This is a comprehensive drawing set and project documentation package for the City of Eugene's Terminal Canopy Repairs and Improvements project located at 2880 Douglas Drive, Eugene, Oregon 97402. The project (GovTribe Project Number 20245144004) involves repair and renovation work across four distinct areas (A, B, C, and D) of the airport terminal building's exterior canopies and roof assemblies. The scope of work includes demolition and replacement of damaged glulam beams, repair or replacement of laminated wood decking, restoration of tongued-and-groove soffit elements, sand and stain finishing of exposed wood surfaces (WD-1 specification), replacement of metal trim and fascia between beams, installation of new roof membranes (TPO), repair of damaged roof sheathing, replacement of roof drain systems, and reconfiguration of gutter framing and associated structural components. Area A (parking lot canopies) is designated as "Construction by Others." The design is at 100 percent completion as of February 27, 2026, with the project issued for bid and permit on March 5, 2026. The project documents specify a Type IIIB fire-rated construction classification with detailed phasing requirements to minimize disruption to airport operations, including restrictions on canopy closures and requirements for dust control, barricading, and coordination with airport authorities.
The construction documents include general notes requiring strict contractor coordination with all trades, verification of existing conditions prior to work commencement, and adherence to the 2022 Oregon Structural Specialty Code and 2023 Oregon Electrical Specialty Code. The project involves replacement and repair of glulam beams using DF 24F-V4 or 24F-V8 grade treated lumber, restoration of laminated wood decking on a like-for-like basis, and installation of new structural components including roof framing, sheathing, and associated hardware. The documents reference multiple consultant firms including RS&H, Inc. (architect/engineer), Hohbach-Lewin, Inc. (structural engineer), KCL Engineering (electrical), and Foundation Engineer (geotechnical), with licenses verified through Oregon registration numbers. Significant design considerations include limiting construction loads, providing adequate shoring during beam replacement, accommodating existing elevator constraints (96 inches tall by 47 inches wide with maximum capacity of 5,000 pounds), and coordinating temporary wall construction for dust control during phased operations.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AEC PROJECT NUMBER
REVISIONS
2/
/2
3:
:0
PM
Au to de sk
D oc s:
//2
_E
U G
C an op y
R ep ai r a nd Im pr ov em en ts /2
_E
U G
_C an op y
R ep ai r a nd Im pr ov em en ts _A
_R
.rv t
20245144004
CITY OF EUGENE
EUG CANOPY REPAIRS AND IMPROVEMENTS
2880 DOUGLAS DRIVE
EUGENE, OREGON 97402
100% DESIGN
02/27/2026
309 W 4TH AVE,
STE 201
EUGENE, OR 97401
ELECTRICAL: KCL ENGINEERING STRUTURAL: HOHBACH-LEWIN, INC.
296 EAST FIFTH AVE.
SUITE 302
EUGENE, OR 97401
BUILDING ID: BLDG. ID
© 2026 RS&H, INC
Copyright © 2026. This drawing is an instrument of service and property of RS&H, Inc. Any use or reproduction without the expressed written consent of this corporation is prohibited. All rights reserved.
RS&H OREGON
ARCHITECTS-ENGINEERS-PLANNERS, P.C
4582 S. ULSTER ST., SUITE 1100
DENVER, CO 80237
303-409-9700 www.rsandh.com
Oregon Registration No. 0871AF
NO. DESCRIPTION DATE
CANOPY REPAIRS & IMPROVEMENTS
ISSUED FOR BID AND PERMIT
03/05/2026
GEOTECH: FOUNDATION ENGINEER
820 NW CORNELL AVE.
CORVALLIS, OR 97330
FIRE-RATED CONSTRUCTION (IBC)
CODE ANALYSIS
2025 RENOVATION - TYPE IIIB, NO CHANGE
PREVIOUS CONSTRUCTION TYPE DESIGNATIONS:
2014 RENOVATION - TYPE IIIB (ENTIRE BUILDING), NO CHANGE
2008 RENOVATION - EAST BLDG IIIA AND WEST BLDG IIA
1988 NEW CONSTRUCTION - EAST BLDG TYPEII- 1 HR(SUBSTITUTION PER UBC SECTION 508; WEST
BLDG TYPE III-1HR)
PRIMARY STRUCTURAL FRAME NOT RATED, NO CHANGE
BEARING WALLS,EXTERIOR 2 HOURS, NO CHANGE
BEARING WALLS, INTERIOR NOT RATED, NO CHANGE
NONBEARING PARTITIONS, INTERIOR NOT RATED, NO CHANGE
FLOOR CONSTRUCTION NOT RATED, NO CHANGE
ROOF CONSTRUCTION NOT RATED, NO CHANGE
FIRE-RATED SEPARATIONS (IBC/LSC)
THE FOLLOWING FIRE RATED SEPARATIONS ARE REQUIRED:
TYPE RATING
SHAFTS (707.3.1) 1 HOUR, NO CHANGE (PER 713.4 FOR BUILDINGS OVER 4 STORIES)
ATRIUM SEPARATION (707.3.6) 1 HOUR, NO CHANGE
NOT RATED PER 1020.1 EXCEPTION 8 IN 2010 OSSC, NO CHANGE
TENANT SEPARATION (708.1) 1 HOUR, NO CHANGE
MEANS OF EGRESS (IBC)
MAXIMUM TRAVEL DISTANCE (TABLE 1016.2)
GROUP A2/ ASSEMBLY - 250 FT
GROUP A3/ ASSEMBLY - 250 FT
GROUP B/ BUSINESS - 300 FT
MAXIMUM DEAD-END CORRIDOR (1018.4)
GROUP A - 20 FT
GROUP B - 50 FT
EGRESS STAIR WIDTH (LSC 7.3.3.2) - .3" PER OCCUPANT
EGRESS WIDTH PER PERSON (LSC 7.3.3.2) - .2" PER OCCUPANT
MINIMUM CORRIDOR WIDTH (LSC12.2.3.8, 38.2.3.2) 44"
THE GENERAL SCOPE OF THE PROJECT AREA B, C AND D INCLUDES REPAIRS AND RENOVATIONS TO THE EXTERIOR CANOPIES AND EXISTING ROOF OF THE MAIN TERMINAL BUILDING. BUILDING OCCUPANCY AND CONSTRUCTION TYPE
PROVIDED FOR REFERENCE ONLY, NO OCCUPANCY CHANGES OR INTERIOR RENOVATIONS.
CODE ANALYSIS
APPLICABLE CODES
MINIMUM STANDARD CODES :
1988 ORIGINAL BUILDING:
1986 OSSC-1985 UBC
2008 RENOVATION:
2006 INTERNATIONAL BUILDING CODE
2007 OREGON STRUCTURAL SPECIALITY CODE
2014 TERMINAL EXPANSION:
2010 OREGON STRUCTURAL SPECIALITY CODE
2010 OREGON MECHANICAL SPECIALITY CODE
2011 OREGON PLUMBING SPECIALITY CODE
2011 OREGON ELECTRICAL SPECIALITY CODE
2010 OREGON FIRE CODE
2010 OREGON ENERGY EFFICIENCY SPECIALITY CODE
2010 OREGON SOLAR INSTALLATION SPECIALITY CODE
2024 CONCOURSE A EXPANSION:
2022 OREGON STRUCTURAL SPECIALITY CODE - CHAPTER 34 EXISTING BUILDINGS
2022 OREGON MECHANICAL SPECIALITY CODE
2023 OREGON PLUMBING SPECIALITY CODE
2023 OREGON ELECTRICAL SPECIALITY CODE
2022 OREGON FIRE CODE
2021 OREGON ENERGY EFFICIENCY SPECIALITY CODE (OEESC) VIA ASHRAE 90.1-209
2022 NFPA1, 10
2022 NFPA 13
ICC 117.1-2017 ACCESSIBILITY CODE
OCCUPANCY CLASSIFICATION (IBC/LSC)
GROUP A3/ASSEMBLY
GROUP B/BUSINESS
GROUP M/MECHANTILE
BUILDING DATA
TOTAL GROSS BUILDING SQUARE FOOTAGE: 125,225 SF
NUMBER OF FLOORS: 2
HEIGHT OF BUILDING: 37'-8" OVERALL, NO CHANGE
SPRINKLERED: Y
PROJECT DESCRIPTION
FIRE-RATED CONSTRUCTION (IBC)
CODE ANALYSIS
UNDER TYPE IB CONSTRUCTION STRUCTURAL ELEMENTS REQUIRE THE FOLLOWING FIRE RATINGS
(TABLE 601):
PRIMARY STRUCTURAL FRAME 0 HOURS
BEARING WALLS 0 HOURS
FLOOR CONSTRUCTION 0 HOURS
ROOF CONSTRUCTION 0 HOUR
ROOF SECONDARY FRAMING 0 HOUR
OCCUPANT LOAD (IBC/LSC)
BUILDING IS NOT ENCLOSED, OCCUPANT LOAD IS NOT APPLICABLE
FIRE-RATED SEPARATIONS (IBC/LSC)
FIRE RATED SEPARATIONS ARE NOT APPLICABLE
MEANS OF EGRESS (IBC)
THE GENERAL SCOPE OF THE PROJECT AREA A INCLUDES REPAIRS TO THE EXTERIOR PARKING LOT CANOPIES. SIZE AND
CONSTRUCTION TO MATCH EXISTING. (CONSTRUCTION BY OTHERS)
CONSTRUCTION QUALIFIES AS TYPE IIB (TABLE 602)
TABLE 504.3 AND 504.4 PERMITS 2 STORY AND 55' HEIGHT FOR THE GROUP U OCCUPANCY.
THE ACTUAL HEIGHT IS 1 STORY AND 12FT.
TABLE 506.2 ALLOWS A MAXIMUM AREA OF 8,500 SF FOR TYPE IIB CONSTRUCTION FOR THE GROUP U OCCUPANCY.
THE ACTUAL AREA PER STORY IS 5,992 SQ.FT.
CODE ANALYSIS
APPLICABLE CODES
MINIMUM STANDARD CODES :
2019 OREGON STRUCTURAL SPECIALITY CODE (OSSC)
2021 OREGON ENERGY EFFICIENCY SPECIALITY CODE (OEESC)
2021 OREGON ELECTRICAL SPECIALITY CODE (OESC)
OCCUPANCY CLASSIFICATION (OSSC)
GROUP U/UTILITY: ACCESSORY OR MISCELLANEOUS STRUCTURE
BUILDING DATA
TOTAL GROSS BUILDING SQUARE FOOTAGE: 5,992 SF
NUMBER OF FLOORS: 1
HEIGHT OF BUILDING: 17'-0" OVERALL
SPRINKLERED: N
CONSTRUCTION CLASSIFICATION (IBC)
PROJECT DESCRIPTION
EXISTING EUGENE AIRPORT - BUILDING CODE ANALYSIS
(NOT IN SCOPE, FOR REFERENCE ONLY)
EUGENE AIRPORT - PARKING CANOPY (A) CODE ANALYSIS
BUILDING IS NOT ENCLOSED, MEANS OF EGRESS ARE NOT APPLICABLE
A
1 2 3 4 5 6
2 3 4 5 6
B
C
D
E
REVISIONS
DATE ISSUED:
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT NUMBER:
PROJECT STATUS:
SHEET ID:
SHEET TITLE:
PROJECT ADDRESS:
PROJECT TITLE:
SEAL:
CITY OF EUGENE
2/
/2
3:
:0
PM
Au to de sk
D oc s:
//2
_E
U G
C an op y
R ep ai r a nd Im pr ov em en ts /2
_E
U G
_C an op y
R ep ai r a nd Im pr ov em en ts _A
_R
.rv t
100% DESIGN
LET
MKI
2880 DOUGLAS DRIVE
EUGENE, OREGON 97402
EUG CANOPY REPAIRS AND
IMPROVEMENTS
20245144004
02/27/2026
LET/MKI
G002
SHEET INDEX &
BUILDING CODE
ANALYSIS/PROJECT
INFORMATION
© 2026 RS&H, INC
Copyright © 2026. This drawing is an instrument of service and property of RS&H, Inc. Any use or reproduction without the expressed written consent of this corporation is prohibited. All rights reserved.
