20260219_Asset_Protection_Pre-Bid_Conference_Slides.pdf

PDF 12 MB Posted

Attached to
Asset Protection - Electrical
Solicitation number
914-0213-26
Issued by
Tehama County, California

About this file

This pre-bid conference slide presentation was prepared by the County of Tehama, California for the Asset Protection Project, a multi-prime procurement to protect County-owned properties from seasonal stormwater flooding. The project encompasses electrical work across multiple sites including 500, 530, 550, and 600 Union Avenue; 500, 510, 512, 520, and 530 Clay Street; 501 and 509 Delaware Street; and 501 Texas Street, along with adjacent driveways and parking areas. The electrical scope includes power systems for submersible and axial flow pumps, motor control centers, panelboards, conduit and wiring systems, lighting installations, card reader systems for access gates, and building management system connections. A mandatory pre-bid conference was scheduled for February 19, 2026, at 10:00 a.m., with sealed bids due March 9, 2026, by 2:00 p.m. via OpenGov. The project also encompasses broader protection measures including barrier walls, berms, landscaping, flood gates, and underground utility reconfiguration. Construction is scheduled to commence March 2, 2026, with substantial completion required within 231 calendar days from the Notice to Proceed and final completion within 30 additional calendar days.

Contractors must possess a current California contractor's license and be registered with the California Department of Industrial Relations. Bid security of 10 percent of the base bid amount is required, with performance and payment bonds each at 100 percent of the contract amount and a one-year warranty bond at 10 percent due within five calendar days of award. Liquidated damages of $2,000 per calendar day apply for delays beyond the completion deadline. The project is federally funded through OES/FEMA Hazard Mitigation Assistance grants and requires compliance with federal procurement standards outlined in Title 2 CFR 200.318-200.326, Davis-Bacon Act prevailing wage requirements, and OSHA regulations. Personnel must obtain mandatory background checks and security badging due to critical access coordination with operational County facilities including the Justice Center, detention facility, emergency services, and cogeneration plant. No specific budget or award value is disclosed in the solicitation documents; contractors must reference the Project Manual and Issued for Construction drawing sets for complete scope details.

