content/sesr.pdf
635 Pull and Junction Boxes 639 Electrical Power Service Assemblies 650 Vehicular Signal Assemblies 652 24/7 Solar Flashing Beacon Assembly 653 Pedestrian Signal Assemblies 660 Inductive Loop Detectors 662 3-M Opticom™ Priority Control Preemption Detection 665 Pedestrian Detector Assembly 670 Traffic Controller Assembly 676 Controller Cabinets 699 Internally Illuminated Signs 901 Coarse Aggregate, 902 Fine Aggregate, 916 Bituminous Materials, and 919 Ground Rubber Tire.
The CONTRACTOR Quality Control requirements outlined in these Sections are required as described herein.
D. CONTRACTOR Quality Control (CQC) program requirements referenced within the
FDOT Standard Specifications are not required on Hillsborough County projects. However, the CONTRACTOR is responsible for constructing the project in accordance with the contract documents and ensuring compliance with the specifications. Therefore, the CONTRACTOR is responsible for scheduling and performing testing as required to ensure contract compliance. All testing performed by the CONTRACTOR must be performed by a FDOT qualified testing laboratory approved by the COUNTY. The COUNTY will perform Quality Assurance testing to ensure CONTRACTOR compliance with the contract documents. This testing is solely for the COUNTY’s benefit. The COUNTY’s testing is not intended to relieve the CONTRACTOR of performing testing and they are not permitted to rely on this testing to ensure their contract compliance. Quality Assurance testing by the COUNTY in no way relieves the CONTRACTOR or their Subcontractors of their responsibility to provide quality materials and workmanship on the project. No act or omission on the part of the COUNTY, Professional, any inspector(s), or representative of the COUNTY shall be construed as relieving CONTRACTOR of this responsibility.
E. If the CONTRACTOR desires to utilize materials, means, or methods which in accordance with the FDOT specifications requires Quality Control testing and approval by the Engineer, the testing shall be performed at the expense of the CONTRACTOR, and reviewed for acceptance by the COUNTY. The COUNTY also reserves the right to require testing above and beyond the FDOT specified LOT testing in situations where the testing of LOT quantities will not provide a reasonable assurance of the quality of the work. This additional testing by the CONTRACTOR will be at no additional cost to the COUNTY.
F. At the CONTRACTOR’s option he may submit a Value Engineering Change Proposal, also known as a Cost Savings Initiative Proposal (CSIP), or hereinafter referred to as a VECP or CSIP in accordance with FDOT Standard Specifications for Road and Bridge Construction, Section 4-3.9, Value Engineering Incentive, or Cost Savings Initiative Proposal. The COUNTY reserves the right to reject at its discretion any VECP or CSIP submittal and the CONTRACTOR shall remain obligated to perform the WORK in accordance with the terms of the existing Contract.
G. Paragraph Not Applicable.
H. The use of the term “Department” in the FDOT Specifications is replaced by COUNTY except in those instances where the FDOT is the controlling organization.
I. The terms Engineer, Project Manager and Project Representative are interchangeable between the various Contract Documents.
J. Control of Materials: The County will accept approved FDOT Quality Product List (QPL) products and materials unless stated to the contrary herein.
1.02R Project Sign
Project identification sign(s) shall be provided by the COUNTY and placed by the CONTRACTOR at each specific project site. CONTRACTOR is responsible for removing the “portable” sign(s) upon completion of project work at the specified location. The sign(s) shall be maintained in good working condition and shall be returned to the COUNTY at the end of the contract term.
1.03R Schedule
The CONTRACTOR’s project schedule shall encompass the project’s entire construction duration specified in the CONTRACT and may not indicate a shorter duration. Additionally, the schedule shall reflect the construction phasing specified in the CONTRACT and shall include all WORK, including work to be performed by others such as coordination, material acquisition, utility relocation, COUNTY submittal reviews, permit reviews and approvals, etc.
Bar Chart: The bar chart schedule as described in Section 01310 of the Standard Specifications shall be required under this contract.
CPM: The CPM schedule as described in Section 01311 of the Standard Specifications shall not be required under this contract.
1.04R Special Working Hours
The Standard work site operation hours within Hillsborough County to be considered by Bidders in preparing their bids shall be as follows:
8:00AM to 5:00PM - Low volume roadways such as subdivisions or any similar locations.
