Attachment_J-1_-_Section_B_CLIN_Scenarios_and_Sample_Quote_Breakdown.docx
DOCX document 45 KB Posted
- Attached to
- IRS, FMSS Logistics Services Federal contract opportunity
- Solicitation number
- 2032H8-18-R-00001
About this file
Attachment J-1
View the file
Other files for this federal contract opportunity
Show all 50
IRS, FMSS Logistics Services has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment J-1, Section B - Contract Line Item Number (CLIN) Scenarios
The prospective offeror shall provide a sample quote for the scenarios listed below. The total quoted price for each scenario shall be multiplied by the average number of requests received from the Government for each performance period, excluding the Phase-In period. This total shall be populated into Attachment J-2, Grand Total Summary Schedule. The Grand Total Summary Schedule will result in the not-to exceed amounts in Section B, Supplies or Services and Price/Costs.
In accordance with Section L, each offeror shall propose its quoted prices in the Pricing Scenario tables in accordance with its normal accounting practices. However, the quotes must be in sufficient detail in order to be evaluated. In addition, the offeror must price out each scenario for a base year and all option years as noted on each sample quote.
The following are the average number of requests received from the Government for each performance period:
| CLIN |
| Description |
| Base Period |
| Option Period 1 |
| Option Period 2 |
| Option Period 3 |
| Option Period 4 |
| X002 |
| Locksmith Services |
| 1187 |
| 984 |
| 911 |
| 911 |
| 807 |
| X003 |
| Office Repairs |
| 810 |
| 710 |
| 673 |
| 661 |
| 621 |
| X004 |
| Box Moves |
| 32 |
| 34 |
| 35 |
| 26 |
| 25 |
| X005 |
| Property Moves |
| 553 |
| 489 |
| 489 |
| 459 |
| 319 |
| X006 |
| Labor Support |
| 74 |
| 68 |
| 51 |
| 40 |
| 43 |
| X007 |
| Excessing/Disposal/Recycling |
| 376 |
| 323 |
| 329 |
| 258 |
| 225 |
These sample quotes are for evaluation purposes only and will not be used for any other purposes.
CLIN X002 - Locksmith Services
Work Order Request #ABC123 to install a new lock and provide two new keys for one two-drawer lateral file cabinet. The manufacturer is Herman Miller. The location of the cabinet is 751 Daily Drive, Camarillo, CA, 93010.
CLIN X003 - Office Repairs
Work Order Request #DEF455 to repair the cabinet in my cubicle because it has fallen off the hinges. The furniture manufacturer is Knoll. The location is 550 West Fort Street, Boise, ID, 83724.
CLIN X004 - Box Moves
Work Order Request #GHl789 received to move 200 boxes from the 2nd Floor at 3848 West Columbus Drive, Tampa, FL, 33507 to the 1st Floor storage room at 1 Independent Drive, Jacksonville, FL, 32202. Boxes must be palletized and shrink wrapped prior to transporting.
CLIN X005 - Property Moves
Work Order Request #JKL 123 received to breakdown 5 workstations; move them from the 3rd floor to the 5th floor and reassemble them in the same configuration on the 5th Floor. The location is 1000 Elm Street, Manchester, NH, 03101.
CLIN X006 - Labor Support
Work Order Request #MN0123 received to install 3 bulletin boards, 2 pictures and 1 clock on the wall. The location is 290 Broadway, New York, NY, 10007.
CLIN X007 - Excessing/Disposal/Recycling
Work Order Request #PQR123 received to pick-up and dispose of 5 2 drawer lateral metal filing cabinets. The disposal point will be UNICOR located in Leavenworth, KS. The filing cabinets are located at 4503Colemen Street, Suite 101, Bismark, ND, 58503.