View the file

Other files

File Type Posted
20260219_Asset_Protection_Pre-Bid_Conference_Sign-In_Sheet.pdf PDF
20260223_Offsite_Sanitary_Sewer_Improvements_Drawings_100%_Submittal.pdf PDF
20260219_Asset_Protection_Pre-Bid_Conference_Slides.pdf PDF
20260223_Revised_Section_31_00_00_Embankment_Construction.pdf PDF
20260223_Revised_Volume_1_Asset_Protection_IFC_Drawing_Set_-_Select_Drawings.pdf PDF
20260223_Sanitary_Sewer_Bypass_Specification.pdf PDF
20260303_Revised_Section_09_90_00_Painting_and_Coating.pdf PDF
20260223_Revised_Section_31_00_00_Embankment_Construction.pdf PDF
20260223_Revised_Section_31_23_16_Structure_Excavation_and_Backfill.pdf PDF
20260219_Asset_Protection_Pre-Bid_Conference_Sign-In_Sheet.pdf PDF
20260223_Revised_Section_31_23_16_Structure_Excavation_and_Backfill.pdf PDF
20260223_Temporary_Sewer_Bypass_Drawing_Sheet_SS1.pdf PDF
20260223_Offsite_Sanitary_Sewer_Improvements_Civil_Specifications_100%_Set.pdf PDF
20260223_Sanitary_Sewer_Bypass_Specification.pdf PDF
20260223_Revised_Volume_1_Asset_Protection_IFC_Drawing_Set_-_Select_Drawings.pdf PDF
20260223_Temporary_Sewer_Bypass_Drawing_Sheet_SS1.pdf PDF
20260303_Revised_Section_09_90_00_Painting_and_Coating.pdf PDF
20260210_Asset_Protection_Electrical_-_Project_Manual.pdf PDF
20260210_Asset_Protection_Electrical_-_Project_Manual.pdf PDF
20260210_Asset_Protection_Electrical_-_Project_Manual.pdf PDF
PO_TERMS_CONDITIONS.pdf PDF
PO_TERMS_CONDITIONS.pdf PDF
PO_TERMS_CONDITIONS.pdf PDF
PO_TERMS_CONDITIONS.pdf PDF
Exhibit_C_-_General_Terms_6_12_18.pdf PDF
Exhibit_C_-_General_Terms_6_12_18.pdf PDF
Exhibit_C_-_General_Terms_6_12_18.pdf PDF
20251208_Volume_1_Asset_Protection_IFC_Drawing_Set_Building_Div_Approved.pdf PDF
20251208_Volume_1_Asset_Protection_IFC_Drawing_Set_Building_Div_Approved.pdf PDF
20251208_Volume_1_Asset_Protection_IFC_Drawing_Set_Building_Div_Approved.pdf PDF
20251208_Volume_1_Asset_Protection_IFC_Drawing_Set_Building_Div_Approved.pdf PDF
20251211_Volume_2_Parking_and_Security_Improvements_IFC_Rev_1_Drawing_Set_Building_Div_Approved.pdf PDF
20251211_Volume_2_Parking_and_Security_Improvements_IFC_Rev_1_Drawing_Set_Building_Div_Approved.pdf PDF
20251211_Volume_2_Parking_and_Security_Improvements_IFC_Rev_1_Drawing_Set_Building_Div_Approved.pdf PDF
20251211_Volume_2_Parking_and_Security_Improvements_IFC_Rev_1_Drawing_Set_Building_Div_Approved.pdf PDF
20210903_Geotech_Report_CE&G.pdf PDF
20210903_Geotech_Report_CE&G.pdf PDF
20210903_Geotech_Report_CE&G.pdf PDF
20210903_Geotech_Report_CE&G.pdf PDF
Hazard_Mitigation_Assistance_Contracting_Guidance_for_FEMA-Eligible_Projects,_Non-State_Subrecipients.pdf PDF
Hazard_Mitigation_Assistance_Contracting_Guidance_for_FEMA-Eligible_Projects,_Non-State_Subrecipients.pdf PDF
Hazard_Mitigation_Assistance_Contracting_Guidance_for_FEMA-Eligible_Projects,_Non-State_Subrecipients.pdf PDF
20260119_Asset_Protection_Project_Schedule.pdf PDF
20260119_Asset_Protection_Project_Schedule.pdf PDF
20260119_Asset_Protection_Project_Schedule.pdf PDF
20260119_Asset_Protection_Project_Schedule.pdf PDF
Access_Requirements.pdf PDF
Access_Requirements.pdf PDF
Access_Requirements.pdf PDF
Access_Requirements.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ASSET PROTECTION

PUMPS & VAULTS

JANUARY 6, 2026

KCONNER

Text Box

FEBRUARY 19, 2026

JGonzal4 Text Box *This is not a contract document. For reference only

KCONNER

Text Box

FEBRUARY 19, 2026

AGENDA

• Asset Protection Project Background

• Pump Station Scope

• Schedule

• Access Requirements

• Bidding Instructions

• Addendum 1

• Questions

JGonzal4 Text Box *This is not a contract document. For reference only

KCONNER

Text Box

KCONNER

Text Box

• Asset Protection Project Background

• Scope Review

• Schedule

• Access Requirements

• Bidding Instructions

• Questions

JGonzal4 Text Box *This is not a contract document. For reference only

Storm Walls

Berms

Raised Access Points

Passive Storm Gates

JGonzal4

PUMPS & VAULTS

JANUARY 6, 2026

JGonzal4 Text Box *This is not a contract document. For reference only

KCONNER

Text Box

SCOPES INCLUDES

1. Fencing and Gates

2. Painting and Coating

3. Electrical

4. Miscellaneous Metals

5. Earthwork and Paving

6. Landscaping

7. Concrete

8. Site Utilities

KCONNER

Image

QUESTIONS?