20262004_A2_Addendum 1_Attachment B_2016 Terminal Expansion As-Builts.pdf

PDF 5 MB Posted

Attached to
ITB 20262004 Terminal Canopy Repairs and Improvements
Solicitation number
S-KE0010-00016279
Issued by
Lane County, Oregon

About this file

This file is an Addendum 1 attachment containing as-built architectural and mechanical drawings for the Eugene Airport Terminal Expansion project in Eugene, Oregon, prepared by RS&H Oregon and dated March 13, 2017. The document includes comprehensive construction drawings depicting the 2016 terminal expansion, encompassing multiple levels and areas including baggage claim expansion, concourse improvements, staircase and escalator installations, elevator sections, HVAC systems, and reflected ceiling plans. The drawings illustrate terminal floor plans at Level 1 (364'-0" elevation) and Level 2 (377'-10" elevation), roof plans, building sections, wall details, ceiling systems with lighting and sprinkler head locations, vertical circulation elements including stairs and escalators, and mechanical systems layout. The as-built set documents construction details including material specifications, dimensions, elevation controls (NGVD 29 datum with 3.87-foot vertical control difference from NAVD 88), and references to related specification sheets and details across architectural, structural, mechanical, plumbing, fire protection, electrical, and baggage handling system drawings.

The document serves as a record of construction completion and includes notations referencing addenda, RFIs (Requests for Information), and RFP markups applied during the project execution. Drawing details specify finish materials including wood panels (WD-2, WD-5), gypsum board assemblies (GWB-1), acoustic ceilings, fluorescent and recessed lighting fixtures, HVAC diffusers, fire sprinkler systems, and TPO roofing with specified slope requirements. The drawings incorporate coordination notes requiring field verification of dimensions, reference to code sheets for fire extinguisher locations, and compliance with wall assembly, door type, curtain wall, storefront window, and finish schedules. Mechanical systems are detailed with specific unit designations, ductwork sizing, CFM ratings, and equipment locations throughout the terminal spaces.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

4700 S. Syracuse St., Suite 300 Denver, CO 80237

303-409-9700 FAX 303-409-9701

Oregon Registration No. 0871AF

RS&H Oregon, www.rsandh.com

Architects-Engineers-Planners, P.C.

B

B

LANE 3

LANE 2

T D C C A T

TABLE630

BINS

EMPTY

BINS

EMPTYTABLE630

BINS

EMPTY

BINS

EMPTY

E N T E R

W

TM

D

C

EIAR

AD

A

GAT

E

AT2

6040 aTiX

L

R

T D C C A T

1N 2N

3N

4N

5N

6N

7N

8N

9N

10N

11N

12N

13N

14N

1S

2S

3S

4S

5S

6S

7S

8S

9S

10S

11S

12S

13S

AB

DD.5EFG

IJKL

MNOPQ

RSTUVWXY

14S

.9N

1.1S

2.1S

3.1S

4.1S

5.1S

H D.8 D.4

NS

T.1

C

15S

K.1

N.3

E.8

E.8

NOT ALL NOTES APPLY TO THIS SHEET

A. DIMENSIONS SHOWN ARE FROM FACE OF STRUCTURAL STRATA OR

FINISH FACE OF EXISTING CONSTRUCTION U.N.O.

B. WHERE DIMENSIONS, WALL TYPES, ETC. ARE NOT SHOWN, REFER

TO ENLARGED PLANS

C. ARCHITECTURAL FINISHED FLOOR GRADES ARE BASED ON NGVD

29 ELEVATION CONTROLS. THE EXTERIOR TOPOGRAPHICAL

SURVEY IS BASED ON NAVD 88 ELEVATION CONTROLS. THERE IS A

VERTICAL CONTROL DIFFERENCE BETWEEN THESE TWO DATUM

OF 3.87 FT.

D. TERMINAL LEVEL 1 FINISH FLOOR 364’-0”

E. ALL WINDOW/DOOR DIMENSIONS ARE TO CENTER OF

WINDOW/DOOR UNLESS NOTED OTHERWISE. COORDINATE ROUGH

OPENING DIMENSIONS WITH ASSOCIATED DOOR AND WINDOW

DETAILS PRIOR TO CONSTRUCTION.

F. REFER TO CODE SHEETS FOR LOCATIONS OF WALL MOUNTED

FIRE EXTINGUISHER(S).

G. DOOR FRAMES TO BE LOCATED 4” FROM CORNER OF WALL

UNLESS NOTED OTHERWISE.

H. WHERE PLYWOOD IS ADDED FOR SHEAR ON PARTIAL WALL,

REMAINDER OF WALL SHALL HAVE SIMILAR SHEATHING TO

PROVIDE FLUSH WALL SURFACE. RE: STRUCT. FOR SHEAR WALL

LOCATIONS.

I. FIELD VERIFY ALL DIMENSIONS. REPORT ANY DISCREPANCIES TO

THE ARCHITECT FOR CLARIFICATION PRIOR TO PROCEEDING WITH

CONSTRUCTION.

J. REFER TO SHEET G500 FOR WALL ASSEMBLIES

K. REFER TO SHEET A700 FOR DOOR TYPES AND SCHEDULES

L. REFER TO SHEET A721 FOR CURTAIN WALL DETAILS

M. REFER TO SHEET A722 FOR STOREFRONT WINDOW DETAILS

N. REFER TO SHEET A801 FOR FINISH SCHEDULES/FINISH LEGEND

O. FURNITURE NOT IN CONTRACT. LOCATIONS SHOWN FOR

COORDINATION OF ELECTRICAL FLOOR OUTLET LOCATIONS.

P. WHERE ENLARGED PLANS ARE CALLED OUT ON SHEET, WALL

TAGS, DIMENSIONS, AND OTHER INFORMATION ARE LOCATED ON

ENLARGED PLAN VIEW

Q. PROVIDE BRONZE BUILDING DEDICATORY PLAQUE. COORDINATE

MOUNTING LOCATION WITH OWNER. REFERENCE SPECIFICATION

SECTION 101416 PLAQUES

PLAN GENERAL NOTES

© 2013 RS&H Oregon, Architects-Engineers-Planners, P.C.

PROJECT NUMBER

REVIEWED BY:

DRAWN BY:

DESIGNED BY:

DATE ISSUED:

REVISIONS

SHEET NUMBER

SHEET TITLE

SEAL

CONSULTANTS

1 2 3 4 5 6

A

B

C

D

E

A

B

C

D

E

1 2 3 4 5 6

GJN 50934

/1

/2

:4 :2

P

M C

U se rs

\B a rs ta d K

\D o cu m e n ts

\2 .0

A

C

E N

T R

A L B a rs ta d K

.r vt

March 13, 2017

KB

Checker

224−9675−015

LEVEL 2

OVERALL PLAN

A120

Designer

AS−BUILT SET

Eugene Airport Terminal Expansion

City of Eugene

28801 Douglas Drive Eugene, Oregon 97402

0 32'-0" 64'-0"16'-0" 1/32" = 1'-0"1

LEVEL 2 - OVERALL PLAN LEVEL 1 KEY PLAN

N.T.S.

A B

C D L

H

I

K

JE

F

BAG CLAIM EXPANSION

ARCHITECTURAL WORK AREA

ALTERNATE NO.1

ARCHITECTURAL WORK AREA

SSCP/HOLDROOM EXPANSION

ARCHITECTURAL WORK AREA

No. DESCRIPTION DATE

303-409-9700 FAX 303-409-9701

Oregon Registration No. 0871AF

RS&H Oregon, www.rsandh.com

Architects-Engineers-Planners, P.C.

A313

A325

A326

A326

A326

A325

1N

2N

1S

2S

3S

4S

LMNOPQR

NS

A D

S E

E

M A

T C

H L

IN

E

A D

S E

E

M A

T C

H L

IN

E

MATCH LINE

30' - 0" 30' - 0" 30' - 0" 30' - 0" 2' - 3" 30' - 0"

A325

A313

N.3

1/4" \ 1'-0"

SLOPE TO ROOF DRAIN

1/4" \ 1'-0"SLOPE TO ROOF DRAIN

A150 10

GUTTER R-3R-3

SKA313-1

A110C

A540

ROOF GENERAL NOTES

A. ALL ROOF PENETRATIONS SHALL BE CONCEALED BEHIND THE

PARAPET WALLS OR MECHANICAL ROOF WELLS AND SHALL NOT

EXTEND ABOVE THE PARAPET WALLS OR THE ADJACENT RIDGE

LINE. WHERE VENTILATION CHIMNEYS ARE PROVIDED, APPROVED

VENT PIPES MAY BE GANGED WITHIN CHIMNEYS AS WELL.

CONTRACTOR SHALL COORDINATE ALL PENETRATIONS FOR

EXHAUST AND INTAKES VENTS, ETC. TO ENSURE CODE REQUIRED

CLEARANCES ARE MET.

B. APPROVED VISIBLE ROOF PENETRATIONS ARE TO BE PAINTED TO

MATCH ADJACENT ROOF COLORS.

C. ALL EXPOSED WOOD ROOF FRAMING MEMBERS TO BE STAINED

U.N.O. COLOR SELECTED BY ARCHITECT.

D. ALL REQUIRED CRICKETS MAY NOT BE INDICATED. CONTRACTOR

TO PROVIDE CRICKETS AS REQUIRED TO ENSURE PROPER

DRAINAGE AROUND ROOF PENETRATIONS AND VERTICAL

WALL/SLOPED ROOF INTERSECTIONS.

E. FLASHING MATERIAL SHALL MATCH METAL ROOFING MATERIAL IT

COMES IN CONTACT WITH.

F. PROVIDE TPO WALKWAYS AT ALL ACCESS POINTS TO THE ROOF

SYSTEM INCLUDING LADDERS, HATCHWAYS, STAIRS AND DOORS

AND MECHANICAL EQUIPMENT SERVICE AREAS. DO NOT INSTALL

TOP WALKWAYS WITHIN 10' OF THE ROOF PERIMETER.

© 2013 RS&H Oregon, Architects-Engineers-Planners, P.C.

PROJECT NUMBER

REVIEWED BY:

DRAWN BY:

DESIGNED BY:

DATE ISSUED:

REVISIONS

SHEET NUMBER

SHEET TITLE

SEAL

CONSULTANTS

1 2 3 4 5 6

A

B

C

D

E

A

B

C

D

E

1 2 3 4 5 6

GJN 50934

/1

/2

:4 :0

P

M C

U se rs

\B a rs ta d K

\D o cu m e n ts

\2 .0

A

C

E N

T R

A L B a rs ta d K

.r vt

March 13, 2017

Author

Checker

224−9675−015

ROOF PLAN,

AREA C

A130C

Designer

AS−BUILT SET

Eugene Airport Terminal Expansion

City of Eugene

28801 Douglas Drive Eugene, Oregon 97402

0 8'-0" 16'-0"4'-0" 1/8" = 1'-0"1

ROOF PLAN, AREA C LEVEL 1 KEY PLAN

N.T.S.

A B

C D L

H

I

K

JE

F

No. DESCRIPTION DATE

1 ADDENDUM No. 1 06/16/14

2 ADDENDUM No. 3 06/27/14

303-409-9700 FAX 303-409-9701

Oregon Registration No. 0871AF

RS&H Oregon, www.rsandh.com

Architects-Engineers-Planners, P.C.