9:00AM to 4:00PM - High volume roadways (collector and arterial roadways) congested areas, and any similar locations.
9:00PM to 6:00AM - High volume roadways (level “F” roadways) congested areas, and any similar locations.
Monday through Friday, excluding COUNTY-observed holidays and weekends. No work shall proceed outside these hours without 72 hours prior notice (minimum) and written authorization by the County’s PROJECT MANAGER. However, the COUNTY reserves the right to establish work hours based on traffic volumes, congestion, or other situations that will interfere with the normal flow of traffic.
Temporary Traffic Control Permits will be issued by the COUNTY, as described later in these Supplemental Specifications. The TTC Permits indicate the allowable hours for operation within the actual roadway limits for each road or portion thereof in each project’s work order(s). The CONTRACTOR may request alternative work hours, based on the allowable hours established by the TTC Permit(s). The approval of alternate work hours for each project is subject to the same authorization described above and will be based on a standard 8-hour shift as provided by the normal work hours. These provisions allow daytime and nighttime shifts, based on the allowable hours indicated by the TTC Permit. Further changes to the approved work hours require a formal request by the CONTRACTOR for the TTC Permit to be amended by the COUNTY and the written authorization by the County’s PROJECT MANAGER. If approved, an amended TTC Permit will be issued to the CONTRACTOR.
If the work is on schedule, the PROJECT MANAGER is not obliged to consider a shift longer than 8 hours or additional workdays beyond those described above. However, if the work is deemed to be behind schedule, the PROJECT MANAGER may approve longer shifts and/or additional shifts based on the approval of a recovery schedule submitted by the CONTRACTOR.
At the discretion of the PROJECT MANAGER, additional costs incurred by the COUNTY for overtime wages and/or employing additional staff are subject to reimbursement by the CONTRACTOR to the COUNTY.
Overtime Work:
The Work Order will establish the milestone dates for the Work Order completion. The CONTRACTOR is responsible to complete the Work within the required milestone dates, using overtime work if necessary, at no additional cost to the COUNTY.
Emergency Work/Urgent Work:
In the event of an emergency or urgent work, as identified by the COUNTY, the CONTRACTOR will be required to confirm receipt of the request with the Project Manager or his designated representative within twenty-four (24) hours of notification, including weekends.
The CONTRACTOR shall complete a site visit within 48 hours of notification and provide a project estimate within 48 hours following the site visit. The CONTRACTOR may be required to provide immediate safety corrective actions, including but not limited to, MOT/ Road Closure devices, steel road plates or other temporary measures to maintain the safety of the public.
Failure to meet this contract requirement may result in the work being assigned to another firm;
and/or no further Work Orders being issued to the CONTRACTOR; and/or termination of this CONTRACT; and/or the filing of a claim by the COUNTY against the performance bond. In the event of an emergency condition, certain purchase restrictions may be waived by the
COUNTY.
Routine Work:
In the event of routine WORK, as identified by the Project Manager or designated representative, the CONTRACTOR will be required to respond to the request of the Project Manager or designated representative, and commence WORK unless otherwise agreed to by the Project Manager. Failure to meet this contract requirement may result in the work's being assigned to another firm; and/or no further Work Orders being issued to the CONTRACTOR; and/or termination of this CONTRACT; and/or the filing of a claim by the COUNTY against the performance bond.
1.05 Clearing & Grubbing
Clearing & Grubbing shall be performed in accordance with FDOT Specification Section 110.
Additionally, specified plowing of the surface shall include the removal of the top layer of organic material beginning from the original ground line and if applicable stockpiling of the material for future use on the project. No additional compensation shall be provided for this WORK or associated WORK within the designated limits of construction with the exception of tree removal that is greater than 6” DBH. DBH is defined as Diameter at Breast Height, which is 4.5 feet above the ground on the uphill side of the tree. Tree removal greater than 6” in DBH should utilize “tree removal” bid items for payment.
1.06R Pedestrian Facilities A. All pedestrian facilities shall be constructed in accordance with the Americans with
Disabilities Act (ADA) and the Department of Transportation Regulation 49 CFR, Part 37.
B. Sidewalks and curb ramps shall be constructed in accordance with the FDOT Design
Standards 2026-27 (or the latest edition at time of bid opening) Index 522.
