This is a project schedule document for the Solano County Asset Protection project, a multi-phase construction initiative designed to protect county properties from stormwater damage. The project encompasses protection measures at multiple locations including 500, 530, 550, and 600 Union Avenue; 500, 510, 512, 520, and 530 Clay Street; 501 and 509 Delaware Street; 501 Texas Street; and adjacent driveways and parking areas. The scope of work includes barrier walls, berms, landscaping, hardscape, flood gates, underground utility reconfiguration, and pump systems. The Notice to Proceed (NTP) is scheduled for November 12, 2025, with construction commencing on March 2, 2026. The project is organized into ten major construction phases plus a procurement phase and design phase. Design completion is targeted for December 11, 2025, with city abandonment work from December 12, 2025 through February 6, 2026, and permit approval scheduled for February 9-27, 2026. The bid period runs from January 19 through February 13, 2026, with bid protest period from February 19-25, 2026. Substantial completion is anticipated for November 25, 2026, with final project completion and FEMA closeout documentation due by January 12, 2027.

The schedule reflects a complex, phased construction approach with significant lead times allocated for equipment procurement, particularly for pumps and related electrical controls, which are scheduled from March 24 through July 24, 2026. Key procurement milestones include front-end development for pumps and vaults from November 12, 2025 through February 9, 2026, and long-lead pump submittals and review from February 10 through March 23, 2026. The project is being procured through a multi-prime manner, with this particular scope limited to electrical work. Final billings are due by December 11, 2026, reimbursement requests by January 5, 2027, and closeout documentation by January 12, 2027, indicating the project is FEMA-funded and subject to federal reimbursement procedures.

View the file

Other files

File Type Posted
20260219_Asset_Protection_Pre-Bid_Conference_Slides.pdf PDF
20260223_Offsite_Sanitary_Sewer_Improvements_Civil_Specifications_100%_Set.pdf PDF
20260223_Sanitary_Sewer_Bypass_Specification.pdf PDF
20260219_Asset_Protection_Pre-Bid_Conference_Sign-In_Sheet.pdf PDF
20260223_Offsite_Sanitary_Sewer_Improvements_Drawings_100%_Submittal.pdf PDF
20260219_Asset_Protection_Pre-Bid_Conference_Slides.pdf PDF
20260223_Revised_Section_31_00_00_Embankment_Construction.pdf PDF
20260223_Revised_Volume_1_Asset_Protection_IFC_Drawing_Set_-_Select_Drawings.pdf PDF
20260223_Sanitary_Sewer_Bypass_Specification.pdf PDF
20260303_Revised_Section_09_90_00_Painting_and_Coating.pdf PDF
20260223_Revised_Volume_1_Asset_Protection_IFC_Drawing_Set_-_Select_Drawings.pdf PDF
20260223_Temporary_Sewer_Bypass_Drawing_Sheet_SS1.pdf PDF
20260303_Revised_Section_09_90_00_Painting_and_Coating.pdf PDF
20260223_Offsite_Sanitary_Sewer_Improvements_Civil_Specifications_100%_Set.pdf PDF
20260223_Offsite_Sanitary_Sewer_Improvements_Drawings_100%_Submittal.pdf PDF
20260223_Revised_Section_31_00_00_Embankment_Construction.pdf PDF
20260223_Revised_Section_31_23_16_Structure_Excavation_and_Backfill.pdf PDF
20260210_Asset_Protection_Electrical_-_Project_Manual.pdf PDF
20260210_Asset_Protection_Electrical_-_Project_Manual.pdf PDF
20260210_Asset_Protection_Electrical_-_Project_Manual.pdf PDF
20260210_Asset_Protection_Electrical_-_Project_Manual.pdf PDF
PO_TERMS_CONDITIONS.pdf PDF
PO_TERMS_CONDITIONS.pdf PDF
PO_TERMS_CONDITIONS.pdf PDF
Exhibit_C_-_General_Terms_6_12_18.pdf PDF
Exhibit_C_-_General_Terms_6_12_18.pdf PDF
Exhibit_C_-_General_Terms_6_12_18.pdf PDF
20251208_Volume_1_Asset_Protection_IFC_Drawing_Set_Building_Div_Approved.pdf PDF
20251208_Volume_1_Asset_Protection_IFC_Drawing_Set_Building_Div_Approved.pdf PDF
20251208_Volume_1_Asset_Protection_IFC_Drawing_Set_Building_Div_Approved.pdf PDF
20251208_Volume_1_Asset_Protection_IFC_Drawing_Set_Building_Div_Approved.pdf PDF
20251211_Volume_2_Parking_and_Security_Improvements_IFC_Rev_1_Drawing_Set_Building_Div_Approved.pdf PDF
20251211_Volume_2_Parking_and_Security_Improvements_IFC_Rev_1_Drawing_Set_Building_Div_Approved.pdf PDF
20251211_Volume_2_Parking_and_Security_Improvements_IFC_Rev_1_Drawing_Set_Building_Div_Approved.pdf PDF
20251211_Volume_2_Parking_and_Security_Improvements_IFC_Rev_1_Drawing_Set_Building_Div_Approved.pdf PDF
20210903_Geotech_Report_CE&G.pdf PDF
20210903_Geotech_Report_CE&G.pdf PDF
20210903_Geotech_Report_CE&G.pdf PDF
20210903_Geotech_Report_CE&G.pdf PDF
Hazard_Mitigation_Assistance_Contracting_Guidance_for_FEMA-Eligible_Projects,_Non-State_Subrecipients.pdf PDF
Hazard_Mitigation_Assistance_Contracting_Guidance_for_FEMA-Eligible_Projects,_Non-State_Subrecipients.pdf PDF
Hazard_Mitigation_Assistance_Contracting_Guidance_for_FEMA-Eligible_Projects,_Non-State_Subrecipients.pdf PDF
Hazard_Mitigation_Assistance_Contracting_Guidance_for_FEMA-Eligible_Projects,_Non-State_Subrecipients.pdf PDF
20260119_Asset_Protection_Project_Schedule.pdf PDF
20260119_Asset_Protection_Project_Schedule.pdf PDF
20260119_Asset_Protection_Project_Schedule.pdf PDF
Access_Requirements.pdf PDF
Access_Requirements.pdf PDF
Access_Requirements.pdf PDF
Access_Requirements.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Activity ID Activity Name Start Finish

Solano County Asset Protection - County ReviewSolano County Asset Protection - County Review 11-12-25 01-12-27