1N 2N

3N

4N

5N

6N

7N

8N

9N

10N

11N

12N

13N

14N

1S

2S

3S

4S

5S

6S

7S

8S

9S

10S

11S

12S

13S

AB

DD.5EFG

IJKL

MNOPQ

RSTUVWXY

14S

.9N

1.1S

2.1S

3.1S

4.1S

5.1S

H D.8 D.4

NS

T.1

C

15S

K.1

N.3

E.8

E.8

BAG CLAIM EXPANSION

ARCHITECTURAL WORK AREA

SSCP/HOLDROOM EXPANSION

ARCHITECTURAL WORK AREA

ALTERNATE NO. 1

ARCHITECTURAL

WORK AREA

OPEN TO

ABOVE

CEILING PLAN LEGEND

8' SUPPLY

DIFFUSER

2'X2' SUPPLY

DIFFUSER

2'X4' FLOURESCENT

LIGHT FIXTURE

2'X2' FLOURESCENT

LIGHT FIXTURE

4' SUPPLY

DIFFUSER

FIRE SPRINKLER HEAD

SPEAKERs

RECESSED CAN

FIXTURE

9.5" X 4' FLOURESCENT

LIGHT FIXTURE

AC-1

WD-1

WD-2

GVB-1

US-1

SEE SHEET A801 FOR

FINISH LEGEND/SCHEDULE

WD-5

OPEN TO

ABOVE

GWB-1

© 2013 RS&H Oregon, Architects-Engineers-Planners, P.C.

PROJECT NUMBER

REVIEWED BY:

DRAWN BY:

DESIGNED BY:

DATE ISSUED:

REVISIONS

SHEET NUMBER

SHEET TITLE

SEAL

CONSULTANTS

1 2 3 4 5 6

A

B

C

D

E

A

B

C

D

E

1 2 3 4 5 6

GJN 50934

/1

/2

:4 :0

P

M C

U se rs

\B a rs ta d K

\D o cu m e n ts

\2 .0

A

C

E N

T R

A L B a rs ta d K

.r vt

March 13, 2017

Author

Checker

224−9675−015

LEVEL 1

OVERALL

REFLECTED

CEILING PLAN

A210

Designer

AS−BUILT SET

Eugene Airport Terminal Expansion

City of Eugene

28801 Douglas Drive Eugene, Oregon 97402

0 32'-0" 64'-0"16'-0" 1/32" = 1'-0"1

LEVEL 1 OVERALL REFLECTED CEILING PLAN LEVEL 1 KEY PLAN

N.T.S.

A B

C D L

H

I

K

JE

F

CEILING PATCH & REPAIR FOR FIRE SPRINKLER

INSTALLATION

REFERENCE DRAWINGS F110A THROUGH F120D FOR

ALL LOCATIONS OF NEW FIRE SPRINKLER PIPE

INSTALLATION.

PATCH AND REPAIR EXISTING CEILING AREAS SHOWN

ON THIS SHEET AT AREAS OF NEW SPRINKLER PIPE

INSTALLATION. ADDITIONAL CEILING PATCHING AND

REPAIR IS REQUIRED FOR AREAS A,F,H AND L NOT

SHOWN ON A REFLECTED CEILING PLAN.

FIELD VERIFY THE EXISTING CEILING MATERIALS IN

ALL AREAS THAT REQUIRE PATCHING. MATCH

EXISTING CEILING FOR LIKE NEW APPEARANCE IN ALL

WORK AREAS. IN AREAS THAT REQUIRE PAINT FOR

REPAIR, PAINT ENTIRE CEILING AREA FOR UNIFORM

APPEARANCE.

IN AREAS OF EXISTING VENTWOOD GRILLE (W2)

CEILINGS, CEILING SECTIONS MUST BE CAREFULLY

REMOVED AND SALVAGED FOR REINSTALLATION IN

AREAS OF NEW SPRINKLER WORK. REPLACE ANY

DAMAGED CEILING SECTIONS AS REQUIRED IN THESE

WORK AREAS.

No. DESCRIPTION DATE

303-409-9700 FAX 303-409-9701

Oregon Registration No. 0871AF

RS&H Oregon, www.rsandh.com

Architects-Engineers-Planners, P.C.

R

R

R

R

E

E

E E

E

E

A601

A601

A313

A325

A326

A326

A326

A325

1N

2N

1S

2S

3S

4S

LMNOPQR

NS

WOMEN'S TOILET

1501MEN'S TOILET

B NORTH STAGING

AREA

CORRIDOR

(N) STORAGE

(N) GENERATOR

ROOM

30' - 0" 30' - 0" 30' - 0" 30' - 0" 2' - 3" 30' - 0"

A D

S E

E

M A

T C

H L

IN

E

A D

S E

E

M A

T C

H L

IN

E

A510

A325

A313

N.3

OPEN TO ABOVEESCALATORS

AC-4

EXISTING AC-4EXISTING AC-4

US-1

US-1

GWB-1

@ 8'-0" AFF

GWB-1

@ 8'-0" AFF

AC-1

EXISTING AC-4

EXPANSION JOINT

SYSTEM

A150 10

SKA313-1

EXPANSION JOINT

EXPANSION JOINT

GWB-1

11'-7" AFF

GWB-1

9'-0" AFF

GWB-1

9'-0" AFF

1 HR CLNG.

& SOFFIT

ELEVATOR

EQUIPMENT

/8 "2

/8

3 ?

372' - 0"372' - 0"

372' - 0"

372' - 0"

371' - 11 1/2"

373' - 0"

373' - 0"

373' - 2"

A540

CEILING PLAN LEGEND

8' SUPPLY

DIFFUSER

2'X2' SUPPLY

DIFFUSER

2'X4' FLOURESCENT

LIGHT FIXTURE

2'X2' FLOURESCENT

LIGHT FIXTURE

4' SUPPLY

DIFFUSER

FIRE SPRINKLER HEAD

SPEAKERs

RECESSED CAN

FIXTURE

9.5" X 4' FLOURESCENT

LIGHT FIXTURE

AC-1

WD-1

WD-2

GVB-1

US-1

SEE SHEET A801 FOR

FINISH LEGEND/SCHEDULE

WD-5

OPEN TO

ABOVE

GWB-1

© 2013 RS&H Oregon, Architects-Engineers-Planners, P.C.

PROJECT NUMBER

REVIEWED BY:

DRAWN BY:

DESIGNED BY:

DATE ISSUED:

REVISIONS

SHEET NUMBER

SHEET TITLE

SEAL

CONSULTANTS

1 2 3 4 5 6

A

B

C

D

E

A

B

C

D

E

1 2 3 4 5 6

GJN 50934

/1

/2

:4 :1

P

M C

U se rs

\B a rs ta d K

\D o cu m e n ts

\2 .0

A

C

E N

T R

A L B a rs ta d K

.r vt

March 13, 2017

KB

Checker

224−9675−015

LEVEL 1

REFLECTED

CEILING PLAN,

AREA C

A210C

Designer

AS−BUILT SET

Eugene Airport Terminal Expansion

City of Eugene

28801 Douglas Drive Eugene, Oregon 97402

0 8'-0" 16'-0"4'-0" 1/8" = 1'-0"1

1ST LEVEL REFLECTED CEILING PLAN - AREA C LEVEL 1 KEY PLAN

N.T.S.

A B

C D L

H

I

K

JE

F

CEILING PATCH & REPAIR FOR FIRE SPRINKLER

INSTALLATION

REFERENCE DRAWINGS F110A THROUGH F120D FOR

ALL LOCATIONS OF NEW FIRE SPRINKLER PIPE

INSTALLATION.

PATCH AND REPAIR EXISTING CEILING AREAS SHOWN

ON THIS SHEET AT AREAS OF NEW SPRINKLER PIPE

INSTALLATION. ADDITIONAL CEILING PATCHING AND

REPAIR IS REQUIRED FOR AREAS A,F,H AND L NOT

SHOWN ON A REFLECTED CEILING PLAN.

FIELD VERIFY THE EXISTING CEILING MATERIALS IN

ALL AREAS THAT REQUIRE PATCHING. MATCH

EXISTING CEILING FOR LIKE NEW APPEARANCE IN ALL

WORK AREAS. IN AREAS THAT REQUIRE PAINT FOR

REPAIR, PAINT ENTIRE CEILING AREA FOR UNIFORM

APPEARANCE.

IN AREAS OF EXISTING VENTWOOD GRILLE (W2),

CEILING SECTIONS MUST BE CAREFULLY REMOVED

AND SALVAGED FOR REINSTALLATION IN AREAS OF

NEW SPRINKLER WORK. REPLACE ANY DAMAGED

CEILING SECTIONS AS REQUIRED IN THESE WORK

AREAS.

No. DESCRIPTION DATE

3 RFP 12 02/02/15

303-409-9700 FAX 303-409-9701

Oregon Registration No. 0871AF

RS&H Oregon, www.rsandh.com

Architects-Engineers-Planners, P.C.

TERMINAL 1ST LEVEL

(0'- 0")

364' - 0"

TERMINAL 2ND LEVEL

(13' - 10")

377' - 10"

FLOOR LEVEL (-1' - 0")

363' - 0"

B.O. 'BANDING' SOFFIT

(9' - 2")

373' - 2"

A326

A326

A326

A326

JKLM

N

OP

24' - 3 1/2"30' - 0"2' - 3"30' - 0"30' - 0"

A403

A403

K.1N.3

A604

1' - 0"1' - 0"

TERMINAL 1ST LEVEL

(0'- 0")

364' - 0"

TERMINAL 2ND LEVEL

(13' - 10")

377' - 10"

FLOOR LEVEL (-1' - 0")

363' - 0"

B.O. 'BANDING' SOFFIT

(9' - 2")

373' - 2"

A326

A326

A326

JKLMNOP

B.O. GLAZING (10' - 6

1/2")

374' - 2 1/2"

EXTERIOR MATERIAL

CHANGE (11' - 6")

375' - 6"

30' - 0"24' - 3 1/2"30' - 0"2' - 3"30' - 0"30' - 0"

A510

A510

A404

A403

A404

K.1N.3

A604

A110C

9 5/8"

9"

1' - 0"

3"

TERMINAL 1ST LEVEL

(0'- 0")

364' - 0"

TERMINAL 2ND LEVEL

(13' - 10")

377' - 10"

FLOOR LEVEL (-1' - 0")

363' - 0"

T.O. PARAPET (28' - 10")

392' - 10"

B.O. 'BANDING' SOFFIT

(9' - 2")

373' - 2"

A326

A326

A326

A326

A324

JKLM

N

OP

EXTERIOR MATERIAL

CHANGE (26' - 8")

390' - 8"

T.O. PRECAST

CONCRETE

366' - 1"

A510

A404

A404

K.1N.3

A612

A604

1' - 9 1/4" A540

1' - 2"

A. ARCHITECTURAL FINISHED FLOOR GRADES ARE BASED ON NGVD 29

ELEVATION CONTROLS. THE EXTERIOR TOPOGRAPHICAL SURVEY IS

BASED ON NAVD 88 ELEVATION CONTROLS. THERE IS A VERTICAL

CONTROL DIFFERENCE BETWEEN THESE TWO DATUM OF 3.87 FT.

B. BUILDING SECTIONS SHOWN ARE TO HELP CLARIFY OVERALL DESIGN

INTENT. REFER TO FLOOR AND FOUNDATION PLANS, REFLECTED

CEILING PLANS, ROOF PLANS, WALL SECTIONS AND DETAILS FOR MORE

SPECIFIC DESIGN INFORMATION NOT EXPRESSLY DEFINED HEREIN.

C. ALL CLIMATE-CONDITIONED SPACES SHALL BE INSULATED AT THE

EXTERIOR ENVELOPE TO MEET ENERGY ANALYSIS OR LOCAL ENERGY

CODE REQUIREMENTS. REFER TO WALL TYPES, SPECIFICATIONS, AND

DETAILS FOR INSULATION TYPES. PROVIDE CAVITY VENTILATION AND

WARM-SIDE VAPOR BARRIERS AT INSULATED SPACES.