Residential sidewalks adjacent to driveways shall be six (6) inches depth up to the first construction joint, which shall be five (5) feet measured from the edge of the driveway. Sidewalks/Ramps adjacent to roadways shall be six (6) inches in depth up to the first construction joint which shall be a minimum distance of six (6) feet measured from the edge of pavement, or back of curb. The construction joint may not transect the detectable warning surface.
C. Detectable warning surfaces, as defined by the latest edition of FDOT Standard Specifications for Road and Bridge Construction - Specification 527, will be utilized in lieu of tactile surfaces. Detectable warning surfaces must be capable of supporting vehicular traffic and no waivers to the warranty are acceptable. All references to tactile surfaces in the Hillsborough County Standard Specifications for construction shall be interpreted as referring to detectable warning surfaces. In order to meet ADA visual contrast requirements, the standard color for application on Hillsborough County maintained roads is red, unless otherwise directed by the Project Manager. If field conditions exist in which red would not create sufficient contrast, the Project Manager should be notified in order to determine if another color should be utilized. On FDOT maintained roads, the color requirements may vary and should be confirmed prior to placement.
Acceptable Materials for Detectable Warning Surfaces:
1. Top Guard Detectable Warning by Roadway Concepts
2. Proprietary epoxy-based system supplied and installed by Vanguard of Florida.
3. Alternate materials and methods which fully meet contract specifications, and which have been approved for the FDOT Qualified Products List, may be used if approved by the Project Manager. Only those materials and methods which are compatible with traffic loads (including warranty) will be considered.
- End of Section -
Section 2 – Project Specific
2.01R Office Facilities:
No Field Office Required.
2.02R Superpave Asphalt Unit of Measure:
For this contract the unit of measure for Pay item 334-1 Superpave asphaltic concrete shall be as designated by each corresponding line item.
2.03R Environmental Project Signs - If required per Spec Section 01560-1.08.
CONTRACTOR shall provide Two (2) project sign(s) for the COUNTY. Project sign(s) shall be fabricated, painted, and lettered in accordance with the Special Conditions if the project is financed entirely by the COUNTY, or in accordance with the EPA Supplementary General Conditions if partially financed by an EPA grant. Each sign shall be erected in a location as directed by the PROJECT MANAGER. Each sign shall be braced to keep it in a plumb position for the construction duration. CONTRACTOR shall remove and dispose of the sign(s) when directed by the PROJECT MANAGER.
2.04R Construction Phasing:
In addition to the requirements of Section 01550 Hillsborough County Public Works Standard Specifications for Construction October 2023 Edition, CONTRACTOR is to include the following:
The CONTRACTOR shall maintain at least one lane of traffic in each direction. Additionally, the CONTRACTOR shall maintain all existing auxiliary turn lanes throughout the duration of the project, even during temporary traffic shifts.
The CONTRACTOR shall prepare Maintenance of Traffic (M.O.T.) drawings required for permitting at the CONTRACTOR’s expense, for each redirection of traffic. The COUNTY Public Works Department issues Temporary Traffic Control permits. The CONTRACTOR is responsible for obtaining any required permits. Refer to FDOT Standard Indexes.
Under no circumstances will a road closure be permitted unless otherwise approved by the COUNTY. CONTRACTOR shall adhere to the conditions contained in the construction plans and the Standard Specifications related to lane closure restrictions and requirements. If a road closure is requested by the CONTRACTOR for COUNTY consideration, the CONTRACTOR shall be required to submit a site-specific traffic control plan in a CADD drawing(s) that has been signed and sealed by a licensed Florida Professional Engineer. The CONTRACTOR shall adhere to FDOT Specifications Section 102-4 when preparing for a road closure request. The plan shall detail all the necessary signage, temporary striping, temporary lighting signal adjustment(s) and equipment for this alternative traffic control plan for permit approval. Payment for this shall be included in the cost for the Maintenance of Traffic pay item and no other compensation shall be provided.
Payment for this item shall include the removal of all conflicting existing pavement markings, it shall also include material (asphalt, concrete, milling, crushed concrete, etc.) required to maintain driveways during construction.
2.05R Temporary Loop Detectors:
Not Applicable.