303-409-9700
RS&H Oregon Architects - Engineers - Planners, P.C.
4582 S. Ulster St., Suite 1100 Denver, CO 80237 www.rsandh.com Oregon Registration No. 0871AF
KEY PLAN:
A B
C
D
N
PN
NO. DESCRIPTION DATE
SHEET INDEX
SHEET NUMBER SHEET NAME
00 GENERAL
G001 COVER SHEET
G002 SHEET INDEX & BUILDING CODE ANALYSIS/PROJECT INFORMATION
G003 GENERAL NOTES, ABBREVIATIONS AND SYMBOLS
G101 OVERALL FIRST FLOOR LIFE SAFETY PLAN
G702 PHASE LAYOUT
06 STRUCTURAL
S001 GENERAL STRUCTURAL NOTES AND SYMBOLS
S101A AREA A - ROOF FRAMING PLANS (CONSTRUCTION BY OTHERS)
S101B AREA A - ROOF FRAMING PLANS_ALTERNATE 2 - (CONSTRUCTION BY OTHERS)
S102 AREA B - ROOF FRAMING PLANS
S106 AREA D - ROOF FRAMING PLANS
S201 STRUCTURAL ELEVATIONS
S801 AREA C - STRUCTURAL DETAILS
S802 AREA B - STRUCTURAL DETAILS
S803 AREA A - STRUCTURAL DETAILS (CONSTRUCTION BY OTHERS)
07 ARCHITECTURAL
AS101 OVERALL ARCHITECTURAL SITE PLAN
AD101 OVERALL DEMOLITION PLAN
A101 OVERALL PLANS_ AREA A
A102 OVERALL PLANS_ AREA B
A103 OVERALL PLANS_ AREA B AND AREA C
A104 OVERALL PLAN_AREA D
A201 OVERALL CANOPY ELEVATIONS AND SECTIONS_AREA A
A202 OVERALL CANOPY ELEVATIONS AND SECTIONS_AREA B
A203 OVERALL CANOPY ELEVATIONS AND SECTIONS_AREA C
14 ELECTRICAL
E000 GENERAL NOTES & SYMBOLS
EDS101 OVERALL DEMOLITION SITE PLAN
ED102 ENLARGED DEMO CEILING PLAN - AREA A
ES101 OVERALL ELECTRICAL SITE PLAN
E101 ENLARGED CEILING PLAN - AREA A
03/05/2026
ISSUED FOR BID
AND PERMIT
AD RE CR HET ITSI EG CE TR
MARK IP
RIVERSIDE, IL
ARI-14151
ARCHITECTURAL ABBREVIATIONS PLAN SYMBOLS
1-HOUR RATED WALL 2-HOUR RATED WALL
3-HOUR RATED WALL SMOKE RATED WALL
BATT INSULATION CONCRETE
EARTH EXPOSED & FINISHED WOOD TRIM
GYPSUM / PLASTER MASONRY - BRICK
PLYWOOD
RIGID INSULATION STEEL
MATERIAL SYMBOLS
STUCCO / E.I.F.S.
GRAVELGRASS
MASONRY - CONCRETE BLOCK
TILE / CARPET
XX View Name
SCALE:1/8" = 1'-0"
DOOR TAG
CALLOUT HEAD & REGION
A101 A1
SIM
BUILDING SECTION
KEYNOTE
VIEW TITLE LEVEL HEAD
A1 A101
SIM
A1 A101
SIM
A1 A101
SIM
A1
A101
SIM
Name Elevation
ROOM TAG WALL TAG
XXX
DETAIL SECTION
WINDOW & STOREFRONT TAG
MATERIAL TAG
VIEW REFERENCE
REVISION TAG
NORTH ARROW
XX
A101 A101
ELEVATION - EXTERIOR ELEVATION - INTERIOR
WALL SECTION
CEILING TAG
GENERAL NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
A.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
ALL DIMENSIONS ARE IN FEET / INCHES UNLESS NOTED OTHERWISE.
THESE GENERAL NOTES ARE NOT INTENDED TO REPLACE SPECIFICATIONS - REFER TO SPECIFICATIONS FOR REQUIREMENTS IN ADDITION TO GENERAL NOTES.
THE TERMS RENOVATE AND REHABILITATE ARE USED INTERCHANGEABLY IN THESE DOCUMENTS.
NO DEVIATIONS FROM THESE CONTRACT DOCUMENTS MUST BE MADE WITHOUT THE PRIOR WRITTEN APPROVAL OF THE ARCHITECT.
DO NOT SCALE DIMENSIONS FROM DRAWINGS - THE CONTRACTOR MUST REQUEST NECESSARY DIMENSIONS NOT SHOWN ON THE DRAWINGS FROM THE ARCHITECT.
DETAILS SHOWN ON DRAWINGS ARE TYPICAL FOR ALL SIMILAR CONDITIONS.
DRAWING NOTES AND SPECIFICATIONS ARE INSTRUCTIONS TO THE CONTRACTOR AND APPLY TO ALL THE WORK UNLESS MORE SPECIFIC INFORMATION IS SHOWN ELSEWHERE ON THE DRAWINGS OR WRITTEN IN THE SPECIFICATIONS - IN THE EVENT OF CONFLICTING INSTRUCTIONS, THE ARCHITECT MUST DETERMINE WHAT CONTROLS THE CONTRACT DOCUMENTS ARE COMPLEMENTARY WHAT IS REQUIRED BY ONE MUST BE REQUIRED BY ALL.
PRINCIPAL OPENINGS IN THE STRUCTURE ARE SHOWN ON THESE DRAWINGS – THE GENERAL CONTRACTOR MUST EXAMINE THE ARCHITECTURAL, MECHANICAL, ELECTRICAL, AND PLUMBING DRAWINGS FOR REQUIRED OPENINGS. GENERAL CONTRACTOR MUST VERIFY SIZE AND LOCATION OF ALL OPENINGS WITH ALL SUB-CONTRACTORS PRIOR TO CONSTRUCTION.
STRUCTURAL DRAWINGS AND SPECIFICATIONS REPRESENT THE FINISHED STRUCTURE, AND, EXCEPT WHERE SPECIFICALLY SHOWN, DO NOT INDICATE THE METHOD OR MEANS OF CONSTRUCTION - THE CONTRACTOR MUST SUPERVISE CONSTRUCTION MEANS, METHODS, PROCEDURES, TECHNIQUES, SEQUENCE, AND APPLICABLE SAFETY REGULATIONS TO BE FOLLOWED.
CONTRACTOR MUST BE RESPONSIBLE FOR SCHEDULING AND COORDINATING THE WORK OF THE SUB-CONTRACTORS - THE CONTRACTOR MUST BE RESPONSIBLE TO COORDINATE WITH THE BUILDING OWNER, TENANT OR HIS REPRESENTATIVES
THE DELIVERY AND INSTALLATION OF ITEMS BEING PROVIDED AND INSTALLED BY OTHERS.
MECHANICAL, PLUMBING AND ELECTRICAL WORK RELATED TO DEMOLITION AND NEW INSTALLATION OF COMPONENTS MUST COMPLY WITH ALL APPLICABLE CODES.
ALL MATERIALS, FABRICATION AND INSTALLATION MUST COMPLY WITH THE APPLICABLE REQUIREMENTS AND SPECIFICATIONS FOR EACH DIVISION OF WORK.
CONSTRUCTION MUST COMPLY WITH APPLICABLE CODES AND ORDINANCES, LAWS AND SAFETY ORDERS AS DIRECTED BY LOCAL JURISDICTION.
CONTRACTOR MUST BE RESPONSIBLE FOR THE TIMELY ORDERING OF MATERIALS INCLUDED IN THESE CONTRACT DOCUMENTS - SOME ITEMS IN THESE DOCUMENTS MAY REQUIRE LONG LEAD TIMES OR SPECIAL COORDINATION. SUBSTITUTIONS
WILL NOT BE ALLOWED FOR MATERIAL NOT ORDERED IN A TIMELY FASHION.
CONTRACTOR MUST CHECK AND VERIFY ALL DIMENSIONS AND EXISTING CONDITIONS, (BOTH NEW AND EXISTING) REPORTING ANY DISCREPANCIES TO THE ARCHITECT PRIOR TO ORDERING MATERIALS OR PROCEEDING WITH ANY PHASE OF THE
WORK.
CONTRACTOR MUST CHECK AND VERIFY ALL DIMENSIONS PRIOR TO COMMENCING CONSTRUCTION - ALL DISCREPANCIES MUST BE NOTED AND SENT TO THE ARCHITECT WITH ADEQUATE TIME TO REVIEW PRIOR TO STARTING THAT PORTION OF THE
WORK IN ORDER TO AVOID PROJECT DELAYS.
CONTRACTOR MUST CLEAN, PATCH AND REPAIR ALL SURFACES DAMAGED BY DEMOLITION, ALTERATION OR INSTALLATION OF THE WORK.
CONTRACTOR MUST PREPARE ALL WALLS AND PARTITIONS AS REQUIRED BY THE FINISH MANUFACTURER TO RECEIVE THE FINISHES SPECIFIED.
ALL REQUESTS FROM INFORMATION PROMPTED BY THE BUILDING OFFICIALS MUST INCLUDE A COPY OF THE BUILDING OFFICIALS ’ COMMENTS AND THE BUILDING INSPECTORS FIELD REPORT TO ENSURE AN ACCURATE AND TIMELY RESPONSE.
CONTRACTOR AND SUBCONTRACTOR MUST ALL BE LICENSED TO PERFORM THEIR REQUESTED DUTIES AS REQUIRED IN ACCORDANCE WITH LOCAL STANDARDS.
CONTRACTOR MUST COMPARE STRUCTURAL SECTIONS WITH ARCHITECTURAL SECTIONS AND REPORT ANY DISCREPANCY TO THE ARCHITECT PRIOR TO FABRICATION OR INSTALLATION OF STRUCTURAL MEMBERS.
ALL EXISTING EQUIPMENT AND FINISHES THAT ARE SCHEDULED OR NOTED TO REMAIN WILL BE PROTECTED BY THE CONTRACTOR. PHOTOGRAPHS OF EXISTING CONDITIONS MUST BE PROVIDED BY THE CONTRACTOR TO DOCUMENT PRE-EXISTING
DAMAGE & FINISH CONDITIONS.
THE CONTRACTOR MUST COORDINATE ALL DEMO AND NEW WORK ACTIVITIES WITH THE AIRPORT PRIOR TO PROCEEDING.
MOCK UPS (AS REQUIRED) MUST BE CONSTRUCTED BY THE CONTRACTOR PRIOR TO BEGINNING DEMOLITION WORK.