D. REFER TO PLANS, WALL TYPES, AND SPECIFICATIONS FOR LOCATIONS

WHERE SOUND ATTENUATION BLANKETS ARE REQUIRED, AND FOR

LOCATIONS AND DETAILS OF FIRE BARRIERS AND FIRE-RATED

ASSEMBLIES.

E. REFER TO STRUCTURAL DRAWINGS FOR SIZE AND MATERIAL

REQUIREMENTS AND CONNECTIONS FOR STRUCTURAL MEMBERS,

FOUNDATION AND FRAMING ELEMENTS.

F. COORDINATE STRUCTURAL FRAMING LAYOUT WITH HVAC, FIRE

PROTECTION SMOKE DETECTION, LIGHTING, AND IT DEVICE

LOCATIONS TO ENSURE ALIGNMENT IN FINISHED WALLS AND CEILINGS.

G. INTERIOR ELEVATIONS OF SURFACES BEYOND SHOWN IN BUILDING

SECTION ARE FOR GENERAL REFERENCE, AND ARE SUPERSEDED BY

SPECIFIC PLAN, SCHEDULE, AND DETAIL INFORMATION WHERE

PROVIDED.

H. IN COMBUSTIBLE CONSTRUCTION INSTALL FIREBLOCKING TO CUT OFF

VERTICAL AND HORIZONTAL DRAFT OPENINGS WITH MATERIALS

COMPLYING WITH IBC 716.

BUILDING SECTION GENERAL NOTES

ARCHITECTUAL FINISHED FLOOR ELEVATIONS ARE BASED

ON NGVD 29 ELEVATION CONTROLS. THE EXTERIOR

TOPOGRAPHICAL SURVEY IS BASED ON NAVD 88 ELEVATION

CONTROLS. THERE IS A VERTICAL CONTROL DIFFERENCE

BETWEEN THESE TWO DATUM OF 3.87 FEET.

BUILDING ELEVATION NOTE:

© 2013 RS&H Oregon, Architects-Engineers-Planners, P.C.

PROJECT NUMBER

REVIEWED BY:

DRAWN BY:

DESIGNED BY:

DATE ISSUED:

REVISIONS

SHEET NUMBER

SHEET TITLE

SEAL

CONSULTANTS

1 2 3 4 5 6

A

B

C

D

E

A

B

C

D

E

1 2 3 4 5 6

GJN 50934

/1

/2

:5 :5

P

M C

U se rs

\B a rs ta d K

\D o cu m e n ts

\2 .0

A

C

E N

T R

A L B a rs ta d K

.r vt

March 13, 2017

Author

Checker

224−9675−015

BUILDING

SECTIONS −

SSCP/CIRCULATION

EXPANSION

A325

Designer

AS−BUILT SET

Eugene Airport Terminal Expansion

City of Eugene

28801 Douglas Drive Eugene, Oregon 97402

0 8'-0" 16'-0"4'-0" 1/8" = 1'-0"24

SSCP/CIRCULATION EXPANSION

0 8'-0" 16'-0"4'-0" 1/8" = 1'-0"22

SSCP/CIRCULATION EXPANSION

0 8'-0" 16'-0"4'-0" 1/8" = 1'-0"21

SSCP/CIRCULATION EXPANSION

1 1

No. DESCRIPTION DATE

1 RFI 345 07/23/20

303-409-9700 FAX 303-409-9701

Oregon Registration No. 0871AF

RS&H Oregon, www.rsandh.com

Architects-Engineers-Planners, P.C.

TERMINAL 1ST LEVEL

(0'- 0")

364' - 0"

TERMINAL 2ND LEVEL

(13' - 10")

377' - 10"

T.O. PARAPET (28' - 10")

392' - 10"

B.O. 'BANDING' SOFFIT

(9' - 2")

373' - 2"

A325

A325

1N2N 1S 2S 3S.9N 1.1S 2.1S 3.1SNS

T.O. PRECAST

CONCRETE

366' - 1"

A325 A402

A402

B.O. NEW ESCALATOR

PIT(S)

359' - 8"

TERMINAL 1ST LEVEL

(0'- 0")

364' - 0"

TERMINAL 2ND LEVEL

(13' - 10")

377' - 10"

T.O. PARAPET (28' - 10")

392' - 10"

B.O. 'BANDING' SOFFIT

(9' - 2")

373' - 2"

A325

A325

1N2N 1S 2S 3S.9N 1.1S 2.1S 3.1SNS

T.O. PRECAST

CONCRETE

366' - 1"

EXTERIOR MATERIAL

CHANGE (11' - 6")

375' - 6"

20' - 0" 2' - 3" 7' - 9" 10' - 0" 2' - 3" 17' - 9" 2' - 3" 17' - 9" 2' - 3"

A325 A402

A403

A403

7 3/4" 11"

A. ARCHITECTURAL FINISHED FLOOR GRADES ARE BASED ON NGVD 29

ELEVATION CONTROLS. THE EXTERIOR TOPOGRAPHICAL SURVEY IS

BASED ON NAVD 88 ELEVATION CONTROLS. THERE IS A VERTICAL

CONTROL DIFFERENCE BETWEEN THESE TWO DATUM OF 3.87 FT.

B. BUILDING SECTIONS SHOWN ARE TO HELP CLARIFY OVERALL DESIGN

INTENT. REFER TO FLOOR AND FOUNDATION PLANS, REFLECTED

CEILING PLANS, ROOF PLANS, WALL SECTIONS AND DETAILS FOR MORE

SPECIFIC DESIGN INFORMATION NOT EXPRESSLY DEFINED HEREIN.

C. ALL CLIMATE-CONDITIONED SPACES SHALL BE INSULATED AT THE

EXTERIOR ENVELOPE TO MEET ENERGY ANALYSIS OR LOCAL ENERGY

CODE REQUIREMENTS. REFER TO WALL TYPES, SPECIFICATIONS, AND

DETAILS FOR INSULATION TYPES. PROVIDE CAVITY VENTILATION AND

WARM-SIDE VAPOR BARRIERS AT INSULATED SPACES.

D. REFER TO PLANS, WALL TYPES, AND SPECIFICATIONS FOR LOCATIONS

WHERE SOUND ATTENUATION BLANKETS ARE REQUIRED, AND FOR

LOCATIONS AND DETAILS OF FIRE BARRIERS AND FIRE-RATED

ASSEMBLIES.

E. REFER TO STRUCTURAL DRAWINGS FOR SIZE AND MATERIAL

REQUIREMENTS AND CONNECTIONS FOR STRUCTURAL MEMBERS,

FOUNDATION AND FRAMING ELEMENTS.

F. COORDINATE STRUCTURAL FRAMING LAYOUT WITH HVAC, FIRE

PROTECTION SMOKE DETECTION, LIGHTING, AND IT DEVICE

LOCATIONS TO ENSURE ALIGNMENT IN FINISHED WALLS AND CEILINGS.

G. INTERIOR ELEVATIONS OF SURFACES BEYOND SHOWN IN BUILDING

SECTION ARE FOR GENERAL REFERENCE, AND ARE SUPERSEDED BY

SPECIFIC PLAN, SCHEDULE, AND DETAIL INFORMATION WHERE

PROVIDED.

H. IN COMBUSTIBLE CONSTRUCTION INSTALL FIREBLOCKING TO CUT OFF

VERTICAL AND HORIZONTAL DRAFT OPENINGS WITH MATERIALS

COMPLYING WITH IBC 716.

BUILDING SECTION GENERAL NOTES

TERMINAL 1ST LEVEL

(0'- 0")

364' - 0"

TERMINAL 2ND LEVEL

(13' - 10")

377' - 10"

B.O. 'BANDING' SOFFIT

(8' - 4")

372' - 4"

A325

A325

1N2N 1S 2S 3S.9N 1.1S 2.1S 3.1SNS

20' - 0" 2' - 3" 7' - 9" 10' - 0" 2' - 3" 17' - 9" 2' - 3" 17' - 9" 2' - 3"

A510

A510

A325 A402

A402

A540

TERMINAL 1ST LEVEL

(0'- 0")

364' - 0"

TERMINAL 2ND LEVEL

(13' - 10")

377' - 10"

T.O. PARAPET (28' - 10")

392' - 10"

A325

1N .9N 1.1SNS

EXTERIOR MATERIAL

CHANGE (22' - 4")

386' - 4"

EXTERIOR MATERIAL

CHANGE (11' - 6")

375' - 6"

2' - 3" 7' - 9"

A510

A510

A510

A510

A510

A403

A403

ARCHITECTUAL FINISHED FLOOR ELEVATIONS ARE BASED

ON NGVD 29 ELEVATION CONTROLS. THE EXTERIOR

TOPOGRAPHICAL SURVEY IS BASED ON NAVD 88 ELEVATION

CONTROLS. THERE IS A VERTICAL CONTROL DIFFERENCE

BETWEEN THESE TWO DATUM OF 3.87 FEET.

BUILDING ELEVATION NOTE:

© 2013 RS&H Oregon, Architects-Engineers-Planners, P.C.

PROJECT NUMBER

REVIEWED BY:

DRAWN BY:

DESIGNED BY:

DATE ISSUED:

REVISIONS

SHEET NUMBER

SHEET TITLE

SEAL

CONSULTANTS

1 2 3 4 5 6

A

B

C

D

E

A

B

C

D

E

1 2 3 4 5 6

GJN 50934

/1

/2

:5 :2

P

M C

U se rs

\B a rs ta d K

\D o cu m e n ts

\2 .0

A

C

E N

T R

A L B a rs ta d K

.r vt

March 13, 2017

Author

Checker

224−9675−015

BUILDING

SECTIONS −

SSCP/CIRCULATION

EXPANSION

A326

Designer

AS−BUILT SET

Eugene Airport Terminal Expansion

City of Eugene

28801 Douglas Drive Eugene, Oregon 97402

0 4'-0" 8'-0"2'-0" 1/8" = 1'-0"12

SSCP/CIRCULATION EXPANSION

0 4'-0" 8'-0"2'-0" 1/8" = 1'-0"14

SSCP/CIRCULATION EXPANSION

0 8'-0" 16'-0"4'-0" 1/8" = 1'-0"11

SSCP/CIRCULATION EXPANSION

0 8'-0" 16'-0"4'-0" 1/8" = 1'-0"21

SSCP/CIRCULATION EXPANSION

303-409-9700 FAX 303-409-9701

Oregon Registration No. 0871AF

RS&H Oregon, www.rsandh.com

Architects-Engineers-Planners, P.C.

E E

R

E

K

12' - 8 3/8"

5 1/8"

1/4" GAP/LT. FIXT.

1/4" GAP/LT. FIXT.

SPRINKLER

HEAD

LIGHT FIXTURE

WD-2

DIFFUSER -

ATTACH TO

STRUCT. ABV. -

CENTER IN

OPENING

EXTERIOR

INTERIOR

4 1/8"

OPENING

FOR DIFF.

WD-2

A620

A152

A152

4' - 7 5/8"

/8

8' - 11 1/2" 1 7/8"

5"

1' - 4 3/4"

A540

INTERIOR EXTERIOR

1/4" GAP/LT. FIXT.

1/4" GAP/LT. FIXT.

WD-2

SPRINKLER

HEAD

LIGHT FIXTURE

4 1/8"

OPENING

FOR DIFF.

DIFFUSER - ATTACH

TO STRUCT. ABV-

CENTER IN OPENING

AHU ABOVE

SEE MECH.