2.06R Utility Coordination:
The CONTRACTOR shall coordinate its work with that of the utility companies. Any conflicts between the WORK that the CONTRACTOR shall perform, and the utility owner’s facilities shall be resolved by the CONTRACTOR and the utility owner with the COUNTY’S concurrence. The CONTRACTOR shall protect from any damage all existing structures, underground piping, benchmarks, trees, and other facilities. The CONTRACTOR will be held responsible for damage to such existing facilities in the event of interruption of water, wastewater or other utility services as a result of accidental breakage, exposure, or lack of support. The CONTRACTOR shall promptly notify the proper authority and cooperate with the authority in the prompt restoration of service. If water or wastewater service is interrupted and the CONTRACTOR is performing or assisting the repair work, the CONTRACTOR shall work continuously until the service is restored. Do not begin work around fire hydrants until the local fire authority has approved provisions for continued service. No additional compensation shall be provided for this WORK or associated WORK.
2.07R Vibration Monitoring:
As defined by the latest edition of FDOT Standard Specifications for Road and Bridge Construction
- Specification 108, vibration monitoring of existing structures shall be used for preservation of existing property from damage, when applicable, due to activity within the project work area. The CONTRACTOR will implement a vibration monitoring program in accordance with FDOT Standard Specifications for Road and Bridge Construction - Specification 108; however, at its discretion, the COUNTY reserves the right to reject the CONTRACTOR’s request to implement a vibration monitoring program. The unit price shall be inclusive for the entire vibration monitoring program (i.e., inspection and settlement monitoring, initial setup of monitoring equipment, operation, adjustments and removal, including all labor and equipment, and reporting).
2.08R Incidental Items:
Miscellaneous or incidental items such as dewatering (excluding bypassing pumping and special cofferdam beyond dewatering as defined below), cutting, patching, grading, saw-cutting, concrete pipe collars, electrical hardware, bolts, nuts, fittings, utility coordination, etc., or other ancillary items may be required to complete the construction as indicated on the plans or in the scope of work. If no specific bid item is shown, such miscellaneous or incidental items are to be included in the unit price (s) for the item (s) with which they are associated. SEPARATE PAYMENT FOR MISCELLANEOUS INCIDENTAL ITEMS SHALL NOT BE MADE BY THE COUNTY, unless specifically agreed to by the County’s Project Manager and solely at the County’s discretion. All components shown and described on the bid documents are to be included in the bid items shown on the bid form.
Means and Methods:
Additional compensation for items considered as means and methods will not be compensated for by the COUNTY. Specifically, but not limited to; the use of water trucks (for lining, structure sealing etc.), divers, dewatering systems (excluding bypassing pumping and special cofferdam beyond dewatering as defined below), access mats, and concrete pumps.
Bypass Pumping:
Bypassing pumping is considered as a temporary method to redirect a stream of water within the project work area. Any bypass pumping to be compensated for must have prior approval from the County Project Manager. CONTRACTOR shall be responsible for any and all bypass pumping operations and is solely responsible for each project site, maintaining existing stormwater runoff flow pattern upstream and downstream of project site. The unit price shall be inclusive for the entire bypass pumping system (i.e., initial setup, operation, adjustments and removal, including all labor and equipment).
Compensation will not be provided for the idle (standby) time of the bypass pumping system.
Special Cofferdam Beyond Dewatering:
CONTRACTOR shall be responsible for installation and removal of a special cofferdam system required beyond dewatering. A special cofferdam system is considered as a temporary barrier using Z-shaped sheet piles to stop or redirect the flow of water from the project work area. The special cofferdam system is a non-structural wall, and for example, does not include walers. Earthen embankments are not considered a special cofferdam system. The unit price shall be inclusive for the entire system (i.e., installation and removal of material, labor, and equipment costs).
2.09R Description of Work It is anticipated that the work to be performed under this CONTRACT may include, but is not limited to the following:
A. Storm sewer installation, including cross drains, side drains, manhole and inlet structures, and outfall and/or end treatment that may encounter groundwater during installation within project limits.
B. CIPP lining of existing storm sewers, cleaning and sealing of existing pipe joints, which may necessitate pipe plugging upstream/downstream and bypass pumping.
C. Roadway construction and restoration.
D. Right-of-Way construction and restoration.
E. Retention/Detention Pond construction and restoration, grading and ditch construction; all should be considered to be under wet conditions unless noted on the construction plans.