MILESTONESMILESTONES 11-12-25 01-12-27

MILE-10 NTP 11-12-25

MILE-250 Construction Start 03-02-26

LOE-100 Phase 1 Level of Effort 03-30-26 07-24-26

LOE-140 Phase 5 Level of Effort 03-30-26 06-19-26

LOE-150 Phase 4 Level of Effort 03-30-26 07-08-26

LOE-160 Phase 6 Level of Effort 03-30-26 10-01-26

LOE-170 Phase 2 Level of Effort 03-30-26 09-14-26

LOE-180 Phase 9 Level of Effort 03-30-26 11-25-26

LOE-190 Phase 3 Level of Effort 03-30-26 10-02-26

MILE-110 Phase 6C Completion 05-28-26

MILE-150 Phase 5 Completion 06-19-26

MILE-140 Phase 6A Completion 06-29-26

MILE-130 Phase 4 Completion 07-08-26

MILE-190 Phase 1 Completion 07-25-26

LOE-110 Phase 7 Level of Effort 08-24-26 11-09-26

LOE-120 Phase 8 Level of Effort 08-24-26 11-13-26

LOE-130 Phase 10 Level of Effort 09-03-26 11-25-26

MILE-220 Phase 2 Completion 09-14-26

MILE-200 Phase 6 Completion 10-01-26

MILE-210 Phase 6B Completion 10-01-26

MILE-160 Phase 3 Completion 10-02-26

MILE-170 Phase 7 Completion 11-09-26

MILE-100 Phase 8 Completion 11-13-26

MILE-180 Phase 10 Completion 11-25-26

MILE-120 Phase 9 Completion 11-25-26

MILE-240 Substantial Completion 11-25-26*

MILE-230 Project Completion 01-12-27

Asset Protection - FEMAAsset Protection - FEMA 11-12-25 01-12-27

DesignDesign 11-12-25 02-27-26

DESIGN-100 Design Completion 11-12-25 12-11-25

DESIGN-110 City Abandonment 12-12-25 02-06-26

DESIGN-120 Permit Approval 02-09-26 02-27-26

AwardsAwards 11-12-25 03-27-26

AWARD-100 Draft Bid Packages 11-12-25 01-09-26

AWARD-110 County Review and Approval of Bid Packages 01-12-26 01-16-26

AWARD-120 Bid Period 01-19-26 02-13-26

AWARD-130 Unseal of Bid and NOI 02-16-26 02-18-26

AWARD-140 Bid Protest Period 02-19-26 02-25-26

AWARD-150 NTP 02-26-26 02-26-26

AWARD-160 Submittals and Review Period 02-27-26 03-26-26

AWARD-170 COI 03-27-26 03-27-26

ProcurementProcurement 11-12-25 07-24-26

PRO-100 Front End Development for Pumps and Vaults 11-12-25 02-09-26

PRO-110 Long Lead Pump Submittals and Review 02-10-26 03-23-26

PRO-140 Pump Lead Time 03-24-26 07-24-26

PRO-130 Pump Vault Lead Time 03-24-26 05-04-26

PRO-150 Pumps/Electrical/Controls Lead Time 03-24-26 07-24-26

ConstructionConstruction 03-28-26 11-25-26

Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr 2026 2027

NTP

Construction Start

Phase 1 Level of Effort

Phase 5 Level of Effort

Phase 4 Level of Effort

Phase 6 Level of Effort

Phase 2 Level of Effort

Phase 9 Level of Effort

Phase 3 Level of Effort

Phase 6C Completion

Phase 5 Completion

Phase 6A Completion

Phase 4 Completion

Phase 1 Completion

Phase 7 Level of Effort

Phase 8 Level of Effort

Phase 10 Level of Effort

Phase 2 Completion

Phase 6 Completion

Phase 6B Completion

Phase 3 Completion

Phase 7 Completion

Phase 8 Completion

Phase 10 Completion

Phase 9 Completion

Substantial Completion

Project Completion

Design Completion

City Abandonment

Permit Approval

Draft Bid Packages

County Review and Approval of Bid Packages

Bid Period

Unseal of Bid and NOI

Bid Protest Period

NTP

Submittals and Review Period

COI

Front End Development for Pumps and Vaults

Long Lead Pump Submittals and Review

Pump Lead Time

Pump Vault Lead Time

Pumps/Electrical/Controls Lead Time

Data Date: 11-11-25 Print Date: 01-19-26 08:31

SOLANOC-ASSET-LF-1-1-2 | # 123

Complete

Milestone

Critical Milestones

Summary Milestones

Actual Work

Remaining Work

Critical Remaining Work

Remaining Level of Effort

Actual Level of Effort

Solano County Asset Protection - County Review

Full Schedule

Phased WorkPhased Work 03-28-26 11-25-26

Phase 1 03-28-26 07-25-26

P1-CON-100 Call 811 and Markout Utilities 03-28-26 03-31-26

P1-CON-110 Setup Construction Fencing and Barriers 04-01-26 04-06-26

P1-CON-120 Setup Temporary Access 04-01-26 04-06-26

P1-CON-130 Setup SWPPP 04-07-26 04-11-26

P1-CON-140 Clear and Grub from 00+00 to 05+00 04-13-26 04-18-26

P1-CON-150 Cap Off Utilities and Irrigation Lines 04-20-26 04-21-26

P1-CON-160 Demo Existing Sidewalk 04-22-26 04-27-26

P1-CON-170 Excavate and Remove Storm Drain Pipes and Basin 04-28-26 05-08-26

P1-CON-180 Rough Grade From 00+00 to 01+75 05-09-26 05-14-26

P1-CON-190 Rough Grade From 01+75 to 05+52 05-15-26 05-20-26

P1-CON-200 Install New Storm Drainage Lines and Basins 05-21-26 06-02-26

P1-CON-210 Fine Grade and Build Berm 06-03-26 06-25-26

P1-CON-220 Install Irrigatiion Mains 06-26-26 07-03-26

P1-CON-230 Install Irrigation Branches 07-06-26 07-08-26

P1-CON-240 Form and Pour Mow Bands at Berm 07-06-26 07-10-26

P1-CON-250 Install Landscaping 07-11-26 07-22-26

P1-CON-260 Remove Construction Fencing and Barriers 07-23-26 07-25-26

Phase 2Phase 2 03-28-26 09-14-26

Clay StreetClay Street 03-28-26 09-14-26

P2-CON-CLAY-100 Call 811 and Markout Utilities 03-28-26 03-28-26

P2-CON-CLAY-110 Setup Construction Fencing and Barriers 03-30-26 04-02-26

P2-CON-CLAY-120 Setup Road Closure 03-30-26 03-31-26

P2-CON-CLAY-130 Setup SWPPP 04-03-26 04-04-26

P2-CON-CLAY-140 Clear and Grub 04-06-26 04-07-26

P2-CON-CLAY-150 Demo Existing Pavement and Sidewalk 04-08-26 04-18-26

P2-CON-CLAY-160 Excavate and Remove Storm Drain Pipes and Basin 04-20-26 04-24-26

P2-CON-CLAY-170 Setup Dewatering 04-20-26 04-22-26

P2-CON-CLAY-180 Rough Grade 04-25-26 04-30-26

P2-CON-CLAY-190 Install New Storm Drainage Lines and Basins 05-01-26 05-23-26

P2-CON-CLAY-200 Excavate Retaining Wall Footings and Flood Gate 05-01-26 05-08-26

P2-CON-CLAY-210 Install New Sewer Line (Add Alt) 05-01-26 05-23-26

P2-CON-CLAY-220 Install Retaining Wall Footings and Flood Gate 05-09-26 05-16-26

P2-CON-CLAY-230 Backfill Retaining Wall Footings and Form Retaining Walls 05-09-26 05-18-26

P2-CON-CLAY-240 Inspect Underground Utilities 05-26-26 05-27-26

P2-CON-CLAY-250 Backfill Storm Drain Trenches Backfill to Grade 05-28-26 06-08-26

P2-CON-CLAY-260 Trench for Electrical 06-09-26 06-13-26

P2-CON-CLAY-270 Install Underground Conduits 06-15-26 06-19-26

P2-CON-CLAY-280 Inspect Underground Electrical 06-20-26 06-22-26

P2-CON-CLAY-290 Backfill Electrical Trench 06-23-26 06-29-26

P2-CON-CLAY-300 Complete Fine Grade 06-30-26 07-14-26

P2-CON-CLAY-310 Pour Retaining Walls 06-30-26 07-01-26

P2-CON-CLAY-320 Form and Pour Curbs 07-15-26 07-28-26

P2-CON-CLAY-330 Pull Electrical 07-15-26 07-20-26

P2-CON-CLAY-340 Form and Pour Sidewalks 07-29-26 08-08-26

P2-CON-CLAY-350 Place AC Pavement 08-28-26 09-03-26

P2-CON-CLAY-360 Paint Striping 09-03-26 09-08-26

P2-CON-CLAY-370 Install Signage 09-03-26 09-10-26

P2-CON-CLAY-380 Remove Construction Fencing and Barriers 09-10-26 09-14-26

Texas StreetTexas Street 03-28-26 07-10-26

Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr 2026 2027

Call 811 and Markout Utilities

Setup Construction Fencing and Barriers

Setup Temporary Access

Setup SWPPP

Clear and Grub from 00+00 to 05+00

Cap Off Utilities and Irrigation Lines

Demo Existing Sidewalk

Excavate and Remove Storm Drain Pipes and Basin

Rough Grade From 00+00 to 01+75

Rough Grade From 01+75 to 05+52

Install New Storm Drainage Lines and Basins

Fine Grade and Build Berm

Install Irrigatiion Mains

Install Irrigation Branches

Form and Pour Mow Bands at Berm

Install Landscaping

Remove Construction Fencing and Barriers

Call 811 and Markout Utilities

Setup Construction Fencing and Barriers

Setup Road Closure

Setup SWPPP

Clear and Grub

Demo Existing Pavement and Sidewalk

Excavate and Remove Storm Drain Pipes and Basin

Setup Dewatering

Rough Grade

Install New Storm Drainage Lines and Basins

Excavate Retaining Wall Footings and Flood Gate

Install New Sewer Line (Add Alt)