DO NOT USE ESCALATORS OR STAIRS FOR MOVING EQUIPMENT AND OR MATERIALS UNLESS COORDINATED WITH AIRPORT FACILITIES/OPERATIONS. WHEN USING ELEVATOR, ELEVATOR WALL, SIDES AND CEILING MUST BE PROTECTED FROM DAMAGE, ALL DAMAGE IS THE RESPONSIBILITY OF GENERAL CONTRACTOR AND MUST BE CORRECTED PRIOR TO PROJECT COMPLETION.
THE CONTRACTOR IS TO PROTECT EXISTING FINISHES, AND MAKE REPAIRS TO THE EXISTING FINISHES AND FIRE PROOFING WHERE DAMAGED OR REQUIRED FOR UNDER SLAB WORK AND CORES, AS PART OF THE NEW WORK ASSOCIATED WITH THIS
PROJECT.
WHERE MATERIALS ARE APPLIED TO, OR ARE IN DIRECT CONTACT WITH WORK INSTALLED BY ANOTHER SUBCONTRACTOR, COMMENCEMENT OF WORK IMPLIES ACCEPTANCE OF THE SUBSTRATE AS SUITABLE FOR THE APPLICATION INTENDED.
ISOLATE DISSIMILAR METALS TO PREVENT GALVANIC CORROSION.
OPENINGS IN RATED WALL, FLOOR, CEILING AND ROOF ASSEMBLIES MUST BE SEALED WITH PENETRATION SEALANT SYSTEMS MEETING OR EXCEEDING THE REQUIRED FIRE RESISTIVE RATINGS.
MAINTAIN THE FIRE RATING OF CONSTRUCTION AROUND CABINETS, PANELS, AND BOXES RECESSED IN FIRE RATED WALL, FLOOR, AND CEILING ASSEMBLIES.
PROVIDE CONTINUOUS PERIMETER FIRE SAFING BETWEEN FLOORS AND COORDINATE THE INSTALLATION WITH THE EXTERIOR WALL. FIRE RATING OF SAFING MUST MATCH FIRE RATING OF FLOOR CONSTRUCTION.
FIELD MEASURE AND CONFIRM DIMENSIONS FOR OWNER PROVIDED EQUIPMENT AND FURNISHINGS.
PROVIDE STIFFENERS, BRACING, BACKING PLATES AND BLOCKING REQUIRED FOR SECURE INSTALLATION OF TOILET PARTITIONS, DOORS AND DOOR HARDWARE INCLUDING WALL-MOUNTED DOOR STOPS, HANDRAILS, WALL-MOUNTED SHELVES, OPERABLE PARTITIONS, MISCELLANEOUS EQUIPMENT, AND SUSPENDED MECHANICAL AND ELECTRICAL EQUIPMENT.
COORDINATE ALL BASE AND HOUSEKEEPING PADS WITH MECHANICAL, PLUMBING AND ELECTRICAL EQUIPMENT.
LOCATE ACCESS PANELS AS INDICATED ON DRAWINGS. FOR ACCESS PANELS NOT SHOWN BUT REQUIRED BY PROVISIONS OF THE CONTRACT DOCUMENTS, LOCATED IN ACCORDANCE WITH APPLICABLE CODES. SUBMIT PROPOSED LOCATIONS TO
THE ARCHITECT FOR REVIEW AND ACCEPTANCE PRIOR TO INSTALLATION.
ALL NON-GALVANIZED EXTERIOR EXPOSED STEEL TO RECEIVE HIGH PERFORMANCE COATING UNLESS OTHERWISE NOTED ON DRAWINGS OR SPECIFICATIONS.
DO NOT OBSTRUCT ACCESS TO EXISTING EXITS, OR REDUCE THE WIDTH OF PUBLIC CORRIDORS.
PENETRATIONS IN THE EXTERIOR BUILDING WALL ARE NOT ALLOWED, INCLUDING THOSE REQUIRED FOR OUTLETS AND BLOCKING.
FULLY LAY OUT GRID, WALL, AND OPENING PLACEMENT IN AN AREA PRIOR TO START OF PARTITION CONSTRUCTION. VERIFY THAT DIMENSIONS ARE CONSISTENT WITH REQUIREMENTS INDICATED IN THE DOCUMENTS. REFER ANY DIMENSIONAL INCONSISTENCIES TO THE ARCHITECT FOR RESOLUTION PRIOR TO THE START OF PARTITION CONSTRUCTION.
FINISH FLOOR ELEVATIONS ARE TO TOP OF CONCRETE UNLESS OTHERWISE NOTED.
LEVEL FLOORS THAT EXCEED 1/4" VARIANCE IN A 10'-0" RADIUS.
12'-0"
XXXX
CEILING TYPE
CEILING HEIGHT
*NOTE - REFER TO PARTITION TYPE SHEET FOR INFO ON TAG
PT-1
FURNITURE & EQUIPMENT TAG TOILET ACCESSORY TAG
1i 1i
ROOM NAME
N
PN
X#-X
A
1 2 3 4 5 6
2 3 4 5 6
B
C
D
E
REVISIONS
DATE ISSUED:
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT NUMBER:
PROJECT STATUS:
SHEET ID:
SHEET TITLE:
PROJECT ADDRESS:
PROJECT TITLE:
SEAL:
CITY OF EUGENE
2/
/2
3:
:1
PM
Au to de sk
D oc s:
//2
_E
U G
C an op y
R ep ai r a nd Im pr ov em en ts /2
_E
U G
_C an op y
R ep ai r a nd Im pr ov em en ts _A
_R
.rv t
100% DESIGN
LET
MKI
2880 DOUGLAS DRIVE
EUGENE, OREGON 97402
EUG CANOPY REPAIRS AND
IMPROVEMENTS
20245144004
02/27/2026
LET/MKI
G003
GENERAL NOTES,
ABBREVIATIONS AND
SYMBOLS
© 2026 RS&H, INC
Copyright © 2026. This drawing is an instrument of service and property of RS&H, Inc. Any use or reproduction without the expressed written consent of this corporation is prohibited. All rights reserved.
& AND
@ AT
A/C AIR CONDITIONER
AB ANCHOR BOLT
ACT ACOUSTICAL CEILING TILE
ADJ ADJUSTABLE
AFF ABOVE FINISHED FLOOR
AFS ABOVE FLOOR SLAB
AHU AIR HANDLING UNIT
ALUM ALUMINUM
ANOD ANODIZED
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
APPROX APPROXIMATE OR APPROXIMATELY
ARCH ARCHITECTURE, ARCHITECTURAL
AVG AVERAGE
AWI ARCHITECTURAL WOODWORK INSTITUTE
BHMI BUILDER'S HARDWARE MANUFACTURER'S ASSOCIATION, INC
BID BAGGAGE INFORMATION DISPLAY
BIM BUILDING INFORMATION MODELING
BLDG BUILDING
BM BEAM
BO BOTTOM OF
BUR BUILT-UP ROOFING
CFMF COLD FORMED METAL FRAMING
CJ CONTROL JOINT
CL CENTERLINE
CL OTS CENTERLINE OF TENANT SEPARATION
CLG CEILING
CLO CLOSET
CLR CLEAR
CMU CONCRETE MASONRY UNIT
COL COLUMN
COLS COLUMNS
CONC CONCRETE
CONT CONTINUOUS
DIA DIAMETER
DR DOOR
DS DOWNSPOUT
DTL OR DET DETAIL
DWG DRAWING
EA EACH
EFS EXTERIOR FACE OF SHEATHING
EJ EXPANSION JOINT
ELEC ELECTRIC, ELECTRICAL
ELEV ELEVATION
ENG ENGINEER, ENGINEERING
EOS EDGE OF SLAB
EP ELECTRICAL PANEL
EPDM ETHYLENE PROPYLENE DIENE MONOMER
EQ EQUAL
EQUIP EQUIPMENT
ERD EMERGENCY ROOF DRAIN
ETD ESTIMATED TRAVEL DISTANCE
EWC ELECTRIC WATER COOLER
EXIST EXISTING
EXP EXPANSION, EXPOSED
EXT EXTERIOR
FD FIRE DAMPER, FLOOR DRAIN
FDC FIRE DEPARTMENT CONNECTION
FDN FOUNDATION
FE FIRE EXTINGUISHER
FEC FIRE EXTINGUISHER CABINET
FF FINISHED FLOOR
FFE FINISHED FLOOR ELEVATION
FHC FIRE HOSE CABINET
FID FLIGHT INFORMATION DISPLAY
FIN. FINISH, FINISHED
FLR FLOOR
FO FACE OF
FOB FACE OF BRICK
FOP FACE OF POST
FRP FIBER REINFORCED PANEL
FT FEET
FTG FOOTING
FV FIELD VERIFY
GA GAUGE
GALV GALVANIZED
GBF GYPSUM BOARD FURRING
GID GATE INFORMATION DISPLAY
GL GLASS
GP GLOSSY PAINT
GWB GYPSUM WALL BOARD
GYP GYPSUM
HB HOSE BIB
HDW HARDWARE
HGT OR HT HEIGHT
HKS HOOKS
HM HOLLOW METAL
HORIZ HORIZONTAL
HVAC HEATING VENTILATION & AIR CONDITIONING
i.e. THAT IS, SUCH AS
ID INSIDE DIAMETER
IFS INTERIOR FACE OF STUD
IN. INCH, INCHES
INSUL INSULATION
INT INTERIOR
JAN. JANITOR
JST JOIST
JT JOINT
KP KICK PLATE
303-409-9700
RS&H Oregon Architects - Engineers - Planners, P.C.