F. Underdrain, trench and French drain installation.
G. Channel grading and/or large stormwater structure installation under wet conditions.
H. Potable water, reclaimed water, and/or sanitary relocations due to potential conflicts; by-pass pumping of utilities may be required.
I. Other related stormwater projects
Work will be performed at various locations throughout Hillsborough County. CONTRACTOR may be required to work outside of awarded area. The COUNTY reserves the right to arrange the sequence of Project Locations. Work may be removed, or additional work may be added to the contract, not to exceed the Awarded Contract Price.
The CONTRACTOR shall make whatever investigations it deems necessary as to the actual field conditions and to comply with the requirements of the Contract documents at no additional cost to the County.
2.10R Restoration of Site:
Upon completion of any work, the CONTRACTOR shall be responsible for cleaning and restoring the site. This includes removing all unused materials and excess soil. The area shall be left in the same or better condition as before performance of the work. All disturbed sod shall be replaced in kind.
2.11R Storage of Construction Materials and Equipment:
Supplemental to the provisions in the Contract Terms and Conditions, if the CONTRACTOR intends to store or stage materials, equipment, construction debris, etc. on private or public property outside of the right of way, the CONTRACTOR shall obtain permission via a written agreement.
The CONTRACTOR shall provide the COUNTY with a copy of the written agreement prior to any utilization of the property. The written agreement shall specify the terms, identify the parties involved, and be signed by authorized individuals representing the property owner and the CONTRACTOR. If the property is a County facility, the COUNTY REPRESENTATIVE will assist with obtaining written permission to the extent possible. Areas utilized by the CONTRACTOR for storing or staging materials, equipment, and other items will be fully restored to their original condition at the expense of the CONTRACTOR. Restoration will occur immediately after the CONTRACTOR’s last use of the area.
2.12R Traffic Control Officer Requirement:
When needed, and approved by the County’s PROJECT MANAGER, the use of an off-duty law enforcement officer will be paid by the hour. The total hours actually worked at the site by each individual officer will be entered for payment daily. Travel time to and from the site are not included in the daily payment. A line item is added to the bid pages to address the support of an off-duty law enforcement officer.
2.13R Residential Irrigation (Sprinkler) System Repair:
The construction activities associated with stormwater installation and road reconstruction could impact existing irrigation systems that are within or near the County’s right-of-way. The CONTRACTOR is responsible at his own expense for immediate repairs to these systems which result from construction activity in their vicinity. Generally, these repairs are anticipated to be PVC pipeline break repairs (typically ½” to 2” diameter pipe) and damaged sprinkler head repair and/or replacement. The repair work will be coordinated with the affected residents or entities responsible for the irrigation system and accomplished to their satisfaction. No compensation will be provided for the investigation or repair of any damaged irrigation systems.
2.14R Maintenance of Traffic:
The Contractor shall furnish all necessary traffic control, message board(s), temporary striping, barricades, signs and flagmen, to ensure the safety of the traveling public and to all working personnel.
The Contractor shall submit an M.O.T plan indicating all facets of traffic control for the project area.
The MOT plan must be approved in writing by the County prior to commencing any work. All traffic control shall be in accordance with the FDOT Design Standards and FDOT Standard Specifications for Road and Bridge Construction Section 102, the most current edition. M.O.T. and associated devices shall be checked daily and periodically throughout the project for compliance; and where adjustments or corrections are needed, prompt revisions shall be made.
Under no circumstances will road closure be permitted unless approved by the COUNTY. As a minimum, two (2) way traffic shall be maintained at all times. Daytime and overnight lane closures shall be in accordance with all applicable permits, policies and Section 1 of these Supplemental Specifications, Article 1.04 Work Hours. Lane closures on roadways under FDOT’s jurisdiction shall be coordinated with FDOT by the CONTRACTOR. Similarly, lane closures involving other authorities and municipalities, where the County’s roads intersect or are continuous with roads under their jurisdiction, will be coordinated with that entity by the CONTRACTOR. This may include expressway authorities, cities, and adjacent counties. All associated costs for coordination, plans and/or permit(s) preparation, submittal and securing approval, are to be included in this Pay Item.