Install Retaining Wall Footings and Flood Gate

Backfill Retaining Wall Footings and Form Retaining Walls

Inspect Underground Utilities

Backfill Storm Drain Trenches Backfill to Grade

Trench for Electrical

Install Underground Conduits

Inspect Underground Electrical

Backfill Electrical Trench

Complete Fine Grade

Pour Retaining Walls

Form and Pour Curbs

Pull Electrical

Form and Pour Sidewalks

Place AC Pavement

Paint Striping

Install Signage

Remove Construction Fencing and Barriers

Data Date: 11-11-25 Print Date: 01-19-26 08:31

SOLANOC-ASSET-LF-1-1-2 | # 123

Complete

Milestone

Critical Milestones

Summary Milestones

Actual Work

Remaining Work

Critical Remaining Work

Remaining Level of Effort

Actual Level of Effort

Storm DrainStorm Drain 03-28-26 05-22-26

P2-CON-TEXAS-100Call 811 and Markout Utilities 03-28-26 04-01-26

P2-CON-TEXAS-110Setup Construction Fencing and Barriers 04-02-26 04-02-26

P2-CON-TEXAS-120Setup Temporary Access 04-02-26 04-02-26

P2-CON-TEXAS-130Setup SWPPP 04-03-26 04-03-26

P2-CON-TEXAS-140Clear and Grub 04-04-26 04-06-26

P2-CON-TEXAS-150Demo Existing Pavement 04-07-26 04-09-26

P2-CON-TEXAS-160Excavate and Remove Storm Drain Pipes and Basin 04-10-26 04-15-26

P2-CON-TEXAS-170Setup Dewatering 04-10-26 04-10-26

P2-CON-TEXAS-180Rough Grade 04-16-26 04-17-26

P2-CON-TEXAS-190Install New Storm Drainage Lines and Basins 04-18-26 05-01-26

P2-CON-TEXAS-200Backfill Storm Drain Trenches and Fine Grade 05-02-26 05-13-26

P2-CON-TEXAS-210Complete Fine Grade 05-14-26 05-15-26

P2-CON-TEXAS-220Place AC Pavement 05-16-26 05-18-26

P2-CON-TEXAS-230Paint Striping 05-19-26 05-20-26

P2-CON-TEXAS-240Install Signage 05-19-26 05-20-26

P2-CON-TEXAS-250Remove Construction Fencing and Barriers 05-21-26 05-22-26

Sewer (Add ALT)Sewer (Add ALT) 05-23-26 07-10-26

P2-CON-TEXAS-260Setup Construction Fencing and Barriers 05-23-26 05-23-26

P2-CON-TEXAS-270Setup Temporary Access 05-23-26 05-23-26

P2-CON-TEXAS-280Setup SWPPP 05-26-26 05-26-26

P2-CON-TEXAS-290Demo Existing Pavement 05-27-26 05-29-26

P2-CON-TEXAS-300Excavate and Remove New Sewer Line (Add Alt) 05-30-26 06-04-26

P2-CON-TEXAS-310Setup Dewatering 05-30-26 05-30-26

P2-CON-TEXAS-320Rough Grade 06-05-26 06-06-26

P2-CON-TEXAS-330Install New Sewer Line (Add Alt) 06-08-26 06-30-26

P2-CON-TEXAS-340Complete Fine Grade 07-01-26 07-02-26

P2-CON-TEXAS-350Place AC Pavement 07-03-26 07-06-26

P2-CON-TEXAS-360Paint Striping 07-07-26 07-08-26

P2-CON-TEXAS-370Install Signage 07-07-26 07-08-26

P2-CON-TEXAS-380Remove Construction Fencing and Barriers 07-09-26 07-10-26

Phase 3Phase 3 03-28-26 10-02-26

P3-CON-100 Call 811 and Markout Utilities 03-28-26 04-01-26

P3-CON-110 Setup Construction Fencing and Barriers 04-02-26 04-07-26

P3-CON-120 Setup Temporary Access 04-02-26 04-04-26

P3-CON-130 Setup SWPPP 04-08-26 04-09-26

P3-CON-140 Cap Off Utilities and Irrigation Lines 04-10-26 04-11-26

P3-CON-150 Demo Existing Pavement and Sidewalk 04-13-26 04-23-26

P3-CON-160 Rough Grade 04-24-26 04-29-26

P3-CON-170 Excavate and Remove Storm Drain Pipes and Basin 04-30-26 05-05-26

P3-CON-180 Install New Storm Drainage Lines and Basins 05-06-26 05-22-26

P3-CON-190 Backfill Storm Drain Trenches and to Grade 05-23-26 06-04-26

P3-CON-200 Trench for Shallow Underground Electrical 06-05-26 06-12-26

P3-CON-210 Excavate Retaining Wall Footings and Flood Gate 06-05-26 06-12-26

P3-CON-220 Install Underground Electrical Conduit 06-13-26 06-18-26

CLOS-CON-120 Install Retaining Wall Footings and Flood Gate 06-13-26 06-20-26

P3-CON-250 Backfill Electrical Trench to Grade 06-19-26 06-30-26

P3-CON-260 Pull Electrical Wire 06-19-26 07-02-26

P3-CON-270 Install Irrigations Mains 06-19-26 06-26-26

P3-CON-240 Backfill Retaining Wall Footings and Form Retaining Walls 06-22-26 06-30-26

P3-CON-290 Install Irrigation Branches 06-27-26 07-09-26

Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr 2026 2027

Call 811 and Markout Utilities

Setup Construction Fencing and Barriers

Setup Temporary Access

Setup SWPPP

Clear and Grub

Demo Existing Pavement

Excavate and Remove Storm Drain Pipes and Basin

Setup Dewatering

Rough Grade

Install New Storm Drainage Lines and Basins

Backfill Storm Drain Trenches and Fine Grade

Complete Fine Grade

Place AC Pavement

Paint Striping

Install Signage

Remove Construction Fencing and Barriers

Setup Construction Fencing and Barriers

Setup Temporary Access

Setup SWPPP

Demo Existing Pavement

Excavate and Remove New Sewer Line (Add Alt)

Setup Dewatering

Rough Grade

Install New Sewer Line (Add Alt)