A401

A152

A152

A152

3/4" 5/8" 1/2"

1 7/8"

FIN. CLG. HT: 7'-

6" A.F.F.

HEAD OF AUTOMATIC DOOR

ADD PC. TO PANELS ADJACENT TO

AUTOMATIC DRS. - LENGTH TO MATCH

PANEL - WD SPECIES & FINISH TO

MATCH WD-2 PANELS

BLKG @ SCREW CONNECTIONS -

1'-0" I.C. TYP. PAINT BLACK

WD-2 PANEL OR PORTION THEREOF

11S

12S

/4

/2

/4

/2

/2

GRID LINE

BOT. OF GLU-LAM

BMS.

(8) PANELS @ 1'-0"

PLUS (1) PANEL @ 1'-

2 3/8" PLUS (1) RAIL

@ 5/8" - TYP. BTWN

ROWS OF LT. FIXTS.

9' - 3"

LT. FIXT.-TYP.

BOT. OF GLU-LAM

BMS.

GRID LINE

WD-2

A540

A540

A540

A540

ATTACH SPEAKERS TO 'T' BAR

SUSP. SYSTEM - TYP.

ACOUSTIC BD-PAINT BLACK-

NOTE: OCCURS ONLY

WHERE SPRINKLER HEADS

PENETRATE FIN. CLG.

'T' BAR SUSP. SYSTEM

CLG. PANEL CONNECTIONS

PER MFG.

RECOMMENDATIONS

FIN. CLG-WD-2, IP-11

GAP BTWN. PANELS 1/4" & 1" 9 1/2"

9 1/2"

1" x 2" 18 GA. CLIP MIN. (2)

EA. SIDE OF LT. FIXT.-

TYP.- PAINT BLACK

CONNECT N-S 'T' S'

BETWEEN LT. FIXT.- TYP.-

PAINT BLACK

MAIN 'T' BAR RUNNER-

CONT. N-S. - PAINT BLACK

MAIN 'T' BAR RUNNER -

CONT. E-W BTWN. ROWS-

PAINT BLACK

FIN. CLG. WD-2 IP-11

TO BOT. OF FIXT.

1/4"9"1/4"

9 1/2"

/2

PROFILE OF LIGHT FIXTURE

'T' CONNECTOR BEYOND

'T' BAR SUSP. SYSTEM

FIN. CLG WD-2, IP-11

MET. PAN - IP-3 CLIP

TO 'T' BAR

12S

11 1/2"

/8

4" MET. STUD @ 16" O.C.-

PAINT BLACK WHERE EXP.

RET. AIR SLOT-CONT. MET.

TRIM @ OPNG - IP-3

PAINT BLACK

'T' BAR SUSP. SYSTEM

LIGHT FIXTURE

WD-2, IP-11 - FIN. CLG.

MET. PAN - IP-3 -

ATTACH TO 'T' BAR

& CLIP @ END

GWB-1, IP-6

GWB-1, IP-6

11 1/2"

1 1/4"

4 5/8"

/8

/4

/2

1' - 0 3/4"

/2

WD-5

ON BLACK ACCOUSTICAL

CEILING GRID1' - 0"

PERIMETER DETAIL PER

ACCENT INSTALLATION

INSTRUCTION, RE:

AC-430C-P5

OR

AC-430C-PFC2

6" 6"

© 2013 RS&H Oregon, Architects-Engineers-Planners, P.C.

PROJECT NUMBER

REVIEWED BY:

DRAWN BY:

DESIGNED BY:

DATE ISSUED:

REVISIONS

SHEET NUMBER

SHEET TITLE

SEAL

CONSULTANTS

1 2 3 4 5 6

A

B

C

D

E

A

B

C

D

E

1 2 3 4 5 6

GJN 50934

/1

/2

:5 :4

P

M C

U se rs

\B a rs ta d K

\D o cu m e n ts

\2 .0

A

C

E N

T R

A L B a rs ta d K

.r vt

March 13, 2017

Author

Checker

224−9675−015

CEILING DETAILS

A540

Designer

AS−BUILT SET

Eugene Airport Terminal Expansion

City of Eugene

28801 Douglas Drive Eugene, Oregon 97402

0 1'-4" 2'-8"8" 1/4" = 1'-0"1

NEW B-GATES VESITBULE

0 1'-4" 2'-8"8" 1/4" = 1'-0"2

NEW BAGGAGE CLAIM VESTIBULE

0 8" 1'-4"4" 6" = 1'-0"4

CLG. DETAIL

0 1'-4" 2'-8"8" 1/4" = 1'-0"3

PARTIAL REFL. CLG. PLAN - AREA K

0 1'-0" 2'-0"6" 3" = 1'-0"5

CLG. CLIP DETAIL

0 1'-0" 2'-0"6" 3" = 1'-0"6

CLG. LT. DETAIL

0 1'-0" 2'-0"6" 3" = 1'-0"7

CLG. LT. FILL DETAIL

0 1'-0" 2'-0"6" 3" = 1'-0"8

CLG. SOFFIT DETAIL

1. REFERENCE DRAWING SHEET

A210 FOR CEILING TYPE LEGEND

2. REFERENCE DRAWING SHEET

A801 FOR FINISH SCHEDULE

GENERAL NOTES:

0 1'-4" 2'-8"8" 3/4" = 1'-0"9

SECTION DETAIL

No. DESCRIPTION DATE

1 ADDENDUM No. 3 06/27/14

2 RFI 372 11/11/15

303-409-9700 FAX 303-409-9701

Oregon Registration No. 0871AF

RS&H Oregon, www.rsandh.com

Architects-Engineers-Planners, P.C.

TERMINAL 1ST LEVEL

(0'- 0")

364' - 0"

TERMINAL 2ND LEVEL

(13' - 10")

377' - 10"

FLOOR LEVEL (-1' - 0")

363' - 0"

T.O. PARAPET (28' - 10")

392' - 10"

19 EQUAL TREADS = 19' - 0"7" 5' - 6"

3 EQUAL TREADS =

3' - 0"

E

Q U

A L

R

IS

E

R S

/8

2" DIA. STAINLESS

STEEL PIPE RAIL

STRINGER

ESCALATOR

TRUSS BEYOND

CONCRETE SLAB

SEE STRUCTURAL

5/8" GYPSUM BOARD

ON METAL STUDS

LM

N

B.O. NEW ELEVATOR PIT

(-5' - 0")

359' - 0"

T.O. PARAPET (24' - 6")

388' - 6"

T.O. PARAPET (16' - 0")

380' - 0"

B.O. WALL (10' - 5")

374' - 5"

E

Q U

A L

R

IS

E

R S

/8

A602

3' - 10" 23' - 8"

N.3

B.O. NEW ESCALATOR

PIT(S)

359' - 8"

TERMINAL 1ST LEVEL

(0'- 0")

364' - 0"

TERMINAL 2ND LEVEL

(13' - 10")

377' - 10"

FLOOR LEVEL (-1' - 0")

363' - 0"

T.O. PARAPET (28' - 10")

392' - 10"

CLEAR TEMPERED

GLASS BALUSTRADE

WORKING POINT

WORKING POINT

TRUSS

ENCLOSURE

STAINLESS STEEL

INNER CLADDING

LM

N

B.O. NEW ELEVATOR PIT

(-5' - 0")

359' - 0"

A601

A601

A602

A602

N.3

43' - 3"

B.O. NEW ESCALATOR

PIT(S)

359' - 8"

TERMINAL 2ND LEVEL

(13' - 10")

377' - 10"

ESCALATOR

TRUSS

REMOVABLE NON-

SKID ALUMINUM

ACCESS COVER BY

MANUFACTURER

GROUT

SCHEDULED

FLOOR FINISH

SEALANT

CONCRETE

SLAB ON

METAL DECK

STRUCTURAL STEEL

SEE STRUCTURAL

DRAWINGS

STEEL ANGLE BY

ESCALATOR MANUF.

6 5/8"

N.3

TERMINAL 1ST LEVEL

(0'- 0")

364' - 0"

6 7/8"

1 1/2" © 2013 RS&H Oregon, Architects-Engineers-Planners, P.C.

PROJECT NUMBER

REVIEWED BY:

DRAWN BY:

DESIGNED BY:

DATE ISSUED:

REVISIONS

SHEET NUMBER

SHEET TITLE

SEAL

CONSULTANTS

1 2 3 4 5 6

A

B

C

D

E

A

B

C

D

E

1 2 3 4 5 6

GJN 50934

/1

/2

:0 :0

P

M C

U se rs

\B a rs ta d K

\D o cu m e n ts

\2 .0

A

C

E N

T R

A L B a rs ta d K

.r vt

March 13, 2017

Author

Checker

224−9675−015

STAIR AND

ESCALATOR

SECTIONS AND

DETAILS

A601

Designer

AS−BUILT SET

Eugene Airport Terminal Expansion

City of Eugene

28801 Douglas Drive Eugene, Oregon 97402

0 4'-0" 8'-0"2'-0" 1/4" = 1'-0"1

STAIR SECTION

0 4'-0" 8'-0"2'-0" 1/4" = 1'-0"2

NEW ESCALATOR SECTION

0 8" 1'-4"4" 3" = 1'-0"3

ESCALATOR TOP SUPPORT DETAIL

0 8" 1'-4"4" 3" = 1'-0"4

ESCALATOR BOTTOM SUPPORT DETAIL

303-409-9700 FAX 303-409-9701

Oregon Registration No. 0871AF

RS&H Oregon, www.rsandh.com

Architects-Engineers-Planners, P.C.

TERMINAL 1ST LEVEL

(0'- 0")

364' - 0"

TERMINAL 2ND LEVEL

(13' - 10")

377' - 10"

A612

5/8" GYPSUM

BOARD ON METAL

FURRING STRIPS

A613

ESCALATOR

BEYOND

HOIST BEAM

COORDINATE WITH

ELEVATOR MANUF.

SUSPENDED

GYPSUM BOARD

CEILING

CONCRETE SLAB

SEE STRUCTURAL

8" REINFORCED CMU

SEE STRUCTURAL

DRAWINGS

CONCRETE SLAB

SEE STRUCTURAL

MN

B.O. NEW ELEVATOR PIT

(-5' - 0")

359' - 0"

A613

A613

A613

A613

A613

A613

N.3

1' - 0"

3"

3"

D2

D2

G3

A2

TERMINAL 1ST LEVEL

(0'- 0")

364' - 0"

TERMINAL 2ND LEVEL

(13' - 10")

377' - 10"

A612

5/8" GYSPUM

BOARD ON METAL

FURRING STRIPS

3S3.1S

B.O. NEW ELEVATOR PIT

(-5' - 0")

359' - 0"

8" REINFORNCED CMU

SEE STRUCTURAL

DRAWINGS

CONCRETE SLAB

SEE STRUCTURAL

DRAWINGS

ELEVATOR PIT

WATERPROOF

MEMBRANE

HOIST BEAM

COORDINATE WITH

ELEVATOR MANUF.

10 7/8"

A954

© 2013 RS&H Oregon, Architects-Engineers-Planners, P.C.

PROJECT NUMBER

REVIEWED BY:

DRAWN BY:

DESIGNED BY:

DATE ISSUED:

REVISIONS

SHEET NUMBER

SHEET TITLE

SEAL

CONSULTANTS

1 2 3 4 5 6

A

B

C

D

E

A

B

C

D

E

1 2 3 4 5 6

GJN 50934

/1

/2

:0 :2

P

M C

U se rs

\B a rs ta d K

\D o cu m e n ts

\2 .0

A

C

E N

T R

A L B a rs ta d K

.r vt

March 13, 2017

Author

Checker

224−9675−015

ELEVATOR

SECTIONS

A612

Designer

AS−BUILT SET

Eugene Airport Terminal Expansion

City of Eugene

28801 Douglas Drive Eugene, Oregon 97402

0 2'-0" 4'-0"1'-0" 1/2" = 1'-0"1

NEW ELEVATOR EW SECTION

0 2'-0" 4'-0"1'-0" 1/2" = 1'-0"2

NEW ELEVATOR NS SECTION

Denver, CO 80237

303-409-9700 FAX 303-409-9701

OR Registration No. 0871AF

RS&H Oregon, www.rsandh.com

Architects-Engineers-Planners, P.C.