4582 S. Ulster St., Suite 1100 Denver, CO 80237 www.rsandh.com Oregon Registration No. 0871AF
LAM LAMINATE
LAV LAVATORY
LB POUND
LDG LANDING
LONG. LONGITUDINAL
LRV LOUVER
LT LIGHT
LTG LIGHTING
LVP LUXURY VINYL PLANK
LVT LUXURY VINYL TILE
MATL MATERIAL
MAX. MAXIMUM
MECH MECHANICAL
MEP MECHANICAL, ELECTRICAL, & PLUMBING
MFGR MANUFACTURER
MGR MANAGER
MIN MINIMUM
MO MASONRY OPENING
MOD MODIFIED
MSC MISCELLANEOUS
MTL METAL
MUFID MULTI-USER FLIGHT INFORMATION DISPLAY
N/A NOT APPLICABLE
NFPA NATIONAL FIRE PROTECTION ASSOCIATION
NIC NOT IN CONTRACT
NO NUMBER
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OFCI OWNER FURNISHED CONTRACTOR INSTALLED
OPG OPENING
OPP OPPOSITE
OSHA OCCUPATIONAL SAFETY AND HEALTH ACT
OVHD OVERHEAD
PBB PASSENGER BOARDING BRIDGE
PDU POWER DISTRIBUTION UNIT
PLAM PLASTIC LAMINATE
PLYWD PLYWOOD
PNL PANEL
PR PAIR
PRE-FAB PRE-FABRICATED
PSF POUNDS PER SQUARE FOOT
PSI POUNDS PER SQUARE INCH
PT PAINT, PRESSURE TREATED
PVC POLYVINYL CHLORIDE
QT QUARRY TILE
R RADIUS
RAF RAISED ACCESS FLOOR
RAG RETURN AIR GRILLE
RB RUBBER BASE
RD ROOF DRAIN
RECEP RECEPTION, RECEPTIONIST
REF REINFORCING, REINFORCEMENT
REQ'D REQUIRED
REV REVISED, REVISION
RO ROUGH OPENING
SC SEALED CONCRETE
SCHED SCHEDULE
SCW SOLID CORE WOOD
SECT SECTION
SF SQUARE FEET
SFRM SPRAYED FIRE RESISTIVE MATERIAL
SGP SEMI-GLOSS PAINT
SHT SHEET
SHTS SHEETS
SIM SIMILAR
SPECS SPECIFICATIONS
SQ SQUARE
SQ IN. SQUARE INCHES
SS SERVICE SINK
STC SOUND TRANSMISSION CLASS
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL, STRUCTURE
SUSP SUSPENDED
T&G TONGUE & GROOVE
TEL TELEPHONE
TG TEMPERED GLASS
TO STL TOP OF STEEL
TOB TOP OF BRICK, TOP OF BEAM
TOS TOP OF STEEL, TOP OF SLAB
TOSH TOP OF SHEATHING
TOW TOP OF WALL
TYP TYPICAL
UL UNDERWRITERS LABORATORIES
UON UNLESS OTHERWISE NOTED
VB VAPOR BARRIER
VCT OR VT VINYL COMPOSITION TILE
VDC VIRTUAL DESIGN & CONSTRUCTION
VERT VERTICAL
VR VIRTUAL REALITY
W/ WITH
WC WATER CLOSET
WCO WALL CLEANOUT
WD WOOD
WMP WIRE MESH PARTITION
WWF WELDED WIRE FABRIC
YD YARD
Ø DIAMETER
KEY PLAN:
A B
C
D
N
PN
NO. DESCRIPTION DATE
03/05/2026
ISSUED FOR BID
AND PERMIT
AD RE CR HET ITSI EG CE TR
MARK IP
FEC
NOPA
RK
IN
G
C C
C C
C C
C
TW A9
TW L
TW
P
TW A5
TW D
TW E
TW A4
TW A2
TW A1
TW C
TW B1
TW B2
TW B3
TW R
TW B4
TW M
TW
B
TW
K
TW J
TW H
TW
A
TW
A
TW
A
TW
P
TW
K
TW C
TW M
TW
B
TW
B
TW C
RW
6L -3
4R
RU
NW
AY
R-
L
TW A3
CA
RG
O
AP
RO
N
.4
AIR
CAR
GO
RAM
P
WE
YE
RH
AE
US
ER
FE
C
FEC
FE
C
FEC
FE
C
FE
C
FE
C
FE
C
FE
C
FE
C
38'
59'
13' 54'
54'
18'
18'
5'
11'
17'
33'
78'
20'
5'
32'
13'
103'
22'
45' 9'
7'
20' 29'
19' 28'
58'
21'
33'
20'
5' 44'
131'
9'
6'
10'
2'
10' 27'
12' 7'
10'
21'
38'
40'
34'
32'
93'
17'
SYMBOL LEGEND
LIFE SAFETY LEGEND
ESCAPE ROUTE TRAVEL PATH
PARTITION LEGEND
FIRE EXTINGUISHER CABINET
EXIT
EXIT SIGN
NON-RATED WALL SYSTEM
1-HOUR RATED WALL SYSTEM
2-HOUR RATED WALL SYSTEM
3-HOUR RATED WALL SYSTEM
SMOKE RATED WALL SYSTEM
NOTE: REFER TO PARTITION TAGS ON PLANS FOR PARTITION TYPE DETAILS
EXIT
1N
2N
1S
2S
3S
4S
KL
MNOPQRST
.9N
1.1S
2.1S
3.1S
4.1S
NS
3N
4N
5N
6N
7N
8N
9N
10N
11N
12N
5S
6S
7S
8S
9S
10S
11S
12S
13S
ABDEFGIJ
14S
H C
15S
UVWXY
1.2S
A2 B2 C2 D2 E2 F2 G2 H2 J2 K2 L2 A3 B3 C3 D3 E3 F3 G3 H3 J3 K3 L3 M3 A4 B4 C4 D4 E4 F4 G4 H4 J4 K4 L4
PROJECT AREA A- CONSTRUCTION BY OTHERS
PROJECT AREA B
PROJECT AREA C
PROJECT AREA D
201 / 360 OCC.
319 / 360 OCC.
317 / 360 OCC.
317 / 360 OCC.
317 / 360 OCC.
317 / 360 OCC.
317 / 360 OCC.
EXIT EXIT
EXIT
EXIT
EXIT
EXIT
EXIT
133' 133'
0' 39'
221' 254'
0' 222'
0' 89'
0' 70'
0' 71'
19' 73'
53' 92'
61' 70'
0' 51'
0' 17'
0' 78'
ALL PATHS OF TRAVEL AND EXIT CAPACITIES
ARE EXISTING AND UNCHANGED AND
PROVIDED FOR REFERENCE ONLY.
SCALE: = 40'-0"
A
1 2 3 4 5 6
2 3 4 5 6
B
C
D
E
0 40 8040
1"
REVISIONS
DATE ISSUED:
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT NUMBER:
PROJECT STATUS:
SHEET ID:
SHEET TITLE:
PROJECT ADDRESS:
PROJECT TITLE:
SEAL:
CITY OF EUGENE
2/
/2
3:
:1
PM
Au to de sk
D oc s:
//2
_E
U G
C an op y
R ep ai r a nd Im pr ov em en ts /2
_E
U G
_C an op y
R ep ai r a nd Im pr ov em en ts _A
_R
.rv t
100% DESIGN
LET
MKI
2880 DOUGLAS DRIVE
EUGENE, OREGON 97402
EUG CANOPY REPAIRS AND
IMPROVEMENTS
20245144004
02/27/2026
LET/MKI
G101
OVERALL FIRST
FLOOR LIFE SAFETY
PLAN
© 2026 RS&H, INC
Copyright © 2026. This drawing is an instrument of service and property of RS&H, Inc. Any use or reproduction without the expressed written consent of this corporation is prohibited. All rights reserved.
303-409-9700
RS&H Oregon Architects - Engineers - Planners, P.C.
4582 S. Ulster St., Suite 1100 Denver, CO 80237 www.rsandh.com Oregon Registration No. 0871AF
KEY PLAN:
A B
C
D
N
PN
N
PN
SCALE: 1" = 40'-0"
A1 OVERALL LIFE SAFETY PLAN
NO. DESCRIPTION DATE
03/05/2026
ISSUED FOR BID
AND PERMIT
AD RE CR HET ITSI EG CE TR
MARK IP
FE
C
FEC
FE
C
FEC
FE
C
FE
C
FE
C
FE
C
FE
C
FE
C
1N
2N
1S
2S
3S
4S
KL
MNOPQRST
.9N
1.1S
2.1S
3.1S
4.1S
NS
3N
4N
5N
6N
7N
8N
9N
10N
11N
12N
13N
14N
5S
6S
7S
8S
9S
10S
11S
12S
13S
ABDEFGIJ
14S
H C
15S
UVWXY
1.2S
A2 B2 C2 D2 E2 F2 G2 H2 J2 K2 L2 A3 B3 C3 D3 E3 F3 G3 H3 J3 K3 L3 M3 A4 B4 C4 D4 E4 F4 G4 H4 J4 K4 L4
1.
2.
3.
A.
4.
5.
6.
7.
1.
2.
3.
(BY OTHERS) CANOPY A WORK CONSISTS OF:
DEMOLITION OF EXISTING LIGHTING FIXTURES AND
SURROUNDING WOOD ENCLOSURE
CONSTRUCTION OF NEW LIGHTING FIXTURES
DEMOLITION AND INSTALLATION OF (31) NEW GLULAM
BEAMS ON SOUTH SIDE OF CANOPY (BASE BID)
REPAIR OF DAMAGED BEAMS (100 CUBIC INCHES PER
BEAM) AND REPLACEMENT OF (4) BEAMS IN THEIR
ENTIRETY (ALT 2)
DEMOLITION OF EXISTING BUILT UP ROOF AS REQUIRED
FOR NEW TPO ROOF.
INSTALLATION OF NEW TPO ROOF
RESTORATION OF EXISTING LAMINATED WOOD DECKING.
SEE UNIT PRICE SPECIFICATIONS AND STRUCTURAL
DRAWINGS.
SAND AND STAIN ALL EXPOSED WOOD AREAS WD-1, TYP.
PHASING NOTES:
ONLY ONE CANOPY MAY BE CLOSED AT A TIME.
PROVIDE BARRICADES TO PREVENT PASSENGERS FROM
ENTERING WORK AREA.
PROVIDE DUST CONTROL TO PREVENT DUST FROM
EXITING CURRENT PHASE CONSTRUCTION AREA.
1.
2.
3.
A.
4.
1.
2.
3.
4.
5.
CANOPY B WORK CONSISTS OF:
DEMOLITION OF EXISTING DAMAGED GLULAM BEAM AT
GRIDLINE 2.1S
INSTALLATION OF NEW GLULAM BEAM
DEMOLITION AND REPLACEMENT OF METAL TRIM
BETWEEN AND AROUND GLULAM BEAMS (BASE BID)
REFINISH IN PLACE OR REMOVE AND REFINISH OFF-
SITE ALL METAL TRIM BETWEEN AND AROUND GLULAM
BEAMS (ALT 1)
SAND AND STAIN ALL EXPOSED WOOD AREAS WD-1, TYP
INCLUDING SOFFIT AND EXISTING GLULAM BEAMS
PHASING NOTES:
LIMIT CLOSURE OF CANOPY AREAS DIRECTLY IN FRONT OF
DOORS TO MAX ONE AT A TIME. PROVIDE PROPOSED
PHASING OF CLOSURES TO AIRPORT FOR REVIEW AND
APPROVAL.
LIMIT CLOSURE OF NON-ENTRANCE CANOPY AREAS TO
MAX TWO BAYS AT ONE TIME.
WHERE EXISTING SECURITY CAMERAS MUST BE REMOVED,
REMOVE AND REINSTALL ON TEMPORARY FRAMING TO
MINIMIZE INTERRUPTIONS. COORDINATE WITH AIRPORT
PRIOR TO ANY SERVICE INTERRUPTION.
PROVIDE BARRICADES TO PREVENT PASSENGERS FROM
ENTERING WORK AREA.
PROVIDE DUST CONTROL TO PREVENT DUST FROM
EXITING CURRENT PHASE CONSTRUCTION AREA.
1.
A.
2.
1.
2.
3.
4.
5.
CANOPY C WORK CONSISTS OF:
DEMOLITION AND REPLACEMENT OF METAL TRIM
BETWEEN AND AROUND GLULAM BEAMS (BASE BID)
REFINISH IN PLACE OR REMOVE AND REFINISH OFF-
SITE ALL METAL TRIM BETWEEN AND AROUND GLULAM
BEAMS (ALT 1)
SAND AND STAIN ALL EXPOSED WOOD AREAS WD-1, TYP
INCLUDING SOFFIT AND EXISTING GLULAM BEAMS.
PHASING NOTES:
LIMIT CLOSURE OF CANOPY AREAS DIRECTLY IN FRONT OF
DOORS TO MAX ONE AT A TIME. PROVIDE PROPOSED
PHASING OF CLOSURES TO AIRPORT FOR REVIEW AND
APPROVAL.
LIMIT CLOSURE OF NON-ENTRANCE CANOPY AREAS TO
MAX TWO BAYS AT ONE TIME.
WHERE EXISTING SECURITY CAMERAS MUST BE
REMOVED, REMOVE AND REINSTALL ON TEMPORARY
FRAMING TO MINIMIZE INTERRUPTION. COORDINATE WITH
AIRPORT PRIOR TO ANY SERVICE INTERRUPTION.