Complete Fine Grade

Place AC Pavement

Paint Striping

Install Signage

Remove Construction Fencing and Barriers

Call 811 and Markout Utilities

Setup Construction Fencing and Barriers

Setup Temporary Access

Setup SWPPP

Cap Off Utilities and Irrigation Lines

Demo Existing Pavement and Sidewalk

Rough Grade

Excavate and Remove Storm Drain Pipes and Basin

Install New Storm Drainage Lines and Basins

Backfill Storm Drain Trenches and to Grade

Trench for Shallow Underground Electrical

Excavate Retaining Wall Footings and Flood Gate

Install Underground Electrical Conduit

Install Retaining Wall Footings and Flood Gate

Backfill Electrical Trench to Grade

Pull Electrical Wire

Install Irrigations Mains

Backfill Retaining Wall Footings and Form Retaining Walls

Install Irrigation Branches

Data Date: 11-11-25 Print Date: 01-19-26 08:31

SOLANOC-ASSET-LF-1-1-2 | # 123

Complete

Milestone

Critical Milestones

Summary Milestones

Actual Work

Remaining Work

Critical Remaining Work

Remaining Level of Effort

Actual Level of Effort

P3-CON-280 Complete Fine Grade 07-01-26 07-07-26

P3-CON-300 Form and Pour Curbs 07-08-26 07-18-26

P3-CON-310 Form and Pour Sidewalks 07-20-26 07-30-26

P3-CON-320 Set Fence Pole Bases and Poles 07-20-26 07-30-26

P3-CON-330 Excavate for Light Pole Bases 07-20-26 07-24-26

P3-CON-340 Set Cages and Finish Conduit 07-25-26 07-30-26

P3-CON-350 Install Fencing 07-31-26 08-08-26

P3-CON-360 Form and Pour Light Pole Bases 07-31-26 08-10-26

P3-CON-370 Set Light Poles 08-11-26 08-15-26

P3-CON-380 Place AC Pavement 08-17-26 08-22-26

P3-CON-390 Pull Wire for Security 08-24-26 08-27-26

P3-CON-400 Install Landscaping 08-28-26 09-04-26

P3-CON-410 Install Vehicle Gates and Card Readers 08-28-26 09-04-26

P3-CON-420 Paint Parking Striping 09-05-26 09-17-26

P3-CON-430 Set Wheel Stops 09-18-26 09-29-26

P3-CON-440 Remove Construction Fencing and Barriers 09-30-26 10-02-26

Phase 4Phase 4 03-28-26 07-08-26

P4-CON-100 Call 811 and Markout Utilities 03-28-26 04-01-26

P4-CON-110 Setup Construction Fencing and Barriers 04-02-26 04-02-26

P4-CON-120 Setup Temporary Access 04-02-26 04-02-26

P4-CON-130 Setup SWPPP 04-03-26 04-03-26

P4-CON-140 Clear and Grub 04-04-26 04-06-26

P4-CON-150 Cap Off Utilities and Irrigation Lines 04-07-26 04-08-26

P4-CON-160 Demo Existing Pavement and Sidewalk 04-09-26 04-11-26

P4-CON-170 Excavate and Remove Storm Drain Pipes and Basin 04-13-26 04-15-26

P4-CON-180 Rough Grade 04-16-26 04-17-26

P4-CON-190 Install New Storm Drainage Lines and Basins 04-18-26 04-21-26

P4-CON-200 Trench for Electrical for Gate 04-18-26 04-18-26

P4-CON-210 Install Electrical Conduit for Electrical for Gate 04-20-26 04-22-26

P4-CON-220 Backfill Storm Drain Trenches and Fine Grade 04-22-26 05-02-26

P4-CON-230 Install Footing for Retaining Wall and Fencing 04-23-26 04-30-26

P4-CON-240 Trench for Electrical 05-04-26 05-05-26

P4-CON-250 Install Underground Electrical Conduit 05-06-26 05-07-26

P4-CON-260 Install Irrigations Mains 05-06-26 05-08-26

P4-CON-270 Backfill Electrical Trench 05-08-26 05-12-26

P4-CON-280 Complete Fine Grade 05-13-26 05-14-26

P4-CON-290 Form and Pour Perimeter Fencing Posts 05-13-26 05-18-26

P4-CON-300 Form and Pour Curbs 05-19-26 05-30-26

P4-CON-310 Set Lightpoles Bases, Light Poles and Bollards 06-01-26 06-03-26

P4-CON-320 Form and Pour Sidewalks 06-04-26 06-15-26

P4-CON-330 Place AC Pavement 06-16-26 06-17-26

P4-CON-340 Pull Electrical Wire and Security Wire 06-16-26 06-17-26

P4-CON-350 Paint Parking Striping 06-18-26 06-22-26

P4-CON-360 Install Landscaping 06-18-26 06-22-26

P4-CON-370 Pull Wire for Lights and Security 06-18-26 06-19-26

P4-CON-380 Install Security Fencing and Gates 06-23-26 07-03-26

P4-CON-390 Install Irrigation Branches 06-23-26 06-24-26

P4-CON-400 Set Wheel Stops 06-25-26 06-29-26

P4-CON-410 Install Card Readers 07-06-26 07-07-26

P4-CON-420 Remove Construction Fencing and Barriers 07-08-26 07-08-26

Phase 5Phase 5 03-28-26 06-19-26

Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr 2026 2027

Complete Fine Grade

Form and Pour Curbs

Form and Pour Sidewalks

Set Fence Pole Bases and Poles

Excavate for Light Pole Bases

Set Cages and Finish Conduit

Install Fencing

Form and Pour Light Pole Bases

Set Light Poles

Place AC Pavement

Pull Wire for Security

Install Landscaping

Install Vehicle Gates and Card Readers

Paint Parking Striping

Set Wheel Stops

Remove Construction Fencing and Barriers

Call 811 and Markout Utilities

Setup Construction Fencing and Barriers

Setup Temporary Access

Setup SWPPP

Clear and Grub

Cap Off Utilities and Irrigation Lines

Demo Existing Pavement and Sidewalk

Excavate and Remove Storm Drain Pipes and Basin

Rough Grade

Install New Storm Drainage Lines and Basins

Trench for Electrical for Gate

Install Electrical Conduit for Electrical for Gate

Backfill Storm Drain Trenches and Fine Grade

Install Footing for Retaining Wall and Fencing

Trench for Electrical

Install Underground Electrical Conduit

Install Irrigations Mains

Backfill Electrical Trench

Complete Fine Grade

Form and Pour Perimeter Fencing Posts

Form and Pour Curbs

Set Lightpoles Bases, Light Poles and Bollards

Form and Pour Sidewalks

Place AC Pavement

Pull Electrical Wire and Security Wire

Paint Parking Striping

Install Landscaping

Pull Wire for Lights and Security

Install Security Fencing and Gates

Install Irrigation Branches

Set Wheel Stops

Install Card Readers

Remove Construction Fencing and Barriers

Data Date: 11-11-25 Print Date: 01-19-26 08:31

SOLANOC-ASSET-LF-1-1-2 | # 123

Complete

Milestone

Critical Milestones

Summary Milestones

Actual Work

Remaining Work

Critical Remaining Work

Remaining Level of Effort

Actual Level of Effort

P5-CON-100 Call 811 and Markout Utilities 03-28-26 04-01-26

P5-CON-110 Setup Construction Fencing and Barriers 04-02-26 04-02-26

P5-CON-120 Setup Temporary Access 04-02-26 04-02-26

P5-CON-130 Setup SWPPP 04-03-26 04-03-26

P5-CON-140 Clear and Grub 04-04-26 04-06-26

P5-CON-150 Cap Off Utilities and Irrigation Lines 04-07-26 04-08-26

P5-CON-160 Demo Existing Pavement and Sidewalk 04-09-26 04-11-26

P5-CON-170 Excavate and Remove Storm Drain Pipes and Basin 04-13-26 04-17-26

P5-CON-180 Rough Grade 04-18-26 04-21-26

P5-CON-190 Install New Storm Drainage Lines and Basins 04-22-26 04-27-26

P5-CON-200 Backfill Storm Drain Trenches and Fine Grade 04-28-26 05-08-26

P5-CON-210 Trench for Electrical 05-09-26 05-14-26

P5-CON-220 Install Underground Electrical Conduit 05-15-26 05-18-26

P5-CON-230 Install Irrigations Mains 05-15-26 05-18-26

P5-CON-240 Backfill Electrical Trench 05-19-26 05-21-26

P5-CON-250 Complete Fine Grade 05-22-26 05-23-26

P5-CON-260 Form and Pour Curbs 05-26-26 06-02-26

P5-CON-270 Form and Pour Sidewalks 06-03-26 06-09-26

P5-CON-280 Place AC Pavement 06-10-26 06-11-26

P5-CON-290 Paint Parking Striping 06-12-26 06-13-26

P5-CON-300 Install Landscaping 06-12-26 06-12-26

P5-CON-310 Pull Wire and Makeup for Lights and Security 06-12-26 06-16-26

P5-CON-320 Install Irrigation Branches 06-15-26 06-15-26

P5-CON-330 Set Wheel Stops 06-16-26 06-17-26

P5-CON-340 Remove Construction Fencing and Barriers 06-18-26 06-19-26

Phase 6Phase 6 03-28-26 10-01-26

Phase 6A North Oval and PlatformPhase 6A North Oval and Platform 03-28-26 06-29-26