DN

FCU-101

Q P O N.3 N M

RSTUVWXY

5.1S

4.1S

3.1S

2.1S 2.1S

1.1S

1.1S

1S

NS

.9N

1N

6S

4N

L K.1 K J I

14N

13N

12N

11N

10N

9N

8N

7N

6N

5N

H G F E D.8 D.5 D.4 D C

2N

2S

3S

4S

5S

7S

8S

9S

10S

11S

12S

13S

14S

15S

© 2013 RS&H Oregon, Architects-Engineers-Planners, P.C.

PROJECT NUMBER

REVIEWED BY:

DRAWN BY:

DESIGNED BY:

DATE ISSUED:

REVISIONS

SHEET NUMBER

SHEET TITLE

SEAL

CONSULTANTS

1 2 3 4 5 6

A

B

C

D

E

A

B

C

D

E

1 2 3 4 5 6

GJN 50934

/3

/2

:1

:1

A

M C

U se rs

\a sh to n m

\D o cu m e n ts

\2 .0

M

C

E N

T R

A L a sh to n m

.r vt

September 8, 2014

Author

Checker

224−9675−015

LEVEL 1 HVAC

FLOOR PLAN

M110

Designer

CONFORMED SET

Eugene Airport Terminal Expansion

City of Eugene

28801 Douglas Drive Eugene, Oregon 97402

0 40'-0" 80'-0"20'-0" 1/32" = 1'-0"1

LEVEL 1 HVAC - OVERALL

LEVEL 1 KEY PLAN

N.T.S.

A B

C D L

H

I

K

JE

F

No. DESCRIPTION DATE

PROJECT RECORD DOCUMENTS AS-BUILTS

PROJECT RECORD DOCUMENTS AS-BUILTS

Denver, CO 80237

303-409-9700 FAX 303-409-9701

OR Registration No. 0871AF

RS&H Oregon, www.rsandh.com

Architects-Engineers-Planners, P.C.

DN

"x

EF-15

144"x108" DUCT ATTACHED TO LOUVER WITH (2) MD 140"x50"

EACH

8"ø

TERMINATE GENERATOR

EXHAUST PIPE FLUSH

WITH FACE OF

BUILDING ABOVE

14"x14"

F

375 CFM

F

75 CFM

8" x8

"x

F

200 CFM

F

175 CFM

"x

12"x12"

8"øA 200 CFM

8"ø

8"ø

8"ø 12"x12" AIR INTAKE

LOUVER

M

AT

C

H

LI

N E

- S E E

M

1 1 0B

VO

ID

CUH-12

CUH-11

EMERGENCY

GENERATOR DAY TANK

T T

EF-21

24x24 INTAKE

LOUVER AT 9'-0"

AFF

WITH 18"x18"

SHEETMETAL

DUCT AND MD

INTERLOCK EF-

21 WITH MD

T

TRANSFER GRILLE

1N1N

2N2N

1S1S

2S2S

3S3S

4S4S

5S5S

L

L

M

M

N

N

O

O

P

P

Q

Q

R

R

.9N.9N

1.1S1.1S

2.1S2.1S

3.1S3.1S

4.1S4.1S

5.1S5.1S

NSNS

N.3

N.3

AC-3

CU-3

UH-12

CUH-14

T

"x

GENERATOR

CUH-10

10"ø

MEN'S TOILET

WOMEN'S TOILET

(N) CONCOURSE A

LOWER LANDING

COMPOSURE

AREA

(N) STORAGE

(N) ELECTRICAL

B NORTH

STAGING AREA

(N) CONCOURSE A

LOWER LANDING

(N) GENERATOR

ROOM

SWITCHBOARD

ELECTRICAL

ROOM

1507B

FCU-110

"x

"ø

10"øA 300 CFM

12"x12"D 510 CFM

(TYP OF 2)

TT

T

T

14x14 UP TO

EF-20 ON ROOF

6" ø

"x

8"øA 200 CFM

FT-1 FT-2

10"øH 450 CFM

12"ø

12"

8"x8"F 75 CFM

(TYP OF 2)

T

ELEVATOR

EQUIPMENT

EF-22

EMERGENCY

ELECTRICAL

ROOM

1507A

T

T

CUH-16

PROVIDE MD FOR

EF-21 & 22

24x24 INTAKE

LOUVER AT 9'-0"

AFF WITH 18"x18"

SHEETMETAL

DUCT AND MD.

INTERLOCK EF-22

WITH MD

32"x10"

UH-13

32"x10"

40"x14"

FC-202

FC-201

"x

"x

8"

6" ø

6"ø 48"x20"J 4500 CFM

32"x10" SA DUCT

UP TO UPPER

LEVEL CEILING

12"x12" AIR INTAKE

LOUVER

T T

30"x12"

40"x14"

1. INSTALL 8" DIAMETER SCHEDULE 40 PIPE TO ENGINE WITH

BUILT IN FLEXIBLE CONNECTION AND NECESSARY BUILT IN

ORIFICE TO MINIMUM AND MAXIMUM BACK PRESSURE

REQUIREMENT BASED ON MANUFACTURER OF EMERGENCY

GENERATOR STANDARD AND INSTALLATION INSTRUCTIONS.

INSULATE ALL HIGH TEMPERATURE EXHAUST PIPE AND

SILENCER WITH 5" THICK CALCIUM SILICATE INSULATION

WITH OUTER ALUMINUM JACKET,

2. INSTALL GALVANIZED STEEL SILENCER CLARKE MODEL

C06535 OR APPROVED EQUAL. INCLUDE BUILD IN DRAINS IN

SILENCER. SLOPE PIPE FROM EXTERNAL WALL TO

SILENCER TOWARD DRAIN AT 1%.

3. INSTALL MINIMUM TWO FEET LONG THIMBLE THRU WALL

PENETRATION TO PREVENT DAMAGE DUE TO HIGH

TEMPERATURE EXHAUST PIPE.

4. PROVIDE AND INSTALL A COMPLETE SPLIT SYSTEM WITH

PIPING AND CONTROLS. NEW AC-3/CU-3 UNITS TO SERVE

NEW ELEVATOR MACHINE ROOM. SEE UNITS CAPACITIES

AND CONTROLS ON SPLIT UNITS SCHEDULE ON M004 OR

APPROVED SHOP DRAWING FOR AC-1/CU-1.

KEY NOTES:

© 2013 RS&H Oregon, Architects-Engineers-Planners, P.C.

PROJECT NUMBER

REVIEWED BY:

DRAWN BY:

DESIGNED BY:

DATE ISSUED:

REVISIONS

SHEET NUMBER

SHEET TITLE

SEAL

CONSULTANTS

1 2 3 4 5 6

A

B

C

D

E

A

B

C

D

E

1 2 3 4 5 6

GJN 50934

1/

/2

6:

:0

P

M C

:\U se rs \b el ah m ij\

D oc um en ts \2

.0

_M

_C E

N T

R A

L_ be la hm ij.

rv t

September 8, 2014

Author Checker

224−9675−015

LEVEL 1 HVAC

FLOOR PLAN −

AREA C

M110C

Designer

CONFORMED SET

Eugene Airport Terminal Expansion

City of Eugene

28801 Douglas Drive Eugene, Oregon 97402

0 8'-0" 16'-0"4'-0" 1/8" = 1'-0"1 LEVEL 1 HVAC FLOOR PLAN- AREA C

LEVEL 1 KEY PLAN

N.T.S.

A B C D L

H

I

K

JE

F

No. DESCRIPTION DATE

1 ADDENDUM NO. 1 06/16/14

7 RFP-12 02/10/15

9 RFP-47 03/05/15

16 SI-12 01/22/16

PROJECT RECORD DOCUMENTS AS-BUILTS

PROJECT RECORD DOCUMENTS AS-BUILTS

MD provided for EF-15 also

FC

-2

Drainpan

Drainpan

FSD

NOTE:

Colors used do not indicate specific systems. They are merely to aid in distinguishing changes when multiple markups are present near one another.

Drainpan

AS-BUILT CONSTRUCTION DOCUMENT DRAWINGS
GENERAL - Architect's Version
G000 - COVER SHEET
G001 - PROJECT DEFINITION SHEET
G002 - SHEET INDEX & PROJECT NOTES
G003 - ABBREVIATIONS, LEGENDS & GENERAL NOTES
G100 - CODE ANALYSIS & OCCUPANCY SCHEDULE
G110 - LEVEL 1 FIFE SAFETY PLAN
G120 - LEVEL 2 LIFE SAFETY PLAN
G500 - INTERIOR PARTITIONS, RATED ASSEMBLIES
G600 - ADA INFORMATION & DETAILS
G700 - CONSTRUCTION SAFETY AND PHASING PLAN
G701 - CONSTRUCTION ACCESS & TRAFFIC ROUTING PLAN
G702 - PHASE I LAYOUT
G703 - PHASE II LAYOUT
G704 - PHASE III LAYOUT
G801 - PAVEMENT MARKING PLAN AND DETAILS
GENERAL - Contractor's Version
G000 - COVER SHEET
G001 - PROJECT DEFINITION SHEET
G002 - SHEET INDEX & PROJECT NOTES
G003 - ABBREVIATIONS, LEGENDS & GENERAL NOTES
G100 - CODE ANALYSIS & OCCUPANCY SCHEDULE
G110 - LEVEL 1 LIFE SAFETY PLAN
G120 - LEVEL 2 LIFE SAFETY PLAN
G500 - INERIOR PARTITIONS, RATED ASSEMBLIES
G600 - ADA INFORMATION & DETAILS
G700 - CONSTRUCTION SAFETY AND PHASING PLAN
G701 - CONSTRUCTION ACCESS & TRAFFIC ROUTING PLAN
G702 - PHASE I LAYOUT
G703 - PHASE II LAYOUT
G704 - PHASE III LAYOUT
G801 - PAVEMENT MARKING PLAN AND DETAILS
CIVIL
C1.0 - EROSION CONTROL & TREE PROTECTION PLAN
C1.1 - EROSION CONTROL NOTES
C1.2 - EROSION CONTROL & TREE PROTECTION DETAILS
C2.0 - HORIZONTAL CONTROL
ASI 8 - ASI 17
C3.0 - GRADING PLAN
608
C4.0 - UTILITY PLAN
C4.0 - UTILITY PLAN
610
C4.0E - UTILITY PLAN
C4.1 - UTILITY PLAN DETAILS
C4.2 - UTILITY PLAN DETAILS
C4.3 - UTILITY PLAN DETAILS
C5.0 - PAVING PLAN
617