PROVIDE BARRICADES TO PREVENT PASSENGERS FROM
ENTERING WORK AREA.
PROVIDE DUST CONTROL TO PREVENT DUST FROM
EXITING CURRENT PHASE CONSTRUCTION AREA.
1.
2.
3.
1.
2.
3.
4.
5.
AREA D WORK CONSISTS OF:
DEMOLITION OF ROOF ASSEMBLY FROM ABOVE TO
ACCESS DAMAGED GUTTER FRAMING BEAMS AND
DECKING.
INSTALLATION OF NEW TRENCH DRAIN FRAMING AND
DECKING.
RESTORATION OF ROOF ASSEMBLY INCLUDING VAPOR
BARRIER, INSULATION, TPO ROOFING WITH WALK PADS,
AND ROOF DRAIN CONNECTION.
PHASING NOTES:
ACCESS STRUCTURE FROM ROOF ONLY.
IF ACCESS FROM BELOW IS REQUIRED, PROVIDE
SCAFFOLDING WITH PEDESTRIAN CANOPIES SO AS TO
ALLOW FULL UNINTERRUPTED PASSENGER CIRCULATION
FROM THE FIRST FLIGHT AT 4AM UNTIL THE LAST FLIGHT IN
THE EVENING.
IF SCAFFOLDING IS REQUIRED, INSTALL SCAFFOLDING
ONLY AFTER THE LAST FLIGHT OF THE DAY HAS ARRIVED
AND BEFORE THE FIRST FLIGHT AT 4AM. COORDINATE
CLOSURE TIMES WITH AIRPORT.
PROVIDE BARRICADES TO PREVENT PASSENGERS FROM
ENTERING WORK AREA.
PROVIDE DUST CONTROL TO PREVENT DUST FROM
EXITING CURRENT PHASE CONSTRUCTION AREA.
PROJECT AREA A- CONSTRUCTION BY OTHERS
PROJECT AREA B
PROJECT AREA C
PROJECT AREA D
CONSTRUCTION BOUNDARY - REFER TO PLAN FOR
SPECIFIED BARRIER TYPE. SEE G700 FOR DETAILS
NOT IN SCOPE
LEGEND
UNDER CONSTRUCTION
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
THE CONTRACTOR SHALL SUBMIT A DETAILED PHASING PLAN AND SCHEDULE TO THE ARCHITECT AND AIRPORT FOR REVIEW AND APPROVAL. THE PHASING NOTES INCLUDED IN THESE CONTRACT DOCUMENTS ARE ADVISORY AND MAY BE MODIFIED SUBJECT TO APPROVAL BY THE ARCHITECT AND
AIRPORT AUTHORITIES. THE CONTRACTOR TO COORDINATE ALL THE PHASING EFFORTS WITH
AIRPORT AND AFFECTED CONCESSIONS.
THE CONTRACTOR WILL HOLD A MEETING WITH THE AIRPORT TO DISCUSS EACH PHASE OF WORK
BEFORE IT BEGINS;
IDENTIFYING AREAS IMPACTED
GIVE A SCHEDULE OF WORK
RESPOND TO ISSUES AND CONCERNS
THE CONTRACTOR TO MINIMIZE THE IMPACT ON THE AIRPORT OPERATIONS AND PASSENGERS AS
MUCH AS POSSIBLE AND MAKE ACCOMMODATIONS AS NECESSARY.
PHASE CONSTRUCTION AS NECESSARY TO ENSURE THAT EXITS ARE NOT OBSTRUCTED OR
REDUCED IN WIDTH. IF EXITS MUST BE OBSTRUCTED DURING CONSTRUCTION, PROVIDE ALTERNATE EXIT ROUTES DURING EACH PHASE OF CONSTRUCTION. MINIMIZE OR AVOID DISRUPTIONS TO FIRE
ALARM AND SPRINKLER SYSTEMS IF POSSIBLE.
UPON PROJECT COMPLETION THE CONTRACTOR SHALL RESTORE CONTRACTOR STAGING AND
EMPLOYEE PARKING AREAS TO ORIGINAL CONDITION. THIS COULD INCLUDE GRADING, TOPSOILING, SEEDING AND MULCHING. RESTORATION OF THE CONTRACTOR STAGING AREA AND HAUL ROAD
RESTORATION SHALL BE PERFORMED IN ACCORDANCE WITH APPLICABLE PROJECT
SPECIFICATIONS.
CONTRACTOR SHALL REPAINT ANY PAVEMENT MARKINGS DAMAGED BY CONSTRUCTION
EQUIPMENT OUTSIDE OF PROJECT AREA.
CONSTRUCTION PARKING AND STAGING AREAS TO BE COORDINATED WITH AIRPORT.
CONTRACTOR TO PROVIDE DUST MITIGATION MEASURES TO ASSURE HEALTHY AIR QUALITY IN
PROJECT WORK AREA AND ADJACENT AREAS. PROJECT WORK AREA TO BE CLEANED DAILY.
CONTRACTOR TO MAINTAIN A CLEAR, SAFE, AND UNOBSTRUCTED AREAS FOR AIRPORT
PERSONNEL TO PERFORM THEIR WORK ACTIVITIES.
VISIT AND CAREFULLY EXAMINE THOSE PORTIONS OF THE SITE AND/OR PRESENT BUILDING
AFFECTED BY THIS WORK SO AS TO BECOME FAMILIAR WITH EXISTING CONDITIONS AND
DIFFICULTIES THAT WILL ATTEND THE EXECUTION OF THE WORK BEFORE SUBMITTING PROPOSAL.
SUBMISSION OF PROPOSAL WILL BE CONSTRUCTED AS EVIDENCE THAT SUCH EXAMINATION HAS
BEEN MADE AND LATER CLAIMS FOR LABOR, EQUIPMENT OR MATERIALS REQUIRED BECAUSE OF
DIFFICULTIES ENCOUNTERED, WHICH COULD HAVE BEEN FORESEEN HAD SUCH EXAMINATION BEEN
MADE, WILL NOT BE RECOGNIZED.
CONTRACTOR TO INVESTIGATE SITE AND COORDINATE WITH AIRPORT TO IDENTIFY POTENTIAL
HAZARDOUS MATERIALS PRIOR TO ANY DEMOLITION OR NEW WORK BEGINS. IF NECESSARY,
CONTRACTOR TO COMMISSION TESTING OF MATERIAL AND NOTIFY ARCHITECT AND ENGINEER.
PARKING BENEATH THE CONCOURSE A WALKWAY AT THE APRON LEVEL WILL BE UNAVAILABLE
DURING CONSTRUCTION.
SCISSOR LIFTS ARE PERMITTED INSIDE THE BUILDING. HOWEVER, ACCESS TO THE SECOND
FLOOR IS LIMITED TO A PASSENGER ELEVATOR, WHICH WILL RESTRICT THE SIZE OF LIFT THAT CAN BE TRANSPORTED. THE EXISTING ELEVATOR NEXT TO THE ESCALATORS CAN ACCOMMODATE UP TO 5000LBS, DOORWAY IS 96 ” TALL BY 47 ½ “ WIDE. USABLE LENGTH OF THE ELEVATOR IS 101 ½ “. THIS
IS A PASSENGER-FACING ELEVATOR. THE CONTRACTOR MUST COORDINATE WITH AIRPORT TO
SCHEDULE EQUIPMENT AND MATERIAL MOVES —SUCH AS SCISSOR LIFTS—OUTSIDE OF PEAK
PASSENGER TRAFFIC TIMES.
IT IS RECOMMENDED THAT THE TOTAL LIFT LOAD—INCLUDING THE LIFT, WORKER, AND
MATERIALS—DOES NOT EXCEED 4,000 LBS.
PHASING GENERAL NOTES
CLIMATE CONTROLLED, INSULATED, ACOUSTIC,
TEMPORARY WALL. PRIME AND PAINT AND PREPARE
FOR OWNER INSTALLED GRAPHICS. REFER TO 2/G704
FLAGGER
CONSTRUCTION BY OTHERS
EXISTING EGRESS PATH OF TRAVEL
EGRESS PATH OF TRAVEL - DURING
CONSTRUCTION
CLOSED DURING CONSTRUCTION
BARRIER TYPE
SCALE: = 40'-0"
A
1 2 3 4 5 6
2 3 4 5 6
B
C
D
E
0 40 8040
1"
REVISIONS
DATE ISSUED:
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT NUMBER:
PROJECT STATUS:
SHEET ID:
SHEET TITLE:
PROJECT ADDRESS:
PROJECT TITLE:
SEAL:
CITY OF EUGENE
2/
/2
3:
:2
PM
Au to de sk
D oc s:
//2
_E
U G
C an op y
R ep ai r a nd Im pr ov em en ts /2
_E
U G
_C an op y
R ep ai r a nd Im pr ov em en ts _A
_R
.rv t
100% DESIGN
LET
MKI
2880 DOUGLAS DRIVE
EUGENE, OREGON 97402
EUG CANOPY REPAIRS AND
IMPROVEMENTS
20245144004
02/27/2026
LET/MKI
G702
PHASE LAYOUT
© 2026 RS&H, INC
Copyright © 2026. This drawing is an instrument of service and property of RS&H, Inc. Any use or reproduction without the expressed written consent of this corporation is prohibited. All rights reserved.
303-409-9700
RS&H Oregon Architects - Engineers - Planners, P.C.
4582 S. Ulster St., Suite 1100 Denver, CO 80237 www.rsandh.com Oregon Registration No. 0871AF
KEY PLAN:
A B
C
D
N
PN
SCALE: 1" = 40'-0"
A1 PHASE LAYOUT
NO. DESCRIPTION DATE
03/05/2026
ISSUED FOR BID
AND PERMIT
AD RE CR HET ITSI EG CE TR
MARK IP
A
A
1 2 3 4 5 6
2 3 4 5 6
B
C
D
E
REVISIONS
DATE ISSUED:
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT NUMBER:
PROJECT STATUS:
SHEET ID:
SHEET TITLE:
PROJECT ADDRESS:
PROJECT TITLE:
SEAL:
CITY OF EUGENE
H O
H
BA
C H
-L
EW
IN
.4
100% SET
BC
20245144004
02/27/2026
303-409-9700
RS&H Oregon Architects - Engineers - Planners, P.C.
4582 S. Ulster St., Suite 1100 Denver, CO 80237 www.rsandh.com Oregon Registration No. 0871AF
KEY PLAN:
NO. DESCRIPTION DATE
S T R U C T U R A L & C I V I L E N G I N E E R S
(541) 349-1701
199 East Fifth Ave, Suite 23 Eugene, OR 97401
84424
OREGON
C
R
N
BR E
N O
ETSI
E
G
PD
RE EFOR
S
AR WFO
3, R
NIG E NOI
S
L A
NE
ER
V. 2 0
Expires: 12-31-27
T
D
CUR T
TS
URAL
DIGITAL SIGNATURE
© 2025 RS&H, INC
2880 DOUGLAS DRIVE
EUGENE, OREGON 97402
EUG CANOPY REPAIRS
AND IMPROVEMENTS
KEY PLAN:
B
C
D
N
PN
AMA
BC
GENERAL
STRUCTURAL NOTES
AND SYMBOLS
S001
STRUCTURAL SHEET INDEX
S001 GENERAL STRUCTURAL NOTES AND SYMBOLS
S101A AREA A - ROOF FRAMING PLANS (CONSTRUCTION BY OTHERS)
S101B
AREA A - ROOF FRAMING PLANS - ALTERNATE 2
(CONSTRUCTION BY OTHERS)
S102 AREA B - ROOF FRAMING PLAN
S106 AREA D - ROOF FRAMING PLAN
S201 STRUCTURAL ELEVATIONS
S801 AREA C STRUCTURAL DETAILS
S802 AREA B STRUCTURAL DETAILS
S803 AREA A STRUCTURAL DETAILS (CONSTRUCTION BY OTHERS)
STRUCTURAL GENERAL NOTES
· GENERAL
A. THESE DRAWINGS ARE COPY RIGHTED INSTRUMENTS OF SERVICE OF HOHBACH-LEWIN, INC. FOR USE
ONLY ON THIS PROJECT.