P6A-CON-100 Call 811 and Markout Utilities 03-28-26 04-01-26

P6A-CON-110 Setup Construction Fencing and Barriers 04-02-26 04-07-26

P6A-CON-120 Setup Temporary Access 04-02-26 04-07-26

P6A-CON-130 Setup SWPPP 04-08-26 04-08-26

P6A-CON-140 Clear and Grub 04-09-26 04-10-26

P6A-CON-150 Cap Off Utilities and Irrigation Lines 04-11-26 04-13-26

P6A-CON-160 Demo Existing Pavement and Sidewalk 04-14-26 04-16-26

P6A-CON-170 Rough Grade 04-17-26 04-22-26

P6A-CON-180 Trench for Electrical 04-23-26 04-24-26

P6A-CON-190 Install Underground Electrical Conduit 04-25-26 04-27-26

P6A-CON-200 Set Pull and Junction Boxes 04-28-26 04-30-26

P6A-CON-210 Backfill Electrical Trench 05-01-26 05-05-26

P6A-CON-220 Set Lightpoles Bases, Light Poles and Bollards 05-06-26 05-07-26

P6A-CON-230 Trench and Install Storm Drain Line 05-06-26 05-08-26

P6A-CON-240 Install Irrigations Mains 05-08-26 05-09-26

P6A-CON-250 Backfill Storm Drain Line 05-09-26 05-11-26

P6A-CON-260 Form and Pour Curbs 05-11-26 05-21-26

P6A-CON-270 Form and Pour Foundations for Stairs and Walls 05-12-26 05-22-26

P6A-CON-280 Form and Pour Slab 05-22-26 06-03-26

P6A-CON-290 Backfill Foundations 05-23-26 05-28-26

P6A-CON-300 Form and Pour Stairs 05-29-26 06-05-26

P6A-CON-310 Fine Grade Site 06-04-26 06-05-26

P6A-CON-320 Form and Pour Sidewalks 06-06-26 06-12-26

P6A-CON-330 Pull Wire and Makeup for Lights and Security 06-13-26 06-16-26

Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr 2026 2027

Call 811 and Markout Utilities

Setup Construction Fencing and Barriers

Setup Temporary Access

Setup SWPPP

Clear and Grub

Cap Off Utilities and Irrigation Lines

Demo Existing Pavement and Sidewalk

Excavate and Remove Storm Drain Pipes and Basin

Rough Grade

Install New Storm Drainage Lines and Basins

Backfill Storm Drain Trenches and Fine Grade

Trench for Electrical

Install Underground Electrical Conduit

Install Irrigations Mains

Backfill Electrical Trench

Complete Fine Grade

Form and Pour Curbs

Form and Pour Sidewalks

Place AC Pavement

Paint Parking Striping

Install Landscaping

Pull Wire and Makeup for Lights and Security

Install Irrigation Branches

Set Wheel Stops

Remove Construction Fencing and Barriers

Call 811 and Markout Utilities

Setup Construction Fencing and Barriers

Setup Temporary Access

Setup SWPPP

Clear and Grub

Cap Off Utilities and Irrigation Lines

Demo Existing Pavement and Sidewalk

Rough Grade

Trench for Electrical

Install Underground Electrical Conduit

Set Pull and Junction Boxes

Backfill Electrical Trench

Set Lightpoles Bases, Light Poles and Bollards

Trench and Install Storm Drain Line

Install Irrigations Mains

Backfill Storm Drain Line

Form and Pour Curbs

Form and Pour Foundations for Stairs and Walls

Form and Pour Slab

Backfill Foundations

Form and Pour Stairs

Fine Grade Site

Form and Pour Sidewalks

Pull Wire and Makeup for Lights and Security

Data Date: 11-11-25 Print Date: 01-19-26 08:31

SOLANOC-ASSET-LF-1-1-2 | # 123

Complete

Milestone

Critical Milestones

Summary Milestones

Actual Work

Remaining Work

Critical Remaining Work

Remaining Level of Effort

Actual Level of Effort

P6A-CON-340 Install Pre-Fab Seats 06-13-26 06-16-26

P6A-CON-350 Install Landscaping 06-17-26 06-22-26

P6A-CON-360 Install Irrigation Branches 06-23-26 06-25-26

P6A-CON-370 Remove Construction Fencing and Barriers 06-26-26 06-29-26

Phase 6B South OvalPhase 6B South Oval 06-30-26 10-01-26

P6B-CON-100 Setup Construction Fencing and Barriers 06-30-26 07-02-26

P6B-CON-110 Setup Temporary Access 07-03-26 07-09-26

P6B-CON-120 Setup SWPPP 07-10-26 07-10-26

P6B-CON-130 Clear and Grub 07-11-26 07-13-26

P6B-CON-140 Cap Off Utilities and Irrigation Lines 07-14-26 07-15-26

P6B-CON-150 Demo Existing Pavement and Sidewalk 07-16-26 07-18-26

P6B-CON-160 Rough Grade 07-20-26 07-30-26

P6B-CON-170 Trench for Electrical 07-31-26 08-03-26

P6B-CON-180 Install Underground Electrical Conduit 08-04-26 08-06-26

P6B-CON-190 Set Pull and Junction Boxes 08-07-26 08-08-26

P6B-CON-200 Backfill Electrical Trench 08-10-26 08-13-26

P6B-CON-210 Set Lightpoles Bases, Light Poles and Bollards 08-14-26 08-19-26

P6B-CON-220 Install Irrigations Mains 08-20-26 08-24-26

P6B-CON-230 Fine Grade Site 08-20-26 08-21-26

P6B-CON-240 Form and Pour Curbs 08-25-26 08-29-26

P6B-CON-250 Form and Pour Sidewalks 08-31-26 09-11-26

P6B-CON-260 Pull Electrical Wire and Security Wire 09-12-26 09-16-26

P6B-CON-270 Install Landscaping 09-17-26 09-24-26

P6B-CON-280 Install Irrigation Branches 09-25-26 09-28-26

P6B-CON-290 Remove Construction Fencing and Barriers 09-29-26 10-01-26

Phase 6C Law and Justice CenterPhase 6C Law and Justice Center 04-02-26 05-28-26

P6C-CON-100 Setup Construction Fencing and Barriers 04-02-26 04-02-26

P6C-CON-110 Setup Temporary Access 04-03-26 04-03-26

P6C-CON-120 Setup SWPPP 04-04-26 04-04-26

P6C-CON-130 Clear and Grub 04-06-26 04-07-26

P6C-CON-140 Cap Off Utilities and Irrigation Lines 04-08-26 04-09-26

P6C-CON-150 Demo Existing Pavement and Sidewalk 04-10-26 04-13-26

P6C-CON-160 Rough Grade 04-14-26 04-15-26

P6C-CON-170 Fine Grade Site 04-16-26 04-17-26

P6C-CON-180 Form and Pour Curbs and Wall 04-18-26 05-05-26

P6C-CON-190 Form and Pour Sidewalks 05-06-26 05-16-26

P6C-CON-200 Install Expansion Joints 05-18-26 05-20-26

P6C-CON-210 Install Landscaping 05-21-26 05-22-26

P6C-CON-220 Install Signage 05-23-26 05-23-26

P6C-CON-230 Remove Construction Fencing and Barriers 05-26-26 05-28-26

Phase 7Phase 7 08-24-26 11-09-26

P7-CON-100 Call 811 and Markout Utilities 08-24-26 08-24-26

P7-CON-110 Setup Construction Fencing and Barriers 08-25-26 08-25-26

P7-CON-120 Setup Temporary Access 08-25-26 08-25-26

P7-CON-130 Setup SWPPP 08-26-26 08-26-26

P7-CON-140 Clear and Grub 08-27-26 08-28-26

P7-CON-150 Cap Off Utilities and Irrigation Lines 08-29-26 08-31-26

P7-CON-160 Demo Existing Pavement and Sidewalk 09-01-26 09-03-26

P7-CON-170 Excavate and Remove Storm Drain Pipes and Basin 09-04-26 09-10-26

P7-CON-180 Rough Grade 09-11-26 09-12-26

P7-CON-190 Install New Storm Drainage Lines and Basins 09-14-26 09-24-26

Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr 2026 2027

Install Pre-Fab Seats

Install Landscaping

Install Irrigation Branches

Remove Construction Fencing and Barriers

Setup Construction Fencing and Barriers

Setup Temporary Access

Setup SWPPP

Clear and Grub

Cap Off Utilities and Irrigation Lines

Demo Existing Pavement and Sidewalk

Rough Grade

Trench for Electrical

Install Underground Electrical Conduit

Set Pull and Junction Boxes

Backfill Electrical Trench

Set Lightpoles Bases, Light Poles and Bollards

Install Irrigations Mains

Fine Grade Site

Form and Pour Curbs

Form and Pour Sidewalks

Pull Electrical Wire and Security Wire

Install Landscaping

Install Irrigation Branches

Remove Construction Fencing and Barriers

Setup Construction Fencing and Barriers

Setup Temporary Access

Setup SWPPP

Clear and Grub

Cap Off Utilities and Irrigation Lines

Demo Existing Pavement and Sidewalk

Rough Grade

Fine Grade Site

Form and Pour Curbs and Wall

Form and Pour Sidewalks

Install Expansion Joints

Install Landscaping

Install Signage

Remove Construction Fencing and Barriers

Call 811 and Markout Utilities

Setup Construction Fencing and Barriers

Setup Temporary Access

Setup SWPPP

Clear and Grub

Cap Off Utilities and Irrigation Lines

Demo Existing Pavement and Sidewalk

Excavate and Remove Storm Drain Pipes and Basin

Rough Grade

Install New Storm Drainage Lines and Basins

Data Date: 11-11-25 Print Date: 01-19-26 08:31

SOLANOC-ASSET-LF-1-1-2 | # 123

Complete

Milestone

Critical Milestones

Summary Milestones

Actual Work

Remaining Work

Critical Remaining Work

Remaining Level of Effort

Actual Level of Effort

P7-CON-200 Install Footing for Barrier Wall 09-14-26 09-24-26

P7-CON-210 Backfill Storm Drain Trenches and Fine Grade 09-25-26 09-30-26

P7-CON-230 Trench for Electrical 09-25-26 09-26-26

P7-CON-220 Form and Pour Barrier Wall 1A and 1B 09-25-26 10-01-26

P7-CON-240 Install Underground Electrical Conduit 10-01-26 10-02-26

P7-CON-250 Backfill Electrical Trench 10-03-26 10-05-26

P7-CON-280 Install Irrigations Mains 10-03-26 10-05-26

P7-CON-260 Complete Fine Grade 10-06-26 10-07-26

P7-CON-270 Form and Pour Footings for Fencing 10-06-26 10-08-26

P7-CON-290 Backfill Around Footings 10-09-26 10-09-26

P7-CON-300 Form and Pour Curbs 10-10-26 10-16-26

P7-CON-310 Set Lightpoles Bases, Light Poles and Bollards 10-17-26 10-21-26

P7-CON-320 Form and Pour Sidewalks 10-17-26 10-23-26

P7-CON-330 Pull Electrical Wire and Security Wire 10-22-26 10-24-26

P7-CON-340 Place AC Pavement 10-24-26 10-29-26

P7-CON-350 Paint Parking Striping 10-30-26 10-30-26

P7-CON-360 Install Landscaping 10-30-26 11-02-26

P7-CON-370 Pull Wire for Lights and Security 10-30-26 10-31-26

P7-CON-380 Install Irrigation Branches 11-03-26 11-04-26

P7-CON-390 Set Wheel Stops 11-05-26 11-05-26

P7-CON-400 Remove Construction Fencing and Barriers 11-06-26 11-09-26

Phase 8Phase 8 08-24-26 11-13-26

P8-CON-100 Call 811 and Markout Utilities 08-24-26 08-24-26

P8-CON-110 Setup Construction Fencing and Barriers 08-25-26 08-25-26

P8-CON-120 Setup Temporary Access 08-25-26 08-25-26

P8-CON-130 Setup SWPPP 08-26-26 08-26-26

P8-CON-140 Clear and Grub 08-27-26 08-28-26

P8-CON-150 Demo Existing Pavement and Sidewalk 08-29-26 09-03-26

P8-CON-160 Excavate and Remove Storm Drain Pipes and Basin 09-04-26 09-10-26

P8-CON-170 Setup Dewatering 09-04-26 09-04-26

P8-CON-180 Rough Grade 09-11-26 09-15-26

P8-CON-190 Install New Storm Drainage Lines and Basins 09-16-26 09-21-26

P8-CON-200 Backfill Storm Drain Trenches and Fine Grade 09-22-26 09-26-26

P8-CON-210 Complete Fine Grade 09-28-26 09-30-26

P8-CON-220 Install Footing for Barrier Wall 09-28-26 10-08-26

P8-CON-230 Form and Pour Barrier Wall 1A and 1B 10-09-26 10-15-26

P8-CON-240 Form and Pour Curbs 10-16-26 10-24-26

P8-CON-250 Form and Pour Sidewalks 10-26-26 10-30-26

P8-CON-260 Place AC Pavement 10-31-26 11-05-26

P8-CON-270 Paint Striping 11-06-26 11-12-26

P8-CON-280 Install Signage 11-06-26 11-09-26

P8-CON-290 Remove Construction Fencing and Barriers 11-13-26 11-13-26

Phase 9Phase 9 03-28-26 11-25-26

Phase 9APhase 9A 03-28-26 09-15-26

P9A-CON-100 Call 811 and Markout Utilities 03-28-26 04-01-26

P9A-CON-110 Safe Off 04-02-26 04-02-26

P9A-CON-120 Cap Off Utilities and Irrigation Lines 04-02-26 04-03-26

P9A-CON-130 Install Construction Site Fencing 04-03-26 04-03-26

P9A-CON-140 Setup Temporary Access 04-03-26 04-03-26

P9A-CON-150 Setup SWPPP 04-04-26 04-04-26

P9A-CON-160 Clear and Grub 04-06-26 04-06-26

Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr 2026 2027

Install Footing for Barrier Wall

Backfill Storm Drain Trenches and Fine Grade

Trench for Electrical

Form and Pour Barrier Wall 1A and 1B

Install Underground Electrical Conduit

Backfill Electrical Trench

Install Irrigations Mains

Complete Fine Grade

Form and Pour Footings for Fencing

Backfill Around Footings

Form and Pour Curbs

Set Lightpoles Bases, Light Poles and Bollards

Form and Pour Sidewalks

Pull Electrical Wire and Security Wire

Place AC Pavement

Paint Parking Striping

Install Landscaping

Pull Wire for Lights and Security

Install Irrigation Branches

Set Wheel Stops

Remove Construction Fencing and Barriers

Call 811 and Markout Utilities

Setup Construction Fencing and Barriers

Setup Temporary Access

Setup SWPPP

Clear and Grub

Demo Existing Pavement and Sidewalk

Excavate and Remove Storm Drain Pipes and Basin

Setup Dewatering

Rough Grade

Install New Storm Drainage Lines and Basins

Backfill Storm Drain Trenches and Fine Grade

Complete Fine Grade

Install Footing for Barrier Wall

Form and Pour Barrier Wall 1A and 1B

Form and Pour Curbs

Form and Pour Sidewalks

Place AC Pavement

Paint Striping

Install Signage

Remove Construction Fencing and Barriers

Call 811 and Markout Utilities

Safe Off

Cap Off Utilities and Irrigation Lines

Install Construction Site Fencing

Setup Temporary Access

Setup SWPPP

Clear and Grub

Data Date: 11-11-25 Print Date: 01-19-26 08:31

SOLANOC-ASSET-LF-1-1-2 | # 123