C5.1 - PAVING PLAN DETAILS

ARCHITECTURAL - Architects Version
DEMOLITION PLANS
AD10 - LEVEL 1 OVERALL DEMOLITION PLAN
AD10B.1 - LEVEL 1 DEMOPLITION PLAN - AREA B (ALT No. 1)
AD10C - LEVEL 1 DEMOPLITION PLAN - AREA C
AD10D - LEVEL 1 DEMOPLITION PLAN - AREA D
AD10E - LEVEL 1 DEMOPLITION PLAN - AREA E
AD10I - LEVEL 1 DEMOPLITION PLAN - AREA I
AD10J - LEVEL 1 DEMOPLITION PLAN - AREA J
AD20 - LEVEL 2 OVERALL DEMOLITION PLAN
AD20B.1 - LEVEL 2 DEMOPLITION PLAN - AREA B (ALT No. 1)
AD20C - LEVEL 2 DEMOPLITION PLAN - AREA C
AD20D - LEVEL 2 DEMOPLITION PLAN - AREA D
AD20J - LEVEL 2 DEMOPLITION PLAN - AREA J
AD30 - ROOF OVERALL DEMOLITION PLAN
FLOOR/ROOF PLANS
A110 - LEVEL 1 OVERALL PLAN
A110B.1 - LEVEL 1 FLOOR PLAN, AREA B (ALT No. 1)
A110C - LEVEL 1 FLOOR PLAN, AREA C
A110D - LEVEL 1 FLOOR PLAN, AREA D
A110E - LEVEL 1 FLOOR PLAN, AREA E
A110I - LEVEL 1 FLOOR PLAN, AREA I
A110J - LEVEL 1 FLOOR PLAN, AREA J
A110K - LEVEL 1 FLOOR PLAN, AREA K
A120 - LEVEL 2 OVERALL PLAN
A120B.1 - LEVEL 2 FLOOR PLAN, AREA B (ALT No.1)
A120C - LEVEL 2 FLOOR PLAN, AREA C
A120D - LEVEL 2 FLOOR PLAN, AREA D
A130 - ROOF OVERALL PLAN
A130B.1 - ROOF FLOOR PLAN, AREA B (ALT No.1)
A130C - ROOF FLOOR PLAN, AREA C
A130D - ROOF FLOOR PLAN, AREA D
A130E - ROOF FLOOR PLAN, AREA E
A130J - ROOF FLOOR PLAN, AREA J
A130K - ROOF FLOOR PLAN, AREA K
A150 - TOILET PLANS & ELEVATIONS
A151 - RENTAL CAR KIOSK PLAN AND DETAILS
A152 - VESTIBULE PLANS AND SECTIONS
REFLECTED CEILING PLANS
A210 - LEVEL 1 OVERALL REFLECTED CEILING PLAN
A210B.1 - LEVEL 1 REFLECTED CEILING PLAN, AREA B (ALT No.1)
A210C - LEVEL 1 REFLECTED CEILING PLAN, AREA C
A210D - LEVEL 1 REFLECTED CEILING PLAN, AREA D
A210E - LEVEL 1 REFLECTED CEILING PLAN, AREA E
A210I - LEVEL 1 REFLECTED CEILING PLAN, AREA I
A210J - LEVEL 1 REFLECTED CEILING PLAN, AREA J
A210K - LEVEL 1 REFLECTED CEILING PLAN, AREA K
A220 - LEVEL 2 OVERALL REFLECTED CEILING PLAN
A220B.1 - LEVEL 2 REFLECTED CEILING PLAN, AREA B (ALT No.1)
A220C - LEVEL 2 REFLECTED CEILING PLAN, AREA C
A220D - LEVEL 2 REFLECTED CEILING PLAN, AREA D
BUILDING ELEVATIONS
A310 - BUILDING ELEVATIONS - BAG CLAIM EXPANSION
A311 - BUILDING ELEVATIONS - BAG CLAIM EXPANSION
A312 - BUILDING ELEVATIONS - CONCOURSE B HOLDROOM
A313 - BUILDING ELEVATIONS - SSCP/CIRCULATION EXPANSION
A314 - BUILDING ELEVATIONS - CONCOURSE A ELEVATOR (ALT No.1)
BUILDING SECTIONS
A320 - BUILDING SECTIONSS - BAG CLAIM EXPANSION
A321 - BUILDING SECTIONSS - BAG CLAIM EXPANSION
A322 - BUILDING SECTIONSS - BAG CLAIM EXPANSION
A323 - BUILDING SECTIONSS - CONCOURSE B HOLDROOM
A324 - BUILDING SECTIONSS - CONCOURSE B HOLDROOM
A325 - BUILDING SECTIONSS - SSCP/CIRCULATION EXPANSION
A326 - BUILDING SECTIONSS - SSCP/CIRCULATION EXPANSION
WALL SECTIONS
A400 - WALL SECTIONS
A401 - WALL SECTIONS
A402 - WALL SECTIONS
A403 - WALL SECTIONS
A404 - WALL SECTIONS
A405 - WALL SECTIONS
A406 - WALL SECTIONS
A407 - WALL SECTIONS
A408 - WALL SECTIONS
DETAILS
A510 - PLAN DETAILS
A511 - PLAN DETAILS
A520 - SECTION DETAILS
A521 - SECTION DETAILS
A522 - SECTION DETAILS
A540 - CEILING DETAILS
A541 - CEILING DETAILS
A561 - INTERIOR DETAILS
VERTICLE CIRCULATION
A600 - STAIR/ESCALATOR PLANS
A601 - STAIR/ESCALATOR SECTIONS AND DETAILS
A602 - STAIR/ESCALATOR SECTIONS AND DETAILS
A604 - EXTERIOR EGRESS STAIR
A605 - NEW CANOPY AT EXISTING STAIR PLANS
A606 - NEW CANOPY ELEVATION AT EXISTING NORTH STAIR
A607 - EXISTING STAIR/RAIL AND NEW CANOPY DETAILS
A610 - ELEVATOR RELOCATION (ALT No.1)
A612 - ELEVATOR SECTIONS
A613 - ELEVATOR DETAILS
A620 - SECTIONS AND DETAILS
A621 - RAMP PLAN, SECTIONS & DETAILS
A630 - CONCOURSE B CONNECTION
DOORS & WINDOWS
A700 - DOOR SCHEDULE & DETAILS
A720 - WINDOW SCHEDULE & DETAILS
A721 - WINDOW WALL DETAILS
A722 - STOREFRONT SYSTEM DETAILS
FINISH PLANS & ELEVATIONS
A801 - FINISH SCHEDULE
A810C - LEVEL 1 FINISH PLAN, AREA C
A810D - LEVEL 1 FINISH PLAN, AREA D
A810E - LEVEL 1 FINISH PLAN, AREA E
A810I - LEVEL 1 FINISH PLAN, AREA I
A810J - LEVEL 1 FINISH PLAN, AREA J
A810K - LEVEL 1 FINISH PLAN, AREA K
A820C - LEVEL 2 FINISH PLAN, AREA C
A820D - LEVEL 2 FINISH PLAN, AREA D
A850 - INTERIOR ELEVATIONS
A851 - INTERIOR ELEVATIONS
A852 - INTERIOR ELEVATIONS
SIGNAGE
A900 - SIGNAGE SCHEDULE
A901 - SIGN LOCATION PLAN - LEVEL 1
A902 - SIGN LOCATION PLAN - LEVEL 2
A903 - SIGNAGE TYPES AND ELEVATIONS
A904 - SIGNAGE DETAILS
A905 - SIGN DETAILS
MILLWORK
A950 - MILLWORK PLANS
A951 - MILLWORK OVERALL ELEVATIONS
A952 - MILLWORK, RENTAL CAR
A953 - MILLWORK, GATE PODIUMS
A954 - MILLWORK, GATE BACKWALLS
ARCHITECTURAL - Contractor's Version
DEMOLITION PLANS
AD10 - LEVEL 1 OVERALL DEMOLITION PLAN
AD10B.1 - LEVEL 1 DEMOLITION PLAN, AREA B (ALT NO.1)
AD10B.1 - RFP 33
AD10C - LEVEL 1 DEMOLITION PLAN, AREA C
AD10D - LEVEL 1 DEMOLITION PLAN, AREA D
RFI 460
AD10E - LEVEL 1 DEMOLITION PLAN, AREA E
AD10I - LEVEL 1 DEMOLITION PLAN, AREA I
AD10J - LEVEL 1 DEMOLITION PLAN, AREA J
AD20 - LEVEL 2 OVERALL DEMOLITION PLAN
AD20B.1 - LEVEL 2 DEMOLITION PLAN, AREA B (ALT No 1)
AD20C - LEVEL 2 DEMOLITION PLAN, AREA C
AD20D - LEVEL 2 DEMOLITION PLAN, AREA D
AD20J - LEVEL 2 DEMOLITION PLAN, AREA J
AD30 - ROOF OVERALL DEMOLITION PLAN
FLOOR/ROOF PLANS
A110 - LEVEL 1 OVERALL PLAN
A110B.1 - LEVEL 1 FLOOR PLAN, AREA B (ALT NO. 1)
588
A110C - LEVEL 1 FLOOR PLAN, AREA C
590
A110D - LEVEL 1 FLOOR PLAN, AREA D
592
A110E - LEVEL 1 FLOOR PLAN, AREA E
594
A110I - LEVEL 1 FLOOR PLAN, AREA I
A110J - LEVEL 1 FLOOR PLAN, AREA J
597
A110K - LEVEL 1 FLOOR PLAN, AREA K
599
A120 - LEVEL 2 OVERALL PLAN
A120B.1 - LEVEL 2 FLOOR PLAN, AREA B (ALT NO. 1)
A120C - LEVEL 2 FLOOR PLAN, AREA C
603
605
A120D - LEVEL 2 FLOOR PLAN, AREA D
A130 - ROOF OVERALL PLAN
A130B.1 - ROOF PLAN, AREA B (ALT No 1)
A130C - ROOF PLAN, AREA C
A130D - ROOF PLAN, AREA D
A130E - ROOF PLAN, AREA E
A130J - ROOF PLAN, AREA J
A130K - ROOF PLAN, AREA K
A150 - TOILET PLANS & ELEVATIONS
614
A151 - RENTAL CAR KIOSK PLAN AND DETAILS
616

A152 - VESTIBULES PLANS AND SECTIONS

REFLECTED CEILING PLANS
A210 - LEVEL 1 OVERALL REFLECTED CEILING PLAN
A210B.1 - LEVEL 1 REFLECTED CEILING PLAN, AREA B (ALT NO. 1)
RFP 33 - RFI 260
A210C - LEVEL 1 REFLECTED CEILING PLAN, AREA C
RFI 260 - RFI 147
A210D - LEVEL 1 REFLECTED CEILING PLAN, AREA D
611
A210E - LEVEL 1 REFLECTED CEILING PLAN, AREA E
613
A210I - LEVEL 1 REFLECTED CEILING PLAN, AREA I
RFI 260
A210J - LEVEL 1 REFLECTED CEILING PLAN, AREA J
RFI 260
A210K - LEVEL 1 REFLECTED CEILING PLAN, AREA K
RFI 260
A220 - LEVEL 2 OVERALL REFLECTED CEILING PLAN
A220B.1 - LEVEL 2 REFLECTED CEILING PLAN AREA B (ALT NO. 1)
RFI 260
A220C - LEVEL 2 REFLECTED CEILING PLAN, AREA C
RFI 372 - RFI 260
A220D - LEVEL 2 REFLECTED CEILING PLAN, AREA D
RFI 260
BUILDING ELEVATIONS
A310 - BUILDING ELEVATIONS - BAG CLAIM EXPANSION
RFI 199
563
A311 - BUILDING ELEVATIONS-BAG CLAIM EXPANSION
A312 - BUILDING ELEVATIONS - CONCOURSE B HOLDROOM
565
A313 - BUILDING ELEVATIONS - SSCP/CIRCULATION EXPANSION
567

A314 - BUILDING ELEVATIONS - CONCOURSE A ELEVATOR (ALT No 1)