B. CONTRACTOR RESPONSIBILITY - CONSTRUCTION DOCUMENTS REPRESENT THE FINISHED STRUCTURE. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR CONSTRUCTION MEANS, METHODS, SEQUENCES AND SAFETY
PRECAUTIONS, INCLUDING BUT NOT LIMITED TO SHORING AND TEMPORARY BRACING.
C. DIMENSIONS - USE WRITTEN DIMENSIONS ONLY. VERIFY ALL DIMENSIONS AT JOB SITE BEFORE COMMENCING WORK AND REPORT ANY DISCREPANCIES. WHERE NO DIMENSIONS ARE PROVIDED, OBTAIN
CLARIFICATION PRIOR TO PROCEEDING WITH WORK. DO NOT SCALE DRAWINGS.
D. COORDINATION - OPENINGS THROUGH WALLS AND FLOORS FOR MECHANICAL AND ELECTRICAL SYSTEMS SHALL BE COORDINATED BY CONTRACTOR AND CONSTRUCTED PER TYPICAL DETAILS SHOWN IN THESE DOCUMENTS. NO MECHANICAL OR ELECTRICAL SYSTEM COMPONENTS SHALL BE EMBEDDED IN SLABS OR
WALLS UNLESS SPECIFICALLY DETAILED IN THESE DOCUMENTS.
E. OMISSIONS AND CONFLICTS - OMISSIONS OR CONFLICTS BETWEEN VARIOUS ELEMENTS OF THE CONSTRUCTION DOCUMENTS SHOULD BE BROUGHT TO THE ATTENTION OF THE DESIGN TEAM. IF CERTAIN FEATURES ARE NOT FULLY DELINEATED IN THE CONSTRUCTION DOCUMENTS, THEIR CONSTRUCTION SHALL
BE OF THE SAME CHARACTER AS FOR SIMILAR CONDITIONS THAT ARE DELINEATED.
F. STRUCTURAL DRAWINGS ARE INTENDED TO BE USED WITH ARCHITECTURAL AND MECHANICAL
DRAWINGS. THE CONTRACTOR IS RESPONSIBLE FOR COORDINATING SUCH REQUIREMENTS INTO THEIR
SHOP DRAWINGS AND WORK.
G. THERE SHALL BE NO CHANGE IN SIZE OR DIMENSION OF A STRUCTURAL MEMBER, NOR SHALL ANY OPENINGS BE MADE IN ANY STRUCTURAL MEMBER, WITHOUT THE WRITTEN APPROVAL OF THE ENGINEER.
H. THE CONTRACTOR IS RESPONSIBLE FOR LIMITING THE AMOUNT OF CONSTRUCTION LOAD IMPOSED UPON THE STRUCTURE. CONSTRUCTION LOADS SHALL NOT EXCEED THE DESIGN CAPACITY OF THE STRUCTURE
AT THE TIME THE LOADS ARE IMPOSED.
I. THE CONTRACTOR SHALL INFORM THE ENGINEER IN WRITING OF ANY DEVIATION FROM THE
CONTRACT DOCUMENTS.
J. SEE DRAWINGS OTHER THAN STRUCTURAL FOR: TYPES OF FLOOR FINISH AND THEIR LOCATION, DEPRESSIONS IN FLOOR SLABS, OPENINGS IN WALLS AND FLOORS REQUIRED BY ARCHITECTURAL AND
MECHANICAL FEATURES, AND ROADWAY PAVING, WALKS, RAMPS, STAIRS, CURBS, ETC.
K. TYPICAL DETAILS - DETAILS NOTED AS TYPICAL ARE APPLICABLE WHERE SPECIFIED ON
THE STRUCTURAL DRAWINGS AND WHEREVER THE CONDITION OCCURS THROUGHOUT THE
PROJECT, INCLUDING LOCATIONS WHERE THE DETAIL IS NOT EXPLICITLY SPECIFIED OR
REFERENCED. IT IS THE CONTRACTOR'S RESPONSIBILITY TO IDENTIFY LOCATIONS
WHERE TYPICAL DETAILS ARE APPLICABLE PRIOR TO CONSTRUCTION.
SYMBOLS
DROP IN FLOOR OR ROOF ELEVATION, S.A.D.
SLOPED FINISH SEE ARCHITECTURAL DRAWINGSLOPE
· DESIGN BASIS
A. STRUCTURAL SCOPE: FRAMING REPAIRS AT (3) LOCATIONS:
1. AREA A: CANOPY REPAIRS ARE INTENDED TO RESTORE DURABILITY AND
SERVICEABILITY. STRUCTURAL CAPACITY HAS BEEN EVALUATED BASED ON LIMITED
SECTION LOSS.
2. AREA B: CANOPY BEAM IS TO BE REPLACED LIKE-FOR-LIKE.
3. AREA D: REPAIRS ARE LIKE-FOR-LIKE IN NATURE, BUT UTILIZE DIFFERING SECTIONS
DUE TO SCALE OF CONSTRUCTION.
B. APPLICABLE CODE: OREGON STRUCTURAL SPECIALTY CODE (OSSC), 2022 EDITION.
C. RISK CATEGORY: III
D. VERTICAL LOAD - ROOF LIVE LOADS:
1. ROOF: 20 psf
E. VERTICAL LOAD - ROOF SNOW LOAD:
1. SNOW DESIGN CRITERIA:
GROUND SNOW LOAD, pg = 13.0 psf SNOW EXPOSURE FACTOR, Ce = 0.9
IMPORTANCE FACTOR, Is = 1.1 THERMAL FACTOR, Ct = 1.0 SLOPE FACTOR, Cs = 1.0
FLAT ROOF SNOW LOAD, pf = 9 psf DESIGN ROOF LOAD, pf, min = 27 psf
F. LATERAL LOADS - WIND DESIGN:
1. WIND DESIGN CRITERIA:
WIND EXPOSURE: C
BASIC DESIGN WIND SPEED, V = 105 mph
ALLOWABLE STRESS DESIGN WIND SPEED, V and = 81 mph INTERNAL PRESSURE COEFFICIENT, GCpi = ±0.18
WALLS ABOVE LEVEL
WALLS BELOW LEVEL
EXISTING STRUCTURAL STEEL COLUMN
DETAIL NUMBER
" - " INDICATES THIS SHEET
X
DETAIL NUMBER
SHEET NUMBER
X sxxx
· WOOD
A. FRAMING LUMBER - DOUGLAS FIR U.O.N.;
1. JOISTS AND RAFTERS: NO. 1
2. STUDS, PLATES, BLOCKS, LIGHT FRAMING AND MISC: NO. 2
3. ALL LUMBER IN CONTACT WITH CONCRETE OR MASONRY TO BE PRESERVATIVE TREATED.
4. ALL LUMBER SHALL HAVE A MAXIMUM MOISTURE CONTENT OF 19% PRIOR TO FINAL FRAMING
INSPECTION.
B. SHEATHING:
1. ROOF SHEATHING: 5/8 INCH (19/32) PLYWOOD APA RATED 40/20 EXPOSURE 1. (4 PLY MIN.)
C. FRAMING HARDWARE: AS MANUFACTURED BY SIMPSON OR APPROVED EQUAL. SIMPSON DESIGNATIONS
USED.
D. NAILS: COMMON WIRE GAGE U.O.N. NAILING TO CONFORM TO OSSC TABLE 2304.10.2 U.O.N.
E. BOLTS: ASTM A307. PROVIDE WASHER UNDER HEADS AND NUTS.
F. PROVIDE LATERAL SUPPORT FOR BEAMS, JOISTS AND RAFTERS AT ENDS AND POINTS OF BEARING.
G. LAG SCREWS PER ANSI/ ASME STANDARD B18.2.1 PROVIDE LEAD HOLE SAME DIAMETER AND DEPTH AS
SHANK AND THEN DRILL HOLE 60% - 70% OF SHANK DIAMETER FOR THREADED PORTIONS.
H. GLUE-LAMINATED BEAMS:
1. DF 24F-V4 FOR SIMPLE SPANS AND 24F-V8 FOR CANTILEVERED AND CONTINUOUS BEAMS.
2. ARCHITECTURAL APPEARANCE GRADE TYP., WHERE EXPOSED, INDUSTRIAL GRADE ELSEWHERE.
3. EXTERIOR CANOPY BEAMS SHALL BE TREATED WITH HI-CLEAR II OR APPROVED EQUAL.
4. CAMBER TO RADIUS OF 3500' U.O.N.
5. FABRICATED WITH EXTERIOR GLUE.
6. MATERIAL SHALL BE IN ACCORDANCE WITH ANSI/AITC A190.1 AND ASTM D3737.
I. MICRO-LAMS 2.0E (LVL); PARALLEL STRAND LUMBER 2.2E (PSL) 'PARALLAM'; TIMBER STRAND 1.55E (LSL)
SHALL BE MANUFACTURED BY WEYERHAEUSER OR EQUIVALENT APPROVED ICC MANUFACTURED
PRODUCT.
J. I-JOISTS SHALL BE MANUFACTURED BY REDBUILT OR EQUIVALENT APPROVED ICC MANUFACTURED
PRODUCT.
K. LAMINATED WOOD DECKING:
1. DEPTH AND PATTERN TO MATCH EXISTING - G.C. TO FIELD VERIFY.
2. SPECIES AND GRADE: DOUGLAS FIR-LARCH, FIELD-VERIFIED TO MATCH EXISTING.
K. PRESSURE TREATED LUMBER:
1. PRESSURE TREATED D.F. SHALL BE AWPB STAMPED. AMMONIACAL COPPER QUAT (ACQ),
COPPER BORON AZOLE (CBA), OR BORATE TREATED AWPA STANDARD C2, MINIMUM 0.40
INCH. PENETRATION INCISED.
2. ALL PRESERVATIVE TREATED LUMBER SHALL BE FIELD-APPLIED WITH PRESERVATIVE
WHERE CUT AND DRILLED ON SITE WITH COPPER NAPHATHENATE (2% COPPER AS METAL).
3. USE HOT DIPPED GALVANIZED HARDWARE, IE. BOLTS, NAIL, ETC. FOR ALL ATTACHMENT TO
ACQ OR CBA TREATED MEMBERS.
4. PLAIN CARBON STEEL FASTENERS, INCLUDING NUTS AND WASHERS, IN SBX/ DOT AND ZINC
BORATE PRESERVATIVE-TREATED WOOD IN AN INTERIOR, DRY ENVIRONMENT SHALL BE
PERMITTED PER OSSC SECTION 2304.10.5.