Payment for this item shall include the removal of all conflicting existing pavement markings and interim phase pavement markings and/or temporary pavement markings. Other means of removal or obliteration of conflicting or obsolete pavement markings may be employed if approved by the PROJECT MANAGER. It shall also include material (asphalt, concrete, millings, crushed concrete, etc.) required to maintain driveways during construction, and their removal and disposal if required. Payment for this item includes all necessary traffic control components with the exception of prior approved Off-Duty-Law Enforcement as stated in section 2.11R.
2.15R Measurement & Payment:
This Section modifies or clarifies items in the FDOT Standard Specifications for Road and Bridge Construction FY2026-27 and the Hillsborough County Public Works Standard Specifications for Construction October 2023 Edition, with respect to this contract.
Standard Specifications for Road & Bridge Construction FY 2026-27, Section 660, Vehicle Detection System Assembly: Article 660-6 Method of Measurement and Article 660-7 Basis of Payment:
Furnish and install a vehicle detection system in accordance with the Contract Documents. Use vehicle detection systems and loop sealant that meet the requirements of this Specification and are listed on the Department’s Approved Product List (APL). Many traffic loop assemblies in Hillsborough County’s traffic systems may only require connection of the new loop lead into the first pull box. However, there are traffic signals on County roads that are operated and maintained by other municipalities. The contractor is cautioned about predicating their price on a limited scope of work. Some traffic loop assemblies may require significantly more work to satisfy the Specifications, such as installing additional signal cables in conduits, cutting and epoxy sealing signal cables in asphalt, loop lead-in installation, and any other work required to produce a complete and accepted installation by the jurisdictional owner and operator of the traffic signals. Payment will be per traffic loop assembly type (AS). All other provisions of Section 660 apply.
Standard Specifications for Road & Bridge Construction FY26-27, Section 711, Thermoplastic Pavement Markings: Article 711-9 Method of Measurement and Article 711-10 Basis of Payment:
All types of thermoplastic stripes will be paid in linear feet (LF). Solid stripes will be paid as the total length of the unbroken solid stripe. Skip stripes will be paid as the total length of the skip stripe, from the beginning of the first thermo stripe to the end of the last thermo stripe in the series. All configurations of skip traffic stripes, including 10-30, 3-9, 2-4, and 6-10 are paid as TRAFFIC STRIPE SKIP (THERMO) (6”), and either white or yellow. All other provisions of Section 711 apply.
Hillsborough County Public Works Standard Specifications for Construction October 2023 Edition, Section 101 – 1.02 Payment for Mobilization: Section 101-2.01 Basis of Payment:
Payment for Mobilization shall be based on lump sum Price per individual work order as shown in the contract bid pages. All other provisions of Section 101 apply.
Hillsborough COUNTY Public Works Standard Specifications for Construction October 2023 Edition, Maintenance of Traffic Section 102-5.01 Basis of Payment:
Payment for Maintenance of Traffic shall be based on lump sum Price per individual work order as shown in the contract bid pages. All other provisions of Section 102 apply.
2.16R Excavation for Structures and Pipe Excavation for Structures and Pipe shall be performed in accordance with FDOT Specification Section 125. No additional compensation shall be provided for this WORK or associated WORK. Payment for this work under this Section shall be strictly adhered to in this contract and no other listed bid items shall be utilized unless prior approval from the Project Manager has been permitted and work order has been issued.
2.17R Pipe Culverts and Storm Sewer Pipe material shall be specified on the construction plans or in some cases directed by the Project Manager. Two description designations have been provided for in this contract’s bid items. One is
Rhonda Bowman Comment on Text Should be FY2026-27
Rhonda Bowman Comment on Text Should be FY2026-27
Rhonda Bowman Comment on Text Should be FY2026-27
“pipe conc culv” for only reinforced concrete pipe and the other is “pipe culvert (optional material)” for various material types such as, but not limited to, corrugated metal pipe, HDPE, and polyvinyl chloride (PVC) pipe. CONTRACTOR’s unit prices for optional material shall be taken into consideration for the use of various piping materials as directed by the COUNTY’s Project Manager for project specific reasons.