BUILDING SECTIONS
A320 - BUILDING SECTIONS - BAG CLAIM EXPANSION
A321 - BUILDING SECTIONS - BAG CLAIM EXPANSION
A322 - BUILDING SECTIONS - BAG CLAIM EXPANSION
A323 - BUILDING SECTIONS - CONCOURSE B HOLDROOM
RFI 341
A324 - BUILDING SECTIONS - CONCOURSE B HOLDROOM
RFI 345
A325 - BUILDING SECTIONS - SSCP/CIRCULATION EXPANSION
RFI 345

A326 - BUILDING SECTIONS - SSCP/CIRCULATION EXPANSION

WALL SECTIONS
A400 - WALL SECTIONS
RFI 175
A401 - WALL SECTIONS
582
A402 - WALL SECTIONS
584
A403 - WALL SECTIONS
RFI 429
A404 - WALL SECTIONS
RFI 423
A405 - WALL SECTIONS
RFI 336 - RFP 42
A406 - WALL SECTIONS
A406 - RFP 42 - ASI 13
A407 - WALL SECTIONS
A408 - WALL SECTIONS
RFI 179
DETAILS
A510 - PLAN DETAILS
RFI 402 - RFI 339 - ASI 8 RFP 25
A511 - PLAN DETAILS
A520 - SECTION DETAILS
A521 - SECTION DETAILS
A522 - SECTION DETAILS
A540 - CEILING DETAILS
A541 - CEILING DETAILS
A561 - INTERIOR DETAILS
VERTICLE CIRCULATION
A600 - STAIR/ESCALATOR PLANS - RFP 12
A600 - STAIR/ESCALATOR PLANS
A601 - STAIR AND ESCALATOR SECTIONS AND DETAILS
A602 - STAIR AND ESCALATOR SECTIONS AND DETAILS
A604 - EXTERIOR EGRESS STAIR
RFP 68 - RFI 166
A610 - ELEVATOR RELOCATION (ALT NO. 1)
RFI 174 - RFP 33
A612 - ELEVATOR SECTIONS
RFI 159
A613 - ELEVATOR DETAILS
A620 - RAMP SECTIONS AND DETAILS
A620 - RAMP SECTIONS AND DETAILS - RFP 69

A621 - RAMP PLAN, SECTION & DETAILS

DOORS & WINDOWS
A700 - DOOR SCHEDULE & DETAILS
RFP 47
A720 - WINDOW SCHEDULE & DETAILS
A721 - WINDOW WALL DETAILS
A721
A722 - STOREFRONT SYSTEM DETAILS
A722 - RFP 33
FINISH PLANS & ELEVATIONS
A801 - FINISH SCHEDULE
A810C - LEVEL 1 FINISH PLAN, AREA C
A810C - LEVEL 1 FINISH PLAN, AREA C
A810D - LEVEL 1 FINISH PLAN, AREA D
A810D - LEVEL 1 FINISH PLAN, AREA D - ASI 6
A810E - LEVEL 1 FINISH PLAN, AREA E
A810E - LEVEL 1 FINISH PLAN, AREA E - ASI 6
A810I - LEVEL 1 FINISH PLAN, AREA I
A810I - LEVEL 1 FINISH PLAN, AREA I - ASI 6
A810J - LEVEL 1 FINISH PLAN, AREA J
A810J - LEVEL 1 FINISH PLAN, AREA J - ASI 6
A810K - LEVEL 1 FINISH PLAN, AREA K
A810K - LEVEL 1 FINISH PLAN, AREA K - ASI 6
A820C - LEVEL 2 FINISH PLANS, AREA C
A820C - LEVEL 2 FINISH PLANS, AREA C - ASI 6
A820D - LEVEL 2 FINISH PLANS, AREA D
A820D - ASI 6
A850 - INTERIOR ELEVATIONS
A851 - INTERIOR ELEVATIONS
A852 - INTERIOR ELEVATIONS
SIGNAGE
A900 - SIGNAGE SCHEDULE
A901 - SIGN LOCATION PLAN - LEVEL 1
605
A902 - SIGN LOCATION PLAN - LEVEL 2
607
A903 - SIGNAGE TYPES AND ELEVATIONS
A904 - SIGNAGE DETAILS
A905 - SIGN DETAILS
STRUCTURAL
S0.01 - STRUCTURAL NOTES AND SYMBOLS
S2.11 - AREA C FOUNDATION PLAN
SKS2.11-2 - RFP 25
S2.12 - AREAS D & E FOUNDATION PLAN
RFI 32 - RFI 189
S2.13 - AREAS J & K FOUNDATION PLAN
RFI 33 - RFI 155
S2.14 - FDN & 2ND LEVEL FRAMING PLAN - AREA B (ALT No 1)
S2.21 - AREA C 2ND LEVEL FRAMING PLAN
RFI 24 - ASI 4
S2.31 - AREA C ROOF FRAMING PLAN
S2.32 AREAS D & E ROOF & 2ND LEVEL FRAMING PLANS
RFI 24 - RFI 290 - RFI 286
S2.33 - AREAS J & K ROOF FRAMING PLAN
RFI 229-1
S4.01 MOMENT FRAME ELEVATIONS - BAG CLAIM EXPANSION
S4.02 - MOMENT FRAME ELEVATIONS - CONCOURSE B HOLDROOM
S4.03 - MOMENT FRAME ELEVATIONS - CONCOURSE B HOLDROOM
S4.04 - MOMENT FRAME ELEV - SSCP/CIRCULATION EXPANSION
S4.05 - MOMENT FRAME ELEV - SSCP/CIRCULATION EXPANSION
S4.06 - GLULAM BEAM ELEVATIONS
S5.01 - TYPICAL CONCRETE DETAILS
RFI 100
S5.02 - CONCRETE DETAILS
S5.03 - CONCRETE DETAILS
S7.01 - TYPICAL STEEL DETAILS
RFI 279
S7.02 - TYPICAL STEEL DETAILS
RFI 414
S7.03 - STEEL MOMENT FRAME DETAILS
RFI 192
S7.04 - STEEL MOMENT FRAME DETAILS
RFI 187
S7.05 - STEEL DETAILS
RFI 191 - RFI 277
S7.06 - ELEVATOR DETAILS
S8.01 - TYPICAL WOOD FRAMING DETAILS
S8.02 - WOOD FRAMING DETAILS
RFI 337
S8.03 - WOOD FRAMING DETAILS
S8.04 - WOOD FRAMING DETAILS
ASI 13
S9.01 - TYPICAL LIGHT GAUGE DETAILS
ASI 13