M. WOOD REPAIR SYSTEM:
1. ABATRON LIQUIDWOOD + WOODEPOX OR APPROVED EQUAL.
NAIL DESIGNATION AND REQUIRED SIZES
NAIL DIAMETER (in) LENGTH (in)
16d 0.162 3.5
16d SINKER 0.148 3.25
10d 0.148 3
10d SHORT 0.148 2.5
8d 0.131 2.5
ABBREVIATIONS
& AND
@ AT
A.B. ANCHOR BOLT
ADD'L. ADDITIONAL
ARCH. ARCHITECTURAL
BLDG. BUILDING
BLKG. BLOCKING
BM. BEAM
BRG. BEARING
B.N. BOUNDARY NAIL
B.O. BOTTOM OF
B.O.C. BOTTOM OF CONCRETE
BOT. BOTTOM
CL CENTER LINE
CANT. CANTILEVER
C.I.P. CAST-IN-PLACE
C.J. CONTROL JOINT
CLR. CLEAR
CMU CONCRETE MASONRY UNIT
COL. COLUMN
COMP. COMPRESSION
CONC. CONCRETE
CONN. CONNECTION
CONT. CONTINUOUS
CORR. CORRIDOR
CTR. CENTER
DBL DOUBLE
DET. DETAIL
D.F. DOUGLAS FIR
DIA. DIAMETER
DO DITTO
DWG. DRAWINGS
E EAST
(E) EXISTING
EA. EACH
E.F. EACH FACE
E.J. EXPANSION JOINT
EL. ELEVATION
E.N. EDGE NAIL
E.O.R. ENGINEER OF RECORD
E.W. EACH WAY
EXP. EXPANSION
EXT. EXTERIOR
FDN. FOUNDATION
FIN. FINISH
F.F. FINISH FLOOR
F.G. FINISHED GRADE
FLR. FLOOR
F.N. FIELD NAIL
F.O.C. FACE OF CONCRETE
F.O.S. FACE OF STUD
F.R.T. FIRE RETARDANT TREATED
F.S. FAR SIDE
FTG. FOOTING
GA. GAUGE
G.B. GRADE BEAM
G.C. GENERAL CONTRACTOR
GLB GLUE LAMINATED (BEAM)
HCA HEADED CONC. ANCHOR
(STUD)
HD HOLDOWN
HDR HEADER
HGR. HANGER
HORIZ. HORIZONTAL
HT. HEIGHT
H.S. HIGH STRENGTH
H.S.B. HIGH STRENGTH BOLTS
HSS HOLLOW STEEL SECTION
HSSH HORIZONTAL SHORT
SLOTTED HOLES
INT. INTERIOR
LONG. LONGITUDINAL
LSL LAMINATED STRAND LUMBER
L.V.F. LOW-VELOCITY FASTENER
LVL LAMINATED VENEER LUMBER
MAX. MAXIMUM
MECH. MECHANICAL
MANUF. MANUFACTURER
M.B. MACHINE BOLTS
MIN. MINIMUM
MISC. MISCELLANEOUS
MTL. METAL
N NORTH
(N) NEW
NO. NUMBER
N.S. NEAR SIDE
N.T.S. NOT TO SCALE
O.C. ON CENTER
OPG. OPENING
OPP. OPPOSITE
O.H. OPPOSITE HAND
OSSC OREGON STRUCTURAL
SPECIALTY CODE
PL PLATE
PAR. PARALLEL
PERP. PERPENDICULAR
PLY PLYWOOD
PSL PARALLEL STRAND
LUMBER
R.C.J. ROUGHENED
CONSTRUCTION JOINT
REINF. REINFORCEMENT
REQD. REQUIRED
S SOUTH
S.A.D. SEE ARCHITECTURAL
DRAWINGS
S.C. SLIP CRITICAL
S.C.D. SEE CIVIL DRAWINGS
SCHED. SCHEDULE
SDS SELF-DRIVING SCREW
S.F.R.S. SEISMIC FORCE RESISTING
SYSTEM
SHTG SHEATHING
SIM. SIMILAR
S.O.G. SLAB-ON-GRADE
SPEC. SPECIFICATION
SQ. SQUARE
S.S. STAINLESS STEEL
STD. STANDARD
SSH SHORT SLOTTED HOLE
SYM. SYMMETRICAL
T&B TOP AND BOTTOM
T&G TONGUE AND GROOVE
T.O. TOP OF
T.O.C. TOP OF CONCRETE
T.O.F. TOP OF FOOTING
T.O.S. TOP OF STEEL FRAMING
T.O.P. TOP OF PLATE/ TOP OF
PARAPET
TRANS. TRANSVERSE
TYP. TYPICAL
U.O.N. UNLESS OTHERWISE
NOTED
U.T. ULTRASONIC TESTING
VERT. VERTICAL
V.I.F. VERIFY IN FIELD
W WEST
W/ WITH
WF WIDE FLANGE
W.H.S. WELDED HEADED STUD
W.J. WALL JOINT
W/O WITHOUT
W.P. WORK POINT
· CONTRACTOR SUBMITTALS
THE FOLLOWING IS A LISTING OF REQUIRED ITEMS TO BE SUBMITTED TO STRUCTURAL ENGINEER OF
RECORD (TO BE PROVIDED IF MARKED):
(1) DEFERRED SUBMITTALS SHALL FIRST BE SUBMITTED TO THE PROJECT ARCHITECT
AND/OR ENGINEER FOR REVIEW AND COORDINATION, THEN SUBMITTED TO THE
APPROPRIATE JURISDICTION FOR APPROVAL. THIS SUBMITTAL SHALL INCLUDE
HOHBACH-LEWIN'S SHOP DRAWING STAMP INDICATING THE STRUCTURAL REVIEW HAS
BEEN COMPLETED AND THAT THE PLANS AND CALCULATIONS FOR THE DEFERRED
APPROVAL ITEMS ARE IN GENERAL COMPLIANCE WITH THE INFORMATION PROVIDED
WITHIN THE CONTRACT DOCUMENTS.
(2) ELECTRONIC SHOP DRAWINGS ARE TO BE SUBMITTED TO HOHBACH-LEWIN FOR REVIEW.
SUBMITTAL CERTIFICATE
SHOP
DRAWINGS
(2)
CALCS W/
ENG. STAMP
DEFERRED
SUBMITTAL
(1)
GLUE-LAMINATED BEAM
STRUCTURAL COMPOSITE LUMBER
I-JOISTS
LAMINATED WOOD DECKING
· STRUCTURAL OBSERVATION (BY HOHBACH-LEWIN, INC.)
HOHBACH-LEWIN SHALL BE NOTIFIED FOR STRUCTURAL OBSERVATION AT THE STAGES OF CONSTRUCTION INDICATED BELOW. IT IS THE CONTRACTOR'S RESPONSIBILITY TO PROVIDE A MINIMUM OF 48 HOURS NOTICE IN ADVANCE OF COVERING STRUCTURAL ELEMENTS WITH CONCRETE, FINISHES, OR OTHER VISUAL OBSTRUCTIONS. THE CONTRACTOR SHALL PROVIDE SUITABLE TIME TO MAKE A REQUIRED CORRECTIONS
FOLLOWING SITE OBSERVATION BY THE ENGINEER.
STRUCTURAL OBSERVATIONS ARE REPRESENTATIVE LOCATIONS OF THE STRUCTURE FOR GENERAL
CONFORMANCE WITH THE APPROVED STRUCTURAL DRAWINGS AND DO NOT WAIVE INSPECTION
REQUIREMENTS.
HOHBACH-LEWIN SHALL BE NOTIFIED AT THE FOLLOWING STAGES OF CONSTRUCTION:
1. WOOD FRAMING, PRIOR TO CONCEALMENT BY FINISHES OR OTHER OBSTRUCTIONS.
· EXISTING CONSTRUCTION/ CONDITIONS:
A. SHORING: THE CONTRACTOR SHALL PROVIDE SHORING WHEREVER NECESSARY TO ALLOW
INSTALLATION OF THE WORK. THE CONTRACTOR SHALL BE SOLELY RESPONSIBLE FOR THE DESIGN, INSTALLATION AND MAINTENANCE OF ALL SHORING AND TEMPORARY WORK REQUIRED THROUGHOUT
THE PROGRESS OF THE WORK.
B. EXISTING CONSTRUCTION: EXISTING CONSTRUCTION SHOWN ON THE DRAWINGS WAS OBTAINED FROM LIMITED VISUAL OBSERVATIONS. THE CONTRACTOR SHALL VERIFY ALL EXISTING CONDITIONS AND SHALL NOTIFY THE STRUCTURAL ENGINEER OF RECORD OF ALL EXCEPTIONS AND RECEIVE DIRECTION PRIOR
TO PROCEEDING WITH THE WORK IN QUESTION.
C. DEMOLITION: THE REMOVAL, CUTTING, DRILLING. ETC. OF EXISTING WORK SHALL BE PERFORMED WITH
GREAT CARE AND WITH APPROPRIATE TOOLS IN ORDER TO NOT JEOPARDIZE THE STRUCTURAL
INTEGRITY OF THE BUILDING. SEE ARCHITECTURAL DRAWINGS FOR REQUIRED DEMOLITION.
03/05/2026
ISSUED FOR BID
AND PERMIT
N
PN
N
PN
N
PN
A2 B2 C2 D2 E2 F2 G2 H2 J2 K2 L2
(E) 3 1/8" GLB RIPPED TO
SLOPE (DEPTH VARIES
FROM 12" TO 13 1/2" TYP)
(E) 3 1/8" GLB RIPPED TO
SLOPE (DEPTH VARIES
FROM 11 1/2" TO 13" TYP.)
(E H
S S x4
C O
L
B E
L O
W T Y
P
(E) 2 7/8" LAMINATED
WOOD DECKING
REPLACE (E) GLB'S ON
SOUTH FACE LIKE-FOR-LIKE
13 1/2" 12" 12" 12" 12" 12"13 1/2" 13 1/2" 13 1/2" 13 1/2" 13 1/2"
A3 B3 C3 D3 E3 F3 G3 H3 J3 K3 L3 M3
(E) 3 1/8" GLB RIPPED TO
SLOPE (DEPTH VARIES
FROM 12" TO 13 1/2" TYP.)
(E) 3 1/8" GLB RIPPED TO
SLOPE (DEPTH VARIES
FROM 11 1/2" TO 13" TYP.)
(E) 2 7/8" LAMINATED
WOOD DECKING
(E H
S S x4
C O
L
B E
L O
W T Y
P
REPLACE (E) GLB'S
ON SOUTH FACE
LIKE-FOR-LIKE
REPLACE (E) DECKING, SEE LAMINATED
WOOD DECKING REPAIR NOTES AND DET. 5/S803.
13 1/2" 12" 12" 12" 12" 12"13 1/2" 13 1/2" 13 1/2" 13 1/2" 13 1/2" 12"
A4 B4 C4 D4 E4 F4 G4 H4 J4 K4 L4
(E) 3 1/8" GLB RIPPED TO
SLOPE (DEPTH VARIES
FROM 12" TO 13 1/2" TYP.)
(E) 3 1/8" GLB RIPPED TO
SLOPE (DEPTH VARIES
FROM 11 1/2" TO 13" TYP.)
(E H
S S x4 x1 /4
B E
L O
W T Y
P
(E) 2 7/8" LAMINATED
WOOD DECKING
5'-0"
REPLACE (E) DECKING, SEE
LAMINATED WOOD DECKING
REPAIR NOTES AND DET. 5/S803
REPLACE (E) GLB'S ON
SOUTH FACE LIKE-FOR-LIKE
G.C. TO FIELD VERIFY
EXTENT OF DAMAGE
13 1/2" 12" 12" 12" 12" 12"13 1/2" 13 1/2" 13 1/2" 13 1/2" 13 1/2"
PLAN NOTES
2.