CLIN 0002 – Locksmith Services
Prime Contractor
Labor
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Category
Category
Materials
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Item
Item
Item
Subcontractor
Labor
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Category
Category
Materials
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Item
Item
Item
Subtotal
Overhead Rate
Profit Rate
Total Quote
CLIN 1002 – Locksmith Services
Prime Contractor
Labor
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Category
Category
Materials
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Item
Item
Item
Subcontractor
Labor
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Category
Category
Materials
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Item
Item
Item
Subtotal
Overhead Rate
Profit Rate
Total Quote
CLIN 2002 – Locksmith Services
Prime Contractor
Labor
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Category
Category
Materials
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Item
Item
Item
Subcontractor
Labor
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Category
Category
Materials
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Item
Item
Item
Subtotal
Overhead Rate
Profit Rate
Total Quote
CLIN 3002 – Locksmith Services
Prime Contractor
Labor
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Category
Category
Materials
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Item
Item
Item
Subcontractor
Labor
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Category
Category
Materials
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Item
Item
Item
Subtotal
Overhead Rate
Profit Rate
Total Quote
CLIN 4002 – Locksmith Services
Prime Contractor
Labor
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Category
Category
Materials
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Item
Item
Item
Subcontractor
Labor
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Category
Category
Materials
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Item
Item
Item
Subtotal
Overhead Rate
Profit Rate
Total Quote
CLIN 0003 – Office Repairs
Prime Contractor
Labor
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Category
Category
Materials
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Item
Item
Item
Subcontractor
Labor
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Category
Category
Materials
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Item
Item
Item
Subtotal
Overhead Rate
Profit Rate
Total Quote
CLIN 1003 – Office Repairs
Prime Contractor
Labor
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Category
Category
Materials
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Item
Item
Item
Subcontractor
Labor
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Category
Category
Materials
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Item
Item
Item
Subtotal
Overhead Rate
Profit Rate
Total Quote
CLIN 2003 – Office Repairs
Prime Contractor
Labor
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Category
Category
Materials
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Item
Item
Item
Subcontractor
Labor
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Category
Category
Materials
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Item
Item
Item
Subtotal
Overhead Rate
Profit Rate
Total Quote
CLIN 3003 – Office Repairs
Prime Contractor
Labor
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Category
Category
Materials
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Item
Item
Item
Subcontractor
Labor
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Category
Category
Materials
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Item
Item
Item
Subtotal
Overhead Rate
Profit Rate
Total Quote
CLIN 4003 – Office Repairs
Prime Contractor
Labor
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Category
Category
Materials
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Item
Item
Item
Subcontractor
Labor
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Category
Category
Materials
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Item
Item
Item
Subtotal
Overhead Rate
Profit Rate
Total Quote
CLIN 0004 – Box Moves
Prime Contractor
Labor
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Category
Category
Materials
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Item
Item
Item
Subcontractor
Labor
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Category
Category
Materials
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Item
Item
Item
Subtotal
Overhead Rate
Profit Rate
Total Quote
CLIN 1004 – Box Moves
Prime Contractor
Labor
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Category
Category
Materials
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Item
Item
Item
Subcontractor
Labor
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Category
Category
Materials
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Item
Item
Item
Subtotal
Overhead Rate
Profit Rate
Total Quote
CLIN 2004 – Box Moves
Prime Contractor
Labor
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Category
Category
Materials
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Item
Item
Item
Subcontractor
Labor
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Category
Category
Materials
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Item
Item
Item
Subtotal
Overhead Rate
Profit Rate
Total Quote
CLIN 3004 – Box Moves
Prime Contractor
Labor
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Category
Category
Materials
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Item
Item
Item
Subcontractor
Labor
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Category
Category
Materials
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Item
Item
Item
Subtotal
Overhead Rate
Profit Rate
Total Quote
CLIN 4004 – Box Moves
Prime Contractor
Labor
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Category
Category
Materials
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Item
Item
Item
Subcontractor
Labor
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Category
Category
Materials
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Item
Item
Item
Subtotal
Overhead Rate
Profit Rate
Total Quote
CLIN 0005 – Property Moves
Prime Contractor
Labor
