20260223_Sanitary_Sewer_Bypass_Specification.pdf

PDF 10 KB Posted

Attached to
Asset Protection - Electrical
Solicitation number
914-0213-26
Issued by
Tehama County, California

About this file

This is a Sanitary Sewer Bypass Specification document prepared by Solano County for the Justice Campus Asset Protection project, with project management by KSN, Inc. and engineering by Baumbach & Piazza, Inc. The specification outlines the contractor's responsibility to furnish all labor, materials, equipment, and incidentals necessary to install and operate a temporary sewer bypass system as detailed on plan sheet SS-1. The work encompasses installing and operating bypass pumping systems and pipelines, with all costs for labor, materials, tools, transportation, disposal, supplies, equipment, and site restoration included in the scope. The contractor must perform all work in accordance with Fairfield-Suisun Sewer District Standards and applicable City, District, County, State, and Federal regulations and codes for environmental requirements.

Compensation for this work is structured as a lump sum price that covers the complete installation, operation, and maintenance of the bypass system, including all backfilling, grassing, sodding, and routine site restoration. The specification directs contractors to refer to the Sanitary Sewer Bypass Provisions shown on plan sheet SS-1 for detailed requirements regarding preparation, execution, and submittals. All items not specifically covered in the bid schedule are to be included in the cost estimates for other bid items, ensuring comprehensive pricing of the temporary sewer bypass system necessary to support the Justice Campus Asset Protection project during construction.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLANO COUNTY

JUSTICE CAMPUS ASSET PROTECTION

SANITARY SEWER BYPASS SPECIFICATION

FEBRUARY 23, 2026

Project Manager KSN, Inc.

1550 Harbor Blvd.

West Sacramento, CA 95691

Project Engineer Baumbach & Piazza, Inc.

323 W. Elm St.

Lodi, CA 95240

Solano County Sanitary Sewer Bypass Justice Campus Asset Protection 02 01 40-1

SECTION 02 01 40

SANITARY SEWER BYPASS

PART 1 - GENERAL

1.01 SECTION INCLUDES

A. The Contractor shall furnish all labor, materials, equipment, and incidentals to place and maintain operation of a temporary sewer bypass system as shown on plan sheet SS-1.

1.02 MEASUREMENT AND PAYMENT

A. Full compensation for conforming to the requirements of this Section shall be paid by lump sum price. The lump sum price includes installing and operating bypass pumping (if used) and pipelines, and including furnishing all labor, materials, tools, transportation, disposal, supplies, equipment, appurtenances, and incidentals and for doing all the work involved in sewer bypass, complete as shown on plan sheet SS-1.

1.03 REFERENCES

A. Perform Work in accordance with the Fairfield-Suisun Sewer District (District) Standards, and the Sanitary Sewer Bypass Provisions as shown on plan sheet SS-1.

1.04 REGULATORY REQUIREMENTS

A. Conform to applicable City, District, County, State and Federal regulations and/or codes for environmental requirements.

1.05 SUBMITTALS

A. Refer to Sanitary Sewer Bypass Provisions as shown on plan sheet SS-1.

PART 2 - PRODUCTS – NOT USED

PART 3 - EXECUTION

3.01 PREPARATION

A. Refer to Sanitary Sewer Bypass Provisions as shown on plan sheet SS-1.

3.02 GENERAL

A. Refer to Sanitary Sewer Bypass Provisions as shown on plan sheet SS-1.

B. Provide complete restoration including, but not limited to, all backfilling, grassing and sodding, and routine site restoration. Items not covered in the Bid Schedule shall be included in the cost for other items.

END OF SECTION 02 01 40

File details come from the government source that posted it. Updated .