About this file

This is Addendum #1 to an Invitation to Bid issued by the Florida Department of Military Affairs, Construction & Facility Management Office, on behalf of the Florida Army National Guard at Camp Blanding Joint Training Center. The addendum provides clarifications and modifications to the original bidding documents for the CBJTC SR16 Chain Link Fence project (Project Number 224112), with an original invitation to bid date of March 13, 2026, and a bid opening scheduled for April 21, 2026, at 2:00 p.m. Eastern Time. The project involves removal and replacement of approximately 5,784 linear feet of chain-link fencing, including terminal posts, line posts, barbed wire, and two 30-foot manually operated cantilever gates. The new fencing will be black vinyl, 6 feet high with 1 foot of barbed wire with black vinyl coating, with an alternate bid item (ABI 1) for 7-foot high fencing with identical barbed wire configuration. All fence posts must be set in concrete with horizontal cross bars at the top and tension wire at the bottom, in accordance with USACE FE6-TR-72 Chain-Link Security Fence specifications and CBJTC Fencing Standards.

The addendum addresses eight key questions and clarifications regarding fence specifications, removal procedures, and contractor requirements. The specification calls for Class 2b commercial-grade chain link wire with 9-gauge core wire and polyvinyl chloride-coated steel fabric with 92 grams of zinc coating per square meter in accordance with ASTM F668, with twist top and knuckle bottom selvage configuration. Complete removal of existing posts and concrete footers is required, and grounding is limited to gate posts only, not line posts. A General Contractor license is not mandatory for the project, and no permit is required. The post size specifications vary by fence height: 2-inch line posts and 2.5-inch terminal posts for fences up to 72 inches, and 2.5-inch line posts and 3-inch terminal posts for fences 72 inches and above. All hardware must be domestic due to federal funding under the Build America, Buy America Act. Bidders must submit proposals for both the base bid and the alternate bid item (ABI 1) on separate line items of the proposal form.

View the file

Other files

File Type Posted
224112 Chain Link Fence- SOW- REVISED.pdf PDF
Fence Part_1_Supplemental_Conditions.pdf PDF
Fence Part_2_General_Terms & Cond _Lvl_4.pdf PDF
Fence Part_1_Supplemental_Conditions.pdf PDF
224112 Chain Link Fence- SOW- REVISED.pdf PDF
Fence Part_1_Supplemental_Conditions.pdf PDF
224112 Exhibit_4_5_Proposal & Sub List.docx DOCX document
224112 Fence PRE_BID_AGENDA.pdf PDF
224112 CBJTC Chain Link Fence ITB.pdf PDF
Prequalifications for Award.docx DOCX document
224112 Chain Link Fence ADDENDUM #1.pdf PDF
224112 Exhibit_4_5_Proposal & Sub List.docx DOCX document
224112 CBJTC Chain Link Fence ITB.pdf PDF
Fence Part_2_General_Terms & Cond _Lvl_4.pdf PDF
224112 Chain Link Fence- SOW- REVISED.pdf PDF
Fence Part_2_General_Terms & Cond _Lvl_4.pdf PDF
Prequalifications for Award.docx DOCX document
224112 CBJTC Chain Link Fence ITB.pdf PDF
224112 Chain Link Fence- SOW- REVISED.pdf PDF
PreBid Sign in sheet.pdf PDF
224112 Exhibit_4_5_Proposal & Sub List.docx DOCX document
224112 Chain Link Fence ADDENDUM #1.pdf PDF
224112 bid tab.pdf PDF
Fence Part_1_Supplemental_Conditions.pdf PDF
224112 Exhibit_4_5_Proposal & Sub List.docx DOCX document
224112 CBJTC Chain Link Fence ITB.pdf PDF
Prequalifications for Award.docx DOCX document
Fence Part_2_General_Terms & Cond _Lvl_4.pdf PDF
224112 Fence PRE_BID_AGENDA.pdf PDF
Prequalifications for Award.docx DOCX document
PreBid Sign in sheet.pdf PDF
Show all 31

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Florida Army National Guard

Construction & Facility Management Office

ISSUED ADDENDUM

Rev. 11/2018

Date April 3, 2026

ADDENDUM Number 1

Project Number and Name 224112 – CBJTC SR16 Chain Link Fence

Invitation to Bid Date March 13, 2026

Number of Attachments 0

Bid Opening Date and Time April 21, 2026, 2:00 p.m. Eastern

From: Department of Military Affairs, CFMO Contracting Office

This addendum and the listed attachments forms a part of the contract documents and modifies the original bidding documents. Acknowledgement of this addendum in Exhibit 4 - Bid Proposal form is required.

Concerns with this addendum should be addressed to:

ng.fl.flarng.list.cfmo-contracting@army.mil

Answers to Questions (Q) / Clarifications (C) / Modifications (M)

Q1. Please confirm the Class of Chain Link Wire (vinyl coated wire chart attached for reference):

o Class 1: 13 ga. core wire w/ a 9ga. finish o Class 2a: 9 ga. core wire / a 6ga. finish o Class 2b: 9 ga. core wire w/ a 8ga. Finish

A1. Class 2b-Commercial Grade, 9 ga. Core wire; (polyvinyl chloride-coated steel fabric with 92 grams of zinc coating per square meter in accordance with ASTM F668)

Q2. What is the top and bottom selvage of the chain link wire: Twist Top / Twist Bottom or Twist Top / Knuckle Bottom?

A2. Twist Top / Knuckle Bottom

Q3. For Removal: can existing posts be cut off below grade? Or does the entire post need to be pulled along w/ concrete footer?

A3. The entire post needs to be pulled along with concrete footer.

mailto:ng.fl.flarng.list.cfmo-contracting@army.mil

Q4. Please confirm if grounding of the fence and gates is to be included.

A4. Grounding of the gate posts are included (NOT Line posts)

Q5. Could you please confirm whether a General Contractor license is mandatory for this project?

A5. No, a GC license is not mandatory.

Q6. Is a permit required.

A6. No, a permit is not required.

Q7. Specs pg 02444-1 calls for 2" line posts and 2-1/2" Terminal posts, and on FE6 Chain Link details show 2-1/2" line posts and 3" terminal posts?

A7. The post size confusion is because they are looking at 2 different fences. We have dealt with this in the past. The table shows “Up to 72” and then it shows 72” and above.

The correct table is the 72” and above.

Q8. Does the hardware need to be domestic or is import acceptable?

A8. Yes, it must be domestic. Due to the money being Federal. (Refer to Section D-4 Buy America Preference (Pub. L. No. 117-58,§§ 70901-52, Title IV—Build America, Buy America Act)

C. You are preparing a bid for a Base Bid and an Alternate Bid Item (ABI 1). There are two separate line items on the proposal form for each bid.

Attachment List

N/A

END OF ADDENDUM #1