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Category
Category
Materials
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Item
Item
Item
Subcontractor
Labor
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Category
Category
Materials
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Item
Item
Item
Subtotal
Overhead Rate
Profit Rate
Total Quote
CLIN 1005 – Property Moves
Prime Contractor
Labor
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Category
Category
Materials
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Item
Item
Item
Subcontractor
Labor
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Category
Category
Materials
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Item
Item
Item
Subtotal
Overhead Rate
Profit Rate
Total Quote
CLIN 2005 – Property Moves
Prime Contractor
Labor
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Category
Category
Materials
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Item
Item
Item
Subcontractor
Labor
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Category
Category
Materials
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Item
Item
Item
Subtotal
Overhead Rate
Profit Rate
Total Quote
CLIN 3005 – Property Moves
Prime Contractor
Labor
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Category
Category
Materials
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Item
Item
Item
Subcontractor
Labor
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Category
Category
Materials
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Item
Item
Item
Subtotal
Overhead Rate
Profit Rate
Total Quote
CLIN 4005 – Property Moves
Prime Contractor
Labor
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Category
Category
Materials
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Item
Item
Item
Subcontractor
Labor
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Category
Category
Materials
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Item
Item
Item
Subtotal
Overhead Rate
Profit Rate
Total Quote
CLIN 0006 – Labor Support
Prime Contractor
Labor
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Category
Category
Materials
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Item
Item
Item
Subcontractor
Labor
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Category
Category
Materials
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Item
Item
Item
Subtotal
Overhead Rate
Profit Rate
Total Quote
CLIN 1006 – Labor Support
Prime Contractor
Labor
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Category
Category
Materials
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Item
Item
Item
Subcontractor
Labor
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Category
Category
Materials
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Item
Item
Item
Subtotal
Overhead Rate
Profit Rate
Total Quote
CLIN 2006 – Labor Support
Prime Contractor
Labor
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Category
Category
Materials
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Item
Item
Item
Subcontractor
Labor
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Category
Category
Materials
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Item
Item
Item
Subtotal
Overhead Rate
Profit Rate
Total Quote
CLIN 3006 – Labor Support
Prime Contractor
Labor
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Category
Category
Materials
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Item
Item
Item
Subcontractor
Labor
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Category
Category
Materials
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Item
Item
Item
Subtotal
Overhead Rate
Profit Rate
Total Quote
CLIN 4006 – Labor Support
Prime Contractor
Labor
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Category
Category
Materials
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Item
Item
Item
Subcontractor
Labor
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Category
Category
Materials
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Item
Item
Item
Subtotal
Overhead Rate
Profit Rate
Total Quote
CLIN 0007 – Excessing/Disposal/Recycling
Prime Contractor
Labor
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Category
Category
Materials
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Item
Item
Item
Subcontractor
Labor
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Category
Category
Materials
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Item
Item
Item
Subtotal
Overhead Rate
Profit Rate
Total Quote
CLIN 1007 – Excessing/Disposal/Recycling
Prime Contractor
Labor
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Category
Category
Materials
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Item
Item
Item
Subcontractor
Labor
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Category
Category
Materials
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Item
Item
Item
Subtotal
Overhead Rate
Profit Rate
Total Quote
CLIN 2007 – Excessing/Disposal/Recycling
Prime Contractor
Labor
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Category
Category
Materials
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Item
Item
Item
Subcontractor
Labor
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Category
Category
Materials
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Item
Item
Item
Subtotal
Overhead Rate
Profit Rate
Total Quote
CLIN 3007 – Excessing/Disposal/Recycling
Prime Contractor
Labor
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Category
Category
Materials
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Item
Item
Item
Subcontractor
Labor
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Category
Category
Materials
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Item
Item
Item
Subtotal
Overhead Rate
Profit Rate
Total Quote
CLIN 4007 – Excessing/Disposal/Recycling
Prime Contractor
Labor
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Category
Category
Materials
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Item
Item
Item
Subcontractor
Labor
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Category
Category
Materials
| Qty |
| Unit of Issue |
| Unit Price |
| Extended Price |
Item
Item
Item
Subtotal
Overhead Rate
Profit Rate
Total Quote
File details come from the government source that posted it.