2.18R Box Culvert (Cast-in-Place and/or Pre-cast) and Reinforcing Steel In accordance with the contract documents, the box culvert shall be installed and/or constructed per FDOT Standard Index, Specification and contract documents. In the event when there are no plans available, the CONTRACTOR shall install/construct the box culvert as approved by the COUNTY’s Project Manager. At the COUNTY’s discretion, the COUNTY may request that the box culvert be constructed as a “cast-in-place” and/or a “pre-cast” box culvert and will require the necessary shop drawings submission for COUNTY approval prior to this work commencing. No additional compensation shall be made for the different methods.
The method of measurement for the “in-place” quantity of concrete to be paid on the bases of volume, specifically in cubic yards, of each of the various concrete classes (Class I, II, III, IV) as shown in plans and/or directed by the COUNTY.
Basis for payment for cast-in-place and/or pre-cast box culvert shall be made for all work, labor, equipment, materials and all appurtenances required to complete the work in an acceptable manner.
The reinforcing steel in box culverts shall be performed in accordance with FDOT Specifications Section 415-5.11, FDOT Design Standards and contract documents. The method of measurement for the in-place quantity to be paid for will be the computed weight, in pounds, of reinforcing steel entering into the completed structure or item of steel needed to cast-in-place the concrete structure.
The basis of payment will be compensated for all work specified in FDOT Specification Section 415, including all welding, all clips, spacers, ties, mechanical couplers, etc. and wire or other material used for fastening the reinforcement in place.
2.19R Record Drawings In addition to the requirements stated in the Specifications, each sheet of the record drawings shall be signed and sealed by the CONTRACTOR’s Project Superintendent and the Registered Surveyor in a timely manner. Final payment shall be contingent upon the COUNTY’s acceptance and approval of these record drawings.
2.20R Audiovisual and Project Survey A. Audiovisual Survey:
A pay item for “Audio Video Survey” has been included in the bid proposal. The CONTRACTOR shall perform both the pre-construction and post-construction audio video survey as one (1) unit in each work order unless otherwise directed by the COUNTY. The audio video surveys are to be provided to the COUNTY and must meet all requirements stated in Section 01385.
Basis of payment for the pre-construction and post-construction audio video surveys shall be considered as one (1) unit per work order. The project’s pre-construction audio video survey and accompanying report(s) shall be submitted for review and approval to the COUNTY by the CONTRACTOR at least two weeks prior to CONTRACTOR’s mobilization date. Also, final payment approval and final certification of project completion shall be contingent on the CONTRACTOR’s timely submission of the project’s post-construction audio video survey and accompanying report(s) for review and approval.
B. Project Survey:
A pay item for “Project Survey” has been included in the bid proposal. CONTRACTOR shall perform both the pre-construction and post-construction Project Survey as one (1) unit in each work order unless otherwise directed by the COUNTY.
Basis of payment for the pre-construction and post-construction Project Surveys shall be considered as one (1) unit per work order. Final payment approval and final certification of project completion shall be contingent on the CONTRACTOR’s timely submission of the project’s Project Survey to include any necessary as-builts as referenced in section 2.18R.
2.21R Remove Slip Liner from Existing Culvert CONTRACTOR shall be responsible for the removal of exiting slip liner in an existing culvert. The unit price shall be inclusive for the removal and disposal of entire system, paid by linear foot (i.e., removal and disposal of material, labor, and equipment costs).
2.22R Non-Priced Items (NPI) Non-Priced Items (NPI) are defined as those which have not been included as a specific unit price items in this bid document. An allowance for NPI’s has been included in the Bid Proposal, which represents the maximum amount that may be expended for such work during the term of this contract.
NPI work shall be identified by the CONTRACTOR in its proposal at the time a Work Order is being prepared. Once an NPI is approved in a Work Order, it may be incorporated into the contract and thus permit its continued use as a unit priced item for future Work Orders. The NPI work shall be priced as follows:
1. Florida Department of Transportation (FDOT) Construction Cost History cost data books (latest Edition) shall be used for the NPI.
2. If the NPI is not provided in the above-referenced FDOT publication, the price shall be negotiated with the CONTRACTOR utilizing other referenced sources as identified by the COUNTY. An example of such sources would be previous Hillsborough COUNTY bids, bids from other municipalities, etc.
For an individual work order, the value of NPI work shall not exceed 10% of the total work order value without prior approval of the Department Director. Once an NPI is approved in a Work Order, it may be incorporated into the contract and thus permit its continued use as a unit priced item for future Work Order.
- End of Section -