S9.02 - TYPICAL LIGHT GAUGE DETAILS

MECHANICAL
M001 - LEGEND, SYMBOLS AND GENERAL NOTES
M002 - HVAC NOTES AND SCHEDULES
M003 - HVAC SCHEDULES HVAC SCHEDULES
M004 - HVAC SCHEDULES
M005 - HVAC SCHEDULES
MD10 - LEVEL 1 HVAC DEMOLITION OVERALL PLAN
MD10B - LEVEL 1 HVAC DEMOLITION PLAN − AREA B
MD10B.1 - LEVEL 1 HVAC DEMOLITION PLAN − AREA B (ALT 1)
MD10C - LEVEL 1 HVAC DEMOLITION PLAN − AREA C
MD10D - LEVEL 1 HVAC DEMOLITION PLAN − AREA D
MD10J - LEVEL 1 HVAC DEMOLITION PLAN− AREA J
MD11B - LEVEL 1 PIPING DEMOLITION PLAN − AREA B
MD11C - LEVEL 1 PIPING DEMOLITION PLAN − AREA C
MD11D - LEVEL 1 PIPING DEMOLITION PLAN − AREA D
MD11J - LEVEL 1 PIPING DEMOLITION PLAN − AREA J
MD20B.1 - LEVEL 2 HVAC DEMOLITION PLAN − AREA B (ALT 1)
MD120J - LEVEL 2 HVAC DEMOLITION PLAN AREA J
M110 - LEVEL 1 HVAC FLOOR PLAN
M110B - LEVEL 1 HVAC FLOOR PLAN − AREA B
M110C - LEVEL 1 HVAC FLOOR PLAN − AREA C
M110D - LEVEL 1 HVAC FLOOR PLAN − AREA D
M110E - LEVEL 1 HVAC FLOOR PLAN − AREA E
M110J - LEVEL 1 HVAC FLOOR PLAN − AREA J
M110K - LEVEL 1 HVAC FLOOR PLAN − AREA K
M111B - LEVEL 1 PIPING FLOOR PLAN, AREA B
M111C - LEVEL 1 PIPING FLOOR PLAN − AREA C
M111D - LEVEL 1 PIPING FLOOR PLAN − AREA D
M111E - LEVEL 1 PIPING FLOOR PLAN − AREA E
M111J - LEVEL 1 PIPING FLOOR PLAN − AREA J
M111K - LEVEL 1 PIPING FLOOR PLAN − AREA K
M120B.1 - LEVEL 2 HVAC FLOOR PLAN − AREA B (ALT 1)
M120C - LEVEL 2 HVAC FLOOR PLAN − AREA C
M120D - LEVEL 2 HVAC FLOOR PLAN − AREA D
M120J - LEVEL 2 HVAC FLOOR PLAN − AREA J
M121B.1 - LEVEL 2 PIPING FLOOR PLAN − AREA B (ALT 1)
M121C - LEVEL 2 PIPING FLOOR PLAN − AREA C
M121D - LEVEL 2 PIPING FLOOR PLAN − AREA D
M121J - LEVEL 2 PIPING FLOOR PLAN − AREA J
M300 - MECHANICAL ENLARGED PLAN
M301 - MECHANICAL ENLARGED PLAN
M401 - MECHANICAL DETAILS
M402 - MECHANICAL DETAILS
M403 - MECHANICAL DETAILS
M404 - MECHANICAL DETAILS
M405 - MECHANICAL DETAILS
M601 - CHILLED WATER FLOW & CONTROLS SCHEMATIC
M602 - CHILLER SEQUENCE OF OPERATIONS
M603 - HOT WATER FLOW & CONTROL SCHEMATIC
M604 - AHU−3 CONTROLS & SEQUENCE OF OPERATION
M605 - FAN COIL CONTROL SCHEMATIC
PLUMBING
P001 - PLUMBING SYMBOLS AND ABBREVIATIONS
P002 - PLUMBING SCHEDULES
P110 - LEVEL 1 OVERALL PLAN
P110B - LEVEL 1 PLUMBING FLOOR PLAN − AREA B − FORCE MAIN
P110C - LEVEL 1 FLOOR PLAN, AREA C − PLUMBING
P110J - LEVEL 1 FLOOR PLAN, AREA J − PLUMBING
P110K - LEVEL 1 FLOOR PLAN, AREA K − PLUMBING
P111D - LEVEL 1 FLOOR PLAN, AREA D − PLUMBING
P111E - LEVEL 1 FLOOR PLAN, AREA E - PLUMBING
P112D - LEVEL 1 FLOOR PLAN, AREA D − PLUMBING
P120 - LEVEL 2 OVERALL PLAN
P120C - LEVEL 2 FLOOR PLAN, AREA C− PLUMBING
P130 - OVERALL ROOF PLAN - PLUMBING
P210 - ENLARGED PLUMBING PLANS
P310 - PLUMBING DETAILS
P410 - PLUMBING RISER DIAGRAMS
FIRE PROTECTION
F001 - FIRE PROTECTION NOTES, LEGEND AND DETAILS
FD110A - LEVEL 1 FIRE PROTECTION DEMOLITION, AREA A
FD110B - LEVEL 1 FIRE PROTECTION DEMOLITION, AREA B
FD110C - LEVEL 1 FIRE PROTECTION DEMOLITION, AREA C
FD110D - LEVEL 1 FIRE PROTECTION DEMOLITION, AREA D
FD110E - LEVEL 1 FIRE PROTECTION DEMOLITION, AREA E
FD110F - LEVEL 1 FIRE PROTECTION DEMOLITION, AREA F
FD110H - LEVEL 1 FIRE PROTECTION DEMOLITION, AREA H
FD110I - LEVEL 1 FIRE PROTECTION DEMOLITION, AREA I
FD110J - LEVEL 1 FIRE PROTECTION DEMOLITION, AREA J
FD110L - LEVEL 1 FIRE PROTECTION DEMOLITION, AREA L
F110A - LEVEL 1 FIRE PROTECTION, AREA A
F110B - LEVEL 1 FIRE PROTECTION, AREA B
F110B.1 - LEVEL 1 FIRE PROTECTION PLAN, AREA B (ALT No 1)
F110C - LEVEL 1 FIRE PROTECTION, AREA C
F110C - LEVEL 1 FIRE PROTECTION, AREA C (RFP 12)
F110D - LEVEL 1 FIRE PROTECTION, AREA D
F110E - LEVEL 1 FIRE PROTECTION, AREA E
F110F - LEVEL 1 FIRE PROTECTION, AREA F
F110H - LEVEL 1 FIRE PROTECTION, AREA H
F110I - LEVEL 1 FIRE PROTECTION, AREA I
F110J - LEVEL 1 FIRE PROTECTION, AREA J
F110J - RFP 42
F110K - LEVEL 1 FIRE PROTECTION, AREA K
F110L - LEVEL 1 FIRE PROTECTION, AREA L
F120B.1 - LEVEL 2 FIRE PROTECTION PLAN, AREA B (ALT No 1)
F120C - LEVEL 2 FIRE PROTECTION, AREA C
F120D - LEVEL 2 FIRE PROTECTION, AREA D
ELECTRICAL
EG001 - ELECTRICAL LEGEND AND NOTES
EG002 - LIGHTING FIXTURE SCHEDULE
RFP−015/ES010/100 - ELECTRICAL SITE PLAN
RFP−015/ED010/100 - ELECTRICAL SITE DEMO PLAN
ED101 - LEVEL 1 ELECTRICAL DEMO PLAN
ED102 - LEVEL 2 ELECTRICAL DEMO PLAN
ES120 - ELECTRICAL SITE PLAN CONDUIT ROUTING
EL110B.1 - LEVEL 1 LIGHTING PLAN, AREA B (ALT No 1) LEVEL 1 LIGHTING PLAN, AREA B (ALT No 1)
EL110C EL110C - LEVEL 1 LIGHTING PLAN, AREA C LEVEL 1 LIGHTING PLAN, AREA C LEVEL 1 LIGHTING PLAN, AREA C
EL110D - LEVEL 1 LIGHTING PLAN, AREA D
EL110E - LEVEL 1 LIGHTING PLAN, AREA E
EL110I - LEVEL 1 LIGHTING PLAN, AREA I SHEET TITLE LEVEL 1 LIGHTING PLAN, AREA I
EL110J - LEVEL 1 LIGHTING PLAN, AREA J LEVEL 1 LIGHTING PLAN, AREA J
EL110K - LEVEL 1 LIGHTING PLAN, AREA K
EL120B.1 - LEVEL 2 LIGHTING PLAN, AREA B (ALT No 1)
EL120C - LEVEL 2 LIGHTING PLAN, AREA C
EL120D - LEVEL 2 LIGHTING PLAN, AREA D
EL401 - DAYLIGHT ZONES
EL402 - LIGHTING CONTROL ZONES
EL501 - LIGHTING CONTROL DETAILS
EP110B.1 LAN P110B.1 EP110B.1 - LEVEL 1 POWER PLAN, AREA B (ALT No 1) A PO AR J K SHEET TITLE LEVEL 1 POWER PLAN, AREA B (ALT No 1) SHEET TITLE LEVEL 1 POWER PLAN, AREA B (ALT No 1)
EP110C EP110C - LEVEL 1 POWER PLAN, AREA C LEVEL 1 POWER PLAN, AREA C
EP110D EP110D - LEVEL 1 POWER PLAN, AREA D LEVEL 1 POWER PLAN, AREA D
EP110E - LEVEL 1 POWER PLAN, AREA E
EP110I - LEVEL 1 POWER PLAN, AREA I
EP110J - LEVEL 1 POWER PLAN, AREA J
EP110K - LEVEL 1 POWER PLAN, AREA K
EP120A.1 - LEVEL 2 POWER PLAN, AREA A (ALT No 1)
P120B.1 - LEVEL 2 POWER PLAN, AREA B (ALT No 1)
EP120C - LEVEL 2 POWER PLAN, AREA C
EP120D - LEVEL 2 POWER PLAN, AREA D
EP401 - ENLARGED NEW POWER & COMM ROOM LAYOUTS
EP601 - PARTIAL ONE−LINE POWER RISER DIAGRAM
EP602 - PARTIAL ONE−LINE POWER RISER DIAGRAM
EP700 - ELECTRICAL FEEDER & PANEL SCHEDULES
EP701 EP701 EP701 - ELECTRICAL PANEL SCHEDULES ELECTRICAL PANEL SCHEDULES ELECTRICAL PANEL SCHEDULES
EP702 - ELECTRICAL PANEL SCHEDULES
EP703 - ELECTRICAL PANEL SCHEDULES
EP704 - ELECTRICAL PANEL SCHEDULES
EP705 - ELECTRICAL PANEL SCHEDULES
EP706 - ELECTRICAL PANEL SCHEDULES
EP707 - ELECTRICAL PANEL SCHEDULES
EP708 - ELECTRICAL PANEL SCHEDULES
EP709 - ELECTRICAL PANEL SCHEDULES
EP710 - ELECTRICAL PANEL SCHEDULES
EP711 - ELECTRICAL PANEL SCHEDULES
EP712 - ELECTRICAL PANEL SCHEDULES
EP713 - ELECTRICAL PANEL SCHEDULES
EM110B - LEVEL 1 MECH EQUIP & FIRE ALARM PLAN, AREA B
EM110B.1 - LEVEL 1 MECH EQUIP & FIRE ALARM PLAN, AREA B (ALT No 1) LEVEL 1 MECH EQUIP & FIRE ALARM PLAN, AREA B (ALT No 1)
EM110C - LEVEL 1 MECH EQUIP & FIRE ALARM PLAN, AREA C LEVEL 1 MECH EQUIP & FIRE ALARM PLAN, AREA C LEVEL 1 MECH EQUIP & FIRE ALARM PLAN, AREA C
EM110D - LEVEL 1 MECH EQUIP & FIRE ALARM PLAN, AREA D
EM110E - LEVEL 1 MECH EQUIP & FIRE ALARM PLAN, AREA E
EM110I - LEVEL 1 MECH EQUIP & FIRE ALARM PLAN, AREA I
EM110J - LEVEL 1 MECH EQUIP & FIRE ALARM PLAN, AREA J
EM110K - LEVEL 1 MECH EQUIP & FIRE ALARM PLAN, AREA K
M120B.1 - LEVEL 2 MECH EQUIP & FIRE ALARM PLAN, AREA B (ALT No 1)
EM120C - LEVEL 2 MECH EQUIP & FIRE ALARM PLAN, AREA C
EM120D - LEVEL 2 MECH EQUIP & FIRE ALARM PLAN, AREA D
EM120J - LEVEL 2 MECH EQUIP & FIRE ALARM PLAN, AREA J
EM130C - ROOF MECH EQUIP & FIRE ALARM PLAN − AREA C
EM601 - FIRE ALARM RISER DIAGRAM − EXISTING
EM602 - FIRE ALARM RISER DIAGRAM − PROPOSED
EY110B.1 - LEVEL 1 SECURITY INFRASTRUCTURE PLAN, AREA B (ALT No 1)
EY110C - LEVEL 1 SECURITY INFRASTRUCTURE PLAN, AREA C
EY110D - LEVEL 1 SECURITY INFRASTRUCTURE PLAN, AREA D
EY110E - LEVEL 1 SECURITY INFRASTRUCTURE PLAN, AREA E
EY110I - LEVEL 1 SECURITY INFRASTRUCTURE PLAN, AREA I
EY110J - LEVEL 1 SECURITY INFRASTRUCTURE PLAN, AREA J
EY110K - LEVEL 1 SECURITY INFRASTRUCTURE PLAN, AREA K
EY120B.1 - LEVEL 2 SECURITY INFRASTRUCTURE PLAN, AREA B (ALT No 1)
EY120C - LEVEL 2 SECURITY INFRASTRUCTURE PLAN, AREA C
EY120D - LEVEL 2 SECURITY INFRASTRUCTURE PLAN, AREA D
EY401 - SECURITY ROUGH−IN DETAILS
TG001 - TECHNOLOGY LEGEND AND NOTES
TN101 - LEVEL 1 OVERALL TELECOM PLAN
TN102 - LEVEL 2 OVERALL TELECOM PLAN
TN401 - PREMISE WIRING RISER DIAGRAM
TN403 - PAGING RISER DIAGRAM
TN404 - COMMUNICATIONS ROOM RACK ELEVATIONS
BAGGAGE SYSTEM
B001 - LEGENDS, SYMBOLS AND ABBREVIATIONS
B002 - CONVEYOR MANIFEST
B101 - BHS LEVEL 1 DEMOLITION PLAN
B110J - BHS LEVEL 1 DEMOLITION PLAN, AREA J
B201 - BHS LEVEL 1 OVERALL PLAN
B210J - BHS LEVEL 1 FLOOR PLAN, AREA J
B210K - BHS LEVEL 1 FLOOR PLAN, AREA K
B401 - BHS SECTIONS
B402 - BHS SECTIONS
B510 - BHS LEVEL 1 CATWALK PLAN
B610 - BHS LEVEL 1 PHASING − PHASE 1
B611 - BHS LEVEL 1 PHASING − PHASE 2
B612 - BHS LEVEL 1 PHASING − PHASE 3
B701 - BHS CONTROL STATION DETAILS
B710 - BHS LEVEL 1 CONTROL STATION PLAN
B801 - BHS DETAILS − LOADING DIAGRAMS
B802 - BHS DETAILS − SUPPORTS
B803 - BHS DETAILS − ATTACHMENTS
RFI 171
B804 - BHS DETAILS − ATTACHMENTS
B805 - BHS DETAILS − ACCESS LADDERS
B806 - BHS DETAILS − FIRE AND SECURITY DOORS
B807 - BHS DETAILS − SLIDE DETAILS
B808 - BHS DETAILS − INCLINE PLATE CLAIM DEVICE AND IMPACT PROTECTION
B809 - BHS DETAILS − SIGNAGE
AS-BUILT FIRE SPRINKLER DRAWINGS
FP1
FP2
FP3
FP4
FP5
FP6
FP7
FP8
FP9
FP10
FP11
FP12
FP13
FP14
AS-BUILT FIRE STANDPIPE DRAWINGS
SP1
SP2
SP3
SP4
SP5
AS-BUILT SIGNAGE PACKAGE DRAWINGS
Sign - 1
Sign - 2
Sign - 3
Sign - 4
Sign - 5
Sign - 6
Sign - 7
Sign - 8
Sign - 9
Sign - 10
Sign - 10.1
Sign - 11
Sign - 12
Sign - 12.1
Sign - 13
Sign - 14
Sign - 15
Sign - 16
Sign - 17
Sign - 18
Sign - 19
Sign - 20
Sign - 21
Sign - 22
Sign - 23
Sign - 24

File details come from the government source that posted it. Updated .