Complete

Milestone

Critical Milestones

Summary Milestones

Actual Work

Remaining Work

Critical Remaining Work

Remaining Level of Effort

Actual Level of Effort

P9A-CON-170 Demo Site 04-07-26 04-11-26

P9A-CON-180 Rough Grade Area 9A 04-13-26 04-21-26

P9A-CON-190 Excavate Underground Storm Drain 04-22-26 04-30-26

P9A-CON-200 Install Storm Drain Lines 05-01-26 05-01-26

P9A-CON-210 Install Underground Electrical 05-02-26 05-02-26

P9A-CON-220 Install New Pump Vault 05-05-26 05-05-26

P9A-CON-230 Install New Pump 07-24-26 07-25-26

P9A-CON-240 Connect Storm Drain Lines to New Pump 07-25-26 07-27-26

P9A-CON-250 Connect Electrical Lines to New Pump 07-27-26 07-28-26

P9A-CON-260 Connect Storm Drain Lines to New Pump 07-28-26 07-29-26

P9A-CON-270 Excavate Footing for Wall 07-29-26 08-01-26

P9A-CON-280 Fine Grade and Build Berm 07-29-26 08-07-26

P9A-CON-290 Install Footing for Wall 08-01-26 08-03-26

P9A-CON-300 Form and Pour Wall 08-03-26 08-14-26

P9A-CON-310 Install Security Fencing 08-14-26 08-15-26

P9A-CON-320 Pull Wire for Lights and Security 08-15-26 08-17-26

P9A-CON-330 Form and Pour Curbs 08-17-26 08-28-26

P9A-CON-340 Form and Pour Sidewalks 08-28-26 09-10-26

P9A-CON-350 Paint Parking Striping 09-10-26 09-11-26

P9A-CON-360 Install Landscaping 09-11-26 09-12-26

P9A-CON-370 Set Wheel Stops 09-12-26 09-14-26

P9A-CON-380 Remove Construction Fencing and Barriers 09-14-26 09-15-26

Phase 9BPhase 9B 03-28-26 11-25-26

P9B1-CON-100 Call 811 and Markout Utilities 03-28-26 04-01-26

P9B1-CON-110 Safe Off 04-02-26 04-02-26

P9B1-CON-120 Install Construction Site Fencing 04-03-26 04-03-26

P9B1-CON-130 Cap Off Utilities and Irrigation Lines 04-03-26 04-04-26

P9B1-CON-140 Setup Temporary Access 04-03-26 04-03-26

P9B1-CON-150 Setup SWPPP 04-04-26 04-04-26

P9B1-CON-160 Clear and Grub 04-06-26 04-06-26

P9B1-CON-170 Demo Site 04-07-26 04-11-26

P9B1-CON-180 Install Sanitary By-Pass 04-13-26 04-17-26

Area 9B1Area 9B1 04-18-26 09-08-26

P9B1-CON-190 Excavate and Install Shoring 04-18-26 04-29-26

P9B1-CON-200 Install Foundations 04-30-26 05-05-26

P9B1-CON-210 Install Pre-Cast Rings 05-06-26 05-11-26

P9B1-CON-220 Install SD Piping 05-12-26 05-13-26

P9B1-CON-230 Install Pumps 07-24-26 07-29-26

P9B1-CON-240 Install Electrical 07-29-26 08-04-26

P9B1-CON-250 Install Waterproofing 08-04-26 08-08-26

P9B1-CON-260 Backfill and Strip Forms 08-08-26 08-12-26

P9B1-CON-270 Connect Pumps 08-12-26 08-21-26

P9B1-CON-280 Excavate Footing for Wall 08-21-26 08-24-26

P9B1-CON-290 Install Footing for Wall 08-24-26 08-28-26

P9B1-CON-300 Form and Pour Wall 08-28-26 09-08-26

Area 9B2Area 9B2 04-30-26 11-25-26

P9B2-CON-100 Excavate and Install Shoring - Pump Vaults 04-30-26 05-11-26

P9B2-CON-110 Pour Foundations - Pump Vaults 05-12-26 05-16-26

P9B2-CON-120 Install Pre-Cast Rings - Pump Vaults 05-18-26 05-22-26

P9B2-CON-130 Install SD Piping - Pump Vaults 05-23-26 05-26-26

P9B2-CON-140 Waterproof - Pump Vaults 05-27-26 05-28-26

Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr 2026 2027

Demo Site

Rough Grade Area 9A

Excavate Underground Storm Drain

Install Storm Drain Lines

Install Underground Electrical

Install New Pump Vault

Install New Pump

Connect Storm Drain Lines to New Pump

Connect Electrical Lines to New Pump

Connect Storm Drain Lines to New Pump

Excavate Footing for Wall

Fine Grade and Build Berm

Install Footing for Wall

Form and Pour Wall

Install Security Fencing

Pull Wire for Lights and Security

Form and Pour Curbs

Form and Pour Sidewalks

Paint Parking Striping

Install Landscaping

Set Wheel Stops

Remove Construction Fencing and Barriers

Call 811 and Markout Utilities

Safe Off

Install Construction Site Fencing

Cap Off Utilities and Irrigation Lines

Setup Temporary Access

Setup SWPPP

Clear and Grub

Demo Site

Install Sanitary By-Pass

Excavate and Install Shoring

Install Foundations

Install Pre-Cast Rings

Install SD Piping

Install Pumps

Install Electrical

Install Waterproofing

Backfill and Strip Forms

Connect Pumps

Excavate Footing for Wall

Install Footing for Wall

Form and Pour Wall

Excavate and Install Shoring - Pump Vaults

Pour Foundations - Pump Vaults

Install Pre-Cast Rings - Pump Vaults

Install SD Piping - Pump Vaults

Waterproof - Pump Vaults

Data Date: 11-11-25 Print Date: 01-19-26 08:31

SOLANOC-ASSET-LF-1-1-2 | # 123

Complete

Milestone

Critical Milestones

Summary Milestones

Actual Work

Remaining Work

Critical Remaining Work

Remaining Level of Effort

Actual Level of Effort

P9B2-CON-150 Backfill Precast Vaults and Strip Forms - Pump Vaults 05-29-26 06-01-26

P9B2-CON-160 Excavate and Install Shoring - 5 SIde Vault 06-02-26 06-06-26

P9B2-CON-170 Trench for Electrical After Backfill 06-02-26 06-04-26

P9B2-CON-180 Install Undergroud Electrical After Backfill 06-05-26 06-09-26

P9B2-CON-190 Form and Pour Foundation - 5 Side Vault 06-08-26 06-10-26

P9B2-CON-200 Install Undergroud Storm Drain After Backfill 06-10-26 06-20-26

P9B2-CON-210 Form and Pour Walls - 5 Side Vault 06-11-26 06-13-26

P9B2-CON-220 Setup Shoring for Lid - 5 Side Vault 06-15-26 06-15-26

P9B2-CON-230 Form and Pour Lid - 5 Side Vault 06-16-26 06-18-26

P9B2-CON-250 Form and Pour Equipment Pads 06-22-26 06-27-26

P9B2-CON-270 Set Electrical Equipment 06-29-26 06-30-26

P9B2-CON-280 Set Mechanical and Storm Drain Equipment 06-29-26 07-10-26

P9B2-CON-240 Install Pumps 07-24-26 07-30-26

P9B2-CON-260 Install Electrical 07-30-26 08-05-26

P9B2-CON-290 Install Waterproofing 08-05-26 08-07-26

P9B2-CON-300 Backfill- 5 Side Vault 08-07-26 08-11-26

P9B2-CON-310 Pull Wire and Terminate Electrical 08-10-26 08-21-26

P9B2-CON-320 Connect Pumps 08-12-26 08-21-26

P9B2-CON-330 Test and Energize Equipment 08-21-26 08-26-26

P9B2-CON-340 Excavate Footing for Wall (Continue from 9A-A) 09-08-26 09-12-26

P9B2-CON-350 Install Footing for Wall 09-12-26 09-21-26

P9B2-CON-360 Form and Pour Wall 09-21-26 09-30-26

P9B2-CON-370 Install Security Fencing 09-30-26 10-12-26

P9B2-CON-380 Install Devices and Pull Wire for Lights and Security 10-12-26 10-17-26

