22 - DRAFT TECHNICAL EXHIBIT D - CDRLs.pdf

PDF 15 MB Posted

Attached to
MISSION SUPPORT SERVICES - WHITE SANDS MISSILE RANGE - DRAFT RFP Federal contract opportunity
Solicitation number
W51EW7-25-R-A003
Issued by
Department of the Army Materiel Command Mission and Installation Contracting Command Fort Sam Houston

About this file

This document is a Contract Data Requirements List (CDRL) Draft Technical Exhibit D for a Mission Support Services contract at White Sands Missile Range. The CDRL details 20 individual data items (A001-A021) that the contractor must submit throughout the contract, including Quality Control Plan, Quality Control Reporting, Key Personnel Identification, Training/Qualification/Certification, Emergency Plans/Operations, Cost File Report Submission, Government Furnished Property Inventory, Mishap/Incident Notification, and other administrative and operational reports.

Each data item specifies submission requirements such as frequency (annual, monthly, as required), format (PDF, editable excel), encryption standards (128-bit), and distribution (to Contracting Officer Representative and Contracting Officer). Submission timelines range from 5-90 days after contract award, with most reports requiring electronic submission via email with specific encryption protocols. The documents are part of a draft Request for Proposal (RFP) for engineering services under NAICS code 541330, with the final government requirements to be determined upon release of the final RFP.

View the file

Other files for this federal contract opportunity

Other files attached to MISSION SUPPORT SERVICES - WHITE SANDS MISSILE RANGE - DRAFT RFP, newest first.
File Type Posted
Letter from the KO 16APR2025.pdf PDF
20 - DRAFT TECHNICAL EXHIBIT B - SAFETY REQUIREMENTS.pdf PDF
17 - DRAFT Attachment 0007 - WSMR MSS DIDs.pdf PDF
14 - DRAFT Attachment 0004 - CBA WSMR MSS 2023 - 2026 Final.pdf PDF
13 - DRAFT Attachment 0003 - Labor Category Descriptions.xlsx XLSX spreadsheet
11 - DRAFT Attachment 0001 - PWS Attachment 9_Government Furnished Facilities.pdf PDF
9 - DRAFT Attachmennt 0001 - PWS Attachment 7_MSS Vehicle Usage FY2024.pdf PDF
8 - DRAFT Attachment 0001 - PWS Attachment 6_Technical_Instrumentation_Equipment_and_Facilities.pdf PDF
1 - DRAFT RFP - W51EW725RA003.pdf PDF
24 - WSMR MSS Section M.pdf PDF
23 - WSMR MSS Section L.pdf PDF
18 - Attachment 0008 - WSMR MSS DRAFT RFP Questions.xlsx XLSX spreadsheet
12 - DRAFT Attachment 0002 - WSMR MSS Price Matrix 19MAR2025.xlsx XLSX spreadsheet
10 - DRAFT Attachment 0001 - PWS Attachment 8_MSS Historical Workload Data.pdf PDF
4 - DRAFT Attachment 0001 - PWS Attachment 2_References for Contract_Management_and_Compliance.pdf PDF
21 - DRAFT TECHNICAL EXHIBIT C - WSMR MSS PRS.pdf PDF
16 - DRAFT Attachment 0006 - Past Performance Questionnaire.docx DOCX document
7 - DRAFT Attachment 0001 - Attachment 5_Courier Schedule WSMR.pdf PDF
6 - DRAFT Attachment 0001 - PWS Attachment 4_Contractor Furnished Property.pdf PDF
19 - DRAFT TECHNICAL EXHIBIT A - SECURITY REQUIREMENTS.pdf PDF
15 - DRAFT Attachment 0005 - WSMR MSS DD254.pdf PDF
5 - DRAFT Attachment 0001 - PWS Attachment 3_MSS GFP List 17MAR2025.xlsx XLSX spreadsheet
3 - DRAFT Attachment 0001 - PWS Attachment 1_ENVIRONMENTAL COMPLIANCE.pdf PDF
2 - DRAFT ATTACHMENT 0001 - WSMR MSS Performance Work Statement 19MAR2025.pdf PDF
Letter from the KO.pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST Form Approved

(1 Data Item) 0MB No. 0704-0188

The public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing the burden, to the Department of Defense, Executive Services Directorate (0704-0188). Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid 0MB control number. Please do not return your form to the above organization. Send completed form to the Government Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

TDP TM OTHER

D. SYSTEM/ITEM

I

E. CONTRACT/PR NO. F.CONTRACTOR

MSS TBD TBD

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE

A00I Quality Control Plan

4. AUTHORITY (Data Acquisition Document No.)

5. CONTRACT REFERENCE 6. REQUIRING OFFICE

DI-QCIC-81722 PWS 1.5.1 ATEC/WSMR

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION 14. DISTRIBUTION

REQUIRED

ONE/R I0DAC LT b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT a. ADDRESSEE Final C SUBMISSION Draft

NIA NIA ASREQ Reg Repro

16. REMARKS COR 1 1

DI-QCIC-81722 is tailored as follows: Contracting Officer 1 1 The Contractor shall develop and maintain a Quality Control Plan to ensure services are performed IA W the PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor's QCP is how it assures that the work provided complies with the requirements of the contract. The report shall be submitted to the KO and COR within 10 days after contract award. The plan must include the following:

- A chart showing organization structure and lines of authority, the names, qualifications, duties, responsibilities, and classification of each member of the Contractor's Quality

Control Team.

- How the Contractor will monitor work to ensure performance complies with all deliverables (etc. timelines, deadlines, and goals).

- How the Contractor will monitor work to ensure performance complies with all specifications and requirements of the contract, including the contract's clauses.

- How the Contractor will monitor and ensure staff qualifications remain current and valid including DoD Contractor Personnel Office (DOCPER) processes/approves throughout contract performance.

- How the Contractor will ensure all keys issued will remain controlled items (Paragraph

1. 7 Key Control).

- How the Contractor will inventory and track maintenance of all Government Provided

Equipment/Materials.

- How the Contractor will identify, investigate and correct any non-conforming performance and prevent similar deficiencies in the future, and

- How the Contractor will file and save all Quality Control related documents for the life of the contract plus five (5) years.

Contractor format is acceptable as long as it is submitted in PDF.

BLK 8: COR(s) will review and provide feedback 30 calendar days following receipt of initial submission. The Contractor shall address all issues within 11 calendar days following receipt feedback.

BLK 10: ONE/R = One Time with Revisions

BLK 12: 10 days after contract award

BLK 13: As Required

15.TOTAL 2 2 0

G. PREPARED BY H.DATE I. APPROVED BY J. DATE

DD FORM 1423-1, FEB 2001 PREVIOUS EDITION MAY BE USED. Page of Pages

Adobe Professional 7.0

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

DRAFT

A001 CDRL
A002 CDRL
A003 CDRL
A004 CDRL
A005 CDRL
A006 CDRL
A007 CDRL
A008 CDRL
A009 CDRL
A010 CDRL
A011 CDRL
A012 CDRL
A013 CDRL
A014 CDRL
A015 CDRL
A016 CDRL
A017 CDRL
A018 CDRL
A019 CDRL
A020 CDRL
A021 CDRL

File details come from the government source that posted it. Updated .