1.
FOR DIMENSIONS, NON-STRUCTURAL COMPONENTS, DRAINAGE DETAILS,
SEE DRAWINGS OTHER THAN STRUCTURAL.
SEE GENERAL NOTES AND SYMBOLS ON SHEET S001.
A1
A2
A3
AA
D
C
B
AREA A KEY PLAN
LAMINATED WOOD DECKING REPAIR NOTES:
1. INTENT OF SITE CANOPY WOOD DECKING REPAIR IS "LIKE-FOR-LIKE". MAKE-UP OF
(E) WOOD DECKING IS UNKNOWN, BUT IS ASSUMED TO BE 2 7/8" LAMINATED
DECKING. G.C. TO FIELD VERIFY MAKE-UP OF EXISTING DECKING.
2. EXTENT OF DAMAGE TO (E) DECKING IS BASED ON LIMITED OBSERVATION AND IS
NOT WELL DOCUMENTED. G.C. TO INVESTIGATE AND FIELD DOCUMENT EXISTING
CONDITIONS PRIOR TO DEMOLITION AND CONFIRM EXTENT OF REPAIRS WITH
ARCHITECT/ENGINEER PRIOR TO ORDERING DECKING.
3. ACTUAL REPAIR AREA OF LAMINATED DECKING MAY BE MORE OR LESS THAN
ASSUMED QUANTITIES. PROVIDE UNIT PRICE IN CONTRACT AND ADJUST
CONTRACT BASED ON THE REPAIR QUANTITY.
4. DECKING REPAIRS MAY BE "DROP-IN" PER DETAIL 5/S803.
5. THE UNDERSIDE OF THE WOOD DECKING IS EXPOSED, COORDINATE AESTHETICS
WITH THE ARCHITECT PRIOR TO ORDERING.
6. FASTENERS INTO DECKING SHALL NOT PENETRATE THE UNDERSIDE, UNLESS
SPECIFICALLY NOTED AS SUCH.
EXISTING GLULAM BEAM REPLACEMENT NOTES:
1. EXISTING GLULAM BEAMS ARE TO BE REPLACED "LIKE-FOR-LIKE". REMOVE
EXISTING GLULAM BEAM AND FASTENERS AS REQ'D FOR NEW INSTALLATION.
PROTECT DECKING AND COLUMNS DURING DEMOLITION. SEE DETAILS ON SHEET S803.
2. THE TOP OF THE EXISTING BEAMS ARE TAPERED. THE NEW 3 1/8" GLULAM BEAMS
SHALL HAVE THE TOP FACE RIPPED TO MATCH EXISTING SLOPE AND DEPTH NOT LESS
THAN FIELD-VERIFIED DEPTH OF EXISTING BEAM AT EACH END.
3. APPROXIMATE BEAM DEPTHS ARE INDICATED ON PLAN, WITH XX" INDICATING THE
APPROXIMATE DEPTH OF THE BEAM, THUS:
4. AT BEAMS THAT WILL BE REPLACED, REPLACE THE FASCIA "LIKE-FOR-LIKE" U.O.N. IN
ARCHITECTURAL DRAWINGS.
5. G.C. TO SHORE CANOPY PRIOR TO DEMOLITION AND REPLACEMENT OF GLULAM
BEAMS. SHORING IS BY THE G.C.
xx"
OREGON
R
ETSI
E
G
PD
RE EFOR
S
NIG E
N
OI
S
L A
NE
ER
CUR T
TS
URAL
84424
C N
B
R E
V
AR W FO
13, R. 20
T
D
O
N OREGON
R
ETSI
E
G
PD
RE EFOR
S
NIG E
N
OI
S
L A
NE
ER
CUR T
TS
URAL
DIGITAL SIGNATURE
(541) 349-1701
199 East Fifth Ave, Suite 23 Eugene, OR 97401
HOHBACH-LEWIN, INC.
S T R U C T U R A L E N G I N E E R S
A
1 2 3 4 5 6
2 3 4 5 6
B
C
D
E
REVISIONS
DATE ISSUED:
REVIEWED BY:
DRAWN BY:
DESIGNED BY:
PROJECT NUMBER:
PROJECT STATUS:
SHEET ID:
SHEET TITLE:
PROJECT ADDRESS:
PROJECT TITLE:
SEAL:
CITY OF EUGENE
Expires: 12-31-27
H O
H B
A C
H -L
E W
IN
.4
/2
/2
:1
:2
P
M C
U s e rs \a ri a s \D o c u m e n ts
\2
E
U G
C a n o p y R e p a ir a n d I m p ro v e m e n ts
S
R
A
A ri a s h o h b a c h -l e w in
.c o m .r v t
100% SET
AMA
BC
2880 DOUGLAS DRIVE
EUGENE, OREGON 97402
EUG CANOPY REPAIRS AND
IMPROVEMENTS
20245144004
02/27/2026
TMR
S101A
AREA A - ROOF
FRAMING PLANS
(CONSTRUCTION BY
OTHERS)
© 2025 RS&H, INC
Copyright © 2025. This drawing is an instrument of service and property of RS&H, Inc. Any use or reproduction without the expressed written consent of this corporation is prohibited. All rights reserved.
1/8" = 1'-0"1 AREA A1 - ROOF FRAMING PLANS
1/8" = 1'-0"2 AREA A2 - ROOF FRAMING PLAN
1/8" = 1'-0"3 AREA A3 - ROOF FRAMING PLAN
303-409-9700
RS&H Oregon Architects - Engineers - Planners, P.C.
4582 S. Ulster St., Suite 1100 Denver, CO 80237 www.rsandh.com
Oregon Registration No. 0871AF
N
PN
NO. DESCRIPTION DATE
AREA A KEY PLAN
03/05/2026
AA
D
C
B
AREA A KEY PLAN
A2 B2 C2 D2 E2 F2 G2 H2 J2 K2 L2
(E) 3 1/8" GLB RIPPED TO
SLOPE (DEPTH VARIES
FROM 12" TO 13 1/2" TYP)
(E) 3 1/8" GLB RIPPED TO
SLOPE (DEPTH VARIES
FROM 11 1/2" TO 13" TYP.)
(E H
S S x4
C O
L
B E
L O
W T Y
P
(E) 2 7/8" LAMINATED
WOOD DECKING
13 1/2" 12" 12" 12" 12" 12"13 1/2" 13 1/2" 13 1/2" 13 1/2" 13 1/2"
REPLACE (E) GLB, SEE
(E) GLB REPLACEMENT
NOTE 1.
REPAIR (E) GLB ALL
ALONG GRIDLINE 2,
SEE EXISTING GLULAM BEAM
REPAIR NOTES THIS SHEET
A3 B3 C3 D3 E3 F3 G3 H3 J3 K3 L3 M3
(E) 3 1/8" GLB RIPPED TO
SLOPE (DEPTH VARIES
FROM 12" TO 13 1/2" TYP.)
(E) 3 1/8" GLB RIPPED TO
SLOPE (DEPTH VARIES
FROM 11 1/2" TO 13" TYP.)
(E) 2 7/8" LAMINATED
WOOD DECKING
(E H
S S x4
C O
L
B E
L O
W T Y
P
REPLACE (E) DECKING, SEE LAMINATED
WOOD DECKING REPAIR NOTES AND DET. 5/S803.
13 1/2" 12" 12" 12" 12" 12"13 1/2" 13 1/2" 13 1/2" 13 1/2" 13 1/2" 12"
REPAIR (E) GLB ALL ALONG
GRIDLINE 2, SEE EXISTING
GLULAM BEAM REPAIR
NOTES THIS SHEET
A4 B4 C4 D4 E4 F4 G4 H4 J4 K4 L4
(E) 3 1/8" GLB RIPPED TO
SLOPE (DEPTH VARIES
FROM 12" TO 13 1/2" TYP.)
(E) 3 1/8" GLB RIPPED TO
SLOPE (DEPTH VARIES
FROM 11 1/2" TO 13" TYP.)
(E H
S S x4 x1 /4
B E
L O
W T Y
P
(E) 2 7/8" LAMINATED
WOOD DECKING
5'-0"
REPLACE (E) DECKING, SEE
LAMINATED WOOD DECKING
REPAIR NOTES AND DET. 5/S803
G.C. TO FIELD VERIFY
EXTENT OF DAMAGE
13 1/2" 12" 12" 12" 12" 12"13 1/2" 13 1/2" 13 1/2" 13 1/2" 13 1/2"
REPLACE (E) GLB,
SEE (E) GLB
REPLACEMENT NOTE 1.
REPAIR (E) GLB ALL ALONG
GRIDLINES 2, SEE EXISTING
GLULAM BEAM REPAIR
NOTES THIS SHEET
PLAN NOTES
2.
1.
FOR DIMENSIONS, NON-STRUCTURAL COMPONENTS, DRAINAGE DETAILS,
SEE DRAWINGS OTHER THAN STRUCTURAL.
SEE GENERAL NOTES AND SYMBOLS ON SHEET S001.
A1
A2
A3
LAMINATED WOOD DECKING REPAIR NOTES:
1. INTENT OF SITE CANOPY WOOD DECKING REPAIR IS "LIKE-FOR-LIKE". MAKE-UP OF
(E) WOOD DECKING IS UNKNOWN, BUT IS ASSUMED TO BE 2 7/8" LAMINATED
DECKING. G.C. TO FIELD VERIFY MAKE-UP OF EXISTING DECKING.
2. EXTENT OF DAMAGE TO (E) DECKING IS BASED ON LIMITED OBSERVATION AND IS
NOT WELL DOCUMENTED. G.C. TO INVESTIGATE AND FIELD DOCUMENT EXISTING
CONDITIONS PRIOR TO DEMOLITION AND CONFIRM EXTENT OF REPAIRS WITH
ARCHITECT/ENGINEER PRIOR TO ORDERING DECKING.
3. ACTUAL REPAIR AREA OF LAMINATED DECKING MAY BE MORE OR LESS THAN
ASSUMED QUANTITIES. PROVIDE UNIT PRICE IN CONTRACT AND ADJUST
CONTRACT BASED ON THE REPAIR QUANTITY.
4. DECKING REPAIRS MAY BE "DROP-IN" PER DETAIL 5/S803.
5. THE UNDERSIDE OF THE WOOD DECKING IS EXPOSED, COORDINATE AESTHETICS
WITH THE ARCHITECT PRIOR TO ORDERING.
6. FASTENERS INTO DECKING SHALL NOT PENETRATE THE UNDERSIDE, UNLESS
SPECIFICALLY NOTED AS SUCH.
EXISTING GLULAM BEAM REPLACEMENT NOTES:
1. EXISTING GLULAM BEAMS ARE TO BE REPLACED "LIKE-FOR-LIKE". REMOVE
EXISTING GLULAM BEAM AND FASTENERS AS REQ'D FOR NEW INSTALLATION.
PROTECT DECKING AND COLUMNS DURING DEMOLITION. SEE DETAILS ON SHEET S803.
2. THE TOP OF THE EXISTING BEAMS ARE TAPERED. THE NEW 3 1/8" GLULAM BEAMS
SHALL HAVE THE TOP FACE RIPPED TO MATCH EXISTING SLOPE AND DEPTH NOT LESS