P9B2-CON-390 Form and Pour Curbs 10-17-26 10-27-26

P9B2-CON-400 Form and Pour Sidewalks 10-27-26 11-02-26

P9B2-CON-410 Pave Area 11-02-26 11-12-26

P9B2-CON-420 Paint Parking Striping 11-12-26 11-16-26

P9B2-CON-430 Install Landscaping 11-16-26 11-21-26

P9B2-CON-440 Remove Construction Fencing and Barriers 11-21-26 11-25-26

Phase 10Phase 10 09-03-26 11-25-26

P10-CON-100 Call 811 and Markout Utilities 09-03-26 09-05-26

P10-CON-110 Setup Construction Fencing and Barriers 09-05-26 09-08-26

P10-CON-120 Setup Temporary Access 09-05-26 09-08-26

P10-CON-130 Setup SWPPP 09-08-26 09-09-26

P10-CON-140 Clear and Grub 09-09-26 09-11-26

P10-CON-150 Cap Off Utilities and Irrigation Lines 09-11-26 09-12-26

P10-CON-160 Demo Existing Sidewalk 09-12-26 09-16-26

P10-CON-170 Excavate and Remove Storm Drain Pipes and Basin 09-16-26 09-22-26

P10-CON-180 Start Dewatering 09-16-26 09-18-26

P10-CON-190 Rough Grade 09-22-26 09-25-26

P10-CON-200 Install New Storm Drainage Lines and Basins 09-25-26 10-02-26

P10-CON-210 Trench for Electrical 09-25-26 09-28-26

P10-CON-220 Install Footing for Wall 09-25-26 10-05-26

P10-CON-230 Install Underground Electrical Conduit 09-28-26 10-02-26

P10-CON-240 Backfill Electrical Trench 10-02-26 10-05-26

P10-CON-250 Fine Grade and Build Berm 10-05-26 10-12-26

P10-CON-260 Form and Pour Wall 10-05-26 10-10-26

P10-CON-270 Form and Pour Curbs 10-10-26 10-28-26

P10-CON-280 Install Irrigatiion Mains 10-12-26 10-16-26

P10-CON-290 Form and Pour Sidewalk 10-16-26 10-26-26

Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr 2026 2027

Backfill Precast Vaults and Strip Forms - Pump Vaults

Excavate and Install Shoring - 5 SIde Vault

Trench for Electrical After Backfill

Install Undergroud Electrical After Backfill

Form and Pour Foundation - 5 Side Vault

Install Undergroud Storm Drain After Backfill

Form and Pour Walls - 5 Side Vault

Setup Shoring for Lid - 5 Side Vault

Form and Pour Lid - 5 Side Vault

Form and Pour Equipment Pads

Set Electrical Equipment

Set Mechanical and Storm Drain Equipment

Install Pumps

Install Electrical

Install Waterproofing

Backfill- 5 Side Vault

Pull Wire and Terminate Electrical

Connect Pumps

Test and Energize Equipment

Excavate Footing for Wall (Continue from 9A-A)

Install Footing for Wall

Form and Pour Wall

Install Security Fencing

Install Devices and Pull Wire for Lights and Security

Form and Pour Curbs

Form and Pour Sidewalks

Pave Area

Paint Parking Striping

Install Landscaping

Remove Construction Fencing and Barriers

Call 811 and Markout Utilities

Setup Construction Fencing and Barriers

Setup Temporary Access

Setup SWPPP

Clear and Grub

Cap Off Utilities and Irrigation Lines

Demo Existing Sidewalk

Excavate and Remove Storm Drain Pipes and Basin

Start Dewatering

Rough Grade

Install New Storm Drainage Lines and Basins

Trench for Electrical

Install Footing for Wall

Install Underground Electrical Conduit

Backfill Electrical Trench

Fine Grade and Build Berm

Form and Pour Wall

Form and Pour Curbs

Install Irrigatiion Mains

Form and Pour Sidewalk

Data Date: 11-11-25 Print Date: 01-19-26 08:31

SOLANOC-ASSET-LF-1-1-2 | # 123

Complete

Milestone

Critical Milestones

Summary Milestones

Actual Work

Remaining Work

Critical Remaining Work

Remaining Level of Effort

Actual Level of Effort

P10-CON-310 Install Landscaping 10-26-26 11-04-26

P10-CON-300 Set Lightpoles Bases, Light Poles and Bollards 10-28-26 11-06-26

P10-CON-330 Install Irrigation Branches 11-04-26 11-09-26

P10-CON-340 Install Security Fencing and Gates 11-04-26 11-14-26

P10-CON-320 Place AC Pavement 11-06-26 11-17-26

P10-CON-350 Paint Parking Striping 11-17-26 11-19-26

P10-CON-360 Pull Wire and Makeup for Lights and Security 11-17-26 11-24-26

P10-CON-370 Remove Construction Fencing and Barriers 11-24-26 11-25-26

FEMA CloseoutFEMA Closeout 11-25-26 01-12-27

CLOS-CON-100 Final Billings 11-25-26 12-11-26

CLOS-CON-120 Closeout Documentation 11-25-26 01-12-27

CLOS-CON-110 Reimbursement Request 12-11-26 01-05-27

Nov Dec Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Jan Feb Mar Apr 2026 2027

Install Landscaping

Set Lightpoles Bases, Light Poles and Bollards

Install Irrigation Branches

Install Security Fencing and Gates

Place AC Pavement

Paint Parking Striping

Pull Wire and Makeup for Lights and Security

Remove Construction Fencing and Barriers

Final Billings

Closeout Documentation

Reimbursement Request

Data Date: 11-11-25 Print Date: 01-19-26 08:31

SOLANOC-ASSET-LF-1-1-2 | # 123

Complete

Milestone

Critical Milestones

Summary Milestones

Actual Work

Remaining Work

Critical Remaining Work

Remaining Level of Effort

Actual Level of Effort

AREA LITE

AREA LITE

NO

PARKING

RESERVED

RESERVED

NO

PARKING

RESERVED

NO

PARKING

NO

PARKING

NO

PARKING

NO

PA

RK

IN

G

NO

PARKING

NO

PARKING

NO

PARKING

NO

PARKING

B

BB

B

B

B

B

B

B

B

B

B

B

B

B

B

BB

B

B

B

B

B

B

B

B

B

B

BB

B

B

NO

PA

RK

IN

G

NO

PARKING

NO

PARKING

CR

IC

C R

IC IC

IC

IC

C R

C R

C R

CR

IC

IC

CR

C R

C R

C R

CR

IC

IC

IC

IC

CR

C R

CR

C R

C R

CR

C R

C R

CONSTRUCTION

PHASING

X:

\1

\1

4.

\T

EC

H \C

AD

\P

AR

KI

N G

L O

T

IM

PR

O

VE

M

EN

TS

\G -0

C

O N

ST

R

U C

TI

O

N P

H

AS

IN

G

.D W

G

/2

1/

:4 9:

P

M